CN107481162A - A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site) - Google Patents

A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site) Download PDF

Info

Publication number
CN107481162A
CN107481162A CN201710635437.6A CN201710635437A CN107481162A CN 107481162 A CN107481162 A CN 107481162A CN 201710635437 A CN201710635437 A CN 201710635437A CN 107481162 A CN107481162 A CN 107481162A
Authority
CN
China
Prior art keywords
information
task
server
mobile terminal
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710635437.6A
Other languages
Chinese (zh)
Inventor
黄静波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710635437.6A priority Critical patent/CN107481162A/en
Publication of CN107481162A publication Critical patent/CN107481162A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Abstract

The invention discloses a kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site), belong to Traffic Engineering Construction construction field.Its method includes:Establish Engineering Division, danger source machine account corresponds to the relational database in geographical position with process control point;Carry out special messenger and mobile terminal binding;Set up job site engineering Sign Board;Mobile terminal identification marking initiates task request;The task request band geographical location information that mobile terminal is sent to server;Server judges whether geographical location information is consistent with basic data;The job information that server transmission database is specified is to mobile terminal;Mobile terminal feed back on-site information;Received server-side simultaneously stores arrangement information.The present invention establishes the many-one relationship of engineering name, position and process, startup feedback of the information and arbitration functions field labeled by scanning recognition, reaches guarantee personnel and complete the purpose of assigned work in appointed place by carrying out man-machine binding.

