CN109598442A - A kind of methods of marking and device of supervision behavior - Google Patents

A kind of methods of marking and device of supervision behavior Download PDF

Info

Publication number
CN109598442A
CN109598442A CN201811472899.1A CN201811472899A CN109598442A CN 109598442 A CN109598442 A CN 109598442A CN 201811472899 A CN201811472899 A CN 201811472899A CN 109598442 A CN109598442 A CN 109598442A
Authority
CN
China
Prior art keywords
supervision
behavior
project
diary
result
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811472899.1A
Other languages
Chinese (zh)
Inventor
韩涛
易伟强
张湘
黄远征
张毅
陈淳
吴杏磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing North International Engineering Project Management Co Ltd
Original Assignee
Beijing North International Engineering Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing North International Engineering Project Management Co Ltd filed Critical Beijing North International Engineering Project Management Co Ltd
Priority to CN201811472899.1A priority Critical patent/CN109598442A/en
Publication of CN109598442A publication Critical patent/CN109598442A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06398Performance of employee with respect to a job function

Abstract

This application provides a kind of methods of marking of supervision behavior and devices, wherein this method comprises: obtaining at least one supervision diary that Project Surveillance engineer terminal determines within a preset period of time;Each supervision diary is to be generated according to Project Surveillance engineer in projects supervision behavior information that Project Surveillance engineer's terminal inputs;At least one supervision diary is sent to Project Director terminal, so that Project Director terminal determines the appraisal result of each Project Surveillance behavior corresponding with the supervision diary based on received each supervision diary.In the application, projects supervision behavior information that Project Surveillance engineer terminal can be inputted according to Project Surveillance engineer generates corresponding supervision diary, supervision diary is sent to Project Director terminal by server, so that Project Director terminal scores online to the corresponding supervision behavior of the supervision diary, time saving and energy saving, intelligence degree is higher.

