CN110428176A - Project progress checking method and system - Google Patents

Project progress checking method and system Download PDF

Info

Publication number
CN110428176A
CN110428176A CN201910718909.3A CN201910718909A CN110428176A CN 110428176 A CN110428176 A CN 110428176A CN 201910718909 A CN201910718909 A CN 201910718909A CN 110428176 A CN110428176 A CN 110428176A
Authority
CN
China
Prior art keywords
report
progress
project
construction site
site image
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910718909.3A
Other languages
Chinese (zh)
Other versions
CN110428176B (en
Inventor
张慧翔
刘强
高云鹏
周慧
丁崇
杨辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhijia (beijing) Technology Co Ltd
China Electric Power Enterprise Federation Electric Power Construction Technical And Economic Consulting Center
Original Assignee
Zhijia (beijing) Technology Co Ltd
China Electric Power Enterprise Federation Electric Power Construction Technical And Economic Consulting Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhijia (beijing) Technology Co Ltd, China Electric Power Enterprise Federation Electric Power Construction Technical And Economic Consulting Center filed Critical Zhijia (beijing) Technology Co Ltd
Priority to CN201910718909.3A priority Critical patent/CN110428176B/en
Publication of CN110428176A publication Critical patent/CN110428176A/en
Application granted granted Critical
Publication of CN110428176B publication Critical patent/CN110428176B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F18/00Pattern recognition
    • G06F18/20Analysing
    • G06F18/22Matching criteria, e.g. proximity measures
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Marketing (AREA)
  • Game Theory and Decision Science (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Evolutionary Biology (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of project progress checking method disclosed in the present application and system, including import construction schedule;According to the construction schedule, the process for receiving at least one process to be done in the current review period indicates information;Receive construction personnel makes a report on operation, according to the current completed amount progress made a report on operation and determine the process: obtaining the first construction site image: the project amount progress made a report on and the first construction site image being forwarded to management end again, it is audited for obtaining the second construction site image, and by second construction site image and the project amount progress made a report on and the first construction site image comparison at the management end;Finally, receiving the auditing result that management end is sent.It is audited by the second construction site image comparison that the information for making a report on the construction personnel received and the first construction site image of upload and management end obtain, can intuitively judge the authenticity for the project amount progress made a report on.

