CN109508906A - The control method and device of well lid operation - Google Patents

The control method and device of well lid operation Download PDF

Info

Publication number
CN109508906A
CN109508906A CN201811565958.XA CN201811565958A CN109508906A CN 109508906 A CN109508906 A CN 109508906A CN 201811565958 A CN201811565958 A CN 201811565958A CN 109508906 A CN109508906 A CN 109508906A
Authority
CN
China
Prior art keywords
well lid
work
transmission
work flow
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811565958.XA
Other languages
Chinese (zh)
Inventor
吴淼喆
张雷
李上国
王闯
刘正义
刘志刚
于磊
茹立鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Beijing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Beijing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201811565958.XA priority Critical patent/CN109508906A/en
Publication of CN109508906A publication Critical patent/CN109508906A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Alarm Systems (AREA)

Abstract

The invention discloses a kind of control method and device of well lid operation.Wherein, this method comprises: obtaining each work flow in well lid transmission work task executes sequence;According to the sequence that executes of each work flow, well lid transmission work is successively executed;After the completion of each work flow, by presetting Intranet terminal transmission implementing result;The implementing result of each work flow is handled, to establish work data corresponding with well lid transmission work task library.The present invention solves in the related technology when carrying out well lid operation, the technical issues of needing to carry a large amount of equipments of recording, and need to inquire the exception information of well lid in advance, working efficiency is caused to reduce.

