CN108171383A - Electric Power Capital Construction engineering management optimization method and system - Google Patents

Electric Power Capital Construction engineering management optimization method and system Download PDF

Info

Publication number
CN108171383A
CN108171383A CN201711489668.7A CN201711489668A CN108171383A CN 108171383 A CN108171383 A CN 108171383A CN 201711489668 A CN201711489668 A CN 201711489668A CN 108171383 A CN108171383 A CN 108171383A
Authority
CN
China
Prior art keywords
list
inspection
current power
infrastructure project
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711489668.7A
Other languages
Chinese (zh)
Inventor
林克全
陈畅
谢志炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau Co Ltd filed Critical Guangzhou Power Supply Bureau Co Ltd
Priority to CN201711489668.7A priority Critical patent/CN108171383A/en
Publication of CN108171383A publication Critical patent/CN108171383A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application involves Electric Power Capital Construction engineering management optimization method, system, storage medium and computer equipments.The method includes:Determine the item types of current power infrastructure project;According to matching result of the item types in preset list matching library, corresponding each inspection list is determined;According to each comprehensive list of inspection list generation, and generate list and fill in prompting message;Issue comprehensive list and list fill in prompting message, and receive terminal return fill in updated comprehensive list;According to the status information for filling in updated comprehensive list update current power infrastructure project.The scheme of the application is by determining required each inspection list according to the item types of current power infrastructure project, and it generates, issue comprehensive list, according to the status information for filling in updated comprehensive list update Electric Power Capital Construction engineering of upload, the handling situations of infrastructure project can be grasped in time, supervision pressure is effectively shared, improves the operating efficiency of infrastructure project.

