CN106980919A - A kind of engineering information management method and system - Google Patents

A kind of engineering information management method and system Download PDF

Info

Publication number
CN106980919A
CN106980919A CN201710086093.8A CN201710086093A CN106980919A CN 106980919 A CN106980919 A CN 106980919A CN 201710086093 A CN201710086093 A CN 201710086093A CN 106980919 A CN106980919 A CN 106980919A
Authority
CN
China
Prior art keywords
information
management
construction
engineering
construction manager
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710086093.8A
Other languages
Chinese (zh)
Inventor
张大力
杨晓霜
刘绍涛
董明明
郑化浦
郭伟
董亚琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Urban Construction
Original Assignee
Henan University of Urban Construction
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Urban Construction filed Critical Henan University of Urban Construction
Priority to CN201710086093.8A priority Critical patent/CN106980919A/en
Publication of CN106980919A publication Critical patent/CN106980919A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Image Analysis (AREA)

Abstract

The present invention relates to field of engineering technology, and in particular to a kind of engineering information management method and system, a kind of engineering information management method, obtains the video image information in monitor area;The video image information is analyzed, is determined to actually enter the information of the construction manager of job site according to analysis result;The information of the construction manager for actually entering job site determined by the video image analysis is obtained from personnel information management system, the first personal information is obtained from engineering production monitoring system, management is monitored to construction manager information according to the construction manager information and the first personal information, construction manager is exercised supervision management into job site by carry out that analysis can be promptly and accurately to video image, administrative vulnerability is avoided, the supervision and management facilitated in engineering construction is rapidly and efficiently exchanged with information.

