- CN107563635A CN107563635A CN201710758559.4A CN201710758559A CN107563635A CN 107563635 A CN107563635 A CN 107563635A CN 201710758559 A CN201710758559 A CN 201710758559A CN 107563635 A CN107563635 A CN 107563635A
- Authority
- CN
- China
- Prior art keywords
- camera device
- master station
- mobile terminal
- check
- long
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of long-range audit system of distribution line engineering construction quality and method, the audit system includes checking master station, display device, mobile base station, server, mobile terminal, first camera device and the second camera device, the image data of job site is obtained by the first camera device and the second camera device, pass through the measurement data at the APP modules input scene of mobile terminal, the image data and measurement data, which are uploaded to, checks that master station stores, processing, generation report, show and supply remotely to pacify matter person and check, this checks that master station can send order to notify scene peace matter person to be supervised engineering rectification to mobile terminal.The audit system is simple, conveniently, it is easy-to-use;Its real-time, promptness are strong, realize that the overall process of construction process is controlled, strengthen the supervision of engineering construction.
Description
Technical field
The present invention relates to a kind of long-range audit system of distribution line engineering construction quality and method.
Background technology
In recent years, country accelerates power infrastructures construction, and Guo Wang companies also increase construction and the transformation dynamics of power distribution network.
2016, just there were all kinds of engineerings 108 in company, total investment up to more than 8,700 ten thousand yuan, wherein, distribution transformation and overhaul just have 79
, invest 36,000,000 yuan.Because distribution engineering point is more, wide, task weight, power transmission are anxious, construction quality exist more management and control less than
The phenomenon of position, causing to break down in work progress or after putting into operation influences power network normal operation, the serious accident that even results in
Occur, entangling its reason mainly has:
First, design strength is weak, designer's professional standards are poor, and projected depth is not in place, and design is not rigorous, and design becomes
More not in time etc..The Chevron Research Company (CRC) being largely affiliated to, designer is few, and designer lacks practical experience, the design item of undertaking
Mesh is again more, in order to make a dash for task, is often less than the design prospecting that depth is carried out at scene, simply applies mechanically allusion quotation and set drawing, when causing construction
Material is inapplicable, design alteration is more, and not in time, design mistake and leak are more for design alteration and offer design drawing and data
Deng.
Second, construction team's quality mind is poor, progress is blindly pursued, construction team only does by rule of thumb, and it is new to be unfamiliar with new technology
Technique, construction lacks quality surveillance and management and control, phenomenon of using inferior materials and turning out substandard goods are serious.
Third, management weak, site supervision is not in place, and supervisor's responsibility consciousness is not strong, and site supervision is stayed in shape
Formula.
Fourth, to manage on behalf of another phenomenon serious to wrap for engineering, quality dynamics of checking in job site is inadequate, check and accept it is not in place, check and accept stay in
Form, defect Rectification of hidden dangers not in time, check and accept the length that delays, and engineering band defect puts into operation.
The content of the invention
The invention provides a kind of long-range audit system of distribution line engineering construction quality and method, background skill is which overcomed
The deficiencies in the prior art described in art.
The technical solution adopted for the present invention to solve the technical problems is:
The long-range audit system of distribution line engineering construction quality, it includes checking master station, display device, mobile base station, clothes
Business device, mobile terminal, the first camera device and the second camera device, second camera device are communicated with mobile terminal by WIFI
Connection, the mobile terminal and the first camera device are all communicatively connected to mobile base station, and the mobile base station is communicatively connected to server,
The server checks that master station communicates to connect and is located in same LAN with this, the mobile base station and the server and checks master station
Set up defences between the LAN of place wall with flues, the display device and check that master station communicates to connect, APP modules are installed on the mobile terminal;
The image data of job site is obtained by first camera device and the second camera device, passes through mobile terminal
The measurement data at APP modules input scene, the image data and measurement data, which are uploaded to, checks master station's storage, processing, generation report
Accuse, show and checked for long-range peace matter person, this checks that master station can send order to notify scene peace matter person to work to mobile terminal
Journey is supervised rectification.
Among one embodiment:Between first camera device and mobile base station, between mobile terminal and mobile base station all
Connected by 4G network services.
Among one embodiment:The mobile terminal includes any of mobile phone, tablet personal computer or notebook computer.
Among one embodiment:First camera device is portable cradle head camera, and second camera device is
Camera.