Description

Electric Power Capital Construction engineering management optimization method and system
Technical field
This application involves power infrastructures construction project technical field, more particularly to a kind of Electric Power Capital Construction engineering management Optimization method, system, computer readable storage medium and computer equipment.
Background technology
With being continuously increased during social and economic development to the demand of electric energy, country is to urban electric power construction investment Also constantly increase, electric power enterprise enter large-scale power infrastructures and build period, and Electric Power Capital Construction engineering management is increasingly It is taken seriously.The quality of Electric Power Capital Construction engineering management is directly related to the quality of power infrastructures project construction, this is for each The later stage O&M of item power infrastructures is most important.And the quantity of infrastructure development project is more, and to infrastructure pipe Efficiency, quality of reason etc. require higher and higher, and very big challenge is brought to electric power enterprise infrastructure project management work.
At present, the engineering project that Electric Power Capital Construction engineering management is related to is multi-point and wide-ranging, and Construction Party's human hand is limited, supervision amount Greatly, traditional infrastructure project management needs that a large amount of manual labor is spent to put into, and statistical analysis of following up in time to projects can not Supervision pressure effectively is shared, the operating efficiency for leading to infrastructure project is low.
Invention content
Based on this, it is necessary in view of the above-mentioned problems, providing a kind of electricity that can effectively improve motor infrastructure project operating efficiency Power infrastructure project management optimization method, system, computer readable storage medium and computer equipment.
A kind of Electric Power Capital Construction engineering management optimization method, including step:
Determine the item types of current power infrastructure project;
According to matching result of the item types in preset list matching library, determine corresponding to current power infrastructure project Each check list;
According to each comprehensive list of inspection list generation, and generate list and fill in prompting message;
Issue comprehensive list and list fill in prompting message, and receive terminal return fill in updated comprehensive list;
According to the status information for filling in updated comprehensive list update current power infrastructure project.
In one embodiment, the matching result according to item types in preset list matching library determines current electricity Each the step of checking list corresponding to power infrastructure project, includes:
Preset list matching library is inquired, list matching library includes the inspection list of Electric Power Capital Construction engineering projects type;
Item types with projects type in list matching library are matched, obtain item types matching result;
Corresponding each inspection list is obtained according to item types matching result.
In one embodiment, the step of list comprehensive according to each inspection list generation includes:
Inquire preset comprehensive list establishment rules;
According to comprehensive list establishment rules, each inspection is extracted from each check in list corresponding to current power infrastructure project The preset necessary check item of list;
It is worked out to obtain comprehensive list according to each necessary check item for checking list.
In one embodiment, according to the status information for filling in updated comprehensive list update current power infrastructure project The step of include:
Each inspection data for checking list are extracted in updated comprehensive list from filling in;
Each inspection data update for checking list is checked to corresponding in list, the status information packet of Electric Power Capital Construction engineering Include updated inspection list.
In one embodiment, it further includes:
When monitoring that the construction of current power infrastructure project starts, receive the live video data of upload and check item number According to check item data include personnel inspection data, material inspection data, safety inspection data and quality examination data;
It according to live video data and checks item data, updates the status information of current power infrastructure project.
In one embodiment, it further includes:
Receive upload register/check out data, register/check out data include identity information, register/check out project, positioning It information and registers/checks out the time.
In one embodiment, it further includes:
It is for statistical analysis according to the status information of register/check out data and current power infrastructure project;
Charge book table is built according to statistic analysis result, charge book table is used to record the history work number of everyone According to.
A kind of Electric Power Capital Construction engineering management optimization system, including:
Item types determining module, for determining the item types of current power infrastructure project;
It checks list determining module, for the matching result according to item types in preset list matching library, determines Each inspection list corresponding to current power infrastructure project;
Comprehensive list generation module, for checking the comprehensive list of list generation according to each, and generating list that filling in prompting disappears Breath;
More new table acquisition module fills in prompting message for issuing comprehensive list and list, and receives terminal return Fill in updated comprehensive list;
State information updating module, for according to the shape for filling in updated comprehensive list update current power infrastructure project State information.
A kind of computer readable storage medium is stored with computer program, when the computer program is executed by processor, So that the processor performs the step of method as described above.
A kind of computer equipment, including memory and processor, the memory is stored with computer program, the calculating When machine program is performed by the processor so that the processor performs the step of method as described above.
