CN109784613A - Electric power field work managing and control system anti-violating the regulations - Google Patents
Electric power field work managing and control system anti-violating the regulations Download PDFInfo
- Publication number
- CN109784613A CN109784613A CN201811452142.6A CN201811452142A CN109784613A CN 109784613 A CN109784613 A CN 109784613A CN 201811452142 A CN201811452142 A CN 201811452142A CN 109784613 A CN109784613 A CN 109784613A
- Authority
- CN
- China
- Prior art keywords
- regulations
- management
- violating
- work order
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007619 statistical method Methods 0.000 claims abstract description 16
- 238000007726 management method Methods 0.000 claims description 83
- 230000006870 function Effects 0.000 claims description 23
- 238000012550 audit Methods 0.000 claims description 22
- 238000010276 construction Methods 0.000 claims description 14
- 238000012217 deletion Methods 0.000 claims description 13
- 230000037430 deletion Effects 0.000 claims description 13
- 238000012423 maintenance Methods 0.000 claims description 13
- 238000000034 method Methods 0.000 claims description 12
- 238000007792 addition Methods 0.000 claims description 10
- 230000008569 process Effects 0.000 claims description 8
- 238000013475 authorization Methods 0.000 claims description 6
- 230000006399 behavior Effects 0.000 claims description 6
- 230000005611 electricity Effects 0.000 claims description 6
- 238000007689 inspection Methods 0.000 claims description 6
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 238000012986 modification Methods 0.000 claims description 6
- 230000004048 modification Effects 0.000 claims description 6
- 230000008520 organization Effects 0.000 claims description 6
- 238000012360 testing method Methods 0.000 claims description 6
- 238000012800 visualization Methods 0.000 claims description 6
- 230000008859 change Effects 0.000 claims description 5
- 238000007639 printing Methods 0.000 claims description 5
- 238000012790 confirmation Methods 0.000 claims description 4
- 238000013439 planning Methods 0.000 claims description 4
- 230000009471 action Effects 0.000 claims description 3
- 230000005540 biological transmission Effects 0.000 claims description 3
- 238000011161 development Methods 0.000 claims description 3
- 238000004079 fireproofing Methods 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 3
- 238000002360 preparation method Methods 0.000 claims description 3
- 238000012545 processing Methods 0.000 claims description 3
- 230000009466 transformation Effects 0.000 claims description 3
- 230000000007 visual effect Effects 0.000 claims 1
- 230000000694 effects Effects 0.000 description 5
- 238000009826 distribution Methods 0.000 description 3
- 208000027418 Wounds and injury Diseases 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 230000010354 integration Effects 0.000 description 2
- 206010039203 Road traffic accident Diseases 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The invention discloses a kind of electric power field work managing and control systems anti-violating the regulations, including line module, serviced component module, applied function module and infrastructure, wherein line module includes supervise and examine user and system manager;Applied function module includes the end system PC and the end system APP, the end system PC includes plan creation, plan look facility, the end system PC includes workform management, information management, report management, appraisal management, statistical analysis and system administration, the end system APP, which includes that plan is online, to be created, plans check, plan to distribute function, and the end system APP includes workform management, Spot-supervision, information management and statistical analysis;Calling hinge of the serviced component module between line module and applied function module.The present invention solve the problems, such as to supervise during operation of power networks existing in the prior art cannot standardize, supervise covering surface complete and supervise low efficiency.
Description
Technical field
The invention belongs to big data applied technical fields, and in particular to a kind of electric power field work managing and control system anti-violating the regulations.
Background technique
Safety is the basis of all work, not safe guarantee, and enterprise, power grid and Employee development are exactly to indulge in empty talk.Ensure
Power grid security and personal safety, be the great social responsibility of grid company and political responsibility and corporate security work set out
Point and foothold.The safe and stable operation of power grid, concerning national economy;The personal safety of employee, direct relation family and relatives
Happiness, related company and social stability;Safeguard the good situation of safety and stability, it is most important to company's sustainable and healthy development.
Collect the mentality of designing of five big System Constructions according to Guo Wang company three and " regulation integration, O&M integration, maintenance are special
The developing direction of industry ", management system is gradually to intensive, specialized direction transition, and power grid enterprises are in safety supervision management
Contradiction between the movable increase of existing production and the scarcity of administrative staff is very prominent, as safety responsibility is not in production activity
It implements, key issues of safety supervision is not in place, and safety training is not carried out cannot effectively control, so as to cause field operation is arrived
The accidents such as personal injury, grid power blackout and equipment damage.Therefore, the awareness of safety for enhancing crew is current safety supervision system
The most important thing of construction, reinforce production activity in all levels of management personnel, field personnel safety quality, improve company peace
The level managed entirely realizes power grid enterprises' power generation working site safety supervision.
