CN107633352A - The method and apparatus of specification task flow - Google Patents

The method and apparatus of specification task flow Download PDF

Info

Publication number
CN107633352A
CN107633352A CN201710769052.9A CN201710769052A CN107633352A CN 107633352 A CN107633352 A CN 107633352A CN 201710769052 A CN201710769052 A CN 201710769052A CN 107633352 A CN107633352 A CN 107633352A
Authority
CN
China
Prior art keywords
task
construction
user
flow
inspection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710769052.9A
Other languages
Chinese (zh)
Inventor
刘润生
盛宇军
李洪斌
穆克彬
蔡有军
陈明
王伟波
李海峰
常晓旗
张惟中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710769052.9A priority Critical patent/CN107633352A/en
Publication of CN107633352A publication Critical patent/CN107633352A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of method and apparatus of specification task flow.Wherein, this method includes:Determine the task type of being performed for task of at least one user, and determine the flow of task corresponding with task type, task based access control flow obtains the process performing that at least one user performs task, process performing is assessed, obtain assessment result, wherein, task type comprises at least one of following:Construction task and patrol task, flow of task are used for the process performing that at least one user of specification performs task.The present invention is solved during execution task, and the technical problem that the process performing of task is assessed can not be performed to user.

Description

The method and apparatus of specification task flow
Technical field
The present invention relates to power engineering field, in particular to a kind of method and apparatus of specification task flow.
Background technology
With expanding economy, people's living standards continue to improve, staff is in the task of execution to construction environment Requirement also more and more higher, the particularly higher power engineering of construction risk degree.Nowadays, due to not carried out according to rules and regulations Construction and caused by it is unexpected of common occurrence.Further, since the monitoring of patrol officer is not in place, inspection work arbitrarily also causes indirectly There is the possibility of risk.
Although during power construction, many safety precautions are taken, but if workmen have ignored certain The tiny safety measure of item, it is possible to cause security incident.Also, in work progress, due to the stream of neither one specification Journey guides, and adds the randomness of construction and the randomness of collection data.For safety patrol inspection aspect, due to neither one essence True surveillance and control measure, can not ensure the implementation dynamics of inspection work, and can not ensure that each link can be checked, and Data is exhaustively gathered in work progress.In addition, the progress of daily construction task and patrol task can not be monitored in real time, And statistical analysis construction whether the information such as specification, inspection coverage rate.
For above-mentioned during execution task, it can not ask what the process performing of user's execution task was assessed Topic, not yet proposes effective solution at present.
The content of the invention
The embodiments of the invention provide a kind of method and apparatus of specification task flow, at least to solve in the task of execution During, the technical problem that the process performing of task is assessed can not be performed to user.
One side according to embodiments of the present invention, there is provided a kind of method of specification task flow, including:It is determined that at least The task type of one being performed for task of user, wherein, task type comprises at least one of following:Construction task and inspection Task;It is determined that the flow of task corresponding with task type, wherein, flow of task is used at least one user of specification and performs task Process performing;Task based access control flow obtains the process performing that at least one user performs task;Process performing is assessed, Obtain assessment result.
Another aspect according to embodiments of the present invention, a kind of device of specification task flow is additionally provided, including:First is true Cover half block, the task type of being performed for determining at least one user for task, task type comprise at least one of following: Construction task and patrol task;Second determining module, for determining the flow of task corresponding with task type, wherein, task Flow is used for the process performing that at least one user of specification performs task;Acquisition module, obtained at least for task based access control flow One user performs the process performing of task;Evaluation module, for assessing process performing, obtain assessment result.
Another aspect according to embodiments of the present invention, a kind of storage medium is additionally provided, the storage medium includes storage Program, wherein, the method that program performs specification task flow.
Another aspect according to embodiments of the present invention, a kind of processor being additionally provided, the processor is used for operation program, its In, the method for execution specification task flow when program is run.
In embodiments of the present invention, by the way of the progress of tasks carrying is obtained in real time, by determining at least one use The task type of being performed for task of family, and the flow of task corresponding with task type is determined, task based access control flow obtains At least one user performs the process performing of task, and process performing is assessed, obtains assessment result, wherein, task type Including at least one of following:Construction task and patrol task, flow of task are used at least one user of specification and perform holding for task Every trade is to have reached the implementation progress of real-time monitor task, and the purpose effectively assessed the process performing of user, so as to The technique effect for the standardization of process for improving execution task is realized, and then is solved during execution task, can not be right User performs the technical problem that the process performing of task is assessed.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is a kind of method flow diagram of specification task flow according to embodiments of the present invention;
Fig. 2 is a kind of system architecture diagram of optional specification task flow according to embodiments of the present invention;
Fig. 3 is a kind of method flow diagram of optional specification task flow according to embodiments of the present invention;
Fig. 4 is a kind of method flow diagram of optional specification task flow according to embodiments of the present invention;
Fig. 5 is a kind of method flow diagram of optional specification task flow according to embodiments of the present invention;
Fig. 6 is a kind of method flow diagram of optional specification task flow according to embodiments of the present invention;
Fig. 7 is a kind of method flow diagram of optional specification task flow according to embodiments of the present invention;
Fig. 8 is a kind of optional schematic flow sheet for performing task according to embodiments of the present invention;
Fig. 9 is a kind of block schematic illustration of optional specification task flow according to embodiments of the present invention;
Figure 10 is a kind of system framework of method based on specification task flow according to embodiments of the present invention;And
Figure 11 is a kind of apparatus structure schematic diagram of specification task flow according to embodiments of the present invention.
Embodiment
In order that those skilled in the art more fully understand the present invention program, below in conjunction with the embodiment of the present invention Accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, rather than whole embodiments.Based on the embodiment in the present invention, ordinary skill people The every other embodiment that member is obtained under the premise of creative work is not made, it should all belong to the model that the present invention protects Enclose.
