CN104700192A - Aided intelligent management and control system for power transmission and transformation project and management and control method thereof - Google Patents
Aided intelligent management and control system for power transmission and transformation project and management and control method thereof Download PDFInfo
- Publication number
- CN104700192A CN104700192A CN201410606949.6A CN201410606949A CN104700192A CN 104700192 A CN104700192 A CN 104700192A CN 201410606949 A CN201410606949 A CN 201410606949A CN 104700192 A CN104700192 A CN 104700192A
- Authority
- CN
- China
- Prior art keywords
- project
- construction
- management
- engineering
- work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an aided intelligent management and control system for a power transmission and transformation project and a management and control method for the project. The system is mainly composed of a computer mainframe, a mobile platform terminal and auxiliary equipment, wherein the computer mainframe as a new creating project is used for managing the existing project, and integrating and storing the main data returned by each mobile platform terminal; the computer mainframe is equipped with multiple mobile platform terminals connected by wireless communication systems of a local area network, and the mobile platform terminals are regarded as a client program for running the aided intelligent management system for power transmission and transformation project; according to the management and control method, the project is divided into three parts such as earlier stage of the project, project construction and project acceptance according to organization and management requirements of the power transmission and transformation project. According to the system and the method, the standardization level of the construction technology is improved, the operating efficiency of constructors is increased, comprehensive management and execution and assessment for power transmission and transformation project construction can be realized, and the construction quality and safety management level of the power transmission and transformation project is comprehensively increased.
Description
Technical field
What the present invention relates to is that a kind of project of transmitting and converting electricity is constructed intelligent auxiliary tube Ore-controlling Role and management-control method thereof, belongs to the intelligent management and control technical field of engineering construction.
Background technology
At present, project of transmitting and converting electricity construction working is wide, point is many, it is numerous to measure, proficiency is uneven, all kinds of technological standardss, the rules and regulations of required execution in construction are various, as technological standards, common quality defect, compulsive clause, safety management system etc., often can not be exhaustive in construction task implementation process, construction quality problem in the acceptance of work is frequently occurred; Construction operation risk pressure is large, and dangerous operation occurs often, can not effectively effect a radical cure, and there is certain construction safety hidden danger.
Summary of the invention
The object of the invention is to the deficiency overcoming prior art existence, and provide one mainly to improve construction technology standard level, lifting construction person works efficiency, promote safety management in construction site level, thus the management in all directions of engineering construction can be realized and perform examination, the project of transmitting and converting electricity of General Promotion engineering construction quality, safety management level is constructed intelligent auxiliary tube Ore-controlling Role and management-control method thereof.
Object of the present invention has been come by following technical solution, described project of transmitting and converting electricity is constructed intelligent auxiliary tube Ore-controlling Role, it is primarily of main frame, mobile platform terminal and utility appliance composition, it is characterized in that described main frame is as creating newly built construction, managing existing engineering; To each mobile platform terminal distribution task, and the master data that each mobile platform terminal returns is integrated and stored; Described main frame is configured with multiple mobile platform terminal connected by local area network wireless communication system, described mobile platform terminal is an operation project of transmitting and converting electricity construction intelligence-aided project manage-ment system client-side program, and after completing item by item the task of main frame distribution, return data is to main frame.
Described utility appliance at least comprises a bluetooth scanning and robs and a bar code printer, mobile platform terminal and bluetooth scan to rob corresponding configuration and can accept bluetooth and scan the input of robbing, and automatically identify numbering equipment, check equipment installation progress, installation quality, safety work situation; Working-yard security civilization mark, Preventive Control of Dangerous Spot measure, installation procedure quality, construction operation safety, acceptance of work situation are taken pictures and touched input record, and can send short messages and inform and specify responsible official current project progress.
Described bar code printer corresponding configuration is in described main frame, and equipment bar code is being robbed input mobile platform terminal by bluetooth scanning and after being uploaded to main frame, printing relevant device bar code by described bar code printer; Described main frame is server end.
