CN106980919A - A kind of engineering information management method and system - Google Patents
A kind of engineering information management method and system Download PDFInfo
- Publication number
- CN106980919A CN106980919A CN201710086093.8A CN201710086093A CN106980919A CN 106980919 A CN106980919 A CN 106980919A CN 201710086093 A CN201710086093 A CN 201710086093A CN 106980919 A CN106980919 A CN 106980919A
- Authority
- CN
- China
- Prior art keywords
- information
- management
- construction
- engineering
- construction manager
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 73
- 238000010276 construction Methods 0.000 claims abstract description 83
- 238000012544 monitoring process Methods 0.000 claims abstract description 27
- 238000004458 analytical method Methods 0.000 claims abstract description 20
- 238000004519 manufacturing process Methods 0.000 claims abstract description 19
- 238000010191 image analysis Methods 0.000 claims abstract description 9
- 238000009430 construction management Methods 0.000 claims description 17
- 238000000034 method Methods 0.000 claims description 14
- 230000002159 abnormal effect Effects 0.000 claims description 13
- 238000012360 testing method Methods 0.000 claims description 12
- 238000012545 processing Methods 0.000 claims description 11
- 230000001939 inductive effect Effects 0.000 claims description 8
- 230000010365 information processing Effects 0.000 claims description 4
- 238000004321 preservation Methods 0.000 claims description 4
- 238000005516 engineering process Methods 0.000 abstract description 4
- 238000004590 computer program Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 7
- 230000006870 function Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000008054 signal transmission Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Image Analysis (AREA)
Abstract
The present invention relates to field of engineering technology, and in particular to a kind of engineering information management method and system, a kind of engineering information management method, obtains the video image information in monitor area;The video image information is analyzed, is determined to actually enter the information of the construction manager of job site according to analysis result;The information of the construction manager for actually entering job site determined by the video image analysis is obtained from personnel information management system, the first personal information is obtained from engineering production monitoring system, management is monitored to construction manager information according to the construction manager information and the first personal information, construction manager is exercised supervision management into job site by carry out that analysis can be promptly and accurately to video image, administrative vulnerability is avoided, the supervision and management facilitated in engineering construction is rapidly and efficiently exchanged with information.
Description
Technical field
The present invention relates to field of engineering technology, and in particular to a kind of engineering information management method and system.
Background technology
In engineering construction, construction accident constantly occurs in recent years, and most of reason is that general contracting unit is managed on behalf of another with wrapping, to existing
Field lacks supervision and management, and effective supervision and management is lacked to construction manager, and the information management of construction manager is not good for
Entirely, comprehensive effective supervision and management in the whole engineering phase is lacked.
At construction project scene, existing engineering subcontract system effectively can not exercise supervision to construction manager, and then
Potential safety hazard is caused for engineering site, it is also difficult to information management examination is carried out to construction manager, it is impossible to just access at any time
And obtaining correlation engineering information, it has not been convenient to the supervision and management in engineering construction is rapidly and efficiently exchanged with information.
The content of the invention
To solve problem of the prior art, the invention provides a kind of one kind effectively managed construction manager
Engineering information management method and system.
In order to achieve the above object, the present invention uses following technical scheme:A kind of engineering information management method, obtains monitoring
Video image information in region;The video image information is analyzed, is determined to actually enter construction according to analysis result
The information of the construction manager at scene;The reality determined by the video image analysis is obtained from personnel information management system
Into the information of the construction manager of job site, the first personal information is obtained from engineering production monitoring system, according to
The construction manager information and the first personal information are monitored management to construction manager information.
The further video image to acquisition is analyzed, and is determined to appear in the default prison according to the analysis result
Control the direction of motion of the target person in region;The management terminal is according to the direction of motion of the target person of determination, root
According to the direction of motion of the site construction management personnel of determination, the direction of motion includes entering or going out.
The further video image to acquisition is analyzed, and obtains the shape facility of the face;By the face
Shape facility is matched one by one with the shape facility of all template images in personnel information management system, is obtained and the face
Closest template image, determines the site construction management personal information in the corresponding personnel information management system of template image.
It is further that inductive statistics, whole mistake of the inductive statistics through construction are carried out to construction manager management information
Journey, after engineering terminates, makes the construction manager management information, by engineering information system at engineering information processing terminal
To the information analysis, and carry out processing renewal preservation.