It should be noted that term " first " in description and claims of this specification and above-mentioned accompanying drawing, " Two " etc. be for distinguishing similar object, without for describing specific order or precedence.It should be appreciated that so use Data can exchange in the appropriate case, so as to embodiments of the invention described herein can with except illustrating herein or Order beyond those of description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, be not necessarily limited to for example, containing the process of series of steps or unit, method, system, product or equipment Those steps or unit clearly listed, but may include not list clearly or for these processes, method, product Or the intrinsic other steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, there is provided a kind of embodiment of the method for specification task flow is, it is necessary to illustrate, attached The step of flow of figure illustrates can perform in the computer system of such as one group computer executable instructions, though also, So logical order is shown in flow charts, but in some cases, can be with different from shown by order execution herein Or the step of description.
Fig. 1 is the method flow diagram of specification task flow according to embodiments of the present invention, as shown in figure 1, this method includes Following steps:
Step S102, the task type of being performed for task of at least one user is determined, wherein, task type at least wraps Include one of following:Construction task and patrol task.
It should be noted that at least one user is including at least one of following:At least one construction user and at least one Inspection user, wherein, at least one construction user performs construction task, and at least one inspection user performs patrol task.
Specifically, construction user and inspection user each hold corresponding mobile terminal, wherein, the shifting for the user that constructs Dynamic terminal is construction terminal, and the mobile terminal of inspection user be inspection terminal, and construction terminal and inspection terminal can be but unlimited In smart mobile phone, flat board and wearable device.Each construction terminal and each inspection terminal have mark (example corresponding to it Such as, ID), supervising platform can get the mark of each mobile terminal, and can determine each mobile terminal according to the mark Hold being performed for task, it is determined that after being performed for the task of holder of each mobile terminal, supervising platform will appoint Business is issued in corresponding mobile terminal.
In addition it is also necessary to explanation, in this application, supervising platform are developed using JAVA language, and it is equal by loading Strategy weigh to issue task to mobile terminal, and the message transmitted by each mobile terminal can be received.
Step S104, it is determined that the flow of task corresponding with task type, wherein, it is at least one that flow of task is used for specification User performs the process performing of task.
It should be noted that flow of task is including at least one of following:Construction process and inspection flow.It is in addition, different Flow of task corresponding to task differs, and therefore, supervising platform needs the task according to corresponding to different task type Corresponding flow of task is issued to each mobile terminal.Staff performs corresponding appoint by mobile terminal according to flow of task Business, and after some link in having performed task, by clicking on the APP of installation on mobile terminals ACK button, To indicate that the current link of task has been completed.
In addition it is also necessary to explanation, on each mobile terminal installation be mounted on above-mentioned staff be used for according to times Business flow performs the APP of task, and the APP is developed using B/S frameworks, and construction user and inspection user can be divided by the APP Manage construction process and inspection flow in other places.Meanwhile implementing result can be fed back to supervising platform by APP.
Wherein, the system architecture diagram of whole specification task flow is as shown in Fig. 2 whole system is divided into mobile terminal and supervision is flat Platform, wherein, mobile terminal is mainly the mobile terminal side that user and inspection user hold of constructing, and including but not limited to construct user APP, work responsible person APP, construction enterprises legal person APP, engineered tissue personnel APP and security control personnel APP.Supervision is flat Platform mainly includes cloud platform and supervision backstage, wherein, cloud platform passes through internet and mobile terminal and supervision background communication, cloud platform Include real-time video module, electric power application module, real-time voice module again, and supervisor passes through enterprise road using supervision backstage Communicated by device, fire wall with mobile terminal and cloud platform.
In addition, real-time video module include RDS DB (Relational Database Service, i.e. cloud database), NGC3 platforms, sipproxy (Session Initiation Protocol Proxy, i.e. session initiation protocol are acted on behalf of) service Device, SBC (Server-based Computing, i.e., calculate) server based on server, pass through SLB (Server Load Balancer, i.e. load balancing) it is connected with internet.Electric power application module include OSS (Object Storage Service, That is object storage service), RDS DB, Redis caching servers, application server cluster, and by load balancing with mutually Networking connection.Implementing voice module includes voice service platform.
Step S106, task based access control flow obtain the process performing that at least one user performs task.
It should be noted that process performing is including at least one of following:Construction behavior and inspection behavior.
In a kind of optional embodiment, some link after task has been performed or in completion task of construction user it Afterwards, the user that constructs clicks on the submitting button of the APP in construction terminal, and the implementation status of task is fed back into supervising platform, supervised Platform can get the process performing of construction user in real time.
In an alternative embodiment, inspection user is when the construction behavior to the user that constructs carries out inspection, to applying Each construction link of work user is monitored, and gathers the data of correlation.During inspection, inspection user will can obtain Inspection information supervising platform is uploaded to by modes such as voice, word, picture and videos.
Step S108, is assessed process performing, obtains assessment result.
In a kind of optional embodiment, supervising platform is carried out respectively to the information transmitted by construction user and inspection user Filing is handled, and is audited according to construction user and inspection user institute feedack, and to construction task and patrol task In each step or link scored, supervising platform is commented according to each step or link of construction task and patrol task Point, the generation construction user such as violation information and time-out information and company's ranking where inspection user, the form of personnel's ranking, And shelves are stayed to restore.
The scheme limited based on above-mentioned steps S102 to step S108, it can know, by determining at least one user The task type of being performed for task, and determine the flow of task corresponding with task type, task based access control flow obtain to A few user performs the process performing of task, and process performing is assessed, obtains assessment result, wherein, task type is extremely Include less one of following:Construction task and patrol task, flow of task are used for the execution that at least one user of specification performs task Behavior.
