CN113469445A - Risk management and control real-time tracking system based on field operation - Google Patents

Risk management and control real-time tracking system based on field operation Download PDF

Info

Publication number
CN113469445A
CN113469445A CN202110778611.9A CN202110778611A CN113469445A CN 113469445 A CN113469445 A CN 113469445A CN 202110778611 A CN202110778611 A CN 202110778611A CN 113469445 A CN113469445 A CN 113469445A
Authority
CN
China
Prior art keywords
work
ticket
bottom plate
tracking system
bearing bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110778611.9A
Other languages
Chinese (zh)
Inventor
邱国印
叶冲
张丁
赵瑞刚
张银军
芦小林
冯俊男
冯筱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Zuoquan Coal Power Co ltd
Original Assignee
Huaneng Zuoquan Coal Power Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Zuoquan Coal Power Co ltd filed Critical Huaneng Zuoquan Coal Power Co ltd
Priority to CN202110778611.9A priority Critical patent/CN113469445A/en
Publication of CN113469445A publication Critical patent/CN113469445A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The invention discloses a real-time tracking system based on field operation risk management and control, which comprises a first bearing bottom plate: one side of the first bearing bottom plate is provided with a second bearing bottom plate, the first bearing bottom plate and the second bearing bottom plate are fixedly connected together through two locking assemblies, and the top of the first bearing bottom plate is provided with a risk management and control tracking system. In the invention, when in actual use, the work ticket management bears all management information, process information, safety measures and risk analysis carriers related to the work, and the effective management and control of the operation risk are realized through the implementation and supervision of each item of content; modern 'two-ticket' management is adopted, and real-time and quantitative risk management and control are carried out on risks; the two kinds of ' two tickets ' management are not essentially different, and compared with the modern ' two tickets ' management, the two kinds of tickets ' management is an innovation and optimization mode on the basis of inheritance of traditional management.