Description

It is a kind of ensure special messenger carry out at the construction field (site) assigned work information feedback method and Equipment
Technical field
The present invention relates to Traffic Engineering Construction construction field, is to ensure that special messenger is referred at the construction field (site) using information technology Surely the information feedback control method and apparatus to work.
Background technology
To promote Highway Design to be blended with construction, Highway Design construction quality is improved, promotes modern project Management, general office of Department of Transportation prints and distributes《Highway Design management of general contract method》(People's Republic of China's traffic Department of Transportation make 2015 No. 10), and implemented within 1st from August in 2015.But over contract is not turnkey investment.Project entity has To the responsibility of engineering construction Whole Course Management.Projects total cost management mode(EPC)Belong to broad sense PPP model of project management (Public—Private—Partnership)Category.There are EPC management modes the performance modern times to share out the work and help one another mutual supplement with each other's advantages Many advantages, such as, but there is also the drawbacks of the conflict of each side's behavior dynamics source:EPC contractors can be that enterprise's number one maximizes And effort, social responsibility, historic responsibility can be ignored, acts and efforts for expediency are serious in terms of quality and safety control;Supervisor is without foot The problems such as strict supervision quality of enough power, safety etc..Traffic Engineering Construction construction project concealed work is more, process is more, inspection man Work amount is big, along with multi-party interest game, and causes quality, security control difficulty big.These all give our person in charge of the project portion Door and project entity are with certain management difficulty.The management of original low-level informationization technology means can not meet current country Development situation, also it is unfavorable for promoting " modern project management " theory, is unfavorable for country and encourages to use in traffic engineering construction field The policy of PPP management modes.
Production informatization is constantly promoted to upgrade with the development of computer and Internet technology.It is in information at present The economic society transition stage of mechanics of communication driving, in each field such as Industrial agglomeration, industrial production, retailing, social life, Generate revolutionary variation in all directions.Also occur many information system management means in transport development field.Such as Toone IPES project management systems, build literary JESTWIN Project Management Softwares, 8Manage PPM, it is middle friendship capital latitude project management cloud put down Platform etc..But the management to practitioner's work behavior from the perspective of management remains in the primitive stage, and not finding can To ensure that special messenger completes the operation on duty of assigned work in appointed place using Information Technology Methods.
Work behavior management for personnel in manufacturing industry uses work order system more, but work order does not need geographical position to determine Position, it is different from Communications construction project.Also different from business field personnel identical work is completed in appointed place --- Communications construction project Assigned work be multiple-person cooperative work someone certain point of some time assigned work.
The control method that guarantee special messenger of the present invention carries out assigned work at the construction field (site) just belongs to supervisor, applied The important ring that work order position contract is honoured an agreement --- contract of guarantee provides professional's operation on duty.Existing control method is to make an inspection tour Inspect the sentries, also have and attendance management is carried out using technologies such as fingerprint recognition, recognitions of face.But these means, which do not ensure that, to be carried out Carried out at the construction field (site) by contracted special messenger during specific works, cannot guarantee that their frequency progress as contracted, The lifelong responsibility system of quality for each process of constructing can't more be established.
The content of the invention
Patent of the present invention is a kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site).Core Psychology is read:The work behavior of people and job site are controlled using information technology measure, and special messenger is improved to phase with this Answer the responsible Liability Retroact system of process.Technical scheme is as described below.
Technical scheme implements the method in terms of preparation:
First, server-side database is built, its construction method is:Built-in personnel identity identification module, basic data module, work Make task-set module, geographical position management collection module, these modules are made up of its submodule respectively again:
Personnel identity identification module, including:Personnel's name, position submodule;Telephone number, device id submodule;Access rights Manage submodule;The data of this module are from requirement of the traffic engineering construction contract documents to the personnel of taking part in building.
Basic data module, including:Unit branch subitem division submodule;Danger source control machine account submodule;Examination The plan of testing, visit program submodule etc.;The data of this module come from drawing of engineering design and associated documents.
Task collection module, including:Assigned work control point sets submodule;Work order typing submodule;This mould The work process for the controlling that the data of block are set from basic data according to engineering characteristic.