It is easily noted that, the difference of the task type according to performed by user, different users is issued different Task, the corresponding flow of task of task that user can be according to performed by with itself performs task, because flow of task is specification The flow of change, therefore, task is performed according to flow of task, it is possible to prevente effectively from operating lack of standardization and losing in the task of execution Leakage performs the problem of step.In addition, during user is according to flow of task execution task, holding for user can be monitored in real time Every trade is, and the process performing of user is assessed, and can improve the work incentive of user.
Above-described embodiment of the application can reach the implementation progress of real-time monitor task, and the process performing of user is entered The purpose that row is effectively assessed, it is achieved thereby that improving the technique effect of the standardization of process of execution task, and then solve and holding During row task, the technical problem that the process performing of task is assessed can not be performed to user.
In a kind of optional embodiment, a kind of method flow diagram of optional specification task flow as shown in Figure 3, really The fixed flow of task corresponding with task type, specifically comprises the following steps:
Step S302, the task guiding book corresponding with task type is determined according to task type;
Step S304, the flow of task corresponding with task type is generated according to task guiding book.
It should be noted that task guiding book is the specification or standard for instructing staff to complete task, i.e., Staff can complete corresponding work according to the job step of defined in task guiding book, for example, in power engineering, apply Work user can complete the placement operations to job site according to the operating process of task guiding book.Wherein, different task is performed Task guiding book differs used in staff, for example, inspection user uses patrol task guiding book, construction User uses construction task guiding book.
Specifically, supervising platform can get the mark of each mobile terminal, and movement end is held according to mark determination The task type of the user at end, and task guiding book corresponding to being found in the database of supervising platform according to task type, And go out the flow of task of correspondingly task according to the Context resolution of task guiding book, finally, supervising platform is by mission dispatching to correspondingly Mobile terminal on.
In a kind of optional embodiment, a kind of method flow diagram of optional specification task flow as shown in Figure 4, It is determined that after the flow of task corresponding with task type, the method for specification task flow also comprises the following steps:
Step S402, obtain the current location where at least one construction user;
Step S404, the construction location of at least one construction user is determined according to task type;
Step S406, in the case of matching in current location and construction location, it is allowed to which at least one construction user performs Construction task.
Specifically, construction terminal on GPS (Global Positioning System, i.e. global positioning system) and/or GIS (Geographic Information System, i.e. global information system) can get the present bit where construction user Put, and the current location where the user that constructs is sent to supervising platform, supervising platform is according to the construction for holding the construction terminal The task of user determines construction location, and judge construct user where current location whether construction location boundary of works area It is interior, if, it is determined that construction user has reached job site, and now, supervising platform is sent to construction terminal allows construction to use Family performs the order of construction task.APP in construction terminal after mentioned order is received, APP by voice or The forms such as word prompting construction user can start to construct.If construct user where current location not in boundary of works area, It is determined that construction user is not up to job site, now, supervising platform is sent to construction terminal forbids construction user's execution construction to appoint The order of business, construction user can not by being operated to the node of flow of task in APP, meanwhile, APP also remind construction user Job site is also not up to, it is necessary to could start to construct after reaching job site.
In an alternative embodiment, in the case of it is determined that construction user is not up to job site, APP ejections are led Navigate interface, and cook up construction user by current location to job site optimal route and it is optimal by bus or road of driving Line, and voice is construction user's navigation.
It should be noted that by being positioned to the current location for the user that constructs, and according to the present bit of construction user Put come whether the user that determines to construct reaches job site, it is possible to prevente effectively from construction user reaches the construction site of mistake, perform Task not corresponding with construction process, and then the operating efficiency of construction user can be effectively improved, avoid the generation of accident.
In addition it is also necessary to explanation, according to flow of task get construction user perform task process performing it Afterwards, supervising platform can be also assessed the process performing for the user that constructs, and then obtains assessment result, as shown in figure 5, this method Specifically comprise the following steps:
Step S502, obtain the construction behavior that at least one construction user performs construction task according to construction process;
Step S504, construction behavior is assessed, obtain construction evaluation result.
In a kind of optional embodiment, a kind of method flow diagram of optional specification task flow as shown in Figure 6, It is determined that after the flow of task corresponding with task type, the method for specification task flow also comprises the following steps:
Step S602, obtain the first position of at least one construction user and the second place of at least one inspection user;
In the case that step S604, matches in first position and the second place, and the user that constructs performs construction task, At least one inspection user is allowed to perform patrol task.
In a kind of optional embodiment, the first position of the second place of inspection user and the user that constructs are being got Afterwards, judge whether first position and the second place match, if both matchings, illustrate inspection user and construction user same One position, now, further judge whether construction user is carrying out or starts to perform construction task, if it is determined that construction is used Family has begun to execution task, illustrates that construction user has reached job site, and because the second place of inspection user is with applying The first position of work user matches, and illustrates inspection user also at the construction field (site), and now, inspection user can appoint to construction user Implementation status of being engaged in carries out inspection.Wherein, inspection user can be by shooting the forms pair such as picture, video, voice and literature record The tasks carrying situation of construction user is recorded.
In an alternative embodiment, in the second place of inspection user and the first position not phase for the user that constructs In the case of matching somebody with somebody, determine whether construction user is carrying out or starts to perform construction task, if it is determined that construction user Execution task is had begun to, illustrates that construction user has reached job site, now, the inspection terminal that inspection user holds will be applied Optimal route is planned for inspection user, and navigated as target endpoint for inspection user in the first position of work user.