Description

Project progress checking method and system
Technical field
This application involves production statistics technical field more particularly to a kind of project progress checking method and systems.
Background technique
In engineering project, in order to realize effective management and can be it is anticipated that completing each stage work, construction plan Be it is essential, construction plan is to make overall arrangement to total engineering duty, wherein a necessary link be exactly engineering into Degree audit.
Project progress audit refers to that the project working hour made a report on or reported to employee and content audit, main purposes It is the work in every task definition and the time it takes of record, statistics and analysis employee in project and non-project, to adopt Collection project standard work force examines employee performance, thus Perform Project Financial Aanalysis cost of labor reduces project cost of labor, improves employee's work Make efficiency.
Existing project progress audit mode is usually, and after employee makes a report on the workload of completion, gives leading body at a higher level's audit, But true situation is, leading body at a higher level can not verify employee and make a report on the authenticity of information, so that employee occur lies about engineering Amount, leading body at a higher level are unable to get the problem of complete true project progress.
Summary of the invention
The embodiment of the present invention discloses a kind of project progress checking method and system, to solve existing project progress audit side In formula, after employee makes a report on the workload of completion, leading body at a higher level's audit is given, still, true situation is that leading body at a higher level can not test Card employee makes a report on the authenticity of information, to occur that employee lies about project amount, leading body at a higher level is unable to get complete true engineering The problem of progress.
The application's in a first aspect, disclosing a kind of project progress checking method, comprising:
Import construction schedule;
According to the construction schedule, the process for receiving at least one process to be done in the current review period indicates letter Breath;
The process is indicated that process information corresponding to information is shown to terminal interface;
Receive construction personnel and make a report on operation, according to it is described make a report on operation determine the current completed amount of correspondence process into Degree;
The first construction site image is obtained, includes and the current completion work made a report in the image of first construction site The corresponding information of journey amount progress;
The project amount progress made a report on and the first construction site image are forwarded to management end, the management end is for obtaining the Two construction site images, and by second construction site image and the project amount progress made a report on and the first construction site figure As comparison audit;
Receive management end send auditing result, the auditing result by make a report on project amount progress, the first construction site Image and the second construction site image generate.
Further, further includes:
The selection operation for receiving construction personnel determines the work that selection is completed or is partially completed according to the selection operation Sequence;
The marking operation for receiving construction personnel determines that label is selected according to the marking operation and is completed or part is complete At process;
Receive construction personnel makes a report on operation, makes a report on the determining current completion for making a report on marked process of operation according to described Project amount progress.
Further, the project amount progress that will be made a report on and the first construction site image are forwarded to management end and include:
If the project amount progress of making a report on is to be partially completed project amount, every time corresponding is partially completed engineering Amount progress and corresponding first construction site image are forwarded to management end in batches.
Further, the project amount progress that will be made a report on and image are forwarded to management end and include:
If the project amount progress made a report on is to be partially completed project amount, after the completion of all project amounts, by every section Time is corresponding to be partially completed project amount and corresponding first construction site image is disposably forwarded to management end.
Further, the shape that the current completed amount progress includes: current project amount Percent Complete, actually generates As progress amount, the resource quantity of actual consumption.
In the second aspect of the present invention, a kind of project progress auditing system, including terminal and management end are disclosed;
The terminal, for importing construction schedule;According to the construction schedule, receive in the current review period The process of at least one process to be done indicates information;The process is indicated that process information corresponding to information is shown to terminal Interface;Receive construction personnel makes a report on operation, according to the current completed amount progress made a report on operation and determine corresponding process; The first construction site image is obtained, includes and the current completed amount progress made a report in the image of first construction site Corresponding information;The project amount progress made a report on and the first construction site image are forwarded to management end, receive what management end was sent Auditing result, the auditing result are raw by project amount progress, the first construction site image and the second construction site image made a report on At;
The management end, for the second construction site image of acquisition, and by second construction site image with it is described The project amount progress made a report on and the audit of the first construction site image comparison.
Further, the terminal is also used to receive the selection operation of construction personnel, is determined and is selected according to the selection operation Select the process for being completed or being partially completed;The marking operation for receiving construction personnel is determined according to the marking operation selected by marking The process for being completed or being partially completed selected;Receive construction personnel and make a report on operation, according to it is described make a report on operation and determine make a report on institute The current completed amount progress of the process of label.
Further, the management end further includes the first forwarding module, and first forwarding module is used for, in the audit As a result for by when, corresponding audit is transmitted to site operation personnel simultaneously by information.
Further, the terminal further includes the second forwarding module;Second forwarding module, for making a report on work described Journey amount progress is that the every time corresponding project amount progress and corresponding first that is partially completed is constructed when being partially completed project amount Live image is forwarded to management end in batches.
Further, the terminal further includes third forwarding module;
