CN104732345A - Supervision and management information system used for field management in power transmission and transformation engineering - Google Patents

Supervision and management information system used for field management in power transmission and transformation engineering Download PDF

Info

Publication number
CN104732345A
CN104732345A CN201510118903.4A CN201510118903A CN104732345A CN 104732345 A CN104732345 A CN 104732345A CN 201510118903 A CN201510118903 A CN 201510118903A CN 104732345 A CN104732345 A CN 104732345A
Authority
CN
China
Prior art keywords
management
data server
supervision
management data
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510118903.4A
Other languages
Chinese (zh)
Inventor
龚淼
张雷
周俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201510118903.4A priority Critical patent/CN104732345A/en
Publication of CN104732345A publication Critical patent/CN104732345A/en
Pending legal-status Critical Current

Links

Abstract

The invention relates to a supervision and management information system used for field management in power transmission and transformation engineering. The information system comprises a supervision and management data server and a plurality of mobile devices. The supervision and management data server is in wireless connection with the mobile devices through a network. Each mobile device comprises a technical file module used for displaying technical files in the supervision and management data server, an address book module used for displaying an engineering address book in the supervision and management data server, a notice and announcement module used for displaying notices and announcements published by the supervision and management data server, a field management module used for displaying plan time tables, engineering scheme information, worker work certificate information, construction material information, field equipment information and construction schemes of corresponding projects in the supervision and management data server and transmitting content of supervision and management notice letters and field work inspection cards to the supervision and management data server. Compared with the prior art, the supervision and management information system has the advantages of increasing the management level of power transmission and transformation engineering construction, and being convenient to operate, good in convenience and the like.