Description

A kind of methods of marking and device of supervision behavior
Technical field
This application involves engineer application technical fields, in particular to the methods of marking and device of a kind of supervision behavior.
Background technique
Performance appraisal is a link in enterprise performance management, refers to examination main body control target and performance mark Standard, using the Assessment of science, the job responsibility of the task performance, employee of evaluating employee fulfils degree and employee Development, and evaluation result is fed back to the process of employee.
Currently, Project Surveillance engineer is responsible for recording project progress, quality testing, live material in Engineering Project Implementation Service condition, the operation conditions of material and facility.Project Surveillance engineer summarizes the content recorded daily, arranges, and fill out Write in the supervision diary table of papery, and the supervision diary table that will fill in is submitted to Project Director, in order to Project Director according to The supervision behavior of Project Surveillance engineer is examined according to the supervision diary table.
But the existing supervision diary table using papery carries out the scheme of engineering record and supervision behavior examination, it is time-consuming to take Power, intelligence degree are lower.
Summary of the invention
In view of this, the methods of marking and device for being designed to provide a kind of supervision behavior of the embodiment of the present application, it can Generate Project Surveillance engineer terminal according to projects supervision behavior information that Project Surveillance engineer inputs corresponding Supervision diary is sent to Project Director terminal by supervision diary, server, so that Project Director terminal is corresponding to the supervision diary Supervision behavior scored online, time saving and energy saving, intelligence degree is higher.
In a first aspect, the embodiment of the present application provides a kind of methods of marking of supervision behavior, wherein include:
Obtain at least one supervision diary that Project Surveillance engineer terminal determines within a preset period of time;Each prison Managing diary is projects supervision behavior information inputted according to Project Surveillance engineer in the Project Surveillance engineer terminal It generates;
At least one described supervision diary is sent to Project Director terminal, so that the Project Director terminal is based on receiving Each supervision diary determine the appraisal result of corresponding with the supervision diary each Project Surveillance behavior.
With reference to first aspect, the embodiment of the present application provides the first possible embodiment of first aspect, wherein also Include:
For each supervision diary, each project corresponding with the supervision diary that the Project Director terminal determines is obtained The appraisal result of supervision behavior;
According to the appraisal result of projects supervision behavior and the appraisal result of each Project Surveillance behavior corresponding first Default weighted value, calculates the overall score result of all items supervision behavior corresponding with the supervision diary.
The possible embodiment of with reference to first aspect the first, the embodiment of the present application provide second of first aspect Possible embodiment, wherein further include:
The overall score result of calculating is sent to the Project Surveillance engineer terminal.
The possible embodiment of with reference to first aspect the first, the embodiment of the present application provide the third of first aspect Possible embodiment, wherein further include:
The overall score of all items supervision behavior corresponding with each supervision diary based on calculating is as a result, calculate described pre- If the final appraisal result of the corresponding all items supervision behavior of all supervision diaries in the period.
The third possible embodiment with reference to first aspect, the embodiment of the present application provide the 4th kind of first aspect Possible embodiment, wherein the general comment of all items supervision behavior corresponding with each supervision diary based on calculating Point as a result, calculate the final appraisal result of the corresponding all items supervision behavior of all supervision diaries in the preset time period, Include:
The corresponding second default power is assigned for the overall score result of the corresponding all items supervision behavior of each supervision diary Weight values;
The overall score of all items supervision behavior corresponding with each supervision diary based on calculating is as a result, and be each The second default weighted value that the overall score result of the corresponding all items supervision behavior of supervision diary assigns, when determining described default Between in section the corresponding all items supervision behavior of all supervision diaries final appraisal result.
The third possible embodiment with reference to first aspect, the embodiment of the present application provide the 5th kind of first aspect Possible embodiment, wherein further include:
By the final scoring of the corresponding all items supervision behavior of supervision diaries all in the preset time period of calculating As a result the Project Surveillance engineer terminal and the Project Director terminal are sent to.
Second aspect, the embodiment of the present application also provides a kind of scoring apparatus of supervision behavior, wherein includes:
Supervision diary obtains module, at least one determined within a preset period of time for obtaining Project Surveillance engineer terminal A supervision diary;Each supervision diary is to be inputted according to Project Surveillance engineer in the Project Surveillance engineer terminal Projects supervision behavior information generate;
Supervision diary sending module, at least one described supervision diary to be sent to Project Director terminal, so that institute It states Project Director terminal and each Project Surveillance behavior corresponding with the supervision diary is determined based on received each supervision diary Appraisal result.
In conjunction with second aspect, the embodiment of the present application provides the first possible embodiment of second aspect, wherein also Include:
Appraisal result obtains module, for being directed to each supervision diary, obtain that the Project Director terminal determines with this The appraisal result of the corresponding each Project Surveillance behavior of supervision diary;