A kind of engineering information management system, including first acquisition unit, obtain the video image information in monitor area;Point
Unit is analysed, is analyzed for the image to acquisition, the video image information is analyzed, is determined according to analysis result real
Border enters the information of the construction manager of job site;Second acquisition unit, is obtained by institute from personnel information management system
State the information of the construction manager for actually entering job site of video image analysis determination, the 3rd acquiring unit, from work
The first personal information, monitoring unit, for according to the construction manager information and first are obtained in journey production monitoring system
Personal information is monitored management to construction manager information.
The further analytic unit includes:Test sample acquisition module, the sample for obtaining test image judges
Whether module, the sample of the test image for judging to detect meets preset attribute bar;Determine that the test image is corresponding
The site construction management personal information of personnel information management system.
Further second acquisition unit also includes enquiry module, for according to the construction manager tissue post from
The construction manager information in the tissue post is inquired about in the personnel information management system;And memory module, for inciting somebody to action
Query Result is stored in tables of data and regard the Query Result as the construction manager information.
The further monitoring unit includes:Matching module, for by the site construction management personal information and institute
State the first personal information to be matched, obtain matching result;Determining module, for determining described first according to the matching result
Abnormal personal information in personal information;First monitoring modular, for being monitored to the abnormal personal information.
Further and described system also includes:Amending unit, for according to first personal information to described different
Normal construction manager information is modified;And updating block, it is described for revised abnormal personal information to be updated to
In engineering production monitoring system.
The present invention obtain monitor area in video image information, the video image information is analyzed, according to divide
Analysis result is determined to actually enter the information of the construction manager of job site, obtained from personnel information management system by described
The information for the construction manager for actually entering job site that video image analysis is determined, from engineering production monitoring system
The first personal information is obtained, construction manager information is carried out according to the construction manager information and the first personal information
Monitoring management, by video image carry out analysis can be promptly and accurately construction manager is exercised supervision into job site
Management, it is to avoid administrative vulnerability, the supervision and management that facilitates in engineering construction is rapidly and efficiently exchanged with information.
Brief description of the drawings
Fig. 1 is engineering information management method flow schematic diagram of the present invention.
Fig. 2 is engineering information management system schematic of the present invention.
Fig. 3 is engineering information statistical method schematic flow sheet of the present invention.
Embodiment
The present invention is described in further details below by embodiment, embodiment is only used for illustrating the present invention, does not limit
The scope of the present invention processed.
A kind of one embodiment of engineering information management method, obtains the video image in monitor area as shown in Figure 1,3
Information;The video image information is analyzed, is determined to actually enter the construction management of job site according to analysis result
The information of personnel;Obtained from personnel information management system and actually enter job site by what the video image analysis was determined
The information of construction manager, wherein, the information of the construction manager for actually entering job site is the personnel
The personal information stored in information management system, the personnel information management system is used to supervise construction manager information
Survey;The first personal information is obtained from engineering production monitoring system, wherein, first personal information is that the engineering produces prison
The construction manager information stored in examining system, the production that the engineering production monitoring system is used for the engineering system is believed
Breath is monitored, and the production information includes personal information, facility information and operation information;Believed according to the construction manager
Breath and the first personal information are monitored management to construction manager information.By the construction manager information and described
One personal information is matched, and obtains matching result;Exception in first personal information is determined according to the matching result
Personal information;And the abnormal personal information is monitored.
The video image of acquisition is analyzed, is determined to appear in the default monitor area according to the analysis result
Target person the direction of motion;The management terminal is according to the direction of motion of the target person of determination, according to determination
The direction of motion of the site construction management personnel, the direction of motion includes entering or going out, and statistics, which is actually entered, in time applies
The information such as the construction manager information such as quantity at work scene, for obtaining working as the site construction management personnel in monitor area
Preceding statistical value, the current statistic value of the administrative staff's quantity for actually entering job site is to be detected untill current time
The quantity for appearing in the construction manager in the monitor area and being disappeared out of described monitor area of detecting show
The difference of the quantity of field construction manager, can be by the pure video technique of web camera come in default monitor area
Construction manager is monitored and counted, and obtains the passenger flow statisticses value of current preset monitor area, video acquisition module sum
Word signal transacting computing module, video acquisition module is used for the video image letter for obtaining the real-time video in default monitor area
Breath, it is possible to highlighted to video image information to improve the processing of the simple images such as contrast, to improve the definition of picture,
Improve the accuracy of detection to personnel;Digital Signal Processing computing module is used to enter the video image information collected row mode knowledge
Not, all personnel's (can be any one first object personnel) occurred in video and the motion side of these personnel are identified
To, and determine that it is come out into predeterminable area or from predeterminable area according to their direction of motion.