Above-mentioned Electric Power Capital Construction engineering management optimization method, system, computer readable storage medium and computer equipment, true After the item types of settled preceding Electric Power Capital Construction engineering, according to matching result of the item types in preset list matching library, really Each inspection list corresponding to settled preceding Electric Power Capital Construction engineering, generates further according to each inspection list and issues comprehensive list and list Prompting message is filled in, receive terminal return fills in updated comprehensive list, and last basis fills in updated comprehensive list Update the status information of current power infrastructure project.The scheme of the application passes through the item types according to current power infrastructure project It determines required each inspection list, and generates, issues comprehensive list, electricity is updated according to the updated comprehensive list of filling in of upload The status information of power infrastructure project can grasp the handling situations of infrastructure project, effectively share supervision pressure, carry in time The high operating efficiency of infrastructure project.
Description of the drawings
Fig. 1 is the flow diagram of Electric Power Capital Construction engineering management optimization method in one embodiment of the application;
Fig. 2 is the structural schematic block diagram of Electric Power Capital Construction engineering management optimization system in one embodiment of the application.
Specific embodiment
Object, technical solution and advantage to make the application are more clearly understood, with reference to the accompanying drawings and embodiments, to this Application is described in further detail.It should be appreciated that the specific embodiments described herein are only used to explain the application, The protection domain of the application is not limited.
Fig. 1 is the flow diagram of Electric Power Capital Construction engineering management optimization method in one embodiment of the application.As shown in Figure 1, In the present embodiment, Electric Power Capital Construction engineering management optimization method includes step:
Step S101:Determine the item types of current power infrastructure project.
The item types of current power infrastructure project are determined first, specifically, can be according to current power infrastructure project The engineering datas such as engineering name, construction plan or unit in charge of construction determine the item types of current infrastructure project.Generally, disparity items The engineering datas such as engineering name, construction plan, unit in charge of construction and the inspection list of the Electric Power Capital Construction engineering of type simultaneously differ, so The engineering data of current power infrastructure project can be first obtained, and its item types is determined according to the engineering data.
Step S103:According to matching result of the item types in preset list matching library, current power capital construction is determined Each inspection list corresponding to engineering.
After the item types for determining current power infrastructure project, preset list matching library is inquired.List matching library has The inspection list of Electric Power Capital Construction engineering projects type.Specifically, list matching library can include safety, quality and check and accept three greatly Type list library, the Electric Power Capital Construction engineering of projects type correspond respectively to different safety, quality and check and accept list.In addition, It is set personalized list can also be carried out according to current power infrastructure project, such as matching result in list matching library, It determines each inspection list corresponding to current power infrastructure project and then carries out checking list modification, check item can be added Mesh leaves out check item, in this way can basis to obtain respectively checking list with what is postponed corresponding to current power infrastructure project Each inspection list is configured in specific Electric Power Capital Construction engineering, to obtain optimal inspection list.
Step S105:According to each comprehensive list of inspection list generation, and generate list and fill in prompting message.
The inspection list of Electric Power Capital Construction engineering mainly has safety, quality, checks and accepts three categories, has fixed lattice per class list Formula, the scope of examination is more, causes to check that efficiency is low.In real work, handle is not needed to the site inspection of Electric Power Capital Construction engineering It checks that the total Options of list check out, only need to check part list option, the score of inspection is to spot-check part as radix It is calculated.If not only checked a type site inspection, but the contents such as safety, quality, examination are primary Property inspection finishes, and the checking step for making Electric Power Capital Construction engineering site is cumbersome, and efficiency is low.It is compiled therefore, it is necessary to create comprehensive list Function processed a plurality of types of scopes of examination and needs to be checked in the option synthesis a to list inspected by random samples.To electricity Power infrastructure project scene, which check, to be made, and need to only complete filling in for list, you can filling in for multiple lists is automatically performed, and The contents such as complete independently fractional statistics, signature, sharing of project information in different types of list, can greatly reduce inspection when Between.Specifically, after obtaining each inspection list corresponding to current power infrastructure project, according to each inspection list generation consolidated statement It is single, and generate list and fill in prompting message, which fills in prompting message for the personnel of prompt terminal operation to comprehensive list It carries out filling in update.In specific implementation, according to preset comprehensive list establishment rules, extracted from each check in list of acquisition Each preset necessary check item for checking list.Wherein, necessary check item can be set according to the characteristic of Electric Power Capital Construction engineering Fixed, comprehensive list establishment rules can be configured to obtain according to the corresponding necessary check item of Electric Power Capital Construction engineering.
