CN109680946A - Based on assembled feed back on-site decoration implementation method, device, equipment and medium - Google Patents
Based on assembled feed back on-site decoration implementation method, device, equipment and medium Download PDFInfo
- Publication number
- CN109680946A CN109680946A CN201811613555.8A CN201811613555A CN109680946A CN 109680946 A CN109680946 A CN 109680946A CN 201811613555 A CN201811613555 A CN 201811613555A CN 109680946 A CN109680946 A CN 109680946A
- Authority
- CN
- China
- Prior art keywords
- decoration
- component
- site
- feedback
- feed back
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Abstract
The embodiment of the invention discloses one kind based on assembled feed back on-site decoration implementation method, device, equipment and computer readable storage medium.Wherein, method includes obtaining the corresponding architectural plan in construction site to be feedback, architectural plan projected based on floor by the three-dimensional BIM model to construction site to be feedback and is formed plan view after adding decoration attributes information, decoration attributes information includes exposed area inside and outside component, decorated type, decoration process, ornamental work amount, the length in exterior wall gap and default processing rule.Decoration attributes information of the selection instruction to the corresponding component of construction personnel's exhibition building plan view based on the received.The application, which can not only be realized to construction personnel, feeds back figure makeup decorations relevant information, also substantially shortens the transmission time of feedback procedure, improves the efficiency for feeding back decoration field data to construction personnel, and lower to feedback terminal equipment requirement.
Description
Technical field
The present embodiments relate to assembled architecture technical fields, are filled more particularly to one kind based on assembled feed back on-site
Adorn implementation method, device, equipment and computer readable storage medium.
Background technique
With the development of architectural engineering industry, the cast-in-place mode of traditional architecture, since process is tedious, artificial demand is big, pipe
Reason confusion, the wasting of resources, noise is big, the duration is longer, construction quality is uncontrollable, leads to construction quality more problems.And assembled
Construction method, i.e. design-manufacture-assembly (construction) integration, can effectively avoid the above problem, be widely used in building row
Industry.
Assembled architecture mode needs the various prefabricated components well prepared in advance before construction, and before assembled component,
It needs to arrange built-in fitting (such as built-in fitting, built-in pipe and pre-embedded bolt) in corresponding position.Built-in fitting is exactly that installation in advance (is buried
Hiding) component in concealed work, the component and fitting disposed in structure casting, for building overlap joint when superstructure, with benefit
It is fixed in the installation of field engineering Equipment Foundations.Built-in fitting is manufactured by metal mostly, such as reinforcing bar or cast iron, it is also possible to wood
Head, the non-metallic rigid materials such as plastics.
BIM (Building Information Modeling, Building Information Model) is the items with construction-engineering project
Basis of the relevant information data as model, carries out the foundation of buildings model, is had by digital information analogue simulation building
Some real informations.BIM technology is a kind of digitization tool that management is built applied to engineering design, is integrated by parameter model
The relevant information of various projects is shared and is transmitted in the lifecycle process of project planning, operation and maintenance, makes work
Journey technical staff makes correct understanding and efficiently reply to various architecture informations, for design team and including building unit of operation
Each side's construction bodies inside provide the basis to cooperate, are improving production efficiency, save the cost and are shortening the construction period aspect hair
Wave important function.
The acquisition of information of the construction site decoration of assembled architecture is generally all based on threedimensional model, but three-dimensional mould at present
The preposition file that type not only needs to input is more, and typing amount is larger, and filter condition is more, complicated for operation, cumbersome, operating process
It is long, inefficiency.Further, since 3 D graphic data amount is big, long time loading all the elements are needed, site operation is not only needed
Staffing meets 3-D graphic and shows desired terminal device, and it is slow to go back loading efficiency, leads to entire construction site feedback decoration
Information efficiency is lower.
Summary of the invention
The embodiment of the present disclosure provides a kind of based on assembled feed back on-site decoration implementation method, device, equipment and calculating
Machine readable storage medium storing program for executing improves the efficiency of construction site feedback decoration information.
In order to solve the above technical problems, the embodiment of the present invention the following technical schemes are provided:
On the one hand the embodiment of the present invention provides a kind of based on assembled feed back on-site decoration implementation method, comprising:
Obtain the corresponding architectural plan in construction site to be feedback;
Selection instruction shows the decoration attributes letter of the corresponding component of the architectural plan to construction personnel based on the received
Breath;
Wherein, the architectural plan is to carry out throwing based on floor to the three-dimensional BIM model of the construction site to be feedback
Shadow simultaneously adds formed plan view after decoration attributes information, and the decoration attributes information includes exposed area inside and outside component, decoration
Type, decoration process, ornamental work amount, the length in exterior wall gap and default processing rule.
Optionally, the selection instruction based on the received shows the corresponding component of the architectural plan to construction personnel
After decoration attributes information, further includes:
Component decoration feedback information is generated according to the feedback command of construction personnel's input.
Optionally, based on the received selection instruction shown to construction personnel it is each in the corresponding region of the architectural plan
The decoration attributes information of component, the feedback command according to construction personnel's input generate component decoration feedback information are as follows:
The decoration feedback information of each component is generated according to the feedback command that construction personnel sequentially inputs.
Optionally, if the exterior wall exposed area that the default processing rule is two neighboring component differs by more than default threshold
Gap, then be set at the big component of exterior wall exposed area by value;If two neighboring component exterior wall exposed area difference is no more than
Then gap position is arranged according to the sequence of the architectural plan from top to bottom, from left to right in gap by preset threshold.
Optionally, the selection instruction based on the received shows the corresponding component of the architectural plan to construction personnel
After decoration attributes information, further includes:
Receiving member decorates scene photo, and the component decoration scene is uploaded to the default file path of corresponding component
Under, for being fed back to component decorative scene problem.
On the other hand the embodiment of the present invention provides a kind of based on assembled feed back on-site decoration realization device, comprising:
Architectural plan pre-generatmg module, for carrying out for the three-dimensional BIM model to construction site to be feedback based on floor
Formed plan view after decoration attributes information is projected and adds, the decoration attributes information includes exposed area inside and outside component, dress
Adorn type, decoration process, ornamental work amount, the length in exterior wall gap and default processing rule;
X-Y scheme obtains module, for obtaining the corresponding architectural plan in the construction site to be feedback;
Decorative scene information display module shows the architectural plane to construction personnel for selection instruction based on the received
Scheme the decoration attributes information of corresponding component.
Optionally, further includes:
Decorative scene feedback module, the feedback command for being inputted according to construction personnel generate component decoration feedback information.
Optionally, further includes:
Component decoration problem feedback module decorates scene photo for receiving member, the component decoration scene is uploaded to
Under the default file path of corresponding component, for being fed back to component decorative scene problem.
The embodiment of the invention also provides one kind to realize equipment, including processor, institute based on assembled feed back on-site decoration
It is realized when stating processor for executing the computer program stored in memory existing based on assembled feedback as described in preceding any one
The step of field decoration implementation method.
The embodiment of the present invention finally additionally provides a kind of computer readable storage medium, the computer readable storage medium
On be stored with based on assembled feed back on-site decorate realize program, it is described based on assembled feed back on-site decoration realize program located
Manage the step of being realized as described in preceding any one when device executes based on assembled feed back on-site decoration implementation method.
The advantages of technical solution provided by the present application is, by the three-dimensional BIM illustraton of model of assembled architecture be based on floor into
Row projection generates two-dimensional plan view, and decorates correlation attribute information for plan view additional member.Utilize plan representation three-dimensional
Figure relevant information carries out component decoration information in construction personnel since plan view has both graphical and less information content advantage
When acquisition, it can not only realize to construction personnel and feed back figure makeup decorations relevant information, also substantially shorten the figure load time, thus
The transmission time for shortening feedback procedure improves the efficiency for feeding back decoration field data to construction personnel, and sets to feedback terminal
It is lower for requiring, it is adaptable;By reinforcing interacting with what site operation was decorated, the effective of site operation feedback can be also promoted
Property, and then be conducive to be promoted the construction efficiency and construction accuracy of whole building projects.
In addition, the embodiment of the present invention provides corresponding realization also directed to based on assembled feed back on-site decoration implementation method
Device, equipment and computer readable storage medium, further such that the method have more practicability, described device, equipment and
Computer readable storage medium has the advantages that corresponding.
It should be understood that the above general description and the following detailed description are merely exemplary, this can not be limited
It is open.
Detailed description of the invention
It, below will be to embodiment or correlation for the clearer technical solution for illustrating the embodiment of the present invention or the relevant technologies
Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair
Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of process signal that implementation method is decorated based on assembled feed back on-site provided in an embodiment of the present invention
Figure;
Fig. 2 is another process signal that implementation method is decorated based on assembled feed back on-site provided in an embodiment of the present invention
Figure;
Fig. 3 is a kind of specific embodiment party provided in an embodiment of the present invention that realization device is decorated based on assembled feed back on-site
Formula structure chart;
Fig. 4 is another specific implementation provided in an embodiment of the present invention that realization device is decorated based on assembled feed back on-site
Mode structure chart.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description
The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under every other embodiment obtained, shall fall within the protection scope of the present invention.
The description and claims of this application and term " first ", " second ", " third " " in above-mentioned attached drawing
Four " etc. be for distinguishing different objects, rather than for describing specific sequence.Furthermore term " includes " and " having " and
Their any deformations, it is intended that cover and non-exclusive include.Such as contain a series of steps or units process, method,
System, product or equipment are not limited to listed step or unit, but may include the step of not listing or unit.
After describing the technical solution of the embodiment of the present invention, the various non-limiting realities of detailed description below the application
Apply mode.
Referring first to Fig. 1, Fig. 1 is provided in an embodiment of the present invention a kind of based on assembled feed back on-site decoration implementation method
Flow diagram, the embodiment of the present invention may include the following contents:
S101: in advance the three-dimensional BIM model of construction site to be feedback projected based on floor and add decoration attributes
Architectural plan is formed after information.
Decoration attributes information includes exposed area inside and outside component, decorated type, decoration process, ornamental work amount, exterior wall seam
The length of gap and default processing rule, in addition, decoration attributes information may also include structure attribute information and floor information, component
Attribute information includes element type, number, position, outer profile attribute information, construction material (concrete, reinforcing bar etc.), manufacture work
Skill data, member connection (with the connection type of each component, the attribute information for the connection member that is connected etc.).When pre-establishing floor
When with the corresponding relationship of component, the location information in structure attribute information can refer to show in the position of respective storey;If no
When establishing the corresponding relationship of floor and component, the location information in structure attribute information is some position of a certain floor, such as
The location information of window is 3 layer of 301 kitchen.In this case, floor information can also not included, it can be directly from the position of component
Floor information is acquired in information.
Decorated type includes decoration of exterior wall and inner wall decoration, can know decoration area according to the outer profile of component and type
Size, and then ornamental work amount is calculated.
The inside and outside exposed area of component be interior wall exposed area and exterior wall exposed area, can be based on the component phase of BIM model
Boolean calculation is mutually carried out to obtain.
When calculating ornamental work amount, it is contemplated that the calculating of component interface portion, such as two components are built together, this
The part built need to carry out calculation process, and the surface area based on adjacent members builds the length of processing by the adjacent determination of component
Degree, can be calculated based on BIM model.Have in component centainly have it is adjacent just build, exist to build and there is gap.Gap
Length can be calculated using BIM model.
In the calculating for a kind of project amount of plastering, half, the processing in corresponding gap, those skilled in the art are calculated in every side
Member can carry out presetting gap processing rule according to actual items demand and working experience.For example the exposure of which component
Area is put over there greatly, if be not much different, according to from top to bottom, from left to right, in the plan view of same projection, is come excellent
First arrange the gap on top, the left side.Namely in a specific embodiment, if default processing rule can be two neighboring component
Exterior wall exposed area differ by more than preset threshold (5cm2), then gap is set at bulky component;If two neighboring
Component exterior wall exposed area difference be no more than preset threshold, then by gap according to the architectural plan from top to bottom, from a left side to
Gap position is arranged in right sequence.
S102: the corresponding architectural plan in construction site to be feedback is obtained.
Structure attribute information content is smaller, and the information that 2 d plane picture relative dimensional figure includes is less, and document is smaller, therefore builds
Load time needed for plan view substantially shortens, construction personnel can quick obtaining scene to be feedback design drawing.
S103: selection instruction is believed to the decoration attributes of the corresponding component of construction personnel's exhibition building plan view based on the received
Breath.
Architectural plan includes the information such as element type, floor, component perspective view, number attribute, when need to obtain some structure
When the decoration correlation of part, it is based on BIM model selected member type, which floor is transferred automatically, which element type, to transfer
Corresponding architectural plan is obtained, entire information feedback transmission process is short.
Construction personnel can directly click component to be decorated on two-dimentional architectural plan, and it is logical that system receives construction personnel
Cross the associated decorative attribute information that the selection instruction clicked and exported shows the component to construction personnel, such as the work of decorative scene
Content, decoration process as the problem of plastering, increase process, exterior wall have which process, which process completed, ornamental work amount
Etc. information.Construction personnel can not need the other informations such as input link number by X-Y scheme reading element decoration attributes, high
Effect is quick.
When showing decoration attributes information, decoration attributes information can be shown, it can also be according to the choosing of construction personnel
The demand of selecting is shown.
The decoration attributes information that selection requirement command and required displaying can be preset establishes corresponding relationship, is receiving choosing
When selecting requirement command, according to the decoration attributes information that selection requirement command matching is shown needed for corresponding, and presents it to and apply
Worker person.
Construction personnel can be selected with the click of a component, a component in selected member, one can also be selected by frame
Region is selected, and when construction personnel is when architectural plan center selects a region, system can be by structure all in the region
Part associated decorative information is shown.
In technical solution provided in an embodiment of the present invention, by the three-dimensional BIM illustraton of model of assembled architecture be based on floor into
Row projection generates two-dimensional plan view, and decorates correlation attribute information for plan view additional member.Utilize plan representation three-dimensional
Figure relevant information carries out component decoration information in construction personnel since plan view has both graphical and less information content advantage
When acquisition, it can not only realize to construction personnel and feed back figure makeup decorations relevant information, also substantially shorten the figure load time, thus
The transmission time for shortening feedback procedure improves the efficiency for feeding back decoration field data to construction personnel, and sets to feedback terminal
It is lower for requiring, it is adaptable;By reinforcing interacting with what site operation was decorated, the effective of site operation feedback can be also promoted
Property, and then be conducive to be promoted the construction efficiency and construction accuracy of whole building projects.
Based on the above embodiment, Fig. 2 is referred to, Fig. 2 is provided in an embodiment of the present invention another based on assembled feedback
The flow diagram of decorative scene implementation method, it may include the following contents:
S104: component decoration feedback information is generated according to the feedback command of construction personnel's input.
Construction personnel can be fed back when completing the decoration of some component, and feedback command is to be completed;Can also it start
When decorating to some component, feedback command can be in decoration progress;Can also to some component show information it is wrong when into
Row feedback, feedback command may include the attribute information of component number and addition error label.
When construction personnel is when architectural plan center selects a region, system can be related by component all in the region
Decoration information is shown, and construction personnel successively submits decoration feedback to each component, and system is submitted according to construction personnel
Feedback information generates corresponding component decoration feedback information.
S105: receiving member decorates scene photo, and the component decoration scene is uploaded to the default file of corresponding component
Under path, for being fed back to component decorative scene problem.
Default file path can be the document location for presetting, storing feedback construction site image.Those skilled in the art
Member can be preset according to the actual situation.
When component decoration goes wrong, construction personnel can the scene of progress take pictures, and by the component decoration comprising going wrong
Live image (i.e. component decoration scene photo) reaches at the plane map file of the component, so as in time to site operation problem into
Row feedback.
It is timely by system to not only contribute to sundry item participant for the feedback of construction personnel's real-time perfoming component decoration
The progress of current project is solved, project overall progress is held, can also in time, quickly correct the place of design error, is avoided because of design
Error causes project to be done over again, and then is conducive to be promoted the construction efficiency and construction accuracy of whole building projects.
The embodiment of the present invention provides corresponding realization device also directed to based on assembled feed back on-site decoration implementation method,
Further such that the method has more practicability.It is decorated below to provided in an embodiment of the present invention based on assembled feed back on-site
Realization device is introduced, described below based on assembled feed back on-site decoration realization device and above-described based on assembly
Formula feed back on-site decoration implementation method can correspond to each other reference.
Referring to Fig. 3, Fig. 3 is that the assembled feed back on-site provided in an embodiment of the present invention that is based on decorates realization device in a kind of tool
Structure chart under body embodiment, the device can include:
Architectural plan pre-generatmg module 301, for carrying out for the three-dimensional BIM model to construction site to be feedback based on building
Layer projects and adds formed plan view after decoration attributes information, and decoration attributes information includes exposed area inside and outside component, decoration
Type, decoration process, ornamental work amount, the length in exterior wall gap and default processing rule.
X-Y scheme obtains module 302, for obtaining the corresponding architectural plan in construction site to be feedback.
Decorative scene information display module 303, for selection instruction based on the received to construction personnel's exhibition building plane
Scheme the decoration attributes information of corresponding component.
Optionally, in some embodiments of the present embodiment, referring to Fig. 4, described device may also include decorative scene
Feedback module 304, the feedback command for being inputted according to construction personnel generate component decoration feedback information.
Described device for example may also include component decoration problem feedback module 305, decorate scene photo for receiving member, will
Component decoration scene is uploaded under the default file path of corresponding component, with anti-for carrying out to component decorative scene problem
Feedback.
The function of each functional module based on assembled feed back on-site decoration realization device described in the embodiment of the present invention can root
According to the method specific implementation in above method embodiment, the correlation that specific implementation process is referred to above method embodiment is retouched
It states, details are not described herein again.
From the foregoing, it will be observed that the embodiment of the present invention, which can not only be realized to construction personnel, feeds back figure makeup decorations relevant information, it is also big
Width shortens the transmission time of feedback procedure, improves the efficiency that decoration field data is fed back to construction personnel, and to feedback terminal
Equipment requirement is lower.
The embodiment of the invention also provides one kind to realize equipment based on assembled feed back on-site decoration, specifically can include:
Memory, for storing computer program;
Processor is realized described in any one embodiment as above for executing computer program based on assembled feed back on-site
The step of decorating implementation method.
The function of decorating each functional module for realizing equipment based on assembled feed back on-site described in the embodiment of the present invention can root
According to the method specific implementation in above method embodiment, the correlation that specific implementation process is referred to above method embodiment is retouched
It states, details are not described herein again.
From the foregoing, it will be observed that the embodiment of the present invention, which can not only be realized to construction personnel, feeds back figure makeup decorations relevant information, it is also big
Width shortens the transmission time of feedback procedure, improves the efficiency that decoration field data is fed back to construction personnel, and to feedback terminal
Equipment requirement is lower.
The embodiment of the invention also provides a kind of computer readable storage medium, it is stored with and is filled based on assembled feed back on-site
Decorations realize program, any one embodiment institute as above when realizing that program is executed by processor based on assembled feed back on-site decoration
The step of stating based on assembled feed back on-site decoration implementation method.
The function of each functional module of computer readable storage medium described in the embodiment of the present invention can be according to above method reality
The method specific implementation in example is applied, specific implementation process is referred to the associated description of above method embodiment, herein no longer
It repeats.
From the foregoing, it will be observed that the embodiment of the present invention, which can not only be realized to construction personnel, feeds back figure makeup decorations relevant information, it is also big
Width shortens the transmission time of feedback procedure, improves the efficiency that decoration field data is fed back to construction personnel, and to feedback terminal
Equipment requirement is lower.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with it is other
The difference of embodiment, same or similar part may refer to each other between each embodiment.For being filled disclosed in embodiment
For setting, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part
Explanation.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure
And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These
Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession
Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered
Think beyond the scope of this invention.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor
The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
Above to it is provided by the present invention it is a kind of based on assembled feed back on-site decorate implementation method, device, equipment and based on
Calculation machine readable storage medium storing program for executing is described in detail.Specific case used herein to the principle of the present invention and embodiment into
Elaboration is gone, the above description of the embodiment is only used to help understand the method for the present invention and its core ideas.It should be pointed out that pair
For those skilled in the art, without departing from the principle of the present invention, the present invention can also be carried out
Some improvements and modifications, these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims (10)
1. one kind decorates implementation method based on assembled feed back on-site characterized by comprising
Obtain the corresponding architectural plan in construction site to be feedback;
Selection instruction shows the decoration attributes information of the corresponding component of the architectural plan to construction personnel based on the received;
Wherein, the architectural plan is to carry out to the three-dimensional BIM model of the construction site to be feedback based on floor projection, simultaneously
Formed plan view after decoration attributes information is added, the decoration attributes information includes exposed area inside and outside component, decorated type,
Decoration process, ornamental work amount, the length in exterior wall gap and default processing rule.
2. according to claim 1 decorate implementation method based on assembled feed back on-site, which is characterized in that the default place
If the exterior wall exposed area that reason rule is two neighboring component differs by more than preset threshold, gap is set to exterior wall exposure
At the big component of product;If two neighboring component exterior wall exposed area difference is no more than preset threshold, gap is built according to described
Build the sequence setting gap position of plan view from top to bottom, from left to right.
3. according to claim 1 decorate implementation method based on assembled feed back on-site, which is characterized in that the basis connects
The selection instruction of receipts is shown to construction personnel after the decoration attributes information of the corresponding component of the architectural plan, further includes:
Component decoration feedback information is generated according to the feedback command of construction personnel's input.
4. according to claim 2 decorate implementation method based on assembled feed back on-site, which is characterized in that based on the received
Selection instruction shows the decoration attributes information of each component in the corresponding region of the architectural plan to construction personnel, described
Component decoration feedback information is generated according to the feedback command of construction personnel's input are as follows:
The decoration feedback information of each component is generated according to the feedback command that construction personnel sequentially inputs.
5. according to any one of claims 1 to 4 decorate implementation method based on assembled feed back on-site, feature exists
In the selection instruction based on the received shows the decoration attributes information of the corresponding component of the architectural plan to construction personnel
Later, further includes:
Receiving member decorates scene photo, and the component decoration scene is uploaded under the default file path of corresponding component, with
For being fed back to component decorative scene problem.
6. one kind decorates realization device based on assembled feed back on-site characterized by comprising
Architectural plan pre-generatmg module, for for the three-dimensional BIM model to construction site to be feedback carry out based on floor projection,
And formed plan view after decoration attributes information is added, the decoration attributes information includes exposed area inside and outside component, decorative kind
Type, decoration process, ornamental work amount, the length in exterior wall gap and default processing rule;
X-Y scheme obtains module, for obtaining the corresponding architectural plan in the construction site to be feedback;
Decorative scene information display module shows the architectural plan phase to construction personnel for selection instruction based on the received
The decoration attributes information of counterpart member.
7. according to claim 6 decorate realization device based on assembled feed back on-site, which is characterized in that further include:
Decorative scene feedback module, the feedback command for being inputted according to construction personnel generate component decoration feedback information.
8. according to claim 7 decorate realization device based on assembled feed back on-site, which is characterized in that further include:
Component decoration problem feedback module decorates scene photo for receiving member, the component decoration scene is uploaded to relatively
Under the default file path for answering component, for being fed back to component decorative scene problem.
9. one kind realizes equipment based on assembled feed back on-site decoration, which is characterized in that including processor, the processor is used for
It is realized when executing the computer program stored in memory as described in any one of claim 1 to 5 based on assembled feed back on-site
The step of decorating implementation method.
10. a kind of computer readable storage medium, which is characterized in that be stored on the computer readable storage medium based on dress
It is decorated with formula feed back on-site and realizes program, it is described that realization when realizing that program is executed by processor is decorated based on assembled feed back on-site
The step of as described in any one of claim 1 to 5 based on assembled feed back on-site decoration implementation method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811613555.8A CN109680946A (en) | 2018-12-27 | 2018-12-27 | Based on assembled feed back on-site decoration implementation method, device, equipment and medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811613555.8A CN109680946A (en) | 2018-12-27 | 2018-12-27 | Based on assembled feed back on-site decoration implementation method, device, equipment and medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109680946A true CN109680946A (en) | 2019-04-26 |
Family
ID=66190601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811613555.8A Pending CN109680946A (en) | 2018-12-27 | 2018-12-27 | Based on assembled feed back on-site decoration implementation method, device, equipment and medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109680946A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111814245A (en) * | 2020-09-02 | 2020-10-23 | 广东博智林机器人有限公司 | Ceiling joint layout acquisition method and device, electronic equipment and storage medium |
CN116838114A (en) * | 2023-07-06 | 2023-10-03 | 同创华建集团有限公司 | Steel construction and curtain intelligent monitoring system based on data analysis |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102750618A (en) * | 2012-06-27 | 2012-10-24 | 西安理工大学 | {0>Auxiliary management system for subway integrated pipeline construction and implementation method thereof |
CN107481162A (en) * | 2017-07-31 | 2017-12-15 | 黄静波 | A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site) |
CN108427794A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | A kind of three-dimensional building model method for dividing and processing and device based on BIM |
CN108710739A (en) * | 2018-05-11 | 2018-10-26 | 北京建筑大学 | A kind of Building Information Model lightweight and three-dimensional scenic visualization method and system |
CN108733873A (en) * | 2018-04-03 | 2018-11-02 | 中民筑友有限公司 | Technique profile design drawing generating method, system, device and readable storage medium storing program for executing |
-
2018
- 2018-12-27 CN CN201811613555.8A patent/CN109680946A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102750618A (en) * | 2012-06-27 | 2012-10-24 | 西安理工大学 | {0>Auxiliary management system for subway integrated pipeline construction and implementation method thereof |
CN107481162A (en) * | 2017-07-31 | 2017-12-15 | 黄静波 | A kind of information feedback method and equipment for ensureing special messenger and carrying out assigned work at the construction field (site) |
CN108427794A (en) * | 2017-08-12 | 2018-08-21 | 中民筑友科技投资有限公司 | A kind of three-dimensional building model method for dividing and processing and device based on BIM |
CN108733873A (en) * | 2018-04-03 | 2018-11-02 | 中民筑友有限公司 | Technique profile design drawing generating method, system, device and readable storage medium storing program for executing |
CN108710739A (en) * | 2018-05-11 | 2018-10-26 | 北京建筑大学 | A kind of Building Information Model lightweight and three-dimensional scenic visualization method and system |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111814245A (en) * | 2020-09-02 | 2020-10-23 | 广东博智林机器人有限公司 | Ceiling joint layout acquisition method and device, electronic equipment and storage medium |
CN116838114A (en) * | 2023-07-06 | 2023-10-03 | 同创华建集团有限公司 | Steel construction and curtain intelligent monitoring system based on data analysis |
CN116838114B (en) * | 2023-07-06 | 2024-01-23 | 同创华建集团有限公司 | Steel construction and curtain intelligent monitoring system based on data analysis |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7042468B2 (en) | Text overlay for multi-dimensional construction project models | |
Kim et al. | Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology | |
Benros et al. | An integrated system for providing mass customized housing | |
Pybus et al. | New realities for Canada’s parliament: A workflow for preparing heritage BIM for game engines and virtual reality | |
CN107391842A (en) | Concealed work design system and its design method based on BIM | |
JP2005502111A (en) | Simultaneous use of 2D and 3D modeling data | |
US20080018665A1 (en) | System and method for visualizing drawing style layer combinations | |
US20080070198A1 (en) | Computerized method, system and machine-readable medium to enable a user to remotely perform a decorating session on an electronic image | |
CN108153932B (en) | Desktop type three-dimensional virtual maintenance model modeling system | |
CN109680946A (en) | Based on assembled feed back on-site decoration implementation method, device, equipment and medium | |
JP2018005507A (en) | Building design/construction planning method and building design/construction planning system | |
CN108428094A (en) | A kind of design side's collaborative management method and device based on BIM | |
KR20110045719A (en) | Animation production method, computer readable medium in which program for executing the method is stored and animation production system in online using the method | |
Figliola et al. | Post-industrial Robotics | |
CN109680947A (en) | Construction site feedback method, device, equipment and medium based on assembled architecture | |
Kim et al. | Interoperability Building Information Modeling and acoustical analysis software-A demonstration of a performing arts hall design process | |
Silveira et al. | Real-time procedural generation of personalized facade and interior appearances based on semantics | |
JPH09297861A (en) | Method and device for generating and displaying perspective for building, and storage medium | |
CN109815551A (en) | Architectural design method, device, readable storage medium storing program for executing and mixed reality equipment | |
Ma et al. | Combine BIM-based and mobile technologies to design on-site support system for the communication and management of architectural heritage conservation works | |
Finkenzeller et al. | Feature-based decomposition of façades | |
JP2003157290A (en) | Processing method and processing system for image simulation, image simulation processing program, and recording medium | |
KR19980026933A (en) | Process planning method by CAD based process status visualization. | |
CN105984146A (en) | Manufacturing method of 3D object and 3D printing device | |
Vilkner et al. | Integrated processes in structural engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190426 |
|
RJ01 | Rejection of invention patent application after publication |