Description

The control method and device of well lid operation
Technical field
The present invention relates to well lid Operation control technical fields, a kind of control method in particular to well lid operation and Device.
Background technique
Under current well lid work pattern, on-site personnel work load weight needs to carry when executing task every time Large number of equipment, such as recording pen, camera, video camera, paper form, for newly entering the employee of enterprise, be unfamiliar with well lid present position, Situations such as landform, road distribution, it may can not be timely completed task, for defect, abnormal data existing for well lid, Yi Jifa Failure, exception for giving birth to etc. require to inquire in advance, record it is good after could carry out the work till now, greatly reduce work effect Rate.
For above-mentioned problem, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the invention provides a kind of control method and device of well lid operation, at least to solve to exist in the related technology When carrying out well lid operation, needs to carry a large amount of equipments of recording, and need to inquire the exception information of well lid in advance, work is caused to be imitated The technical issues of rate reduces.
According to an aspect of an embodiment of the present invention, a kind of control method of well lid operation is provided, comprising: obtain well lid Each work flow executes sequence in transmission work task;According to the sequence that executes of each work flow, well lid is successively executed Transmission work;After the completion of each work flow, by presetting Intranet terminal transmission implementing result;Each work flow is held Row result is handled, to establish work data corresponding with well lid transmission work task library.
Further, in obtaining well lid transmission work task before the execution sequence of each work flow, the control Method further include: obtain the well lid number and well lid location information of well lid transmission work;Obtain the work for executing well lid transmission work Have information and activity duration.
Further, the work flow of the well lid transmission work task includes: work ticket signature, arranges that site safety is arranged It applies, monitoring well lid is opened at scene, remote opening monitoring well lid, fills in well lid work data, well lid operation filing.
It further, include: in operation by default Intranet terminal transmission implementing result after the completion of each work flow When process is that work ticket is signed, recorded by the default Intranet terminal transmission work ticket signature photo and work ticket electronic signature Data;When work flow is arrangement site safety measure, by the default Intranet terminal transmission hang sign board photo and Operation fence photo.
Further, after the completion of each work flow, by presetting Intranet terminal transmission implementing result further include: making When industry process is that monitoring well lid is opened at scene, target monitoring well lid is opened by key by the default Intranet terminal transmission Photo, and transmit the target monitoring well lid turn-on data, self-locking data and alert data;It is remote opening prison in work flow It, can remote opening and long-range self-locking number by target monitoring well lid described in the default Intranet terminal transmission when controlling well lid According to, and transmit well lid defective data.
Further, after the completion of each work flow, by presetting Intranet terminal transmission implementing result further include: making Industry process is to verify data when filling in well lid work data by the default Intranet terminal transmission well lid and well lid verification is shone Piece;When work flow is that well lid operation is filed, pass through the operational data of the default interior network termination well lid transmission work.
According to another aspect of an embodiment of the present invention, a kind of control device of well lid operation is additionally provided, comprising: obtain single Member executes sequence for obtain each work flow in well lid transmission work task;Execution unit, for according to each operation Process executes sequence, successively executes well lid transmission work;Transmission unit is used for after the completion of each work flow, by pre- If Intranet terminal transmission implementing result;Establish unit, handled for the implementing result to each work flow, with establish with The corresponding work data library of well lid transmission work task.
Further, the control device further include: first obtains module, in obtaining well lid transmission work task Before the execution sequence of each work flow, the well lid number and well lid location information of well lid transmission work are obtained;Second obtains Module, for obtaining the tool information and the activity duration that execute well lid transmission work.
Further, the work flow of the well lid transmission work task includes: work ticket signature, arranges that site safety is arranged It applies, monitoring well lid is opened at scene, remote opening monitoring well lid, fills in well lid work data, well lid operation filing.
Further, the transmission unit includes: the first transmission module, is used for when work flow is that work ticket is signed, Data are recorded by the default Intranet terminal transmission work ticket signature photo and work ticket electronic signature;Second transmission module, For hanging sign board photo and work by the default Intranet terminal transmission when work flow is arrangement site safety measure Industry fence photo.
Further, the transmission unit further include: third transmission module, for being that monitoring is opened at scene in work flow When well lid, the photo of target monitoring well lid is opened by key by the default Intranet terminal transmission, and transmits the target Monitor well lid turn-on data, self-locking data and alert data;4th transmission module, for being remote opening monitoring in work flow When well lid, by target monitoring well lid described in the default Intranet terminal transmission can remote opening and long-range self-locking data, And transmit well lid defective data.
According to another aspect of an embodiment of the present invention, a kind of storage medium is additionally provided, the storage medium is for storing Program, wherein equipment where described program controls the storage medium when being executed by processor executes above-mentioned any one institute The control method for the well lid operation stated.