Geographical position management collection module, including:Task control point geographical position gathers submodule;Geographical position and work Make corresponding relation database;Geographical position verification management submodule.Server geographical position management collection is traffic engineering design text The basic data in back-end data base is established in the geographical position of unit part-to-item project in part.The data are to pass through respective tube Manage what module was set or gathered in advance by engineering construction side.Industry standard of the method for collection according to relevant ministries and commissions, the side of input Method is:The typing in server-side database.The basic data includes:The division of unit part-to-item project, danger source capsule Manage account, test plan, engineering visit program etc..Further, then according to basic data task collection is formulated.
Basic database is detailedization for the engineering construction content that traffic engineering is formed after the completion of design document.Complete Each single item engineering construction content needs to complete corresponding process or work again.Find the crucial controlling work in these processes and work The needs for being formed task concentration ensure to remove the job control point of completion by special messenger to job site.These work controls System point all has it accurately to complete geographical position point according to design document.It is corresponding with work that geographical position is just established with this Relational database.
Server-side database be substantially a contract requirement honour an agreement personnel, according to unit part-to-item project divide establish The task collection for the process that works and geographical position management collection form many-to-one relationship database.
Second, geographical position management collection sets up field labeled method in specified job location:The mark is according to basis Data and geographical position and work corresponding relation database, the task message board of making, and the message board is built up in and applied Work scene.Pasted on the message board or spray the figures corresponding with task collection such as Quick Response Code, bar code, so that special messenger holds shifting Dynamic terminal is used to the identification of live barcode scanning.
3rd, mobile terminal and special messenger carry out the method for corresponding binding.Methods described includes:
According to the partner such as supervisory contract and construction contract contract performance requirements, by personnel identity management module by system pipes The name of reason person typing special messenger, post, work unit, the work information such as telephone number, mobile terminal device id, access rights, Carry out system registry.Identification is logged in as later client to be used.
In terms of ensureing that special messenger carries out assigned work at the construction field (site):
Firstth, basic technical scheme implementing procedure:
Mark at the construction field (site) is set up in user of service's identity management module and mobile terminal, at the construction field (site) identification:
Using registered mobile terminal login system, man-machine one-to-one corresponding binding is carried out;
The information that mobile terminal identification is set up on task message board at the construction field (site) enters request action;
Mobile terminal geographical position residing for is sent to server obtains task information request;
Server geographical position with work corresponding relation database compare the acquisition task request geographical location information with Whether basic data is consistent;
Server sends corresponding task details to mobile end equipment if information is consistent.
Secondth, the special messenger holds shooting of his mobile terminal at the scene by being used to identify Quick Response Code, bar code in terminal Head mould block scan is built up in the Quick Response Code at scene, bar code identification either information input window and manually enters engineering name, work The engineering informations such as journey pile No. are sent to server receives task request.Started when receiving task request due to sending Geoposition Request acquisition module built in mobile terminal, so mobile terminal belonging to being carried in the solicited message of transmission Client logs in identity identification information, global positioning information, and location information includes longitude and latitude geographical location information.
3rd, management module is checked into the geographical position for triggering server when mobile terminal sends task request Arbitration functions, judge that output there are two kinds:
Consistent with the geographical location information data of basic database, server then feeds back the task details to mobile terminal;
Inconsistent with the geographical location information data of basic database, server then feeds back " non-at-scene work " to mobile terminal, whole Only it is asked.
4th, after server judges that request geographical position is consistent, corresponding refer to is sent by server info sending module Task details are determined to mobile terminal, it is desirable to which the special messenger completes assigned work process.These assigned works are different from manufacturing industry not The work order of Geographic mapping is needed, completes identical work in appointed place also different from field personnel, it is that multiple-person cooperative work exists The assigned work of someone certain point of some time, so needing to go to transfer server-side database task collection at the scene.