Description

Risk management and control real-time tracking system based on field operation
Technical Field
The invention belongs to the technical field of on-site operation risk management and control, and particularly relates to a real-time tracking system based on-site operation risk management and control.
Background
The field operation safety management is one of important organization measures, plays an important role in the field operation risk management and control of safety production, is an important means for realizing operation organization in production, is a source for controlling operation risks, can effectively realize maintenance operation risk management and control, and is mainly characterized by strict and standard execution of a work ticket system and effective supervision measures and means.
The traditional field operation management mode has the following defects:
firstly, during the operation of the production field, the danger comes from unsafe behaviors of people, unsafe states of objects and unsafe factors of the environment, and if the danger cannot be effectively controlled, personal injury, equipment damage or other unpredictable risks can be caused.
In a production field, the situation that part of personnel are lack of service level inevitably exists, and a work licensor is not familiar with a work responsible person exists, so that the phenomena of 'signature generation' and 'safe settlement generation' are organically improved; partial job responsible persons do not work, and the person is searched for 'agency work ticket', 'agency guardianship', 'agency maintenance and repair replacement'; in part of teams and groups, one working responsible person is responsible for multiple works in one overhaul period, the multiple works which are worked in a responsibility area are not easy to master, comprehensive field supervision cannot be achieved, and zero violation and no risk of field risk management cannot be achieved.
Disclosure of Invention
The invention aims to provide a real-time tracking system based on field operation risk management and control, which aims to solve the problems that in the production field operation process, dangers are caused by unsafe behaviors of people, unsafe states of objects and unsafe factors of the environment, if the dangers cannot be effectively controlled, personal injury, equipment damage or other unpredictable risks can be caused, in the production field, the service level of part of personnel is inevitably deficient, and the conditions that a work licensor is not familiar with a work responsible person exist, so that the phenomena of ' signature generation ' and ' generation safety background of the work are organically multiplied; partial job responsible persons do not work, and the person is searched for 'agency work ticket', 'agency guardianship', 'agency maintenance and repair replacement'; the work period of part of teams is within one overhaul period, one work responsible person is responsible for multiple works, the multiple works which are worked in the responsibility area are not easy to control, comprehensive field supervision cannot be achieved, and zero-violation and risk-free technical problems of field risk management cannot be achieved.
The technical scheme for solving the technical problems is as follows: the utility model provides a based on real-time tracking system of field operation risk management and control, includes that bearing bottom plate one: the novel multifunctional intelligent printing machine is characterized in that a second bearing bottom plate is arranged on one side of the first bearing bottom plate, the first bearing bottom plate and the second bearing bottom plate are fixedly connected together through two locking assemblies, a risk management and control tracking system is arranged at the top of the first bearing bottom plate, and a printing system is arranged at the top of the second bearing bottom plate.
The risk management and control tracking system comprises system operation equipment and command input equipment, wherein the system operation equipment and the command input equipment can be detachably mounted on the first bearing bottom plate.
The printing system comprises a printing device, a paper placing opening is formed in one side of the printing device, a paper work ticket is arranged on the inner side of the paper placing opening, and a paper outlet is formed in one side of the printing device.
Preferably, the locking assembly comprises a rotating shaft rod fixedly mounted on the first bearing base plate and a clamping pin fixedly mounted on the second bearing base plate, a clamping rod is movably mounted on the surface of the rotating shaft rod, and one side of the clamping rod is buckled on the clamping groove.
Preferably, one side of the top of the first bearing bottom plate is fixedly provided with three clamping pieces, and the system operation equipment is fixedly arranged on the first bearing bottom plate through the three clamping pieces.
Preferably, the bottom of the printing device is fixedly provided with a mounting bottom plate, and four corners of the mounting bottom plate are fixedly arranged on the second bearing bottom plate through screws.
