CN109872055A - A kind of personnel management system based on construction site - Google Patents
A kind of personnel management system based on construction site Download PDFInfo
- Publication number
- CN109872055A CN109872055A CN201910091095.5A CN201910091095A CN109872055A CN 109872055 A CN109872055 A CN 109872055A CN 201910091095 A CN201910091095 A CN 201910091095A CN 109872055 A CN109872055 A CN 109872055A
- Authority
- CN
- China
- Prior art keywords
- construction site
- personnel
- staff
- information
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 117
- 230000010354 integration Effects 0.000 claims abstract description 28
- 238000012806 monitoring device Methods 0.000 claims abstract description 18
- 238000012545 processing Methods 0.000 claims abstract description 14
- 238000012544 monitoring process Methods 0.000 claims abstract description 10
- 238000012163 sequencing technique Methods 0.000 claims description 9
- 238000005516 engineering process Methods 0.000 claims description 6
- 230000001815 facial effect Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 6
- 238000004891 communication Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Alarm Systems (AREA)
Abstract
The invention discloses a kind of personnel management systems based on construction site, including server, identity recognition device, several area monitoring devices and positioning terminal;Wherein, monitor supervision platform is equipped in server;Monitor supervision platform is equipped with personnel information storage module, for the personal information of staff to be stored in advance;Identity recognition device, the real-time face information for collecting work personnel;Positioning terminal includes locating module, for being positioned in real time to staff;Several area monitoring devices, for monitoring the real time information of construction site;Monitor supervision platform carries out integration processing according to the personal information that staff is stored in advance in real time information and personnel information storage module, obtains the field data of construction site staff to realize the management of personnel.When safety accident occurs for construction site, higher level department can also rapidly get in touch with the truth that related personnel on the scene recognize construction site in time according to the field data of the construction site staff got.
Description
Technical field
The present invention relates to field of communication technology more particularly to a kind of personnel management systems based on construction site.
Background technique
In building construction process, in order to fully understand the operational circumstances of construction site, construction enterprises generally can all applied
Comprehensive monitoring camera is arranged in work scene, although construction site monitored picture rotates, certainly with fine definition, 360 ° of active
The functions such as dynamic focusing function, can distant surveillance operation field local detail can not be transferred to monitor supervision platform, so construction
Enterprise generally can all send safety manager to supervise to construction site, and safety accident occur to prevent construction site cannot be timely
Field condition is reflected in processing and superior department.
General construction enterprises can all pre-register the information for accrediting the safety manager of construction site, and safety is occurring
Can get in touch with safety manager when accident in time, but safety accident be it is unpredictable, sometimes occur in peace
During full administrative staff's changing shifts or situations such as safety manager temporarily goes out to wait, it can not be related to so as to cause higher level department
The safety manager of construction site understands the truth of construction site in time.
Summary of the invention
The object of the present invention is to provide a kind of personnel management systems based on construction site, when safe thing occurs for construction site
Therefore when, even if accrediting the safety manager of construction site not at the construction field (site), higher level department can also rapidly get in touch with phase
Close the truth that personnel on the scene recognize construction site in time.
A kind of personnel management system based on construction site provided in an embodiment of the present invention, comprising:
Server, identity recognition device, several area monitoring devices and positioning terminal;Wherein, it is set in the server
There is monitor supervision platform;
The identity recognition device, several described area monitoring devices, the positioning terminal by the server with
The monitor supervision platform realizes information exchange;The identity recognition device is set to the entrance of the construction site;It is described several
A area monitoring device is set to several regions of the construction site;The positioning terminal fixation is worn on staff's body
On;
The monitor supervision platform is equipped with personnel information storage module, for the personal information of staff to be stored in advance;Wherein,
The personal information includes name, unit, contact number, position and facial image;
The identity recognition device, for acquiring all work people for wearing the positioning terminal and entering the construction site
The real-time face information of member;
The positioning terminal includes locating module, and the locating module for positioning staff in real time;
Several described area monitoring devices, for monitoring the real time information of the construction site;
The monitor supervision platform, for issuing the real time information of the server forwarding, and according to the real time information and institute
It states and the personal information of staff is stored in advance in personnel information storage module carries out integration processing, obtain the construction site work
Make the field data of personnel to realize the management of personnel.
