CN204548395U - 一种带侧推船艏分段制作工艺 - Google Patents
一种带侧推船艏分段制作工艺 Download PDFInfo
- Publication number
- CN204548395U CN204548395U CN201520044318.XU CN201520044318U CN204548395U CN 204548395 U CN204548395 U CN 204548395U CN 201520044318 U CN201520044318 U CN 201520044318U CN 204548395 U CN204548395 U CN 204548395U
- Authority
- CN
- China
- Prior art keywords
- making
- basal plane
- lower shoe
- jigsaw
- thruster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 230000011218 segmentation Effects 0.000 claims abstract description 15
- 238000003466 welding Methods 0.000 claims description 8
- 238000010586 diagram Methods 0.000 claims description 7
- 238000000465 moulding Methods 0.000 claims description 6
- 238000007747 plating Methods 0.000 claims description 4
- 230000007306 turnover Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
本实用新型涉及一种带侧推船艏分段制作工艺,所述船艏分段以上、下底板为分界分为上下两个部分,上部分以上底板为基面反造,下部分以下底板为基面反造,然后上部分与下部分整体合拢。本实用新型的优点在于:本实用新型的船艏分段以上、下底板为分界分为上下两个部分,并以上、下底板作为基面进行制造,提高了生产效率,缩短船艏分段的建造周期,加快了造船速度。
Description
技术领域
本发明涉及船舶制造领域,特别涉及一种带侧推船艏分段制作工艺。
背景技术
船体通常在制造的过程中分三部分,即船艏,中艏和艉艏,如图1所示带侧推船艏某一分段结构,包括上下平行设置的上底板1、下底板2以及分别支撑在上底板1下方与下底板2下方的上骨架与下骨架,在上骨架与下骨架的左、右舷侧铺设的外板3,上骨架与下骨架艉部安装有腹板4,下骨架的两侧还设置有侧推管6。
上述带侧推船艏某一分段制作时,目前采用的分段制作工艺,施工周期长,费时费力。
发明内容
本发明要解决的技术问题是提供一种能够缩短施工周期,提高制作效率的带侧推船艏分段制作工艺。
为解决上述技术问题,本发明的技术方案为:一种带侧推船艏分段制作工艺,其创新点在于:所述船艏分段以上、下底板为分界分为上下两个部分,上部分以上底板为基面反造,下部分以下底板为基面反造,然后上部分与下部分整体合拢。
进一步地,所述下部分制作步骤具体如下:
(1) 小组立预制:根据部件图制作出肘板、肋板、纵桁板以及平台板;
(2) 中组立制作:首先制作下底板,将下底板沿长轴方向分为第一下底板与第二下底板两个部分进行制作,制作时依次吊装小组立进行拼板来完成;制作完成后,以第一下底板与第二下底板为基面布置平面胎架;胎架布置完成后,以第一下底板为基面安装中纵舱壁,沿中纵舱壁从艉往艏依次安装纵舱壁两侧与上底板之间的肋板,然后安装中纵舱壁艏部的纵舱壁,最后安装相邻两肋板间的肘板;
(3) 装配:以第一底板与第二底板为基面依次吊装合拢,吊装散装件及外板,然后整体翻身吊装侧推管,开孔流板,从而完成下部分骨架与下底板的制作。
进一步地,所述上部分制作步骤具体如下:
(1) 小组立预制:根据部件图制作出肘板、横梁、中纵桁、纵桁、水平桁以及箱体;
(2) 中组立制作:首先制作上底板,依次吊装小组粒并采用拼板完成上底板的制作;制作完成后,首先拼板完成上底板艏部内侧面板的制作,以该内侧面板为基面在其上端面划线安装肋骨、横梁以及纵桁;然后拼板完成上骨架左、右舷侧外板的制作,以左、右舷侧外板为基面吊装平台板;再然后拼板完成内腹板的制作,以该内腹板为基面在其上端面划线安装纵舱壁;最后拼板完成骨架艉部腹板的制作,以该艉部腹板为基面在其上端面划线安装水平桁;
