CN108229798A - early-warning processing method, device and system - Google Patents

early-warning processing method, device and system Download PDF

Info

Publication number
CN108229798A
CN108229798A CN201711378599.2A CN201711378599A CN108229798A CN 108229798 A CN108229798 A CN 108229798A CN 201711378599 A CN201711378599 A CN 201711378599A CN 108229798 A CN108229798 A CN 108229798A
Authority
CN
China
Prior art keywords
warning
mentioned
work
type
risk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711378599.2A
Other languages
Chinese (zh)
Inventor
李洪达
师瑞妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Investment Corp Ltd
Shenhua Guoneng Group Corp Ltd
Shanxi Luneng Hequ Power Generation Co Ltd
Original Assignee
Shenhua Group Corp Ltd
Shenhua Guoneng Group Corp Ltd
Shanxi Luneng Hequ Power Generation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenhua Group Corp Ltd, Shenhua Guoneng Group Corp Ltd, Shanxi Luneng Hequ Power Generation Co Ltd filed Critical Shenhua Group Corp Ltd
Priority to CN201711378599.2A priority Critical patent/CN108229798A/en
Publication of CN108229798A publication Critical patent/CN108229798A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of early-warning processing method, device and system.Wherein, this method includes:The job information of work about electric power in predetermined amount of time is obtained, wherein, above-mentioned job information includes at least:The work risk of above-mentioned work about electric power;Warning information corresponding with the above-mentioned type is generated according to the type of above-mentioned work risk, above-mentioned warning information includes at least:Warning grade and control measure;Above-mentioned warning information is sent to user terminal, wherein, above-mentioned warning information is used to indicate user and handles above-mentioned work risk according to above-mentioned warning grade and above-mentioned control measure.The present invention solves and can not realize the technical issues of effective early warning processing is carried out to the work risk in work about electric power in the prior art.