A real-time tracking system based on field operation risk management and control is disclosed, and the use method comprises the following steps:
firstly, in the production field operation process, before entering a field, a worker has to go to a person in charge on duty to carry out preparation and specific information remarking, and fill in a corresponding work ticket, and then can carry out in-field work:
1. when the installation, overhaul, maintenance or test work is carried out on an electric, thermal, mechanical, thermal control device or system, an operator on duty needs to take measures on the device or take measures for guaranteeing the personal safety and the device safety on the aspects of operation mode and operation adjustment, and an (outsourcing) electric work ticket or an (outsourcing) thermal mechanical work ticket needs to be filled in.
2. The method is characterized in that the method comprises the following steps of carrying out construction, scaffold erecting and dismantling, equipment heat preservation, welding, painting, greening or other civilized production, daily maintenance and other work in a production area, not working on equipment, and not needing to run work of taking safety measures by an operator on duty, and using a production area work contact list.
3. Performing maintenance work on the production equipment or system, such as: the method comprises the following steps of carrying out lifting operation, operation under pressure, container opening operation, blasting operation, limited space operation, radioactive operation, diving operation, excavating and drilling operation, temporary electricity utilization operation and the like by using a lifting machine, wherein a special operation measure ticket is attached to a corresponding electric work ticket, a thermal machine work ticket or a work contact list.
4. When the fire operation is carried out in the first-level and second-level fire operation areas, fire operation measure tickets are attached to the corresponding work tickets or work contact lists.
5. After the permission of the operation on-duty responsible person, the emergency repair work of accidents and the temporary repair of night and holidays can be carried out without using a work ticket and a work contact list under the special condition that no work ticket issuer exists, and the emergency repair list of accidents is used to ensure the safety measures before the emergency repair and ensure the safety of the emergency repair and the maintenance work of holidays.
If the safety measures need to be executed by the relay protection personnel and the thermal control personnel in the work ticket safety measures in a matching way, the safety measure columns executed by the relay protection personnel and the thermal control personnel need to be filled with the safety measure columns, executed and signed by the relay protection personnel and the thermal control personnel, and a thermal operation measure ticket can be attached if necessary.
And thirdly, the work tickets are managed by a computer, the overhaul and operation teams and groups must register the work tickets, the registered contents comprise the serial numbers of the work tickets, work responsible persons, work contents, the start time and the end time of the work permission, and the invalidation tickets mark the invalidation reason.
The method for generating the work ticket comprises the following steps:
firstly, a table body structure comprising a table header and a data area is established according to user requirements; the creating process specifically comprises: creating a work ticket attribute area; creating a work ticket area; creating a work ticket input data recording area; creating a work ticket output data display area; and creating a work ticket remark information area.
And secondly, compiling the table body structure in an application environment to generate a work ticket engine file.
And thirdly, acquiring data corresponding to the user and stored by the tracking system.
And fourthly, integrating the acquired data with the work ticket engine file, and generating a work ticket in the tracking system.
Preferably, the work ticket is saved in a file form, or the work ticket is added into a work information queue of the tracking system, or the work ticket is inserted into an existing target database in the tracking system for saving.
Preferably, the terminal downloads the work ticket file through the network; or transferring the work ticket file to the user terminal by using the mobile storage device.
Preferably, the work ticket stored in the database is printed into a paper document by operating the device through the operating system and matching with the printing device.
