CN103010404A - 一种铝合金上层建筑分段总组方法 - Google Patents

一种铝合金上层建筑分段总组方法 Download PDF

Info

Publication number
CN103010404A
CN103010404A CN2012105630107A CN201210563010A CN103010404A CN 103010404 A CN103010404 A CN 103010404A CN 2012105630107 A CN2012105630107 A CN 2012105630107A CN 201210563010 A CN201210563010 A CN 201210563010A CN 103010404 A CN103010404 A CN 103010404A
Authority
CN
China
Prior art keywords
superstructure
moulding bed
aluminium alloy
layer
segmentation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105630107A
Other languages
English (en)
Other versions
CN103010404B (zh
Inventor
夏文亚
聂黎军
邹丽榕
段显龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Guangzhou Huangpu Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Guangzhou Huangpu Shipbuilding Co Ltd filed Critical CSSC Guangzhou Huangpu Shipbuilding Co Ltd
Priority to CN201210563010.7A priority Critical patent/CN103010404B/zh
Publication of CN103010404A publication Critical patent/CN103010404A/zh
Application granted granted Critical
Publication of CN103010404B publication Critical patent/CN103010404B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明提供的铝合金上层建筑分段总组方法,包括如下步骤:1)制作第一层上层建筑整体胎架;2)在第一层上层建筑整体胎架上组装第一层上层建筑;3)于第一层上层建筑的甲板上制作第二层上层建筑整体胎架;4)在第二层上层建筑整体胎架上组装第二层上层建筑;5)重复步骤1)~4)建造其他层的上层建筑;6)将各层整体胎架上的分段合拢口焊接,完成铝合金上层建筑的分段总组。本发明直接制作整体胎架总装铝合金上层建筑结构,省去了分段胎架和分段组装场地,而且铝合金分段无须翻身吊运,不会产生不易控制的变形。本发明的整体胎架结构简单,可用废旧钢材制作,胎架强度高,支撑点为可拆式,环保且重复利用率高。

Description

一种铝合金上层建筑分段总组方法
技术领域
本发明涉及船舶制造与装配领域,特别涉及一种铝合金上层建筑分段总组方法。
背景技术
现代造船模式采用的区域造船法是以总段为建造单元,各个分段在分段场地制造完毕后,然后吊装到总组场地进行总装成为总段,这种总段建造法是钢质海船的船体结构的一般总装方法,但是对于某些类型船的铝合金上层建筑来说就不适用了,因为铝合金的弹性模量低,铝合金分段经过多次吊装、运输、翻身后必然产生较大的变形,需要进行大量的变形预防和后期的变形矫正工作,不利于建造周期的缩短,甚至影响船台搭载精度。
发明内容
本发明的目的是提供一种铝合金上层建筑分段总组方法,替代铝合金上层建筑分段总组的常规方法,各层上层建筑采用整体建造方法,避免吊装过程中铝合金结构的变形。
为达上述目的,本发明提供了一种铝合金上层建筑分段总组方法,包括如下步骤:1)、制作第一层上层建筑整体胎架;2)、在第一层上层建筑整体胎架上组装第一层上层建筑;3)、于第一层上层建筑的甲板上制作第二层上层建筑整体胎架;4)、在第二层上层建筑整体胎架上组装第二层上层建筑;5)、重复步骤1)~4)建造其他层的上层建筑;6)、将各层整体胎架上的分段合拢口焊接,完成铝合金上层建筑的分段总组。
在步骤2)或4)的过程中,先将铝合金上层建筑分为若个分段,各分段由下向上依次组装,先吊装各分段的内部壁板于各自的整体胎架上固定,再吊装各分段的甲板于各自的整体胎架上固定,然后吊装各分段的外侧壁板并固定在各自的整体胎架上,最后安装各分段的散装零件,完成各层上层建筑的组装。
上述整体胎架主要布置在铝合金上层建筑的外侧壁板、内部壁板以及甲板的强横梁、纵桁的下方。
应对铝合金上层建筑结构的整体强度进行分析,对无强横梁和纵桁的甲板结构强度较薄弱部位,在其下方增加布置胎架。
上述整体胎架为支柱式胎架,其支撑点为码板螺栓式连接。
本发明的有益效果是:本发明直接制作整体胎架总装铝合金上层建筑结构,省去了分段胎架和分段组装场地,而且最主要的是铝合金分段无须翻身吊运,不会产生不易控制的变形。本发明的整体胎架结构简单,可用废旧钢材制作,胎架强度高,支撑点的形式为可拆式,环保且重复利用率高。
下面结合附图及具体实施方式对本发明作进一步详细说明。
附图说明
图1为第一层上层建筑总装示意图;
图2为第二层上层建筑总装示意图;
图3为支撑点节点1示意图;
图4为支撑点节点2示意图;
图5为支撑点节点3示意图;
图6为整体胎架示意图。
图中: 1、支撑角钢;2、加强槽钢;3、加强角钢;4、螺栓;5、铝合金码板;6、铝合金板条;7、分段外侧壁;8、分段甲板纵桁;9、分段甲板板;10、第一节点;11、第二节点;12、第三节点。
具体实施方式
为了是克服铝合金上层建筑分段总组的常规方法,在吊装过程中存在铝合金结构变形的问题,本实施例提供了一种铝合金上层建筑分段总组方法,包括如下步骤:1)、制作第一层上层建筑整体胎架;2)、在第一层上层建筑整体胎架上组装第一层上层建筑;3)、于第一层上层建筑的甲板上制作第二层上层建筑整体胎架;4)、在第二层上层建筑整体胎架上组装第二层上层建筑;5)、重复步骤1)~4)建造其他层的上层建筑;6)、将各层整体胎架上的分段合拢口焊接,完成铝合金上层建筑的分段总组。
在步骤2)或4)的过程中,先将铝合金上层建筑分为若个分段,各分段由下向上依次组装,先吊装各分段的内部壁板于各自的整体胎架上固定,再吊装各分段的甲板于各自的整体胎架上固定,然后吊装各分段的外侧壁板并固定在各自的整体胎架上,最后安装各分段的散装零件,完成各层上层建筑的组装。
整体胎架主要布置在铝合金上层建筑的外侧壁板、内部壁板以及甲板的强横梁、纵桁的下方。除此之外,还应对铝合金上层建筑结构的整体强度进行分析,对无强横梁和纵桁8的甲板结构强度较薄弱部位,在其下方增加布置胎架。
本实施例中涉及的整体胎架如图6所示,为支柱式胎架(根据施工需要,分为4个分段,即自下而上、依次是分段1、和分段1相邻的分段2,以及依次设置在分段2上方的分段3和分段4),其支撑点为码板螺栓式连接,具体连接结构可借由图3、4和5可知,其中,图3所示为图1中所示的第一层上层建筑总装示意图中的第一接点10的连接结构,由此可见,码板5与板条6焊接,同时通过蜡烛头螺栓4与胎架角钢1连接,码板5与板条6为铝合金材料。外围壁板7下端与板条6连接。图4所示为图1或2所示的第一层上层建筑总装示意图或第二层上层建筑总装示意图中的第二接点11的连接结构,其同样是码板5与强横梁或纵桁8焊接,同时码板5通过蜡烛头螺栓4与胎架角钢1连接;而图5所示为图2所示的第二层上层建筑总装示意图中的第三接点12的连接结构,其同样是其同样是码板5与甲板9焊接,同时码板5通过蜡烛头螺栓4与胎架角钢1连接。
由图1中不难看出,胎架主要由角钢制成的竖向支柱1及连接竖向支柱1的连杆3,连杆3也由角钢制成,及连接第一层上层建筑总装下口的由槽钢制成的横向连杆2,在完成铝合金上层建筑总装时,先其分为若个分段,各分段由下向上依次组装,先吊装各分段的内部壁板于各自的整体胎架上固定,再吊装各分段的甲板9于各自的整体胎架上固定,然后吊装各分段的外侧壁板7并固定在各自的整体胎架上,最后安装各分段的散装零件,完成各层上层建筑的组装。
由图1和图2不难看出,整体胎架主要布置在铝合金上层建筑外围壁板(包括前、后端壁以及左右外侧壁)7、内部壁板以及甲板9上的主要结构(如强横梁、纵桁8——见图4)的下方。
值得注意的是,本实施例中涉及的制作胎架,属于已有的成熟技术,因此,本实施例中对其制作不做过多描述。
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本发明的保护范围。  

Claims (5)

1.一种铝合金上层建筑分段总组方法,其特征在于,包括如下步骤:
1)、制作第一层上层建筑整体胎架;2)、在第一层上层建筑整体胎架上组装第一层上层建筑;3)、于第一层上层建筑的甲板上制作第二层上层建筑整体胎架;4)、在第二层上层建筑整体胎架上组装第二层上层建筑;5)、重复步骤1)~4)建造其他层的上层建筑;6)、将各层整体胎架上的分段合拢口焊接,完成铝合金上层建筑的分段总组。
2.如权利要求1所述的铝合金上层建筑分段总组方法,其特征在于:在步骤2)或4)的过程中,先将铝合金上层建筑分为若个分段,各分段由下向上依次组装,先吊装各分段的内部壁板于各自的整体胎架上固定,再吊装各分段的甲板于各自的整体胎架上固定,然后吊装各分段的外侧壁板并固定在各自的整体胎架上,最后安装各分段的散装零件,完成各层上层建筑的组装。
3.如权利要求1或2所述的铝合金上层建筑分段总组方法,其特征在于:所述整体胎架主要布置在铝合金上层建筑的外侧壁板、内部壁板以及甲板的强横梁、纵桁的下方。
4.如权利要求1或2所述的铝合金上层建筑分段总组方法,其特征在于:应对铝合金上层建筑结构的整体强度进行分析,对无强横梁和纵桁的甲板结构强度较薄弱部位,在其下方增加布置胎架。
5.如权利要求1或2所述的铝合金上层建筑分段总组方法,其特征在于:所述整体胎架为支柱式胎架,其支撑点为码板螺栓式连接。
CN201210563010.7A 2012-12-20 2012-12-20 一种铝合金上层建筑分段总组方法 Active CN103010404B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210563010.7A CN103010404B (zh) 2012-12-20 2012-12-20 一种铝合金上层建筑分段总组方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210563010.7A CN103010404B (zh) 2012-12-20 2012-12-20 一种铝合金上层建筑分段总组方法

Publications (2)

Publication Number Publication Date
CN103010404A true CN103010404A (zh) 2013-04-03
CN103010404B CN103010404B (zh) 2015-04-22

Family

ID=47959638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210563010.7A Active CN103010404B (zh) 2012-12-20 2012-12-20 一种铝合金上层建筑分段总组方法

Country Status (1)

Country Link
CN (1) CN103010404B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103552654A (zh) * 2013-10-31 2014-02-05 广州中船黄埔造船有限公司 一种船舶上层建筑组合式通用支撑胎架
CN109334858A (zh) * 2018-09-05 2019-02-15 中国葛洲坝集团机械船舶有限公司 一种船舶上层建筑建造的方法
CN111422317A (zh) * 2020-04-17 2020-07-17 上海外高桥造船有限公司 一种超大型上建总段整体建造方法
CN112478081A (zh) * 2020-11-03 2021-03-12 中船黄埔文冲船舶有限公司 一种船用胎架
CN114104222A (zh) * 2021-11-08 2022-03-01 沪东中华造船(集团)有限公司 一种避免船舶铝合金上建围壁变形的方法
CN114228944A (zh) * 2022-01-04 2022-03-25 江南造船(集团)有限责任公司 艏部上层建筑一体化建造的方法
CN114919690A (zh) * 2022-06-20 2022-08-19 招商局金陵船舶(江苏)有限公司 一种滚装船上层建筑布置结构及减振结构

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04151391A (ja) * 1990-04-26 1992-05-25 Sky Alum Co Ltd アルミニウム・frp複合船およびその建造方法
CN2897578Y (zh) * 2006-02-13 2007-05-09 江南造船(集团)有限责任公司 铝合金船整体翻身架
CN101492140A (zh) * 2008-01-21 2009-07-29 江南造船(集团)有限责任公司 铝合金双体船的吊运装置和整船下水的工艺方法
CN102442407A (zh) * 2011-11-08 2012-05-09 南通华凯重工有限公司 一种建造船舶上层建筑的流水线及其方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04151391A (ja) * 1990-04-26 1992-05-25 Sky Alum Co Ltd アルミニウム・frp複合船およびその建造方法
CN2897578Y (zh) * 2006-02-13 2007-05-09 江南造船(集团)有限责任公司 铝合金船整体翻身架
CN101492140A (zh) * 2008-01-21 2009-07-29 江南造船(集团)有限责任公司 铝合金双体船的吊运装置和整船下水的工艺方法
CN102442407A (zh) * 2011-11-08 2012-05-09 南通华凯重工有限公司 一种建造船舶上层建筑的流水线及其方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
崔立: "铝合金舰船结构设计中相关问题探讨", 《船海工程》, vol. 37, no. 6, 31 December 2008 (2008-12-31), pages 36 - 37 *
李标峰: "铝合金高速船船体建造工艺", 《材料开发与应用》, vol. 13, no. 3, 30 June 1998 (1998-06-30), pages 24 - 29 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103552654A (zh) * 2013-10-31 2014-02-05 广州中船黄埔造船有限公司 一种船舶上层建筑组合式通用支撑胎架
CN103552654B (zh) * 2013-10-31 2016-01-20 广州中船黄埔造船有限公司 一种船舶上层建筑组合式通用支撑胎架
CN109334858A (zh) * 2018-09-05 2019-02-15 中国葛洲坝集团机械船舶有限公司 一种船舶上层建筑建造的方法
CN111422317A (zh) * 2020-04-17 2020-07-17 上海外高桥造船有限公司 一种超大型上建总段整体建造方法
CN112478081A (zh) * 2020-11-03 2021-03-12 中船黄埔文冲船舶有限公司 一种船用胎架
CN114104222A (zh) * 2021-11-08 2022-03-01 沪东中华造船(集团)有限公司 一种避免船舶铝合金上建围壁变形的方法
CN114228944A (zh) * 2022-01-04 2022-03-25 江南造船(集团)有限责任公司 艏部上层建筑一体化建造的方法
CN114919690A (zh) * 2022-06-20 2022-08-19 招商局金陵船舶(江苏)有限公司 一种滚装船上层建筑布置结构及减振结构
CN114919690B (zh) * 2022-06-20 2023-06-09 招商局金陵船舶(江苏)有限公司 一种滚装船上层建筑减振结构

Also Published As

Publication number Publication date
CN103010404B (zh) 2015-04-22

Similar Documents

Publication Publication Date Title
CN103010404B (zh) 一种铝合金上层建筑分段总组方法
CN101544268B (zh) 船舶建造中半宽型双跨总组搭载方法
CN106335603A (zh) 一种槽型舱壁总段的组装方法
CN109625157B (zh) 大型集装箱船翼桥分段一体化建造的方法
CN109334858A (zh) 一种船舶上层建筑建造的方法
CN102975818A (zh) 一种铝合金上层建筑总段吊装方法
CN109533196A (zh) 一种船体钢结构铰链式安装方法
CN105151225A (zh) 一种顶边舱分段建造工艺
CN104691704B (zh) 一种内河船舶的建造方法
CN112609598B (zh) 一种叠合梁斜拉桥上部结构快速循环施工方法
CN110241959A (zh) 一种叠合板及其施工方法
CN104908885A (zh) 一种船舶艏楼舷墙整体制作方法
CN201649651U (zh) 船闸闸室施工大模板支架
CN104669434A (zh) 大型钢筋混凝土预制柱、梁吊装辅助预埋件施工方法
CN203187288U (zh) 一种箱梁吊架
CN210850737U (zh) 一种预制梁快拆型流水作业钢模板
CN201722621U (zh) 一种预制箱梁的整体吊装架
CN210284030U (zh) 轻量化自卸车厢的侧车厢板结构
CN204570447U (zh) 整幅变截面钢箱梁
CN107386646A (zh) 一种顶盖整体升降的滑移式建筑工程加工车间
CN112455620A (zh) 一种特殊上建总装吊耳结构
CN210104566U (zh) 一种便捷化、稳定型提升架
CN208516811U (zh) 层叠式桥式起重机
CN206843953U (zh) 一种高速铁路墩内定型辅助施工平台
CN204642065U (zh) 一种船舶主机进仓开口结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Cheung Chau Street in Whampoa District of Guangzhou City, Guangdong Province, No. 188 510000

Patentee after: Middle ship Huangpu Wen Chong boats and ships Co., Ltd

Address before: Cheung Chau Street in Whampoa District of Guangzhou City, Guangdong Province, No. 188 510000

Patentee before: CSSC Guangzhou Shipbuilding Co., Ltd.