(3) 装配:以中组立制作的上底板为基面,顺序吊装内腹板、内侧面板、左舷侧拼板、右舷侧拼板并依次吊装合拢,从而完成上部分骨架与上底板的制作。
进一步地,所述上部分与下部分整体合拢,合拢时以上底板为基面,将下部分整体吊装至上部分上方并合拢,合拢后翻身即可完成船艏分段的制作。
进一步地,所述焊接时,先焊对接焊缝,后焊角焊缝;在角焊缝同样可焊的情况下,先焊立角焊缝,后焊平角焊缝。
本发明的优点在于:
(1)本发明的船艏分段以上、下底板为分界分为上下两个部分,并以上、下底板作为基面进行制造,提高了生产效率,缩短船艏分段的建造周期,加快了造船速度;
(2)本发明分段制作工艺中,上、下部分分为三个步骤,由小组、中组到最后合拢,提高了生产效率;
(3)本发明分段制作工艺中,焊接时,先焊对接焊缝,后焊角焊缝;在角焊缝同样可焊的情况下,先焊立角焊缝,后焊平角焊缝,有效控制分段焊接变形,提高焊接质量。
附图说明
图1为目前船艏分段的结构示意图。
图2为目前船艏分段下部分的内部结构示意图。
图3为本发明船首分段制作的结构示意图。
图4为本发明船首分段制作中上部分制作的结构示意图。
图5为本发明船首分段制作中下部分制作的结构示意图。
图6为本发明船首分段制作中上部分与下部分整体合拢的结构示意图。
具体实施方式
如图3所示,本发明公开了一种带侧推船艏分段制作工艺,船艏分段以上、下底板为分界分为上下两个部分,上部分a以上底板1为基面反造,下部分b以下底板为基面反造,然后上部分a与下部分b整体合拢。
如图4所示,上述下部分b制作步骤具体如下:
第一步,小组立预制:根据部件图制作出肘板、肋板、纵桁板以及平台板;
第二步,中组立制作:首先制作下底板,将下底板沿长轴方向分为第一下底板6与第二下底板7两个部分进行制作,制作时依次吊装小组立进行拼板来完成;制作完成后,以第一下底板6与第二下底板7为基面布置平面胎架;胎架布置完成后,以第一下底板6为基面安装中纵舱壁8,沿中纵舱壁8从艉往艏依次安装纵舱壁两侧与上底板1之间的肋板9,然后安装中纵舱壁8艏部的纵舱壁10,最后安装相邻两肋板间的肘板11从而完成中组立N1的制作;
第三步,装配:以第一底板6与第二底板7为基面依次吊装合拢,吊装散装件及外板12,然后整体翻身吊装侧推管13,开孔流板,从而完成下部分b骨架与下底板的制作。
如图5所示,上述上部分a制作步骤具体如下:
第一步,小组立预制:根据部件图制作出肘板、横梁、中纵桁、纵桁、水平桁以及箱体;
第二步,中组立制作:首先制作上底板1,依次吊装小组粒并采用拼板完成上底板1的制作;制作完成后,首先拼板完成上底板1艏部内侧面板14的制作,以该内侧面板14为基面在其上端面划线安装肋骨15、横梁16以及纵桁17完成中组立N2的制作;然后拼板完成上骨架左舷侧外板18、右舷侧外板19的制作,以左舷侧外板18、右舷侧外板19为基面分别吊装平台板20、平台板21完成中组立N3L与中组立N4R的制作;再然后拼板完成内腹板22的制作,以该内腹板22为基面在其上端面划线安装纵舱壁23从而完成中组立N5的制作;最后拼板完成骨架艉部腹板24的制作,以该艉部腹板24为基面在其上端面划线安装水平桁25;
第三步,装配:以中组立制作的上底板1为基面,顺序吊装中组立N5,N2,N3L,N4R并合拢,从而完成上部分骨架与上底板1的制作。
如图6所示,上述上部分a与下部分b整体合拢,合拢时以上底板1为基面,将下部分b整体吊装至上部分a上方并合拢,合拢后翻身即可完成船艏分段的制作。
本实施例中,为了有效控制分段焊接变形,提高焊接质量。所述焊接时,先焊对接焊缝,后焊角焊缝;在角焊缝同样可焊的情况下,先焊立角焊缝,后焊平角焊缝。
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。
Claims (5)
1.一种带侧推船艏分段制作工艺,其特征在于:所述船艏分段以上、下底板为分界分为上下两个部分,上部分以上底板为基面反造,下部分以下底板为基面反造,然后上部分与下部分整体合拢。
2.根据权利要1所述的带侧推船艏分段制作工艺,其特征在于:所述下部分制作步骤具体如下:
小组立预制:根据部件图制作出肘板、肋板、纵桁板以及平台板;
中组立制作:首先制作下底板,将下底板沿长轴方向分为第一下底板与第二下底板两个部分进行制作,制作时依次吊装小组立进行拼板来完成;制作完成后,以第一下底板与第二下底板为基面布置平面胎架;胎架布置完成后,以第一下底板为基面安装中纵舱壁,沿中纵舱壁从艉往艏依次安装纵舱壁两侧与上底板之间的肋板,然后安装中纵舱壁艏部的纵舱壁,最后安装相邻两肋板间的肘板;
装配:以第一底板与第二底板为基面依次吊装合拢,吊装散装件及外板,然后整体翻身吊装侧推管,开孔流板,从而完成下部分骨架与下底板的制作。
