CN105752268A - 超大型船舶艉部分段总组吊装方法 - Google Patents
超大型船舶艉部分段总组吊装方法 Download PDFInfo
- Publication number
- CN105752268A CN105752268A CN201610120304.0A CN201610120304A CN105752268A CN 105752268 A CN105752268 A CN 105752268A CN 201610120304 A CN201610120304 A CN 201610120304A CN 105752268 A CN105752268 A CN 105752268A
- Authority
- CN
- China
- Prior art keywords
- stern
- block assembly
- segmentation
- section
- pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种超大型船舶艉部分段总组吊装方法,包括以下步骤:(1)艉部各分段加强:在各分段的弱档用槽钢连接与原结构形成框架结构,在艉部分段组装由中间向两边依次选用钢制垫墩、方形搁墩、稳向架式支撑、方形搁墩支撑稳性支撑;(2)分段翻身吊马设计:在艉部侧板、非平台上安装吊码,在吊装范围内选取多组吊点,采用计算分析的方法进行模拟分析,选取最合适的吊点;(3)分段总组确定:船舶设备能各分段在出坞之前安装到位,分段总组后即可在出坞阶段使用。(4)在完成总组后进行大尺寸的测量,确保型宽、型高、型长值在要求范围内。
Description
技术领域
本发明涉及船舶建造领域,具体说是一种超大型船舶艉部分段总组、吊装方法。
背景技术
集装箱船的艉部总段包括艉部的一层甲板,由于船宽比较大,分段的重量较重,所以分段建造时将艉部分成左中右三段制作,传统建造工艺是将分段制作好依次吊装、搭载,左右对接拼缝的装配及焊接,需要从船坞坞底搭建大量的脚手架才能进行施工,不仅浪费大量的脚手架材料,而且延长了整个施工周期。同时,如果不进行总组,这样许多舾装件不能在总段阶段安装,实现不了预舾装率100%的目标。将这些舾装件和机电设备留在搭载后安装,这样机电设备安装不及时,造成水下出现工种交叉作业,还有大量的高空作业,不仅影响交船周期,而且对安全生产极为不利。
发明内容
本发明的目的在于克服上述不足,提供一种可对大型总段整体吊装的吊装方法,有效提高生产效率和中间产品的完整性。
本发明的技术方案是:一种超大型船舶艉部分段总组吊装方法,包括以下步骤:
(1)艉部各分段加强:在各分段的弱档用槽钢连接与原结构形成框架结构,在艉部分段组装由中间向两边依次选用钢制垫墩、方形搁墩、稳向架式支撑、方形搁墩支撑稳性支撑;
(2)分段翻身吊马设计:在艉部侧板、非平台上安装吊码,在吊装范围内选取多组吊点,采用计算分析的方法进行模拟分析,选取最合适的吊点;
(3)分段总组确定:船舶设备能各分段在出坞之前安装到位,分段总组后即可在出坞阶段使用。
(4)在完成总组后进行大尺寸的测量,确保型宽、型高、型长值在要求范围内。
进一步地,吊码安装于艉封板及前壁板上。
进一步地,艉部分段的挂舵臂总组支撑于钢制垫墩上。
进一步地,艉部总组测量采用激光经纬仪进行测量。
本发明通过分段翻身平移吊马的确定,根据门机要求确定总段包含的分段及吊马的位置,分段的组装,根据定位支撑将分段进行定位,然后依次将其他分段装焊到位;分段组装后进行总段加强。本发明通过将艉部3个大分段组成一个超大总段,让所有的设备都安装到位,保证总段的完整性的同时使原来水下的工作能提前到总组阶段,避免搭载后出现不同工种作业交叉,缩短建造周期。
附图说明
图1为本发明总组结构示意图;
图2为本发明吊码设计图。
图中:艉部中间分段1,艉部左分段2,艉部右分段3,挂舵臂4,钢制垫墩5,中间方形搁墩6,稳向架式支撑7,外方形搁墩8,吊码9,尾封板10。
具体实施方式
以下结合附图和实施例作进一步说明。
图1、2所示:艉部总段包括艉部中间分段1,艉部左分段2,艉部右分段3,挂舵臂4,挂舵臂4安装于艉部中间分段1下方,艉部中间分段1的左右两侧连接艉部左分段2和艉部右分段3,艉部总段的尾封板10以及前侧板(图中未显示),非艉部甲板上设置吊码9,吊码可达跨度设计,满足艉部中间分段1、艉部左分段2、艉部右分段3的总组吊装要求,艉部中间分段1的挂舵臂4支撑于钢制垫墩5上,艉部中间分段1的两边由两中间方形搁墩6对称支撑,艉部左分段2的中部和外边分别由稳向架式支撑7和外方形搁墩8支撑,艉部右分段3的支撑与左侧对应。
本发明超大型船舶艉部分段总组、吊装方法,包括以下步骤:
(1)艉部各分段加强:在各分段的弱档用槽钢连接与原结构形成框架结构,在艉部分段组装由中间向两边依次选用钢制垫墩、方形搁墩、稳向架式支撑、方形搁墩支撑稳性支撑;
(2)分段翻身吊马设计:在艉部非平台、艉封板及前壁板上安装吊码,在吊装范围内选取多组吊点,采用计算分析的方法进行模拟分析,选取最合适的吊点;
(3)分段总组确定:船舶设备能各分段在出坞之前安装到位,分段总组后即可在出坞阶段使用。