According to another aspect of an embodiment of the present invention, a kind of processor is additionally provided, the processor is used to run program, Wherein, the control method of well lid operation described in above-mentioned any one is executed when described program is run.
In embodiments of the present invention, obtain each work flow in well lid transmission work task executes sequence, according to often A work flow executes sequence, successively executes well lid transmission work, whole by default Intranet after the completion of each work flow End transmission implementing result, handles the implementing result of each work flow, corresponding with well lid transmission work task to establish Work data library.In this embodiment it is possible to get well lid operation by the default interior network termination that staff holds Flow content reduces the tools such as recording pen, the camera for needing to carry, subtracts the burden of staff, and can use pre- If Intranet terminal transmission implementing result, well lid transmission work is monitored, improves operation quality, and directly pass through interior network termination typing Well lid defect information is convenient for subsequent query, is improved work efficiency, and then solves in the related technology when carrying out well lid operation, It needs to carry a large amount of equipments of recording, and needs to inquire the exception information of well lid in advance, the technology for causing working efficiency to reduce is asked Topic.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes part of this application, this hair Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of the control method of optional well lid operation according to an embodiment of the present invention;
Fig. 2 is a kind of schematic diagram of the control device of well lid operation according to an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product Or other step or units that equipment is intrinsic.
According to embodiments of the present invention, a kind of control method embodiment of well lid operation is provided, it should be noted that attached The step of process of figure illustrates can execute in a computer system such as a set of computer executable instructions, though also, So logical order is shown in flow charts, but in some cases, it can be to be different from shown by sequence execution herein Or the step of description.
Fig. 1 is a kind of flow chart of the control method of optional well lid operation according to an embodiment of the present invention, such as Fig. 1 institute Show, this method comprises the following steps:
Step S102 obtains each work flow in well lid transmission work task and executes sequence;
Step S104 successively executes well lid transmission work according to the sequence that executes of each work flow;
Step S106, after the completion of each work flow, by presetting Intranet terminal transmission implementing result;
Step S108 handles the implementing result of each work flow, to establish and well lid transmission work task pair The work data library answered.
Through the above steps, each work flow executes sequence in available well lid transmission work task, according to every A work flow executes sequence, successively executes well lid transmission work, whole by default Intranet after the completion of each work flow End transmission implementing result, handles the implementing result of each work flow, corresponding with well lid transmission work task to establish Work data library.In this embodiment it is possible to get well lid operation by the default interior network termination that staff holds Flow content reduces the tools such as recording pen, the camera for needing to carry, subtracts the burden of staff, and can use pre- If Intranet terminal transmission implementing result, well lid transmission work is monitored, improves operation quality, and directly pass through interior network termination typing Well lid defect information is convenient for subsequent query, is improved work efficiency, and then solves in the related technology when carrying out well lid operation, It needs to carry a large amount of equipments of recording, and needs to inquire the exception information of well lid in advance, the technology for causing working efficiency to reduce is asked Topic.
The embodiment of the present invention can be applied in various automatic well lid operations, which may be implemented remote opening and remote The function that journey is closed, and well lid can also be opened by manual key.Well lid transmission can be transmitted by default interior network termination The content of operation.
In the present invention, well lid transmission work instruction staff can be informed long-range by Intranet terminal transmission signal Operator's remote opening well lid, and open signal is passed in long-range intelligent control platform, after automatically opening well lid, Can be by remote operation, automatic blocking well lid, and the well lid in the application when detecting exception or defect, it can be certainly Dynamic alarm.
Above steps is illustrated below.
Optionally, in obtaining well lid transmission work task before the execution sequence of each work flow, control method is also It include: the well lid number and well lid location information for obtaining well lid transmission work;Obtain the tool information for executing well lid transmission work And the activity duration.
It can first determine to want the well lid of operation to number and well lid position, and then determine to need to make at what time Industry, preparation work tool.
Step S102 obtains each work flow in well lid transmission work task and executes sequence.
Optionally, the work flow of well lid transmission work task includes: work ticket signature, arranges site safety measure, is existing It opens monitoring well lid, remote opening monitoring well lid, fill in well lid work data, well lid operation filing in field.
Each operation can have sequencing, for example, it is desired to first carry out the verification of well lid job content, then carry out work ticket Signature opens monitoring well lid followed by arrangement site safety measure, scene, remote opening monitoring well lid, fills in well lid operation Data, well lid operation filing.
Wherein, well lid job content verification instruction is to obtain well lid completion information, generalized information system figure, look on monitor supervision platform Specific well lid position is ask, the confirmation monitoring well lid information on monitor supervision platform;Prepare Work tool and check whether qualification, checks vehicle With the presence or absence of problem.
Step S104 successively executes well lid transmission work according to the sequence that executes of each work flow.