3.根据权利要求1所述的带侧推船艏分段制作工艺,其特征在于:所述上部分制作步骤具体如下:
小组立预制:根据部件图制作出肘板、横梁、中纵桁、纵桁、水平桁以及箱体;
中组立制作:首先制作上底板,依次吊装小组粒并采用拼板完成上底板的制作;制作完成后,首先拼板完成上底板艏部内侧面板的制作,以该内侧面板为基面在其上端面划线安装肋骨、横梁以及纵桁;然后拼板完成上骨架左、右舷侧外板的制作,以左、右舷侧外板为基面吊装平台板;再然后拼板完成内腹板的制作,以该内腹板为基面在其上端面划线安装纵舱壁;最后拼板完成骨架艉部腹板的制作,以该艉部腹板为基面在其上端面划线安装水平桁;
装配:以中组立制作的上底板为基面,顺序吊装内腹板、内侧面板、左舷侧拼板、右舷侧拼板并依次吊装合拢,从而完成上部分骨架与上底板的制作。
4.根据权利要求1所述的带侧推船艏分段制作工艺,其特征在于:所述上部分与下部分整体合拢,合拢时以上底板为基面,将下部分整体吊装至上部分上方并合拢,合拢后翻身即可完成船艏分段的制作。
5.根据权利要求1至4中的任意一项所述的带侧推船艏分段制作工艺,其特征在于:所述焊接时,先焊对接焊缝,后焊角焊缝;在角焊缝同样可焊的情况下,先焊立角焊缝,后焊平角焊缝。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520044318.XU CN204548395U (zh) | 2015-01-22 | 2015-01-22 | 一种带侧推船艏分段制作工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520044318.XU CN204548395U (zh) | 2015-01-22 | 2015-01-22 | 一种带侧推船艏分段制作工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204548395U true CN204548395U (zh) | 2015-08-12 |
Family
ID=53823539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520044318.XU Expired - Fee Related CN204548395U (zh) | 2015-01-22 | 2015-01-22 | 一种带侧推船艏分段制作工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204548395U (zh) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106114757A (zh) * | 2016-08-26 | 2016-11-16 | 福建东南造船有限公司 | 一种艏部立体分段施工工艺 |
CN107235118A (zh) * | 2017-06-08 | 2017-10-10 | 中船黄埔文冲船舶有限公司 | 一种用于船舶分段建造的辅助结构及其制作方法 |
CN107264723A (zh) * | 2017-06-30 | 2017-10-20 | 广船国际有限公司 | 一种侧推装置的安装方法 |
CN108945297A (zh) * | 2018-07-27 | 2018-12-07 | 广船国际有限公司 | 一种船舶机舱位置分段划分方法 |
CN109080769A (zh) * | 2018-05-31 | 2018-12-25 | 沪东中华造船(集团)有限公司 | 一种舰船全宽型结构分段的保形建造方法 |
CN109747772A (zh) * | 2018-12-14 | 2019-05-14 | 大连中远海运重工有限公司 | 海洋工程船艏部侧推器的侧推管支撑结构及安装方法 |
CN110182313A (zh) * | 2019-06-06 | 2019-08-30 | 上海外高桥造船有限公司 | 30万吨浮式生产储油轮艏货舱舷侧总段异地总组工艺 |
CN110466673A (zh) * | 2019-08-29 | 2019-11-19 | 广船国际有限公司 | 内底结构及船舶 |
CN110588884A (zh) * | 2019-09-25 | 2019-12-20 | 江苏扬子鑫福造船有限公司 | 一种大型艏部高精度无余量控制工艺 |
CN113212691A (zh) * | 2021-06-17 | 2021-08-06 | 江南造船(集团)有限责任公司 | 一种船舶曲型分段建造方法 |