An alternative embodiment also be present, in the second place of inspection user and the first position not phase for the user that constructs In the case of matching, inspection terminal detects construction user not at the construction field (site), and now, inspection terminal instructs according to patrol task Book gets the construction location that inspection user wants inspection, and using construction location as target endpoint, is planned most for inspection user Major path, and navigated for inspection user.
In addition it is also necessary to explanation, it is determined that inspection user and construction with reaching job site per family, and use of constructing In the case that family starts construction, inspection user just starts to perform patrol task, it is ensured that and inspection user carries out effective inspection work, And then improve the operating efficiency for performing patrol task.
In addition it is also necessary to explanation, according to flow of task get inspection user perform task process performing it Afterwards, supervising platform can be also assessed the process performing of inspection user, and then obtains assessment result, as shown in fig. 7, this method Specifically comprise the following steps:
Step S702, obtain the inspection behavior that at least one inspection user performs patrol task according to inspection flow;
Step S704, inspection behavior is assessed, obtain inspection assessment result.
In a kind of optional embodiment, Fig. 8 shows the schematic flow sheet of execution task, as shown in figure 8, constructing Before, safety supervision department pushes work plan and patrol plan by supervising platform to staff, and now, the construction of unit in charge of construction is used Family receives work plan, and carries out site inspection, risk assessment, Analysis of Bearing Capacity and work ticket and the task such as fill in, and pacifies The inspection user for examining inspection group receives patrol plan, and checks the Job readiness situation of construction user.In construction, unit in charge of construction Take safety measures and job site is arranged, in the case where confirming to construct, started according to construction task guiding book Construction, during construction, progress safety is told somebody what one's real intentions are and field operation, and the inspection user of safety check inspection group is at the construction field (site) Site safety inspection is carried out, finds and records the construction act of violating regulations of construction user, and supervise and record rectification process.Meanwhile apply The construction user of work order position is rectified and improved according to the regulation-breaching notice.After construction terminates, safety supervision department monitors construction operation in real time And safety patrol inspection, and the regulation-breaching notice is audited, if the regulation-breaching notice is unqualified, inspection user is returned to, by inspection user Rectified and improved again.
In an alternative embodiment, a kind of block schematic illustration of optional specification task flow as shown in Figure 9.By Fig. 9 is understood, before construction, staff needs to carry out the work such as double accesses are verified, site inspection and work are accurate, supervises simultaneously Pipe platform generates job instruction, and is pushed on each mobile terminal.In construction, staff needs to arrive into administrative staff Hilllock, the verification of managing security tools and instruments, and safety measure is arranged, the work such as progress site safety is told somebody what one's real intentions are, technique quality inspection, together When, inspection user also exercises supervision to the operation process for the user that constructs, and in the event of an accident, is linked up with expert Effectively to solve accident.In addition, construction terminal and inspection terminal can navigate to job location.After construction, supervision is flat Platform can be evaluated the tasks carrying situation of construction user and inspection user, and is managed to violating the regulations.
In addition, Figure 10 shows the system framework of the method based on above-mentioned specification task flow, as shown in Figure 10, the system Including three aspects, i.e. operation layer, technology layer and management level.It is main to complete safe construction standardized administration, peace in terms of operation layer The tasks such as full inspection management, and to recording operation track, work flow is monitored, circular study is carried out to act of violating regulations. In terms of technology layer, the application mainly employs following technology:Cloud video technique that voice is combined with video, GIS and LBS phases With reference to Business Stream engine, data are the same as the big data analytical technology that is combined of rule.In terms of management level, mainly to platform, apply Work user, inspection user, user right, parameter and form are managed.
In a kind of preferred embodiment, the task plan as derived from double access systems passes through construction by supervising platform Governing plan is conducted into, and the electric company of regional is by special engineered tissue personnel (for example, construction task custodian Member) by the mobile terminal of the work director of mission dispatching to corresponding unit in charge of construction.Work director receives an assignment, and The previous day that task starts does preparation of construction, step and material on the APP of mobile terminal required for completion preparation of construction.Together When, the electric company of the regional patrol officer as corresponding to safety supervision portion personnel (patrol task administrative staff) by mission dispatching In mobile terminal.Director work when task starts, reaches job site, and confirms the task type of construction, patrol officer Receive an assignment, and when construction task is opened, while reach job site.Work director reaches the spot, and starts to construct, And according to flow processing construction task in APP, patrol officer reaches job site and (can be directly targeted to work by navigation to be responsible for People place), after converging with work director, click is reached the spot, and starts inspection, and according to inspection flow processing inspection in APP Task.During construction and inspection, supervisor can call corresponding construction or patrol officer by supervising platform, in real time Carry out video trace.Voice call can also be carried out in real time.After workmen completes construction task, workmen is on APP Click on and complete, to indicate to complete construction task.During patrol task is performed, discovery has underproofly patrol officer Side, can be with typing director, and records underproof data, and after the completion of patrol task, the filing clicked on APP is pressed Button, complete patrol task.If patrol officer's inspection is to underproof content, the regulation-breaching notice corresponding to APP generations;If After having notice violating the regulations, APP audits the safety supervision portion of branch company corresponding to being submitted to of patrol task;It is if not unqualified Content, then terminate patrol task.Safety supervision portion of branch company is submitted to safety supervision portion of company, entered after auditing by the regulation-breaching notice Row examination & approval.If examination & verification is not by returning patrol officer and rectifying and improving.Safety supervision portion of company examines the regulation-breaching notice, and examination & approval pass through, Circular is then sent, and unit violating the regulations is deducted points;If examination & approval are not by returning and rectifying and improving again.Finally, completed in task Afterwards, safety supervision portion personnel can score construction and each step of patrol task, system by scoring, violation information, surpass When the latitude such as information, branch company's ranking corresponding to generation, personnel's ranking.
Embodiment 2
According to embodiments of the present invention, a kind of device embodiment of specification task flow is additionally provided.