Step S106, after the completion of each work flow, by presetting Intranet terminal transmission implementing result;
Optionally, it signs for work ticket, instruction is that work responsible person needs to carry out safe friendship to staff member Dangerous point is informed at bottom, hands over safety measure and technical measures, and after fulfiling work ticket signature confirmation formality, can lead work Class personnel enter operation field.It include: to make by default Intranet terminal transmission implementing result after the completion of each work flow When industry process is that work ticket is signed, number is recorded by default Intranet terminal transmission work ticket signature photo and work ticket electronic signature According to.
Another optional, arrangement site safety measure instruction is in the good fence of well lid peripheral branch for wanting operation and hangs good mark Will board.It optionally, include: in work flow by default Intranet terminal transmission implementing result after the completion of each work flow When to arrange site safety measure, passing through default Intranet terminal transmission and hanging sign board photo and operation fence photo.
In another optional example of the application, scene opens monitoring well lid and indicates operating personnel with key unlatching monitoring well Lid, checking whether can live open manhole cover;After scene is opened, backstage personnel log in monitor supervision platform well lid account, check whether There is " illegal unlock " alarm;Scene waits well lid self-locking, confirms well lid self-locking function, well lid transmission work is completed.Optionally, After the completion of each work flow, by presetting Intranet terminal transmission implementing result further include: opened in work flow for scene When monitoring well lid, by presetting Intranet terminal transmission by the photo of key unlatching target monitoring well lid, and transmission objectives is monitored Well lid turn-on data, self-locking data and alert data.
As another optional example of the application, it is long-range by monitor supervision platform that remote opening monitors well lid instruction backstage personnel Open manhole cover;Whether on-site personnel confirmation well lid is opened;Confirmation well lid is re-closing off well lid after opening;If it was found that well lid is deposited In defect, answers immediate record and report in time.Optionally, after the completion of each work flow, by presetting Intranet terminal transmission Implementing result further include: when work flow is that remote opening monitors well lid, by presetting Intranet terminal transmission target monitoring well Lid can remote opening and long-range self-locking data, and transmit well lid defective data.
It is another optional, well lid operation instruction operating personnel is filled in after the transmission work for completing well lid checks, it can be with " well lid verification is single " is filled in, optionally, after the completion of each work flow, is also wrapped by default Intranet terminal transmission implementing result It includes: when work flow is to fill in well lid work data, data being verified by default Intranet terminal transmission well lid and well lid verifies Photo.
In this application, operation filing instruction is to determine that well lid control storehouse installation is completed by the responsible person that works, really It protects well lid to have been switched off, after closing casting iron well lid, scene can be left after tidying up live all waste object and safety equipment.Work Ticket backfill, Data storage.Optionally, it after the completion of each work flow, is also wrapped by default Intranet terminal transmission implementing result It includes: when work flow is well lid operation filing, passing through the operational data of default interior network termination well lid transmission work.
Step S108 handles the implementing result of each work flow, to establish and well lid transmission work task pair The work data library answered.
The related data of the secondary well lid transmission work can be transmitted in database.
Through the foregoing embodiment, detailed standardized work cable monitoring well lid transmission method of calibration has been formulated, and by duty The elements such as duty, system, standard solidify on stream, refinement in step, form a set of standardized work system, monitoring well lid passes The overall process that dynamic task is completed from opening to verifying directly examines intelligent control platform by interior network termination and fortune and carries out data friendship Mutually, Intranet job-oriented terminal and fortune examine intelligent control platform and carry out depth integration.Every single stepping of interior network termination all arrives feedback Fortune examines intelligent control platform, including arrival time of setting out, GPS coordinate information, scene photograph, defect incipient fault data etc., convenient for pipe Control center grasps field operation quality, carries out monitoring operation and emergency command, greatly promotes fortune inspection control power.
Illustrate the present invention below by another embodiment.
Fig. 2 is a kind of schematic diagram of the control device of well lid operation according to an embodiment of the present invention, as shown in Fig. 2, the dress Setting may include: acquiring unit 21, execution unit 23, and transmission unit 25 establishes unit 27, wherein
Acquiring unit 21 executes sequence for obtain each work flow in well lid transmission work task;
Execution unit 23 successively executes well lid transmission work for the sequence that executes according to each work flow;
Transmission unit 25, for passing through default Intranet terminal transmission implementing result after the completion of each work flow;
Unit 27 is established, is handled for the implementing result to each work flow, to establish and well lid transmission work The corresponding work data library of task.
