CN103208084A - Method and device for analyzing working bearing capacity - Google Patents

Method and device for analyzing working bearing capacity Download PDF

Info

Publication number
CN103208084A
CN103208084A CN2012100092536A CN201210009253A CN103208084A CN 103208084 A CN103208084 A CN 103208084A CN 2012100092536 A CN2012100092536 A CN 2012100092536A CN 201210009253 A CN201210009253 A CN 201210009253A CN 103208084 A CN103208084 A CN 103208084A
Authority
CN
China
Prior art keywords
bearing capacity
capacity threshold
threshold value
workload
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012100092536A
Other languages
Chinese (zh)
Inventor
张丽芳
苑画舫
白晶
肖永立
闫春江
纪利军
李凌志
李晨
孔玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Beijing Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Beijing Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN2012100092536A priority Critical patent/CN103208084A/en
Publication of CN103208084A publication Critical patent/CN103208084A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Alarm Systems (AREA)

Abstract

本发明提供了一种工作承载力分析方法与装置,用以解决现有技术中人为手工统计工作承载力使工作风险不可控,有可能导致事故发生的问题。该方法包括:当接收到工作变更信息时,获取采样时间段内要完成的工作量;将要完成的工作量与预设的工作承载力阈值进行对比;当要完成的工作量大于预设的工作承载力阈值时,输出工作承载力报警信息。采用本发明的技术方案,使工作安排更为合理。

Figure 201210009253

The present invention provides a method and device for analyzing work carrying capacity, which is used to solve the problem in the prior art that artificially counting work carrying capacity makes work risks uncontrollable and may lead to accidents. The method includes: when receiving work change information, obtaining the workload to be completed within the sampling period; comparing the workload to be completed with a preset work carrying capacity threshold; when the workload to be completed is greater than the preset work When the bearing capacity threshold is reached, the alarm information of the working bearing capacity will be output. Adopting the technical scheme of the invention makes the work arrangement more reasonable.

Figure 201210009253

Description

工作承载力分析方法与装置Analysis method and device for working bearing capacity

技术领域 technical field

本发明涉及一种工作承载力分析方法与装置。The invention relates to a working bearing capacity analysis method and device.

背景技术 Background technique

在供电领域,变电站的工作承载力是指在保证正常生产前提下的工作承受能力,在变电生产指挥过程中,有关工作承载力分析还处在人为手工统计阶段,以EXCEL文件为介质,人为统计检修单位和运行单位的每月和每日的工作承载力。In the field of power supply, the work carrying capacity of a substation refers to the work bearing capacity under the premise of ensuring normal production. In the process of substation production command, the analysis of the work carrying capacity is still in the stage of manual statistics. With the EXCEL file as the medium, artificial Statistics of the monthly and daily working capacity of maintenance units and operating units.

随着用电量的激增,变电站数据的增加,检修和运行的工作量也随之增加。人为手工统计工作承载力成为一项繁琐的工作,效率低、准确率也在下降,使工作风险不可控,有可能导致事故发生。With the surge of power consumption and the increase of substation data, the workload of maintenance and operation also increases. Manually counting work capacity has become a cumbersome task with low efficiency and declining accuracy, which makes work risks uncontrollable and may lead to accidents.

在现有技术中,人为手工统计工作承载力使工作风险不可控,有可能导致事故发生,对于该问题,目前尚未提出有效解决方案。In the prior art, manual statistics of the work carrying capacity make the work risk uncontrollable, which may lead to accidents. For this problem, no effective solution has been proposed yet.

发明内容 Contents of the invention

本发明的主要目的是提供一种工作承载力分析方法与装置,以解决现有技术中人为手工统计工作承载力使工作风险不可控,有可能导致事故发生的问题。The main purpose of the present invention is to provide a work bearing capacity analysis method and device to solve the problem in the prior art that manual statistics of work bearing capacity make work risks uncontrollable and may lead to accidents.

为了实现上述目的,根据本发明的一个方面,提供了一种工作承载力分析方法。In order to achieve the above purpose, according to one aspect of the present invention, a method for analyzing work bearing capacity is provided.