Power grid enterprises have the following problems in safety supervision management at present:
1. keep a record during the supervisor of scene according to papery data, it inevitably will appear that process is lack of standardization, it is incomplete to record
Situation;Supervisor's effect is largely dependent on the personal experience of live supervisor personnel, is unfavorable for the standardization of supervisor, in addition papery
Material is unfavorable for supervising data statistic analysis safely;
2. scene is multi-point and wide-ranging: nearly electric system in 2 years is very prominent in face of structural understaffing;By available man-power resource,
It has no idea to accomplish the supervisor's all standing safely of all operation fields;
3. inefficiency: safe flight inspection mainly passes through 4 groups of supervisor personnel and rushes to the scene inspection, and supervisor personnel run quickly for a long time
For wave in each operation field, working mechanism causes working efficiency low, while increasing personnel and traffic accident risk occurs;
4. information is grasped not comprehensive: according to the requirement of " four not two straight " mode safety supervision inspection, supervisor is difficult to thing
The information such as stage locating for the first accurate geographical location for grasping operation field, operation (especially make by the fields such as route and distribution
Industry), it is difficult to carry out " four not two straight " supervision and check truly, Checking on effect is inadequate, deterrent force is inadequate.
Summary of the invention
The object of the present invention is to provide a kind of electric power field work managing and control systems anti-violating the regulations, solve and exist in the prior art
Operation of power networks during supervise cannot standardize, supervise covering surface it is incomplete and supervise low efficiency the problem of.
The managing and control system the technical scheme adopted by the invention is that electric power field work is instead broken rules and regulations, including line module, service
Assembly module, applied function module and infrastructure, wherein line module includes supervise and examine user and system manager;Using
Functional module includes the end system PC and the end system APP, and the end system PC includes plan creation, plan look facility, the end system PC packet
Workform management, information management, report management, appraisal management, statistical analysis and system administration are included, the end system APP includes planning
Line creates, plan is checked, plans to distribute function, and the end system APP includes workform management, Spot-supervision, information management and statistical
Analysis;Calling hinge of the serviced component module between line module and applied function module.
The features of the present invention also characterized in that
Serviced component module includes that user right component, report component, task schedule component, visualization component, standard connect
Mouth component, algorithm library component, wherein user right component is used for system permission configuration and user right authorization;Report component
According to practical work order, a situation arises, on-line automatic generation report, provides management, editor, modification, the deletion of report template, and
Report is supported to check, printing function;Task schedule component is uploaded for prefecture-level company checks daily paper, feedback rectification situation and province
Matter portion audit rectification situation is pacified by company;What visualization component was used to statistically analyze business work order, situation violating the regulations, Check can
It is shown depending on changing;Standard interface component is for the seamless connection between each module of system;Algorithm library component is for realizing act of violating regulations
With the Auto-matching of " electric power safety working regulation ".
Supervise and examine user includes business specific responsibility personnel, business group leader, department head;System manager includes operation maintenance personnel and pipe
Reason personnel.
Infrastructure includes computer room, network, server and memory.
The work order field that the workform management at the end system PC includes is as follows: date, action, work unit, work
Place, teams and groups responsible person post contact method, in place cadre, operation class (of an amplifying stage), job category, whether have a power failure, meet an urgent need a little and arranged with control
It applies;
Information management includes the maintenance and management to technical data, rules and regulations and notice, bulletin, the i.e. increasing of rules and regulations
It revises and looks into;The additions and deletions of technical data, which change, looks into;The management service of notice, bulletin;
Report management refers to, actually occurs situation according to selected work order field, on-line automatic generation report provides report
Management, editor, modification, the deletion of template, and support report to check, printing function;
Appraisal management refers to the setting of safety random check group personnel checking-up rule, management;It is notified to the management of template, safeguards and look into
It sees;Anti- violation information management is safeguarded and is checked;
Statistical analysis, including violating the regulations count type of violation, are disobeyed with Check statistics, statistics of breaking rules and regulations basis property violating the regulations
Chapter is live, the anti-accounting situation violating the regulations of prefecture-level company's statistics, wherein property violating the regulations includes red line ban, seriously breaks rules and regulations, is general separated
Chapter, lack of standardization, type of violation includes that management is violating the regulations, device is violating the regulations, behavior is violating the regulations, and the scene of breaking rules and regulations includes that capital construction scene, power transformation are existing
Field, distribution scene, transmission of electricity scene;Check is that the examination amount of money, notification issue, punishment are carried out to person liable and accountability unit
The statistics of number;
System administration is supported to organization and administration and user management, wherein organization and administration, which refer to, is managed organizational structure
Maintenance, user management include user and Role Management, rights management function, and realization, which changes user, addition, audit and additions and deletions, looks into;
And system permission configures and user right authorization.