The control device of above-mentioned well lid operation can obtain each work in well lid transmission work task by acquiring unit 21 Industry process executes sequence, the sequence that executes by execution unit 23 according to each work flow, successively executes well lid transmission and makees Industry, it is single by establishing by presetting Intranet terminal transmission implementing result through transmission unit 25 after the completion of each work flow The implementing result of first 27 pairs of each work flows is handled, to establish work data corresponding with well lid transmission work task Library.In this embodiment it is possible to get the flow content of well lid operation by the default interior network termination that staff holds, subtract The tools such as recording pen, the camera for needing to carry less, subtract the burden of staff, and can use network termination in default and pass Defeated implementing result monitors well lid transmission work, improves operation quality, and directly believe by interior network termination typing well lid defect Breath is convenient for subsequent query, is improved work efficiency, and then solves in the related technology when carrying out well lid operation, needs to carry greatly The technical issues of measuring equipments of recording, and needing to inquire the exception information of well lid in advance, working efficiency is caused to reduce.
Optionally, control device further include: first obtains module, for each work in obtaining well lid transmission work task Before the execution sequence of industry process, the well lid number and well lid location information of well lid transmission work are obtained;Second obtains module, uses In the tool information and activity duration that obtain execution well lid transmission work.
Another optional, the work flow of well lid transmission work task includes: work ticket signature, arranges that site safety is arranged It applies, monitoring well lid is opened at scene, remote opening monitoring well lid, fills in well lid work data, well lid operation filing.
In embodiments of the present invention, transmission unit includes: the first transmission module, for being work ticket signature in work flow When, data are recorded by default Intranet terminal transmission work ticket signature photo and work ticket electronic signature;Second transmission module is used In when work flow is arrangement site safety measure, sign board photo and operation fence are hung by default Intranet terminal transmission Photo.
As the optional example of the application one, transmission unit further include: third transmission module, for being existing in work flow When monitoring well lid is opened in field, by presetting Intranet terminal transmission by the photo of key unlatching target monitoring well lid, and mesh is transmitted Mark monitoring well lid turn-on data, self-locking data and alert data;4th transmission module, for being remote opening prison in work flow When controlling well lid, by preset Intranet terminal transmission target monitoring well lid can remote opening and long-range self-locking data, and transmit Well lid defective data.
The control device of above-mentioned well lid operation can also include processor and memory, and above-mentioned acquiring unit 21 executes Unit 23, transmission unit 25 are established unit 27 etc. and are stored in memory as program unit, be stored in by processor execution Above procedure unit in memory realizes corresponding function.
Include kernel in above-mentioned processor, is gone in memory to transfer corresponding program unit by kernel.Kernel can be set One or more establishes work data corresponding with well lid transmission work task library by adjusting kernel parameter.
Above-mentioned memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM), memory includes extremely A few storage chip.
According to another aspect of an embodiment of the present invention, a kind of storage medium is additionally provided, storage medium is used to store program, Wherein, equipment where program controls storage medium when being executed by processor executes the control of the well lid operation of above-mentioned any one Method.
According to another aspect of an embodiment of the present invention, a kind of processor is additionally provided, processor is used to run program, In, program executes the control method of the well lid operation of above-mentioned any one when running.
The embodiment of the invention provides a kind of equipment, equipment include processor, memory and storage on a memory and can The program run on a processor, processor performs the steps of when executing program to be obtained in well lid transmission work task each Work flow executes sequence;According to the sequence that executes of each work flow, well lid transmission work is successively executed;In each operation After the completion of process, by presetting Intranet terminal transmission implementing result;The implementing result of each work flow is handled, to build Vertical work data corresponding with well lid transmission work task library.
Optionally, when above-mentioned processor executes program, it can also perform the steps of and obtain well lid transmission work task In each work flow execution sequence before, obtain well lid transmission work well lid number and well lid location information;Acquisition is held The tool information of row well lid transmission work and activity duration.
Optionally, the work flow of well lid transmission work task includes: work ticket signature, arranges site safety measure, is existing It opens monitoring well lid, remote opening monitoring well lid, fill in well lid work data, well lid operation filing in field.
Optionally, when above-mentioned processor executes program, can also perform the steps of is being work ticket label in work flow When word, data are recorded by default Intranet terminal transmission work ticket signature photo and work ticket electronic signature;It is in work flow When arranging site safety measure, sign board photo and operation fence photo are hung by default Intranet terminal transmission.
Optionally, when above-mentioned processor executes program, it can also perform the steps of and open prison in work flow for scene When controlling well lid, by presetting Intranet terminal transmission by the photo of key unlatching target monitoring well lid, and transmission objectives monitors well Lid turn-on data, self-locking data and alert data;When work flow is that remote opening monitors well lid, pass through default interior network termination Transmission objectives monitor well lid can remote opening and long-range self-locking data, and transmit well lid defective data.
Optionally, when above-mentioned processor executes program, can also perform the steps of in work flow is to fill in well lid to make When industry data, data and well lid checking picture are verified by default Intranet terminal transmission well lid;It is well lid operation in work flow When filing, pass through the operational data of default interior network termination well lid transmission work.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words It embodies, which is stored in a storage medium, including some instructions are used so that a computer Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-OnlyMemory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (10)

1. a kind of control method of well lid operation characterized by comprising
Each work flow executes sequence in acquisition well lid transmission work task;
According to the sequence that executes of each work flow, well lid transmission work is successively executed;
After the completion of each work flow, by presetting Intranet terminal transmission implementing result;
The implementing result of each work flow is handled, to establish work data corresponding with well lid transmission work task Library.
2. control method according to claim 1, which is characterized in that each operation in obtaining well lid transmission work task Before the execution sequence of process, the control method further include:
Obtain the well lid number and well lid location information of well lid transmission work;
Obtain the tool information for executing well lid transmission work and activity duration.
3. control method according to claim 1, which is characterized in that the work flow packet of the well lid transmission work task Include: work ticket signature, arrangement site safety measure, scene open monitoring well lid, remote opening monitoring well lid, fill in well lid operation Data, well lid operation filing.
4. control method according to claim 3, which is characterized in that after the completion of each work flow, in default Network termination transmits implementing result
When work flow is that work ticket is signed, pass through the default Intranet terminal transmission work ticket signature photo and work ticket electricity Sub- record of signature data;
When work flow is arrangement site safety measure, sign board photo and work are hung by the default Intranet terminal transmission Industry fence photo.
5. control method according to claim 4, which is characterized in that after the completion of each work flow, in default Network termination transmits implementing result further include:
When work flow is that monitoring well lid is opened at scene, target prison is opened by key by the default Intranet terminal transmission The photo of well lid is controlled, and transmits the target monitoring well lid turn-on data, self-locking data and alert data;
When work flow is that remote opening monitors well lid, pass through target monitoring well lid energy described in the default Intranet terminal transmission No remote opening and long-range self-locking data, and transmit well lid defective data.
6. control method according to claim 5, which is characterized in that after the completion of each work flow, in default Network termination transmits implementing result further include:
When work flow is to fill in well lid work data, data and well lid are verified by the default Intranet terminal transmission well lid Checking picture;
When work flow is that well lid operation is filed, pass through the operational data of the default interior network termination well lid transmission work.
7. a kind of control device of well lid operation characterized by comprising
Acquiring unit executes sequence for obtain each work flow in well lid transmission work task;
Execution unit successively executes well lid transmission work for the sequence that executes according to each work flow;
Transmission unit, for passing through default Intranet terminal transmission implementing result after the completion of each work flow;
Unit is established, is handled for the implementing result to each work flow, to establish and well lid transmission work task pair The work data library answered.
8. control device according to claim 7, which is characterized in that the control device further include:
First obtains module, before the execution sequence of each work flow in obtaining well lid transmission work task, obtains The well lid number and well lid location information of well lid transmission work;
Second obtains module, for obtaining the tool information and the activity duration that execute well lid transmission work.
9. a kind of storage medium, which is characterized in that the storage medium is for storing program, wherein described program is processed The control of well lid operation described in any one of equipment perform claim requirement 1 to 6 device controls the storage medium when executing where Method processed.
10. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run Benefit require any one of 1 to 6 described in well lid operation control method.
CN201811565958.XA 2018-12-20 2018-12-20 The control method and device of well lid operation Pending CN109508906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811565958.XA CN109508906A (en) 2018-12-20 2018-12-20 The control method and device of well lid operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811565958.XA CN109508906A (en) 2018-12-20 2018-12-20 The control method and device of well lid operation

Publications (1)

Publication Number Publication Date
CN109508906A true CN109508906A (en) 2019-03-22

Family

ID=65754023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811565958.XA Pending CN109508906A (en) 2018-12-20 2018-12-20 The control method and device of well lid operation

Country Status (1)

Country Link
CN (1) CN109508906A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109919517A (en) * 2019-03-28 2019-06-21 江苏核电有限公司 A kind of power station equipment repair welds work flow control method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005107828A (en) * 2003-09-30 2005-04-21 Central Computer Services Co Ltd Job flow production system and program
US20110272144A1 (en) * 2010-05-07 2011-11-10 Halliburton Energy Services, Inc. System and method for remote wellbore servicing operations
CN107633352A (en) * 2017-08-30 2018-01-26 国网北京市电力公司 The method and apparatus of specification task flow
CN107730069A (en) * 2017-08-30 2018-02-23 国网北京市电力公司 The method and apparatus of standard construction flow
CN107967562A (en) * 2017-11-29 2018-04-27 国网山西省电力公司太原供电公司 A kind of construction site job safety remote-control system and method
CN108197838A (en) * 2018-02-08 2018-06-22 广东电网有限责任公司江门供电局 A kind of power construction operating risk management-control method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005107828A (en) * 2003-09-30 2005-04-21 Central Computer Services Co Ltd Job flow production system and program
US20110272144A1 (en) * 2010-05-07 2011-11-10 Halliburton Energy Services, Inc. System and method for remote wellbore servicing operations
CN107633352A (en) * 2017-08-30 2018-01-26 国网北京市电力公司 The method and apparatus of specification task flow
CN107730069A (en) * 2017-08-30 2018-02-23 国网北京市电力公司 The method and apparatus of standard construction flow
CN107967562A (en) * 2017-11-29 2018-04-27 国网山西省电力公司太原供电公司 A kind of construction site job safety remote-control system and method
CN108197838A (en) * 2018-02-08 2018-06-22 广东电网有限责任公司江门供电局 A kind of power construction operating risk management-control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109919517A (en) * 2019-03-28 2019-06-21 江苏核电有限公司 A kind of power station equipment repair welds work flow control method
CN109919517B (en) * 2019-03-28 2021-11-30 江苏核电有限公司 Power station equipment maintenance welding operation flow control method

Similar Documents

Publication Publication Date Title
CN105035904A (en) Intelligent monitoring system for elevator safe operation based on IOT (Internet of Things) technology
CN104182906B (en) Method and system for realizing transformer substation simulation of multi-role cooperative operation
CN112447033B (en) Security data processing method, system, computer equipment and storage medium
CN113673959B (en) Comprehensive management and control method and device for site operation safety and storage medium
DE112010005812T5 (en) Method of controlling technical equipment
CN102195813A (en) Method and device for intelligently creating operation and maintenance worksheet
CN108107851A (en) A kind of production line intelligent remote pacifies lamp control system
CN105245001B (en) A kind of event driven substation accident intelligent alarm treating method and apparatus
CN112004067A (en) Video monitoring method, device and storage medium
CN108596811A (en) A kind of intelligent micro fire-fighting station administration system
CN109889512A (en) A kind of method for detecting abnormality and device of charging pile CAN message
CN109687581A (en) Method, apparatus, storage medium and the processor of Anti-maloperation for Substation
JP2019046349A (en) Edge server and administrative server
CN104750095B (en) Regulation and control center inspection pilot system and method
CN113867124A (en) Safety monitoring method, device, system and medium for electricity testing and grounding of power transmission line
CN109685389A (en) Elevator faults work dispatching method, device, server, storage medium and system
CN109508906A (en) The control method and device of well lid operation
CN109919540A (en) A kind of express delivery keeping method and system
CN108139722A (en) The safety moving of automated system is accessed
CN112381435A (en) Gridding directional pushing management method for dynamic risk in hydropower station operation process
CN109410013A (en) One kind obtaining VIN code based on mobile unit and identifies matched alarm method and system
CN109193947A (en) Power distribution room monitoring method, device, server and computer readable storage medium
CN109687342A (en) The control method and device of wireline operation
CN108229798A (en) early-warning processing method, device and system
CN110275509A (en) A kind of energy-accumulating power station test of supervisor method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190322

RJ01 Rejection of invention patent application after publication