CN113978649A (zh) * | 2021-12-02 | 2022-01-28 | 沪东中华造船(集团)有限公司 | 一种船舶上可开启侧推盖安装方法 |
CN114750895A (zh) * | 2022-04-02 | 2022-07-15 | 广船国际有限公司 | 一种用于侧推和侧推封盖的定位安装方法 |
CN114932988A (zh) * | 2022-06-06 | 2022-08-23 | 广船国际有限公司 | 一种半潜船侧推分段的建造方法 |
CN115092348A (zh) * | 2022-07-05 | 2022-09-23 | 上海外高桥造船有限公司 | 一种大型邮轮艏部侧推分段建造工艺 |
CN115320804A (zh) * | 2021-05-11 | 2022-11-11 | 江南造船(集团)有限责任公司 | 一种船舶机舱分段建造方法 |
CN115320803A (zh) * | 2022-06-29 | 2022-11-11 | 江南造船(集团)有限责任公司 | 一种船舶曲线型外板大组立安装方法及船舶 |
-
2015
- 2015-01-22 CN CN201520044318.XU patent/CN204548395U/zh not_active Expired - Fee Related
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106114757B (zh) * | 2016-08-26 | 2018-06-19 | 福建东南造船有限公司 | 一种艏部立体分段施工工艺 |
CN106114757A (zh) * | 2016-08-26 | 2016-11-16 | 福建东南造船有限公司 | 一种艏部立体分段施工工艺 |
CN107235118A (zh) * | 2017-06-08 | 2017-10-10 | 中船黄埔文冲船舶有限公司 | 一种用于船舶分段建造的辅助结构及其制作方法 |
CN107235118B (zh) * | 2017-06-08 | 2019-12-03 | 中船黄埔文冲船舶有限公司 | 一种用于船舶分段建造的辅助结构及其制作方法 |
CN107264723B (zh) * | 2017-06-30 | 2019-03-29 | 广船国际有限公司 | 一种侧推装置的安装方法 |
CN107264723A (zh) * | 2017-06-30 | 2017-10-20 | 广船国际有限公司 | 一种侧推装置的安装方法 |
CN109080769A (zh) * | 2018-05-31 | 2018-12-25 | 沪东中华造船(集团)有限公司 | 一种舰船全宽型结构分段的保形建造方法 |
CN109080769B (zh) * | 2018-05-31 | 2020-04-14 | 沪东中华造船(集团)有限公司 | 一种舰船全宽型结构分段的保形建造方法 |
CN108945297A (zh) * | 2018-07-27 | 2018-12-07 | 广船国际有限公司 | 一种船舶机舱位置分段划分方法 |
CN109747772A (zh) * | 2018-12-14 | 2019-05-14 | 大连中远海运重工有限公司 | 海洋工程船艏部侧推器的侧推管支撑结构及安装方法 |
CN110182313A (zh) * | 2019-06-06 | 2019-08-30 | 上海外高桥造船有限公司 | 30万吨浮式生产储油轮艏货舱舷侧总段异地总组工艺 |
CN110466673A (zh) * | 2019-08-29 | 2019-11-19 | 广船国际有限公司 | 内底结构及船舶 |
CN110588884A (zh) * | 2019-09-25 | 2019-12-20 | 江苏扬子鑫福造船有限公司 | 一种大型艏部高精度无余量控制工艺 |
CN115320804A (zh) * | 2021-05-11 | 2022-11-11 | 江南造船(集团)有限责任公司 | 一种船舶机舱分段建造方法 |
CN113212691A (zh) * | 2021-06-17 | 2021-08-06 | 江南造船(集团)有限责任公司 | 一种船舶曲型分段建造方法 |
CN113978649A (zh) * | 2021-12-02 | 2022-01-28 | 沪东中华造船(集团)有限公司 | 一种船舶上可开启侧推盖安装方法 |
CN113978649B (zh) * | 2021-12-02 | 2023-12-08 | 沪东中华造船(集团)有限公司 | 一种船舶上可开启侧推盖安装方法 |