本发明的工作承载力分析方法包括:当接收到工作变更信息时,获取采样时间段内要完成的工作量;将要完成的工作量与预设的工作承载力阈值进行对比;当要完成的工作量大于预设的工作承载力阈值时,输出工作承载力报警信息。The work carrying capacity analysis method of the present invention includes: when receiving work change information, acquiring the workload to be completed within the sampling period; comparing the work to be completed with the preset work carrying capacity threshold; When the amount is greater than the preset working capacity threshold, the working capacity alarm information will be output.

进一步地,工作承载力阈值包括:安全区工作承载力阈值、预警区工作承载力阈值和危险区工作承载力阈值,其中安全区工作承载力阈值小于预警区工作承载力阈值,预警区工作承载力阈值小于危险区工作承载力阈值。Further, the working carrying capacity threshold includes: the working carrying capacity threshold of the safety zone, the working carrying capacity threshold of the early warning zone and the working carrying capacity threshold of the dangerous zone, wherein the working carrying capacity threshold of the safe zone is smaller than the working carrying capacity threshold of the early warning zone, and the working carrying capacity threshold of the early warning zone The threshold is less than the working capacity threshold of the danger zone.

进一步地,将要完成的工作量与预设的工作承载力阈值进行对比之后,方法还包括:根据预设的安全区工作承载力阈值、预警区工作承载力阈值和危险区工作承载力阈值,确定要完成的工作量所对应的工作区域;根据预设的工作区域与区域标记之间的对应关系,将要完成的工作量与区域标记进行关联;输出带有区域标记的要完成的工作量。Further, after comparing the workload to be completed with the preset working capacity threshold, the method further includes: determining The work area corresponding to the workload to be completed; associate the workload to be completed with the area mark according to the preset correspondence between the work area and the area mark; output the work amount to be completed with the area mark.

根据本发明的另一方面,提供了一种工作承载力分析装置。According to another aspect of the present invention, a work bearing capacity analysis device is provided.

本发明的工作承载力分析装置包括:工作量获取设备,用于当接到工作变更信息时,获取采样时间段内要完成的工作量;对比设备,用于将要完成的工作量与预设的工作承载力阈值进行对比;报警信息输出设备,用于当要完成的工作量大于预设的工作承载力阈值时,输出工作承载力报警信息。The work carrying capacity analysis device of the present invention includes: workload acquisition equipment, used to acquire the workload to be completed within the sampling time period when receiving work change information; comparison equipment, used to compare the workload to be completed with the preset The working capacity threshold is compared; the alarm information output device is used to output the working capacity alarm information when the workload to be completed is greater than the preset working capacity threshold.

进一步地,工作承载力阈值包括:安全区工作承载力阈值、预警区工作承载力阈值和危险区工作承载力阈值,其中安全区工作承载力阈值小于预警区工作承载力阈值,预警区工作承载力阈值小于危险区工作承载力阈值。Further, the working carrying capacity threshold includes: the working carrying capacity threshold of the safety zone, the working carrying capacity threshold of the early warning zone and the working carrying capacity threshold of the dangerous zone, wherein the working carrying capacity threshold of the safe zone is smaller than the working carrying capacity threshold of the early warning zone, and the working carrying capacity threshold of the early warning zone The threshold is less than the working capacity threshold of the danger zone.

进一步地,装置还包括:工作区域确定设备,用于根据预设的安全区工作承载力阈值、预警区工作承载力阈值和危险区工作承载力阈值,确定要完成的工作量所对应的工作区域;关联设备,用于根据预设的工作区域与区域标记之间的对应关系,将要完成的工作量与区域标记进行关联;工作量输出设备,用于输出带有区域标记的要完成的工作量。Further, the device further includes: working area determination equipment, which is used to determine the working area corresponding to the workload to be completed according to the preset safety zone working capacity threshold, early warning zone working capacity threshold and dangerous zone working capacity threshold ;Association device, used to associate the workload to be completed with the area mark according to the preset correspondence between the work area and the area mark; workload output device, used to output the workload to be completed with the area mark .