Preferably, the monitor supervision platform is additionally provided with display module, Data Integration module and personal management module;
Wherein, the display module is used to issue the real time information of the server forwarding;
The Data Integration module, for work is stored in advance in the real time information and the personnel information storage module
The personal information for making personnel carries out integration processing, obtains the field data of the construction site staff;
The personal management module, the scene of the construction site staff for being obtained according to the Data Integration module
Information is managed personnel on the scene.
Preferably, the Data Integration module, for pre- in the real time information and the personnel information storage module
The personal information for first storing staff carries out integration processing, obtains the field data of the construction site staff, specifically
Are as follows:
The Data Integration module includes data matching unit, data binding unit;
Wherein, the data matching unit, for according to face recognition technology to real-time face information and pre-stored
Personal information carries out identification matching treatment;
The data binding unit is used for when the data matching unit successful match, by the personal information and institute
The real-time positioning information stated in positioning terminal carries out binding processing.
Preferably, the Data Integration module further includes metrics calculation unit and personnel's sequencing unit;
The metrics calculation unit, for safety to occur when region of the area monitoring assembly monitor into construction site
When accident, the staff in construction site is calculated at a distance from generation safety accident region;
Personnel's sequencing unit is used for according to the metrics calculation unit calculated distance, by preset sequence
Staff is ranked up, personnel's ranking results are obtained.
Further, it when safety accident occurs for construction site, is arranged according to the personnel obtained in personnel's sequencing unit
The position of staff in sequence result and the personnel information storage module, determines the best connection personnel of construction site.
Preferably, the personal management module is equipped with personnel's calling unit, and personnel's calling unit to described for applying
The staff at work scene carries out call treatment.
Preferably, the area monitoring device is full-view camera.
Compared with the existing technology, a kind of personnel management system based on construction site provided in an embodiment of the present invention, according to
The personal information of staff is stored in advance, collects all work people for wearing the positioning terminal and entering the construction site
Member real-time face information and staff at the construction field (site) in real-time positioning information, in real time obtain construction site work people
The field data of member, to realize the management to staff;And when safety accident occurs for construction site, even if accrediting construction
Not at the construction field (site), higher level department can also showing according to the construction site staff got by the safety manager at scene
Field information rapidly gets in touch with the truth that related personnel on the scene recognize construction site in time.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of personnel management system based on construction site provided in an embodiment of the present invention;
Fig. 2 is the structure of monitor supervision platform in a kind of personnel management system based on construction site provided in an embodiment of the present invention
Schematic diagram;
Fig. 3 is Data Integration module in a kind of personnel management system based on construction site provided in an embodiment of the present invention
Structural schematic diagram.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, it is a kind of structure of personnel management system based on construction site provided in an embodiment of the present invention
Schematic diagram, the personnel management system based on construction site include:
Server, identity recognition device, several area monitoring devices and positioning terminal;Wherein, it is set in the server
There is monitor supervision platform;
The identity recognition device, several described area monitoring devices, the positioning terminal by the server with
The monitor supervision platform realizes information exchange;The identity recognition device is set to the entrance of the construction site;It is described several
A area monitoring device is set to several regions of the construction site;The positioning terminal fixation is worn on staff's body
On;
The monitor supervision platform is equipped with personnel information storage module, for the personal information of staff to be stored in advance;Wherein,
The personal information includes name, unit, contact number, position and facial image;
The identity recognition device, for acquiring all work people for wearing the positioning terminal and entering the construction site
The real-time face information of member;
The positioning terminal includes locating module, and the locating module for positioning staff in real time;
Several described area monitoring devices, for monitoring the real time information of the construction site;
The monitor supervision platform, for issuing the real time information of the server forwarding, and according to the real time information and institute
It states and the personal information of staff is stored in advance in personnel information storage module carries out integration processing, obtain the construction site work
Make the field data of personnel to realize the management of personnel.