The long-range auditing method of distribution line engineering construction quality, the auditing method comprise the following steps:
Step 1, by checking that master station creates engineering project;
Step 2, check that master station imports work ticket, using work ticket to check unit;
Step 3, the image data of job site is gathered by camera device, or by being mounted with the mobile end of APP modules
End input field measurement data, the image data and measurement data send to check master station stored, handle, generate report,
Show and supply remotely to pacify matter person and check;
Step 4, order is sent to notify scene peace matter person to work to mobile terminal from checking master station not if if checking
Journey is supervised rectification, and return to step 3 uploading pictures data or measurement data again;If check by the way that the work ticket is complete
Into;
Step 5, judge whether the engineering project checks completion, terminate this if completing and check project, returned if not completing
Return step 2.
Compared with background technology, it has the following advantages that the technical program:
1st, audit system of the present invention it is simple, conveniently, it is easy-to-use;Its real-time, promptness are to realizing engineering construction
The overall process of journey is controlled, and strengthens the supervision of engineering construction.
2nd, standardization, the standardization application that Phase of Electric Power Projects is checked are promoted.
3rd, the operating efficiency checked is improved.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the system block diagram of the audit system described in the present embodiment.
Fig. 2 is the step flow chart of the auditing method described in the present embodiment.
Embodiment
Fig. 1 is refer to, the long-range audit system of distribution line engineering construction quality, it includes checking master station 10, mobile base station
20th, server 30, mobile terminal 40, the second camera device 50, the first camera device 60 and display device 70, this second shooting
Device 50 is communicated to connect with mobile terminal 40 by WIFI, and the camera device 60 of mobile terminal 40 and first is all communicatively connected to shifting
Dynamic base station 20, the mobile base station 20 are communicatively connected to server 30, and the server 30 checks the communication connection of master station 10 and position with this
In in same LAN, the mobile base station 20 and the server 30 and wall with flues 80 of setting up defences between the place LAN of master station 10 is checked,
The display device 70 installs APP modules with checking that master station 10 communicates to connect on the mobile terminal 40;
The image data of job site is obtained by the camera device 50 of the first camera device 60 and second, by mobile whole
The measurement data at the APP modules input scene at end 40, the image data and measurement data are uploaded to and check that master station 10 stores, located
Reason, generation report, show and checked for long-range peace matter person, it is existing to notify that this checks that master station 10 can send order to mobile terminal 40
Peace matter person is supervised engineering rectification, and this checks that master station 10 is controllable and to transfer the first camera device 60 required to obtain
Job site picture.
All pass through 4G between first camera device 60 and mobile base station 20, between mobile terminal 40 and mobile base station 20
Network service connects.
The mobile terminal 40 includes any of mobile phone, tablet personal computer or notebook computer.
Described display device 70 can use the LED display of large-size.
First camera device is portable cradle head camera, and second camera device is camera.
Fig. 2, the long-range auditing method of distribution line engineering construction quality are refer to, the auditing method can pass through above-mentioned distribution
The long-range audit system of line project construction quality realizes that the auditing method comprises the following steps:
Step 1, by checking that master station creates engineering project;
Step 2, check that master station imports work ticket, using work ticket to check unit;
Step 3, the picture of camera device (camera device includes cradle head camera and camera) collection job site is passed through
Data, or field measurement data is inputted by being mounted with the mobile terminal of APP modules, the image data and measurement data send to
Check that master station is stored, handled, generates report, shown and checked for long-range peace matter person;
Step 4, order is sent to notify scene peace matter person to work to mobile terminal from checking master station not if if checking
Journey is supervised rectification, and return to step 3 uploading pictures data or measurement data again;If check by the way that the work ticket is complete
Into;
Step 5, judge whether the engineering project checks completion, terminate this if completing and check project, returned if not completing
Return step 2.
The information of engineering project mainly includes planning item title, (10kV and 0.4kV shaft towers are bright for project construction designing material
Thin table, service conductor detail list, scissors crossing detail list, main equipment material, dismounting equipment and materials, recycling equipment and materials etc.),
ERP outbound lists etc..During the checking of one engineering project, work ticket is gradually outputed and is articulated in project with engineering progress,
Work ticket includes the numbering and task of construction shaft tower, and long-range peace matter person enters according to the code requirement and the standard of checking of work ticket
Row quality is checked.Scene peace matter personnel can be by the APP modules or the second camera device of mobile terminal, according to construction task standard
Check diagram and check content, the construction technology involved by work ticket and equipment, material installation situation are taken pictures, simultaneously will
Related measurement, test data are completed to upload to check master station after inserting APP modules, and scene peace matter person is according to checking that master station retracts
Unqualified quality information, supervise construction team to complete rectification, and take pictures again, uploaded to after measurement data and check that master station checks again
Core, pass through until checking.
