CN204887250U - Construction engineering quality control system based on thing networking - Google Patents
Construction engineering quality control system based on thing networking Download PDFInfo
- Publication number
- CN204887250U CN204887250U CN201520517192.3U CN201520517192U CN204887250U CN 204887250 U CN204887250 U CN 204887250U CN 201520517192 U CN201520517192 U CN 201520517192U CN 204887250 U CN204887250 U CN 204887250U
- Authority
- CN
- China
- Prior art keywords
- server
- unit
- communication unit
- wireless communication
- signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Alarm Systems (AREA)
Abstract
The utility model discloses a construction engineering quality control system based on thing networking, system include construction region control unit and the entrance guard's unit of being connected through cable or radio communication unit and server, still include the local monitor platform and the memory cell that are connected through cable and server to reach the unmanned aerial vehicle who is connected through radio communication unit and server, the utility model has the advantages of this system can in time find the construction problem in the whole construction situation of the real -time control of body and general headquarters' (distal end) to can improve the construction security to staff's health real time monitoring.
Description
Technical field
The utility model relates to Internet of things system, particularly relates to a kind of management system for using in wind power generation construction project.
Background technology
Engineering construction quality has vital impact for the use safety in the future of facility, particularly relate to the Important Project of power construction, at present, wind power plant is in process of construction, examination mode all is traditionally monitored, can only reconstruction being removed once pinpoint the problems, real-time cannot carry out monitoring management to carrying out.
Utility model content
Technical problem to be solved in the utility model realizes one can improve construction safety, in real time the system of monitoring construction quality.
To achieve these goals, the technical solution adopted in the utility model is: a kind of project delivery method management system based on Internet of Things, system comprises the construction area monitoring unit and entrance guard's unit that are connected with server by cable or wireless communication unit, also comprise the local monitor platform and memory cell that are connected with server by cable, and by unmanned plane that wireless communication unit is connected with server;
Described construction area monitoring unit comprises the multiple camera and Temperature Humidity Sensor that are arranged on construction area, and vision signal and temperature-humidity signal are delivered to server by described construction area monitoring unit;
Described entrance guard's unit comprises the camera and punched-card machine that are arranged on construction area porch, and vision signal and signal of checking card are delivered to server by described entrance guard's unit;
Described unmanned plane is hung with camera, and vision signal is delivered to server by signal wireless communication unit by described camera, is provided with the remote control of operation unmanned plane in described local monitor platform;
Described memory cell receives and data message in storage server;
Described local monitor platform is provided with display screen, and the information displaying received by server on a display screen.
This system is provided with employee's monitoring unit, it comprises watchband, the monitoring chip be arranged on watchband, described monitoring chip comprises wireless communication unit, the GPS unit be connected with wireless communication unit, body temperature heart rate detection unit, and signal is sent to server by described wireless communication unit.
This system is provided with PDA, and signal by manually inputting builder's diary, and is sent to server by the wireless communication unit in PDA by described PDA.
This system is provided with remote monitoring platform, and the signal that server receives is uploaded to remote monitoring platform by the Internet by described server.
The utility model has the advantage of that this system can at the real-time whole Construction Condition of monitoring of body and general headquarters' (far-end), Timeliness coverage construction problem, and can monitor in real time employee's health, improve working security.
Accompanying drawing explanation
Mark in the content expressed every width accompanying drawing in the utility model specification below and figure is briefly described:
Fig. 1 is the block diagram of the project delivery method management system based on Internet of Things;
Mark in above-mentioned figure is: 1, server; 2, local monitor platform; 3, construction area monitoring unit; 4, unmanned plane; 5, entrance guard's unit; 6, employee's monitoring unit; 7, PDA; 8, memory cell; 9, remote monitoring platform.
Embodiment
As shown in Figure 1, based on the project delivery method management system of Internet of Things, comprise server 1, local monitor platform 2, construction area monitoring unit 3, unmanned plane 4, entrance guard's unit 5, employee's monitoring unit 6, PDA7, memory cell 8, remote monitoring platform 9.