The third forwarding module, for owning when the project amount progress made a report on is to be partially completed project amount After the completion of project amount, every time corresponding is partially completed project amount and corresponding first construction site image disposably forwards To management end.
The embodiment of the present application discloses a kind of project progress checking method and system, in this method, is first directed to construction speed Plan;Then according to the construction schedule, the process instruction of at least one process to be done in the current review period is received Information;The process is indicated that process information corresponding to information is shown to terminal interface;Then, making a report on for construction personnel is received Operation, according to the current completed amount progress made a report on operation and determine the process;The first construction site image is obtained again, It include information corresponding with the current completed amount progress made a report in the image of first construction site;It will make a report on again Project amount progress and the first construction site image are forwarded to management end, and the management end is used to obtain the second construction site image, And second construction site image and the project amount progress made a report on and the first construction site image comparison are audited;Most Afterwards, receive management end send auditing result, the auditing result by make a report on project amount progress, the first construction site image and Second construction site image generates.
Scheme disclosed in the embodiment of the present application is applied by the first of the information and upload of making a report on the construction personnel received The second construction site image comparison that work live image and management end obtain is audited, and can intuitively judge the project amount made a report on The authenticity of progress after employee makes a report on the workload of completion, gives leading body at a higher level's audit to solve in the prior art, but It is that leading body at a higher level can not verify employee and make a report on the authenticity of information, to occur that employee lies about project amount, leading body at a higher level can not obtain The problem of to complete true project progress.
Detailed description of the invention
In order to illustrate more clearly of the technical solution of the application, letter will be made to attached drawing needed in the embodiment below Singly introduce, it should be apparent that, for those of ordinary skills, without any creative labor, It is also possible to obtain other drawings based on these drawings.
Fig. 1 is a kind of workflow schematic diagram of project progress checking method disclosed in the embodiment of the present application;
Fig. 2 is the workflow schematic diagram of another project progress checking method disclosed in the embodiment of the present application;
Fig. 3 is a kind of structural block diagram of project progress auditing system disclosed in the embodiment of the present application;
Fig. 4 is a kind of interaction schematic diagram of project progress audit terminal and management end disclosed in the embodiment of the present application.
Specific embodiment
Technical solution in order to enable those skilled in the art to better understand the present invention, below in conjunction with of the invention real The attached drawing in example is applied, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work, all should belong to protection of the present invention Range.
It is usually after employee makes a report on the workload of completion, to give higher level to solve existing project progress audit mode Leader's audit, still, true situation is that leading body at a higher level can not verify employee and make a report on the authenticity of information, to employee occur Lie about project amount, the problem of leading body at a higher level is unable to get complete true project progress, the application is disclosed by following embodiment A kind of project progress checking method.
The application first embodiment discloses a kind of project progress checking method.Workflow schematic diagram shown in Figure 1, Project progress checking method disclosed in the embodiment of the present application the following steps are included:
Step S101, construction schedule is imported.
Unit in charge of construction can site operation schedule prepared in advance, site operation schedule prepared in advance is imported eventually End, and establishes the incidence relation of task items and process at the terminal, so that it is determined that each process corresponding completion date letter that goes into operation Breath.
Step S102, according to the construction schedule, at least one process to be done in the current review period is received Process indicates information.
Based on the data of step S101, the process for needing to construct in the recent period can be obtained automatically, wherein recent range can be with It is: on the basis of system current date, plans the process to go into operation totally within the scope of 15 days toward the last week, toward latter week, and will receive To the current review period in the process instruction information of process to be done be pushed to site operation personnel, reduce construction personnel into The selection data area in row process report working hour.
The process that terminal receives process to be done in the current review period indicates information, wherein the current review period when Between measurement unit can be minute, hour, day or the moon, this is not construed as limiting, process indicate information may include one or more Process to be done.
Step S103, the process is indicated that process information corresponding to information is shown to terminal interface.
It can check that process indicates information by terminal interface, wherein terminal can be mobile phone, computer or ipad etc. and set It is standby, and can indicate that information carries out corresponding operation by the process that end-on receives.
Step S104, receive construction personnel makes a report on operation, makes a report on the current complete of the determining corresponding process of operation according to described At project amount progress.
According to the operation of making a report on of construction personnel, the current completed amount progress of corresponding process is determined, wherein construction personnel It can be made a report in mobile phone terminal and the end PC, making a report on for single process can be carried out, making a report on for batch process can also be carried out;Together When making a report on, the same process, which can permit, repeatedly to be carried out making a report on operation.
Wherein, the project amount progress made a report on may include: vivid progress same day project amount Percent Complete, actually generated Amount, the resource quantity of actual consumption, the resource of actual consumption includes artificial, material and mechanical equipment actual consumption, by filling out Above data is reported, facilitates to form the construction reference of project and enterprise, provides data branch for the construction of other processes and engineering project Support and data guidance.
Step S105, the first construction site image is obtained, includes to be made a report on described in the image of first construction site The currently corresponding information of completed amount progress.
First construction site image is the image of the corresponding process actual performance in construction site.First construction site figure It seem to upload to terminal after the process that oneself is completed or is partially completed by construction personnel shoots photo, terminal obtains first Construction site image.
