CN104134124A - Enterprise material management system and method - Google Patents
Enterprise material management system and method Download PDFInfo
- Publication number
- CN104134124A CN104134124A CN201410372307.4A CN201410372307A CN104134124A CN 104134124 A CN104134124 A CN 104134124A CN 201410372307 A CN201410372307 A CN 201410372307A CN 104134124 A CN104134124 A CN 104134124A
- Authority
- CN
- China
- Prior art keywords
- stock ground
- stock
- stockpile
- management system
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
Abstract
The invention discloses an enterprise material management system and method. The enterprise material management system comprises a data collection module, a data matching module, a control rule management module, an interface displaying module and a data storage module. The method comprises the steps of dividing a material yard, matching measured materials in an MES and materials of an ERP system of an up one level, associating the material yard with the measured materials, dividing the material yard into material strips, dividing the material strips into material piles, storing the specific measured materials into the specific material piles and generating a material inventory information real-time distribution diagram of the material yard, wherein the positions of the material piles and the stacked materials can be revised. According to the enterprise material management system and method, it only needs one or two persons to analyze the material inventory information real-time distribution diagram of the material yard, then the positions, the orders and the materials of the material piles in the material yard can be fast adjusted according to the material warehousing plan, and the material piles can be increased or decreased or split or combined; the operators can set the frequently-used material pile positions nearby according to the accumulated production experience and vacate or merge or replace the positions of the material piles so as to meet the requirement of the materials with the large inventory in a short time.
Description
Technical field
The invention belongs to Computer Applied Technology field, be specifically related to a kind of enterprise material management system and method.
Background technology
In the present stage MES of iron and steel enterprise system, stock ground way to manage is: stock ground is divided and the material data that can deposit is recorded in Excel, in the time of the depositing of management stock ground and planning material, need to check and analyze multiple Excel forms and carry out back work.First this method needs to read the material depository project of higher level's ERP system, is reading whole stock grounds situation of depositing at that time, after analyzing according to knowhow discussion, implements the management work of stock ground and material.It is orderly, accurate that the method has ensured that stock ground material is deposited, but there is following shortcoming compared with this technological invention: the material and data that (1) management process need to be prepared are many, relevant responsible person has to carefully check multiple Excel forms, sometimes also needs to generate extra statistical table or distribution schematic diagram is deposited in stock ground.
(2) personnel that management process need to participate in are many, personnel easily exceed 2 to 3 people, because except stock ground person in overall and concrete stock ground responsible official, may also need material strip responsible official under each stock ground, it is even likely the participation that in higher level's ERP system, material is deposited responsible official.(3) promptness is poor, and process and participant too much cause stock ground and material information can not be reacted in time in MES system and higher level SAP system.(4) very flexible, exchange, the merging of depositing material; The merging in stock ground is soared, then divides and adjust, and all needs to reanalyse the stock ground data that are recorded in Excel, just can make corresponding measure.(5) stock ground information reuse is poor, such as: under stock ground, material strip information-change amount is larger, and operator generally can regenerate relevant stock ground information in Excel.Therefore, developing a kind of management system addressing the above problem is very important.
Summary of the invention
The first object of the present invention is to provide a kind of enterprise material management system; The second object is to provide the using method of described enterprise material management system.
The first object of the present invention is achieved in that and comprises data acquisition module, Data Matching module, control law administration module, showing interface module, data memory module, wherein:
Data acquisition module: gather and read material depository project and deposit situation and store into data module for and enterprise management system on-the-spot from material stock ground;
Data Matching module: obtain matched data and store data memory module into for the metering material of MES system is mated with the material of higher level's ERP system;
Control law administration module: deposit stock ground division and mark rule for arranging;
Showing interface module: material information generates " stock ground stock material information real-time distribution figure " and displaying operates for operating personnel for calling from data memory module;
Data memory module: for storing enterprise's material information.
The second object of the present invention is achieved in that and comprises the following steps:
A, division stock ground;
B, the metering material in MES is mated with the material of higher level's ERP system, convenient by the inquiry of higher level's ERP system, statistics inventory information;
C, stock ground with metering material be associated;
Material strip is divided in D, stock ground;
E, material strip are divided stockpile, and stockpile identifies with starting point horizontal ordinate and terminal horizontal ordinate, and stockpile title connects underscore " _ " with " stockpile sequence number " and connecting " metering name of material " composition;
F, select concrete metering material to deposit in concrete stockpile, stockpile position and stack material and can revise;
G, generation " stock ground stock material information real-time distribution figure ".