In the present embodiment, the positioning terminal can be safety cap, Intelligent bracelet, chest card, sticker or other portable
Wearable device, as long as the equipment that staff is convenient for carrying;The locating module is using Beidou/GPS satellite positioning
The mode combined with bluetooth 4.0 is positioned in real time, and real-time positioning information is sent to the monitor supervision platform.Wherein, according to
The field data for the construction site staff that the monitor supervision platform obtains, can reasonably managerial staff member, such as when applying
Safety accident occurs for work scene, construction enterprises accredit the safety manager of construction site just not at the construction field (site) when, higher level
Department can rapidly get in touch with related personnel on the scene in time according to the field data of the construction site staff got
Recognize the truth of construction site;When construction site is there is no when safety accident, higher level department can be according to getting
Construction site staff field data, reasonably deploy staff, open the work of construction site rationally balancedly
Exhibition improves construction efficiency.
Referring to Fig. 2, it is monitored in a kind of personnel management system based on construction site provided in an embodiment of the present invention
The structural schematic diagram of platform, the monitor supervision platform are additionally provided with display module, Data Integration module and personal management module;
Wherein, the display module is used to issue the real time information of the server forwarding;
The Data Integration module, for work is stored in advance in the real time information and the personnel information storage module
The personal information for making personnel carries out integration processing, obtains the field data of the construction site staff;
The personal management module, the scene of the construction site staff for being obtained according to the Data Integration module
Information is managed personnel on the scene.
In the present embodiment, user can check that being stored in advance in personal information deposits by the display module in monitor supervision platform
It stores up staff's personal information in module and enters the real-time positioning information behind construction site into staff.
Referring to Fig. 3, it is data in a kind of personnel management system based on construction site provided in an embodiment of the present invention
Integrate the structural schematic diagram of module, the Data Integration module, for storing mould to the real time information and the personal information
The personal information that staff is stored in advance in block carries out integration processing, obtains the scene letter of the construction site staff
Breath, specifically:
The Data Integration module includes data matching unit, data binding unit;
Wherein, the data matching unit, for according to face recognition technology to real-time face information and pre-stored
Personal information carries out identification matching treatment;
The data binding unit is used for when the data matching unit successful match, by the personal information and institute
The real-time positioning information stated in positioning terminal carries out binding processing.
In the present embodiment, the data matching unit further includes receiving entrance before carrying out identification matching treatment
It also will do it when the real-time face information of the staff of construction site and detect whether the staff wears positioning terminal, due to
The positioning terminal is equipped with locating module, if the data matching unit is not received by the real-time fixed of the positioning terminal transmission
Position information, then do not carry out identification matching treatment to real-time face information and pre-stored personal information, i.e., it is believed that matching not
Success.
In an alternative embodiment, the Data Integration module further includes that metrics calculation unit and personnel's sequence are single
Member;
The metrics calculation unit, for safety to occur when region of the area monitoring assembly monitor into construction site
When accident, the staff in construction site is calculated at a distance from generation safety accident region;
Personnel's sequencing unit is used for according to the metrics calculation unit calculated distance, by preset sequence
Staff is ranked up, personnel's ranking results are obtained.
Further, it when safety accident occurs for construction site, is arranged according to the personnel obtained in personnel's sequencing unit
The position of staff in sequence result and the personnel information storage module, determines the best connection personnel of construction site.
In the present embodiment, the preset sequence be ranked up from small to large according to the size of distance or from greatly to
It is small to be ranked up;When safety accident occurs for region of the area monitoring assembly monitor into construction site, higher level department can
With rapidly got in touch with according to the field data of construction site staff got construction site best connection personnel and
When recognize the truth of construction site, it is described such as when safety accident occurs for a certain region for finding construction site
Monitor supervision platform locks the region, and calculates all staff on board in construction site and occur at a distance from safety accident region, institute
The personnel sequencing unit of stating can obtain personnel's ranking results according to distance, and personnel's ranking results include the personal letter of staff
It ceases and at a distance from generation safety accident region, higher level department can be according to personnel's ranking results, the position situation of personnel, hair
Situations such as type of raw safety accident includes landslide, fire, casualties etc., comprehensively considers, and chooses best connection personnel and carries out
Consulting understands the truth of construction site in time.