Step S107:It issues comprehensive list and list fills in prompting message, and it is updated to receive filling in for terminal return Comprehensive list.
After the comprehensive list of acquisition and list fill in prompting message, the synthesis list and list are filled in into prompting message and issued, And it receives and fills in updated comprehensive list by what terminal returned.In a particular application, by the synthesis of current power infrastructure project List and list are filled in after prompting message issues, and the scene of Electric Power Capital Construction engineering is accordingly checked according to the synthesis list, and The comprehensive list of update is filled according to inspection result, then will fill in updated consolidated statement single upload.
Step S109:According to the status information for filling in updated comprehensive list update current power infrastructure project.
Receive by terminal returns fill in updated comprehensive list after, updated comprehensive list update is filled according to this The status information of current power infrastructure project.Wherein, the status information of current power infrastructure project is used to record current power base The engineering state of engineering is built, project progress, inspection state and engineering is specifically included and lasts the information such as data.It is filled in more by basis The status information of synthesis list update current power infrastructure project after new, can be in time by the site inspection of Electric Power Capital Construction engineering Data update realizes the real-time management and control to Electric Power Capital Construction engineering to status information.For Electric Power Capital Construction engineering project group, also may be used With state that is quick, precisely grasping each Electric Power Capital Construction engineering, to realize the efficient management and control to project cluster.
Above-mentioned Electric Power Capital Construction engineering management optimization method, after the item types for determining current power infrastructure project, according to Matching result of the item types in preset list matching library determines each inspection table corresponding to current power infrastructure project It is single, it is generated further according to each inspection list and issues comprehensive list and list fills in prompting message, received and filled in by what terminal returned Updated comprehensive list, it is last according to the status information for filling in updated comprehensive list update current power infrastructure project. The scheme of the present embodiment by according to the item types of current power infrastructure project determine it is required it is each check list, and generate, Comprehensive list is issued, according to the status information for filling in updated comprehensive list update Electric Power Capital Construction engineering of upload, Neng Gouji When grasp infrastructure project handling situations, effectively share supervision pressure, improve the operating efficiency of infrastructure project.
Further, the matching result according to item types in preset list matching library, determines current power capital construction Each the step of checking list corresponding to engineering, can include:
Preset list matching library is inquired, list matching library includes the inspection list of Electric Power Capital Construction engineering projects type;
Item types with projects type in list matching library are matched, obtain item types matching result;
Corresponding each inspection list is obtained according to item types matching result.
Wherein, list matching library includes the inspection list of Electric Power Capital Construction engineering projects type, and list matching library can root It is generated according to check item list of each Electric Power Capital Construction engineering at three aspect such as safety, quality and examination.Specifically, list matching library can To include safe list library, quality list library and check and accept list library, there are safety inspection list, quality examination list respectively and test It receives and checks list.The item types of Electric Power Capital Construction engineering with projects type in list matching library are matched, obtain item Mesh type matching result.Specifically, can by the item types in the item types of Electric Power Capital Construction engineering and list matching library into Line character matches, and selected matching result, is tied for example, character match degree can be selected highest and matched as item types Fruit.After obtaining item types matching result, corresponding each inspection list is obtained.For example, according to item types matching result is obtained Corresponding each inspection list, as each inspection list needed for current power infrastructure project.In addition, it is matched according to item types As a result it can also include after obtaining corresponding each inspection list, list, which is configured, be checked to each of acquisition, such as deletion or addition Configuration to adapt to current power infrastructure project, further ensures that each reliability for checking list.
Further, the step of list comprehensive according to each inspection list generation can include:
Inquire preset comprehensive list establishment rules;
According to comprehensive list establishment rules, each inspection is extracted from each check in list corresponding to current power infrastructure project The preset necessary check item of list;
It is worked out to obtain comprehensive list according to each necessary check item for checking list.
Each inspection list for checking list, including safety, quality and examination three categories type obtained, wherein per class table Single to have fixed form, the scope of examination is more, and process is cumbersome time-consuming when being checked.In the application, according to item types After obtaining corresponding each inspection list with result, preset comprehensive list establishment rules are inquired, comprehensive list establishment rules are used for Necessary check item is extracted in list from checking, establishment obtains comprehensive list, wherein, comprehensive list establishment rules and necessary check item It is preset all in accordance with the item types of Electric Power Capital Construction engineering.After obtaining comprehensive list establishment rules, compiled according to the synthesis list System rule extracts each preset necessary check item for checking list from each check corresponding to current power infrastructure project in list, It is finally worked out to obtain comprehensive list according to each necessary check item for checking list.By the Electric Power Capital Construction work for being directed to projects type Journey, formulates typical comprehensive list, and each critical process can be corresponding with a typical comprehensive list safety, quality, examination Etc. contents all check finish, the management and control efficiency to Electric Power Capital Construction engineering supervision list can be effectively improved.
Further, according to the step of the status information for filling in updated comprehensive list update current power infrastructure project Can by it is general it is following in the form of carry out:
Each inspection data for checking list are extracted in updated comprehensive list from filling in;
Each inspection data update for checking list is checked to corresponding in list, the status information packet of Electric Power Capital Construction engineering Include updated inspection list.
After the synthesis list of generation is issued, Electric Power Capital Construction engineering construction Field Force is applied according to the synthesis list Work inspection, such as safety inspection, quality inspection and acceptance inspection, and filled according to corresponding inspection result and update the consolidated statement It is single, after all inspection tasks have been performed, it will fill in updated consolidated statement single upload.Receiving filling in more for terminal return After synthesis list after new, each inspection data for checking list are therefrom extracted, then by each inspection data update for checking list extremely In corresponding inspection list, the status information of Electric Power Capital Construction engineering includes updated inspection list.By being received in time by end What end returned fills in updated comprehensive list, therefrom extracts each inspection data, and according to the corresponding inspection of each inspection data update It tables look-up list, realizes the update of the status information to Electric Power Capital Construction engineering, realize and task is checked to Electric Power Capital Construction engineering list Real-time management and control.
Further, the Electric Power Capital Construction engineering management optimization method of the application can also include:
When monitoring that the construction of current power infrastructure project starts, receive the live video data of upload and check item number According to check item data include personnel inspection data, material inspection data, safety inspection data and quality examination data;
It according to live video data and checks item data, updates the status information of current power infrastructure project.
The Construction State of Electric Power Capital Construction engineering is monitored, specifically, can monitor whether to receive applying for Electric Power Capital Construction engineering Work triggers message.When receiving construction triggering message, then it is believed that current power infrastructure project has started to construct, at this point, connecing It receives the live video data uploaded and checks item data.Wherein, live video data can include the reality uploaded by on-site terminal When the video data that shoots, check item data include personnel inspection data, material inspection data, safety inspection data and quality inspection Look into data.More specifically, personnel inspection data can include personnel's checking data, qualification certification data etc.;Material inspection data It can include legal rule, operation manual and the job instruction etc. of closing of equipment list, equipment account, three cards and check data;Safety inspection It looks into data and includes the inspection data such as equipment safety, construction safety;Quality examination data include WHS, and (W, Witness point, refer to Witness point;H, Hold point, refer to holding point;S, Standby Point refer to other website) quality examination data, check and accept matter Amount checks data etc..Specifically, mode the construction site data of upload can be received by radio communication, such as pass through wireless office Domain network carries out construction site data transmission.By the way that when monitoring that Electric Power Capital Construction engineering construction starts, real-time reception is by scene The live video data and check item data that terminal uploads, can grasp Electric Power Capital Construction engineering construction field condition, with reality in real time Now to the real-time management and control of construction site, so as to improve the management and control efficiency to Electric Power Capital Construction engineering.Finally according to the scene of reception Video data and inspection item data update the status information of current power infrastructure project, with timely record electricity infrastructure project Construction State can realize the progress control to Electric Power Capital Construction engineering, improve the management and control efficiency of Electric Power Capital Construction engineering.
Further, the Electric Power Capital Construction engineering management optimization method of the application can also include:
Receive upload register/check out data, register/check out data include identity information, register/check out project, positioning It information and registers/checks out the time.
By receive upload register/check out data, the operational data of everyone can be obtained in time, to perform scheduling Commander can be used for examination reference.Specifically, data of registering carry out after can starting monitoring Electric Power Capital Construction engineering construction It receives;And checking out data can be received after the step of status information for updating current power infrastructure project.It registers/signs Go out data include identity information, register/check out project, location information and register/check out the time.In specific implementation, Ke Yiling Everyone registers after reaching the construction site of Electric Power Capital Construction engineering, is checked out when leaving construction site.Specific label It is set to/the checking out execution that can also be according to everyone in Electric Power Capital Construction engineering construction of the task, such as scene is applied Construct responsible person for work order position, registers after construction site is reached, and the corresponding project of registering of selection uploads corresponding position Information, time of registering, number of work and scene photograph etc.;And when leaving construction site, it is checked out, uploads corresponding position Information checks out time etc..It is accordingly registered after showing up for project manager, selects project, input same administrative staff, take pictures Upload etc.;It when leaving workshop, is checked out, uploads corresponding photo etc..It is carried out when reaching scene for safety supervision personnel corresponding It registers, selects project, colleague's number is inputted, with administrative staff etc.;It is checked out when leaving workshop.
Further, the Electric Power Capital Construction engineering management optimization method of the application can also further include:
It is for statistical analysis according to the status information of register/check out data and current power infrastructure project;
Charge book table is built according to statistic analysis result, charge book table is used to record the history work number of everyone According to.
It registers/checks out data and status information specifically, obtaining, it is for statistical analysis and build charge book table, operation Record sheet is used to record the history operational data of everyone.In specific implementation, it can build everyone's as unit of personnel Individual work record sheet, the data that will register check out data and Construction State information is recorded into the individual work record sheet, so as to The history operational data of each personnel can be recorded, so as to obtain the history operational data of everyone in time, is realized pair The efficient management of everyone's job performance.
Based on this, the application also provides a kind of Electric Power Capital Construction engineering management optimization system.
Fig. 2 is the structural schematic block diagram of Electric Power Capital Construction engineering management optimization system in one embodiment of the application.Such as Fig. 2 institutes Show, in the present embodiment, Electric Power Capital Construction engineering management optimization system includes:
Item types determining module 201, for determining the item types of current power infrastructure project;
Check list determining module 203, for the matching result according to item types in preset list matching library, really Each inspection list corresponding to settled preceding Electric Power Capital Construction engineering;
Comprehensive list generation module 205, for generating comprehensive list, and generate list and fill in prompting according to each inspection list Message;
More new table acquisition module 207 fills in prompting message for issuing comprehensive list and list, and receives terminal return Fill in updated comprehensive list;
State information updating module 209 fills in updated comprehensive list update current power infrastructure project for basis Status information.
Above-mentioned Electric Power Capital Construction engineering management optimization system determines current power infrastructure project by item types determining module Item types, by checking matching result of the list determining module according to item types in preset list matching library, really Each inspection list corresponding to settled preceding Electric Power Capital Construction engineering, then generated by comprehensive list generation module according to each inspection list And pass through that more new table acquisition module issues comprehensive list and list fills in prompting message, it receives and fills in update by what terminal returned Synthesis list afterwards updates current power capital construction finally by state information updating module according to updated comprehensive list is filled in The status information of engineering.The scheme of the present embodiment is by determining required each inspection according to the item types of current power infrastructure project It tables look-up list, and generates, issues comprehensive list, according to the shape for filling in updated comprehensive list update Electric Power Capital Construction engineering of upload State information can grasp the handling situations of infrastructure project, effectively share supervision pressure, improve infrastructure project in time Operating efficiency.
Based on this, the application also provides a kind of computer readable storage medium and a kind of computer equipment.
In one embodiment, the computer readable storage medium of the application is stored with computer program, the computer When program is executed by processor so that the processor performs the step of Electric Power Capital Construction engineering management optimization method as described above.
In one embodiment, the computer equipment of the application, including memory and processor, the memory is stored with Computer program, when the computer program is performed by the processor so that the processor performs electric power base as described above The step of building engineering management optimization method.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the program can be stored in a non-volatile computer and can be read In storage medium, the program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, it is provided herein Each embodiment used in any reference to memory, storage, database or other media, may each comprise non-volatile And/or volatile memory.Nonvolatile memory may include that read-only memory (ROM), programming ROM (PROM), electricity can be compiled Journey ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double data rate sdram (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) directly RAM (RDRAM), straight Connect memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Embodiment described above only expresses the several embodiments of the application, and description is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that those of ordinary skill in the art are come It says, under the premise of the application design is not departed from, various modifications and improvements can be made, these belong to the protection of the application Range.Therefore, the protection domain of the application patent should be determined by the appended claims.

Claims (10)

1. a kind of Electric Power Capital Construction engineering management optimization method, which is characterized in that including step:
Determine the item types of current power infrastructure project;
According to matching result of the item types in preset list matching library, the current power infrastructure project institute is determined Corresponding each inspection list;
According to each comprehensive list of inspection list generation, and generate list and fill in prompting message;
Issue the comprehensive list and the list fill in prompting message, and receive terminal return fill in updated consolidated statement It is single;
According to the status information filled in updated comprehensive list and update the current power infrastructure project.
2. according to the method described in claim 1, it is characterized in that, described match according to the item types in preset list Matching result in library determines that each the step of checking list corresponding to the current power infrastructure project includes:
Preset list matching library is inquired, the list matching library includes the inspection list of Electric Power Capital Construction engineering projects type;
The item types with projects type in the list matching library are matched, obtain item types matching knot Fruit;
Corresponding each inspection list is obtained according to the item types matching result.
3. according to the method described in claim 1, it is characterized in that, described generate comprehensive list according to each inspection list Step includes:
Inquire preset comprehensive list establishment rules;
According to the comprehensive list establishment rules, extracted respectively from each check in list corresponding to the current power infrastructure project Check the preset necessary check item of list;
It works out to obtain comprehensive list according to each necessary check item for checking list.
4. according to the method described in claim 1, it is characterized in that, updated comprehensive list update is filled in described in the basis The step of status information of the current power infrastructure project, includes:
Each inspection data for checking list are extracted in updated comprehensive list from described fill in;
By in each inspection data update for checking list to corresponding inspection list, the state of the Electric Power Capital Construction engineering is believed Breath includes updated inspection list.
5. it according to the method described in claim 1, it is characterized in that, further includes:
When monitoring that the current power infrastructure project construction starts, receive the live video data of upload and check item number According to the check item data include personnel inspection data, material inspection data, safety inspection data and quality examination data;
According to the live video data and the inspection item data, the status information of the current power infrastructure project is updated.
6. it according to the method described in claim 1, it is characterized in that, further includes:
The data of registering/check out uploaded are received, described to register/checking out data to include identity information, register/checks out project, positioning It information and registers/checks out the time.
7. it according to the method described in claim 6, it is characterized in that, further includes:
It is for statistical analysis according to the status information of register/check out data and the current power infrastructure project;
Charge book table is built according to the statistic analysis result, the charge book table is used to record the history work of everyone Data.
8. a kind of Electric Power Capital Construction engineering management optimization system, which is characterized in that including:
Item types determining module, for determining the item types of current power infrastructure project;
It checks list determining module, for the matching result according to the item types in preset list matching library, determines Each inspection list corresponding to the current power infrastructure project;
Comprehensive list generation module for according to each comprehensive list of inspection list generation, and generates list and fills in prompting and disappear Breath;
More new table acquisition module fills in prompting message, and receive terminal and return for issuing the comprehensive list and the list That returns fills in updated comprehensive list;
State information updating module updates the current power infrastructure project for filling in updated comprehensive list according to Status information.
9. a kind of computer readable storage medium is stored with computer program, when the computer program is executed by processor, makes The processor is obtained to perform such as the step of any one of claim 1 to 7 the method.
10. a kind of computer equipment, including memory and processor, the memory is stored with computer program, the calculating When machine program is performed by the processor so that the processor is performed such as the step of any one of claim 1 to 7 the method Suddenly.
CN201711489668.7A 2017-12-30 2017-12-30 Electric Power Capital Construction engineering management optimization method and system Pending CN108171383A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711489668.7A CN108171383A (en) 2017-12-30 2017-12-30 Electric Power Capital Construction engineering management optimization method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711489668.7A CN108171383A (en) 2017-12-30 2017-12-30 Electric Power Capital Construction engineering management optimization method and system

Publications (1)

Publication Number Publication Date
CN108171383A true CN108171383A (en) 2018-06-15

Family

ID=62516676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711489668.7A Pending CN108171383A (en) 2017-12-30 2017-12-30 Electric Power Capital Construction engineering management optimization method and system

Country Status (1)

Country Link
CN (1) CN108171383A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113421170A (en) * 2021-06-16 2021-09-21 广东诚誉工程咨询监理有限公司 Comprehensive optimization management system and method for power engineering quality
CN116719558A (en) * 2023-08-09 2023-09-08 北京比瓴科技有限公司 Gitlab baseline inspection method, device, equipment and readable storage medium
CN117057325A (en) * 2023-10-13 2023-11-14 湖北华中电力科技开发有限责任公司 Form filling method and system applied to power grid field and electronic equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104732345A (en) * 2015-03-18 2015-06-24 国网上海市电力公司 Supervision and management information system used for field management in power transmission and transformation engineering
CN105303463A (en) * 2015-11-11 2016-02-03 国网山东济阳县供电公司 Mobile terminal equipment used for electric power production
CN106203728A (en) * 2016-07-22 2016-12-07 深圳市赛普爱德科技股份有限公司 A kind of interactive engineering supervision method
CN106845919A (en) * 2016-12-16 2017-06-13 上海建工集团股份有限公司 Construction information collection processing method
CN107085758A (en) * 2017-01-19 2017-08-22 北京恒华伟业科技股份有限公司 A kind of project management method, apparatus and system
CN107491851A (en) * 2016-10-27 2017-12-19 北京市安全生产科学技术研究院 Keep the safety in production information-based inspection system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104732345A (en) * 2015-03-18 2015-06-24 国网上海市电力公司 Supervision and management information system used for field management in power transmission and transformation engineering
CN105303463A (en) * 2015-11-11 2016-02-03 国网山东济阳县供电公司 Mobile terminal equipment used for electric power production
CN106203728A (en) * 2016-07-22 2016-12-07 深圳市赛普爱德科技股份有限公司 A kind of interactive engineering supervision method
CN107491851A (en) * 2016-10-27 2017-12-19 北京市安全生产科学技术研究院 Keep the safety in production information-based inspection system and method
CN106845919A (en) * 2016-12-16 2017-06-13 上海建工集团股份有限公司 Construction information collection processing method
CN107085758A (en) * 2017-01-19 2017-08-22 北京恒华伟业科技股份有限公司 A kind of project management method, apparatus and system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113421170A (en) * 2021-06-16 2021-09-21 广东诚誉工程咨询监理有限公司 Comprehensive optimization management system and method for power engineering quality
CN116719558A (en) * 2023-08-09 2023-09-08 北京比瓴科技有限公司 Gitlab baseline inspection method, device, equipment and readable storage medium
CN117057325A (en) * 2023-10-13 2023-11-14 湖北华中电力科技开发有限责任公司 Form filling method and system applied to power grid field and electronic equipment
CN117057325B (en) * 2023-10-13 2024-01-05 湖北华中电力科技开发有限责任公司 Form filling method and system applied to power grid field and electronic equipment

Similar Documents

Publication Publication Date Title
CN108171383A (en) Electric Power Capital Construction engineering management optimization method and system
CN108154308A (en) Power construction process management optimization method and system
CN107748951A (en) Building engineering construction inspection of quality method and system based on BIM
Liu et al. Automatically updating maintenance information from a BIM database
CN109034659A (en) A kind of grid dispatching management system
CN109409711B (en) Intelligent verification and decision-making assistance system and method for configuration file of intelligent substation
CN106529823A (en) Management and control system
CN109034431A (en) A kind of predetermined management method of highly effective and safe meeting room and system
CN108595523A (en) device data retrieval model construction method, device and computer equipment
CN110134795A (en) Generate method, apparatus, computer equipment and the storage medium of validation problem group
CN108875990A (en) A kind of on-the-spot meeting intelligence building processing method and system
CN109034404A (en) A kind of thermal power plant's multi-person synergy examination and repair system based on AR glasses, method and a kind of AR glasses
Jain et al. A customized quality model for software quality assurance in agile environment
CN104616108A (en) Method for distributing and recovering electric power overhaul tool
CN109905492A (en) Operation safety management system and method based on distributed modular data center
CN110428176A (en) Project progress checking method and system
CN106952081A (en) A kind of flow instance method and apparatus of authority classification business
CN117391544B (en) Decoration project management method and system based on BIM
CN108960781A (en) A kind of meeting fast assembling efficient implementation method and system
CN109034432A (en) A kind of meeting room method of servicing and system based on unmanned management
EP1624614B1 (en) Automatic planning of network configurations
CN112101746A (en) Equipment maintenance method and system
CN104243218B (en) A kind of communication of power system mode list preparation method based on more schedule constraints
CN111815182A (en) Power grid power failure maintenance planning method based on deep learning
CN111340253A (en) Main network maintenance request form analysis method and system

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200922

Address after: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Applicant after: Guangzhou Power Supply Bureau of Guangdong Power Grid Co.,Ltd.

Address before: 510620 Tianhe District, Guangzhou, Tianhe South Road, No. two, No. 2, No.

Applicant before: GUANGZHOU POWER SUPPLY Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20180615

RJ01 Rejection of invention patent application after publication