根据本发明的技术方案,根据预设的工作承载力阈值自动完成工作承载力分析,并报警提醒,从而能够避免因手工统计导致效率和准确率低、工作风险不可控,有可能导致事故发生的不利后果,使工作安排更为合理。According to the technical solution of the present invention, the analysis of the working bearing capacity is automatically completed according to the preset working bearing capacity threshold, and an alarm is given to remind, thereby avoiding low efficiency and accuracy due to manual statistics, uncontrollable work risks, and possible accidents Unfavorable consequences, making work arrangements more reasonable.

附图说明 Description of drawings

说明书附图用来提供对本发明的进一步理解,构成本申请的一部分,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。在附图中:The accompanying drawings in the description are used to provide a further understanding of the present invention and constitute a part of the present application. The schematic embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations to the present invention. In the attached picture:

图1是根据本发明实施例的工作承载力分析方法的主要步骤的流程图;以及Fig. 1 is a flow chart of the main steps of the work carrying capacity analysis method according to an embodiment of the present invention; and

图2是根据本发明实施例的工作承载力分析装置的结构示意图。Fig. 2 is a schematic structural diagram of an analysis device for working bearing capacity according to an embodiment of the present invention.

具体实施方式 Detailed ways

需要说明的是,在不冲突的情况下,本申请中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明。It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and examples.

图1是根据本发明实施例的工作承载力分析方法的主要步骤的流程图,如图1所示,该方法主要包括如下步骤:Fig. 1 is a flowchart of the main steps of the work carrying capacity analysis method according to an embodiment of the present invention. As shown in Fig. 1, the method mainly includes the following steps:

步骤S101:当接收到工作变更信息时,获取采样时间段内要完成的工作量。Step S101: When receiving job change information, acquire the workload to be completed within the sampling time period.

在本步骤中,为了节省时间,并不是实时分析变电站的工作承载力,而是在工作发生变更时,才重新分析变电站的工作承载力。In this step, in order to save time, instead of analyzing the working capacity of the substation in real time, the working capacity of the substation is re-analyzed when the work changes.

步骤S103:将要完成的工作量与预设的工作承载力阈值进行对比。Step S103: Comparing the workload to be completed with the preset work capacity threshold.

在本步骤中,工作承载力阈值包括:安全区工作承载力阈值、预警区工作承载力阈值和危险区工作承载力阈值,其中安全区工作承载力阈值小于预警区工作承载力阈值,预警区工作承载力阈值小于危险区工作承载力阈值。In this step, the working carrying capacity threshold includes: the working carrying capacity threshold of the safety zone, the working carrying capacity threshold of the early warning zone and the working carrying capacity threshold of the dangerous zone, wherein the working carrying capacity threshold of the safe zone is less than the working carrying capacity threshold of the early warning zone, and the working carrying capacity threshold of the early warning zone The bearing capacity threshold is less than the working bearing capacity threshold of the danger zone.

步骤S105:当要完成的工作量大于预设的工作承载力阈值时,输出工作承载力报警信息。Step S105: When the workload to be completed is greater than the preset work capacity threshold, output work capacity warning information.

在本步骤中,当变电站要完成的工作量大于预设的工作承载力阈值中的任何一种,都会输出工作承载力报警信息,提示需要合理调配处理人员。In this step, when the workload to be completed by the substation is greater than any one of the preset work carrying capacity thresholds, a work carrying capacity alarm message will be output, prompting that a reasonable allocation of processing personnel is required.

除了以上描述外,本发明的工作承载力分析方法还包括以下步骤:In addition to the above description, the work carrying capacity analysis method of the present invention also includes the following steps:

(1)在步骤S 103之后,根据预设的安全区工作承载力阈值、预警区工作承载力阈值和危险区工作承载力阈值,确定要完成的工作量所对应的工作区域。(1) After step S103, according to the preset safety zone working capacity threshold, warning zone working capacity threshold and dangerous zone working capacity threshold, determine the corresponding working area of the workload to be completed.