The long-range audit system of distribution line engineering construction quality of the present invention and method, using " internet+" technology,
Computer information technology, the mobile 4G communication technologys, successfully by engineering site installation technology and measurement, test data it is real-time on
Surveillance center is passed to, cooperates with scene peace matter person to complete checking for construction quality by remotely pacifying matter person, constructs complete engineering construction
Quality real-time oversight management and control system, high in technological content, technological precedence.Long-range peace matter person only need to login audit system with browser,
All engineering construction qualities can be checked with information is browsed and engineering construction quality is remotely checked.Scene peace matter person
Engineering construction installation situation can be uploaded in real time using the mobile phone equipped with APP modules and check master station, man-machine interface is simply straight
See, each task has standard quality inspection diagram and required quality inspection project, and general staff is easy to operate and uses.System passes through 4G
Network, transmission speed is fast, can be in real time by 1080P high-definition images information transfer to Surveillance center.Distribution line construction quality is long-range
Check served as theme with project, using work ticket as pipe unit, to last work since distribution line first opens work ticket
Ticket, ticket ticket complete construction quality and check, rectify and improve, and really realize the overall process management and control of engineering construction quality.Distribution line construction matter
Amount remotely checks it is to be set to standard with state's net distribution allusion quotation, checks and accepts and blocks according to distribution line engineering specification, according to standard construction technology
It is required that formulate standard quality check storehouse it will greatly promote modular design, standard construction etc. application.It is complete in same day construction task
Into while, you can complete the examination and rectification of same day task, accomplish Phase of Electric Power Projects " San Tong method " --- while construct, together
When check and accept rectify and improve simultaneously, realize Practical Completion, visa and check and accept complete, rectification complete so that engineering complete can zero-fault throw
Production operation is possibly realized, and is avoided putting into operation because the acceptance of work time is long, rectifies and improves the delay engineering power transmission such as not in place, is also saved a large amount of
Check and accept the manpower and materials of link.
It is described above, only present pre-ferred embodiments, therefore the scope that the present invention is implemented can not be limited according to this, i.e., according to
The equivalent changes and modifications that the scope of the claims of the present invention and description are made, all should still it belong in the range of the present invention covers.
Claims (5)
1. the long-range audit system of distribution line engineering construction quality, it is characterised in that:Including checking master station, display device, movement
Base station, server, mobile terminal, the first camera device and the second camera device, second camera device pass through with mobile terminal
WIFI is communicated to connect, and the mobile terminal and the first camera device are all communicatively connected to mobile base station, mobile base station communication connection
To server, the server checks that master station communicates to connect and is located in same LAN with this, the mobile base station and the server
Check wall with flues of setting up defences between LAN where master station, the display device and check that master station communicates to connect, pacify on the mobile terminal
Fill APP modules;
The image data of job site is obtained by first camera device and the second camera device, passes through the APP of mobile terminal
The measurement data at module input scene, the image data and measurement data be uploaded to check master station's storage, processing, generation report,
Show and supply remotely to pacify matter person and check, this checks that master station can send order to notify scene peace matter person to add engineering to mobile terminal
To supervise rectification.
2. the long-range audit system of distribution line engineering construction quality according to claim 1, it is characterised in that:Described first
All connected between camera device and mobile base station, between mobile terminal and mobile base station by 4G network services.
3. the long-range audit system of distribution line engineering construction quality according to claim 1, it is characterised in that:The movement
Terminal includes any of mobile phone, tablet personal computer or notebook computer.
4. the long-range audit system of distribution line engineering construction quality according to claim 1, it is characterised in that:Described first
Camera device is portable cradle head camera, and second camera device is camera.