The present invention solves management work and spends high time cost, senior staff officer and personnel cost, and message reflection promptness is poor, information is adjusted and amendment very flexible, the shortcomings such as information reuse is poor, improving stock ground capable of regulating ability provides that one is saved time, human cost, is convenient to the method for flexible management.The present invention only needs 1 ~ 2 people to analyze " stock ground stock material information real-time distribution figure ", just can be according to materiel warehouse-in plan, and in rapid adjustment stock ground the position of stockpile, and sequentially, material, increases and reduces or fractionation merging stockpile; Operator, with the knowhow of accumulation, can arrange conventional stockpile material position nearby, also can vacate to merge and exchange stockpile position, to adapt to the larger material of tank farm stock in short-term.
Brief description of the drawings
Fig. 1 is modular structure schematic diagram of the present invention;
Fig. 2 is material storage and managenent schematic flow sheet of the present invention;
Fig. 3 is that iron ore of the present invention (iron content >=58%) is deposited ore stock ground example schematic;
Fig. 4 is stock ground of the present invention stock material information real-time distribution figure schematic diagram.
Embodiment
Below in conjunction with accompanying drawing, the present invention is further illustrated, but never in any form the present invention is limited, and any conversion or the replacement done based on training centre of the present invention, all belong to protection scope of the present invention.
Enterprise of the present invention material management system, comprises data acquisition module, Data Matching module, control law administration module, showing interface module, data memory module, wherein:
Data acquisition module: gather and read material depository project and deposit situation and store into data module for and enterprise management system on-the-spot from material stock ground;
Data Matching module: obtain matched data and store data memory module into for the metering material of MES system is mated with the material of higher level's ERP system;
Control law administration module: deposit stock ground division and mark rule for arranging;
Showing interface module: material information generates " stock ground stock material information real-time distribution figure " and displaying operates for operating personnel for calling from data memory module;
Data memory module: for storing enterprise's material information.
Enterprise management system described in data acquisition module is MES system, ERP system, iron front stock ground management system and metering system
Material depository project described in data acquisition module is name of material, material forward purchasing amount of plan, production schedule demand inventory, production schedule numbering, material standing crop, the actual amount of buying of material, buys date, material variety, stock number and buy metering numbering.
The situation of depositing described in data acquisition module is stock ground (or material strip or stockpile, deposit depending on dividing condition) numbering, stock ground (material strip or stockpile) title, gather numbering, acquisition time, stock number, stock ground (or material strip or stockpile, deposit depending on dividing condition) starting point coordinate, terminal, stock ground shape, stock ground diameter, stock ground length, stock ground width, stock ground height, name of material and name of material.
Matched data described in matching module is MES metering material variety numbering, MES metering material variety title, MES metering stock number, MES metering name of material, SAP material variety numbering, SAP material variety title, SAP stock number, SAP name of material and effective marker.
The stock ground of depositing described in control law administration module is divided into ore stock ground, blending-field, sintering coal tar storehouse, ironmaking coal tar storehouse and warehouse, iron foundry (shop).Wherein ore stock ground is divided: 0# material strip, 1# material strip, 2# material strip; Blending-field is divided: blending-field A heap, blending-field B heap; Sintering coal tar storehouse is divided: sintering coal tar storehouse great Cang, sintering coal tar storehouse little Cang; Ironmaking coal tar storehouse is divided: No. 1 outdoor stock ground, No. 1 storehouse, No. 2 storehouses, No. 3 storehouses, stock ground, No. 2 blow tank east, No. 2 western stock grounds of blow tank, stock ground, No. 2 blow tank south, stock ground, No. 2 blow tank north; Warehouse, iron foundry (shop) divides into: cast iron 1 warehouse, cast iron 2 warehouses.
Mark rule described in control law administration module is that stockpile title connects underscore " _ " with " stockpile sequence number ", then connects " metering name of material " composition.