5th, mobile terminal information receiving module, which receives assigned work task details and will be prompted to user, carries out completing task Feedback.The form of feedback can be the sign task " being completed in scene ", can more pass through information push of mobile terminal module Send comprising form informations such as picture, word, audio, videos.It is hard that mobile terminal information sending module includes camera, microphone etc. Part, and mobile terminal local data.
6th, received server-side module receives the information that mobile terminal returns, and stores these feedback informations, and by reception Claimant's identity, data type, unit branch subitem division etc. arranged, in order to realize workflow retrospect and it is whole Reason.Mobile terminal is multiple similar feedback of the information with server end.When the job site carries out task requests again, clothes Business device still will determine that the information such as claimant's identity, geographical position, and the new task for pushing the place is formed to mobile terminal Multiple feedback.
The beneficial effect that technical scheme provided by the invention is brought is:
Simplify operation, reduce line practitioner's working strength, reduce manager's management difficulty.Change Traffic Engineering Construction at this stage Build extensive operation management mode on duty, improve practitioner's operating discipline managerial skills, improvement contract is honoured an agreement situation.Realize work Journey workflow can trace, make practitioner shoulder the society that each should bear, historic responsibility so as to improve engineering construction quality, Level of security.
Brief description of the drawings
The specific implementation method of the present invention is further described below in conjunction with the accompanying drawings, wherein:
Fig. 1 outlines describe the present invention is how to be judged and fed back to make special messenger carry out job site assigned work with information approach Information feedback method method flow diagram;
Fig. 2 is pie graph and the signal of internal groundwork mechanism for describing server-side database;
Fig. 3 is the basic pie graph of mobile terminal;
Fig. 4 is the schematic diagram for describing how to carry out work on the spot using the present invention.
Embodiment
Patent of the present invention is a kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site).Core Psychology is read:The work behavior of people and job site are controlled using information technology measure, and special messenger is improved to phase with this Answer the responsible Liability Retroact system of process.Embodiments of the present invention are further described below in conjunction with the accompanying drawings:
The first step, sets up server-side database, and its composition is shown in Fig. 2.The database is operated in given server.Server can To be a computer or equipment or Cloud Server provided on network, network resource administration.The server can be with It is connected in several ways with internet.The built-in personnel identity identification module 210 of server-side database, basic data module 220th, task collection module 230, geographical position management collection module 240, these modules are made up of its submodule respectively again:
Personnel identity identification module 210, including:Personnel's name, position submodule 211;Telephone number, device id submodule 212; Access rights manage submodule 213;
Basic data module 220, including:Unit branch subitem division submodule 221;Danger source control machine account submodule 222;Test plan, visit program submodule 223, etc.;
Task collection module 230, including:Assigned work control point sets submodule 231;Work order typing submodule 232;
Geographical position management collection module 240, including:Task control point geographical position gathers submodule 241;Geographical position with Work corresponding relation database 242;Geographical position verification management submodule 243.
Second step, according to the construction contract documents of signing, it is determined that needing the staff list honoured an agreement, that is, determine special People.The personal information for needing to be managed using the input of server end personnel identity management module 210, i.e., it is by system manager They register.Special messenger's information of typing is:Name, post, work unit, work telephone number, mobile terminal device id, visit Ask the information such as authority.Identification is used when using the mobile terminal to be logged in as special messenger.
3rd step, the typing or write-in of server end basic data 220.Basic data is the management mesh of project management Mark, it is the important component for the construction standardization that project management modernization requires.The data needed to use in the present invention Including:With《Unit part-to-item project divides table》(The Ministry of Communications of the People's Republic of China, MOC promulgates)For standard according to each project Particular demands and change unit part-to-item project division 221;Danger source control machine account 222;Test plan, make an inspection tour meter Draw 223.The characteristics of due to engineering project, these management objectives be have its specific works implement working procedure, these programs It is referred to as " process " in engineering.According to《Construction Supervision code》(The Ministry of Communications of the People's Republic of China, MOC promulgates), needed in construction Strict implement process is wanted to control.And these processes need to complete in specific job site, i.e., the geography that construction drawing requires Position.So task collection 230, geography are established in the server-side database of the present invention based on data above Location management collection 240.The two " collection " are an assigned work corresponding with basic data or process and geographical position Corresponding relation storehouse.