5. the long-range auditing method of distribution line engineering construction quality, it is characterised in that:The auditing method comprises the following steps:
Step 1, by checking that master station creates engineering project;
Step 2, check that master station imports work ticket, using work ticket to check unit;
Step 3, it is defeated by the image data of camera device collection job site, or the mobile terminal by being mounted with APP modules
Enter field measurement data, the image data and measurement data are sent to checking that master station is stored, handles, generates report, display
And checked for long-range peace matter person;
Step 4, order is sent to notify scene peace matter person to add engineering to mobile terminal from checking master station not if if checking
To supervise rectification, and return to step 3 uploading pictures data or measurement data again;If check by the way that the work ticket is completed;
Step 5, judge whether the engineering project checks completion, terminate this if completing and check project, step is returned if not completing
Rapid 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710758559.4A CN107563635A (en) | 2017-08-29 | 2017-08-29 | The long-range audit system of distribution line engineering construction quality and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710758559.4A CN107563635A (en) | 2017-08-29 | 2017-08-29 | The long-range audit system of distribution line engineering construction quality and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107563635A true CN107563635A (en) | 2018-01-09 |
Family
ID=60977580
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710758559.4A Pending CN107563635A (en) | 2017-08-29 | 2017-08-29 | The long-range audit system of distribution line engineering construction quality and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107563635A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108848337A (en) * | 2018-06-12 | 2018-11-20 | 中国联合网络通信集团有限公司 | Long-range auditing method, device, terminal and the computer storage medium of line project |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105184519A (en) * | 2015-10-23 | 2015-12-23 | 国家电网公司 | Standardized safety operation tracing management system |
CN105825329A (en) * | 2016-03-14 | 2016-08-03 | 国网福建省电力有限公司 | Safety and quality inspection method based on remote working site monitoring system |
-
2017
- 2017-08-29 CN CN201710758559.4A patent/CN107563635A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105184519A (en) * | 2015-10-23 | 2015-12-23 | 国家电网公司 | Standardized safety operation tracing management system |
CN105825329A (en) * | 2016-03-14 | 2016-08-03 | 国网福建省电力有限公司 | Safety and quality inspection method based on remote working site monitoring system |
Non-Patent Citations (1)
Title |
---|
张欣强 等: "基于"互联网+"配电线路工程施工质量远程稽核的创新实践", 《HTTP://WWW.CHINAQKING.COM/YC/2017/804439.HTML#》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108848337A (en) * | 2018-06-12 | 2018-11-20 | 中国联合网络通信集团有限公司 | Long-range auditing method, device, terminal and the computer storage medium of line project |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109446668A (en) | A kind of component Schedule monitoring system and method based on threedimensional model | |
CN103578154A (en) | PDA-based realization method for intelligent patrol of electric equipment | |
CN108322475A (en) | A kind of equipment remote collaboration method for maintaining and system based on MR live streamings | |
CN105243440A (en) | Marketing mobile working platform based paperless office on-site working method | |
CN104103098A (en) | Electric power distribution network line as well as equipment inspection method and equipment inspection system | |
CN109034404B (en) | AR (augmented reality) -glasses-based multi-user cooperative maintenance system and method for thermal power plant and AR glasses | |
CN106845809A (en) | A kind of engineering course line work dispatching method, system and device, dispatching system | |
CN103177327A (en) | Comprehensive management system for low-voltage power operations based on B/S (browser/server) and C/S (client/server) architectures | |
CN110032148A (en) | For the system of power plant management and the equipment of the 3D dummy model for establishing power plant | |
CN106845834A (en) | Transmission line of electricity hidden danger management method and system based on mobile phone A PP | |
CN108154340A (en) | Prefabricated component informationization management system based on BIM cloud platforms | |
CN107563635A (en) | The long-range audit system of distribution line engineering construction quality and method | |
CN106408091A (en) | Transformer station equipment information management platform | |
CN102096862A (en) | Network-based clothing management method and system | |
CN107480285A (en) | Center monitoring inquiry system and method | |
CN106993041A (en) | A kind of power marketing moves work data synchronous method | |
CN207337347U (en) | It can carry out the AR helmets of power transformation inspection | |
CN109146329A (en) | A kind of power distribution network repairing command comprehensive display platform | |
CN107392458A (en) | Based on field device operation intellectual analysis relative influence equipment topological analysis | |
CN102479359A (en) | Power grid overhauling plan compilation method based on graphic operations | |
CN102663570A (en) | Aluminum product cost accounting processing method and system based on network | |
KR101841347B1 (en) | Mobile Terminal for Maintaining Wind Power Generator and Maintaining Method | |
CN202454974U (en) | Device for electric power production inspection tour | |
CN108736572A (en) | Power equipment intelligence control platform | |
CN108492395A (en) | A kind of cruising inspection system and method for the power matching network equipment based on RFID |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180109 |
|