1. The invention has the beneficial effects that: in the invention, when in actual use, the work ticket management bears all management information, process information, safety measures and risk analysis carriers related to the work, and the effective management and control of the operation risk are realized through the implementation and supervision of each item of content, and the traditional 'two tickets' management controls the risk by virtue of experience and consciousness; modern 'two-ticket' management is adopted, and real-time and quantitative risk management and control are carried out on risks; the two kinds of 'two tickets' management are not essentially different, and compared with the modern 'two tickets' management, the modern 'two tickets' management is an innovative and optimized mode on the basis of inheritance of traditional management, the real-time tracking system based on field operation risk management and control is used for solving the problems that dangers are derived from unsafe behaviors of people, unsafe states of objects and unsafe factors of environments in the process of production field operation, personal injury, equipment damage or other unpredictable risks can be caused if the dangers cannot be effectively controlled, the inevitable existence of partial lack of service level of personnel in the production field exists, and the situation that a work licensor is not familiar with a work responsible person exists, so that the 'signature generation' and 'generation safety interaction' phenomena are organically favorable; partial job responsible persons do not work, and the person is searched for 'agency work ticket', 'agency guardianship', 'agency maintenance and repair replacement'; the work period of part of teams is within one overhaul period, one work responsible person is responsible for multiple works, the multiple works which are worked in the responsibility area are not easy to control, comprehensive field supervision cannot be achieved, and zero-violation and risk-free technical problems of field risk management cannot be achieved.
Drawings
The above and/or other advantages of the invention will become more apparent and more readily appreciated from the following detailed description taken in conjunction with the accompanying drawings, which are given by way of illustration only and not by way of limitation, and in which:
FIG. 1 is a schematic diagram of a tracking system apparatus according to an embodiment of the present invention;
FIG. 2 is an enlarged view of A in FIG. 1 according to an embodiment of the present invention;
FIG. 3 is a flow chart illustrating the operation of the system according to an embodiment of the present invention.
In the drawings, the components represented by the respective reference numerals are listed below:
1. the printing system comprises a first bearing bottom plate, a second bearing bottom plate, a third bearing bottom plate, a mounting bottom plate, a fourth bearing bottom plate, a third bearing bottom plate, a fourth bearing bottom plate, a fifth bearing bottom plate, a sixth bearing bottom plate, a fifth bearing bottom plate, a sixth bearing bottom plate, a printing device, a fifth bearing bottom plate, a sixth bearing bottom plate, a paper outlet, a system operating device, a sixth bearing bottom plate, a paper outlet, 8, a system operating device, 10, a system operating device, a 10, a rotating shaft, a 11, a command input device, 12, a card slot, a card slot, a card.
Detailed Description
Hereinafter, an embodiment of the present invention of a real-time tracking system based on-site work risk management will be described with reference to the accompanying drawings.
The examples described herein are specific embodiments of the present invention, are intended to be illustrative and exemplary in nature, and are not to be construed as limiting the scope of the invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
The drawings in the present specification are schematic views to assist in explaining the concept of the present invention, and schematically show the shapes of respective portions and their mutual relationships. It is noted that the drawings are not necessarily to the same scale so as to clearly illustrate the structures of the various elements of the embodiments of the invention. Like reference numerals are used to denote like parts.
Fig. 1 to 3 show a real-time tracking system based on risk management and control of field work according to an embodiment of the present invention, which includes a first bearing bottom plate 1: one side of the bearing bottom plate I1 is provided with a bearing bottom plate II 2, the bearing bottom plate I1 and the bearing bottom plate II 2 are fixedly connected together through two locking components, the top of the bearing bottom plate I1 is provided with a risk management and control tracking system, and the top of the bearing bottom plate II 2 is provided with a printing system.
The risk management and control tracking system comprises a system operation device 9 and a command input device 11, wherein both the system operation device 9 and the command input device 11 can be detachably mounted on the first bearing bottom plate 1.
Printing system includes printing apparatus 4, one side of printing apparatus 4 is provided with puts paper mouth 5, the inboard of putting paper mouth 5 is provided with paper work ticket 6, one side of printing apparatus 4 is provided with exit slot 7, the hasp subassembly includes pivot pole 10 and the bayonet lock 12 of fixed mounting on bearing bottom plate two 2 of fixed mounting on bearing bottom plate 1, the movable surface mounting of pivot pole 10 has kelly 14, one side lock joint of kelly 14 is on draw-in groove 13, one side fixed mounting at bearing bottom plate 1 top has three fastener 8, system operation equipment 9 is through three fastener 8 fixed mounting on bearing bottom plate one 1, the bottom fixed mounting of printing apparatus 4 has mounting plate 3, screw fixed mounting is passed through on bearing bottom plate two 2 in mounting plate 3's four corners.