Figure 11 is the apparatus structure schematic diagram of specification task flow according to embodiments of the present invention, as shown in figure 11, the dress Put including:First determining module 1101, the second determining module 1103, acquisition module 1105 and evaluation module 1107.
Wherein, the first determining module 1101, the task type of being performed for determining at least one user for task, appoint Service type comprises at least one of following:Construction task and patrol task;Second determining module 1103, for determination and task type Corresponding flow of task, wherein, flow of task is used for the process performing that at least one user of specification performs task;Acquisition module 1105, the process performing of at least one user's execution task is obtained for task based access control flow;Evaluation module 1107, for holding Every trade obtains assessment result to be assessed.
It should be noted that above-mentioned first determining module 1101, the second determining module 1103, acquisition module 1105 and commenting Estimate module 1107 corresponding to the step S102 to step S108 in embodiment 1, four modules with what corresponding step was realized to show Example is identical with application scenarios, but is not limited to the disclosure of that of above-described embodiment 1.
In a kind of optional embodiment, the second determining module includes:3rd determining module and generation module.Wherein, 3rd determining module, for determining the task guiding book corresponding with task type according to task type;Generation module, for root The flow of task corresponding with task type is generated according to task guiding book.
It should be noted that the step S302 that above-mentioned 3rd determining module and generation module correspond in embodiment 1 is extremely Step S304, two modules are identical with example and application scenarios that corresponding step is realized, but are not limited to the institute of above-described embodiment 1 Disclosure.
Optionally, at least one user comprises at least one of following:At least one construction user and at least one inspection are used Family, at least one construction user perform construction task, and at least one inspection user performs patrol task, and flow of task comprises at least It is one of following:Construction process and inspection flow, process performing comprise at least one of following:Construction behavior and inspection behavior.
In a kind of optional embodiment, the device of specification task flow also includes:First acquisition module, the 4th determine mould Block and the first execution module.Wherein, the first acquisition module, for obtain it is at least one construction user where current location; 4th determining module, for determining the construction location of at least one construction user according to task type;First execution module, is used for In the case of matching in current location and construction location, it is allowed to which at least one construction user performs construction task.
Implement it should be noted that above-mentioned first acquisition module, the 4th determining module and the first execution module correspond to Step S402 to step S406 in example 1, three modules are identical with example and application scenarios that corresponding step is realized, but not It is limited to the disclosure of that of above-described embodiment 1.
In a kind of optional embodiment, evaluation module includes:Second acquisition module and the first evaluation module.Wherein, Second acquisition module, for obtaining construction behavior of at least one construction user according to construction process execution construction task;First Evaluation module, for assessing construction behavior, obtain construction evaluation result.
It should be noted that the step that above-mentioned second acquisition module and the first evaluation module correspond in embodiment 1 S502 to step S504, two modules are identical with example and application scenarios that corresponding step is realized, but are not limited to above-mentioned reality Apply the disclosure of that of example 1.
In a kind of optional embodiment, the device of specification task flow also includes:3rd acquisition module and second hold Row module.Wherein, the 3rd acquisition module, for the first position for obtaining at least one construction user and at least one inspection user The second place;Second execution module, for matching in first position and the second place, and at least one construction user holds In the case of row construction task, it is allowed to which at least one inspection user performs patrol task.
It should be noted that the step that above-mentioned 3rd acquisition module and the second execution module correspond in embodiment 1 S602 to step S604, two modules are identical with example and application scenarios that corresponding step is realized, but are not limited to above-mentioned reality Apply the disclosure of that of example 1.
In a kind of optional embodiment, evaluation module includes:4th acquisition module and the second evaluation module.Wherein, 4th acquisition module, for obtaining inspection behavior of at least one inspection user according to inspection flow execution patrol task;Second Evaluation module, for assessing inspection behavior, obtain inspection assessment result.
It should be noted that the step that above-mentioned 4th acquisition module and the second evaluation module correspond in embodiment 1 S702 to step S704, two modules are identical with example and application scenarios that corresponding step is realized, but are not limited to above-mentioned reality Apply the disclosure of that of example 1.
Embodiment 3
Another aspect according to embodiments of the present invention, a kind of storage medium is additionally provided, the storage medium includes storage Program, wherein, the method that program performs the specification task flow in embodiment 1.
Embodiment 4
Another aspect according to embodiments of the present invention, a kind of processor being additionally provided, the processor is used for operation program, its In, the method for specification task flow when program is run in execution embodiment 1.
Apply that a sequence number is for illustration only, do not represent the quality of embodiment.
In the above embodiment of the present invention, the description to each embodiment all emphasizes particularly on different fields, and does not have in some embodiment The part of detailed description, it may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents, others can be passed through Mode is realized.Wherein, device embodiment described above is only schematical, such as the division of the unit, Ke Yiwei A kind of division of logic function, can there is an other dividing mode when actually realizing, for example, multiple units or component can combine or Person is desirably integrated into another system, or some features can be ignored, or does not perform.Another, shown or discussed is mutual Between coupling or direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, unit or module Connect, can be electrical or other forms.
The unit illustrated as separating component can be or may not be physically separate, show as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On unit.Some or all of unit therein can be selected to realize the purpose of this embodiment scheme according to the actual needs.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and is used as independent production marketing or use When, it can be stored in a computer read/write memory medium.Based on such understanding, technical scheme is substantially The part to be contributed in other words to prior art or all or part of the technical scheme can be in the form of software products Embody, the computer software product is stored in a storage medium, including some instructions are causing a computer Equipment (can be personal computer, server or network equipment etc.) perform each embodiment methods described of the present invention whole or Part steps.And foregoing storage medium includes:USB flash disk, read-only storage (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can be with store program codes Medium.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