Construction area monitoring unit 3 comprises the multiple camera and Temperature Humidity Sensor that are arranged on construction area, installation site is according to construction requirement sets itself, generally be arranged on road junction or need the construction area of key monitoring, can understand the situation of construction area, vision signal and temperature-humidity signal are delivered to server 1 by cable or wireless communication unit by construction area monitoring unit 3;
Entrance guard's unit 5 comprises the camera and punched-card machine that are arranged on construction area porch, camera can with noting down and early warning, punched-card machine is used as employee and goes to work the statistics of operating time and situation, can adopt conventional fingerprint clocking-in machine or face recognition punched-card machine etc., vision signal and signal of checking card are delivered to server 1 by wireless communication unit by entrance guard's unit 5;
Unmanned plane 4 (telecontrolled aircraft) is hung with camera, vision signal is delivered to server 1 by signal wireless communication unit by camera, the remote control of operation unmanned plane 4 is provided with in local monitor platform 2, remote control is independently unmanned plane 4 operating system, be not connected with server 1, operating personnel can use for reference the image that the camera on unmanned plane 4 gathers and carry out straighforward operation; Because construction mostly is outdoor operation, can patrol and examine by unmanned plane 4 region that construction area monitoring unit 3 cannot monitor, and patrol and examine work high above the ground quality;
Employee's monitoring unit 6 comprises watchband, the monitoring chip be arranged on watchband, monitoring chip comprises wireless communication unit, the GPS unit be connected with wireless communication unit, body temperature heart rate detection unit, signal is sent to server 1 by wireless communication unit, employee's monitoring unit 6 is the device that each employee all needs to wear, monitor supervision platform can be allowed to recognize current physical condition and the present position of each employee, improve construction safety, and can personal management be strengthened;
PDA7 is the hand-held input equipment of employee, PDA7 is by manually inputting builder's diary, and by the wireless communication unit in PDA7, signal being sent to server 1, needed for builder's diary, the information of record requires setting according to project under construction, thus is convenient to each construction procedure of monitoring understanding;
Memory cell 8 receive and storage server 1 in data message, facilitating query history information like this, when going wrong, finding out person liable.
Local monitor platform 2 is provided with display screen, and the information displaying received by server 1 on a display screen, local monitor platform 2 is generally arranged near job site, the signal that server 1 receives is uploaded to remote monitoring platform 9 by the Internet by server 1, remote monitoring platform 9 is arranged on general headquarters, inside be provided with display screen, the field conditions of each job site of company can be transferred, facilitate general headquarters totally to monitor Construction Condition.
By reference to the accompanying drawings the utility model is exemplarily described above; obvious the utility model specific implementation is not subject to the restrictions described above; as long as have employed the improvement of the various unsubstantialities that method of the present utility model is conceived and technical scheme is carried out; or design of the present utility model and technical scheme directly applied to other occasion, all within protection range of the present utility model without to improve.
Claims (4)
1. the project delivery method management system based on Internet of Things, it is characterized in that: system comprises the construction area monitoring unit and entrance guard's unit that are connected with server by cable or wireless communication unit, also comprise the local monitor platform and memory cell that are connected with server by cable, and by unmanned plane that wireless communication unit is connected with server;
Described construction area monitoring unit comprises the multiple camera and Temperature Humidity Sensor that are arranged on construction area, and vision signal and temperature-humidity signal are delivered to server by described construction area monitoring unit;
Described entrance guard's unit comprises the camera and punched-card machine that are arranged on construction area porch, and vision signal and signal of checking card are delivered to server by described entrance guard's unit;
Described unmanned plane is hung with camera, and vision signal is delivered to server by signal wireless communication unit by described camera, is provided with the remote control of operation unmanned plane in described local monitor platform;
Described memory cell receives and data message in storage server;
Described local monitor platform is provided with display screen, and the information displaying received by server on a display screen.
2. the project delivery method management system based on Internet of Things according to claim 1, it is characterized in that: this system is provided with employee's monitoring unit, it comprises watchband, the monitoring chip be arranged on watchband, described monitoring chip comprises wireless communication unit, the GPS unit be connected with wireless communication unit, body temperature heart rate detection unit, and signal is sent to server by described wireless communication unit.
3. the project delivery method management system based on Internet of Things according to claim 1, is characterized in that: this system is provided with PDA, and signal by manually inputting builder's diary, and is sent to server by the wireless communication unit in PDA by described PDA.