A real-time tracking system based on field operation risk management and control is disclosed, and the use method comprises the following steps:
firstly, in the production field operation process, before entering a production field, a worker has to go to a person in charge on duty to carry out preparation and specific information remarking, and fills in a corresponding work ticket, and then the worker can work in the field.
1. When the installation, overhaul, maintenance or test work is carried out on an electric, thermal, mechanical, thermal control device or system, an operator on duty needs to take measures on the device or take measures for guaranteeing the personal safety and the device safety on the aspects of operation mode and operation adjustment, and an (outsourcing) electric work ticket or an (outsourcing) thermal mechanical work ticket needs to be filled in.
2. The method is characterized in that the method comprises the following steps of carrying out construction, scaffold erecting and dismantling, equipment heat preservation, welding, painting, greening or other civilized production, daily maintenance and other work in a production area, not working on equipment, and not needing to run work of taking safety measures by an operator on duty, and using a production area work contact list.
3. Performing maintenance work on the production equipment or system, such as: the method comprises the following steps of carrying out lifting operation, operation under pressure, container opening operation, blasting operation, limited space operation, radioactive operation, diving operation, excavating and drilling operation, temporary electricity utilization operation and the like by using a lifting machine, wherein a special operation measure ticket is attached to a corresponding electric work ticket, a thermal machine work ticket or a work contact list.
4. When the fire operation is carried out in the first-level and second-level fire operation areas, fire operation measure tickets are attached to the corresponding work tickets or work contact lists.
5. After the permission of the operation on-duty responsible person, the emergency repair work of accidents and the temporary repair of night and holidays can be carried out without using a work ticket and a work contact list under the special condition that no work ticket issuer exists, and the emergency repair list of accidents is used to ensure the safety measures before the emergency repair and ensure the safety of the emergency repair and the maintenance work of holidays.
If the safety measures need to be executed by the relay protection personnel and the thermal control personnel in the work ticket safety measures in a matching way, the safety measure columns executed by the relay protection personnel and the thermal control personnel need to be filled with the safety measure columns, executed and signed by the relay protection personnel and the thermal control personnel, and a thermal operation measure ticket can be attached if necessary.
And thirdly, the work tickets are managed by a computer, the overhaul and operation teams and groups must register the work tickets, the registered contents comprise the serial numbers of the work tickets, work responsible persons, work contents, the start time and the end time of the work permission, and the invalidation tickets mark the invalidation reason.
The method for generating the work ticket comprises the following steps:
firstly, a table body structure comprising a table header and a data area is established according to user requirements; the creating process specifically comprises: creating a work ticket attribute area; creating a work ticket area; creating a work ticket input data recording area; creating a work ticket output data display area; and creating a work ticket remark information area.
And secondly, compiling the table body structure in an application environment to generate a work ticket engine file.
And thirdly, acquiring data corresponding to the user and stored by the tracking system.
Integrating the acquired data with a work ticket engine file, generating a work ticket in the tracking system, storing the work ticket in a file form, or adding the work ticket into a tracking system operation information queue, or inserting the work ticket into an existing target database in the tracking system for storage, and downloading the work ticket file by the terminal through a network; or, the work ticket file is transferred to the user terminal by using the mobile storage device, and the work ticket stored in the database is printed into a paper document by operating the device 9 through the operating system and matching with the printing device 4.
The technical features disclosed above are not limited to the combinations with other features disclosed, and other combinations between the technical features can be performed by those skilled in the art according to the purpose of the invention, so as to achieve the purpose of the invention.