(4)在完成总组后采用激光经纬仪进行大尺寸的测量,确保型宽、型高、型长值在要求范围内。
Claims (4)
1.一种超大型船舶艉部分段总组吊装方法,包括以下步骤:
(1)艉部各分段加强:在各分段的弱档用槽钢连接与原结构形成框架结构,在艉部分段组装由中间向两边依次选用钢制垫墩、方形搁墩、稳向架式支撑、方形搁墩支撑稳性支撑;
(2)分段翻身吊马设计:在艉部侧板、非平台上安装吊码,在吊装范围内选取多组吊点,采用计算分析的方法进行模拟分析,选取最合适的吊点;
(3)分段总组确定:船舶设备能各分段在出坞之前安装到位,分段总组后即可在出坞阶段使用;
(4)在完成总组后进行大尺寸的测量,确保型宽、型高、型长值在要求范围内。
2.根据权利要求1所述的超大型船舶艉部分段总组、吊装方法,其特征是:吊码安装于艉封板及前壁板上。
3.根据权利要求1所述的超大型船舶艉部分段总组、吊装方法,其特征是:艉部分段的挂舵臂总组支撑于钢制垫墩上。
4.根据权利要求1所述的超大型船舶艉部分段总组、吊装方法,其特征是:艉部总组测量采用激光经纬仪进行测量。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610120304.0A CN105752268A (zh) | 2016-03-04 | 2016-03-04 | 超大型船舶艉部分段总组吊装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610120304.0A CN105752268A (zh) | 2016-03-04 | 2016-03-04 | 超大型船舶艉部分段总组吊装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105752268A true CN105752268A (zh) | 2016-07-13 |
Family
ID=56332375
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610120304.0A Pending CN105752268A (zh) | 2016-03-04 | 2016-03-04 | 超大型船舶艉部分段总组吊装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105752268A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018214336A1 (zh) * | 2017-05-24 | 2018-11-29 | 广船国际有限公司 | 一种复杂线型分段的制造方法 |
CN111422321A (zh) * | 2020-04-17 | 2020-07-17 | 上海外高桥造船有限公司 | 一种散货船艏部总段的总组方法 |
CN112078749A (zh) * | 2020-07-29 | 2020-12-15 | 沪东中华造船(集团)有限公司 | 一种用于单壳体燃料舱的总组支撑方法 |
CN112193384A (zh) * | 2020-10-14 | 2021-01-08 | 上海外高桥造船有限公司 | 大型邮轮薄板总段内部临时支撑方法 |
CN113401308A (zh) * | 2021-05-21 | 2021-09-17 | 沪东中华造船(集团)有限公司 | 一种船舶大线型分段总组精度控制方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3875887A (en) * | 1972-01-24 | 1975-04-08 | Parsons Co Ralph M | Apparatus and system for transporting and positioning prefabricated modules in the construction of seagoing ships |
CN101570234A (zh) * | 2008-04-29 | 2009-11-04 | 江南造船(集团)有限责任公司 | 一种机舱总段组装方法以及机舱总段的吊装方法 |
CN102582784A (zh) * | 2012-03-30 | 2012-07-18 | 南通明德重工有限公司 | 船舶的船台或船坞分段搭载工艺 |
CN104260828A (zh) * | 2014-09-12 | 2015-01-07 | 江苏扬子鑫福造船有限公司 | 一种超大型艏部总段的吊装方法 |
CN104743060A (zh) * | 2015-04-27 | 2015-07-01 | 上海外高桥造船海洋工程有限公司 | 船舶主机安装方法 |
-
2016
- 2016-03-04 CN CN201610120304.0A patent/CN105752268A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3875887A (en) * | 1972-01-24 | 1975-04-08 | Parsons Co Ralph M | Apparatus and system for transporting and positioning prefabricated modules in the construction of seagoing ships |