Description

For the Information System of Supervision of field management in a kind of project of transmitting and converting electricity
Technical field
The present invention relates to technical field of information processing, especially relate to the Information System of Supervision for field management in a kind of project of transmitting and converting electricity.
Background technology
Day by day complicated, the development trend that maximizes of Transmission Projects management, make the information interchange of engineering project with transmit increased, iff the demand relying on traditional information management mode and means far from can meet management management.And popularizing along with the office automation system, the working way of electronization, datumization has entered increasing enterprise, informationalized office system has woven the interconnected system of a set of efficient, unimpeded information in enterprises and institutions inside, has greatly promoted the development of business unit's yield-power.And deepening continuously along with power grid construction work, the construction of electrical network infrastructure project relates to that face is large, scope is wide, therefore also has higher requirement to the management of the aspect such as engineering safety, quality.For the management of the management importantly working-yard of safety in production, construction quality, and the Information Condition of working-yard most Customers ' Legal Right often, what bring in the middle of practice is delay and the deviation that information easily appears in working-yard and management and control link.Current working-yard checks compares dispersion with the information rectified and improved, comprise owner, the inspection of supervisor and unit in charge of construction, rectification information often circulate with each unit, link among and be difficult to unified management.The innovation how utilizing informationalized means to realize construction site management means becomes a current challenge.
Relevant mobile platform based on mobile technology can allow each side that takes part in building use infosystem whenever and wherever possible, data are no longer confined among office network environment, and hold rate along with the Chinese smart phone user of the strong popularization of 4G and rise year by year, smart mobile phone, universal (the multiple terminals covering of the palm terminals such as panel computer, support multiple brand on the market, the mobile phone terminal of Multiple Type or panel computer, as apple, Samsung, millet, association, Huawei, in emerging, cruel group etc., omnibearing mobile phone terminal is provided to experience, type can be selected according to self hobby, a few terminal style need not be sticked to, support market Mainstream Platform, as Android, IOS etc., substantially all terminal platforms are on the market covered) make informationization break away from fixing office space, fixing office support equipment, the dependence of steady job time, break the information constraint restriction on these space-times, jump out the informatization stereotype of solidification, be extended to seamless for informationization in each staff.
Summary of the invention
Object of the present invention be exactly in order to overcome above-mentioned prior art exist defect and the Information System of Supervision for field management in a kind of project of transmitting and converting electricity is provided, supervisory personnel at the scene just can data query, discovery the relevant problem of record, improve the management level that project of transmitting and converting electricity is built.
Object of the present invention can be achieved through the following technical solutions:
For an Information System of Supervision for field management in project of transmitting and converting electricity, this infosystem comprises management data server and multiple mobile device, and management data server connects mobile device by network wireless, and described mobile device comprises:
Technological document module, for showing the technological document in management data server;
Address list module, for showing the engineering address list in management data server;
Notice bulletin module, for showing the notice bulletin that management data server is issued;
Field management module, for showing the schedule plan of corresponding engineering in management data server, engineering proposal information, operating personnel's qualification certificate information, construction material information, field device information and arrangement and method for construction, simultaneously by the content delivery of management advice note and site work inspection card to management data server.
The content of described technological document comprises standardization for improving management, the lex fundamentalis Laws & Regulations of operating personnel's technical operation standard, national grid regulations and technical operation handbook.
The content of described engineering address list comprises unit of taking part in building's title and unit of taking part in building responsible official contact method.
Described field management module comprises:
Planning chart unit, for showing the schedule plan of corresponding engineering, schedule plan comprises multiple material time node;
Engineering information unit, for showing engineering proposal information;
Operating personnel's unit, for showing the qualification certificate information of operating personnel;
Construction material unit, for showing construction material information;
Field apparatus unit, for displaying scene facility information;
Arrangement and method for construction unit, for showing arrangement and method for construction;
Management advice note unit, for by the photo upload of management advice note to management data server;
Site work unit, for the step that displaying scene supervisory personnel checks, and receive the confirmation of corresponding step, the card of site work inspection one to one both corresponding step and confirmation thereof export after integrating, and site work inspection card is uploaded to management data server.
Described mobile device is by dedicated network wireless connections management data server.
Described mobile device also comprises user and logins module, user logins module after subscriber authentication, sets up the wireless connections with management data server, when mobile device does not communicate with management data server in setting-up time, then user logins the wireless connections of module disconnection and management data server, when after subscriber authentication failure three times, then user logins module disables and again carries out subscriber authentication.
Compared with prior art, the present invention has the following advantages:
1) based on Information System of Supervision of the present invention, at management data server establishing techniques file, engineering address list etc., supervisory personnel operates mobile device can inquiring technology file, engineering address list etc., and devise planning chart unit, engineering information unit, operating personnel's unit, construction material unit, field apparatus unit, arrangement and method for construction unit, management advice note unit, site work unit, at the scene just can data query, find and record relevant problem, and can take pictures at the construction field (site), recording, under the environment possessing network even can automatically synchronizing data to the management data server of rear end, the comprehensive of working-yard is made to obtain more effective control.