Plan online creation in the end system APP refers to according to the actual situation, completes filling in for respective field, is created online
Plan;Plan, which is checked, to be referred to and checks to daily planning, monthly plan;Plan distribute refer to to be distributed work order selection scene superintend and direct
Personnel are examined directly to distribute;
Spot-supervision supports supervisor personnel to the processing of business work order overall process, provides work order acquisition, scene is registered, work order is fixed
Position and work order complete function, specific as follows:
Work order obtains: can obtain work order information at the end APP after the end PC distributes work order, after obtaining work order, supervise personnel
It chooses whether to cancel work order, cancels information and feed back to supervisor team team leader, supervisor team team leader decides whether to retract according to field condition
Work order is determined according to that should go to supervise live number: if live nobody goes, retract work order;If at least one live people goes
Supervisor's work is carried out, then is not retracted, if rollback work order, back-off information feed back to the personnel of distributing, is reassigned by distributing personnel;
Register at scene: supervisor personnel register after reaching scene;
Work order positioning: work order ongoing geographical location is positioned while registering in real time;
Work order is completed: if supervisor personnel have found to carry out description violating the regulations against rule and regulation and be taken pictures during supervise and examine, and being selected
Type of violation, property violating the regulations, scene violating the regulations and the safety regulations violated, submit to supervisor responsible person;
Work order audit: supervisor responsible person audits the description violating the regulations of submission, and confirmation is reported to province's public affairs after the completion of audit
Peace matter portion, department, provincial company peace matter portion is audited, and is confirmed and be notified to, and the peace matter portion, prefecture-level company being notified is to Check
Carry out feedback submit to provincial company peace matter portion audited, if audit by if prefecture-level company according to submission content examined,
Provincial company peace matter portion is given if not auditing if peace matter portion, prefecture-level company and carrying out feedback Check again, remaining process is same as above one
Step.
It includes: that the preliminary preparation of work is not implemented that management is violating the regulations;Inspection of the scene of a crime system executes not stringent;Work is not implemented
Make supervisory institution;Nonnative personnel's management is not in place;Work tool management system is not implemented;
It includes: device, equipment, the non-reliable ground of equipment that device is violating the regulations;Fireproofing installation is nonconforming;Special equipment is without annual test
Report;Shaft tower, equipment etc. do not identify or identify unintelligible;
Behavior violating the regulations includes: that the execution of two ticket systems is not stringent;The use of construction equipment and managing security tools and instruments, checks keeping
And test;It is not in place that scene guarantees that the technical measures of safety are implemented;Not proper use of personal security's shielding;Civilized construction is carried out
It is lack of standardization;
Information management includes maintenance and the management to technical data and rules and regulations, according to construction scene to " electric power safety
Working regulation " structuring is carried out, expert is constructed based on electricity safety production items rules and regulations and " electric power safety working regulation "
Knowledge base searches for corresponding safety regulations generally according to keyword and carries out checking study.
The end system APP statistical analysis is consistent with the end system PC statistical analysis content.
The managing and control system the invention has the advantages that electric power field work is instead broken rules and regulations improves person works' matter effect;Pass through
Positioning check card, personnel track, realize supervise and examine personnel whole process control;On-line off-line information is fed back and state is known, Quan Fang
Grasp supervisor's information in position.
Detailed description of the invention
Fig. 1 is electric power field work of the present invention managing and control system structural schematic diagram anti-violating the regulations.
Specific embodiment
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
Electric power field work of the present invention managing and control system anti-violating the regulations, structure is as shown in Figure 1, include line module, serviced component
Module, applied function module and infrastructure, wherein line module includes supervise and examine user and system manager;Application function
Module includes the end system PC and the end system APP, and the end system PC includes plan creation, plan look facility, and the end system PC includes work
Menu manager, information management, report management, appraisal management, statistical analysis and system administration, the end system APP include the online wound of plan
It builds, plans to check, plans to distribute function, the end system APP includes workform management, Spot-supervision, information management and statistical analysis;Clothes
Calling hinge of the business assembly module between line module and applied function module.