To construction manager management information carry out inductive statistics, inductive statistics through construction whole process, in work
After journey terminates, the construction manager management information is made at engineering information processing terminal, information terminal is the two of channel
End, channel refers to the passage of communication, is the medium of signal transmission, computer, mobile phone, etc. be all information terminal, and be sent to management
System, by engineering information system to the information analysis, and carries out processing renewal preservation.So that terminal device is accessed and obtained at any time
Information.
A kind of another embodiment of engineering information management method, obtains the video image information in monitor area;To institute
State video image information to be analyzed, determined to actually enter the letter of the construction manager of job site according to analysis result
Breath;The construction management for actually entering job site determined by the video image analysis is obtained from personnel information management system
The information of personnel, wherein, the information of the construction manager for actually entering job site is the personnel information management
The personal information stored in system, the personnel information management system is used to be monitored construction manager information;From work
The first personal information is obtained in journey production monitoring system, wherein, first personal information is the engineering production monitoring system
The construction manager information of middle storage, the engineering production monitoring system is used to carry out the production information of the engineering system
Monitoring, the production information includes personal information, facility information and operation information;According to the construction manager information and
One personal information is monitored management to construction manager information.By the construction manager information and first personnel
Information is matched, and obtains matching result;The abnormal personnel letter in first personal information is determined according to the matching result
Breath;And the abnormal personal information is monitored.
Analyzed using the video image to acquisition, obtain the shape facility of the face;By the shape of the face
Feature is matched one by one with the shape facility of all template images in personnel information management system, obtains nearest with the face
As template image, determine the site construction management personal information in the corresponding personnel information management system of template image, face
Analysis system includes face shape abstraction module, for carrying out Face datection to described image sample, obtains the face shape
Feature, face shape matching module, for by template used image in the shape facility of the face and template image data storehouse
Shape facility matched one by one, obtain the template image closest with the face,
To construction manager management information carry out inductive statistics, inductive statistics through construction whole process, in engineering knot
Shu Hou, makes the construction manager management information at engineering information processing terminal, and information terminal is the two ends of channel, letter
Road refers to the passage of communication, is the medium of signal transmission, computer, mobile phone, etc. be all information terminal, and be sent to management system,
By engineering information system to the information analysis, and carry out processing renewal preservation.So that terminal device is accessed at any time and obtains information.
A kind of engineering information management system as shown in Figure 2, it is characterised in that including first acquisition unit, obtains monitored space
Video image information in domain;Analytic unit, analyzes for the image to acquisition, the video image information is divided
Analysis, determines to actually enter the information of the construction manager of job site according to analysis result;Second acquisition unit, from personnel
Information management system obtains the letter of the construction manager for actually entering job site determined by the video image analysis
Breath, the 3rd acquiring unit obtains the first personal information, monitoring unit, for being applied according to from engineering production monitoring system
Work administrative staff information and the first personal information are monitored management to construction manager information.
The analytic unit includes:Test sample acquisition module, the sample for obtaining test image, determination module is used
Preset attribute bar whether is met in the sample for the test image for judging to detect;Determine the corresponding personal information of the test image
The site construction management personal information of management system, for determining construction manager tissue post information, wherein, the personnel
The construction manager information at least one tissue post is previously stored with information management system.
Second acquisition unit also includes enquiry module, for according to the construction manager tissue post from the personnel
The construction manager information in the tissue post is inquired about in information management system;And memory module, for by Query Result
It is stored in tables of data and using the Query Result as the construction manager information, the monitoring unit includes:Matching
Module, for the site construction management personal information and first personal information to be matched, obtains matching result;Really
Cover half block, for determining the abnormal personal information in first personal information according to the matching result;First monitoring modular,
For being monitored to the abnormal personal information.
And the system also includes:Amending unit, for being managed according to first personal information to the abnormal construction
Reason personal information is modified;And updating block, produced for revised abnormal personal information to be updated into the engineering
In monitoring system.
It should be understood by those skilled in the art that, embodiments of the invention can be provided as method, system or computer program
Product.Therefore, the present invention can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware
Apply the form of example.Moreover, the present invention can be used in one or more computers for wherein including computer usable program code
The shape for the computer program product that usable storage medium is implemented on (including but is not limited to magnetic disk storage and optical memory etc.)
Formula.
The present invention is the flow with reference to method according to embodiments of the present invention, equipment (system) and computer program product
Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram
Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided
The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce
A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real
The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy
Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to
Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or
The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter
Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or
The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one
The step of function of being specified in individual square frame or multiple square frames.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention
God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to comprising including these changes and modification.
Claims (9)
1. a kind of engineering information management method, it is characterised in that:Obtain the video image information in monitor area;Regarded to described
Frequency image information is analyzed, and is determined to actually enter the information of the construction manager of job site according to analysis result;From
Personnel information management system obtains the construction manager for actually entering job site determined by the video image analysis
Information, the first personal information is obtained from engineering production monitoring system, according to the construction manager information and the first
Member's information is monitored management to construction manager information.
2. according to the method described in claim 1, it is characterised in that the video image of acquisition is analyzed, according to described point
Analysis result determines to appear in the direction of motion of the target person in the default monitor area;The management terminal is according to determination
The direction of motion of the target person, according to the direction of motion of the site construction management personnel of determination, the direction of motion
Including entering or going out.
3. according to the method described in claim 1, it is characterised in that the video image of acquisition is analyzed, obtain the people
The shape facility of face;By the shape facility of all template images in the shape facility and personnel information management system of the face by
One is matched, and obtains the template image closest with the face, determines the corresponding personnel information management system of template image
In site construction management personal information.
4. according to the method described in claim 1, it is characterised in that inductive statistics is carried out to construction manager management information,
Inductive statistics after engineering terminates, makes the construction management through the whole process of construction at engineering information processing terminal
Personal management information, by engineering information system to the information analysis, and carries out processing renewal preservation.
5. a kind of engineering information management system, it is characterised in that including first acquisition unit, obtain the video figure in monitor area
As information;Analytic unit, analyzes for the image to acquisition, the video image information is analyzed, according to analysis
As a result determination actually enters the information of the construction manager of job site;Second acquisition unit, from personnel information management system
System obtains the information of the construction manager for actually entering job site determined by the video image analysis, and the 3rd obtains
Unit, obtains the first personal information, monitoring unit, for believing according to the construction manager from engineering production monitoring system
Breath and the first personal information are monitored management to construction manager information.
6. method according to claim 5, it is characterised in that the analytic unit includes:Test sample acquisition module, is used
In the sample for obtaining test image, determination module, whether the sample of the test image for judging to detect meets preset attribute
Bar;Determine the site construction management personal information of the corresponding personnel information management system of the test image.
7. method according to claim 5, it is characterised in that second acquisition unit also includes enquiry module, for basis
The construction management people in the tissue post is inquired about in the construction manager tissue post from the personnel information management system
Member's information;And memory module, for Query Result to be stored in tables of data and the Query Result is regard as the construction
Administrative staff's information.
8. method according to claim 5, it is characterised in that the monitoring unit includes:Matching module, for by described in
Site construction management personal information and first personal information are matched, and obtain matching result;Determining module, for basis
The matching result determines the abnormal personal information in first personal information;First monitoring modular, for the exception
Personal information is monitored.
9. method according to claim 5, it is characterised in that and the system also includes:Amending unit, for basis
First personal information is modified to the abnormal construction manager information;And updating block, for it will correct after
Abnormal personal information be updated in the engineering production monitoring system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710086093.8A CN106980919A (en) | 2017-02-17 | 2017-02-17 | A kind of engineering information management method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710086093.8A CN106980919A (en) | 2017-02-17 | 2017-02-17 | A kind of engineering information management method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106980919A true CN106980919A (en) | 2017-07-25 |
Family
ID=59338072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710086093.8A Pending CN106980919A (en) | 2017-02-17 | 2017-02-17 | A kind of engineering information management method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106980919A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107939447A (en) * | 2017-12-07 | 2018-04-20 | 重庆天府矿业有限责任公司 | A kind of safety of coal mines risk stratification early warning management-control method and system |
CN108154308A (en) * | 2017-12-29 | 2018-06-12 | 广州供电局有限公司 | Power construction process management optimization method and system |
CN109426903A (en) * | 2017-08-26 | 2019-03-05 | 陕西海山安全技术服务有限公司 | A kind of oilfield operation site intelligent monitor system |
CN109872055A (en) * | 2019-01-30 | 2019-06-11 | 广州轨道交通建设监理有限公司 | A kind of personnel management system based on construction site |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103338350A (en) * | 2013-05-31 | 2013-10-02 | 郭亚晋 | Construction transportation safety monitoring system |
CN104110271A (en) * | 2013-04-22 | 2014-10-22 | 开封市测控技术有限公司 | Under-mine equipment monitoring alarm system based on face recognition technology |
CN105046430A (en) * | 2015-07-14 | 2015-11-11 | 国家电网公司 | Method and apparatus for monitoring electric power production personnel information |
US20160012363A1 (en) * | 2013-04-18 | 2016-01-14 | Omron Corporation | Work management system and work management method |
CN105809362A (en) * | 2016-03-16 | 2016-07-27 | 江苏省电力公司常州供电公司 | Operating method of outsourcing team management and control system |
CN105809355A (en) * | 2016-03-14 | 2016-07-27 | 国网福建省电力有限公司 | Personnel information identification method based on working field remote monitoring system |
CN106295788A (en) * | 2015-05-12 | 2017-01-04 | 杭州海康威视数字技术股份有限公司 | The statistical method of the volume of the flow of passengers and device |
-
2017
- 2017-02-17 CN CN201710086093.8A patent/CN106980919A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160012363A1 (en) * | 2013-04-18 | 2016-01-14 | Omron Corporation | Work management system and work management method |
CN104110271A (en) * | 2013-04-22 | 2014-10-22 | 开封市测控技术有限公司 | Under-mine equipment monitoring alarm system based on face recognition technology |
CN103338350A (en) * | 2013-05-31 | 2013-10-02 | 郭亚晋 | Construction transportation safety monitoring system |
CN106295788A (en) * | 2015-05-12 | 2017-01-04 | 杭州海康威视数字技术股份有限公司 | The statistical method of the volume of the flow of passengers and device |
CN105046430A (en) * | 2015-07-14 | 2015-11-11 | 国家电网公司 | Method and apparatus for monitoring electric power production personnel information |
CN105809355A (en) * | 2016-03-14 | 2016-07-27 | 国网福建省电力有限公司 | Personnel information identification method based on working field remote monitoring system |
CN105809362A (en) * | 2016-03-16 | 2016-07-27 | 江苏省电力公司常州供电公司 | Operating method of outsourcing team management and control system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109426903A (en) * | 2017-08-26 | 2019-03-05 | 陕西海山安全技术服务有限公司 | A kind of oilfield operation site intelligent monitor system |
CN107939447A (en) * | 2017-12-07 | 2018-04-20 | 重庆天府矿业有限责任公司 | A kind of safety of coal mines risk stratification early warning management-control method and system |
CN108154308A (en) * | 2017-12-29 | 2018-06-12 | 广州供电局有限公司 | Power construction process management optimization method and system |
CN108154308B (en) * | 2017-12-29 | 2020-11-03 | 广东电网有限责任公司广州供电局 | Power construction process management optimization method and system |
CN109872055A (en) * | 2019-01-30 | 2019-06-11 | 广州轨道交通建设监理有限公司 | A kind of personnel management system based on construction site |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3279700B1 (en) | Security inspection centralized management system | |
US10049283B2 (en) | Stay condition analyzing apparatus, stay condition analyzing system, and stay condition analyzing method | |
CN106980919A (en) | A kind of engineering information management method and system | |
CN111144262A (en) | Process anomaly detection method based on monitoring video | |
CN110738135A (en) | worker work step specification visual identification judgment and guidance method and system | |
EP4137901A1 (en) | Deep-learning-based real-time process monitoring system, and method therefor | |
CN105279386B (en) | Method and device for determining index abnormal data | |
CN111062303A (en) | Image processing method, system and computer storage medium | |
EP3910437B1 (en) | Monitoring apparatus, monitoring method, and computer-readable medium | |
CN110717542A (en) | Emotion recognition method, device and equipment | |
US20200125481A1 (en) | Screen recording preparation method for evaluating software usability, computing system, computer program and computer-readable storage medium implementing the method | |
CN110717461A (en) | Fatigue state identification method, device and equipment | |
CN113177468A (en) | Human behavior detection method and device, electronic equipment and storage medium | |
CN109313442B (en) | Automated visual and acoustic analysis for event detection | |
CN112232210A (en) | Personnel flow analysis method and system, electronic device and readable storage medium | |
CN116264004A (en) | Vision-based monitoring of field safety compliance based on worker re-identification and personal protective equipment classification | |
CN113129530B (en) | Intelligent security electronic fence alarm system based on Internet of things and machine vision | |
US20210027463A1 (en) | Video image processing and motion detection | |
JP2015215709A (en) | Apparatus data processor and apparatus data processing method | |
CN113591589B (en) | Product missing detection identification method and device, electronic equipment and storage medium | |
CN111932581B (en) | Safety rope detection method, device, electronic equipment and readable storage medium | |
KR20160011535A (en) | Apparatus and Method for image processing | |
Luca et al. | Anomaly detection using the Poisson process limit for extremes | |
RU2694139C1 (en) | Method for determining deviant behavior of a person in a mode of simultaneous operation of a group of video cameras | |
US20110235873A1 (en) | Extracting device-related data from graphical user interface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170725 |
|
RJ01 | Rejection of invention patent application after publication |