2) management data server and mobile device adopt dedicated network to communicate, and adding user in a mobile device logins module simultaneously, lost efficacy angularly increase the security of data transmission from authentication, time-out checking.
Accompanying drawing explanation
Fig. 1 is the structural representation for the Information System of Supervision of field management in project of transmitting and converting electricity of the present invention;
Fig. 2 is the schematic network structure forming Information System of Supervision in embodiment.
In figure: 1, management data server, 2, mobile device, 3, user logins module, 4, technological document module, 5, address list module, 6, notice bulletin module, 7, field management module, 8, planning chart unit, 9, engineering information unit, 10, operating personnel's unit, 11, construction material unit, 12, field apparatus unit, 13, arrangement and method for construction unit, 14, management advice note unit, 15, site work unit.
Embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.The present embodiment is implemented premised on technical solution of the present invention, give detailed embodiment and concrete operating process, but protection scope of the present invention is not limited to following embodiment.
As shown in Figure 1, for the Information System of Supervision of field management in a kind of project of transmitting and converting electricity, this infosystem comprises management data server 1 and multiple mobile device 2, mobile device 2 can be smart mobile phone and panel computer, management data server 1 connects mobile device 2 by network wireless, mobile device 2 comprises user and logins module 3, technological document module 4, address list module 5, notice bulletin module 6 and field management module 7, is described below to modules.
User logins module 3, user logins module 3 after subscriber authentication, sets up the wireless connections with management data server 1, therefore, before operating other modules of mobile device 2, need first to login by user the subscriber authentication that module 3 completing user account logins etc.
Technological document module 4, for showing the technological document in management data server 1, the content of technological document comprises standardization for improving management, the lex fundamentalis Laws & Regulations of operating personnel's technical operation standard, national grid regulations and technical operation handbook.
A supervisor, if technical operation standard is so poor that can not to pinpoint the problems at the construction field (site), can not correctly point out in time to unit in charge of construction and point out problem, and data is in a complete mess, so may well ask how can he obtains again the trust of owner and construction.Thus, sturdy technical operation standard be only pinpoint the problems observantly, problem-solving ability prerequisite, can win each side respect, effectively can supervise, manage working-yard.But the structure of knowledge of supervising engineer is reasonable not at present, one is construction working existing retired personnel for many years, although they have the working-yard working experience compared with horn of plenty, relatively deficient to management knowledge, but due to the age, make them not have abundant energy to learn new knowledge.Two is new young graduates, although they are energetic, it is great curiosity to ask all sorts of questions to study diligently, they lack certain working experience and are unfamiliar with related specifications.And the associated documents One's name is legion related in management, and state's net file update comparatively fast (often has redaction, special messenger is responsible for and is updated to the unified platform reducing unnecessary repeated work), so by smart mobile phone/panel computer, particularly site supervision personnel just can consult basic law, regulation to supervisor more easily, state's network planning is determined and standard, associated documents, is all of great advantage for the raising standardization of management and the raising of self-technique professional skill.
Address list module 5, for showing the engineering address list in management data server 1, the content of engineering address list comprises unit of taking part in building's title and unit of taking part in building responsible official contact method.Realize carrying out business datum filing, the more effective each unit of taking part in building of contact entry object to various ways such as project management department's constituent parts name, telephone numbers.
Notice bulletin module 6, for showing the notice bulletin that management data server 1 is issued, can also notify the office documents such as the annex in announcing simultaneously.
Field management module 7, most important module section in system, for showing the schedule plan of corresponding engineering in management data server 1, engineering proposal information, operating personnel's qualification certificate information, construction material information, field device information and arrangement and method for construction, simultaneously by the content delivery of management advice note and site work inspection card to management data server 1.Field management module 7 can be divided into: planning chart unit 8, engineering information unit 9, operating personnel's unit 10, construction material unit 11, field apparatus unit 12, arrangement and method for construction unit 13, management advice note unit 14 and site work unit 15, be described unit below:
Planning chart unit 8, for showing the schedule plan of corresponding engineering, Project Director reason slip-stick artist can be establishment of item one plan or timetable, Supervision Project portion personnel at different levels can be allowed to understand each material time node of this project quickly and easily, as each partitioned project opens time of completion, three grades and above risk source engineering time etc.
Engineering information unit 9, for showing engineering proposal information.For transmission line of electricity, can just input shaft tower numbering, foundation pattern, shaft tower pattern, span, important scissors crossing before project kickoff, basic root opens and a series of data such as Diagonal Dimension, foot bolt, reinforcing bar and inserted angle steel specification, quantity, base plate and column cross dimensions, embedded depth of foundation, shaft tower height, gross weight, every section of weight, by smart mobile phone/panel computer, site supervision can verify data easily, better to exercise supervision management to working-yard.
Operating personnel's unit 10, for showing the qualification certificate information of operating personnel.Workmen's mobility is comparatively large, and particularly work transmission line has a little many, line length, wide feature, and the promptness of site supervision verification working-yard workmen's certificate, authenticity, validity acquire a certain degree of difficulty.But by smart mobile phone/panel computer, the database in inquiry Supervision Project management system, can obtain managerial personnel's qualification, the special construction personnel qualification information of having examined easily.
Construction material unit 11, for showing construction material information.The all raw material that engineering uses, semi-manufacture, component and fitting, working-yard of all must being allowed for access after supervising engineer's examination & approval in advance.And data of reporting to a higher authorities for approval the quantity of paper document has more scattered more, it is all very inconvenient that inquiry arranges, and is unfavorable for being carried into working-yard.Thus site supervision is by smart mobile phone/panel computer, database in inquiry Supervision Project management system, can check whether the actual conditions of material of showing up and required material conform in kind, specification, model, strength grade, manufacturer and trade mark etc., check whether the production numbering of product or lot number, model, specification, date of manufacture conform to product quality certificate.
Field apparatus unit 12, for displaying scene facility information.Site supervision verify working-yard facility and its to report relevant documentary evidence consistance to a higher authorities for approval comparatively inconvenient, and be by smart mobile phone/panel computer, the database in inquiry Supervision Project management system, to ensureing that the operation of working-yard machinery etc. has positive effect.
Arrangement and method for construction unit 13, for showing arrangement and method for construction.By smart mobile phone/panel computer, site supervision can inquire about database in Supervision Project management system to verify working measure examination & approval situation, and the situation of telling somebody what one's real intentions are that Supervision Project portion managerial personnel can upload unit in charge of construction by site supervision is come better that control is on-the-spot.
Management advice note unit 14, for by the photo upload of management advice note to management data server 1.By smart mobile phone/panel computer, on-site supervision engineer can upload management advice note photo in time, so that chief inspector understands field condition in time and makes further work.
Site work unit 15, for the step that displaying scene supervisory personnel checks, and receive the confirmation of corresponding step, the card of site work inspection one to one both corresponding step and confirmation thereof export after integrating, and site work inspection card is uploaded to management data server 1.Inspection of steel reinforcement bars is worked out for transmission line of electricity, tower erection checks, concrete checks, gold utensil quality check, Work tool checks before coming into operation, important crossing frame comes into operation inspection, money inspection is built on basis, foundation excavation checks, insulator quality check, stretching equipment investment uses and checks, cement sandstone checks, other station and test block sampling are built in basis, lead wire and earth wire tension force discharges inspection, lead wire and earth wire stringing checks, optical cable installation checks, grounding construction checks, lead wire and earth wire crimping operation process inspection, lead wire and earth wire annex installation check, scissors crossing and windage yaw inspection, the a series of site work inspection cards such as line protection inspection of construction, play the effect of task instruction to site supervision, specify main project and step that supervisor should check, step such as: to reinforcing bar outward appearance in inspection of steel reinforcement bars, model, whether outgoing conformity certification and survey report inspection, put in place to supervisory personnel in tower erection inspection, whether Work tool uses intact, the whether satisfactory inspection of security control.
Management data server 1 needs design associated databases for data such as Techniques of preserving files, and the quality of database design is directly connected to the realization of database and the normal operation on system foreground.Therefore need to carry out design and study according to database three normal form to database, avoid a large amount of redundant datas to greatest extent, save the space of database and keep the consistance of data.
For transmission line of electricity, before project kickoff, just a series of data such as shaft tower numbering can be inputted, for following table.
For the personnel that unit in charge of construction reports to a higher authorities for approval, machinery, the relevant documentary evidence such as material, also can input data by Supervision Technology personnel, so that inquiry, for special work post operating personnel, sees the following form.
Sequence number Name Work post Certificate is numbered Issuing unit The term of validity Report the date to a higher authorities for approval
1
2
Because user of service is scattered in each base station, the conveniently use of system, can be arranged on high in the clouds by database.How to guarantee that real informationalized safety becomes subject matter thus, therefore control from the following aspects:
1) exhaustive self-destruction is prevented
The user of mobile device 2 logins module 3 and allows each login attempt of user three passwords, if also not right, will automatically stop the line with management data server 1.Make to complete the exhaustive attack to user cipher.
2) expire
When mobile device 2 in certain hour (as a minute) not and 1 communication of management data server time, user logins module 3 and namely gives tacit consent to mobile phone and exit operation, the connection of automatic closedown and management data server 1, mobile phone terminal cannot carry out any operation.
3) dedicated network is set
If condition is permitted, can arrange dedicated network, mobile device 2, by dedicated network wireless connections management data server 1, namely only has this network could access this system, ensure that the security of data.As shown in Figure 2, one end of network is mobile device 2, comprise smart mobile phone and panel computer, for realizing the input of project information inquiry and project information, the other end of network is management data server 1 and gateway device thereof, the data communicated with mobile device 2 are through external firewall, enter mobile office application platform, mobile office application platform builds LAN (Local Area Network), the router building LAN (Local Area Network) is connected by interior firewall, to the corresponding security strategy of inner Firewall, router connects customer side and management data server 1 respectively.
In the present embodiment, can adopt APP mobile platform technology that above-mentioned functional module or unit are set on mobile device 2, namely research and develop APP application, the work of wherein field management module 7 plays the most active and effective effect to realizing APP software in the management of project of transmitting and converting electricity Supervision Project portion.
Along with people's accepting extensively the mobile calculation technique being representative with 4G technology, the application of various mobile terminal produces in succession, the universal obstacle of enterprise mobile application is hindered to disappear, and project of transmitting and converting electricity is as the important component part of in electric system, requirement for engineering construction quality has become more and more higher, project management is met the tendency by the management of science and the method for control, the management level that continuous lifting project of transmitting and converting electricity is built, and the reasonable application of APP software must play increasing effect in the management of project of transmitting and converting electricity Supervision Project portion.

Claims (6)

1. in project of transmitting and converting electricity for an Information System of Supervision for field management, this infosystem comprises management data server and multiple mobile device, and management data server connects mobile device by network wireless, it is characterized in that, described mobile device comprises:
Technological document module, for showing the technological document in management data server;
Address list module, for showing the engineering address list in management data server;
Notice bulletin module, for showing the notice bulletin that management data server is issued;
Field management module, for showing the schedule plan of corresponding engineering in management data server, engineering proposal information, operating personnel's qualification certificate information, construction material information, field device information and arrangement and method for construction, simultaneously by the content delivery of management advice note and site work inspection card to management data server.
2. in a kind of project of transmitting and converting electricity according to claim 1 for the Information System of Supervision of field management, it is characterized in that, the content of described technological document comprises standardization for improving management, the lex fundamentalis Laws & Regulations of operating personnel's technical operation standard, national grid regulations and technical operation handbook.
3. in a kind of project of transmitting and converting electricity according to claim 1 for the Information System of Supervision of field management, it is characterized in that, the content of described engineering address list comprises unit of taking part in building's title and unit of taking part in building responsible official contact method.
4. in a kind of project of transmitting and converting electricity according to claim 1 for the Information System of Supervision of field management, it is characterized in that, described field management module comprises:
Planning chart unit, for showing the schedule plan of corresponding engineering, schedule plan comprises multiple material time node;
Engineering information unit, for showing engineering proposal information;
Operating personnel's unit, for showing the qualification certificate information of operating personnel;
Construction material unit, for showing construction material information;
Field apparatus unit, for displaying scene facility information;
Arrangement and method for construction unit, for showing arrangement and method for construction;
Management advice note unit, for by the photo upload of management advice note to management data server;
Site work unit, for the step that displaying scene supervisory personnel checks, and receive the confirmation of corresponding step, the card of site work inspection one to one both corresponding step and confirmation thereof export after integrating, and site work inspection card is uploaded to management data server.
5. in a kind of project of transmitting and converting electricity according to claim 1 for the Information System of Supervision of field management, it is characterized in that, described mobile device is by dedicated network wireless connections management data server.
6. in a kind of project of transmitting and converting electricity according to claim 1 for the Information System of Supervision of field management, it is characterized in that, described mobile device also comprises user and logins module, user logins module after subscriber authentication, sets up the wireless connections with management data server, when mobile device does not communicate with management data server in setting-up time, then user logins the wireless connections of module disconnection and management data server, when after subscriber authentication failure three times, then user logins module disables and again carries out subscriber authentication.
CN201510118903.4A 2015-03-18 2015-03-18 Supervision and management information system used for field management in power transmission and transformation engineering Pending CN104732345A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510118903.4A CN104732345A (en) 2015-03-18 2015-03-18 Supervision and management information system used for field management in power transmission and transformation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510118903.4A CN104732345A (en) 2015-03-18 2015-03-18 Supervision and management information system used for field management in power transmission and transformation engineering

Publications (1)

Publication Number Publication Date
CN104732345A true CN104732345A (en) 2015-06-24

Family

ID=53456219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510118903.4A Pending CN104732345A (en) 2015-03-18 2015-03-18 Supervision and management information system used for field management in power transmission and transformation engineering

Country Status (1)

Country Link
CN (1) CN104732345A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105117826A (en) * 2015-08-04 2015-12-02 国网上海市电力公司 Power transmission and transformation project safety quality information processing method
CN105512580A (en) * 2015-11-27 2016-04-20 中国长江三峡集团公司 Site security risk quick input system and method based on WeChat
CN105865508A (en) * 2016-03-08 2016-08-17 河南理工大学 Civil engineering measurement informatization system
CN106169131A (en) * 2016-05-16 2016-11-30 北京诺士诚国际工程项目管理有限公司 Project management cloud platform system based on the Internet
CN107481162A (en) * 2017-07-31 2017-12-15 黄静波 A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site)
CN108171383A (en) * 2017-12-30 2018-06-15 广州供电局有限公司 Electric Power Capital Construction engineering management optimization method and system
CN108665128A (en) * 2017-03-31 2018-10-16 罗志达 project management system
CN110570340A (en) * 2019-09-04 2019-12-13 河北斯博思创新科技有限公司 rural toilet transformation management system
CN112330170A (en) * 2020-11-12 2021-02-05 福建京力信息科技有限公司 Power transmission and transformation engineering quality common fault prevention and control platform based on AR technology

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103942654A (en) * 2014-04-30 2014-07-23 国家电网公司 Electric power engineering quality supervision and management platform
CN104156824A (en) * 2014-05-30 2014-11-19 中国石油化工股份有限公司 Mobile HSE inspection method based on explosion-proof hand-held terminal
US20140365271A1 (en) * 2013-06-10 2014-12-11 Abb Technology Ltd. Industrial asset health model update
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140365271A1 (en) * 2013-06-10 2014-12-11 Abb Technology Ltd. Industrial asset health model update
CN103942654A (en) * 2014-04-30 2014-07-23 国家电网公司 Electric power engineering quality supervision and management platform
CN104156824A (en) * 2014-05-30 2014-11-19 中国石油化工股份有限公司 Mobile HSE inspection method based on explosion-proof hand-held terminal
CN104392300A (en) * 2014-10-28 2015-03-04 吴楠 Engineering remote integrated management system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
湖北省电力公司信息通信分公司: "《电力信息通信使用技术 电力信息部分》", 31 October 2013, 北京:中国电力出版社 *
贾克音,等: "移动办公技术在输变电工程"标准工艺"应用的研究", 《科技视界》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105117826A (en) * 2015-08-04 2015-12-02 国网上海市电力公司 Power transmission and transformation project safety quality information processing method
CN105512580A (en) * 2015-11-27 2016-04-20 中国长江三峡集团公司 Site security risk quick input system and method based on WeChat
CN105865508A (en) * 2016-03-08 2016-08-17 河南理工大学 Civil engineering measurement informatization system
CN106169131A (en) * 2016-05-16 2016-11-30 北京诺士诚国际工程项目管理有限公司 Project management cloud platform system based on the Internet
CN108665128A (en) * 2017-03-31 2018-10-16 罗志达 project management system
CN107481162A (en) * 2017-07-31 2017-12-15 黄静波 A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site)
CN108171383A (en) * 2017-12-30 2018-06-15 广州供电局有限公司 Electric Power Capital Construction engineering management optimization method and system
CN110570340A (en) * 2019-09-04 2019-12-13 河北斯博思创新科技有限公司 rural toilet transformation management system
CN112330170A (en) * 2020-11-12 2021-02-05 福建京力信息科技有限公司 Power transmission and transformation engineering quality common fault prevention and control platform based on AR technology
CN112330170B (en) * 2020-11-12 2022-10-04 福建京力信息科技有限公司 Power transmission and transformation engineering quality common fault prevention and control platform based on AR technology

Similar Documents

Publication Publication Date Title
CN104732345A (en) Supervision and management information system used for field management in power transmission and transformation engineering
CN110401692B (en) Integrated automatic checking and accepting system and method for monitoring information of transformer substation
CN106940839B (en) Power transmission and transformation project quality data management and control system and method
CN206133688U (en) Equipment inspection two -dimensional code system of power plant
CN104700192A (en) Aided intelligent management and control system for power transmission and transformation project and management and control method thereof
CN105260857A (en) Intelligent management system and method thereof for rural migrant workers
CN202167018U (en) Power supply reliability data statistical treatment device suitable for power system
CN106485298A (en) A kind of equipment routing inspection maintaining method based on Quick Response Code
CN107798489A (en) A kind of electric network operation site safety management method based on wechat platform
CN105293236A (en) Elevator repairing and maintaining monitoring system
CN110112831A (en) A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN108510405A (en) A kind of one-stop management platform of photovoltaic power station
CN104253813A (en) Modulation integrated system remote maintenance-based safety protection method
CN111598411A (en) Intelligent safety control system for operation site of transformer substation
CN107103407A (en) A kind of power transmission cable based on Internet of Things installs management system
CN106845834A (en) Transmission line of electricity hidden danger management method and system based on mobile phone A PP
CN205151423U (en) Maintenance supervisory systems is maintained to elevator
CN112054599A (en) System and method for safety management of wind power plant
CN107316086A (en) The main human rectal cancer system of substation equipment and O&M method
CN105718602B (en) Standard cloud system for safe production of rural hydropower station
CN104243221A (en) Campus network maintenance recording system and method based on smart phone platform
CN204883348U (en) Cement produced with dry method production line safety monitoring system
CN104318833A (en) Working method for of power grid dispatching automation training system
CN202650332U (en) Virtual simulation training system of distributed transformer substation based on province, prefecture and county level networks
CN204680051U (en) A kind of project of transmitting and converting electricity is constructed intelligent auxiliary tube Ore-controlling Role

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150624