Description

Early-warning processing method, device and system
Technical field
The present invention relates to power industry field, in particular to a kind of early-warning processing method, device and system.
Background technology
If Thermal Power Generation Industry wants have enough market core competitiveness, have to through perfect Risk-warning information system It unites to strengthen itself management level, reduces the loss brought after risk case occurs to enterprise and industry, preferably go to assist Mix up the contradiction between Thermal Power Enterprises Operating profit and production risk.
As power plant's risk pre-control management System Construction level is continuously improved, task vulnerability database is revised also increasingly It is perfect, crew's Risk-warning supervision mechanism how is built, effectively evades the generation of the unsafe incidents such as the person, equipment, fire, into For new a difficulty and subject, at present, existing Thermal Power Enterprises also not there are one perfect Risk-warning information system and Early-warning processing method.
It can not be realized in for the above-mentioned prior art and effective early warning processing is carried out to the work risk in work about electric power Problem, currently no effective solution has been proposed.
Invention content
An embodiment of the present invention provides a kind of early-warning processing method, device and system, at least solve in the prior art without Method is realized carries out the technical issues of effective early warning is handled to the work risk in work about electric power.
One side according to embodiments of the present invention provides a kind of early-warning processing method, including:Obtain predetermined amount of time The job information of interior work about electric power, wherein, above-mentioned job information includes at least:The work risk of above-mentioned work about electric power;According to upper The type for stating work risk generates warning information corresponding with the above-mentioned type, and above-mentioned warning information includes at least:Warning grade and Control measure;Above-mentioned warning information is sent to user terminal, wherein, above-mentioned warning information is used to indicate user according to above-mentioned early warning Grade and above-mentioned control measure handle above-mentioned work risk.
Further, the job information of work about electric power in predetermined amount of time is obtained, including:Determine the risk number pre-established According to library, wherein, above-mentioned vulnerability database is used to store above-mentioned job information;Above-mentioned risk number is obtained in above-mentioned predetermined amount of time According to the above-mentioned job information stored in library.
Further, in the case where the type of above-mentioned work risk is high-risk type, according to the class of above-mentioned work risk Type generates warning information corresponding with the above-mentioned type, including:Generation the first warning grade corresponding with above-mentioned high-risk type;It obtains The first control measure corresponding with above-mentioned first warning grade, wherein, above-mentioned first control measure are used to indicate first kind personnel Early warning control is carried out to the work risk of above-mentioned high-risk type.
Further, in the case where the type of above-mentioned work risk is middle danger type, according to the class of above-mentioned work risk Type generates warning information corresponding with the above-mentioned type, including:Generation and above-mentioned middle corresponding second warning grade of type of endangering;It obtains The second control measure corresponding with above-mentioned second warning grade, wherein, above-mentioned second control measure are used to indicate the second class personnel Early warning control is carried out to the work risk of above-mentioned middle danger type.
Further, in the case where the type of above-mentioned work risk is low danger type, according to the class of above-mentioned work risk Type generates warning information corresponding with the above-mentioned type, including:Generation and the above-mentioned low corresponding third warning grade of type of endangering;It obtains Third control measure corresponding with above-mentioned third warning grade, wherein, above-mentioned third control measure are used to indicate third class personnel Early warning control is carried out to the work risk of above-mentioned low danger type.
Another aspect according to embodiments of the present invention additionally provides a kind of prewarning processing unit, including:Acquisition module is used In the job information for obtaining work about electric power in predetermined amount of time, wherein, above-mentioned job information includes at least:Above-mentioned work about electric power Work risk;Generation module, it is above-mentioned for generating warning information corresponding with the above-mentioned type according to the type of above-mentioned work risk Warning information includes at least:Warning grade and control measure;Sending module, for sending above-mentioned warning information to user terminal, Wherein, above-mentioned warning information is used to indicate user and handles above-mentioned work risk according to above-mentioned warning grade and above-mentioned control measure.
Further, above-mentioned acquisition module includes:Determination sub-module, for determining the vulnerability database pre-established, In, above-mentioned vulnerability database is used to store above-mentioned job information;Acquisition submodule, for being obtained in above-mentioned predetermined amount of time State the above-mentioned job information stored in vulnerability database.
Another aspect according to embodiments of the present invention additionally provides a kind of alarming processing system, including:Database is used for The job information of work about electric power is stored, wherein, above-mentioned job information includes at least:The work risk of above-mentioned work about electric power;Processing Device is connected with above-mentioned database, for obtaining above-mentioned job information within a predetermined period of time, and according to above-mentioned work risk Type generates warning information corresponding with the above-mentioned type, and above-mentioned warning information includes at least:Warning grade and control measure;User Terminal is connect with above-mentioned processor, for receiving the warning information that above-mentioned processor is sent, and according to above-mentioned warning grade and upper It states control measure instruction user and handles above-mentioned work risk.
Another aspect according to embodiments of the present invention, additionally provides a kind of storage medium, and above-mentioned storage medium includes storage Program, wherein, above procedure performs the above-mentioned early-warning processing method of any one.
Another aspect according to embodiments of the present invention additionally provides a kind of processor, and above-mentioned processor is used to run program, Wherein, any one above-mentioned early-warning processing method is performed when above procedure is run.