Overall score result computing module, for according to projects supervision behavior appraisal result and each Project Surveillance The corresponding first default weighted value of the appraisal result of behavior calculates the total of all items supervision behavior corresponding with the supervision diary Appraisal result.
In conjunction with the first possible embodiment of second aspect, the embodiment of the present application provides second of second aspect Possible embodiment, wherein further include:
Overall score result sending module, it is whole for the overall score result of calculating to be sent to the Project Surveillance engineer End.
In conjunction with the first possible embodiment of second aspect, the embodiment of the present application provides the third of second aspect Possible embodiment, wherein further include:
Final appraisal result computing module, for all items management row corresponding with each supervision diary based on calculating For overall score as a result, calculating the most final review of the corresponding all items supervision behavior of all supervision diaries in the preset time period Divide result.
The methods of marking and device of a kind of supervision behavior provided by the embodiments of the present application, wherein this method comprises: obtaining item At least one supervision diary that mesh supervising engineer terminal determines within a preset period of time;Each supervision diary is according to project Supervising engineer generates in projects supervision behavior information that Project Surveillance engineer's terminal inputs;By at least one management day Note is sent to Project Director terminal, so that Project Director terminal is based on received each supervision diary determination and the supervision diary pair The appraisal result for each Project Surveillance behavior answered.In the embodiment of the present application, Project Surveillance engineer terminal can be according to project Projects supervision behavior information of supervising engineer's input generates corresponding supervision diary, and supervision diary is sent to item by server Mesh chief inspector's terminal, so that Project Director terminal scores online to the corresponding supervision behavior of the supervision diary, time saving and energy saving, intelligence It is higher degree to be changed.Which obviate use the supervision diary table of papery to carry out engineering record and supervision behavior examination in the prior art Scheme, time-consuming and laborious, the lower problem of intelligence degree.
To enable the above objects, features, and advantages of the application to be clearer and more comprehensible, preferred embodiment is cited below particularly, and cooperate Appended attached drawing, is described in detail below.
Detailed description of the invention
Technical solution in ord to more clearly illustrate embodiments of the present application, below will be to needed in the embodiment attached Figure is briefly described, it should be understood that the following drawings illustrates only some embodiments of the application, therefore is not construed as pair The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this A little attached drawings obtain other relevant attached drawings.
Fig. 1 shows a kind of flow chart of the methods of marking of supervision behavior provided by the embodiment of the present application;
Fig. 2 shows the flow charts of the methods of marking of another kind supervision behavior provided by the embodiment of the present application;
Fig. 3 shows a kind of structural schematic diagram of the scoring apparatus of supervision behavior provided by the embodiment of the present application;
Fig. 4 shows the structural schematic diagram of server provided by the embodiment of the present application.
Specific embodiment
To keep the purposes, technical schemes and advantages of the embodiment of the present application clearer, below in conjunction with the embodiment of the present application Middle attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only It is some embodiments of the present application, instead of all the embodiments.The application being usually described and illustrated herein in the accompanying drawings is real The component for applying example can be arranged and be designed with a variety of different configurations.Therefore, below to the application's provided in the accompanying drawings The detailed description of embodiment is not intended to limit claimed scope of the present application, but is merely representative of the selected reality of the application Apply example.Based on embodiments herein, those skilled in the art institute obtained without making creative work There are other embodiments, shall fall in the protection scope of this application.
Currently, Project Surveillance engineer summarizes the content recorded daily, arrange, and fill in the management day of papery Remember in table, and the supervision diary table that will fill in is submitted to Project Director, in order to which Project Director is according to the supervision diary table pair The supervision behavior of Project Surveillance engineer is examined.But engineering record and management are carried out using the supervision diary table of papery The scheme of behavior examination, time-consuming and laborious, intelligence degree is lower.In view of the above-mentioned problems, a kind of prison provided by the embodiments of the present application The methods of marking and device of reason behavior can be such that Project Surveillance engineer terminal is inputted according to Project Surveillance engineer each Project Surveillance behavioural information generates corresponding supervision diary, and supervision diary is sent to Project Director terminal by server, so as to item Mesh chief inspector terminal scores online to the corresponding supervision behavior of the supervision diary, time saving and energy saving, and intelligence degree is higher.
For convenient for understanding the embodiment of the present application, first to a kind of supervision behavior disclosed in the embodiment of the present application Methods of marking describes in detail.
As shown in Figure 1, the flow chart of the methods of marking for the embodiment of the present application supervision behavior, the specific steps are as follows:
S101, at least one supervision diary that Project Surveillance engineer terminal determines within a preset period of time is obtained;Each Supervision diary is projects supervision behavior information life inputted according to Project Surveillance engineer in Project Surveillance engineer's terminal At.