One utilizes described project of transmitting and converting electricity intelligent auxiliary tube Ore-controlling Role of constructing to carry out management-control method, described management-control method is the Organization And Management's requirement according to construction of power transmission and transformation engineering project, project is divided into project's earlier stage, project construction, the project acceptance inspection three aspects, specifically:
(1) project's earlier stage, described project's earlier stage comprises two parts, and one is that engineering establishment and system each module primary data are set up and each management clause, special construction plan, the arrangement of the files such as job instruction and formulation; Two is engineering site security civilization standardized construction and Preventive Control of Dangerous Spot carrying out measures.
(2) project construction, described project construction comprises three parts, one be equipment march into the arena in place unpack, bar code make; Two is the Installation and Debugging of equipment standard equalization; Three is site safety task managements.
(3) acceptance of work, after all standard equalization task completes, enter acceptance stage, regulation is checked and accepted according to Guo Wang company and three grades, company of province, inspector, according to the final acceptance of construction flow process pointed out in mobile platform terminal, carries out standardization examination to installation work quality, defect of checking on the quality, propose reform advice, and assign to each person liable by management system; Person liable rectifies and improves according to suggestion, and by rectification situation input system, after to be confirmed, this grade of checking and accepting can complete, and then starts next stage checking and accepting; After checking and accepting terminates, submit completion report of construction work to.
The present invention is preferably: in described (1) project's earlier stage, specifically comprise:
1. engineering duty creates, after construction task is assigned, the file such as project profile, special construction plan, all kinds of job instruction, all kinds of construction management systems carries out arranging, collecting, and the document management module provided based on system is deleted, increase, upgrade certain engineering management fileinfo;
By the inspection of the scene of a crime, incorporation engineering work on the spot actual conditions, the security civilization standardized construction module provided based on system is formulated certain engineering safety civilization markization and is required provision; Certain engineering Preventive Control of Dangerous Spot measure requirement provision is formulated based on duration Preventive Control of Dangerous Spot measure in early stage module; Certain Engineering Standardization job requirements provision is formulated based on standardized work flows control module and engineering site equipment situation;
According to project management needs, set up construction project department, identify project management, workmen; According to the engineering management functional distribution system account authority of everyone; The personnel's file store provided according to system is deleted, increase, upgrade management, workmen's archives of certain engineering project of establishment; According to Engineering Project Construction character, project security management requirement, based on the engineering risk management and control requirement that system provides, delete, increase, upgrade certain engineering risk management and control measure of formation requirement provision.
2. project's earlier stage task closed loop is implemented, the engineering safety standard of civilization construction requirement provided according to system and engineering site Preventive Control of Dangerous Spot measure provision, site layout project construction is carried out in contrast one by one, employing digital photograph is the implementation of conditions of means record every requirement and measure provision, and forms closed loop management.Lead back to server after prerequisite task completes, and it is qualified to carry out onsite acceptance by project manager.After only completing above-mentioned steps, just carry out the task of project construction phase, therefore ensured that the construction of engineering safety standard of civilization and Preventive Control of Dangerous Spot carrying out measures are to crucial point;
In described (2) project construction, specifically comprise:
1. equipment bar code makes, electrical equipment march into the arena in place after, generated corresponding equipment installation management by work responsible official hand-held intelligent terminal encode based on each equipment factory number, the date of production, and uploaded onto the server by WLAN (wireless local area network), print corresponding equipment bar code by bar-code printer, be affixed on each equipment fixed position.Rely on bluetooth scanning technique, work responsible official or project manager can be inquired about by handheld terminal at any time and supervise per unit installation progress and quality, constructability Liability Retroact;
2. equipment standard operation Installation and Debugging, in construction process, the construction task that work responsible official arranges according to hand-held intelligent terminal system, the requirement contrasting corresponding operation and standard, rulyly carry out standardized work, by each stage duty of the form record of digital photograph.After per stage end-of-job, confirmation must be checked and accepted through operation responsible official, and acceptance information is inputted handheld terminal and next step operation can be proceeded to after uploading onto the server, guarantee engineering construction quality controlled, can control, in control.Meanwhile, in work progress, work responsible official can the job instruction of reference device Installation and Debugging at any time, special construction plan, and the files such as all kinds of construction operation handbooks, can make construction procedure normative and reasonable more, evidence-based;
3. site safety task management, in construction task implementation process, determines every work responsible official by project administrator based on personnel's archive database that system provides.In work progress, work responsible official fills in by hand-held intelligent terminal that construction station class meeting is parallel tells somebody what one's real intentions are.Construction task is issued by project of transmitting and converting electricity construction intelligence-aided project manage-ment system, work responsible official fills in construction operation ticket on hand-held intelligent terminal, select there are the personnel of respective attributes as construction working class member (if the current attribute of workmen does not meet construction operation requirement based on workmen's archive database, then cannot be added to construction operation class member), and carry out safely, confide a technological secret, and there are personnel that construction operation signs and issues attribute carry out the identification of construction operation ticket and sign and issue;
Need after a certain construction task completes to submit complete report or termination construction operation ticket to by handheld terminal, and system that information is uploaded onto the server, just can leave construction area after device system feedback corresponding information to be serviced.