In embodiments of the present invention, by obtaining the job information of work about electric power in predetermined amount of time, wherein, above-mentioned work Information includes at least:The work risk of above-mentioned work about electric power;It is generated according to the type of above-mentioned work risk corresponding with the above-mentioned type Warning information, above-mentioned warning information includes at least:Warning grade and control measure;Above-mentioned warning information is sent to user's end End, wherein, above-mentioned warning information is used to indicate user and handles above-mentioned work wind according to above-mentioned warning grade and above-mentioned control measure Danger has achieved the purpose that carry out effective early warning processing to the work risk in work about electric power, it is achieved thereby that effective coordination is electric The technique effect of contradiction between Lixing industry Operating profit and production risk, and then solve and can not realize to electricity in the prior art Work risk in power work carries out the technical issues of effective early warning processing.
Description of the drawings
Attached drawing described herein is used to provide further understanding of the present invention, and forms the part of the application, this hair Bright illustrative embodiments and their description do not constitute improper limitations of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is a kind of step flow chart of early-warning processing method according to embodiments of the present invention;
Fig. 2 is a kind of step flow chart of optional early-warning processing method according to embodiments of the present invention;
Fig. 3 is a kind of step flow chart of optional early-warning processing method according to embodiments of the present invention;
Fig. 4 is a kind of step flow chart of optional early-warning processing method according to embodiments of the present invention;
Fig. 5 is a kind of step flow chart of optional early-warning processing method according to embodiments of the present invention;
Fig. 6 is a kind of structure diagram of alarming processing system according to embodiments of the present invention;And
Fig. 7 is a kind of structure diagram of prewarning processing unit according to embodiments of the present invention.
Specific embodiment
In order to which those skilled in the art is made to more fully understand the present invention program, below in conjunction in the embodiment of the present invention The technical solution in the embodiment of the present invention is clearly and completely described in attached drawing, it is clear that described embodiment is only The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people Member's all other embodiments obtained without making creative work should all belong to the model that the present invention protects It encloses.
It should be noted that term " first " in description and claims of this specification and above-mentioned attached drawing, " Two " etc. be the object for distinguishing similar, and specific sequence or precedence are described without being used for.It should be appreciated that it uses in this way Data can be interchanged in the appropriate case, so as to the embodiment of the present invention described herein can in addition to illustrating herein or Sequence other than those of description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that cover Cover it is non-exclusive include, be not necessarily limited to for example, containing the process of series of steps or unit, method, system, product or equipment Those steps or unit clearly listed, but may include not listing clearly or for these processes, method, product Or the intrinsic other steps of equipment or unit.
Embodiment 1
According to embodiments of the present invention, a kind of embodiment of the method for early-warning processing method is provided, it should be noted that attached The step of flow of figure illustrates can perform in the computer system of such as a group of computer-executable instructions, though also, So show logical order in flow charts, but in some cases, can be performed with the sequence being different from herein shown by Or the step of description.
Fig. 1 is a kind of step flow chart of early-warning processing method according to embodiments of the present invention, as shown in Figure 1, this method Include the following steps:
Step S102 obtains the job information of work about electric power in predetermined amount of time, wherein, above-mentioned job information at least wraps It includes:The work risk of above-mentioned work about electric power;
Step S104 generates warning information corresponding with the above-mentioned type, above-mentioned early warning according to the type of above-mentioned work risk Information includes at least:Warning grade and control measure;
Step S106 sends above-mentioned warning information to user terminal, wherein, above-mentioned warning information be used to indicate user according to Above-mentioned warning grade and above-mentioned control measure handle above-mentioned work risk.
In embodiments of the present invention, by obtaining the job information of work about electric power in predetermined amount of time, wherein, above-mentioned work Information includes at least:The work risk of above-mentioned work about electric power;It is generated according to the type of above-mentioned work risk corresponding with the above-mentioned type Warning information, above-mentioned warning information includes at least:Warning grade and control measure;Above-mentioned warning information is sent to user's end End, wherein, above-mentioned warning information is used to indicate user and handles above-mentioned work wind according to above-mentioned warning grade and above-mentioned control measure Danger has achieved the purpose that carry out effective early warning processing to the work risk in work about electric power, it is achieved thereby that effective coordination is electric The technique effect of contradiction between Lixing industry Operating profit and production risk, and then solve and can not realize to electricity in the prior art Work risk in power work carries out the technical issues of effective early warning processing.
Optionally, since the work risk at daytime and night may have differences, thus day breeze is realized after distinguishing Dangerous early warning and night Risk-warning, above-mentioned predetermined amount of time can be daytime or night.
In a kind of optional embodiment, the job category of above-mentioned work about electric power can include but is not limited to:Great operation, Test plan;Great maintenance, technological transformation plan;Defect elimination maintenance plan;The types such as regular working.
It should be noted that in the embodiment of the present application, design of information system crew's Risk-warning intendant can be utilized System accomplishes that the work safetys such as daily great operation, regular working, defect elimination, maintenance, experiment, technological transformation are clear in job responsibility, identification of dangerous source Comprehensively, control measure are implemented completely, all levels of management personnel can according to system of responsibility in safe production and to hilllock in place standard into sector-style Dangerous work permit simultaneously exercises supervision guidance to scene, it is ensured that state and general Yi Shang operating risk control of the company to main hazard source The supervision of process processed is in place.
In a kind of optional embodiment, information EAM systems and short message, wechat platform can be combined by Utilities Electric Co., Develop a set of people, the task Risk-warning processing method that machine, equipment, task are combined;In company's EAM information systems Develop a day risk pre-alert notification list, night wind danger pre-alert notification list, grade maintenance and technological transformation Risk-warning notification sheet, Risk-warning The processing modules such as examination, Risk-warning multimedia message platform.