In an alternative embodiment, the personal management module is equipped with personnel's calling unit, personnel's call slip
Member carries out call treatment for the staff to the construction site.
In an alternative embodiment, the area monitoring device is full-view camera.
In the present embodiment, uninterrupted monitoring in 24 hours is carried out to entire construction site by the area monitoring device,
Construction site actual conditions are observed by installation full-view camera, grasp practice of construction situation.
Compared with the existing technology, a kind of personnel management system based on construction site provided in an embodiment of the present invention, according to
The personal information of staff is stored in advance, collects all work people for wearing the positioning terminal and entering the construction site
Member real-time face information and staff at the construction field (site) in real-time positioning information, in real time obtain construction site work people
The field data of member, to realize the management to staff;And when safety accident occurs for construction site, even if accrediting construction
Not at the construction field (site), higher level department can also showing according to the construction site staff got by the safety manager at scene
Field information rapidly gets in touch with the truth that related personnel on the scene recognize construction site in time.
It should be noted that embodiments described above is only schematical, wherein described be used as separate part description
Unit may or may not be physically separated, component shown as a unit may or may not be
Physical unit, it can it is in one place, or may be distributed over multiple network units.It can be according to the actual needs
Some or all of the modules therein is selected to achieve the purpose of the solution of this embodiment.In addition, embodiment provided by the invention is attached
In figure, the connection relationship between module indicates there is communication connection between them, specifically can be implemented as one or more communication
Bus or signal wire.Those of ordinary skill in the art can understand and implement without creative efforts.
The above is a preferred embodiment of the present invention, it is noted that for those skilled in the art
For, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also considered as
Protection scope of the present invention.
Claims (7)
1. a kind of personnel management system based on construction site characterized by comprising
Server, identity recognition device, several area monitoring devices and positioning terminal;Wherein, prison is equipped in the server
Control platform;
The identity recognition device, several described area monitoring devices, the positioning terminal by the server with it is described
Monitor supervision platform realizes information exchange;The identity recognition device is set to the entrance of the construction site;Several described areas
Domain monitoring device is set to several regions of the construction site;The positioning terminal fixation is worn on staff;
The monitor supervision platform is equipped with personnel information storage module, for the personal information of staff to be stored in advance;Wherein, described
Personal information includes name, unit, contact number, position and facial image;
The identity recognition device, for acquiring all staff for wearing the positioning terminals and entering the construction site
Real-time face information;
The positioning terminal includes locating module, and the locating module for positioning staff in real time;
Several described area monitoring devices, for monitoring the real time information of the construction site;
The monitor supervision platform, for issuing the real time information of the server forwarding, and according to the real time information and the people
The personal information that staff is stored in advance in member's information storage module carries out integration processing, obtains the construction site work people
The field data of member is to realize the management of personnel.
2. as described in claim 1 based on the personnel management system of construction site, which is characterized in that the monitor supervision platform is also set
There are display module, Data Integration module and personal management module;
Wherein, the display module is used to issue the real time information of the server forwarding;
The Data Integration module, for work people is stored in advance in the real time information and the personnel information storage module
The personal information of member carries out integration processing, obtains the field data of the construction site staff;
The personal management module, the field data of the construction site staff for being obtained according to the Data Integration module
Personnel on the scene are managed.
3. as claimed in claim 2 based on the personnel management system of construction site, which is characterized in that the Data Integration mould
Block, it is whole for being carried out to the personal information that staff is stored in advance in the real time information and the personnel information storage module
Conjunction processing, obtains the field data of the construction site staff, specifically:
The Data Integration module includes data matching unit, data binding unit;
Wherein, the data matching unit is used for according to face recognition technology to real-time face information and pre-stored individual
Information carries out identification matching treatment;
The data binding unit, for when the data matching unit successful match, by the personal information with it is described fixed
Real-time positioning information in the terminal of position carries out binding processing.
4. as claimed in claim 3 based on the personnel management system of construction site, which is characterized in that the Data Integration module
It further include metrics calculation unit and personnel's sequencing unit;
The metrics calculation unit, for safety accident to occur when region of the area monitoring assembly monitor into construction site
When, the staff in construction site is calculated at a distance from generation safety accident region;
Personnel's sequencing unit is used for according to the metrics calculation unit calculated distance, by preset sequence to work
It is ranked up as personnel, obtains personnel's ranking results.
5. as claimed in claim 4 based on the personnel management system of construction site, which is characterized in that further include:
When safety accident occurs for construction site, according to the personnel's ranking results and the people obtained in personnel's sequencing unit
The position of staff in member's information storage module, determines the best connection personnel of construction site.
6. as claimed in claim 2 based on the personnel management system of construction site, which is characterized in that the personal management module
Equipped with personnel's calling unit, personnel's calling unit is used to carry out call treatment to the staff of the construction site.
7. as described in claim 1 based on the personnel management system of construction site, which is characterized in that the area monitoring device
For full-view camera.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910091095.5A CN109872055A (en) | 2019-01-30 | 2019-01-30 | A kind of personnel management system based on construction site |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910091095.5A CN109872055A (en) | 2019-01-30 | 2019-01-30 | A kind of personnel management system based on construction site |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109872055A true CN109872055A (en) | 2019-06-11 |
Family
ID=66918357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910091095.5A Pending CN109872055A (en) | 2019-01-30 | 2019-01-30 | A kind of personnel management system based on construction site |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109872055A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110543866A (en) * | 2019-09-06 | 2019-12-06 | 广东电网有限责任公司 | Safety management system and method for capital construction engineering constructors |
CN110705410A (en) * | 2019-09-23 | 2020-01-17 | 广州轨道交通建设监理有限公司 | Information matching verification method, device, medium and terminal equipment |
CN111011967A (en) * | 2019-11-18 | 2020-04-17 | 中铁武汉电气化局集团科工装备有限公司 | Intelligent safety helmet system |
CN113365031A (en) * | 2021-06-09 | 2021-09-07 | 鲁东大学 | Construction management system based on face recognition |
CN113449978A (en) * | 2021-06-23 | 2021-09-28 | 河北省送变电有限公司 | Job site personnel management system |
CN113746907A (en) * | 2021-08-17 | 2021-12-03 | 安徽云路交通信息技术有限公司 | Real-time positioning system for safety construction application personnel |
CN114202901A (en) * | 2021-12-16 | 2022-03-18 | 中建八局发展建设有限公司 | AI-based building engineering safety management error rate identification and alarm system |
CN114462882A (en) * | 2022-03-04 | 2022-05-10 | 中国水利水电第十二工程局有限公司 | Safety protection system for water conservancy construction based on internet of things |
CN114547578A (en) * | 2022-02-24 | 2022-05-27 | 江苏丰阳建设工程有限公司 | Real-name management method for construction site personnel of large-scale construction site |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106980919A (en) * | 2017-02-17 | 2017-07-25 | 河南城建学院 | A kind of engineering information management method and system |
CN107944838A (en) * | 2017-12-18 | 2018-04-20 | 四川省大益科技有限公司 | A kind of intelligent barrier gate Field Monitoring System and method |
CN108307150A (en) * | 2017-12-29 | 2018-07-20 | 安徽博诺思信息科技有限公司 | A kind of visualized presence monitoring system and method having personnel's management and control function |
CN109144013A (en) * | 2018-10-08 | 2019-01-04 | 北京宇时易能科技发展有限公司 | Capital construction and production scene managing and control system and method based on technology of Internet of things |
-
2019
- 2019-01-30 CN CN201910091095.5A patent/CN109872055A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106980919A (en) * | 2017-02-17 | 2017-07-25 | 河南城建学院 | A kind of engineering information management method and system |
CN107944838A (en) * | 2017-12-18 | 2018-04-20 | 四川省大益科技有限公司 | A kind of intelligent barrier gate Field Monitoring System and method |
CN108307150A (en) * | 2017-12-29 | 2018-07-20 | 安徽博诺思信息科技有限公司 | A kind of visualized presence monitoring system and method having personnel's management and control function |
CN109144013A (en) * | 2018-10-08 | 2019-01-04 | 北京宇时易能科技发展有限公司 | Capital construction and production scene managing and control system and method based on technology of Internet of things |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110543866A (en) * | 2019-09-06 | 2019-12-06 | 广东电网有限责任公司 | Safety management system and method for capital construction engineering constructors |
CN110705410A (en) * | 2019-09-23 | 2020-01-17 | 广州轨道交通建设监理有限公司 | Information matching verification method, device, medium and terminal equipment |
CN111011967A (en) * | 2019-11-18 | 2020-04-17 | 中铁武汉电气化局集团科工装备有限公司 | Intelligent safety helmet system |
CN113365031A (en) * | 2021-06-09 | 2021-09-07 | 鲁东大学 | Construction management system based on face recognition |
CN113449978A (en) * | 2021-06-23 | 2021-09-28 | 河北省送变电有限公司 | Job site personnel management system |
CN113746907A (en) * | 2021-08-17 | 2021-12-03 | 安徽云路交通信息技术有限公司 | Real-time positioning system for safety construction application personnel |
CN114202901A (en) * | 2021-12-16 | 2022-03-18 | 中建八局发展建设有限公司 | AI-based building engineering safety management error rate identification and alarm system |
CN114547578A (en) * | 2022-02-24 | 2022-05-27 | 江苏丰阳建设工程有限公司 | Real-name management method for construction site personnel of large-scale construction site |
CN114547578B (en) * | 2022-02-24 | 2023-02-17 | 江苏丰阳建设工程有限公司 | Real-name management method for construction site personnel of large-scale construction site |
CN114462882A (en) * | 2022-03-04 | 2022-05-10 | 中国水利水电第十二工程局有限公司 | Safety protection system for water conservancy construction based on internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109872055A (en) | A kind of personnel management system based on construction site | |
US9373014B1 (en) | Systems and methods for event monitoring using aerial drones | |
US7245223B2 (en) | Anti terrorist and homeland security public safety warning system | |
US9411997B1 (en) | Systems and methods for tracking subjects | |
CN105847769A (en) | Construction site behavior analysis system and analysis method | |
CN107038675B (en) | A kind of public security inventory management system and its operation method | |
RU113394U1 (en) | SYSTEM OF ELECTRONIC MONITORING OF CONTROLLED PERSONS | |
US20090251312A1 (en) | Private Network Emergency Alert Pager System | |
Kim et al. | Intelligent aerial-ground surveillance and epidemic prevention with discriminative public and private services | |
US11373398B2 (en) | Methods and systems for operating a moving platform to determine data associated with a target person or object | |
CN210181769U (en) | Children prevent losing and prevent turning sell system | |
KR20170087223A (en) | Image surveillance and information transmission and reception system and the method, using smart cctv with beacon | |
CN103227916A (en) | Backup method, device and system of monitoring video | |
KR20170052053A (en) | Electronic monitoring anklet position location and video survelliance system using beacon and smart cctv | |
CN110246062A (en) | A kind of estate management monitoring management system | |
CN107545610A (en) | A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system | |
CN112263057A (en) | Supervision intelligent wrist strap system | |
US10880523B2 (en) | Method of monitoring video | |
CN207352670U (en) | A kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely system | |
KR20160032464A (en) | Social security network method and system | |
WO2022126510A1 (en) | Digital campus safety management system | |
JP6722711B2 (en) | Notification processing system and notification processing method | |
CN108416971A (en) | A kind of teaching building security-protection management system | |
CN108632747A (en) | A kind of public security bureau auxiliary police officer management system | |
Qassab et al. | A PORTABLE HEALTH CLINIC (PHC) APPROACH USING SELF-ORGANIZING MULTI-UAV NETWORK TO COMBAT COVID-19 PANDEMIC SITUATION IN HOTSPOT AREAS. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190611 |