CN114750895A (zh) * | 2022-04-02 | 2022-07-15 | 广船国际有限公司 | 一种用于侧推和侧推封盖的定位安装方法 |
CN114932988A (zh) * | 2022-06-06 | 2022-08-23 | 广船国际有限公司 | 一种半潜船侧推分段的建造方法 |
CN115320803A (zh) * | 2022-06-29 | 2022-11-11 | 江南造船(集团)有限责任公司 | 一种船舶曲线型外板大组立安装方法及船舶 |
CN115092348A (zh) * | 2022-07-05 | 2022-09-23 | 上海外高桥造船有限公司 | 一种大型邮轮艏部侧推分段建造工艺 |
CN115092348B (zh) * | 2022-07-05 | 2023-07-04 | 上海外高桥造船有限公司 | 一种大型邮轮艏部侧推分段建造工艺 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204548395U (zh) | 一种带侧推船艏分段制作工艺 | |
CN108177730A (zh) | 一种舷侧分段一体化建造方法 | |
CN103010404B (zh) | 一种铝合金上层建筑分段总组方法 | |
CN104760662A (zh) | 一种冰区球鼻艏加强结构分段制作工艺 | |
CN106335603A (zh) | 一种槽型舱壁总段的组装方法 | |
CN102582784A (zh) | 船舶的船台或船坞分段搭载工艺 | |
CN204771269U (zh) | 一种用于制作船舶艏楼舷墙的专用胎架 | |
CN101817392A (zh) | 横隔舱分段导轨架预装工艺 | |
CN110027577A (zh) | 铝蜂窝与铝板拼接司机室及具有其的轨道车辆 | |
CN109533196A (zh) | 一种船体钢结构铰链式安装方法 | |
CN104260828A (zh) | 一种超大型艏部总段的吊装方法 | |
CN105151225A (zh) | 一种顶边舱分段建造工艺 | |
CN105539812A (zh) | 一种机翼翼梁对接接头 | |
CN105752268A (zh) | 超大型船舶艉部分段总组吊装方法 | |
CN104908885B (zh) | 一种船舶艏楼舷墙整体制作方法 | |
CN109080769A (zh) | 一种舰船全宽型结构分段的保形建造方法 | |
CN204000570U (zh) | 浮船坞引桥 | |
CN204644878U (zh) | 一种门式墩钢桁梁吊装施工装置 | |
CN203410514U (zh) | 一种车架结构及矿用自卸车 | |
CN205381375U (zh) | 一种超大型船舶艉部分段总组支撑机构 | |
CN104627317B (zh) | 一种具有降噪功能的海工船艏侧推 | |
CN204185085U (zh) | 无支撑双桁架结构 | |
CN204642065U (zh) | 一种船舶主机进仓开口结构 | |
CN103708000B (zh) | 船体总段吊装固定保护器及船体总段吊装方法 | |
CN204571295U (zh) | 一种提高铝合金模板抵抗侧向承载力的结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210901 Address after: 226200 Haigong Avenue 888, Qidong City, Nantong City, Jiangsu Province Patentee after: NANTONG CIMC PACIFIC OCEAN MARINE ENGINEERING Co.,Ltd. Address before: 226200 No. 5555 Haigong Avenue, Qidong Haigong Shipbuilding Industrial Park, Nantong City, Jiangsu Province Patentee before: QIDONG FENGSHUN SHIP HEAVY INDUSTRY Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150812 |
|
CF01 | Termination of patent right due to non-payment of annual fee |