As a kind of optional embodiment, all levels of management personnel is connected to after warning information, according to above-mentioned warning grade and Above-mentioned control measure handle above-mentioned work risk, and the job task of itself responsibility is arrived to hilllock specifically, scene can be arrived in time Position, safety supervision, the problem of for middle discovery in place, hidden danger and information in place, personnel at different levels are in security risk early warning and to hilllock It supervises in wechat group and issues in place.Responsible department is connected to the problem of scene is sent out and hidden danger is rectified and improved immediately, and will be after rectification Picture and text information feed back to security risk early warning and are supervised in wechat group in place to hilllock.
In a kind of optional embodiment, Fig. 2 is a kind of optional early-warning processing method according to embodiments of the present invention Flow chart of steps, as shown in Fig. 2, the job information of work about electric power in predetermined amount of time is obtained, including:
Step S202 determines the vulnerability database pre-established, wherein, above-mentioned vulnerability database is used to store above-mentioned work Information;
Step S204 obtains the above-mentioned job information stored in above-mentioned vulnerability database in above-mentioned predetermined amount of time.
It should be noted that in the embodiment of the present application, Risk-warning and vulnerability database can be organically combined, reached Effective implementation of Risk Pre-control.
In above-mentioned steps S202 to step S204, it may be determined that the vulnerability database pre-established, and on daytime or Night obtains the work risk of above-mentioned work about electric power from above-mentioned vulnerability database, and then can obtain electric power in predetermined amount of time The work risk of work, so that it is determined that the warning information corresponding to the type of the work risk, reaches in work about electric power The risk that works carries out the purpose of effective early warning processing.
In a kind of optional embodiment, Fig. 3 is a kind of optional early-warning processing method according to embodiments of the present invention Flow chart of steps, as shown in figure 3, in the case where the type of above-mentioned work risk is high-risk type, according to above-mentioned work risk Type generate corresponding with the above-mentioned type warning information, including:
Step S302, generation the first warning grade corresponding with above-mentioned high-risk type;
Step S304 obtains the first control measure corresponding with above-mentioned first warning grade, wherein, above-mentioned first control is arranged It is applied to instruction first kind personnel and early warning control is carried out to the work risk of above-mentioned high-risk type.
In a kind of optional embodiment, the type of above-mentioned work risk can be, but not limited to include:High-risk type, middle danger Type and low danger type, any one Risk-warning grade of above-mentioned task, can be according to task vulnerability database The corresponding evaluation grade of each task is determined, such as:Red early warning is high risk events in operation namely the first early warning Grade can be red early warning, since red early warning represents that current risk is more serious, then personnel in place of red early warning project Can be preset as production vice general manager, chief engineer, be in charge of genera manager assistant, safe chief inspector, each production division, workshop are responsible for People, professional deputy director, special work, and early warning control is carried out to the work risk of above-mentioned high-risk type by above-mentioned staff.
In a kind of optional embodiment, Fig. 4 is a kind of optional early-warning processing method according to embodiments of the present invention Flow chart of steps, as shown in figure 4, in the case where the type of above-mentioned work risk is middle danger type, according to above-mentioned work risk Type generate corresponding with the above-mentioned type warning information, including:
Step S402, generation and above-mentioned middle corresponding second warning grade of type of endangering;
Step S404 obtains the second control measure corresponding with above-mentioned second warning grade, wherein, above-mentioned second control is arranged It is applied to the second class personnel of instruction and early warning control is carried out to the work risk of above-mentioned middle danger type.
Based on the method and step that above-mentioned steps S402 is provided to step S404, orange warning can be preset and made for risk Industry project namely the second warning grade can be orange warning, since orange warning represents that current risk is comparatively serious, then The personnel in place of orange warning project can be preset as responsible department and be in charge of deputy director, profession specially work, class monitor and group leader, and by above-mentioned work Make personnel and early warning control is carried out to the work risk of above-mentioned middle danger type.
In a kind of optional embodiment, Fig. 5 is a kind of optional early-warning processing method according to embodiments of the present invention Flow chart of steps, as shown in figure 5, in the case where the type of above-mentioned work risk is low danger type, according to above-mentioned work risk Type generate corresponding with the above-mentioned type warning information, including:
Step S502, generation and the above-mentioned low corresponding third warning grade of type of endangering;
Step S504 obtains third control measure corresponding with above-mentioned third warning grade, wherein, above-mentioned third control is arranged It is applied to instruction third class personnel and early warning control is carried out to the work risk of above-mentioned low danger type.
Based on the method and step that above-mentioned steps S502 is provided to step S504, yellow early warning can be preset as low danger risk Events in operation namely third warning grade can be yellow early warning, since yellow early warning represents that current risk is relatively less serious, Then personnel are profession or teams and groups chief leading cadre and equipment owner, and by above-mentioned staff to above-mentioned low danger in place for yellow early warning The work risk of type carries out early warning control.
In a kind of optional embodiment, day risk pre-alert notification module can be, but not limited to the typing before daily early 8 points Following information (night Risk-warning is consistent with day Risk-warning):Risk-warning grade:According to task vulnerability database each The corresponding evaluation grade of task:Red early warning is high risk events in operation;Orange warning is risk events in operation;Yellow early warning For low-risk events in operation;Main hazard source can be filled according to task database identification result;To hilllock personnel in place:It is red Color early warning project in place personnel for production vice general manager, chief engineer, be in charge of genera manager assistant, safe chief inspector, each production division, Workshop responsible person, professional deputy director, special work;Orange warning project in place personnel for responsible department be in charge of deputy director, profession specially work, Class monitor and group leader;Personnel are profession or teams and groups chief leading cadre and equipment owner in place for yellow early warning;Above-mentioned control measure can basis The control measure to prestore in vulnerability database import.