Claims (9)

1. The real-time tracking system based on-site operation risk management and control is characterized by comprising a first bearing bottom plate (1): a second bearing bottom plate (2) is arranged on one side of the first bearing bottom plate (1), the first bearing bottom plate (1) and the second bearing bottom plate (2) are fixedly connected together through two locking assemblies, a risk management and control tracking system is arranged at the top of the first bearing bottom plate (1), and a printing system is arranged at the top of the second bearing bottom plate (2);
the risk management and control tracking system comprises a system operating device (9) and a command input device (11), wherein both the system operating device (9) and the command input device (11) can be detachably mounted on the first bearing bottom plate (1);
the printing system comprises a printing device (4), a paper placing opening (5) is formed in one side of the printing device (4), a paper work ticket (6) is arranged on the inner side of the paper placing opening (5), and a paper outlet (7) is formed in one side of the printing device (4).
2. The real-time tracking system based on-site operation risk management and control of claim 1 is characterized in that the locking assembly comprises a rotating shaft rod (10) fixedly mounted on the first bearing bottom plate (1) and a clamping pin (12) fixedly mounted on the second bearing bottom plate (2), a clamping rod (14) is movably mounted on the surface of the rotating shaft rod (10), and one side of the clamping rod (14) is buckled on the clamping groove (13).
3. The real-time tracking system based on-site operation risk management and control of claim 2 is characterized in that three clamping pieces (8) are fixedly installed on one side of the top of the first bearing bottom plate (1), and the system operating device (9) is fixedly installed on the first bearing bottom plate (1) through the three clamping pieces (8).
4. The real-time tracking system based on-site operation risk management and control of claim 3 is characterized in that a mounting bottom plate (3) is fixedly mounted at the bottom of the printing device (4), and four corners of the mounting bottom plate (3) are fixedly mounted on the second bearing bottom plate (2) through screws.
5. The on-site operation risk management and control based real-time tracking system according to claims 1-4, characterized in that the using method is as follows:
firstly, in the production field operation process, before entering a field, a worker has to go to a person in charge on duty to carry out preparation and specific information remarking, and fill in a corresponding work ticket, and then can carry out in-field work:
1. when the installation, overhaul, maintenance or test work is carried out on an electric, thermal, mechanical, thermal control device and system, an operator on duty needs to take measures on the device or take safety measures for guaranteeing the person and the device on the aspects of operation mode and operation adjustment, and an (outsourcing) electric work ticket or an (outsourcing) thermal mechanical work ticket needs to be filled in;
2. the method comprises the following steps that the production area is used for building, scaffold erecting and dismantling, equipment heat preservation, welding, painting, greening or other civilized production, daily maintenance and other work, the work is not carried out on equipment, and the work of taking safety measures by operators on duty is not needed;
3. performing maintenance work on the production equipment or system, such as: the method comprises the following steps that toxic and harmful gases, an oxygen-poor environment, dust exceeding, fire operation, 30m and above high-altitude operation are involved, hoisting operation is carried out by using a hoisting machine, operation under pressure, container opening operation, blasting operation, limited space operation, radioactive operation, diving operation, excavation and drilling operation, temporary electricity utilization operation and the like, a special operation measure ticket is attached to a corresponding electric work ticket, a thermal machine work ticket or a work contact list, specifically, after the work ticket is reported by workers, a duty person is operated on a tracking system, information of the workers needing to be filled is input, attention is input, the work ticket is printed, and finally the workers sign and confirm, so that the formed electric work ticket, thermal machine work ticket or work contact list is attached to the special operation measure ticket;
4. when the fire operation is carried out in the first-level and second-level fire operation areas, fire operation measure tickets are attached to the corresponding work tickets or work contact lists, specifically, after the work tickets are reported, a person in charge on duty is operated on a tracking system, the information of the person to be filled is input, attention matters are input, the work tickets are printed out, and finally the work tickets are signed and confirmed to form the corresponding work tickets or work contact lists, wherein the fire operation measure tickets are attached to the work tickets or the contact lists;
5. after the operation on-duty responsible person permits, the accident emergency repair work, the night and holiday temporary repair work can be carried out without using a work ticket and a work contact list under the special condition that no work ticket issuer exists, the accident emergency repair list is used, the safety measures are guaranteed to be implemented before the emergency repair, and the safety of the accident emergency repair and holiday repair work is guaranteed;
secondly, when the safety measures which need to be executed by the relay protection personnel and the thermal control personnel in the work ticket safety measures are related, the safety measure columns executed by the relay protection personnel and the thermal control personnel are filled with the safety measures, executed by the relay protection personnel and the thermal control personnel and signed, and a hot work measure ticket can be attached if necessary;
and thirdly, the work tickets are managed by a computer, the overhaul and operation teams and groups must register the work tickets, the registered contents comprise the serial numbers of the work tickets, work responsible persons, work contents, the start time and the end time of the work permission, and the invalidation tickets mark the invalidation reason.
6. The real-time tracking system based on-site work risk management and control of claim 5, wherein the method for generating the work ticket is as follows:
firstly, a table body structure comprising a table header and a data area is established according to user requirements; the creating process specifically comprises: creating a work ticket attribute area; creating a work ticket area; creating a work ticket input data recording area; creating a work ticket output data display area; creating a work ticket remark information area;
compiling the table body structure in an application environment to generate a work ticket engine file;
thirdly, acquiring data which is stored by a tracking system and corresponds to the user;
and fourthly, integrating the acquired data with the work ticket engine file, and generating a work ticket in the tracking system.
7. The real-time tracking system based on-site work risk management and control of claim 6, characterized in that the work ticket is saved in a file form, or the work ticket is added to a work information queue of the tracking system, or the work ticket is inserted into an existing target database in the tracking system for saving.
8. The system according to claim 7, wherein the terminal downloads the work order file through a network; or transferring the work ticket file to the user terminal by using the mobile storage device.
9. The real-time tracking system based on the on-site work risk management and control of claim 8 is characterized in that the work tickets stored in the database are printed into paper documents through the operating system operating device (9) and the printing device (4).
CN202110778611.9A 2021-07-09 2021-07-09 Risk management and control real-time tracking system based on field operation Pending CN113469445A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110778611.9A CN113469445A (en) 2021-07-09 2021-07-09 Risk management and control real-time tracking system based on field operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110778611.9A CN113469445A (en) 2021-07-09 2021-07-09 Risk management and control real-time tracking system based on field operation