In Engineering Project Implementation, Project Surveillance engineer is responsible for recording project progress, quality testing, live material and set Service condition, the operation conditions applied, Project Surveillance engineer is daily by projects supervision behavior information input of record to project Supervising engineer's terminal, and projects supervision behavior can be multinomial.Wherein, Project Surveillance engineer can be in engineer operation During directly inputted, can also be inputted again after terminating engineer operation.
Here it is possible to preset time period be pre-set according to the assessment period to Project Surveillance engineer, for example, to item The assessment period of mesh supervising engineer A is three months, sets preset time period to one month, preset time period can also be arranged It is one week, can also be adjusted according to the actual situation.
In Project Surveillance engineer daily by projects supervision behavior information input to Project Surveillance engineer's terminal after, Supervision diary can be generated according to projects supervision behavior information.Server can get supervision diary daily, wherein pre- If in the period, at least one supervision diary can be obtained.
S102, at least one supervision diary is sent to Project Director terminal, so that Project Director terminal is based on received Each supervision diary determines the appraisal result of each Project Surveillance behavior corresponding with the supervision diary.
Here, the supervision diary that server will acquire is sent to Project Director terminal, and Project Director is to Project Director terminal Projects supervision behavior scores in the supervision diary received.
Such as: the supervision diary is provided with nine appraisal standards, and Project Director is according to appraisal standards to Project Surveillance engineering Projects supervision behavior of teacher scores, and obtains the appraisal result of each Project Surveillance behavior.
S103, it is directed to each supervision diary, obtains each item corresponding with the supervision diary that Project Director terminal determines The appraisal result of mesh supervision behavior;
S104, it is corresponded to according to the appraisal result of projects supervision behavior and the appraisal result of each Project Surveillance behavior The first default weighted value, calculate the overall score result of corresponding with supervision diary all items supervision behavior;
S105, the overall score result of calculating is sent to Project Surveillance engineer's terminal.
Here, after the appraisal result that chief inspector's terminal determines each Project Surveillance behavior corresponding with the supervision diary, Server can obtain the appraisal result of the corresponding each Project Surveillance behavior of supervision diary from chief inspector's terminal.
Project Director can be different according to the significance level of Project Surveillance behavior each in supervision diary, supervise for each project Reason behavior is arranged corresponding first default weighted value, and according to the corresponding first default weighted value of each Project Surveillance behavior with The appraisal result of each Project Surveillance behavior calculates and obtains the overall score of the corresponding all items supervision behavior of the supervision diary As a result.
Such as: examination item includes whether Project Surveillance engineer terminal determines supervision diary before the deadline;Project Whether the problem of supervising engineer describes be clear, accurately;Project Surveillance engineer input Project Surveillance behavioural information in whether Comprising photo or image etc., if Project Director thinks that Project Surveillance engineer terminal determines supervision diary before the deadline Significance level is lower, then it is smaller that corresponding first weighted value of the examination item can be set in Project Director.
Wherein, the overall score of the corresponding all items supervision behavior of the supervision diary being calculated is as a result, as management day Remember the overall score of corresponding Project Surveillance engineer as a result, namely Project Surveillance engineer's same day the result of appraisal.
After obtaining overall score result, which is sent to Project Surveillance engineer's terminal by server, with There is certain understanding to the Project Surveillance behavior on oneself same day convenient for Project Surveillance engineer, and can be according to the overall score result It is adjusted the supervision behavior of itself.
S106, all items supervision behavior corresponding with each supervision diary based on calculating overall score as a result, calculating The final appraisal result of the corresponding all items supervision behavior of all supervision diaries in preset time period;
S107, by the final scoring of the corresponding all items supervision behavior of supervision diaries all in the preset time period of calculating As a result Project Surveillance engineer terminal and Project Director terminal are sent to.
It here, can be with base after the overall score result for determining the corresponding all items supervision behavior of a supervision diary It is corresponded in each supervision diary and the corresponding overall score of each supervision diary as a result, calculating all supervision diaries in preset time period All items supervision behavior final appraisal result namely Project Surveillance the engineer result of appraisal within a preset period of time.
In a particular application, its wages grade can be determined based on the result of appraisal to Project Surveillance engineer.With pre- If the period be one month for, the end of month calculate project supervising engineer wages when, can be according to Project Surveillance engineer Of that month final appraisal result determines that the wages grade in Project Surveillance engineer's this month, of that month final appraisal result are higher Project Surveillance engineer, wages higher grade, motivates Project Surveillance engineer's better implementation project supervision with this.