As a kind of optional embodiment, task Risk-warning processing method provided herein can be from system Leaders and the administrative staff are constrained to work in place to hilllock in degree and mechanism, effective execution system of responsibility in safe production.Scene Work in every task strengthens supervision, and all kinds of safety control measures perform more specification, effectively evaded the person, equipment, Fire class risk, reduces the generation of unsafe incidents.
By above-described embodiment, the job task Risk-warning that can solve power industry does not have the difficulty of effective treating method Topic, makes the effective execution of vulnerability database related content implement all levels of management personnel's system of responsibility in safe production in " work surface ", Reduce the generation of the person, equipment unsafe incidents, enhance the core competitive in electricity market, coordinated enterprise Contradiction between Operating profit and production risk.
Embodiment 2
The embodiment of the present invention additionally provides a kind of alarming processing system, and Fig. 6 is a kind of early warning according to embodiments of the present invention The structure diagram of processing system, as shown in fig. 6, including:Database 60, processor 62 and user terminal 64, wherein,
Database 60, for storing the job information of work about electric power, wherein, above-mentioned job information includes at least:Above-mentioned electricity The work risk of power work;Processor 62 is connected with above-mentioned database, for obtaining above-mentioned work letter within a predetermined period of time Breath, and warning information corresponding with the above-mentioned type is generated according to the type of above-mentioned work risk, above-mentioned warning information includes at least: Warning grade and control measure;User terminal 64 is connect with above-mentioned processor, for receiving the early warning letter that above-mentioned processor is sent Breath, and above-mentioned work risk is handled according to above-mentioned warning grade and above-mentioned control measure instruction user.
In embodiments of the present invention, by database 60, for storing the job information of work about electric power, wherein, above-mentioned work It is included at least as information:The work risk of above-mentioned work about electric power;Processor 62 is connected with above-mentioned database, for predetermined Above-mentioned job information is obtained in period, and early warning corresponding with the above-mentioned type is generated according to the type of above-mentioned work risk and is believed Breath, above-mentioned warning information include at least:Warning grade and control measure;User terminal 64 is connect with above-mentioned processor, for connecing The warning information that above-mentioned processor is sent is received, and above-mentioned work is handled according to above-mentioned warning grade and above-mentioned control measure instruction user Make risk, achieved the purpose that carry out effective early warning processing to the work risk in work about electric power, it is achieved thereby that effectively association The technique effect of the contradiction between power industry Operating profit and production risk is adjusted, and then solves and can not realize in the prior art The technical issues of effective early warning processing is carried out to the work risk in work about electric power.
It should be noted that the concrete structure of alarming processing system is only signal shown in Fig. 6 in the application, specific In application, the alarming processing system in the application can have more or less structure than alarming processing system shown in fig. 6.
It, can be with it should be noted that any one optional or preferred early-warning processing method in above-described embodiment 1 It performs or realizes in the alarming processing system provided in the present embodiment.
In addition, still it should be noted that the optional or preferred embodiment of the present embodiment may refer to the phase in embodiment 1 Description is closed, details are not described herein again.
Embodiment 3
The embodiment of the present invention additionally provides a kind of device for being used to implement above-mentioned early-warning processing method, and Fig. 7 is according to this hair A kind of structure diagram of prewarning processing unit of bright embodiment, as shown in fig. 7, above-mentioned prewarning processing unit, including:Obtain mould Block 70, generation module 72 and sending module 74, wherein,
Acquisition module 70, for obtaining the job information of work about electric power in predetermined amount of time, wherein, above-mentioned job information is extremely Include less:The work risk of above-mentioned work about electric power;Generation module 72, for according to the type of above-mentioned work risk generation with it is above-mentioned The corresponding warning information of type, above-mentioned warning information include at least:Warning grade and control measure;Sending module 74, for sending out It serves and states warning information to user terminal, wherein, above-mentioned warning information is used to indicate user according to above-mentioned warning grade and above-mentioned The above-mentioned work risk of control measure processing.
Herein it should be noted that above-mentioned acquisition module 70, generation module 72 and sending module 74 correspond to embodiment 1 In step S102 to step S106, the example and application scenarios that above-mentioned module and corresponding step are realized be identical but unlimited In 1 disclosure of that of above-described embodiment.It should be noted that above-mentioned module may operate in calculating as a part for device In machine terminal.
In a kind of optional embodiment, above-mentioned acquisition module includes:Determination sub-module, for determining the wind pre-established Dangerous database, wherein, above-mentioned vulnerability database is used to store above-mentioned job information;Acquisition submodule, in above-mentioned pre- timing Between the above-mentioned job information stored in above-mentioned vulnerability database is obtained in section.
It should be noted that above-mentioned modules can be realized by software or hardware, for example, for the latter, It can be accomplished by the following way:Above-mentioned modules can be located in same processor;Alternatively, above-mentioned modules are with arbitrary The mode of combination is located in different processors.
It should be noted that the optional or preferred embodiment of the present embodiment may refer to the associated description in embodiment 1, Details are not described herein again.
Above-mentioned prewarning processing unit can also include processor and memory, above-mentioned acquisition module 70, generation module 72 And 74 grade of sending module stores in memory as program unit, is performed by processor stored in memory above-mentioned Program unit realizes corresponding function.
Comprising kernel in processor, gone in memory to transfer corresponding program unit by kernel, above-mentioned kernel can be set One or more.Memory may include the volatile memory in computer-readable medium, random access memory (RAM) And/or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM), memory includes at least one Storage chip.
The embodiment of the present application additionally provides a kind of storage medium.Optionally, in the present embodiment, above-mentioned storage medium includes The program of storage, wherein, equipment where above-mentioned storage medium is controlled when above procedure is run performs any one above-mentioned early warning Processing method.