  1. A kind of 1. method of specification task flow, it is characterised in that including:
    Determine the task type of being performed for task of at least one user, wherein, the task type comprise at least it is following it One:Construction task and patrol task;
    It is determined that the flow of task corresponding with the task type, wherein, the flow of task is used at least one described in specification User performs the process performing of task;
    The process performing of at least one user's execution task is obtained based on the flow of task;
    The process performing is assessed, obtains assessment result.
  2. 2. according to the method for claim 1, it is characterised in that it is determined that the flow of task corresponding with the task type, Including:
    The task guiding book corresponding with the task type is determined according to the task type;
    The flow of task corresponding with the task type is generated according to the task guiding book.
  3. 3. according to the method for claim 1, it is characterised in that at least one user comprises at least one of following:Institute At least one construction user and at least one inspection user are stated, at least one construction user performs the construction and appointed Business, at least one inspection user perform the patrol task, and the flow of task comprises at least one of following:Construction process With inspection flow, the process performing comprises at least one of following:Construction behavior and inspection behavior.
  4. 4. according to the method for claim 3, it is characterised in that it is determined that the flow of task corresponding with the task type Afterwards, methods described also includes:
    Obtain the current location where at least one construction user;
    The construction location of at least one construction user is determined according to the task type;
    In the case of matching in the current location and the construction location, it is allowed to which at least one construction user performs institute State construction task.
  5. 5. according to the method for claim 4, it is characterised in that the process performing is assessed, obtains assessment result, Including:
    Obtain the construction behavior that at least one construction user performs the construction task according to the construction process;
    The construction behavior is assessed, obtains construction evaluation result.
  6. 6. according to the method for claim 3, it is characterised in that it is determined that the flow of task corresponding with the task type Afterwards, methods described also includes:
    Obtain the first position of at least one construction user and the second place of at least one inspection user;
    Match in the first position and the second place, and at least one construction user performs the construction and appointed In the case of business, it is allowed to which at least one inspection user performs the patrol task.
  7. 7. according to the method for claim 6, it is characterised in that the process performing is assessed, obtains assessment result, Including:
    Obtain the inspection behavior that at least one inspection user performs patrol task according to the inspection flow;
    The inspection behavior is assessed, obtains inspection assessment result.
  8. A kind of 8. device of specification task flow, it is characterised in that including:
    First determining module, the task type of being performed for determining at least one user for task, the task type is extremely Include less one of following:Construction task and patrol task;
    Second determining module, for determining the flow of task corresponding with the task type, wherein, the flow of task is used for At least one user performs the process performing of task described in specification;
    Acquisition module, for obtaining the process performing of at least one user's execution task based on the flow of task;
    Evaluation module, for assessing the process performing, obtain assessment result.
  9. A kind of 9. storage medium, it is characterised in that the storage medium includes the program of storage, wherein, described program right of execution The method that profit requires the specification task flow described in any one in 1 to 7.
  10. A kind of 10. processor, it is characterised in that the processor is used for operation program, wherein, right of execution when described program is run The method that profit requires the specification task flow described in any one in 1 to 7.
CN201710769052.9A 2017-08-30 2017-08-30 The method and apparatus of specification task flow Pending CN107633352A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710769052.9A CN107633352A (en) 2017-08-30 2017-08-30 The method and apparatus of specification task flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710769052.9A CN107633352A (en) 2017-08-30 2017-08-30 The method and apparatus of specification task flow