Enterprise's material information described in data memory module is stock ground (or material strip or stockpile, deposit depending on dividing condition) numbering, stock ground title, stock ground order, effective date, Expiration Date, stock number, name of material, wet basis weight, warehouse-in date and warehouse-in mode.
Stock ground stock material information real-time distribution figure described in showing interface module comprises stock ground title, material strip title, stockpile title, stockpile starting point coordinate, stockpile terminal point coordinate, stockpile shape, stockpile diameter, stockpile length, stockpile width, material stack height, name of material, weight of material, and the last time takes inventory weight and takes inventory the time.The using method of enterprise of the present invention material management system, comprises the following steps:
A, division stock ground;
B, the metering material in MES is mated with the material of higher level's ERP system, convenient by the inquiry of higher level's ERP system, statistics inventory information;
C, stock ground with metering material be associated;
Material strip is divided in D, stock ground;
E, material strip are divided stockpile, and stockpile identifies with starting point horizontal ordinate and terminal horizontal ordinate, and stockpile title connects underscore " _ " with " stockpile sequence number " and connecting " metering name of material " composition, as: " 1# stockpile _ iron ore concentrate ";
F, select concrete metering material to deposit in concrete stockpile, stockpile position and stack material and can revise;
G, generation " stock ground stock material information real-time distribution figure ".
The object of the invention is to solve above-mentioned management work and spend high time cost, senior staff officer and personnel cost, message reflection promptness is poor, information is adjusted and amendment very flexible, the shortcomings such as information reuse is poor, by improving stock ground capable of regulating ability, thereby provide, one is saved time, human cost, is convenient to the method for flexible management.
The technical solution adopted for the present invention to solve the technical problems is:
1) divide stock ground.
2) the metering material in MES is mated with the material of higher level's ERP system, convenient by the inquiry of higher level's ERP system, statistics inventory information.
3) stock ground is associated with metering material.
4) material strip is divided in stock ground.
5) material strip is divided stockpile, and stockpile identifies with starting point horizontal ordinate and terminal horizontal ordinate, and stockpile title connects underscore " _ " with " stockpile sequence number " and connecting " metering name of material " composition, as: " 1# stockpile _ iron ore concentrate ".
6) select concrete metering material to deposit in concrete stockpile, stockpile position and stacking material can be revised.
7) generate " stock ground stock material information real-time distribution figure ".
Use after this technical scheme, operator is more absorbed in materiel warehouse-in plan, and inventory information distributes and the fixing deposit position of material within a period of time, can be according to materiel warehouse-in plan rapid adjustment material stowed location.
The invention has the beneficial effects as follows: only need 1-2 people to analyze " stock ground stock material information real-time distribution figure ", just can be according to materiel warehouse-in plan, in rapid adjustment stock ground the position of stockpile, and sequentially, material, increases and reduces or fractionation merging stockpile; Operator, with the knowhow of accumulation, can arrange conventional stockpile material position nearby, also can vacate to merge and exchange stockpile position, to adapt to the larger material of tank farm stock in short-term.
It is as follows that the present invention specifically manages the method that stock ground material deposits:
1) divide design stock ground, any material variety can be deposited in stock ground, in actual enforcement, can analyze knowhow and materiel warehouse-in plan, deposits a certain business various materials used in iron and steel enterprise thereby be approximately decided to be.As: sintering coal tar storehouse, deposit the coal tar material in corresponding sintering business, unclassified stores also can be deposited, can be more excellent but leave result of use in special stock ground in.
2) the metering material in MES is mated with the material of higher level's ERP system, MES operator is at ordinary times with metering material name operation material, and system log (SYSLOG), statistics stock material information add the material name of higher level's ERP system of this metering material name correspondence.
3) stock ground is associated with metering material, to select concrete metering material to deposit in concrete stockpile, deposit only the material with stock ground association, these materials can be deposited arbitrarily in the stockpile in stock ground, deposit the not material with stock ground association, need first this material to be associated with stock ground.
4) material strip is divided in stock ground, as: ore stock ground is divided into 0# material strip, 1# material strip.
5) material strip is divided stockpile, carrys out mark location stockpile with starting point horizontal ordinate and terminal horizontal ordinate, and coordinate is since 0, and ascending order is arranged.
