CN207352670U - A kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely system - Google Patents
A kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely system Download PDFInfo
- Publication number
- CN207352670U CN207352670U CN201721289222.5U CN201721289222U CN207352670U CN 207352670 U CN207352670 U CN 207352670U CN 201721289222 U CN201721289222 U CN 201721289222U CN 207352670 U CN207352670 U CN 207352670U
- Authority
- CN
- China
- Prior art keywords
- construction personnel
- deploys
- ensure effective
- effective monitoring
- illegal activities
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
A kind of construction personnel is the utility model is related to deploy to ensure effective monitoring and control of illegal activities safely system, the system includes face recognition work-checking machine or fingerprint recognition for attendance checking machine, Safety vest, locating base station, GPRS wireless transport modules and safety management controller, installation intelligent chip in the Safety vest, the intelligent chip includes GPS positioning module and RFID locating modules, the RFID locating modules, locating base station and GPRS wireless transport modules are sequentially connected, the face recognition work-checking machine or fingerprint recognition for attendance checking machine connection GPRS wireless transport modules, the GPS positioning module connection GPRS wireless transport modules, the GPRS wireless transport modules connection safety management controller.Compared with prior art, the utility model, which has the function of to prevent personnel to check card generation, carries out succouring in time when problem, Dual positioning, accident occur, retains accident recording data and the advantages that easy to effectively manage.
Description
Technical field
Wireless location and safety management system are the utility model is related to, deploying to ensure effective monitoring and control of illegal activities safely more particularly, to a kind of construction personnel is
System.
Background technology
Engineering construction plays an important role in China's Realization a Fairly Well-off Society in a all-around Way target.Engineering construction project has investment
Greatly, the features such as construction period is long, directly concerns the convenience to China's infrastructure integrity and people's lives.In recent years, with
China's rapid development of economy, the scale and quantity of engineering construction all constantly increase.Simultaneously, the pipe of corresponding construction site
Reason puts forward the requirement of higher, and past Engineering Construction Management uses extensive management mode, it is impossible to comprehensively and accurately statistical work
Whether personnel arrive hilllock, if work in certain period of time in defined region, if having external non-working person to enter
Construction site etc., complicated plus construction site accident, working environment difference causes construction site thing there are numerous risk factors
Therefore take place frequently.According to statistics, during 2003 to 2015, in work progress, the dead number people up to up to ten thousand because of accident.Cause
This, the safety management for strengthening engineering construction is a highly important job in engineering construction activity.
For a long time, workmen's safety management is by the way of artificial patrol, supervision, and not only efficiency is low for this mode,
The reception and registration of information not in time, does not meet the idea of development of Modern Construction management yet.Some existing monitoring or location facilities should
In Engineering Construction Management, but these technological means are all relatively simple, there is that can not cover all around, monitor dead angle
It is more, it is impossible to the problem of quickly and accurately positioning construction personnel position.How advanced technological means is used, to the people of construction site
Member implements effectively management, becomes the problem of in the urgent need to address.
The prior art has the following disadvantages:
1st, the examination of construction personnel's condition of going on duty can be looked into by manual record or no record.Even if there is punched-card machine etc. at scene
The drawbacks of smart machine also likely to be present for leaving the post after checking card, swiping the card.
2nd, positioning Field Force position and working motion track in real time can not be realized.For staff working status not
It can understand in real time.
3rd, due to taking extensive management, Frequent Accidents.
4th, after accident occurs, it is impossible to which the live the wounded position of positioning in time, difficulty is brought to rescue and relief work, may
Miss optimal rescue time.
Utility model content
The purpose of this utility model is exactly to provide a kind of construction personnel to overcome the problems of the above-mentioned prior art
Safety is deployed to ensure effective monitoring and control of illegal activities system.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely system, and the system includes face recognition work-checking machine or fingerprint recognition for attendance checking
Machine, Safety vest, locating base station, GPRS wireless transport modules and safety management controller, the interior installation intelligence of the Safety vest
Energy chip, the intelligent chip include GPS positioning module and RFID locating modules, the RFID locating modules, positioning base
Stand and GPRS wireless transport modules are sequentially connected, the face recognition work-checking machine or fingerprint recognition for attendance checking machine connection GPRS are wireless
Transport module, GPS positioning module connection GPRS wireless transport modules, GPRS wireless transport modules connection safety
Management Controller.
Preferably, the intelligent chip further includes power supply, microprocessor, data storage, reminding module and a key and exhales
Module is rescued, the power supply connects microprocessor, data storage, reminding module and a key and calls for help module respectively, and described is micro-
Processor connects data storage, reminding module and a key and calls for help module respectively, and microprocessor connection GPRS is wirelessly passed
Defeated module.
Preferably, a key calls for help module and includes Help Point and set the buzzer of SOS voice signals.
Preferably, the reminding module includes vibrator and sounding horn, the vibrator and sounding horn difference
Connect microprocessor.
Preferably, the intelligent chip further includes recording module, and the recording module includes speech input interface, institute
The data storage stated includes voice memory unit, speech input interface connection voice memory unit.
Preferably, the microprocessor model is STM32F103VET6.
Preferably, the intelligent chip further includes a key first aid button, and a key first aid button passes through wireless network
Network connection immediate care center.
Preferably, the system further includes LED display, LED display connection safety management controller.
Compared with prior art, the utility model has the following advantages:
1st, prevent personnel for problem of checking card:By recognition of face/fingerprint recognition for attendance checking machine, it can effectively prevent personnel from beating in generation
Card problem, while also ensure that building site is turned out for work and personnel safety problem;
2nd, Dual positioning function:By the RFID and GPS module in Safety vest, the identity to site staff is realized
And position location functionality, while Dual positioning can to avoid monitoring dead angle, RFID locating modules make up when GPS/ Big Dippeves signal by
Blocked to shelter when can not position, position blank problem;
3rd, succoured in time when accident occurs, retain accident recording data:Safety vest has sound-recording function, works as appearance
Emergency vest can store the recording material of 1~5 minute, be followed the trail of easy to the later stage, while a key Help Point can send and ask
Signal is rescued, easy to find accident situation in time;
4th, easy to effectively managing:System can be by electronic map system (GIS) real-time display location information, and utilizes wireless
Transport module realizes information sharing, and being conducive to manager, management side and site operation unit etc., to obtain personnel at the same time related
Information;
5th, it is automatically reminded to:The vibrating device and sounding horn that Safety vest carries, as the personnel for starting construction into building site
Do not have a question to the movement locus of construction personnel in specified regional work, or administrative staff and (be such as chronically at somewhere, do not carry out
It is mobile), or when be scheduled to staff, when emergency notice after accident generation and processing, correlation obtains
The personnel of authority can start the function and notify single or multiple building site related personnel.
Brief description of the drawings
Fig. 1 deploys to ensure effective monitoring and control of illegal activities safely system diagram for the utility model construction personnel;
Fig. 2 is Safety vest schematic diagram in the utility model.
Embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describe, it is clear that described embodiment is the part of the embodiment of the utility model, rather than is all implemented
Example.Based on the embodiment in the utility model, those of ordinary skill in the art institute on the premise of creative work is not made
The every other embodiment obtained, should all belong to the scope of the utility model protection.
Embodiment
To strengthen the examination of construction personnel's condition of going on duty, site working condition, the utility model utilizes technology of Internet of things
A kind of construction personnel of utility model deploys to ensure effective monitoring and control of illegal activities safely system, which is checked card by Safety vest, live recognition of face/fingerprint recognition
The hardware facilities such as machine, locating base station and system software composition.The examination dynamics to construction personnel can be improved, precisely in real time to work
Ground personnel are positioned, and reduce accident rate.And when an accident occurs, the people that can be quickly found out by system in accident
Member's positioning, accelerates the efficiency of rescue, greatly reduces accident to harm caused by site staff.
A kind of construction personnel safely the system of deploying to ensure effective monitoring and control of illegal activities be collection construction personnel attendance, personnel positioning and motion track inquiry, recording,
One key is called for help, notice and scheduling, alarm etc. are deployed to ensure effective monitoring and control of illegal activities safely system, such as Fig. 1 in the construction personnel of one.Safety deploys to ensure effective monitoring and control of illegal activities system by pacifying
Full administrative center, recognition of face/fingerprint recognition, building-site, construction personnel, gps satellite positioning, mobile GPRS be wirelessly transferred,
Locating base station and the Safety vest composition being through with construction personnel.The system in real time accurately can determine site staff
Position, can it is convenient, efficiently kept the safety in production and attendance management, it is horizontal to improve construction management, also can be accident treatment and rescue
Work provides reliable data foundation, ensures the Efficient Operation of rescue and relief work.
Each main modular introduction of system:
Security management center:
Including server, work station, LED display, alarm etc. form, security management center play monitoring and management and
The effect of data is called, the information such as name, the gender of construction personnel can be known by security management center, can be monitored in real time
The position of construction personnel and movement locus.And construction personnel is scheduled and is made an announcement.
Live recognition of face/fingerprint recognition punched-card machine:
Punched-card machine realizes the recognition of face of Field Force, and fingerprint attendance function, coordinates the GPS and RFID of Safety vest to position
System ensures that personnel truly in place and are in normal working status.One punched-card machine can accommodate 2000 pieces of fingerprints, 500 faces
Capacity, False Rate:0.0001s, support wifi communications and finite element network communication.
Locating base station:
Locating base station realizes that RFID chip positions, and when gps signal is lost, system is positioned by RFID locating base stations.
Wireless design is exempted to connect up, and Dual module double antenna two-band, there is LED liquid crystal displays, can show personal information nearby.
Safety vest:
Vest is configured with GPS/ Big Dippeves mainboard, GPRS transmissions, RFID chip, a key and calls for help module, such as Fig. 2.System
Using RFID location system, GPS positioning system double orientation technology, nothing is blocked when GPS/ Big Dipper signals are blocked thing to make up
During legal position, position blank problem, vest carries a key calling function, when causing danger can by a key Help Point into
Row is called for help.Safety vest has warning function, and the vibrating device and sounding horn carried, realizes administrative staff to construction personnel's
Notice and scheduling feature.Safety vest installation function module is convenient, can load more function modules.
The major parameter of Safety vest:
GPS location precision:4-10 meters;
The vest working time:High-capacity lithium battery can supply vest continuous work 24 it is small when more than, battery can charge repeatedly
Use;
Safety vest locating speed precision:0.2 meter per second;
Data channel:The transmission of data uses GPRS wireless transmission methods, personnel positioning using GPS/ Big Dippeves signal with
RFID Dual Positioning Technologies, have reached all standing, high accuracy positioning requirement to site staff, when staff indoors or
When GPS/ Big Dippeves signal is weaker in tunnel, system is positioned using RFID;
Safety vest has sound-recording function, when the vest that is in an emergency can store the recording material of 1~5 minute, is easy to
Later stage follows the trail of.
Construction personnel deploys to ensure effective monitoring and control of illegal activities safely system by Safety vest GPS/ Big Dippeves positioning terminal, GPRS wireless transmitting systems, RFID
Chip card, fingerprint on site attendance recorder/recognition of face and building site location-server are formed.
1. system is identified the construction personnel for entering building site using fingerprint on site attendance recorder/recognition of face, record is beaten
Construction personnel's information, safety management is transferred to by GPRS wireless transmitting systems by the information such as the name of card personnel, time of checking card
Controller.Security management center can establish news file database, including the letter such as the name of personnel, gender, identity card, photo
Breath.2. construction personnel checks card by rear, wearing has the Safety vest of GPS and RFID locating modules, and construction personnel is identified
With positioning.3. construction personnel starts to construct into building site, the GPS and RFID module of Safety vest are real to construction personnel current location
When be transferred to administrative center and show on a display screen, save location-temporal information obtains the motion track of construction personnel, can be with
The work activities situation of construction personnel is counted.It can be realized in security management center and define safety work region, when applying
Worker person can automatic alarm beyond safety work district system.Safety vest has warning function, the vibrating device and hair carried
Horn, administrative staff have a question the movement locus of construction personnel and (are such as chronically at somewhere, do not moved), or right
When staff is scheduled, emergency notice after accident generation and when processing, can notify and alert it is single or
Multiple building site related personnel.4. administrative staff can realize the positioning and scheduling to Field Force on center operations computer, improve
The management function of building-site.Data forwarding function is realized by server, management unit, management, site operation unit and
Client can timely obtain relevant information, realize information sharing.Item number is passed to by " wireless access transmission " mode
According in the server at center;System is to deploying to ensure effective monitoring and control of illegal activities safely, alert data carries out mathematical statistics, collects, analyzes, technical staff or supervisor
Leader can be by Internet network login system, the real time data at query monitor position, so that comprehensive reach construction peace
Full monitoring, safety are deployed to ensure effective monitoring and control of illegal activities, the purpose of security alarm.5. if any accident occurs, there is Safety vest a key to call for help work(at scene
Can, it can be called for help when causing danger by a key Help Point;Safety vest further includes a key first aid button, and a key is anxious
Rescue button and use the prior art, pass through wireless network connection immediate care center.Safety vest also has sound-recording function, tight when occurring
Anxious situation vest will store the recording material of 1~5 minute, be followed the trail of easy to the later stage.The double positioning moulds of the GPS and RFID of Safety vest
Block can be that rescuer fast and accurately provides construction personnel's personal information on the line and current location, RFID locating modules
Make up when GPS/ Big Dipper signals be blocked thing block can not position when, position blank problem.
Live recognition of face/fingerprint recognition punched-card machine that the system uses will arrive hilllock personal information by GPRS wireless networks
It is transferred on management center server computer, manages and check for related personnel.By recognition of face/fingerprint recognition for attendance checking machine,
Prevent personnel from checking card problem in generation, while also ensure that building site is turned out for work and personnel safety problem.
The system realizes positioning Field Force position and working motion track in real time by Safety vest.Built in Safety vest
RFID and GPS technology module, realize the identity to site staff and position location functionality.
Safety vest has sound-recording function, when the vest that is in an emergency can store the recording material of 1~5 minute, just
Followed the trail of in the later stage.Safety vest has a key calling function, can be called for help when causing danger by a key Help Point.
The function module of Safety vest is easy for installation, there is the space of amplification function module, and Safety vest is easy to wear.Safety vest has
Warning function, the vibrating device and sounding horn carried, when into building site start construction personnel not in specified regional work, or
Administrative staff have a question the movement locus of construction personnel and (are such as chronically at somewhere, do not moved), or to the people that works
When member is scheduled, in the emergency notice after accident occurs and processing, the personnel that correlation obtains authority can start
The function notifies single or multiple building site related personnel.
Occur if any accident, the distribution situation of site staff can be quick and precisely obtained by system, be accident treatment and
Rescue work provides reliable data foundation, ensures the Efficient Operation of rescue and relief work.
Improve the management function of building-site:Data forwarding function can be realized by server, administrative staff can be in
The positioning and scheduling to Field Force are realized on heart operation computer.System possesses perfect equipment and subscriber management function, at the same time
The real-time positioning information of user is shown with reference to electronic map system (GIS) and current state situation and information is saved in database
For inquiring about in the future.Management unit, management, site operation unit and client can timely obtain relevant information, realize letter
Breath is shared.Passed to by " wireless access transmission " mode in the server at project data center;System is to deploying to ensure effective monitoring and control of illegal activities safely, number of alarming
According to carrying out mathematical statistics, collect, analyze, technical staff or person in charge can be inquired about by Internet network login system
The real time data of monitoring site, so that comprehensive achieve the purpose that construction safety monitors, safety is deployed to ensure effective monitoring and control of illegal activities, security alarm.
The above, is only specific embodiment of the present utility model, but the scope of protection of the utility model is not limited to
In this, any one skilled in the art can readily occur in various in the technical scope that the utility model discloses
Equivalent modifications or substitutions, these modifications or substitutions should be covered within the scope of the utility model.Therefore, this practicality
New protection domain should be subject to scope of the claims.
Claims (8)
- The system 1. a kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely, it is characterised in that the system includes face recognition work-checking machine or fingerprint Identify attendance recorder, Safety vest, locating base station, GPRS wireless transport modules and safety management controller, the Safety vest Interior installation intelligent chip, the intelligent chip include GPS positioning module and RFID locating modules, the RFID positioning moulds Block, locating base station and GPRS wireless transport modules are sequentially connected, and the face recognition work-checking machine or fingerprint recognition for attendance checking machine connect GPRS wireless transport modules, GPS positioning module connection GPRS wireless transport modules are connect, the GPRS is wirelessly transferred mould Block connects safety management controller.
- The system 2. a kind of construction personnel according to claim 1 deploys to ensure effective monitoring and control of illegal activities safely, it is characterised in that the intelligent chip is also Module is called for help including power supply, microprocessor, data storage, reminding module and a key, the power supply connects microprocessor respectively Device, data storage, reminding module and a key call for help module, and the microprocessor connects data storage, prompting mould respectively Block and a key call for help module, microprocessor connection GPRS wireless transport modules.
- The system 3. a kind of construction personnel according to claim 2 deploys to ensure effective monitoring and control of illegal activities safely a, it is characterised in that key calls for help mould Block includes Help Point and sets the buzzer of SOS voice signals.