CN101570234A (zh) * | 2008-04-29 | 2009-11-04 | 江南造船(集团)有限责任公司 | 一种机舱总段组装方法以及机舱总段的吊装方法 |
CN102582784A (zh) * | 2012-03-30 | 2012-07-18 | 南通明德重工有限公司 | 船舶的船台或船坞分段搭载工艺 |
CN104260828A (zh) * | 2014-09-12 | 2015-01-07 | 江苏扬子鑫福造船有限公司 | 一种超大型艏部总段的吊装方法 |
CN104743060A (zh) * | 2015-04-27 | 2015-07-01 | 上海外高桥造船海洋工程有限公司 | 船舶主机安装方法 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018214336A1 (zh) * | 2017-05-24 | 2018-11-29 | 广船国际有限公司 | 一种复杂线型分段的制造方法 |
CN111422321A (zh) * | 2020-04-17 | 2020-07-17 | 上海外高桥造船有限公司 | 一种散货船艏部总段的总组方法 |
CN111422321B (zh) * | 2020-04-17 | 2021-06-25 | 上海外高桥造船有限公司 | 一种散货船艏部总段的总组方法 |
CN112078749A (zh) * | 2020-07-29 | 2020-12-15 | 沪东中华造船(集团)有限公司 | 一种用于单壳体燃料舱的总组支撑方法 |
CN112078749B (zh) * | 2020-07-29 | 2022-12-13 | 沪东中华造船(集团)有限公司 | 一种用于单壳体燃料舱的总组支撑方法 |
CN112193384A (zh) * | 2020-10-14 | 2021-01-08 | 上海外高桥造船有限公司 | 大型邮轮薄板总段内部临时支撑方法 |
CN113401308A (zh) * | 2021-05-21 | 2021-09-17 | 沪东中华造船(集团)有限公司 | 一种船舶大线型分段总组精度控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105752268A (zh) | 超大型船舶艉部分段总组吊装方法 | |
CN204548395U (zh) | 一种带侧推船艏分段制作工艺 | |
CN102336250B (zh) | 一种挂舵臂的安装方法 | |
CN109625157B (zh) | 大型集装箱船翼桥分段一体化建造的方法 | |
CN104386219A (zh) | 自升式平台桩靴后续入坞工艺 | |
CN103452126B (zh) | 一种底板钢材可回收的轻型组合吊箱及其施工工艺 | |
CN205381375U (zh) | 一种超大型船舶艉部分段总组支撑机构 | |
CN103216112A (zh) | 上下钢柱对接结构体系及其一次性安装固定方法 | |
CN104743056A (zh) | 船舶铝合金分段的吊装方法 | |
CN105000153A (zh) | 脚手马及脚手架搭设的方法 | |
CN102328728B (zh) | 深水铺管起重船的重型海洋工程起重机底座的组装方法 | |
CN104340336B (zh) | 一种船舶超重分段翻身方法 | |
CN202225997U (zh) | 一种挂舵臂 | |
CN211815671U (zh) | 一种新型铝制直升机平台结构 | |
CN102126667B (zh) | 体积大、刚度小的敞口式槽体的吊装方法 | |
CN203094373U (zh) | Fpso用生活楼模块 | |
CN104310235A (zh) | 海工生活平台上建整体吊运方法 | |
CN104259808B (zh) | 海上井架拼装及整吊上船方法 | |
CN109353935B (zh) | 一种岸边集装箱起重机的中转平台 | |
CN209410299U (zh) | 一种船体检修用升降平台 | |
CN104477323B (zh) | 桩靴优先入坞工艺 | |
CN201292000Y (zh) | 挂舵臂专用基台 | |
CN204527603U (zh) | 一种焊接式挂舵臂结构 | |
CN203808034U (zh) | 用于大型海洋平台组块分块吊装的连接装置 | |
CN204211355U (zh) | 一种节点板连接式柔性腿 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160713 |
|
WD01 | Invention patent application deemed withdrawn after publication |