Serviced component module includes that user right component, report component, task schedule component, visualization component, standard connect
Mouth component, algorithm library component, wherein user right component is used for system permission configuration and user right authorization;Report component
According to practical work order, a situation arises, on-line automatic generation report, provides management, editor, modification, the deletion of report template, and
Report is supported to check, printing function;Task schedule component is uploaded for prefecture-level company checks daily paper, feedback rectification situation and province
Matter portion audit rectification situation is pacified by company;What visualization component was used to statistically analyze business work order, situation violating the regulations, Check can
It is shown depending on changing;Standard interface component is for the seamless connection between each module of system;Algorithm library component is for realizing act of violating regulations
With the Auto-matching of " electric power safety working regulation ".
Supervise and examine user includes business specific responsibility personnel, business group leader, department head;System manager includes operation maintenance personnel and pipe
Reason personnel.
Infrastructure includes computer room, network, server and memory.
The work order field that the workform management at the end system PC includes is as follows: date, action, work unit, work
Place, teams and groups responsible person post contact method, in place cadre, operation class (of an amplifying stage), job category, whether have a power failure, meet an urgent need a little and arranged with control
It applies;
Information management includes the maintenance and management to technical data, rules and regulations and notice, bulletin, the i.e. increasing of rules and regulations
It revises and looks into;The additions and deletions of technical data, which change, looks into;The management service of notice, bulletin;
Report management refers to, actually occurs situation according to selected work order field, on-line automatic generation report provides report
Management, editor, modification, the deletion of template, and support report to check, printing function;
Appraisal management refers to the setting of safety random check group personnel checking-up rule, management;It is notified to the management of template, safeguards and look into
It sees;Anti- violation information management is safeguarded and is checked;
Statistical analysis, including violating the regulations count type of violation, are disobeyed with Check statistics, statistics of breaking rules and regulations basis property violating the regulations
Chapter is live, the anti-accounting situation violating the regulations of prefecture-level company's statistics, wherein property violating the regulations includes red line ban, seriously breaks rules and regulations, is general separated
Chapter, lack of standardization, type of violation includes that management is violating the regulations, device is violating the regulations, behavior is violating the regulations, and the scene of breaking rules and regulations includes that capital construction scene, power transformation are existing
Field, distribution scene, transmission of electricity scene;Check is that the examination amount of money, notification issue, punishment are carried out to person liable and accountability unit
The statistics of number;
System administration is supported to organization and administration and user management, wherein organization and administration, which refer to, is managed organizational structure
Maintenance, user management include user and Role Management, rights management function, and realization, which changes user, addition, audit and additions and deletions, looks into;
And system permission configures and user right authorization.
Plan online creation in the end system APP refers to according to the actual situation, completes filling in for respective field, is created online
Plan;Plan, which is checked, to be referred to and checks to daily planning, monthly plan;Plan distribute refer to to be distributed work order selection scene superintend and direct
Personnel are examined directly to distribute;
Spot-supervision supports supervisor personnel to the processing of business work order overall process, provides work order acquisition, scene is registered, work order is fixed
Position and work order complete function, specific as follows:
Work order obtains: can obtain work order information at the end APP after the end PC distributes work order, after obtaining work order, supervise personnel
It chooses whether to cancel work order, cancels information and feed back to supervisor team team leader, supervisor team team leader decides whether to retract according to field condition
Work order is determined according to that should go to supervise live number: if live nobody goes, retract work order;If at least one live people goes
Supervisor's work is carried out, then is not retracted, if rollback work order, back-off information feed back to the personnel of distributing, is reassigned by distributing personnel;
Register at scene: supervisor personnel register after reaching scene;
Work order positioning: work order ongoing geographical location is positioned while registering in real time;
Work order is completed: if supervisor personnel have found to carry out description violating the regulations against rule and regulation and be taken pictures during supervise and examine, and being selected
Type of violation, property violating the regulations, scene violating the regulations and the safety regulations violated, submit to supervisor responsible person;
Work order audit: supervisor responsible person audits the description violating the regulations of submission, and confirmation is reported to province's public affairs after the completion of audit
Peace matter portion, department, provincial company peace matter portion is audited, and is confirmed and be notified to, and the peace matter portion, prefecture-level company being notified is to Check
Carry out feedback submit to provincial company peace matter portion audited, if audit by if prefecture-level company according to submission content examined,
Provincial company peace matter portion is given if not auditing if peace matter portion, prefecture-level company and carrying out feedback Check again, remaining process is same as above one
Step.