Step S106, the project amount progress made a report on and the first construction site image are forwarded to management end, the management end For obtaining the second construction site image, and by second construction site image and the project amount progress and first made a report on The audit of construction site image comparison.
After terminal receives the current completed amount progress that construction personnel makes a report on and the first construction site image, it can also connect Receiving the selection auditor operation of construction personnel, that is to say, that construction personnel can select an auditor at management end, The current completed amount progress and the first construction site image that terminal can make a report on the construction personnel received are transmitted to management Hold the auditor that is selected, while the auditor that is selected of management end can also receive that short message is reminded and APP is short on mobile phone Prompting message, the notified prompting message on the end PC.
After management end receives prompting, need in time to audit the information that construction personnel makes a report on, what management end was selected Auditor can arrive construction site and verify, and obtain the second construction site image.The second construction that management end will acquire Live image also uploads to terminal, facilitates and subsequent carries out review check analysis to data.
The project amount progress made a report on and the first construction site image and the second construction site image comparison are audited in management end, If the project amount progress and the first construction site image that are forwarded to management end match with the second construction site image, audit Pass through, auditing flow terminates;If the project amount progress and the first construction site image and second that are forwarded to management end are constructed now Field picture mismatches, then audits and do not pass through.
If fruit audit does not pass through, it re-execute the steps S104- step S106.
In the application, project progress can be power engineering progress, architectural engineering progress etc., and work can be arranged according to demand The particular content of Cheng Jindu, the application is without limitation.
Step S107, receive management end send auditing result, the auditing result by make a report on project amount progress, first Construction site image and the second construction site image generate.
Vivid progress report can be automatically generated according to each auditing result, such as: daily sheet, weekly return, moon sheet And/or year report.Intuitively the sequence of engineering construction is comprehensively understood.
The embodiment of the present application discloses a kind of project progress checking method, in this method, is first directed to construction schedule;So Afterwards according to the construction schedule, the process for receiving at least one process to be done in the current review period indicates information;It will Process information corresponding to the process instruction information is shown to terminal interface;Then, receive construction personnel makes a report on operation, root According to the current completed amount progress made a report on operation and determine the process;Obtain the first construction site image again, described It include information corresponding with the current completed amount progress made a report in one construction site image;The project amount that will be made a report on again Progress and the first construction site image are forwarded to management end, and the management end is for obtaining the second construction site image, and by institute It states the second construction site image and the project amount progress made a report on and the first construction site image comparison is audited;Finally, receiving The auditing result that management end is sent, the auditing result are applied by the project amount progress made a report on, the first construction site image and second Work live image generates.
Scheme disclosed in the embodiment of the present application is applied by the first of the information and upload of making a report on the construction personnel received The second construction site image comparison that work live image and management end obtain is audited, and can intuitively judge the project amount made a report on The authenticity of progress after employee makes a report on the workload of completion, gives leading body at a higher level's audit to solve in the prior art, but It is that leading body at a higher level can not verify employee and make a report on the authenticity of information, to occur that employee lies about project amount, leading body at a higher level can not obtain The problem of to complete true project progress.
Further, referring to Fig. 2, in project progress checking method provided in an embodiment of the present invention, further includes:
Step S201, the selection operation for receiving construction personnel determines that selection is completed or part according to the selection operation The process of completion.
Step S202, the marking operation for receiving construction personnel determines that label is selected complete according to the marking operation At or the process that is partially completed.
Step S203, receive construction personnel and make a report on operation, according to it is described make a report on operation and determine make a report on marked process Current completed amount progress.
Step S201, in step S202, step S203, construction personnel is selected by terminal, is marked, making a report on operation, Terminal receives the above operation of construction personnel, can be set in terminal and is selected, marked, made a report on the triggering of operation to identify. The specific form of triggering mark can be arbitrarily arranged according to demand, it is not limited here.
It should be noted that the sequencing of step S210, step S202, step S203 are not limited in the application, one In a embodiment, firstly, the process that selection is completed or is partially completed, then mark the selected work for being completed or being partially completed Sequence, the mode of label can be before the corresponding selected process for being completed or being partially completed tick or others can Then the mode of realization makes a report on the current completed amount progress of marked process, for example, current completed amount progress It is 100%.
Further, described to make a report in step S106 in project progress checking method provided in an embodiment of the present invention Project amount progress and the first construction site image be forwarded to management end and include:
If the project amount progress of making a report on is to be partially completed project amount, every time corresponding is partially completed engineering Amount progress and corresponding first construction site image are forwarded to management end in batches.
One engineering may include multiple processes, and each process may include one or more project progress sections, such as one A process may need complete for one day, another process may need complete for 5 days.
When a process includes the case where multiple project progress sections, in a kind of achievable mode, the work made a report on every time Journey amount progress is to be partially completed project amount, then every time corresponding can be partially completed project amount progress and corresponding first Construction site image is forwarded to management in batches.