The final appraisal result being calculated is sent to Project Surveillance engineer terminal and Project Director terminal by server, Project Surveillance engineer can according to oneself supervision behavior in the final appraisal result and the preset time period, adjustment from Oneself working method improves the deficiency of itself.In addition, server can also tie the final scoring of multiple Project Surveillance engineers Fruit is sent to Project Director terminal simultaneously, and Project Director can be tied according to the corresponding final scoring of multiple Project Surveillance engineers Fruit is well understood the Project Surveillance behavior of all items management person, the working condition of Project Surveillance engineer is understood with this.
To sum up, projects prison that the embodiment of the present application is inputted by Project Surveillance engineer in Project Surveillance engineer's terminal Behavioural information is managed, which is generated supervision diary by Project Surveillance engineer terminal, and server is by management Project Director terminal is sent on diary line, so that Project Director terminal carries out online the corresponding supervision behavior of the supervision diary Scoring.Further, server can also calculate daily overall score result according to the appraisal result that Project Director terminal determines And the final appraisal result in preset time period, it is time saving and energy saving, it is more intelligent.
When calculating the final appraisal result of the corresponding all items supervision behavior of all supervision diaries in preset time period, It can be calculated according to method as shown in Figure 2, the specific steps are as follows:
S201, corresponding second is assigned in advance for the overall score result of the corresponding all items supervision behavior of each supervision diary If weighted value;
S202, all items supervision behavior corresponding with each supervision diary based on calculating overall score as a result, and For the second default weighted value that the overall score result of the corresponding all items supervision behavior of each supervision diary assigns, determine default The final appraisal result of the corresponding all items supervision behavior of all supervision diaries in period.
Here, when calculating the final appraisal result in preset time period, can be arranged in advance for each overall score result Corresponding second weighted value.According to all overall score results the second weighted value corresponding with each overall score result, calculate pre- If the final appraisal result of the corresponding all items supervision behavior of all supervision diaries namely Project Surveillance engineer in the period The result of appraisal within a preset period of time.
Wherein it is possible to it is different according to the date of supervision diary, each supervision diary is set and is corresponding with the second different weights Value;It can also set identical for corresponding second weighted value of each supervision diary, the embodiment of the present application does not limit this.
The embodiment of the present application can make server according to by pre-setting the first weighted value and the second weighted value Overall score result is calculated in one weighted value and appraisal result;According to the second weighted value and overall score as a result, being calculated final Appraisal result, avoiding artificial calculate leads to error-prone problem, and time saving and energy saving, intelligence degree is higher.
Based on the same inventive concept, the embodiment of the present application also provides management rows corresponding with the methods of marking of supervision behavior For scoring apparatus, the principle solved the problems, such as due to the device in the embodiment of the present application and the above-mentioned supervision behavior of the embodiment of the present application Methods of marking it is similar, therefore the implementation of device may refer to the implementation of method, and overlaps will not be repeated.
Shown in Figure 3, the scoring apparatus of supervision behavior provided by the another embodiment of the application includes:
Supervision diary obtains module 301, determines within a preset period of time extremely for obtaining Project Surveillance engineer terminal A few supervision diary;Each supervision diary be inputted according to Project Surveillance engineer in Project Surveillance engineer's terminal it is each What Project Surveillance behavioural information generated;
Supervision diary sending module 302, at least one supervision diary to be sent to Project Director terminal, so that project Chief inspector's terminal determines the scoring knot of each Project Surveillance behavior corresponding with the supervision diary based on received each supervision diary Fruit.
In one embodiment, the scoring apparatus of above-mentioned supervision behavior further include:
Appraisal result obtain module 303, for be directed to each supervision diary, obtain Project Director terminal determine with the prison Manage the appraisal result of the corresponding each Project Surveillance behavior of diary;
Overall score result computing module 304, for according to the appraisal result of projects supervision behavior and each project prison The corresponding first default weighted value of the appraisal result of reason behavior calculates all items supervision behavior corresponding with the supervision diary Overall score result.
In another embodiment, the scoring apparatus of above-mentioned supervision behavior further include:
Overall score result sending module 305, for the overall score result of calculating to be sent to Project Surveillance engineer's terminal.
In yet another embodiment, the scoring apparatus of above-mentioned supervision behavior further include:
Final appraisal result computing module 306, for all items corresponding with each supervision diary prison based on calculating The overall score of reason behavior is as a result, calculate the most final review of the corresponding all items supervision behavior of all supervision diaries in preset time period Divide result.
In another embodiment, final appraisal result computing module 306 also particularly useful for:
The corresponding second default power is assigned for the overall score result of the corresponding all items supervision behavior of each supervision diary Weight values;
The overall score of all items supervision behavior corresponding with each supervision diary based on calculating is as a result, and be each The second default weighted value that the overall score result of the corresponding all items supervision behavior of supervision diary assigns, determines preset time period The final appraisal result of the corresponding all items supervision behavior of interior all supervision diaries.
In another embodiment, the scoring apparatus of above-mentioned supervision behavior further include:
Final appraisal result sending module 307, the corresponding institute of all supervision diaries in the preset time period for that will calculate There is the final appraisal result of Project Surveillance behavior to be sent to Project Surveillance engineer terminal and Project Director terminal.
As shown in figure 4, being the structural schematic diagram of server provided by the embodiments of the present application, comprising: processor 401, storage Device 402 and bus 403, the storage of memory 402 execute instruction, and when the vehicle is running, lead between processor 401 and memory 402 The communication of bus 403 is crossed, following processing is executed when machine readable instructions are executed by processor 401:
Obtain at least one supervision diary that Project Surveillance engineer terminal determines within a preset period of time;Each management day Note is to be generated according to Project Surveillance engineer in projects supervision behavior information that Project Surveillance engineer's terminal inputs;
At least one supervision diary is sent to Project Director terminal, so that Project Director terminal is based on received each prison Manage the appraisal result that diary determines each Project Surveillance behavior corresponding with the supervision diary.
Optionally, in the method that processor 401 executes, further includes:
For each supervision diary, each Project Surveillance corresponding with the supervision diary that Project Director terminal determines is obtained The appraisal result of behavior;
According to the appraisal result of projects supervision behavior and the appraisal result of each Project Surveillance behavior corresponding first Default weighted value, calculates the overall score result of all items supervision behavior corresponding with the supervision diary.
Optionally, in the method that processor 401 executes, further includes:
The overall score result of calculating is sent to Project Surveillance engineer's terminal.
Optionally, in the method that processor 401 executes, further includes:
The overall score of all items supervision behavior corresponding with each supervision diary based on calculating is as a result, when calculating default Between in section the corresponding all items supervision behavior of all supervision diaries final appraisal result.
Optionally, in the method that processor 401 executes, all items corresponding with each supervision diary prison based on calculating The overall score of reason behavior is as a result, calculate the most final review of the corresponding all items supervision behavior of all supervision diaries in preset time period Divide result, comprising:
The corresponding second default power is assigned for the overall score result of the corresponding all items supervision behavior of each supervision diary Weight values;
The overall score of all items supervision behavior corresponding with each supervision diary based on calculating is as a result, and be each The second default weighted value that the overall score result of the corresponding all items supervision behavior of supervision diary assigns, determines preset time period The final appraisal result of the corresponding all items supervision behavior of interior all supervision diaries.
Optionally, in the method that processor 401 executes, further includes:
By the final appraisal result of the corresponding all items supervision behavior of supervision diaries all in the preset time period of calculating It is sent to Project Surveillance engineer terminal and Project Director terminal.
The methods of marking of supervision behavior provided by the embodiment of the present application and the computer program product of device, including storage The computer readable storage medium of program code, the instruction that program code includes can be used for executing in previous methods embodiment Method, specific implementation can be found in embodiment of the method, and details are not described herein.
Specifically, which can be general storage medium, such as mobile disk, hard disk, on the storage medium Computer program when being run, the methods of marking of above-mentioned supervision behavior is able to carry out, so as to make Project Surveillance engineer Projects supervision behavior information that terminal can be inputted according to Project Surveillance engineer generates corresponding supervision diary, and server will Supervision diary is sent to Project Director terminal, so that Project Director terminal carries out online the corresponding supervision behavior of the supervision diary Scoring, time saving and energy saving, intelligence degree is higher.
It, can be with if the function is realized in the form of SFU software functional unit and when sold or used as an independent product It is stored in the executable non-volatile computer-readable storage medium of a processor.Based on this understanding, the application Technical solution substantially the part of the part that contributes to existing technology or the technical solution can be with software in other words The form of product embodies, which is stored in a storage medium, including some instructions use so that One computer equipment (can be personal computer, server or the network equipment etc.) executes each embodiment institute of the application State all or part of the steps of method.And storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory (Read-Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic or disk etc. is various to deposit Store up the medium of program code.
Finally, it should be noted that embodiment described above, the only specific embodiment of the application, to illustrate the application Technical solution, rather than its limitations, the protection scope of the application is not limited thereto, although with reference to the foregoing embodiments to this Shen It please be described in detail, those skilled in the art should understand that: anyone skilled in the art Within the technical scope of the present application, it can still modify to technical solution documented by previous embodiment or can be light It is readily conceivable that variation or equivalent replacement of some of the technical features;And these modifications, variation or replacement, do not make The essence of corresponding technical solution is detached from the spirit and scope of the embodiment of the present application technical solution, should all cover the protection in the application Within the scope of.Therefore, the protection scope of the application shall be subject to the protection scope of the claim.