6) stockpile title connects underscore " _ " with " stockpile sequence number " and is connecting " metering name of material " composition, as: " 1# stockpile _ dust-removing powder ".
7) stock ground, material strip, stockpile position and stacking material can be revised, but a stockpile synchronization is deposited a kind of metering material only.
8) generate " stock ground stock material information real-time distribution figure ".
Feature of the present invention:
A. stock ground is manageable;
B. material is deposited accurate positioning, in order;
C. analyze " stock ground stock material information real-time distribution figure " and materiel warehouse-in plan, adjust flexibly the material in stock ground and stack.
As shown in Figure 3, the iron ore of iron content >=58% is deposited as ore stock ground.
Claims (10)
1. enterprise's material management system, is characterized in that comprising data acquisition module, Data Matching module, control law administration module, showing interface module, data memory module, wherein:
Data acquisition module: gather and read material depository project and deposit situation and store into data module for and enterprise management system on-the-spot from material stock ground;
Data Matching module: obtain matched data and store data memory module into for the metering material of MES system is mated with the material of higher level's ERP system;
Control law administration module: deposit stock ground division and mark rule for arranging;
Showing interface module: material information generates " stock ground stock material information real-time distribution figure " and displaying operates for operating personnel for calling from data memory module;
Data memory module: for storing enterprise's material information.
2. enterprise according to claim 1 material management system, is characterized in that the enterprise management system described in data acquisition module is MES system, ERP system, iron front stock ground management system and metering system.
3. enterprise according to claim 1 material management system, is characterized in that the material depository project described in data acquisition module is name of material, material forward purchasing amount of plan, production schedule demand inventory, production schedule numbering, material standing crop, the actual amount of buying of material, buys date, material variety, stock number and buy metering numbering.
4. enterprise according to claim 1 material management system, the situation of depositing described in data acquisition module that it is characterized in that is stock ground numbering, stock ground title, collection numbering, acquisition time, stock number, stock ground starting point coordinate, terminal, stock ground shape, stock ground diameter, stock ground length, stock ground width, stock ground height, name of material and name of material.
5. enterprise according to claim 1 material management system, is characterized in that the matched data described in matching module is MES metering material variety numbering, MES metering material variety title, MES metering stock number, MES metering name of material, SAP material variety numbering, SAP material variety title, SAP stock number, SAP name of material and effective marker.
6. enterprise according to claim 1 material management system, it is characterized in that the stock ground of depositing described in control law administration module is divided into ore stock ground, blending-field, sintering coal tar storehouse, ironmaking coal tar storehouse and warehouse, iron foundry (shop), wherein ore stock ground is divided: 0# material strip, 1# material strip, 2# material strip; Blending-field is divided: blending-field A heap, blending-field B heap; Sintering coal tar storehouse is divided: sintering coal tar storehouse great Cang, sintering coal tar storehouse little Cang; Ironmaking coal tar storehouse is divided: No. 1 outdoor stock ground, No. 1 storehouse, No. 2 storehouses, No. 3 storehouses, stock ground, No. 2 blow tank east, No. 2 western stock grounds of blow tank, stock ground, No. 2 blow tank south, stock ground, No. 2 blow tank north; Warehouse, iron foundry (shop) divides into: cast iron 1 warehouse, cast iron 2 warehouses.
7. enterprise according to claim 1 material management system, is characterized in that the mark rule described in control law administration module is that stockpile title connects underscore " _ " with " stockpile sequence number ", then connects " metering name of material " composition.
8. enterprise according to claim 1 material management system, is characterized in that the enterprise's material information described in data memory module is stock ground numbering, stock ground title, stock ground order, effective date, Expiration Date, stock number, name of material, wet basis weight, warehouse-in date and warehouse-in mode.
9. enterprise according to claim 1 material management system, it is characterized in that the stock ground stock material information real-time distribution figure described in showing interface module comprises stock ground title, material strip title, stockpile title, stockpile starting point coordinate, stockpile terminal point coordinate, stockpile shape, stockpile diameter, stockpile length, stockpile width, material stack height, name of material, weight of material, the last time takes inventory weight and takes inventory the time.