Publications (1)

Publication Number Publication Date
CN107633352A true CN107633352A (en) 2018-01-26

Family

ID=61100972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710769052.9A Pending CN107633352A (en) 2017-08-30 2017-08-30 The method and apparatus of specification task flow

Country Status (1)

Country Link
CN (1) CN107633352A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108090748A (en) * 2018-02-07 2018-05-29 墨点狗智能科技(东莞)有限公司 A kind of construction task management system of automation
CN108876568A (en) * 2018-08-30 2018-11-23 同伦拍拍科技服务有限公司 A kind of management method based on auction ancillary service
CN109508906A (en) * 2018-12-20 2019-03-22 国网北京市电力公司 The control method and device of well lid operation
CN109687342A (en) * 2018-12-20 2019-04-26 国网北京市电力公司 The control method and device of wireline operation
CN109976285A (en) * 2019-04-24 2019-07-05 安易享(深圳)科技有限公司 A kind of safety management system and its control method based on the acquisition of 5G terminal
CN110109429A (en) * 2019-04-29 2019-08-09 湖南仪峰安安网络科技股份有限公司 Operation management-control method and system for safety work standard and regulation enforcement
CN111130007A (en) * 2019-12-11 2020-05-08 深圳供电局有限公司 Sequential power transmission line field operation method and system
CN112785014A (en) * 2021-01-26 2021-05-11 昆明新机场高速公路建设发展有限公司 Safety monitoring management system for airport high-speed road section