4. the project delivery method management system based on Internet of Things according to claim 1, it is characterized in that: this system is provided with remote monitoring platform, the signal that server receives is uploaded to remote monitoring platform by the Internet by described server.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520517192.3U CN204887250U (en) | 2015-07-15 | 2015-07-15 | Construction engineering quality control system based on thing networking |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520517192.3U CN204887250U (en) | 2015-07-15 | 2015-07-15 | Construction engineering quality control system based on thing networking |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204887250U true CN204887250U (en) | 2015-12-16 |
Family
ID=54831568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520517192.3U Active CN204887250U (en) | 2015-07-15 | 2015-07-15 | Construction engineering quality control system based on thing networking |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204887250U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105516362A (en) * | 2016-01-21 | 2016-04-20 | 韩松 | System and method for monitoring engineering project operation site |
CN110351525A (en) * | 2019-07-22 | 2019-10-18 | 吴江市腾凯通信工程有限公司 | A kind of road construction site monitoring system |
CN110940320A (en) * | 2019-07-19 | 2020-03-31 | 华北电力大学(保定) | Open stock ground monitored control system based on unmanned aerial vehicle cruises |
-
2015
- 2015-07-15 CN CN201520517192.3U patent/CN204887250U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105516362A (en) * | 2016-01-21 | 2016-04-20 | 韩松 | System and method for monitoring engineering project operation site |
CN110940320A (en) * | 2019-07-19 | 2020-03-31 | 华北电力大学(保定) | Open stock ground monitored control system based on unmanned aerial vehicle cruises |
CN110351525A (en) * | 2019-07-22 | 2019-10-18 | 吴江市腾凯通信工程有限公司 | A kind of road construction site monitoring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107146168A (en) | Wisdom building site management system based on universe frequency conversion positioning Yu self-identifying technology | |
CN103116926B (en) | A kind of real-time monitoring system and application process thereof based on RFID safety cap | |
CN103726881B (en) | Safety of coal mines hidden danger signal acquiring processing system and method | |
CN107748945A (en) | A kind of wisdom site staff management system | |
CN203720890U (en) | Wearable polling terminal | |
CN107701234A (en) | A kind of intelligent mine supervisory systems | |
CN110634265B (en) | Electric power operation accident potential early warning system and method based on Internet of things | |
CN105261079A (en) | Portable intelligent electric power inspection device | |
CN204887250U (en) | Construction engineering quality control system based on thing networking | |
CN209231777U (en) | Wisdom building site management system | |
CN103558132A (en) | Prewarning system for dust pollution in air | |
CN108022412A (en) | Buried cable monitoring and warning system based on Internet of Things | |
CN106331630A (en) | Construction site constructor registration and real-time monitoring information system | |
CN111035098A (en) | Intelligent safety helmet for wind power plant | |
CN106089305A (en) | A kind of down-hole monitors and personnel location system in real time | |
CN208314500U (en) | Environmental monitoring system | |
CN207439401U (en) | A kind of electric power line pole tower construction work monitors system | |
CN106303930A (en) | A kind of intelligent patrol detection based on BLE management system and method | |
CN202954853U (en) | Safety monitoring system for mine | |
CN111642860A (en) | Electrician entry safety identification system and electrician safety helmet | |
CN106871952A (en) | A kind of electric power tower multifunctional monitoring terminal | |
CN105551169A (en) | Multifunctional forest fire prevention warning device utilizing photovoltaic power supply | |
CN106932688B (en) | Power transmission line detector and power transmission line detection system based on unmanned aerial vehicle | |
CN205596351U (en) | Underground works safe risk real -time prewarning device of being under construction based on thing networking | |
CN107545610A (en) | A kind of workmen deploys to ensure effective monitoring and control of illegal activities safely system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 230000 no.218, Xiangzhang Avenue, hi tech Development Zone, Hefei City, Anhui Province Patentee after: China Energy Construction Group Co.,Ltd. Address before: 230000 no.218, Xiangzhang Avenue, hi tech Development Zone, Hefei City, Anhui Province Patentee before: China Energy Engineering Group Anhui No.1 Electric Power Construction Co.,Ltd. |
|