It includes: that the preliminary preparation of work is not implemented that management is violating the regulations;Inspection of the scene of a crime system executes not stringent;Work is not implemented
Make supervisory institution;Nonnative personnel's management is not in place;Work tool management system is not implemented;
It includes: device, equipment, the non-reliable ground of equipment that device is violating the regulations;Fireproofing installation is nonconforming;Special equipment is without annual test
Report;Shaft tower, equipment etc. do not identify or identify unintelligible;
Behavior violating the regulations includes: that the execution of two ticket systems is not stringent;The use of construction equipment and managing security tools and instruments, checks keeping
And test;It is not in place that scene guarantees that the technical measures of safety are implemented;Not proper use of personal security's shielding;Civilized construction is carried out
It is lack of standardization;
Information management includes maintenance and the management to technical data and rules and regulations, according to construction scene to " electric power safety
Working regulation " structuring is carried out, expert is constructed based on electricity safety production items rules and regulations and " electric power safety working regulation "
Knowledge base searches for corresponding safety regulations generally according to keyword and carries out checking study.
The end system APP statistical analysis is consistent with the end system PC statistical analysis content.
Electric power field work of the present invention instead break rules and regulations managing and control system, if supervisor personnel found during supervise and examine against rule and regulation into
Row is violating the regulations to be described and takes pictures, and selects type of violation (and being finely divided), property violating the regulations, scene violating the regulations and the safety item violated
Example submits to supervisor responsible person, and supervisor responsible person audits the description violating the regulations of submission, and confirmation is reported to province after the completion of audit
Matter portion is pacified by company, and provincial company peace matter portion is audited, and is confirmed and be notified to, and the peace matter portion, prefecture-level company being notified is to examination feelings
Condition carry out feedback submit to provincial company peace matter portion audited, if audit by if prefecture-level company according to submission content examined
Core gives provincial company peace matter portion if not auditing if peace matter portion, prefecture-level company and carrying out feedback Check again, and remaining process is same
Previous step.
Claims (9)
- The managing and control system 1. electric power field work is instead broken rules and regulations, which is characterized in that including line module, serviced component module, using function Energy module and infrastructure, wherein line module includes supervise and examine user and system manager;Applied function module includes system The end PC and the end system APP, the end system PC include plan creation, plan look facility, and the end system PC includes workform management, message tube Reason, report management, appraisal management, statistical analysis and system administration, the end system APP include the online creation of plan, plan check, count It draws and distributes function, the end system APP includes workform management, Spot-supervision, information management and statistical analysis;Serviced component module is to use Calling hinge between family module and applied function module.
- The managing and control system 2. electric power field work according to claim 1 is instead broken rules and regulations, which is characterized in that the serviced component mould Block includes user right component, report component, task schedule component, visualization component, standard interface component, algorithm library component, Wherein, user right component is used for system permission configuration and user right authorization;According to practical work order feelings occur for report component Condition, on-line automatic generation report provide management, editor, modification, the deletion of report template, and support report to check, print function Energy;Task schedule component is uploaded for prefecture-level company checks daily paper, feedback rectification situation and the audit rectification of provincial company peace matter portion Situation;Visualization component is used for the visual presentation statisticallyd analyze to business work order, situation violating the regulations, Check;Standard interface Component is for the seamless connection between each module of system;Algorithm library component is for realizing act of violating regulations and " electric power safety work rule Journey " Auto-matching.
- The managing and control system 3. electric power field work according to claim 1 is instead broken rules and regulations, which is characterized in that the supervise and examine user packet Include business specific responsibility personnel, business group leader, department head;System manager includes operation maintenance personnel and administrative staff.
- The managing and control system 4. electric power field work according to claim 1 is instead broken rules and regulations, which is characterized in that the infrastructure packet Include computer room, network, server and memory.
- The managing and control system 5. electric power field work according to any one of claims 1 to 4 is instead broken rules and regulations, which is characterized in that described The work order field that the workform management at the end system PC includes is as follows: date, action, work unit, job site, teams and groups Responsible person post contact method, in place cadre, operation class (of an amplifying stage), job category, whether have a power failure, meet an urgent need a little and with control measure;Information management includes the maintenance and management to technical data, rules and regulations and notice, bulletin, i.e. the additions and deletions of rules and regulations change It looks into;The additions and deletions of technical data, which change, looks into;The management service of notice, bulletin;Report management refers to, actually occurs situation according to selected work order field, on-line automatic generation report provides report template Management, editor, modification, deletion, and support report to check, printing function;Appraisal management refers to the setting of safety random check group personnel checking-up rule, management;It is notified to the management of template, safeguards and check; Anti- violation information management is safeguarded and is checked;It statisticallys analyze, including break rules and regulations statistics and Check count, it is violating the regulations to count according to property violating the regulations, type of violation, break rules and regulations now Field, prefecture-level company count accounting situation anti-violating the regulations, wherein property violating the regulations includes red line ban, seriously breaks rules and regulations, is generally violating the regulations, no Specification, type of violation include that management is violating the regulations, device is violating the regulations, behavior is violating the regulations, and scene violating the regulations includes capital construction scene, power transformation scene, matches Electric scene, transmission of electricity scene;Check is that the examination amount of money, notification issue, punishment number are carried out to person liable and accountability unit Statistics;System administration is supported to organization and administration and user management, wherein organization and administration, which refer to, is managed maintenance to organizational structure, User management includes user and Role Management, rights management function, and realization, which changes user, addition, audit and additions and deletions, looks into;And it is Authority configuration of uniting and user right authorization.
- The managing and control system 6. electric power field work according to claim 5 is instead broken rules and regulations, which is characterized in that the end the system APP The online creation of plan refers to according to the actual situation, completes filling in for respective field, carries out online creation plan;Plan, which is checked, to be referred to Daily planning, monthly plan are checked;Plan, which distributes, to be referred to and selects live supervisor personnel directly to send the work order to be distributed Hair;Spot-supervision support supervisor personnel to business work order overall process processing, provide work order obtain, scene is registered, work order positions and Work order completes function, specific as follows:Work order obtains: can obtain work order information at the end APP after the end PC distributes work order, after obtaining work order, supervise personnel selection Whether cancelling work order, cancels information and feed back to supervisor team team leader, supervisor team team leader decides whether rollback work order according to field condition, Determine according to that should go to supervise live number: if live nobody goes, retract work order;If at least one live people goes to superintend and direct Work is examined, then is not retracted, if rollback work order, back-off information feed back to the personnel of distributing, is reassigned by distributing personnel;Register at scene: supervisor personnel register after reaching scene;Work order positioning: work order ongoing geographical location is positioned while registering in real time;Work order is completed: if supervisor personnel have found to carry out description violating the regulations against rule and regulation and be taken pictures during supervise and examine, and being selected violating the regulations Type, property violating the regulations, scene violating the regulations and the safety regulations violated, submit to supervisor responsible person;Work order audit: supervisor responsible person audits the description violating the regulations of submission, and confirmation is reported to provincial company peace after the completion of audit Matter portion, provincial company peace matter portion is audited, and is confirmed and be notified to, and the peace matter portion, prefecture-level company being notified carries out Check Feedback is submitted to provincial company peace matter portion and is audited, and if audit, prefecture-level company is according to submitting content to be examined if, if not Audit carries out feedback Check by peace matter portion, then prefecture-level company again and pacifies matter portion to provincial company, and remaining process is same as above a step Suddenly.
- The managing and control system 7. electric power field work according to claim 6 is instead broken rules and regulations, which is characterized in that the management packet violating the regulations Include: the preliminary preparation of work is not implemented;Inspection of the scene of a crime system executes not stringent;Work supervisory institution is not implemented;Stranger Member's management is not in place;Work tool management system is not implemented;It includes: device, equipment, the non-reliable ground of equipment that device is violating the regulations;Fireproofing installation is nonconforming;Special equipment is without annual test report It accuses;Shaft tower, equipment etc. do not identify or identify unintelligible;Behavior violating the regulations includes: that the execution of two ticket systems is not stringent;The use of construction equipment and managing security tools and instruments, is checked and is tried keeping It tests;It is not in place that scene guarantees that the technical measures of safety are implemented;Not proper use of personal security's shielding;Civilized construction development is not advised Model.