- The system 4. a kind of construction personnel according to claim 2 deploys to ensure effective monitoring and control of illegal activities safely, it is characterised in that the reminding module bag Vibrator and sounding horn are included, the vibrator and sounding horn connect microprocessor respectively.
- The system 5. a kind of construction personnel according to claim 2 deploys to ensure effective monitoring and control of illegal activities safely, it is characterised in that the intelligent chip is also Including recording module, the recording module includes speech input interface, and the data storage includes voice memory unit, The speech input interface connection voice memory unit.
- The system 6. a kind of construction personnel according to claim 2 deploys to ensure effective monitoring and control of illegal activities safely, it is characterised in that the microprocessor type Number it is STM32F103VET6.
- The system 7. a kind of construction personnel according to claim 2 deploys to ensure effective monitoring and control of illegal activities safely, it is characterised in that the intelligent chip is also Including a key first aid button, a key first aid button passes through wireless network connection immediate care center.
- The system 8. a kind of construction personnel according to claim 1 deploys to ensure effective monitoring and control of illegal activities safely, it is characterised in that the system further includes LED display, LED display connection safety management controller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721289222.5U CN207352670U (en) | 2017-09-30 | 2017-09-30 | A kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721289222.5U CN207352670U (en) | 2017-09-30 | 2017-09-30 | A kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207352670U true CN207352670U (en) | 2018-05-11 |
Family
ID=62358274
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721289222.5U Expired - Fee Related CN207352670U (en) | 2017-09-30 | 2017-09-30 | A kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207352670U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107545610A (en) * | 2017-09-30 | 2018-01-05 | 上海法赫桥梁隧道养护工程技术有限公司 | A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system |
CN111060220A (en) * | 2019-12-30 | 2020-04-24 | 中祖建设安装工程有限公司 | Intelligent construction site personnel positioning method, safety positioning equipment, storage medium and system |
-
2017
- 2017-09-30 CN CN201721289222.5U patent/CN207352670U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107545610A (en) * | 2017-09-30 | 2018-01-05 | 上海法赫桥梁隧道养护工程技术有限公司 | A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system |
CN111060220A (en) * | 2019-12-30 | 2020-04-24 | 中祖建设安装工程有限公司 | Intelligent construction site personnel positioning method, safety positioning equipment, storage medium and system |
CN111060220B (en) * | 2019-12-30 | 2021-11-23 | 中祖建设安装工程有限公司 | Intelligent construction site personnel positioning method, safety positioning equipment, storage medium and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204069358U (en) | Constructing tunnel personnel positioning management system | |
CN107748945A (en) | A kind of wisdom site staff management system | |
CN103854233B (en) | A kind of identifying device supervised for electric power safety and recognition methods | |
CN107146168A (en) | Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology | |
CN205845244U (en) | A kind of community intelligent safety and defence system | |
CN106558206A (en) | A kind of portable anti-lost method based on active RFID technology | |
CN109875172A (en) | A kind of intelligent safety helmet and its monitoring system | |
WO2017075996A1 (en) | Wearable device and real-time active worker management, control and analysis method | |
CN108900979A (en) | School badge positioning system based on NB-IoT | |
CN206042375U (en) | Management system is patrolled and examined to intelligence based on BLE | |
CN208875459U (en) | A kind of intelligent safety helmet | |
CN207352670U (en) | A kind of construction personnel deploys to ensure effective monitoring and control of illegal activities safely system | |
CN108540941A (en) | A kind of remote monitoring safe-guard system | |
CN105354909A (en) | Intelligent safety inspection monitoring information system | |
CN112034502A (en) | Real-time positioning system for production personnel | |
CN111770315A (en) | Intelligent building site video online monitoring system | |
CN104376348A (en) | Local-area intelligent monitoring system | |
CN113284280A (en) | Smart park visiting positioning security system | |
CN107545610A (en) | A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system | |
CN211123277U (en) | Engineering field personnel positioning equipment based on GPS positioning technology | |
CN204887250U (en) | Construction engineering quality control system based on thing networking | |
CN205158452U (en) | Railway upper track operation safety control system | |
CN107182033A (en) | The alignment system that personnel move in different floors | |
CN207264418U (en) | A kind of electric power tunnel management system based on Cloud Server and mobile terminal | |
CN203455934U (en) | 4G panel display terminal remote monitoring system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180511 Termination date: 20180930 |
|
CF01 | Termination of patent right due to non-payment of annual fee |