The present invention has can improve construction technology standard level, lifting construction person works efficiency, promote safety management in construction site level, the management in all directions of engineering construction can be realized and perform examination, the features such as the construction quality of General Promotion project of transmitting and converting electricity and safety management level.
Accompanying drawing explanation
Fig. 1 is intelligent auxiliary tube Ore-controlling Role composition frame chart of the present invention.
Fig. 2 is that intelligent auxiliary tube Ore-controlling Role of the present invention uses process flow diagram at the scene.
Embodiment
Below in conjunction with accompanying drawing, the present invention will be described in detail: shown in Fig. 1, project of transmitting and converting electricity of the present invention is constructed intelligent auxiliary tube Ore-controlling Role, it is primarily of main frame, mobile platform terminal and utility appliance composition, it is characterized in that described main frame is as creating newly built construction, managing existing engineering; To each mobile platform terminal distribution task, and the master data that each mobile platform terminal returns is integrated and stored; Described main frame is configured with multiple mobile platform terminal connected by local area network wireless communication system, described mobile platform terminal is an operation project of transmitting and converting electricity construction intelligence-aided project manage-ment system client-side program, and after completing item by item the task of main frame distribution, return data is to main frame.
Described utility appliance at least comprises a bluetooth scanning and robs and a bar code printer, mobile platform terminal and bluetooth scan to rob corresponding configuration and can accept bluetooth and scan the input of robbing, and automatically identify numbering equipment, check equipment installation progress, installation quality, safety work situation; Working-yard security civilization mark, Preventive Control of Dangerous Spot measure, installation procedure quality, construction operation safety, acceptance of work situation are taken pictures and touched input record, and can send short messages and inform and specify responsible official current project progress.
Described bar code printer corresponding configuration is in described main frame, and equipment bar code is being robbed input mobile platform terminal by bluetooth scanning and after being uploaded to main frame, printing relevant device bar code by described bar code printer; Described main frame is server end.
Number in the figure has: project of transmitting and converting electricity construction intelligence-aided project manage-ment system 1; Hardware system 2; Software systems 3; Main frame (server)+mobile platform (handheld terminal)+utility appliance is adopted to form 4; Adopt C/S model and client and server structure, the two exchanges data 5 by LAN (Local Area Network).
Shown in Fig. 2, one utilizes described project of transmitting and converting electricity intelligent auxiliary tube Ore-controlling Role of constructing to carry out management-control method, described management-control method is the Organization And Management's requirement according to construction of power transmission and transformation engineering project, project is divided into project's earlier stage, project construction, the project acceptance inspection three aspects, specifically:
(1) project's earlier stage, described project's earlier stage comprises two parts, and one is that engineering establishment and system each module primary data are set up and each management clause, special construction plan, the arrangement of the files such as job instruction and formulation; Two is engineering site security civilization standardized construction and Preventive Control of Dangerous Spot carrying out measures.
(2) project construction, described project construction comprises three parts, one be equipment march into the arena in place unpack, bar code make; Two is the Installation and Debugging of equipment standard equalization; Three is site safety task managements.
(3) acceptance of work, after all standard equalization task completes, enter acceptance stage, regulation is checked and accepted according to Guo Wang company and three grades, company of province, inspector, according to the final acceptance of construction flow process pointed out in mobile platform terminal, carries out standardization examination to installation work quality, defect of checking on the quality, propose reform advice, and assign to each person liable by management system; Person liable rectifies and improves according to suggestion, and by rectification situation input system, after to be confirmed, this grade of checking and accepting can complete, and then starts next stage checking and accepting; After checking and accepting terminates, submit completion report of construction work to.