Illustrate:On July 1st, 2017, K12+245 arch bridge main arch ring concrete are poured into a mould, and its assigned work is " mixed Solidifying soil cast ", the working time is on July 1st, 2017, and job control point is other for being responsible for the supervising engineer of the engineering Stand management.According to construction drawing, the geographical position of engineering K12+245 center pile No. is 28.1923 degree of north latitude, east longitude 112.9846 degree.It is, he is when carrying out concrete cast management if if sidegating effect engineer, really side is stood at the scene (Some time on July 1st, 2017)Geographical position just with 28.1923 degree of north latitude, 112.9846 degree of east longitude is tens of rice in the center of circle Within the scope of.Here it is subdivisional work and job control point and the many-to-one corresponding relation in geographical position.Further, the arch Bridge on July 4th, 2017 main arch ring concrete need to carry out form removal, then assigned work is " form removal ", and the working time is in July, 2017 Some time on the 4th, job site is still 28.1923 degree of north latitude, within the scope of 112.9846 degree of east longitude is tens of rice in the center of circle.Thus By live barcode scanning multiple different specified works in same geographical position must could be realized to trigger the feedback mechanism of server Make.
4th step, according to basic data 220 and geographical position and work corresponding relation database 243, make task Message board, and the message board is set up at the construction field (site).Quick Response Code, bar code etc. are pasted or sprayed on the message board with work to appoint Figure corresponding to business collection 230, so that barcode scanning identifies.
The above first step to the preparation that the 3rd step is server end 200, the 4th step be field labeled 402 beam worker Make.It is to realize that special messenger carries out the information feedback method and equipment of assigned work at the construction field (site) that this patent, which will be described below,.Still with Upper example explanation, its object is to realize conscientiously make the supervising engineer at the appointed time, appointed place goes to complete its sidegating effect Work.Its implementation process is as follows:
As shown in Fig. 4 work on the spot schematic diagrames, special messenger uses the login system of login module 301 of mobile terminal 300, afterwards with shifting The mark scanning recognition module 302 of dynamic terminal identifies at the construction field (site) is built up in the job site of part-to-item project entity 401 Field labeled 402.The task information that mobile terminal identification is set up on field labeled the 402 of at the construction field (site) 401 enters request Action.Geographical position residing for the acquisition part-to-item project of geographical position acquisition module 302 entity 401 of mobile terminal 300 passes through Integrated information sending module 306 sends to server 200 and obtains task information request.
The operation of mobile terminal at the scene includes scanning Quick Response Code, bar code or information input window and manually enters engineering The engineering informations such as title, engineering pile No..
Server geographical position compares the geographical position of acquisition task request with work corresponding relation database 242 Whether information is consistent with basic data.
Task details if information is consistent in the corresponding assigned work control point setup module 231 of server transmission are to movement End equipment 300.Obtained because mobile terminal sends the geographical position for receiving to be started during task request built in mobile terminal Module 302, so the client of mobile terminal belonging to being carried in the solicited message of transmission logs in identity identification information, the whole world is determined Position information, location information include longitude and latitude geographical location information.
Server receives solicited message, when mobile terminal 300 send task request when will trigger server geography The arbitration functions of management module 243 are checked in position, judge that output has two kinds:
Consistent with the geographical location information data of basic database, server then feeds back the task details to mobile terminal;
Inconsistent with the geographical location information data of basic database, server then feeds back " non-at-scene work " to mobile terminal, whole Only it is asked.
After server geographical position verification module 243 judges that request geographical position is consistent, mould is sent by server info Block sends corresponding task details to mobile terminal 300.
Mobile terminal information receiving module 307 receive assigned work task details will be prompted to user carry out complete task it is anti- Feedback.The form of feedback can be the sign task " being completed in scene ", more can send mould by mobile terminal integrated information Block 306 is sent comprising form informations such as picture, word, audio, videos.The information that mobile client information is sent gathers including camera Picture, video recording, audio etc. of microphone collection, and mobile terminal local data.
Received server-side module receives the information that mobile terminal returns, and storage analysis module 250 stores these feedback letters Breath, and claimant's identity, data type, unit branch subitem division by reception etc. is arranged, in order to realize workflow Journey is traced and arranged.
Mobile terminal is multiple similar feedback of the information with server end.When the job site carries out task requests again When, server still will determine that the information such as claimant's identity, geographical position, and push the new task in the place to movement End, forms multiple feedback.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc., it all should carry within protection scope of the present invention.