Publications (1)

Publication Number Publication Date
CN113469445A true CN113469445A (en) 2021-10-01

Family

ID=77879479

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110778611.9A Pending CN113469445A (en) 2021-07-09 2021-07-09 Risk management and control real-time tracking system based on field operation

Country Status (1)

Country Link
CN (1) CN113469445A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105825329A (en) * 2016-03-14 2016-08-03 国网福建省电力有限公司 Safety and quality inspection method based on remote working site monitoring system
CN111091304A (en) * 2019-12-24 2020-05-01 金现代信息产业股份有限公司 Digital work ticket management and control system and method for power industry
CN213582140U (en) * 2020-11-24 2021-06-29 山西潞安集团余吾煤业有限责任公司 Portable CAD drawing printing editing control device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105825329A (en) * 2016-03-14 2016-08-03 国网福建省电力有限公司 Safety and quality inspection method based on remote working site monitoring system
CN111091304A (en) * 2019-12-24 2020-05-01 金现代信息产业股份有限公司 Digital work ticket management and control system and method for power industry
CN213582140U (en) * 2020-11-24 2021-06-29 山西潞安集团余吾煤业有限责任公司 Portable CAD drawing printing editing control device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
无: ""工作票管理规定"", 《HTTPS://WWW.DOCIN.COM/P-2687470594.HTML&ISPAY=1》 *

Similar Documents

Publication Publication Date Title
CN101719690B (en) Dispatching method of electric network
CN103177396A (en) Intelligentized whole-employee overall-process full-profession multidimensional risk management and control platform for site operations of power supply enterprises
CN103488138A (en) Method and system for generating scheduling item operation order
CN102582495A (en) Vehicle-mounted comprehensive test system used for condition based maintenance for electrical equipment
CN113469445A (en) Risk management and control real-time tracking system based on field operation
CN106779298A (en) The grid equipment level lifecycle management succeeding year method of cost accounting
CN111668935A (en) Substation operation preparation management method and system based on EIM
CN202978434U (en) Power operation site management and control system
CN204679830U (en) A kind of anti-error and intend the off-line type scheduling operation bill system of ticket training based on scene
CN113794754A (en) Electronic operation ticket control system and method based on mobile application
CN103325003A (en) Electric power ground lead managing system
CN202512179U (en) Vehicle-mounted comprehensive test system for examining and repairing electrical device states
CN201204133Y (en) Intelligent misoperation resistance system for traction electriclpower station
CN111047057A (en) Network cascade processing system and method for repairing size based on key box
Zhang Research on the application of intelligent construction site in construction Site management
Lv et al. HFACS-based analysis of accidents related to lifting operations in construction
Yuanyuan et al. Research on Electricity Falling Accident Based on Improved Bode Accident Causation Model
CN108199339B (en) A kind of intelligent substation protection equipment safety measure list generation method and device
CN212015022U (en) Electric power signboard management cabinet
Yasuda et al. A Work Management System for Nuclear Power Stations and Future Trends Regarding a Maintenance Support System
Wang et al. Research on Working Mechanism of Investigation and Treatment of Hidden Hazards in Construction Enterprises
Xu Summary of Operation and Maintenance with BIM Technology for Large Commercial Complex Architecture
CN113489141A (en) Safety collaborative management and control system
Junfeng Constructon of Safety Monitoring System for Constructon Site Based on BIM Technology
Liu et al. Research on nuclear facilities decommissioning engineering support system framework

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20211001