Claims (10)

1. a kind of methods of marking of supervision behavior characterized by comprising
Obtain at least one supervision diary that Project Surveillance engineer terminal determines within a preset period of time;Each management day Note is to be generated according to Project Surveillance engineer in projects supervision behavior information that the Project Surveillance engineer terminal inputs 's;
At least one described supervision diary is sent to Project Director terminal, so that the Project Director terminal is based on received every A supervision diary determines the appraisal result of each Project Surveillance behavior corresponding with the supervision diary.
2. the method according to claim 1, wherein further include:
For each supervision diary, each Project Surveillance corresponding with the supervision diary that the Project Director terminal determines is obtained The appraisal result of behavior;
It is preset according to the appraisal result of the appraisal result of projects supervision behavior and each Project Surveillance behavior corresponding first Weighted value calculates the overall score result of all items supervision behavior corresponding with the supervision diary.
3. according to the method described in claim 2, it is characterized by further comprising:
The overall score result of calculating is sent to the Project Surveillance engineer terminal.
4. according to the method described in claim 2, it is characterized by further comprising:
The overall score of all items supervision behavior corresponding with each supervision diary based on calculating is as a result, when calculating described default Between in section the corresponding all items supervision behavior of all supervision diaries final appraisal result.
5. according to the method described in claim 4, it is characterized in that, the institute corresponding with each supervision diary based on calculating There is the overall score of Project Surveillance behavior as a result, calculating the corresponding all items management of all supervision diaries in the preset time period The final appraisal result of behavior, comprising:
Corresponding second default weighted value is assigned for the overall score result of the corresponding all items supervision behavior of each supervision diary;
The overall score of all items supervision behavior corresponding with each supervision diary based on calculating is as a result, and be each management The second default weighted value that the overall score result of the corresponding all items supervision behavior of diary assigns, determines the preset time period The final appraisal result of the corresponding all items supervision behavior of interior all supervision diaries.
6. according to the method described in claim 4, it is characterized by further comprising:
By the final appraisal result of the corresponding all items supervision behavior of supervision diaries all in the preset time period of calculating It is sent to the Project Surveillance engineer terminal and the Project Director terminal.
7. a kind of scoring apparatus of supervision behavior characterized by comprising
Supervision diary obtains module, at least one prison determined within a preset period of time for obtaining Project Surveillance engineer terminal Manage diary;Each supervision diary be inputted according to Project Surveillance engineer in the Project Surveillance engineer terminal it is each What Project Surveillance behavioural information generated;
Supervision diary sending module, at least one described supervision diary to be sent to Project Director terminal, so that the item Mesh chief inspector terminal determines the scoring of each Project Surveillance behavior corresponding with the supervision diary based on received each supervision diary As a result.
8. device according to claim 7, which is characterized in that further include:
Appraisal result obtains module, for being directed to each supervision diary, obtain that the Project Director terminal determines with the management The appraisal result of the corresponding each Project Surveillance behavior of diary;
Overall score result computing module, for the appraisal result and each Project Surveillance behavior according to projects supervision behavior The corresponding first default weighted value of appraisal result, calculate the overall score of corresponding with supervision diary all items supervision behavior As a result.
9. device according to claim 8, which is characterized in that further include:
Overall score result sending module, for the overall score result of calculating to be sent to the Project Surveillance engineer terminal.
10. device according to claim 8, which is characterized in that further include:
Final appraisal result computing module, for all items supervision behavior corresponding with each supervision diary based on calculating Overall score is as a result, calculate the final scoring knot of the corresponding all items supervision behavior of all supervision diaries in the preset time period Fruit.
CN201811472899.1A 2018-12-04 2018-12-04 A kind of methods of marking and device of supervision behavior Pending CN109598442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811472899.1A CN109598442A (en) 2018-12-04 2018-12-04 A kind of methods of marking and device of supervision behavior