在本步骤中,工作区域的设置与工作承载力阈值的种类相对应,当变电站要完成的工作量不大于安全区工作承载力阈值时,变电站要完成的工作量对应的工作区域为安全区域;当变电站要完成的工作量大于安全区工作承载力阈值,且不大于预警区工作承载力阈值时,变电站要完成的工作量对应的工作区域为预警区域;当变电站要完成的工作量大于预警区工作承载力阈值,且不大于危险区工作承载力阈值时,变电站要完成的工作量对应的工作区域为危险区域。In this step, the setting of the work area corresponds to the type of work carrying capacity threshold. When the workload to be completed by the substation is not greater than the work carrying capacity threshold of the safety zone, the work area corresponding to the work load to be completed by the substation is a safety area; When the workload to be completed by the substation is greater than the threshold of the work carrying capacity of the safety zone and not greater than the threshold of the work capacity of the early warning zone, the work area corresponding to the workload to be completed by the substation is the early warning area; when the workload to be completed by the substation is greater than the threshold of the early warning zone When the working carrying capacity threshold is not greater than the working carrying capacity threshold of the dangerous area, the working area corresponding to the workload to be completed by the substation is a dangerous area.

(2)根据预设的工作区域与区域标记之间的对应关系,将要完成的工作量与区域标记进行关联。(2) According to the preset correspondence between the work area and the area mark, the workload to be completed is associated with the area mark.

在本步骤中,区域标记可以为多种形式,譬如用不同的颜色表示不同的区域标记。In this step, the area marks can be in various forms, for example, different colors are used to indicate different area marks.

优选地,预设的工作区域与区域标记之间的对应关系是:用“绿色”表示安全区域;用“黄色”表示预警区域;用“红色”表示危险区域。Preferably, the corresponding relationship between the preset working area and the area marking is as follows: "green" is used to indicate a safe area; "yellow" is used to indicate a warning area; "red" is used to indicate a dangerous area.

(3)输出带有区域标记的要完成的工作量。(3) Output the amount of work to be done with area marks.

本发明的工作承载力分析方法,根据预设的工作承载力阈值自动完成工作承载力分析,并报警提醒,从而能够避免因手工统计导致效率和准确率低、工作风险不可控,有可能导致事故发生的不利后果,使工作安排更为合理。The working bearing capacity analysis method of the present invention automatically completes the working bearing capacity analysis according to the preset working bearing capacity threshold, and gives an alarm to remind, thereby avoiding low efficiency and accuracy, uncontrollable work risks and possible accidents caused by manual statistics The unfavorable consequences that occur make the work arrangement more reasonable.

图2是根据本发明实施例的工作承载力分析装置200的结构示意图,如图2所示,该装置主要包括:Fig. 2 is a schematic structural diagram of a working capacity analysis device 200 according to an embodiment of the present invention. As shown in Fig. 2, the device mainly includes:

工作量获取设备201,用于当接到工作变更信息时,获取采样时间段内要完成的工作量。The workload acquiring device 201 is configured to acquire the workload to be completed within the sampling time period when job change information is received.

对比设备203,用于将要完成的工作量与预设的工作承载力阈值进行对比。The comparison device 203 is configured to compare the workload to be completed with the preset work capacity threshold.

报警信息输出设备205,用于当要完成的工作量大于预设的工作承载力阈值时,输出工作承载力报警信息。The alarm information output device 205 is configured to output work capacity alarm information when the workload to be completed is greater than the preset work capacity threshold.

工作区域确定设备207,用于根据预设的安全区工作承载力阈值、预警区工作承载力阈值和危险区工作承载力阈值,确定要完成的工作量所对应的工作区域。The working area determination device 207 is configured to determine the working area corresponding to the workload to be completed according to the preset working capacity thresholds of the safety zone, the warning zone and the dangerous zone.

关联设备209,用于根据预设的工作区域与区域标记之间的对应关系,将要完成的工作量与区域标记进行关联。The associating device 209 is configured to associate the workload to be completed with the area mark according to the preset correspondence between the work area and the area mark.