The present invention is preferably: in described (1) project's earlier stage, specifically comprise:
1. engineering duty creates, after construction task is assigned, the file such as project profile, special construction plan, all kinds of job instruction, all kinds of construction management systems carries out arranging, collecting, and the document management module provided based on system is deleted, increase, upgrade certain engineering management fileinfo;
By the inspection of the scene of a crime, incorporation engineering work on the spot actual conditions, the security civilization standardized construction module provided based on system is formulated certain engineering safety civilization markization and is required provision; Certain engineering Preventive Control of Dangerous Spot measure requirement provision is formulated based on duration Preventive Control of Dangerous Spot measure in early stage module; Certain Engineering Standardization job requirements provision is formulated based on standardized work flows control module and engineering site equipment situation;
According to project management needs, set up construction project department, identify project management, workmen; According to the engineering management functional distribution system account authority of everyone; The personnel's file store provided according to system is deleted, increase, upgrade management, workmen's archives of certain engineering project of establishment; According to Engineering Project Construction character, project security management requirement, based on the engineering risk management and control requirement that system provides, delete, increase, upgrade certain engineering risk management and control measure of formation requirement provision.
2. project's earlier stage task closed loop is implemented, the engineering safety standard of civilization construction requirement provided according to system and engineering site Preventive Control of Dangerous Spot measure provision, site layout project construction is carried out in contrast one by one, employing digital photograph is the implementation of conditions of means record every requirement and measure provision, and forms closed loop management.Lead back to server after prerequisite task completes, and it is qualified to carry out onsite acceptance by project manager.After only completing above-mentioned steps, just carry out the task of project construction phase, therefore ensured that the construction of engineering safety standard of civilization and Preventive Control of Dangerous Spot carrying out measures are to crucial point;
In described (2) project construction, specifically comprise:
1. equipment bar code makes, electrical equipment march into the arena in place after, generated corresponding equipment installation management by work responsible official hand-held intelligent terminal encode based on each equipment factory number, the date of production, and uploaded onto the server by WLAN (wireless local area network), print corresponding equipment bar code by bar-code printer, be affixed on each equipment fixed position.Rely on bluetooth scanning technique, work responsible official or project manager can be inquired about by handheld terminal at any time and supervise per unit installation progress and quality, constructability Liability Retroact;
2. equipment standard operation Installation and Debugging, in construction process, the construction task that work responsible official arranges according to hand-held intelligent terminal system, the requirement contrasting corresponding operation and standard, rulyly carry out standardized work, by each stage duty of the form record of digital photograph.After per stage end-of-job, confirmation must be checked and accepted through operation responsible official, and acceptance information is inputted handheld terminal and next step operation can be proceeded to after uploading onto the server, guarantee engineering construction quality controlled, can control, in control.Meanwhile, in work progress, work responsible official can the job instruction of reference device Installation and Debugging at any time, special construction plan, and the files such as all kinds of construction operation handbooks, can make construction procedure normative and reasonable more, evidence-based;
3. site safety task management, in construction task implementation process, determines every work responsible official by project administrator based on personnel's archive database that system provides.In work progress, work responsible official fills in by hand-held intelligent terminal that construction station class meeting is parallel tells somebody what one's real intentions are.Construction task is issued by project of transmitting and converting electricity construction intelligence-aided project manage-ment system, work responsible official fills in construction operation ticket on hand-held intelligent terminal, select there are the personnel of respective attributes as construction working class member (if the current attribute of workmen does not meet construction operation requirement based on workmen's archive database, then cannot be added to construction operation class member), and carry out safely, confide a technological secret, and there are personnel that construction operation signs and issues attribute carry out the identification of construction operation ticket and sign and issue;
Need after a certain construction task completes to submit complete report or termination construction operation ticket to by handheld terminal, and system that information is uploaded onto the server, just can leave construction area after device system feedback corresponding information to be serviced.
Word content shown in Fig. 2 is the content of the embodiment of the present invention.
The present invention has can improve construction technology standard level, lifting construction person works efficiency, promote safety management in construction site level, the management in all directions of engineering construction can be realized and perform examination, the features such as the construction quality of General Promotion project of transmitting and converting electricity and safety management level.