Claims (15)

1. a kind of ensure that special messenger carries out the information feedback method and equipment of assigned work at the construction field (site), its feature especially suitable for Traffic Engineering Construction construction.
A kind of 2. method to be worked at the scene by feedback of the information guarantee special messenger, it is characterised in that methods described includes:
Using registered mobile terminal login system, man-machine one-to-one corresponding binding is carried out;
Work, the task collection of process and geographical position management collection are established according to the division of unit part-to-item project, formed more One-one relationship storehouse;
It is field labeled with being set up according to geographical position management collection in specified job location;
The task message board information that mobile terminal identification is set up at the construction field (site) enters request action;
Mobile terminal geographical position residing for is sent to server obtains task information request;
Server geographical position with work corresponding relation database compare the acquisition task request geographical location information with Whether basic data is consistent;
Server sends corresponding task details to mobile end equipment if information is consistent.
3. mobile terminal according to claim 2 and special messenger carry out one-to-one corresponding binding, it is characterised in that the special messenger according to Partner's contract requirement such as supervisory contract and construction contract registers name, post, job note by personnel identity management module The information such as position, work telephone number, mobile terminal device id, access rights logs in identification as client and is used.
4. according to claim 2, the special messenger holds his mobile terminal and identifies that task information enters task at the scene Request, it is characterised in that the identification maneuver can be scanning Quick Response Code, bar code or manually enter engineering name, work The engineering informations such as journey pile No..
5. method for sending information according to claim 2, it is characterised in that taken in the solicited message after the on-site identification Client with affiliated mobile terminal logs in identity identification information, the global positioning information of the mobile terminal, and its location information includes Longitude and latitude geographical location information.
6. management collection in server geographical position according to claim 2 is unit part-to-item project in traffic engineering design Geographical position establish basic data in back-end data base, the data are by engineering construction side's thing by corresponding management module First set or gather.
7. according to claim 2,5,6, server has arbitration functions, it is characterised in that methods described includes:
When identity identification information that mobile end equipment is sent, work on the spot task request message, the server such as even shake and connect The arbitration functions for the mandatory action triggers server received, judge that output has two kinds:
Consistent with the geographical location information data of basic database, server then feeds back the task details to mobile terminal;
Inconsistent with the geographical location information data of basic database, server then feeds back " non-at-scene work " to mobile terminal, whole Only it is asked.
8. server according to claim 2 sends method of the corresponding task details to mobile terminal, it is characterised in that Methods described includes:
The built-in personnel identity identification module of server database, basic data module, assigned work control point setup module, work Make instruction recording module;
Server sends geographical position, request time, claimant's identity according to residing for mobile terminal the assigned work task associated Detail information gives the receiving module of mobile end equipment;
If the solicited message of the mobile terminal transmission identification information built-in with server is inconsistent, its request is terminated, is not sent Task details.
9. a kind of received by information realizes the method for carrying out assigned work task feedback, it is characterised in that methods described includes:
Information of mobile terminal receiving module receive assigned work information will be prompted to user carry out complete task feedback, feedback Form can be the sign task " being completed in scene ", can more be sent by mobile terminal info push module comprising picture, The form informations such as word, audio, video.
10. task feedback method according to claim 9, it is each that its function will also record user including server end Feedack, and store, in order to realize workflow retrospect and arrange.
11. according to the task feedback method described in claim 9,10, mobile terminal carries out task again in the job site During request, server still will determine that the information such as claimant's identity, geographical position, and push the new task in the place to shifting Moved end, form multiple feedback.
A kind of 12. equipment to be worked at the scene by sending the information assurance special messenger comprising geographical location information, it is characterised in that The equipment includes:
On-site identification task module, any one such as camera, motion sensor, lteral data input window can be included Or it is a variety of, for sending triggering task information request action;
Geographical position acquisition module, geographical location information residing for end equipment is moved for obtaining client;
Information enters request action sending module, for the solicited message, geographical location information to be sent into server;
Feedback information sending module, for sending the form informations such as the picture fed back, word, audio, video to server.
13. according to claim 12, information sends the identification task module for ensureing special messenger's working equipment at the scene, its It is characterised by, for identifying the camera module of Quick Response Code, bar code, believes for engineerings such as typing engineering name, engineering pile No. The window of breath.
14. according to claim 12, geographical position acquisition module, it will be sent and obtained described mobile whole according to device characteristics The global positioning information at end, the geographical position include latitude and longitude information;
System is converted to longitude and latitude by providing the function of engineering mileage pile No..
15. a kind of received by information realizes the equipment for carrying out assigned work task feedback, it is characterised in that the equipment bag Include:
Mobile terminal information receiving module, completion reception assigned work information will be prompted to user and carries out completing task feedback, letter The form of breath is based on picture and text task choosing;
Mobile terminal information sending module, including the hardware such as camera, microphone, and mobile terminal local data, transmission include The form informations such as picture, word, audio, video;
Server information receiving module, receive feedback information;
Server information sending module, send task and concentrate relevant work task details to claimant;
Server end basic data processing module, the feedback information that storage server client information receiving module receives, and by reception Claimant's identity, data type, unit branch subitem division etc. arranged;
Server end task collection module, the task-set is a dynamic data base, new by being adjusted out according to feedback information Job control point is set with the work request at end to be moved.
CN201710635437.6A 2017-07-31 2017-07-31 A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site) Pending CN107481162A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710635437.6A CN107481162A (en) 2017-07-31 2017-07-31 A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710635437.6A CN107481162A (en) 2017-07-31 2017-07-31 A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site)