In one example, process is to build a stone pier, builds the stone pier and needs complete for 5 days, applies it is possible to receive The content that worker person makes a report on daily, and the content made a report on is forwarded to management end in batches, wherein the content made a report on includes Daily project amount progress and corresponding first construction site image, e.g., the content made a report on for first day includes that project amount progress is 20% and corresponding first construction site image A, the content made a report on for second day include that project amount progress is 25% and corresponding the One construction site image B, the content that third day is made a report on include that project amount progress is 15% and corresponding first construction site image C, the content made a report on for the 4th day include that project amount progress is 20% and corresponding first construction site image D, are made a report within the 5th day Content includes that project amount progress is 20% and corresponding first construction site image E.The content that will be made a report on forwards in batches To management end, the content made a report on can be forwarded to management end daily, the content made a report on daily can also at least be turned in two times It is sent to management end, such management end can monitor the project amount progress of construction party in real time.
Further, when a process includes the case where multiple project progress sections, in the achievable mode of another kind, such as The project amount progress that fruit is made a report on every time is to be partially completed project amount, then after the completion of all project amounts, every time is corresponding It is partially completed project amount and image and is disposably forwarded to management end.In this kind of achievable mode, each project progress section is corresponding First construction site image, which can be same, may not be same, but in an at least first construction site image Including being fully completed the corresponding image of project amount.This kind of achievable mode, by by the different project progress sections of a process Progress is disposably forwarded to management end, saves the audit time at management end, that is to say, that management end does not need each work Cheng Jindu sections are all audited, as long as confirming whether the process is finally completed.
Correspondingly, referring to Fig. 3 and Fig. 4 in an alternative embodiment of the invention, a kind of project progress auditing system is also disclosed, It include: including terminal 100 and management end 200;
The terminal 100, for importing construction schedule;According to the construction schedule, when receiving current review The process of at least one process to be done indicates information in section;By the process indicate information corresponding to process information show to Terminal interface;Receive construction personnel makes a report on operation, according to the current completed amount made a report on operation and determine corresponding process Progress;The first construction site image is obtained, includes and the current completion engineering made a report in the image of first construction site The corresponding information of amount progress;The project amount progress made a report on and the first construction site image are forwarded to management end, receive management end The auditing result of transmission, the auditing result is by project amount progress, the first construction site image and the second construction site made a report on Image generates;
The management end 200, for the second construction site image of acquisition, and by second construction site image and institute State the project amount progress made a report on and the audit of the first construction site image comparison.
Further, the terminal 100 is also used to receive the selection operation of construction personnel, is determined according to the selection operation Select the process for being completed or being partially completed;The marking operation for receiving construction personnel determines label institute according to the marking operation The process for being completed or being partially completed of selection;Receive construction personnel makes a report on operation, operates determining make a report on according to described make a report on The current completed amount progress of the process marked.
Further, the management end 200 further includes the first forwarding module 210, and first forwarding module 210 is used for, The auditing result be by when, corresponding audit is transmitted to site operation personnel simultaneously by information.
Further, the terminal 100 further includes the second forwarding module 110;
Second forwarding module, for it is described make a report on project amount progress be partially completed project amount when, when by every section Between corresponding be partially completed project amount progress and corresponding first construction site image is forwarded to management end in batches.
Further, the terminal 100 further includes third forwarding module 120;
The third forwarding module 120, for the project amount progress made a report on be partially completed project amount when, in institute After the completion of having project amount, every time corresponding project amount and the image of being partially completed disposably is forwarded to management end.
Same and similar part may refer to each other between each embodiment in this specification.Especially for the reality of system For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method In explanation.
Combine detailed description and exemplary example that the application is described in detail above, but these explanations are simultaneously It should not be understood as the limitation to the application.It will be appreciated by those skilled in the art that without departing from the application spirit and scope, A variety of equivalent substitution, modification or improvements can be carried out to technical scheme and embodiments thereof, these each fall within the application In the range of.The protection scope of the application is determined by the appended claims.
In the specific implementation, the embodiment of the present application also provides a kind of computer readable storage medium, wherein this is computer-readable Storage medium can be stored with program, which may include each embodiment of project progress checking method provided by the present application when executing In some or all of step.The storage medium can be magnetic disk, CD, read-only memory (read-only Memory, ROM) or random access memory (random access memory, RAM) etc..
It is required that those skilled in the art can be understood that the technology in the embodiment of the present application can add by software The mode of general hardware platform realize.Based on this understanding, the technical solution in the embodiment of the present application substantially or Say that the part that contributes to existing technology can be embodied in the form of software products, which can deposit Storage is in storage medium, such as ROM/RAM, magnetic disk, CD, including some instructions are used so that computer equipment (can be with It is personal computer, server or the network equipment etc.) execute certain part institutes of each embodiment of the application or embodiment The method stated.
Above-described the application embodiment does not constitute the restriction to the application protection scope.