- The managing and control system 8. electric power field work according to claim 6 is instead broken rules and regulations, which is characterized in that the information management packet Maintenance and the management to technical data and rules and regulations are included, structure is carried out to " electric power safety working regulation " according to construction scene Change, expert knowledge library is constructed based on electricity safety production items rules and regulations and " electric power safety working regulation ", according to keyword Corresponding safety regulations are searched for generally to carry out checking study.
- The managing and control system 9. electric power field work according to claim 6 is instead broken rules and regulations, which is characterized in that the end the system APP Statistical analysis is consistent with the end system PC statistical analysis content.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811452142.6A CN109784613A (en) | 2018-11-30 | 2018-11-30 | Electric power field work managing and control system anti-violating the regulations |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811452142.6A CN109784613A (en) | 2018-11-30 | 2018-11-30 | Electric power field work managing and control system anti-violating the regulations |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109784613A true CN109784613A (en) | 2019-05-21 |
Family
ID=66496058
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811452142.6A Pending CN109784613A (en) | 2018-11-30 | 2018-11-30 | Electric power field work managing and control system anti-violating the regulations |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109784613A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110264082A (en) * | 2019-06-21 | 2019-09-20 | 国网天津市电力公司 | A kind of field work safe state evaluation inspection data management system |
CN110363421A (en) * | 2019-07-10 | 2019-10-22 | 国网甘肃省电力公司武威供电公司 | A kind of power grid security management information platform |
CN111652466A (en) * | 2020-04-23 | 2020-09-11 | 国网上海市电力公司 | Work order management-based meter box repairing application method |
CN112016803A (en) * | 2020-07-23 | 2020-12-01 | 浙江图盛输变电工程有限公司温州科技分公司 | Cross-professional power grid risk safety management and control system fusing operation big data |
CN112712333A (en) * | 2020-12-25 | 2021-04-27 | 中用科技有限公司 | Automatic business work order management system and method |
CN113159633A (en) * | 2021-05-11 | 2021-07-23 | 河北云酷科技有限公司 | Method for evaluating risk level of field operating personnel in industrial field |
CN113592268A (en) * | 2021-07-21 | 2021-11-02 | 云南电网有限责任公司信息中心 | On-site operation safety monitoring system and method |
CN114971261A (en) * | 2022-05-23 | 2022-08-30 | 国网江苏省电力有限公司南通供电分公司 | One-stop safety supervision method for electric power operation site |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013125369A (en) * | 2011-12-14 | 2013-06-24 | Chugoku Electric Power Co Inc:The | Power generating/transforming equipment repair planning support system and repair planning support method thereof |
CN104376081A (en) * | 2014-11-18 | 2015-02-25 | 国家电网公司 | Data application processing system, handhold terminal and on-site checking data processing system |
CN105825329A (en) * | 2016-03-14 | 2016-08-03 | 国网福建省电力有限公司 | Safety and quality inspection method based on remote working site monitoring system |
CN105976076A (en) * | 2016-03-03 | 2016-09-28 | 国网浙江省电力公司 | Power marketing check streamline management method based on data map |
CN205750855U (en) * | 2016-01-28 | 2016-11-30 | 江苏省电力公司南京供电公司 | A kind of electric power safety based on Internet of Things supervisor's management system |
CN106779268A (en) * | 2015-11-23 | 2017-05-31 | 国网浙江省电力公司 | A kind of power marketing checks the early warning management and control supervisor's method of work that becomes more meticulous |
CN106845646A (en) * | 2016-12-02 | 2017-06-13 | 国网山东省电力公司电力科学研究院 | A kind of power marketing intelligence auditing system and method based on GIS platform |
CN107368967A (en) * | 2017-07-20 | 2017-11-21 | 北京建工土木工程有限公司 | Engineering safety quality inspection intelligent management based on internet |
-
2018
- 2018-11-30 CN CN201811452142.6A patent/CN109784613A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013125369A (en) * | 2011-12-14 | 2013-06-24 | Chugoku Electric Power Co Inc:The | Power generating/transforming equipment repair planning support system and repair planning support method thereof |
CN104376081A (en) * | 2014-11-18 | 2015-02-25 | 国家电网公司 | Data application processing system, handhold terminal and on-site checking data processing system |
CN106779268A (en) * | 2015-11-23 | 2017-05-31 | 国网浙江省电力公司 | A kind of power marketing checks the early warning management and control supervisor's method of work that becomes more meticulous |
CN205750855U (en) * | 2016-01-28 | 2016-11-30 | 江苏省电力公司南京供电公司 | A kind of electric power safety based on Internet of Things supervisor's management system |
CN105976076A (en) * | 2016-03-03 | 2016-09-28 | 国网浙江省电力公司 | Power marketing check streamline management method based on data map |
CN105825329A (en) * | 2016-03-14 | 2016-08-03 | 国网福建省电力有限公司 | Safety and quality inspection method based on remote working site monitoring system |
CN106845646A (en) * | 2016-12-02 | 2017-06-13 | 国网山东省电力公司电力科学研究院 | A kind of power marketing intelligence auditing system and method based on GIS platform |
CN107368967A (en) * | 2017-07-20 | 2017-11-21 | 北京建工土木工程有限公司 | Engineering safety quality inspection intelligent management based on internet |
Non-Patent Citations (1)
Title |
---|
余萍: "电力企业信息安全技术督查管理系统设计与实现", 《中国优秀硕士学位论文全文数据库(电子期刊)》 * |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110264082A (en) * | 2019-06-21 | 2019-09-20 | 国网天津市电力公司 | A kind of field work safe state evaluation inspection data management system |
CN110363421A (en) * | 2019-07-10 | 2019-10-22 | 国网甘肃省电力公司武威供电公司 | A kind of power grid security management information platform |
CN111652466A (en) * | 2020-04-23 | 2020-09-11 | 国网上海市电力公司 | Work order management-based meter box repairing application method |
CN111652466B (en) * | 2020-04-23 | 2024-04-09 | 国网上海市电力公司 | Table box repairing application method based on work order management |
CN112016803A (en) * | 2020-07-23 | 2020-12-01 | 浙江图盛输变电工程有限公司温州科技分公司 | Cross-professional power grid risk safety management and control system fusing operation big data |
CN112712333A (en) * | 2020-12-25 | 2021-04-27 | 中用科技有限公司 | Automatic business work order management system and method |
CN113159633A (en) * | 2021-05-11 | 2021-07-23 | 河北云酷科技有限公司 | Method for evaluating risk level of field operating personnel in industrial field |
CN113592268A (en) * | 2021-07-21 | 2021-11-02 | 云南电网有限责任公司信息中心 | On-site operation safety monitoring system and method |
CN114971261A (en) * | 2022-05-23 | 2022-08-30 | 国网江苏省电力有限公司南通供电分公司 | One-stop safety supervision method for electric power operation site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109784613A (en) | Electric power field work managing and control system anti-violating the regulations | |
CN110428112A (en) | A kind of dual prevention mechanism management system of enterprise based under internet+mode | |
CN104361419B (en) | Power transmission and transformation equipment state monitoring fault management system and method based on regulation and control unification | |
CN104200325B (en) | Enterprise technique center management system and management method | |
CN109508848A (en) | Enterprise's production safety risk assessment and management system | |
CN103578039B (en) | A kind of power networks risk prewarning analysis system | |
CN110400040A (en) | A kind of quick transmission system of management and running information based on mobile Internet | |
CN107451737A (en) | A kind of big data O2O check of drawings cloud platform management systems examined for engineering construction figure | |
CN110647567A (en) | Power failure plan auxiliary decision system based on end data fusion | |
CN105096047A (en) | Overall process task control and assessment system and realization method thereof | |
CN102622677A (en) | Enterprise safety production management method | |
CN104732315A (en) | Safety management system | |
CN111598411A (en) | Intelligent safety control system for operation site of transformer substation | |
CN107601187A (en) | A kind of lift management system and method | |
CN104778562B (en) | A kind of safe eye supervising platform system in job site | |
CN108108359A (en) | A kind of device data automation statistical form system and its application method | |
CN108595405A (en) | A kind of equipment Monitoring detailed rules and regulations or outline management method | |
Luo et al. | Research on integration method of integrated management system | |
Ahmad et al. | Measuring safety culture with SPMT—field-data | |
CN112798887A (en) | Control system and device for operation of ring main unit | |
He et al. | Maintenance risk management in Daya Bay nuclear power plant: PSA model, tools and applications | |
CN206696883U (en) | A kind of air traffic control system quality safety checks whole process electronic operating system | |
Zheng et al. | Operating events in Chinese nuclear power plants: A preliminary analysis | |
Chunyan et al. | Research on operation and maintenance management and control technology of power monitoring system based on personnel operation and equipment status evaluation | |
Zhang et al. | Hazards taxonomy and identification methods in civil aviation risk management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190521 |
|
RJ01 | Rejection of invention patent application after publication |