Claims (5)
1. project of transmitting and converting electricity is constructed an intelligent auxiliary tube Ore-controlling Role, and it is primarily of main frame, mobile platform terminal and utility appliance composition, it is characterized in that described main frame is as establishment newly built construction, manage existing engineering; To each mobile platform terminal distribution task, and the master data that each mobile platform terminal returns is integrated and stored; Described main frame is configured with multiple mobile platform terminal connected by local area network wireless communication system, described mobile platform terminal is an operation project of transmitting and converting electricity construction intelligence-aided project manage-ment system client-side program, and after completing item by item the task of main frame distribution, return data is to main frame.
2. project of transmitting and converting electricity according to claim 1 is constructed intelligent auxiliary tube Ore-controlling Role, it is characterized in that described utility appliance at least comprises a bluetooth scanning and robs and a bar code printer, mobile platform terminal and bluetooth scan to rob corresponding configuration and can accept bluetooth and scan the input of robbing, and automatically identify numbering equipment, check equipment installation progress, installation quality, safety work situation; Working-yard security civilization mark, Preventive Control of Dangerous Spot measure, installation procedure quality, construction operation safety, acceptance of work situation are taken pictures and touched input record, and can send short messages and inform and specify responsible official current project progress.
3. project of transmitting and converting electricity according to claim 2 is constructed intelligent auxiliary tube Ore-controlling Role, it is characterized in that described bar code printer corresponding configuration is in described main frame, equipment bar code is being robbed input mobile platform terminal by bluetooth scanning and after being uploaded to main frame, is printing relevant device bar code by described bar code printer; Described main frame is server end.
4. one kind utilizes the intelligent auxiliary tube Ore-controlling Role of constructing of project of transmitting and converting electricity described in claim 1 or 2 or 3 to carry out management-control method, it is characterized in that described management-control method is the Organization And Management's requirement according to construction of power transmission and transformation engineering project, project is divided into project's earlier stage, project construction, the project acceptance inspection three aspects, specifically:
(1) project's earlier stage, described project's earlier stage comprises two parts, and one is that engineering establishment and system each module primary data are set up and each management clause, special construction plan, the arrangement of the files such as job instruction and formulation; Two is engineering site security civilization standardized construction and Preventive Control of Dangerous Spot carrying out measures;
(2) project construction, described project construction comprises three parts, one be equipment march into the arena in place unpack, bar code make; Two is the Installation and Debugging of equipment standard equalization; Three is site safety task managements;
(3) acceptance of work, after all standard equalization task completes, enter acceptance stage, regulation is checked and accepted according to Guo Wang company and three grades, company of province, inspector, according to the final acceptance of construction flow process pointed out in mobile platform terminal, carries out standardization examination to installation work quality, defect of checking on the quality, propose reform advice, and assign to each person liable by management system; Person liable rectifies and improves according to suggestion, and by rectification situation input system, after to be confirmed, this grade of checking and accepting can complete, and then starts next stage checking and accepting; After checking and accepting terminates, submit completion report of construction work to.
5. the project of transmitting and converting electricity intelligent auxiliary tube Ore-controlling Role of constructing that utilizes according to claim 4 carries out management-control method, it is characterized in that, in described (1) project's earlier stage, specifically comprising:
1. engineering duty creates, after construction task is assigned, the file such as project profile, special construction plan, all kinds of job instruction, all kinds of construction management systems carries out arranging, collecting, and the document management module provided based on system is deleted, increase, upgrade certain engineering management fileinfo;