10. a using method for the arbitrary described enterprise's material management system of claim 1 ~ 9, is characterized in that comprising the following steps:
A, division stock ground;
B, the metering material in MES is mated with the material of higher level's ERP system, convenient by the inquiry of higher level's ERP system, statistics inventory information;
C, stock ground with metering material be associated;
Material strip is divided in D, stock ground;
E, material strip are divided stockpile, and stockpile identifies with starting point horizontal ordinate and terminal horizontal ordinate, and stockpile title connects underscore " _ " with " stockpile sequence number " and connecting " metering name of material " composition;
F, select concrete metering material to deposit in concrete stockpile, stockpile position and stack material and can revise;
G, generation " stock ground stock material information real-time distribution figure ".
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410372307.4A CN104134124A (en) | 2014-07-31 | 2014-07-31 | Enterprise material management system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410372307.4A CN104134124A (en) | 2014-07-31 | 2014-07-31 | Enterprise material management system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104134124A true CN104134124A (en) | 2014-11-05 |
Family
ID=51806797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410372307.4A Pending CN104134124A (en) | 2014-07-31 | 2014-07-31 | Enterprise material management system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104134124A (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104793595A (en) * | 2015-04-09 | 2015-07-22 | 江南大学 | Real-time data acquisition system of wheat processing factory |
CN104850975A (en) * | 2015-05-26 | 2015-08-19 | 广州视源电子科技股份有限公司 | MRP (Material Requirement Planning) selection method and device |
CN105632041A (en) * | 2014-11-26 | 2016-06-01 | 上海宝钢钢材贸易有限公司 | Self-service lading bill printing system and method |
CN106056268A (en) * | 2016-05-17 | 2016-10-26 | 北京诺士诚国际工程项目管理有限公司 | Engineering project management cloud platform system based on material tracking |
CN108375949A (en) * | 2018-01-15 | 2018-08-07 | 邯郸市邯钢集团信达科技有限公司 | A kind of on-line calculation method of stock ground mixing material heap doses and its each material proportion |
CN111401814A (en) * | 2020-03-25 | 2020-07-10 | Oppo(重庆)智能科技有限公司 | Data processing method and device, electronic equipment and computer readable medium |
CN112418594A (en) * | 2020-09-29 | 2021-02-26 | 山东魏桥创业集团有限公司 | Coal management system based on big data |
CN112862390A (en) * | 2021-01-18 | 2021-05-28 | 上海燕汐软件信息科技有限公司 | Warehouse inventory query method and device, electronic equipment and storage medium |
CN113807712A (en) * | 2021-09-22 | 2021-12-17 | 宝信软件(武汉)有限公司 | MES management method |
CN114904447A (en) * | 2022-05-18 | 2022-08-16 | 中冶长天国际工程有限责任公司 | Production method and system of blended ore |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1395197A (en) * | 2001-07-05 | 2003-02-05 | 英业达股份有限公司 | Material management system and its method |
CN101694576A (en) * | 2009-10-26 | 2010-04-14 | 马鞍山钢铁股份有限公司 | Stockyard operation dynamic display and real-time management system and management method thereof |
-
2014
- 2014-07-31 CN CN201410372307.4A patent/CN104134124A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1395197A (en) * | 2001-07-05 | 2003-02-05 | 英业达股份有限公司 | Material management system and its method |
CN101694576A (en) * | 2009-10-26 | 2010-04-14 | 马鞍山钢铁股份有限公司 | Stockyard operation dynamic display and real-time management system and management method thereof |
Non-Patent Citations (3)
Title |
---|
杨刚: "原料场库存管理系统的开发及应用", 《全国冶金自动化信息网2011年年会论文集》 * |
毕芙蓉: "原料场工艺及其自动化控制和管理", 《钢铁技术》 * |
蔡雁: "烧结综合料场作业管理与优化系统设计及应用研究", 《中国博士学位论文全文数据库 工程科技I辑(月刊)》 * |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105632041A (en) * | 2014-11-26 | 2016-06-01 | 上海宝钢钢材贸易有限公司 | Self-service lading bill printing system and method |
CN104793595A (en) * | 2015-04-09 | 2015-07-22 | 江南大学 | Real-time data acquisition system of wheat processing factory |