Optionally, in the present embodiment, above-mentioned storage medium can be located in computer network Computer terminal group In any one terminal or in any one mobile terminal in mobile terminal group.
The embodiment of the present application additionally provides a kind of processor.Optionally, in the present embodiment, above-mentioned processor is used to run Program, wherein, above procedure performs any one above-mentioned early-warning processing method when running.
The embodiment of the present application provides a kind of equipment, and equipment includes processor, memory and storage on a memory and can The program run on a processor, processor realize following steps when performing program:Obtain work about electric power in predetermined amount of time Job information, wherein, above-mentioned job information includes at least:The work risk of above-mentioned work about electric power;According to above-mentioned work risk Type generates warning information corresponding with the above-mentioned type, and above-mentioned warning information includes at least:Warning grade and control measure;It sends Above-mentioned warning information to user terminal, wherein, above-mentioned warning information is used to indicate user according to above-mentioned warning grade and above-mentioned control Measure processed handles above-mentioned work risk.
Optionally, when above-mentioned processor performs program, the vulnerability database pre-established can also be determined, wherein, it is above-mentioned Vulnerability database is used to store above-mentioned job information;Obtained in above-mentioned predetermined amount of time stored in above-mentioned vulnerability database it is upper State job information.
Optionally, when above-mentioned processor performs program, first early warning corresponding with above-mentioned high-risk type etc. can also be generated Grade;The first control measure corresponding with above-mentioned first warning grade are obtained, wherein, above-mentioned first control measure are used to indicate first Class personnel carry out early warning control to the work risk of above-mentioned high-risk type.
Optionally, when above-mentioned processor performs program, second early warning corresponding with above-mentioned middle danger type etc. can also be generated Grade;The second control measure corresponding with above-mentioned second warning grade are obtained, wherein, above-mentioned second control measure are used to indicate second Class personnel carry out early warning control to the work risk of above-mentioned middle danger type.
Optionally, when above-mentioned processor performs program, third early warning corresponding with above-mentioned low danger type etc. can also be generated Grade;Third control measure corresponding with above-mentioned third warning grade are obtained, wherein, above-mentioned third control measure are used to indicate third Class personnel carry out early warning control to the work risk of above-mentioned low danger type.
Present invention also provides a kind of computer program products, first when being performed on data processing equipment, being adapted for carrying out The program of beginningization there are as below methods step:The job information of work about electric power in predetermined amount of time is obtained, wherein, above-mentioned job information It includes at least:The work risk of above-mentioned work about electric power;It is generated according to the type of above-mentioned work risk corresponding with the above-mentioned type pre- Alert information, above-mentioned warning information include at least:Warning grade and control measure;Above-mentioned warning information is sent to user terminal, In, above-mentioned warning information is used to indicate user and handles above-mentioned work risk according to above-mentioned warning grade and above-mentioned control measure.
Optionally, when above computer program product performs program, the vulnerability database pre-established can also be determined, In, above-mentioned vulnerability database is used to store above-mentioned job information;It is obtained in above-mentioned predetermined amount of time in above-mentioned vulnerability database The above-mentioned job information of storage.
Optionally, when above computer program product performs program, corresponding with above-mentioned high-risk type the can also be generated One warning grade;The first control measure corresponding with above-mentioned first warning grade are obtained, wherein, above-mentioned first control measure are used for Indicate that first kind personnel carry out early warning control to the work risk of above-mentioned high-risk type.
Optionally, it when above computer program product performs program, can also generate and above-mentioned middle danger type corresponding the Two warning grades;The second control measure corresponding with above-mentioned second warning grade are obtained, wherein, above-mentioned second control measure are used for Indicate that the second class personnel carry out early warning control to the work risk of above-mentioned middle danger type.
Optionally, it when above computer program product performs program, can also generate and above-mentioned low danger type corresponding the Three warning grades;Third control measure corresponding with above-mentioned third warning grade are obtained, wherein, above-mentioned third control measure are used for Indicate that third class personnel carry out early warning control to the work risk of above-mentioned low danger type.
The embodiments of the present invention are for illustration only, do not represent the quality of embodiment.
In the above embodiment of the present invention, all emphasize particularly on different fields to the description of each embodiment, do not have in some embodiment The part of detailed description may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei A kind of division of logic function, can there is an other dividing mode in actual implementation, for example, multiple units or component can combine or Person is desirably integrated into another system or some features can be ignored or does not perform.Another point, shown or discussed is mutual Between coupling, direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, unit or module It connects, can be electrical or other forms.
The unit illustrated as separating component may or may not be physically separate, be shown as unit The component shown may or may not be physical unit, you can be located at a place or can also be distributed to multiple On unit.Some or all of unit therein can be selected according to the actual needs to realize the purpose of this embodiment scheme.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also That each unit is individually physically present, can also two or more units integrate in a unit.Above-mentioned integrated list The form that hardware had both may be used in member is realized, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and is independent product sale or uses When, it can be stored in a computer read/write memory medium.Based on such understanding, technical scheme of the present invention is substantially The part to contribute in other words to the prior art or all or part of the technical solution can be in the form of software products It embodies, which is stored in a storage medium, is used including some instructions so that a computer Equipment (can be personal computer, server or network equipment etc.) perform each embodiment the method for the present invention whole or Part steps.And aforementioned storage medium includes:USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can to store program code Medium.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should It is considered as protection scope of the present invention.

Claims (10)

1. a kind of early-warning processing method, which is characterized in that including:
The job information of work about electric power in predetermined amount of time is obtained, wherein, the job information includes at least:The work about electric power Work risk;
Warning information corresponding with the type is generated according to the type of the work risk, the warning information includes at least: Warning grade and control measure;
The warning information is sent to user terminal, wherein, the warning information is used to indicate user according to the warning grade With the control measure processing work risk.
2. according to the method described in claim 1, it is characterized in that, obtain predetermined amount of time in work about electric power job information, Including:
Determine the vulnerability database pre-established, wherein, the vulnerability database is used to store the job information;
The job information stored in the vulnerability database is obtained in the predetermined amount of time.
3. according to the method described in claim 1, it is characterized in that, the work risk type be high-risk type situation Under, warning information corresponding with the type is generated according to the type of the work risk, including:
Generation the first warning grade corresponding with the high-risk type;
Corresponding with first warning grade the first control measure are obtained, wherein, first control measure are used to indicate the A kind of personnel carry out early warning control to the work risk of the high-risk type.
4. according to the method described in claim 1, it is characterized in that, the work risk type for it is middle danger type situation Under, warning information corresponding with the type is generated according to the type of the work risk, including:
Generation and middle corresponding second warning grade of type of endangering;
Corresponding with second warning grade the second control measure are obtained, wherein, second control measure are used to indicate the Two class personnel carry out early warning control to the work risk of the middle danger type.
5. according to the method described in claim 1, it is characterized in that, the work risk type for it is low danger type situation Under, warning information corresponding with the type is generated according to the type of the work risk, including:
Generation and the low corresponding third warning grade of type of endangering;
Corresponding with third warning grade third control measure are obtained, wherein, the third control measure are used to indicate the Three classes personnel carry out early warning control to the work risk of the low danger type.
6. a kind of prewarning processing unit, which is characterized in that including:
Acquisition module, for obtaining the job information of work about electric power in predetermined amount of time, wherein, the job information at least wraps It includes:The work risk of the work about electric power;
Generation module, for generating warning information corresponding with the type, the early warning according to the type of the work risk Information includes at least:Warning grade and control measure;
Sending module, for sending the warning information to user terminal, wherein, the warning information be used to indicate user according to The warning grade and the control measure handle the work risk.
7. device according to claim 6, which is characterized in that the acquisition module includes:
Determination sub-module, for determining the vulnerability database pre-established, wherein, the vulnerability database is used to store the work Make information;
Acquisition submodule, for obtaining the job information stored in the vulnerability database in the predetermined amount of time.
8. a kind of alarming processing system, which is characterized in that including:
Database, for storing the job information of work about electric power, wherein, the job information includes at least:The work about electric power Work risk;
Processor is connected with the database, for obtaining the job information within a predetermined period of time, and according to the work The type for making risk generates warning information corresponding with the type, and the warning information includes at least:Warning grade and control Measure;
User terminal is connected to the processor, for receiving the warning information that the processor is sent, and according to the early warning Grade and control measure instruction user handle the work risk.
9. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein, described program right of execution Profit requires the early-warning processing method described in any one in 1 to 5.
10. a kind of processor, which is characterized in that the processor is used to run program, wherein, right of execution when described program is run Profit requires the early-warning processing method described in any one in 1 to 5.
CN201711378599.2A 2017-12-19 2017-12-19 early-warning processing method, device and system Pending CN108229798A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711378599.2A CN108229798A (en) 2017-12-19 2017-12-19 early-warning processing method, device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711378599.2A CN108229798A (en) 2017-12-19 2017-12-19 early-warning processing method, device and system

Publications (1)

Publication Number Publication Date
CN108229798A true CN108229798A (en) 2018-06-29

Family

ID=62649936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711378599.2A Pending CN108229798A (en) 2017-12-19 2017-12-19 early-warning processing method, device and system

Country Status (1)

Country Link
CN (1) CN108229798A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114529218A (en) * 2022-03-04 2022-05-24 三门核电有限公司 Risk challenge management method and device for production work of nuclear power unit
CN117273431A (en) * 2023-06-15 2023-12-22 湖北安源安全环保科技有限公司 Double-control management platform and method based on risk management and control and hidden trouble investigation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102663538A (en) * 2012-03-16 2012-09-12 深圳供电局有限公司 Power grid risk management system and application method thereof
CN103077482A (en) * 2013-02-05 2013-05-01 广东电网公司 Power operation risk control method and system
CN103208084A (en) * 2012-01-12 2013-07-17 国家电网公司 Method and device for analyzing working bearing capacity
CN106505740A (en) * 2016-12-06 2017-03-15 国网山东省电力公司鄄城县供电公司 The intelligent monitoring device of power equipment, system and intelligent control system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103208084A (en) * 2012-01-12 2013-07-17 国家电网公司 Method and device for analyzing working bearing capacity
CN102663538A (en) * 2012-03-16 2012-09-12 深圳供电局有限公司 Power grid risk management system and application method thereof
CN103077482A (en) * 2013-02-05 2013-05-01 广东电网公司 Power operation risk control method and system
CN106505740A (en) * 2016-12-06 2017-03-15 国网山东省电力公司鄄城县供电公司 The intelligent monitoring device of power equipment, system and intelligent control system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114529218A (en) * 2022-03-04 2022-05-24 三门核电有限公司 Risk challenge management method and device for production work of nuclear power unit
CN117273431A (en) * 2023-06-15 2023-12-22 湖北安源安全环保科技有限公司 Double-control management platform and method based on risk management and control and hidden trouble investigation

Similar Documents

Publication Publication Date Title
CN112966903A (en) Dangerous chemical safety production risk monitoring and early warning system and method
CN108389007A (en) Security risk managing and control system and method
CN110135689A (en) Enterprise business risk method for early warning, device and computer readable storage medium
CN105844846B (en) A kind of method for safety monitoring based on Ibeacon technologies, apparatus and system
CN108229798A (en) early-warning processing method, device and system
CN109064104A (en) Material equipment management method, system and terminal device
CN114970176B (en) Virtual simulation method and device for electric power operation, computer equipment and storage medium
Zheng et al. Routes to failure and prevention recommendations in work systems of hydropower construction
CN117201203B (en) Block chain-based supply chain data secure sharing system and method
CN109389268A (en) Tank field construction operation risk intellectual analysis device and method based on natural hazard risk information
CN104778562B (en) A kind of safe eye supervising platform system in job site
CN117787885A (en) Enterprise safety production management method and system
KR20210098234A (en) Fire Risk Assessment Indicator System and Method in Traditional Market
CN116859842A (en) Chemical production line safety evaluation system
Thomassen et al. Mapping and monitoring the technical safety level
CN110554354B (en) Equipment maintenance quality monitoring method and system and terminal equipment
CN110706098A (en) Accurate poverty alleviation system and method based on block chain
CN114494878A (en) Potential safety hazard management method, system, equipment and medium based on digital twinning
CN114758416A (en) State monitoring method, device, equipment, storage medium and program product
Watson et al. A digital approach to making a step change in reducing human error in procedures
CN107730204A (en) The efficient management system of construction operation and the efficient management terminal of construction operation
CN113190200A (en) Exhibition data security protection method and device
CN109508906A (en) The control method and device of well lid operation
Lakatos Investigation of Smart Tools in Order to Improve the Effectiveness of the Administration of Disaster Management I.
KR20190110264A (en) Apparatus and method for safety check list generation based on 3d map

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180629

RJ01 Rejection of invention patent application after publication