Claims (10)

1. a kind of project progress checking method characterized by comprising
Import construction schedule;
According to the construction schedule, the process for receiving at least one process to be done in the current review period indicates information;
The process is indicated that process information corresponding to information is shown to terminal interface;
Receive construction personnel makes a report on operation, according to the current completed amount progress made a report on operation and determine corresponding process;
The first construction site image is obtained, includes and the current completed amount made a report in the image of first construction site The corresponding information of progress;
The project amount progress made a report on and the first construction site image are forwarded to management end, the management end is applied for obtaining second Work live image, and by second construction site image and the project amount progress made a report on and the first construction site image pair Than audit;
Receive management end send auditing result, the auditing result by make a report on project amount progress, the first construction site image It is generated with the second construction site image.
2. project progress checking method according to claim 1, which is characterized in that the method also includes:
The selection operation for receiving construction personnel determines the process that selection is completed or is partially completed according to the selection operation;
The marking operation for receiving construction personnel determines that label is selected according to the marking operation and is completed or is partially completed Process;
Receive construction personnel makes a report on operation, makes a report on the determining current completion engineering for making a report on marked process of operation according to described Amount progress.
3. project progress checking method according to claim 1, which is characterized in that the project amount progress that will be made a report on and First construction site image is forwarded to management end
If it is described make a report on project amount progress be partially completed project amount, by every time it is corresponding be partially completed project amount into Degree and corresponding first construction site image are forwarded to management end in batches.
4. project progress checking method according to claim 1, which is characterized in that the project amount progress that will be made a report on and Image is forwarded to management end
If the project amount progress made a report on is to be partially completed project amount, after the completion of all project amounts, by every time It is corresponding to be partially completed project amount and corresponding first construction site image is disposably forwarded to management end.
5. project progress checking method according to claim 1, which is characterized in that the current completed amount progress packet It includes: currently project amount Percent Complete, the vivid progress amount, the resource quantity of actual consumption that actually generate.
6. a kind of project progress auditing system, which is characterized in that including terminal and management end;
The terminal, for importing construction schedule;According to the construction schedule, receive in the current review period at least The process of one process to be done indicates information;The process is indicated that process information corresponding to information is shown to terminal circle Face;Receive construction personnel makes a report on operation, according to the current completed amount progress made a report on operation and determine corresponding process;It obtains The first construction site image is taken, includes and the current completed amount progress pair made a report in the image of first construction site The information answered;The project amount progress made a report on and the first construction site image are forwarded to management end, receive examining for management end transmission Core is as a result, the auditing result is generated by project amount progress, the first construction site image and the second construction site image made a report on;
The management end is made a report on for the second construction site image of acquisition, and by second construction site image with described Project amount progress and the first construction site image comparison audit.
7. project progress auditing system according to claim 6, which is characterized in that the terminal is also used to receive constructor The selection operation of member determines the process that selection is completed or is partially completed according to the selection operation;Receive the mark of construction personnel Note operation, determines according to the marking operation and marks the selected process for being completed or being partially completed;Receive construction personnel's Operation is made a report on, makes a report on the determining current completed amount progress for making a report on marked process of operation according to described.
8. project progress auditing system according to claim 6, which is characterized in that the management end further includes the first forwarding Module, first forwarding module are used for, the auditing result be by when, corresponding audit is forwarded simultaneously by information Give site operation personnel.
9. project progress auditing system according to claim 6, which is characterized in that the terminal further includes the second forwarding mould Block;
Second forwarding module, for it is described make a report on project amount progress be partially completed project amount when, by every time pair Answer be partially completed project amount progress and corresponding first construction site image is forwarded to management end in batches.
10. project progress auditing system according to claim 6, which is characterized in that the terminal further includes third forwarding Module;
The third forwarding module, for the project amount progress made a report on be partially completed project amount when, in all engineerings After the completion of amount, every time corresponding is partially completed project amount and corresponding first construction site image is disposably forwarded to prison Manage end.
CN201910718909.3A 2019-08-05 2019-08-05 Project progress auditing method and system Active CN110428176B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910718909.3A CN110428176B (en) 2019-08-05 2019-08-05 Project progress auditing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910718909.3A CN110428176B (en) 2019-08-05 2019-08-05 Project progress auditing method and system