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103279904A (en) * 2013-02-05 2013-09-04 广州智品网络科技有限公司 Mobile terminal and building information processing method thereof
CN104700192A (en) * 2014-11-03 2015-06-10 国网浙江省电力公司嘉兴供电公司 Aided intelligent management and control system for power transmission and transformation project and management and control method thereof
CN105678856A (en) * 2015-12-31 2016-06-15 合肥大多数信息科技有限公司 Power industry on-site inspection method based on smart phone
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system
CN106127367A (en) * 2016-06-15 2016-11-16 中邮建技术有限公司 A kind of scene anti-cheating inspection method single with random group based on mobile terminal

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103279904A (en) * 2013-02-05 2013-09-04 广州智品网络科技有限公司 Mobile terminal and building information processing method thereof
CN104700192A (en) * 2014-11-03 2015-06-10 国网浙江省电力公司嘉兴供电公司 Aided intelligent management and control system for power transmission and transformation project and management and control method thereof
CN105678856A (en) * 2015-12-31 2016-06-15 合肥大多数信息科技有限公司 Power industry on-site inspection method based on smart phone
CN105809355A (en) * 2016-03-14 2016-07-27 国网福建省电力有限公司 Personnel information identification method based on working field remote monitoring system
CN106127367A (en) * 2016-06-15 2016-11-16 中邮建技术有限公司 A kind of scene anti-cheating inspection method single with random group based on mobile terminal

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108090748A (en) * 2018-02-07 2018-05-29 墨点狗智能科技(东莞)有限公司 A kind of construction task management system of automation
CN108876568A (en) * 2018-08-30 2018-11-23 同伦拍拍科技服务有限公司 A kind of management method based on auction ancillary service
CN109508906A (en) * 2018-12-20 2019-03-22 国网北京市电力公司 The control method and device of well lid operation
CN109687342A (en) * 2018-12-20 2019-04-26 国网北京市电力公司 The control method and device of wireline operation
CN109976285A (en) * 2019-04-24 2019-07-05 安易享(深圳)科技有限公司 A kind of safety management system and its control method based on the acquisition of 5G terminal
CN110109429A (en) * 2019-04-29 2019-08-09 湖南仪峰安安网络科技股份有限公司 Operation management-control method and system for safety work standard and regulation enforcement
CN111130007A (en) * 2019-12-11 2020-05-08 深圳供电局有限公司 Sequential power transmission line field operation method and system
CN112785014A (en) * 2021-01-26 2021-05-11 昆明新机场高速公路建设发展有限公司 Safety monitoring management system for airport high-speed road section

Similar Documents

Publication Publication Date Title
CN107633352A (en) The method and apparatus of specification task flow
CN107705042A (en) Inspection method and device for power equipment
CN107645562A (en) Data transmission processing method, device, equipment and system
CN107895239A (en) Video face dispatch work method, apparatus, equipment and readable storage medium storing program for executing
CN106228497A (en) A kind of multi-operation mode emergency commading system and method for work thereof
CN107545611A (en) A kind of management system for running safety
CN111917878A (en) Message processing method, device, equipment and storage medium
Ashri et al. Towards a semantic web security infrastructure
CN109729068A (en) Security breaches auditing system based on block chain technology
CN110826930A (en) Security task scheduling method, device, equipment and readable storage medium
CN109344311A (en) A kind of generation method of work diary, the generation method of supervision diary and system
CN113158090A (en) State detection system, method, device, equipment and readable storage medium
CN109491733A (en) Based on visual interface display method and relevant device
CN112085225A (en) Operation and maintenance system and method for user side power equipment
Masuda et al. Complex software testing analysis using international standards
CN116306041B (en) Multi-scene set multi-engine automatic driving simulation test service platform
CN109978380A (en) A kind of workflow processing method and device
CN110867105B (en) Family learning supervision method and system based on edge calculation
CN112134734B (en) Configuration method and device of network equipment
CN103973485B (en) Operation management system and method based on fixed port
TWM625409U (en) Platform for automatically collecting destination tourism planning and online evaluation information
CN109685662A (en) Investment data processing method, device, computer equipment and its storage medium
CN104021446A (en) NIT examination room management system and method for examination of examination notes
CN110891080A (en) Supervision on-site intelligent application platform system
Wu et al. On an agent-based architecture for collaborative continuous auditing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180126

RJ01 Rejection of invention patent application after publication