Publications (1)

Publication Number Publication Date
CN107481162A true CN107481162A (en) 2017-12-15

Family

ID=60598232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710635437.6A Pending CN107481162A (en) 2017-07-31 2017-07-31 A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site)

Country Status (1)

Country Link
CN (1) CN107481162A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680947A (en) * 2018-12-27 2019-04-26 中民筑友科技投资有限公司 Construction site feedback method, device, equipment and medium based on assembled architecture
CN109680946A (en) * 2018-12-27 2019-04-26 中民筑友科技投资有限公司 Based on assembled feed back on-site decoration implementation method, device, equipment and medium
CN110682941A (en) * 2019-09-12 2020-01-14 中国神华能源股份有限公司神朔铁路分公司 Railway construction protection method, server and railway construction protection system
CN113344477A (en) * 2021-08-05 2021-09-03 捷尔杰(天津)设备有限公司 Task synchronization control method and device, electronic equipment and computer storage medium
CN113469588A (en) * 2021-09-03 2021-10-01 深圳市信润富联数字科技有限公司 Safety positioning management method, device, equipment and computer program product
CN115796560A (en) * 2023-02-06 2023-03-14 一智科技有限公司 Authority management method and system for constructors

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104732345A (en) * 2015-03-18 2015-06-24 国网上海市电力公司 Supervision and management information system used for field management in power transmission and transformation engineering
CN105303304A (en) * 2015-10-15 2016-02-03 贵州省邮电规划设计院有限公司 Method for engineering field management based on handheld terminal
CN105761023A (en) * 2016-03-16 2016-07-13 江苏省电力公司常州供电公司 Outsourcing team control system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104732345A (en) * 2015-03-18 2015-06-24 国网上海市电力公司 Supervision and management information system used for field management in power transmission and transformation engineering
CN105303304A (en) * 2015-10-15 2016-02-03 贵州省邮电规划设计院有限公司 Method for engineering field management based on handheld terminal
CN105761023A (en) * 2016-03-16 2016-07-13 江苏省电力公司常州供电公司 Outsourcing team control system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109680947A (en) * 2018-12-27 2019-04-26 中民筑友科技投资有限公司 Construction site feedback method, device, equipment and medium based on assembled architecture
CN109680946A (en) * 2018-12-27 2019-04-26 中民筑友科技投资有限公司 Based on assembled feed back on-site decoration implementation method, device, equipment and medium
CN110682941A (en) * 2019-09-12 2020-01-14 中国神华能源股份有限公司神朔铁路分公司 Railway construction protection method, server and railway construction protection system
CN110682941B (en) * 2019-09-12 2021-08-03 中国神华能源股份有限公司神朔铁路分公司 Railway construction protection method, server and railway construction protection system
CN113344477A (en) * 2021-08-05 2021-09-03 捷尔杰(天津)设备有限公司 Task synchronization control method and device, electronic equipment and computer storage medium
CN113469588A (en) * 2021-09-03 2021-10-01 深圳市信润富联数字科技有限公司 Safety positioning management method, device, equipment and computer program product
CN115796560A (en) * 2023-02-06 2023-03-14 一智科技有限公司 Authority management method and system for constructors

Similar Documents

Publication Publication Date Title
CN107481162A (en) A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site)
CN111814240B (en) Highway engineering farmer management system based on BIM technology
CN104143220B (en) Checking-in and positioning tracking system based on local-machine face recognition technology and intelligent terminal
CN108492034B (en) Oil field oil recovery production management system
CN105023200A (en) Power emergency drilling system and emergency drilling method thereof
CN102799964A (en) Performance assessment managing method
CN102136162A (en) Power transmission line polling system
CN107240166A (en) Point inspection terminal and its data processing method
CN106408179A (en) Two-dimensional code and wireless network-based laboratory management system and method
CN106384312A (en) Tour group service management platform
CN107239868A (en) End message processing method and processing device for security cruising inspection system
CN110491315A (en) A kind of science and technology museum intelligence guide system
CN110648422A (en) Standardized inspection method, system and platform
CN104463297A (en) Asset two-dimensional code identification application method and device structure
You et al. City feed: A pilot system of citizen-sourcing for city issue management
CN113283683A (en) Post qualification management method and system
CN104063768A (en) Attendance check roll call statistical system
CN106203728A (en) A kind of interactive engineering supervision method
CN110766818A (en) Check-in interaction system and check-in interaction method
CN110570074A (en) safety education smart voice system based on iBeacon
WO2015068894A1 (en) Talent and career-based academic management system and method
CN112288171A (en) Data processing method, device and system
CN105991421A (en) Method, equipment and system for pushing message in group communication circle
CN103313187A (en) Construction engineering personnel positioning method based on mobile phone GPS (Global Positioning System)
CN104363305A (en) Community management and service system based on mobile terminal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20171215