Publications (2)

Publication Number Publication Date
CN110428176A true CN110428176A (en) 2019-11-08
CN110428176B CN110428176B (en) 2020-10-30

Family

ID=68414227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910718909.3A Active CN110428176B (en) 2019-08-05 2019-08-05 Project progress auditing method and system

Country Status (1)

Country Link
CN (1) CN110428176B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110942239A (en) * 2019-11-21 2020-03-31 中国电力企业联合会电力建设技术经济咨询中心 Automatic inspection method and device for actual engineering progress
CN113537941A (en) * 2021-07-22 2021-10-22 重庆电子工程职业学院 Real-time dynamic progress control method and device for engineering management
CN113705988A (en) * 2021-08-14 2021-11-26 浙江宏瑞达工程管理有限公司 Supervision personnel performance management method and system, storage medium and intelligent terminal
CN113723772A (en) * 2021-08-14 2021-11-30 浙江宏瑞达工程管理有限公司 Construction project supervision and acceptance method, system, storage medium and intelligent terminal

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN106022649A (en) * 2016-06-13 2016-10-12 四川省兴华工程项目管理有限公司 Comprehensive management system for engineering project supervision, cost, bidding, and consultation
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN108830503A (en) * 2018-06-28 2018-11-16 友谊国际工程咨询有限公司 A kind of whole process engineering consulting method of servicing and system
CN109345103A (en) * 2018-09-25 2019-02-15 北京地厚云图科技有限公司 Process receipt control method and storage medium
CN109615324A (en) * 2018-12-06 2019-04-12 江苏苏科建设项目管理有限公司 One kind being based on the project management method of " wisdom management " system
CN109711690A (en) * 2018-12-17 2019-05-03 广州天越电子科技有限公司 The method and system of management scene control project process real-time update
CN110084482A (en) * 2019-03-29 2019-08-02 江苏乐建网络科技有限公司 A kind of critical process recommended method, equipment and medium based on construction plan