Description

A kind of engineering information management method and system
Technical field
The present invention relates to field of engineering technology, and in particular to a kind of engineering information management method and system.
Background technology
In engineering construction, construction accident constantly occurs in recent years, and most of reason is that general contracting unit is managed on behalf of another with wrapping, to existing Field lacks supervision and management, and effective supervision and management is lacked to construction manager, and the information management of construction manager is not good for Entirely, comprehensive effective supervision and management in the whole engineering phase is lacked.
At construction project scene, existing engineering subcontract system effectively can not exercise supervision to construction manager, and then Potential safety hazard is caused for engineering site, it is also difficult to information management examination is carried out to construction manager, it is impossible to just access at any time And obtaining correlation engineering information, it has not been convenient to the supervision and management in engineering construction is rapidly and efficiently exchanged with information.
The content of the invention
To solve problem of the prior art, the invention provides a kind of one kind effectively managed construction manager Engineering information management method and system.
In order to achieve the above object, the present invention uses following technical scheme:A kind of engineering information management method, obtains monitoring Video image information in region;The video image information is analyzed, is determined to actually enter construction according to analysis result The information of the construction manager at scene;The reality determined by the video image analysis is obtained from personnel information management system Into the information of the construction manager of job site, the first personal information is obtained from engineering production monitoring system, according to The construction manager information and the first personal information are monitored management to construction manager information.
The further video image to acquisition is analyzed, and is determined to appear in the default prison according to the analysis result Control the direction of motion of the target person in region;The management terminal is according to the direction of motion of the target person of determination, root According to the direction of motion of the site construction management personnel of determination, the direction of motion includes entering or going out.
The further video image to acquisition is analyzed, and obtains the shape facility of the face;By the face Shape facility is matched one by one with the shape facility of all template images in personnel information management system, is obtained and the face Closest template image, determines the site construction management personal information in the corresponding personnel information management system of template image.
It is further that inductive statistics, whole mistake of the inductive statistics through construction are carried out to construction manager management information Journey, after engineering terminates, makes the construction manager management information, by engineering information system at engineering information processing terminal To the information analysis, and carry out processing renewal preservation.
A kind of engineering information management system, including first acquisition unit, obtain the video image information in monitor area;Point Unit is analysed, is analyzed for the image to acquisition, the video image information is analyzed, is determined according to analysis result real Border enters the information of the construction manager of job site;Second acquisition unit, is obtained by institute from personnel information management system State the information of the construction manager for actually entering job site of video image analysis determination, the 3rd acquiring unit, from work The first personal information, monitoring unit, for according to the construction manager information and first are obtained in journey production monitoring system Personal information is monitored management to construction manager information.
The further analytic unit includes:Test sample acquisition module, the sample for obtaining test image judges Whether module, the sample of the test image for judging to detect meets preset attribute bar;Determine that the test image is corresponding The site construction management personal information of personnel information management system.
Further second acquisition unit also includes enquiry module, for according to the construction manager tissue post from The construction manager information in the tissue post is inquired about in the personnel information management system;And memory module, for inciting somebody to action Query Result is stored in tables of data and regard the Query Result as the construction manager information.
The further monitoring unit includes:Matching module, for by the site construction management personal information and institute State the first personal information to be matched, obtain matching result;Determining module, for determining described first according to the matching result Abnormal personal information in personal information;First monitoring modular, for being monitored to the abnormal personal information.
Further and described system also includes:Amending unit, for according to first personal information to described different Normal construction manager information is modified;And updating block, it is described for revised abnormal personal information to be updated to In engineering production monitoring system.
The present invention obtain monitor area in video image information, the video image information is analyzed, according to divide Analysis result is determined to actually enter the information of the construction manager of job site, obtained from personnel information management system by described The information for the construction manager for actually entering job site that video image analysis is determined, from engineering production monitoring system The first personal information is obtained, construction manager information is carried out according to the construction manager information and the first personal information Monitoring management, by video image carry out analysis can be promptly and accurately construction manager is exercised supervision into job site Management, it is to avoid administrative vulnerability, the supervision and management that facilitates in engineering construction is rapidly and efficiently exchanged with information.
Brief description of the drawings
Fig. 1 is engineering information management method flow schematic diagram of the present invention.
Fig. 2 is engineering information management system schematic of the present invention.
Fig. 3 is engineering information statistical method schematic flow sheet of the present invention.
Embodiment
The present invention is described in further details below by embodiment, embodiment is only used for illustrating the present invention, does not limit The scope of the present invention processed.
A kind of one embodiment of engineering information management method, obtains the video image in monitor area as shown in Figure 1,3 Information;The video image information is analyzed, is determined to actually enter the construction management of job site according to analysis result The information of personnel;Obtained from personnel information management system and actually enter job site by what the video image analysis was determined The information of construction manager, wherein, the information of the construction manager for actually entering job site is the personnel The personal information stored in information management system, the personnel information management system is used to supervise construction manager information Survey;The first personal information is obtained from engineering production monitoring system, wherein, first personal information is that the engineering produces prison The construction manager information stored in examining system, the production that the engineering production monitoring system is used for the engineering system is believed Breath is monitored, and the production information includes personal information, facility information and operation information;Believed according to the construction manager Breath and the first personal information are monitored management to construction manager information.By the construction manager information and described One personal information is matched, and obtains matching result;Exception in first personal information is determined according to the matching result Personal information;And the abnormal personal information is monitored.
The video image of acquisition is analyzed, is determined to appear in the default monitor area according to the analysis result Target person the direction of motion;The management terminal is according to the direction of motion of the target person of determination, according to determination The direction of motion of the site construction management personnel, the direction of motion includes entering or going out, and statistics, which is actually entered, in time applies The information such as the construction manager information such as quantity at work scene, for obtaining working as the site construction management personnel in monitor area Preceding statistical value, the current statistic value of the administrative staff's quantity for actually entering job site is to be detected untill current time The quantity for appearing in the construction manager in the monitor area and being disappeared out of described monitor area of detecting show The difference of the quantity of field construction manager, can be by the pure video technique of web camera come in default monitor area Construction manager is monitored and counted, and obtains the passenger flow statisticses value of current preset monitor area, video acquisition module sum Word signal transacting computing module, video acquisition module is used for the video image letter for obtaining the real-time video in default monitor area Breath, it is possible to highlighted to video image information to improve the processing of the simple images such as contrast, to improve the definition of picture, Improve the accuracy of detection to personnel;Digital Signal Processing computing module is used to enter the video image information collected row mode knowledge Not, all personnel's (can be any one first object personnel) occurred in video and the motion side of these personnel are identified To, and determine that it is come out into predeterminable area or from predeterminable area according to their direction of motion.
To construction manager management information carry out inductive statistics, inductive statistics through construction whole process, in work After journey terminates, the construction manager management information is made at engineering information processing terminal, information terminal is the two of channel End, channel refers to the passage of communication, is the medium of signal transmission, computer, mobile phone, etc. be all information terminal, and be sent to management System, by engineering information system to the information analysis, and carries out processing renewal preservation.So that terminal device is accessed and obtained at any time Information.
A kind of another embodiment of engineering information management method, obtains the video image information in monitor area;To institute State video image information to be analyzed, determined to actually enter the letter of the construction manager of job site according to analysis result Breath;The construction management for actually entering job site determined by the video image analysis is obtained from personnel information management system The information of personnel, wherein, the information of the construction manager for actually entering job site is the personnel information management The personal information stored in system, the personnel information management system is used to be monitored construction manager information;From work The first personal information is obtained in journey production monitoring system, wherein, first personal information is the engineering production monitoring system The construction manager information of middle storage, the engineering production monitoring system is used to carry out the production information of the engineering system Monitoring, the production information includes personal information, facility information and operation information;According to the construction manager information and One personal information is monitored management to construction manager information.By the construction manager information and first personnel Information is matched, and obtains matching result;The abnormal personnel letter in first personal information is determined according to the matching result Breath;And the abnormal personal information is monitored.
Analyzed using the video image to acquisition, obtain the shape facility of the face;By the shape of the face Feature is matched one by one with the shape facility of all template images in personnel information management system, obtains nearest with the face As template image, determine the site construction management personal information in the corresponding personnel information management system of template image, face Analysis system includes face shape abstraction module, for carrying out Face datection to described image sample, obtains the face shape Feature, face shape matching module, for by template used image in the shape facility of the face and template image data storehouse Shape facility matched one by one, obtain the template image closest with the face,
To construction manager management information carry out inductive statistics, inductive statistics through construction whole process, in engineering knot Shu Hou, makes the construction manager management information at engineering information processing terminal, and information terminal is the two ends of channel, letter Road refers to the passage of communication, is the medium of signal transmission, computer, mobile phone, etc. be all information terminal, and be sent to management system, By engineering information system to the information analysis, and carry out processing renewal preservation.So that terminal device is accessed at any time and obtains information.
A kind of engineering information management system as shown in Figure 2, it is characterised in that including first acquisition unit, obtains monitored space Video image information in domain;Analytic unit, analyzes for the image to acquisition, the video image information is divided Analysis, determines to actually enter the information of the construction manager of job site according to analysis result;Second acquisition unit, from personnel Information management system obtains the letter of the construction manager for actually entering job site determined by the video image analysis Breath, the 3rd acquiring unit obtains the first personal information, monitoring unit, for being applied according to from engineering production monitoring system Work administrative staff information and the first personal information are monitored management to construction manager information.
The analytic unit includes:Test sample acquisition module, the sample for obtaining test image, determination module is used Preset attribute bar whether is met in the sample for the test image for judging to detect;Determine the corresponding personal information of the test image The site construction management personal information of management system, for determining construction manager tissue post information, wherein, the personnel The construction manager information at least one tissue post is previously stored with information management system.
Second acquisition unit also includes enquiry module, for according to the construction manager tissue post from the personnel The construction manager information in the tissue post is inquired about in information management system;And memory module, for by Query Result It is stored in tables of data and using the Query Result as the construction manager information, the monitoring unit includes:Matching Module, for the site construction management personal information and first personal information to be matched, obtains matching result;Really Cover half block, for determining the abnormal personal information in first personal information according to the matching result;First monitoring modular, For being monitored to the abnormal personal information.
And the system also includes:Amending unit, for being managed according to first personal information to the abnormal construction Reason personal information is modified;And updating block, produced for revised abnormal personal information to be updated into the engineering In monitoring system.
It should be understood by those skilled in the art that, embodiments of the invention can be provided as method, system or computer program Product.Therefore, the present invention can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the present invention can be used in one or more computers for wherein including computer usable program code The shape for the computer program product that usable storage medium is implemented on (including but is not limited to magnetic disk storage and optical memory etc.) Formula.
The present invention is the flow with reference to method according to embodiments of the present invention, equipment (system) and computer program product Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (9)

1. a kind of engineering information management method, it is characterised in that:Obtain the video image information in monitor area;Regarded to described Frequency image information is analyzed, and is determined to actually enter the information of the construction manager of job site according to analysis result;From Personnel information management system obtains the construction manager for actually entering job site determined by the video image analysis Information, the first personal information is obtained from engineering production monitoring system, according to the construction manager information and the first Member's information is monitored management to construction manager information.
2. according to the method described in claim 1, it is characterised in that the video image of acquisition is analyzed, according to described point Analysis result determines to appear in the direction of motion of the target person in the default monitor area;The management terminal is according to determination The direction of motion of the target person, according to the direction of motion of the site construction management personnel of determination, the direction of motion Including entering or going out.
3. according to the method described in claim 1, it is characterised in that the video image of acquisition is analyzed, obtain the people The shape facility of face;By the shape facility of all template images in the shape facility and personnel information management system of the face by One is matched, and obtains the template image closest with the face, determines the corresponding personnel information management system of template image In site construction management personal information.
4. according to the method described in claim 1, it is characterised in that inductive statistics is carried out to construction manager management information, Inductive statistics after engineering terminates, makes the construction management through the whole process of construction at engineering information processing terminal Personal management information, by engineering information system to the information analysis, and carries out processing renewal preservation.
5. a kind of engineering information management system, it is characterised in that including first acquisition unit, obtain the video figure in monitor area As information;Analytic unit, analyzes for the image to acquisition, the video image information is analyzed, according to analysis As a result determination actually enters the information of the construction manager of job site;Second acquisition unit, from personnel information management system System obtains the information of the construction manager for actually entering job site determined by the video image analysis, and the 3rd obtains Unit, obtains the first personal information, monitoring unit, for believing according to the construction manager from engineering production monitoring system Breath and the first personal information are monitored management to construction manager information.
6. method according to claim 5, it is characterised in that the analytic unit includes:Test sample acquisition module, is used In the sample for obtaining test image, determination module, whether the sample of the test image for judging to detect meets preset attribute Bar;Determine the site construction management personal information of the corresponding personnel information management system of the test image.
7. method according to claim 5, it is characterised in that second acquisition unit also includes enquiry module, for basis The construction management people in the tissue post is inquired about in the construction manager tissue post from the personnel information management system Member's information;And memory module, for Query Result to be stored in tables of data and the Query Result is regard as the construction Administrative staff's information.
8. method according to claim 5, it is characterised in that the monitoring unit includes:Matching module, for by described in Site construction management personal information and first personal information are matched, and obtain matching result;Determining module, for basis The matching result determines the abnormal personal information in first personal information;First monitoring modular, for the exception Personal information is monitored.
9. method according to claim 5, it is characterised in that and the system also includes:Amending unit, for basis First personal information is modified to the abnormal construction manager information;And updating block, for it will correct after Abnormal personal information be updated in the engineering production monitoring system.
CN201710086093.8A 2017-02-17 2017-02-17 A kind of engineering information management method and system Pending CN106980919A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710086093.8A CN106980919A (en) 2017-02-17 2017-02-17 A kind of engineering information management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710086093.8A CN106980919A (en) 2017-02-17 2017-02-17 A kind of engineering information management method and system

Publications (1)

Publication Number Publication Date
CN106980919A true CN106980919A (en) 2017-07-25

Family

ID=59338072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710086093.8A Pending CN106980919A (en) 2017-02-17 2017-02-17 A kind of engineering information management method and system

Country Status (1)

Country Link
CN (1) CN106980919A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107939447A (en) * 2017-12-07 2018-04-20 重庆天府矿业有限责任公司 A kind of safety of coal mines risk stratification early warning management-control method and system
CN108154308A (en) * 2017-12-29 2018-06-12 广州供电局有限公司 Power construction process management optimization method and system
CN109426903A (en) * 2017-08-26 2019-03-05 陕西海山安全技术服务有限公司 A kind of oilfield operation site intelligent monitor system
CN109872055A (en) * 2019-01-30 2019-06-11 广州轨道交通建设监理有限公司 A kind of personnel management system based on construction site

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103338350A (en) * 2013-05-31 2013-10-02 郭亚晋 Construction transportation safety monitoring system
CN104110271A (en) * 2013-04-22 2014-10-22 开封市测控技术有限公司 Under-mine equipment monitoring alarm system based on face recognition technology
CN105046430A (en) * 2015-07-14 2015-11-11 国家电网公司 Method and apparatus for monitoring electric power production personnel information
US20160012363A1 (en) * 2013-04-18 2016-01-14 Omron Corporation Work management system and work management method
CN105809362A (en) * 2016-03-16 2016-07-27 江苏省电力公司常州供电公司 Operating method of outsourcing team management and control system
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system
CN106295788A (en) * 2015-05-12 2017-01-04 杭州海康威视数字技术股份有限公司 The statistical method of the volume of the flow of passengers and device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160012363A1 (en) * 2013-04-18 2016-01-14 Omron Corporation Work management system and work management method
CN104110271A (en) * 2013-04-22 2014-10-22 开封市测控技术有限公司 Under-mine equipment monitoring alarm system based on face recognition technology
CN103338350A (en) * 2013-05-31 2013-10-02 郭亚晋 Construction transportation safety monitoring system
CN106295788A (en) * 2015-05-12 2017-01-04 杭州海康威视数字技术股份有限公司 The statistical method of the volume of the flow of passengers and device
CN105046430A (en) * 2015-07-14 2015-11-11 国家电网公司 Method and apparatus for monitoring electric power production personnel information
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system
CN105809362A (en) * 2016-03-16 2016-07-27 江苏省电力公司常州供电公司 Operating method of outsourcing team management and control system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109426903A (en) * 2017-08-26 2019-03-05 陕西海山安全技术服务有限公司 A kind of oilfield operation site intelligent monitor system
CN107939447A (en) * 2017-12-07 2018-04-20 重庆天府矿业有限责任公司 A kind of safety of coal mines risk stratification early warning management-control method and system
CN108154308A (en) * 2017-12-29 2018-06-12 广州供电局有限公司 Power construction process management optimization method and system
CN108154308B (en) * 2017-12-29 2020-11-03 广东电网有限责任公司广州供电局 Power construction process management optimization method and system
CN109872055A (en) * 2019-01-30 2019-06-11 广州轨道交通建设监理有限公司 A kind of personnel management system based on construction site

Similar Documents

Publication Publication Date Title
EP3279700B1 (en) Security inspection centralized management system
US10049283B2 (en) Stay condition analyzing apparatus, stay condition analyzing system, and stay condition analyzing method
CN106980919A (en) A kind of engineering information management method and system
CN111144262A (en) Process anomaly detection method based on monitoring video
CN110738135A (en) worker work step specification visual identification judgment and guidance method and system
EP4137901A1 (en) Deep-learning-based real-time process monitoring system, and method therefor
CN105279386B (en) Method and device for determining index abnormal data
CN111062303A (en) Image processing method, system and computer storage medium
EP3910437B1 (en) Monitoring apparatus, monitoring method, and computer-readable medium
CN110717542A (en) Emotion recognition method, device and equipment
US20200125481A1 (en) Screen recording preparation method for evaluating software usability, computing system, computer program and computer-readable storage medium implementing the method
CN110717461A (en) Fatigue state identification method, device and equipment
CN113177468A (en) Human behavior detection method and device, electronic equipment and storage medium
CN109313442B (en) Automated visual and acoustic analysis for event detection
CN112232210A (en) Personnel flow analysis method and system, electronic device and readable storage medium
CN116264004A (en) Vision-based monitoring of field safety compliance based on worker re-identification and personal protective equipment classification
CN113129530B (en) Intelligent security electronic fence alarm system based on Internet of things and machine vision
US20210027463A1 (en) Video image processing and motion detection
JP2015215709A (en) Apparatus data processor and apparatus data processing method
CN113591589B (en) Product missing detection identification method and device, electronic equipment and storage medium
CN111932581B (en) Safety rope detection method, device, electronic equipment and readable storage medium
KR20160011535A (en) Apparatus and Method for image processing
Luca et al. Anomaly detection using the Poisson process limit for extremes
RU2694139C1 (en) Method for determining deviant behavior of a person in a mode of simultaneous operation of a group of video cameras
US20110235873A1 (en) Extracting device-related data from graphical user interface

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170725

RJ01 Rejection of invention patent application after publication