By the inspection of the scene of a crime, incorporation engineering work on the spot actual conditions, the security civilization standardized construction module provided based on system is formulated certain engineering safety civilization markization and is required provision; Certain engineering Preventive Control of Dangerous Spot measure requirement provision is formulated based on duration Preventive Control of Dangerous Spot measure in early stage module; Certain Engineering Standardization job requirements provision is formulated based on standardized work flows control module and engineering site equipment situation;
According to project management needs, set up construction project department, identify project management, workmen; According to the engineering management functional distribution system account authority of everyone; The personnel's file store provided according to system is deleted, increase, upgrade management, workmen's archives of certain engineering project of establishment; According to Engineering Project Construction character, project security management requirement, based on the engineering risk management and control requirement that system provides, delete, increase, upgrade certain engineering risk management and control measure of formation requirement provision;
2. project's earlier stage task closed loop is implemented, the engineering safety standard of civilization construction requirement provided according to system and engineering site Preventive Control of Dangerous Spot measure provision, site layout project construction is carried out in contrast one by one, employing digital photograph is the implementation of conditions of means record every requirement and measure provision, and forms closed loop management; Lead back to server after prerequisite task completes, and it is qualified to carry out onsite acceptance by project manager; After only completing above-mentioned steps, just carry out the task of project construction phase, therefore ensured that the construction of engineering safety standard of civilization and Preventive Control of Dangerous Spot carrying out measures are to crucial point;
In described (2) project construction, specifically comprise:
1. equipment bar code makes, electrical equipment march into the arena in place after, generated corresponding equipment installation management by work responsible official hand-held intelligent terminal encode based on each equipment factory number, the date of production, and uploaded onto the server by WLAN (wireless local area network), print corresponding equipment bar code by bar-code printer, be affixed on each equipment fixed position; Rely on bluetooth scanning technique, work responsible official or project manager can be inquired about by handheld terminal at any time and supervise per unit installation progress and quality, constructability Liability Retroact;
2. equipment standard operation Installation and Debugging, in construction process, the construction task that work responsible official arranges according to hand-held intelligent terminal system, the requirement contrasting corresponding operation and standard, rulyly carry out standardized work, by each stage duty of the form record of digital photograph; After per stage end-of-job, confirmation must be checked and accepted through operation responsible official, and acceptance information is inputted handheld terminal and next step operation can be proceeded to after uploading onto the server, guarantee engineering construction quality controlled, can control, in control; Meanwhile, in work progress, work responsible official can the job instruction of reference device Installation and Debugging at any time, special construction plan, and the files such as all kinds of construction operation handbooks, can make construction procedure normative and reasonable more, evidence-based;
3. site safety task management, in construction task implementation process, determines every work responsible official by project administrator based on personnel's archive database that system provides; In work progress, work responsible official fills in by hand-held intelligent terminal that construction station class meeting is parallel tells somebody what one's real intentions are; Construction task is issued by project of transmitting and converting electricity construction intelligence-aided project manage-ment system, work responsible official fills in construction operation ticket on hand-held intelligent terminal, select there are the personnel of respective attributes as construction working class member (if the current attribute of workmen does not meet construction operation requirement based on workmen's archive database, then cannot be added to construction operation class member), and carry out safely, confide a technological secret, and there are personnel that construction operation signs and issues attribute carry out the identification of construction operation ticket and sign and issue;