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103136626A (en) * 2011-11-29 2013-06-05 北京建龙重工集团有限公司 On-line management method for engineering project
CN106022649A (en) * 2016-06-13 2016-10-12 四川省兴华工程项目管理有限公司 Comprehensive management system for engineering project supervision, cost, bidding, and consultation
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN108830503A (en) * 2018-06-28 2018-11-16 友谊国际工程咨询有限公司 A kind of whole process engineering consulting method of servicing and system
CN109345103A (en) * 2018-09-25 2019-02-15 北京地厚云图科技有限公司 Process receipt control method and storage medium
CN109615324A (en) * 2018-12-06 2019-04-12 江苏苏科建设项目管理有限公司 One kind being based on the project management method of " wisdom management " system
CN109711690A (en) * 2018-12-17 2019-05-03 广州天越电子科技有限公司 The method and system of management scene control project process real-time update
CN110084482A (en) * 2019-03-29 2019-08-02 江苏乐建网络科技有限公司 A kind of critical process recommended method, equipment and medium based on construction plan

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110942239A (en) * 2019-11-21 2020-03-31 中国电力企业联合会电力建设技术经济咨询中心 Automatic inspection method and device for actual engineering progress
CN113537941A (en) * 2021-07-22 2021-10-22 重庆电子工程职业学院 Real-time dynamic progress control method and device for engineering management
CN113705988A (en) * 2021-08-14 2021-11-26 浙江宏瑞达工程管理有限公司 Supervision personnel performance management method and system, storage medium and intelligent terminal
CN113723772A (en) * 2021-08-14 2021-11-30 浙江宏瑞达工程管理有限公司 Construction project supervision and acceptance method, system, storage medium and intelligent terminal
CN113705988B (en) * 2021-08-14 2023-12-19 浙江宏瑞达工程管理有限公司 Method and system for managing performance of staff, storage medium and intelligent terminal
CN113723772B (en) * 2021-08-14 2024-03-05 浙江宏瑞达工程管理有限公司 Method and system for supervising and accepting constructional engineering, storage medium and intelligent terminal

Also Published As

Publication number Publication date
CN110428176B (en) 2020-10-30

Similar Documents

Publication Publication Date Title
CN110428176A (en) Project progress checking method and system
Mok et al. Addressing stakeholder complexity and major pitfalls in large cultural building projects
Wynn et al. Business process simulation for operational decision support
CN106572000A (en) WeChat official account platform-based construction site quality and safety management method
CN111027944A (en) Human resource management system
CN104461708B (en) Mission bit stream processing method and system
CN109242288B (en) Performance data matching method and system
CN104766155A (en) Engineering project element management method and system based on BIM
CN109376167A (en) Selection of specialists method, apparatus and server
CN113205319A (en) Human resource allocation method and device
CN109754337A (en) A kind of household services optimization method based on block chain technology
CN107609792A (en) Worker based on big data algorithm assesses labor service resource allocation method and system
CN107636545A (en) Equipment maintenance and management system, plant maintenance device and program
CN109242665B (en) Business rule multi-channel sharing method, device, equipment and storage medium
Bjarnason et al. Evidence-based timelines for project retrospectives—A method for assessing requirements engineering in context
CN108197888A (en) A kind of building trade reference recruitment methods
Dutoit et al. Knowledge scouts: Reducing communication barriers in a distributed software development project
Sampurna et al. The USAge of Ward and Peppard Method in Is/it Strategic Plan Compilaton in Dishubkominfo East Lampung
Scarpino et al. THE QUALITY OF AGILE-TRANSFORMING A SOFTWARE DEVELOPMENT COMPANY'S PROCESS: A FOLLOW-UP CASE STUDY.
Shrestha et al. Building a software tool for transparent and efficient process assessments in IT Service Management
CN113064829B (en) Test data life tree structure based on credit card core and data generation method
Singh et al. Enhancing organizational performance through Balance scorecard with strategic management activities
Male et al. Reappraising value methodologies in Construction for Achieving best value
Yahya et al. Hybrid agile development phases: The practice in software projects as performed by software engineering team
Wong et al. Software process improvements in bagladesh

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant