CN104532754B - 一种预应力混凝土箱梁封端模板施工方法 - Google Patents

一种预应力混凝土箱梁封端模板施工方法 Download PDF

Info

Publication number
CN104532754B
CN104532754B CN201510015210.2A CN201510015210A CN104532754B CN 104532754 B CN104532754 B CN 104532754B CN 201510015210 A CN201510015210 A CN 201510015210A CN 104532754 B CN104532754 B CN 104532754B
Authority
CN
China
Prior art keywords
template
base plate
web
box girder
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510015210.2A
Other languages
English (en)
Other versions
CN104532754A (zh
Inventor
郑福建
王波
金洲
石建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
China Railway Hi Tech Industry Corp Ltd
Original Assignee
China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 2 Engineering Group Co Ltd filed Critical China Railway No 2 Engineering Group Co Ltd
Priority to CN201510015210.2A priority Critical patent/CN104532754B/zh
Publication of CN104532754A publication Critical patent/CN104532754A/zh
Application granted granted Critical
Publication of CN104532754B publication Critical patent/CN104532754B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及混凝土箱梁施工领域,特别涉及一种预应力混凝土箱梁封端模板施工方法,其步骤中包括:在混凝土桥梁相邻梁间的底部、腹板内外侧及梁端面分别设置模板,分别为底板模板、腹板内外侧模板、端模板;底板模板和腹板模板进行搭接,底板模板外边与端模板紧贴并采用螺栓连接;对所述模板进行支撑,依靠底板模板、腹板内外侧模板、端模板与已浇筑梁端形成密封的空间形成完整的模具;采用小型物料提升机将混凝土提升至梁面,再通过料斗转运、浇筑混凝土,并采用小型振捣棒振捣密实;本发明的目的在于提供一种工期短、操作方便、效率高、成本投入少、降低污染的预应力混凝土箱梁封端模板施工方法。

Description

一种预应力混凝土箱梁封端模板施工方法
技术领域
本发明涉及混凝土箱梁施工领域,特别涉及一种预应力混凝土箱梁封端模板施工方法。
背景技术
后张法预应力混凝土桥梁施工中,为填补梁端预应力张拉槽口、封闭预应力的锚头和补平梁体端头,须在桥位处两跨梁体之间的窄小空间内对梁端进行封端施工。在窄小的空间条件下保证封端混凝土的质量要求,具有一定的施工技术难度;
现有的竹胶板进行施工的方法,安全性能不高,工期长,同时比较复杂,人员机械设备的投入大,也有部分污染。
发明内容
本发明的目的在于克服现有技术中所存在的上述不足,提供一种工期短、操作方便、效率高、成本投入少、降低污染的预应力混凝土箱梁封端模板施工方法。
为了实现上述发明目的,本发明提供了以下技术方案:
一种预应力混凝土箱梁封端模板施工方法,其步骤为:
A.在混凝土桥梁相邻梁间的底部、腹板内外侧及梁端面分别设置模板,分别为底板模板、腹板内外侧模板、端模板;
B.底板模板和腹板模板进行搭接,底板模板外边与端模板紧贴并采用螺栓连接;
C.对所述模板进行支撑,依靠底板模板、腹板内外侧模板、端模板与已浇筑梁端形成密封的空间形成完整的模具;
D.采用小型物料提升机将混凝土提升至梁面,再通过料斗转运、浇筑混凝土,并采用小型振捣棒振捣密实;
E.养护,拆除模板。
整体设计为混凝土运至桥下—机械提升—桥面浇筑混凝土的施工方法,不仅解决了混凝土车不能上桥进行施工的技术难题,而且形成一个循环作业的体系,且施工周期短,整体设计解决了梁端、墩顶窄小空间的封端施工,确保了安全施工,更为公司解约了成本,减少了人员机械设备的投入,降低了对周围环境的污染。
作为本发明的优选方案,步骤C中,端模板采用5cm×5cm方木支撑于相邻梁端面,材料加工简单,效果好,成本低。
作为本发明的优选方案,步骤C中,底板模板采用可调高度顶托加方木组合支撑,方便安装模板时随时的调整,增加容错率。
作为本发明的优选方案,步骤C中,腹板内外侧模板采用U形夹及钢筋对拉进行加固,加固牢固可靠,整体性强,施工安全可靠。
作为本发明的优选方案,安装模板时,顺序依次为底板模板、端模板、腹板内外侧模板,顺序科学,过程稳固,减少安全隐患。
与现有技术相比,本发明的有益效果:
工期短、操作方便、效率高、成本投入少、降低污染。
附图说明:
图1为本发明实施例1后浇段施工工艺具体流程图。
具体实施方式
下面结合实施例及具体实施方式对本发明作进一步的详细描述。但不应将此理解为本发明上述主题的范围仅限于以下的实施例,凡基于本发明内容所实现的技术均属于本发明的范围。
实施例1
本实施例中,梁端结构形式和现场实际情况(相邻梁缝宽度为10cm,0.5m—18m墩高,墩顶无施工空间等),设计采用3mm钢板作为模板的面板,角钢∠30×4作为筋板的小块钢模组合形式,以保证模板足够刚度的同时,解决了轻重量及操作方便的要求;
组合模板(模板均采用薄钢板加角钢作为背楞焊接而成,,整套模板采用螺栓、U形夹、对拉杆配合加固)一共分为三部分:腹板内外侧、底板及端模板,均根据梁形轮廓设计其模板形状。其中底板和腹板模板设计内搭接5cm,外边与端模板紧贴并采用螺栓连接,以防止漏浆。
模板的支撑,端模板采用5cm×5cm方木支撑于相邻梁端面,底板模板采用可调高度顶托加方木组合支撑,进一步加强模板的刚度及施工的安全保障,腹板内外侧模板采用U形夹及钢筋对拉进行加固。
钢模板一共分为三个部位,分别为底部、腹板内外侧及梁端面。依靠此三个部位与已浇筑梁端形成密封的空间并进行加固,完成对后浇段的封端模板密封拼装后,采用小型物料提升机将混凝土提升至梁面,再通过料斗转运、浇筑混凝土,并采用小型振捣棒振捣密实。
后浇段施工工艺具体流程如图1;本方法中具体过程包括:
A封端模板设计
(1)梁端结构形状
节段梁梁端根据预应力管道的布置,预留了腹板和底板张拉槽口,宽度与箱梁结构相同,且底板中间预留过人洞。
(2)模板设计要求
该模板需满足的要求:
a解决桥墩、梁端施工空间小施工困难;
b操作方便,高空施工安全保障;
c刚度好,反复使用。
B封端混凝土配合比设计
(1)封端混凝土技术要求
强度C50、微膨胀、大坍落度、新旧混凝土色差小等。
(2)原材料的选用
在原材料的选用时,考虑到与节段梁之间色差问题,在材料选用上使用节段梁混凝土施工相同的原材料。
(3)配合比的选定
设计采用低水胶比,按要求掺膨胀剂(8%—10%),坍落度控制在(80—100)。此设计配合比满足3天40Mpa、7天50Mpa,28天65—70Mpa。
C梁端凿毛及钢筋绑扎
在节段梁端梁混凝土初凝后,拆除端模板并对张拉预留槽口进行凿毛处理;后浇段钢筋设计采用局部钢筋网片并固定在张拉工作锚上,每个工作锚固定两层钢筋。其操作要点为保证保护层的同时,固定钢筋网片的位置。
D拼装模板
首先,安装底板模板。底板模板共分为三节,模板间采用螺栓连接,背楞为10cmx10cm方木,通过钢管加上顶托组合,将其支撑于墩顶,利用可调顶托方便调节模板的水平以及支撑的牢固,保证底板模板与桥梁底板紧贴密实,防止漏浆、爆模等施工安全质量事故。
其次,安装梁端模板。梁端模板分为三块,通过梁缝垂直放下,两块上模板支撑在下模板上,下模板支撑于底板模板,模板之间采用螺栓连接。使用小方木作为背楞,利用木楔紧固于相邻梁端。
最后,安装腹板模板。腹板内外侧模板同时安装,并采用对拉使其紧贴于已浇筑混凝土轮廓,并使用U形卡,进一步加固于梁端模板,使所以模板形成一个整体,完成模板的安装于加固。
E吊砼至梁面及浇筑砼
混凝土运送至现场,放入斗车中,采用物料提升机将混凝土提升至梁面,再通过人工将斗车中的混凝土通过梁端排水孔倒入后浇段,从底层开始往上浇筑,浇筑的同时采用插入式振捣棒进行振捣。
F养护、拆模
(1)应在浇筑完毕后的12h以内对混凝土加以覆盖并保湿养护。
(2)混凝土浇水养护的时间不得少于7d。
(3)当混凝土达到设计强度的70%,进行混凝土拆模。
实施例有益效果和优点
1整体设计为混凝土运至桥下—机械提升—桥面浇筑混凝土的施工方法,不仅解决了混凝土车不能上桥进行施工的技术难题,而且形成一个循环作业的体系,且施工周期短。
2整体设计解决了梁端、墩顶窄小空间的封端施工。
3自重轻,模板均采用薄钢板加角钢作为背楞焊接而成;刚度好,可反复循环利用。
4操作方便,整套模板采用螺栓、U形夹、对拉杆配合加固,易于熟练掌握,劳动强度低;且加固牢固可靠,整体性强,施工安全可靠。
5该工法与普通方法(采用竹胶板进行施工的方法)相比,不仅确保了安全施工,更为公司解约了成本,减少了人员机械设备的投入,降低了对周围环境的污染。

Claims (5)

1.一种预应力混凝土箱梁封端模板施工方法,其步骤为:
A.在混凝土桥梁相邻梁间的底部、腹板内外侧及梁端面分别设置模板,分别为底板模板、腹板内外侧模板、端模板;
B.底板模板和腹板模板进行搭接,底板模板外边与端模板紧贴并采用螺栓连接;
C.对所述模板进行支撑,依靠底板模板、腹板内外侧模板、端模板与已浇筑梁端形成密封的空间形成完整的模具;
D.采用小型物料提升机将混凝土提升至梁面,再通过料斗转运、浇筑混凝土,并采用小型振捣棒振捣密实;
E.养护,拆除模板。
2.根据权利要求1所述的一种预应力混凝土箱梁封端模板施工方法,其特征在于,步骤C中,端模板采用5cm×5cm方木支撑于相邻梁端面。
3.根据权利要求1所述的一种预应力混凝土箱梁封端模板施工方法,其特征在于,步骤C中,底板模板采用可调高度顶托加方木组合支撑。
4.根据权利要求1所述的一种预应力混凝土箱梁封端模板施工方法,其特征在于,步骤C中,腹板内外侧模板采用U形夹及钢筋对拉进行加固。
5.根据权利要求1所述的一种预应力混凝土箱梁封端模板施工方法,其特征在于,安装模板时,顺序依次为底板模板、端模板、腹板内外侧模板。
CN201510015210.2A 2015-01-13 2015-01-13 一种预应力混凝土箱梁封端模板施工方法 Active CN104532754B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510015210.2A CN104532754B (zh) 2015-01-13 2015-01-13 一种预应力混凝土箱梁封端模板施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510015210.2A CN104532754B (zh) 2015-01-13 2015-01-13 一种预应力混凝土箱梁封端模板施工方法

Publications (2)

Publication Number Publication Date
CN104532754A CN104532754A (zh) 2015-04-22
CN104532754B true CN104532754B (zh) 2016-04-20

Family

ID=52848362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510015210.2A Active CN104532754B (zh) 2015-01-13 2015-01-13 一种预应力混凝土箱梁封端模板施工方法

Country Status (1)

Country Link
CN (1) CN104532754B (zh)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947603B (zh) * 2015-04-30 2016-12-07 西安科技大学 一种钢筋混凝土梁桥主梁加固构造及加固方法
CN104947597A (zh) * 2015-07-07 2015-09-30 中建三局第二建设工程有限责任公司 一种混凝土箱梁人孔封模系统及施工方法
CN106808564B (zh) * 2017-04-07 2023-05-26 中铁十七局集团第三工程有限公司 一种三字扣式箱梁封端模板及箱梁封端方法
CN108360362A (zh) * 2018-04-12 2018-08-03 中交第公路勘察设计研究院有限公司 装配式简支箱梁端横梁构造
CN114182634A (zh) * 2021-11-10 2022-03-15 中铁二局集团有限公司 一种用于悬臂梁体浇筑的端模板加固结构及其加固方法
CN114214974B (zh) * 2021-12-29 2024-02-27 山西省交通科技研发有限公司 小跨径梁桥上部结构快速装配化改造方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008019687A (ja) * 2006-07-14 2008-01-31 Kawasaki Heavy Ind Ltd 連続桁橋の施工方法、合成床版および連続桁橋
CN101713168A (zh) * 2008-10-06 2010-05-26 中交第三航务工程局有限公司 一种节段箱梁制作模板的安装工艺
CN202174632U (zh) * 2011-07-08 2012-03-28 四川五新智能设备有限公司 一种用于箱梁模板端模支撑的装置
CN102691268A (zh) * 2012-06-12 2012-09-26 宁波二十冶建设有限公司 超长预应力钢束张拉施工工艺
KR20120111506A (ko) * 2011-04-01 2012-10-10 한국건설기술연구원 프리캐스트 단부 세그먼트를 단부거푸집으로 이용하는 거더 제작방법 및 그 방법으로 제작된 거더
CN203700971U (zh) * 2014-02-10 2014-07-09 苏玉明 一种桥梁湿接缝施工模板
CN203938971U (zh) * 2014-07-08 2014-11-12 宁夏路桥工程股份有限公司 预应力混凝土空心板端头整体模板

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008019687A (ja) * 2006-07-14 2008-01-31 Kawasaki Heavy Ind Ltd 連続桁橋の施工方法、合成床版および連続桁橋
CN101713168A (zh) * 2008-10-06 2010-05-26 中交第三航务工程局有限公司 一种节段箱梁制作模板的安装工艺
KR20120111506A (ko) * 2011-04-01 2012-10-10 한국건설기술연구원 프리캐스트 단부 세그먼트를 단부거푸집으로 이용하는 거더 제작방법 및 그 방법으로 제작된 거더
CN202174632U (zh) * 2011-07-08 2012-03-28 四川五新智能设备有限公司 一种用于箱梁模板端模支撑的装置
CN102691268A (zh) * 2012-06-12 2012-09-26 宁波二十冶建设有限公司 超长预应力钢束张拉施工工艺
CN203700971U (zh) * 2014-02-10 2014-07-09 苏玉明 一种桥梁湿接缝施工模板
CN203938971U (zh) * 2014-07-08 2014-11-12 宁夏路桥工程股份有限公司 预应力混凝土空心板端头整体模板

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
悬浇箱梁预应力施工技术简介;张文基;《企业科技与发展》;20110920(第312期);第55-57页 *

Also Published As

Publication number Publication date
CN104532754A (zh) 2015-04-22

Similar Documents

Publication Publication Date Title
CN104532754B (zh) 一种预应力混凝土箱梁封端模板施工方法
CN106223360B (zh) 采用桩撑支护体系的明挖装配整体式结构地铁站施工方法
CN100587165C (zh) 装配式支架原位现浇制梁施工方法
CN100572011C (zh) 后张法预应力混凝土箱梁整孔预制施工方法
CN102392536B (zh) 大跨度悬空通廊式模板支撑体系施工方法
CN107724680A (zh) 一种高层建筑框架结构梁柱节点施工方法
CN205025086U (zh) 一种劲性骨架混凝土梁施工的悬吊模板
CN103104091B (zh) 滑模整体提升平台及施工方法
CN108104284B (zh) 剪力墙钢臂嵌入楼板的墙板连接结构及装配方法
CN105804395B (zh) 基于整体式定型模板的楼梯一次连续浇筑成型施工方法
CN107905114A (zh) 一种特大跨径连续刚构拱桥的施工方法
CN107476337A (zh) 明挖地铁装配式车站预制侧墙拼装施工方法
CN110552502A (zh) 一种c型料场中间挡墙悬挑平台的施工方法
CN107476341A (zh) 采用装配整体式结构地铁车站预制板拼装方法
CN105649248B (zh) 装配式预应力混凝土空心板与现浇梁一体化施工方法
CN111236720B (zh) 无施工缝浇筑筒仓减压锥的施工方法
CN204266132U (zh) 采用d型梁的铁路框架墩横梁
CN110344844B (zh) 一种轨道工程轨排井施工方法
CN107988921A (zh) 一种上跨铁路、高速公路的跨线桥梁单点连续顶推施工方法
CN205224332U (zh) 预制墙体和预制墙板
CN204475184U (zh) 城市轻轨高架桥山型u梁施工支撑体系
CN207109593U (zh) 一种t型高墩现浇盖梁支模结构
CN205857697U (zh) 反吊模板的楼板支撑施工装置
CN102767378B (zh) 排架施工隧道双柱式洞门方法
CN106884366A (zh) 一种装配式道路及其施工方法

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160301

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Address before: 610041, No. nine, No. 156, building B, high building, Xing Xing Road, Chengdu hi tech Zone, Sichuan

Applicant before: China Railway Erju Co., Ltd.

Applicant before: China Railway Erju Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180730

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: China Railway Erju Co., Ltd.

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: China Railway Erju Co., Ltd.

Patentee after: China Railway No. 2 Engineering Group Co., Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee before: China Railway Erju Co., Ltd.

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.