Need after a certain construction task completes to submit complete report or termination construction operation ticket to by handheld terminal, and system that information is uploaded onto the server, just can leave construction area after device system feedback corresponding information to be serviced.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410606949.6A CN104700192A (en) | 2014-11-03 | 2014-11-03 | Aided intelligent management and control system for power transmission and transformation project and management and control method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410606949.6A CN104700192A (en) | 2014-11-03 | 2014-11-03 | Aided intelligent management and control system for power transmission and transformation project and management and control method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104700192A true CN104700192A (en) | 2015-06-10 |
Family
ID=53347288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410606949.6A Pending CN104700192A (en) | 2014-11-03 | 2014-11-03 | Aided intelligent management and control system for power transmission and transformation project and management and control method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104700192A (en) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106651653A (en) * | 2016-12-19 | 2017-05-10 | 国家电网公司 | Intelligent power distribution network project auxiliary management system |
CN106845649A (en) * | 2016-12-13 | 2017-06-13 | 湖南华电长沙发电有限公司 | A kind of thermal power plant repair quality movement management-control method based on internet |
CN106940839A (en) * | 2017-03-13 | 2017-07-11 | 中国南方电网有限责任公司超高压输电公司 | A kind of project of transmitting and converting electricity qualitative data managing and control system and method |
CN107180300A (en) * | 2017-05-05 | 2017-09-19 | 国网山东省电力公司枣庄供电公司 | Goods and materials regulation and control and management system in extra-high voltage direct-current transmission process of construction |
CN107230163A (en) * | 2017-06-07 | 2017-10-03 | 北京友泰科技发展有限责任公司 | The system and method for power engineering quality in site supervision and check |
CN107633352A (en) * | 2017-08-30 | 2018-01-26 | 国网北京市电力公司 | The method and apparatus of specification task flow |
CN107704991A (en) * | 2017-08-30 | 2018-02-16 | 国网北京市电力公司 | The method and apparatus of specification inspection flow |
CN108038673A (en) * | 2017-12-29 | 2018-05-15 | 国网上海市电力公司 | A kind of archive management system of electric power overhaul engineering project |
CN108229807A (en) * | 2017-12-28 | 2018-06-29 | 广州建软科技股份有限公司 | A kind of marketing programs construction rotation managing and control system |
CN108364113A (en) * | 2017-12-26 | 2018-08-03 | 中国移动通信集团广东有限公司 | Base station Acceptance Test System and computer readable storage medium |
CN108444603A (en) * | 2018-03-15 | 2018-08-24 | 上海士翌测试技术有限公司 | The intelligent movable distributed diagnosis system of instrument is examined based on infrared thermal imaging point |
CN109190966A (en) * | 2018-08-28 | 2019-01-11 | 云南电网有限责任公司电力科学研究院 | Manage system and method in a kind of distribution net equipment O&M scene |
CN109740835A (en) * | 2018-11-14 | 2019-05-10 | 遵义华正电缆桥架有限公司 | A kind of power construction command system |
CN110751454A (en) * | 2019-09-19 | 2020-02-04 | 国网山东省电力公司济宁供电公司 | Cable accessory installation process control system and method |
CN110796431A (en) * | 2019-10-15 | 2020-02-14 | 国网辽宁省电力有限公司抚顺供电公司 | Management method of capital construction project construction management terminal |
CN117973947A (en) * | 2024-04-01 | 2024-05-03 | 国网山东省电力公司宁津县供电公司 | Standardized acceptance checking method and system for power distribution network engineering construction process |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120172080A1 (en) * | 2006-01-23 | 2012-07-05 | Motorola Mobility, Inc. | Power control in schedulable wireless communication terminal |
CN103729712A (en) * | 2013-10-25 | 2014-04-16 | 国家电网公司 | Intelligent security control method of electric power field operating personnel |
CN103955815A (en) * | 2014-05-09 | 2014-07-30 | 国家电网公司 | Portable transformer substation inventory material management system and method |
-
2014
- 2014-11-03 CN CN201410606949.6A patent/CN104700192A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120172080A1 (en) * | 2006-01-23 | 2012-07-05 | Motorola Mobility, Inc. | Power control in schedulable wireless communication terminal |
CN103729712A (en) * | 2013-10-25 | 2014-04-16 | 国家电网公司 | Intelligent security control method of electric power field operating personnel |
CN103955815A (en) * | 2014-05-09 | 2014-07-30 | 国家电网公司 | Portable transformer substation inventory material management system and method |
Non-Patent Citations (1)
Title |
---|
李元峰等: ""变电站基建施工智能辅助管理系统的开发与应用"", 《自动化应用》 * |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106845649A (en) * | 2016-12-13 | 2017-06-13 | 湖南华电长沙发电有限公司 | A kind of thermal power plant repair quality movement management-control method based on internet |
CN106651653A (en) * | 2016-12-19 | 2017-05-10 | 国家电网公司 | Intelligent power distribution network project auxiliary management system |
CN106940839A (en) * | 2017-03-13 | 2017-07-11 | 中国南方电网有限责任公司超高压输电公司 | A kind of project of transmitting and converting electricity qualitative data managing and control system and method |
CN106940839B (en) * | 2017-03-13 | 2020-11-24 | 中国南方电网有限责任公司超高压输电公司 | Power transmission and transformation project quality data management and control system and method |
CN107180300A (en) * | 2017-05-05 | 2017-09-19 | 国网山东省电力公司枣庄供电公司 | Goods and materials regulation and control and management system in extra-high voltage direct-current transmission process of construction |
CN107230163B (en) * | 2017-06-07 | 2020-09-08 | 北京友泰科技发展有限责任公司 | System for on-site quality supervision and inspection of power engineering |
CN107230163A (en) * | 2017-06-07 | 2017-10-03 | 北京友泰科技发展有限责任公司 | The system and method for power engineering quality in site supervision and check |
CN107633352A (en) * | 2017-08-30 | 2018-01-26 | 国网北京市电力公司 | The method and apparatus of specification task flow |
CN107704991A (en) * | 2017-08-30 | 2018-02-16 | 国网北京市电力公司 | The method and apparatus of specification inspection flow |
CN108364113A (en) * | 2017-12-26 | 2018-08-03 | 中国移动通信集团广东有限公司 | Base station Acceptance Test System and computer readable storage medium |
CN108229807A (en) * | 2017-12-28 | 2018-06-29 | 广州建软科技股份有限公司 | A kind of marketing programs construction rotation managing and control system |
CN108038673A (en) * | 2017-12-29 | 2018-05-15 | 国网上海市电力公司 | A kind of archive management system of electric power overhaul engineering project |
CN108444603A (en) * | 2018-03-15 | 2018-08-24 | 上海士翌测试技术有限公司 | The intelligent movable distributed diagnosis system of instrument is examined based on infrared thermal imaging point |
CN109190966A (en) * | 2018-08-28 | 2019-01-11 | 云南电网有限责任公司电力科学研究院 | Manage system and method in a kind of distribution net equipment O&M scene |
CN109740835A (en) * | 2018-11-14 | 2019-05-10 | 遵义华正电缆桥架有限公司 | A kind of power construction command system |
CN110751454A (en) * | 2019-09-19 | 2020-02-04 | 国网山东省电力公司济宁供电公司 | Cable accessory installation process control system and method |
CN110796431A (en) * | 2019-10-15 | 2020-02-14 | 国网辽宁省电力有限公司抚顺供电公司 | Management method of capital construction project construction management terminal |
CN117973947A (en) * | 2024-04-01 | 2024-05-03 | 国网山东省电力公司宁津县供电公司 | Standardized acceptance checking method and system for power distribution network engineering construction process |
CN117973947B (en) * | 2024-04-01 | 2024-06-14 | 国网山东省电力公司宁津县供电公司 | Standardized acceptance checking method and system for power distribution network engineering construction process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104700192A (en) | Aided intelligent management and control system for power transmission and transformation project and management and control method thereof | |
CN106815681B (en) | Transformer substation secondary equipment closed-loop management platform based on two-dimensional code and management system thereof | |
CN106485298A (en) | A kind of equipment routing inspection maintaining method based on Quick Response Code | |
CN105449867A (en) | Visual operation process monitoring mistake precaution system and control method | |
CN102968748A (en) | Field comprehensive maintenance system for power distribution network electrical equipment | |
CN105243440A (en) | Marketing mobile working platform based paperless office on-site working method | |
CN104573971A (en) | Metal mine underground safety digital management system based on radio frequency and WIFI technology | |
CN203217621U (en) | On-site comprehensive maintenance system of electrical equipment for distribution network | |
CN110126886B (en) | Hump safety protection information system | |
CN104076767B (en) | Railway signal equipment overhauling control system and method | |
CN104978696A (en) | Electronic acceptance and handover method based on BIM technology | |
CN102938101A (en) | Method for implementing mobile operation of low-voltage distribution region based on intelligent mobile terminal | |
CN104732345A (en) | Supervision and management information system used for field management in power transmission and transformation engineering | |
CN103177327A (en) | Comprehensive management system for low-voltage power operations based on B/S (browser/server) and C/S (client/server) architectures | |
CN104902011A (en) | Overhauling operation control method based on mobile terminal | |
CN102594604A (en) | Operation and maintenance management system and method | |
CN106845834A (en) | Transmission line of electricity hidden danger management method and system based on mobile phone A PP | |
CN108154340A (en) | Prefabricated component informationization management system based on BIM cloud platforms | |
CN109934360A (en) | Substation fault repairs system and method | |
CN105184519A (en) | Standardized safety operation tracing management system | |
CN110751454A (en) | Cable accessory installation process control system and method | |
CN204680051U (en) | A kind of project of transmitting and converting electricity is constructed intelligent auxiliary tube Ore-controlling Role | |
CN105576832A (en) | Sub-station simulation and transmission system and method of substation automation system | |
CN113114747B (en) | Intelligent auxiliary decision-making method for work ticket permission link | |
CN205721963U (en) | A kind of Condition-based Maintenance of Substation Equipment operation management system based on Quick Response Code mobile interchange technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150610 |