工作量输出设备211,用于输出带有区域标记的要完成的工作量。The workload output device 211 is configured to output the workload to be completed with the area mark.

从以上描述可知,本发明的工作承载力分析方法与装置,根据预设的工作承载力阈值自动完成工作承载力分析,并报警提醒,从而能够避免因手工统计导致效率和准确率低、工作风险不可控,有可能导致事故发生的不利后果;同时将变电站要完成的工作量与区域标记建立关联,使运维人员非常直观地掌握变电站的人员调配的情况,使工作风险和系统风险降至安全可控范围。From the above description, it can be known that the work carrying capacity analysis method and device of the present invention automatically complete the work carrying capacity analysis according to the preset work carrying capacity threshold, and give an alarm to remind, thereby avoiding low efficiency and accuracy and work risks caused by manual statistics. It is uncontrollable and may lead to adverse consequences of accidents; at the same time, the workload to be completed by the substation is associated with the area mark, so that the operation and maintenance personnel can intuitively grasp the personnel deployment of the substation, and reduce the work risk and system risk to safety Controllable range.

显然,本领域的技术人员应该明白,上述的本发明的各设备或各步骤可以用通用的计算装置来实现,它们可以集中在单个的计算装置上,或者分布在多个计算装置所组成的网络上,可选地,它们可以用计算装置可执行的程序代码来实现,从而,可以将它们存储在存储装置中由计算装置来执行,或者将它们分别制作成各个集成电路设备,或者将它们中的多个设备或步骤制作成单个集成电路设备来实现。这样,本发明不限制于任何特定的硬件和软件结合。Obviously, those skilled in the art should understand that each device or each step of the present invention described above can be realized by a general-purpose computing device, and they can be concentrated on a single computing device, or distributed in a network composed of multiple computing devices Optionally, they can be realized by program codes executable by a computing device, so that they can be stored in a storage device and executed by a computing device, or they can be made into individual integrated circuit devices, or they can be integrated into Multiple devices or steps are fabricated into a single integrated circuit device to realize. As such, the present invention is not limited to any specific combination of hardware and software.

以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included within the protection scope of the present invention.

Claims (6)

1. a work Analysis of Bearing Capacity method is characterized in that, comprising:
When receiving job change information, obtain the workload that to finish in the sampling time section;
The described workload that will finish and preset working bearing capacity threshold value are compared, when the described workload that will finish during greater than described preset working bearing capacity threshold value, output services bearing capacity warning message.
2. method according to claim 1, it is characterized in that, described work bearing capacity threshold value comprises: place of safety work bearing capacity threshold value, pre-police region work bearing capacity threshold value and explosive area work bearing capacity threshold value, wherein said place of safety work bearing capacity threshold value is less than described pre-police region work bearing capacity threshold value, and described pre-police region work bearing capacity threshold value is less than described explosive area work bearing capacity threshold value.
3. method according to claim 2 is characterized in that, described the described workload that will finish and preset working bearing capacity threshold value are compared after, described method also comprises:
According to default place of safety work bearing capacity threshold value, pre-police region work bearing capacity threshold value and explosive area work bearing capacity threshold value, determine that the corresponding perform region of the described workload that will finish is place of safety, pre-police region or explosive area;
According to the perform region of described correspondence and the corresponding relation between the zone marker, carry out related with described zone marker the described workload that will finish;
Output has the described workload that will finish of zone marker.
4. a work Analysis of Bearing Capacity device is characterized in that, comprising:
Workload is obtained equipment, is used for obtaining the workload that will finish in the sampling time section when receiving job change information;
Comparative apparatus is used for the described workload that will finish and preset working bearing capacity threshold value are compared;
The warning message output device is used for when the described workload that will finish during greater than described preset working bearing capacity threshold value output services bearing capacity warning message.
5. device according to claim 4, it is characterized in that, described work bearing capacity threshold value comprises: place of safety work bearing capacity threshold value, pre-police region work bearing capacity threshold value and explosive area work bearing capacity threshold value, wherein said place of safety work bearing capacity threshold value is less than described pre-police region work bearing capacity threshold value, and described pre-police region work bearing capacity threshold value is less than described explosive area work bearing capacity threshold value.
6. device according to claim 5 is characterized in that, described device also comprises:
Equipment is determined in the perform region, be used for according to default place of safety work bearing capacity threshold value, pre-police region work bearing capacity threshold value and explosive area work bearing capacity threshold value, determine that the corresponding perform region of the described workload that will finish is place of safety, pre-police region or explosive area;
Associate device is used for according to the perform region of described correspondence and the corresponding relation between the zone marker, carries out related with described zone marker the described workload that will finish;
The workload output device is used for the described workload that will finish that output has zone marker.
CN2012100092536A 2012-01-12 2012-01-12 Method and device for analyzing working bearing capacity Pending CN103208084A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012100092536A CN103208084A (en) 2012-01-12 2012-01-12 Method and device for analyzing working bearing capacity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012100092536A CN103208084A (en) 2012-01-12 2012-01-12 Method and device for analyzing working bearing capacity