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811472899.1A CN109598442A (en) 2018-12-04 2018-12-04 A kind of methods of marking and device of supervision behavior

Publications (1)

Publication Number Publication Date
CN109598442A true CN109598442A (en) 2019-04-09

Family

ID=65960945

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811472899.1A Pending CN109598442A (en) 2018-12-04 2018-12-04 A kind of methods of marking and device of supervision behavior

Country Status (1)

Country Link
CN (1) CN109598442A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112465457A (en) * 2020-11-27 2021-03-09 重庆康盛监理咨询有限公司 Supervision project management method, system, device and computer storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105719049A (en) * 2016-01-12 2016-06-29 深圳大尚网络技术有限公司 Realization method and system of intelligent logs
CN106056347A (en) * 2016-05-16 2016-10-26 北京诺士诚国际工程项目管理有限公司 Engineering project management cloud platform system based on video monitoring
CN106056268A (en) * 2016-05-17 2016-10-26 北京诺士诚国际工程项目管理有限公司 Engineering project management cloud platform system based on material tracking
CN107133776A (en) * 2016-08-02 2017-09-05 北京尚优力达科技有限公司 A kind of mobile security supervisory systems
CN108683673A (en) * 2018-05-22 2018-10-19 厦门港湾咨询监理有限公司 Long-range multiple terminals Supervision Organization work service managing and control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105719049A (en) * 2016-01-12 2016-06-29 深圳大尚网络技术有限公司 Realization method and system of intelligent logs
CN106056347A (en) * 2016-05-16 2016-10-26 北京诺士诚国际工程项目管理有限公司 Engineering project management cloud platform system based on video monitoring
CN106056268A (en) * 2016-05-17 2016-10-26 北京诺士诚国际工程项目管理有限公司 Engineering project management cloud platform system based on material tracking
CN107133776A (en) * 2016-08-02 2017-09-05 北京尚优力达科技有限公司 A kind of mobile security supervisory systems
CN108683673A (en) * 2018-05-22 2018-10-19 厦门港湾咨询监理有限公司 Long-range multiple terminals Supervision Organization work service managing and control system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112465457A (en) * 2020-11-27 2021-03-09 重庆康盛监理咨询有限公司 Supervision project management method, system, device and computer storage medium

Similar Documents

Publication Publication Date Title
Sjøberg et al. Quantifying the effect of using kanban versus scrum: A case study
Nasirzadeh et al. Dynamic modeling of labor productivity in construction projects
Suri et al. Comparative analysis of software effort estimation techniques
CN109144724A (en) A kind of micro services resource scheduling system and method
Martens et al. The impact of applying effort to reduce activity variability on the project time and cost performance
Glaiel et al. Agile project dynamics: A system dynamics investigation of agile software development methods
Ankenman et al. A quick assessment of input uncertainty
CN110517148B (en) Control method, system and device for executing quantitative transaction strategy
Concas et al. Simulation of software maintenance process, with and without a work‐in‐process limit
CN109934708A (en) A kind of more policy-simulative method of commerce in local and system and device
KR20150095874A (en) Data quality measurement method based on a scatter plot
US20150018060A1 (en) System and method for decision making in strategic environments
CN109933501A (en) A kind of capacity evaluating method and device of application system
Van Dyk et al. A systems thinking approach to the sustainability of quality improvement programmes
CN108182448A (en) A kind of selection method and relevant apparatus for marking strategy
CN109598442A (en) A kind of methods of marking and device of supervision behavior
CN114546864A (en) Software quality evaluation method, device, equipment and storage medium
JP2016110231A (en) Project evaluation device, project evaluation method and project evaluation program
JP5063444B2 (en) Line production management support method and apparatus
Vera et al. Prospective study using archetypes and system dynamics
CN107451048A (en) The method and apparatus of pressure simulation test on a kind of line
US10387975B2 (en) Viable system of governance for service provisioning engagements
Huskins et al. Enhancing the efficiency and effectiveness of application development
CN107229487A (en) Code process method and device
CN107644292A (en) SaaS service quality guarantee method and devices

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190409

RJ01 Rejection of invention patent application after publication