CN104850975A (en) * | 2015-05-26 | 2015-08-19 | 广州视源电子科技股份有限公司 | MRP (Material Requirement Planning) selection method and device |
CN106056268A (en) * | 2016-05-17 | 2016-10-26 | 北京诺士诚国际工程项目管理有限公司 | Engineering project management cloud platform system based on material tracking |
CN108375949A (en) * | 2018-01-15 | 2018-08-07 | 邯郸市邯钢集团信达科技有限公司 | A kind of on-line calculation method of stock ground mixing material heap doses and its each material proportion |
CN111401814B (en) * | 2020-03-25 | 2024-01-12 | Oppo(重庆)智能科技有限公司 | Data processing method, device, electronic equipment and computer readable medium |
CN111401814A (en) * | 2020-03-25 | 2020-07-10 | Oppo(重庆)智能科技有限公司 | Data processing method and device, electronic equipment and computer readable medium |
CN112418594A (en) * | 2020-09-29 | 2021-02-26 | 山东魏桥创业集团有限公司 | Coal management system based on big data |
CN112418594B (en) * | 2020-09-29 | 2023-09-19 | 山东魏桥创业集团有限公司 | Coal management system based on big data |
CN112862390A (en) * | 2021-01-18 | 2021-05-28 | 上海燕汐软件信息科技有限公司 | Warehouse inventory query method and device, electronic equipment and storage medium |
CN112862390B (en) * | 2021-01-18 | 2024-01-19 | 上海燕汐软件信息科技有限公司 | Warehouse inventory query method and device, electronic equipment and storage medium |
CN113807712A (en) * | 2021-09-22 | 2021-12-17 | 宝信软件(武汉)有限公司 | MES management method |
CN114904447A (en) * | 2022-05-18 | 2022-08-16 | 中冶长天国际工程有限责任公司 | Production method and system of blended ore |
CN114904447B (en) * | 2022-05-18 | 2024-03-12 | 中冶长天国际工程有限责任公司 | Production method and system for mixed ore |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104134124A (en) | Enterprise material management system and method | |
CN203165006U (en) | Engineering project management system | |
CN104036375B (en) | Storage data based on the goods and materials dynamic tracking of bar code processes system and method | |
CN111080271A (en) | System and method for land batch supervision | |
CN106296065A (en) | The monitoring method of order correct-distribute based on GIS technology exception, Apparatus and system | |
CN103366284A (en) | Tender offer and expense control system | |
CN108205741A (en) | A kind of articles from the storeroom money storage route Intelligent planning method and electronic equipment | |
CN204237263U (en) | A kind of automatic transport of cigarette pallet and the storage of artificial de-stacking divide integrated system | |
CN104866912B (en) | A kind of bulk cargo stock yard material heap management method | |
CN106126587A (en) | Multinode data based on flow process display recording mechanism | |
CN107301490A (en) | Bi- inventory optimal insurance storage level computational methods based on Poisson distribution | |
CN110288361A (en) | A kind of have furniture made to order information tracking method and system based on Life cycle | |
CN103559594A (en) | Management system and method for having control over procurement plan according to inventory level of spare parts | |
Sawers | Urban primacy in Tanzania | |
CN114047777A (en) | Mass operation scheduling method for plant protection unmanned aerial vehicle | |
Vermillion | The privatization and self-management of irrigation. Final report submitted to the Deutsche Gesellschaft für Technische Zusammenarbeit (GTZ) GmbH by IIMI | |
CN103870949A (en) | Metallurgy production process tracking system and method | |
CN104484716A (en) | Reserve quota prediction algorithm of ERP (Enterprise Resource Planning) system | |
CN204406398U (en) | A kind of financial management inquiry unit | |
CN109409650A (en) | A kind of ERP management system of corporate resources | |
CN102012942A (en) | System for adjusting and changing plan | |
CN110209379A (en) | A kind of intelligent interactive software systems and application method | |
Gollehon | Water markets implications for rural areas of the west | |
CN115358679A (en) | Medical material intelligent management method based on cloud warehouse | |
CN114037371A (en) | Intelligent warehousing system design method based on digital twin technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20141105 |
|
RJ01 | Rejection of invention patent application after publication |