Publications (1)

Publication Number Publication Date
CN103208084A true CN103208084A (en) 2013-07-17

Family

ID=48755301

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012100092536A Pending CN103208084A (en) 2012-01-12 2012-01-12 Method and device for analyzing working bearing capacity

Country Status (1)

Country Link
CN (1) CN103208084A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108229798A (en) * 2017-12-19 2018-06-29 神华集团有限责任公司 early-warning processing method, device and system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101908764A (en) * 2010-08-11 2010-12-08 华北电力大学 Power grid self-healing control method
CN101958986A (en) * 2010-09-20 2011-01-26 中兴通讯股份有限公司 Method and device for warning terminal
CN202004534U (en) * 2011-02-11 2011-10-05 华北电网有限公司 Power grid risk monitoring system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101908764A (en) * 2010-08-11 2010-12-08 华北电力大学 Power grid self-healing control method
CN101958986A (en) * 2010-09-20 2011-01-26 中兴通讯股份有限公司 Method and device for warning terminal
CN202004534U (en) * 2011-02-11 2011-10-05 华北电网有限公司 Power grid risk monitoring system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108229798A (en) * 2017-12-19 2018-06-29 神华集团有限责任公司 early-warning processing method, device and system

Similar Documents

Publication Publication Date Title
CN103077482B (en) Power operation risk control method and system thereof
CN102866360B (en) A kind of power battery pack allows discharge power predictor method
CN104636450A (en) Database table space monitoring method
CN104378258B (en) A kind of network flow monitoring method, device and terminal
CN103955564A (en) IEC 61850-based leakage current on-line monitoring equipment communication simulation method
CN104751292A (en) Integrated management method for electromechanical equipment operation
CN104662392A (en) A wireless radio communication system for consumption meters
CN103208084A (en) Method and device for analyzing working bearing capacity
CN107194654A (en) Equipment accessory management model establishing method
CN104753728B (en) A kind of customer flow monitoring method and system
CN104317868A (en) Control integration method based on single-front and multi-SCADA (Supervisory Control and Data Acquisition) application
CN204423386U (en) A kind of prefabricated components intelligent identifying system
CN106550137A (en) A kind of breath light points out the method and device of battery electric quantity
CN102638365B (en) A kind of implementation method of webmaster magnanimity automatic device discovery
CN105007174A (en) Automatic checking method for dispatching automatic main station downlink command
CN104158253A (en) Intelligent fast charging method
CN103593586A (en) Data quality evaluation method
CN104050519A (en) Safety risk prediction method and system for grid scheduling staff
CN103178610A (en) Equipment load display method and device
CN203250188U (en) Cement Equipment Status Monitoring System
CN104156825A (en) Power system operation risk monitoring interaction platform
CN204988473U (en) Distributing type material weighing system
CN204537424U (en) A kind of power information specially becomes acquisition terminal
CN103928917B (en) Multi-scheme setting calculation matching method
CN204288298U (en) A kind of power marketing data collector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130717