CN110562386A - 一种大型船舶上层建筑的预总组方法 - Google Patents

一种大型船舶上层建筑的预总组方法 Download PDF

Info

Publication number
CN110562386A
CN110562386A CN201910906592.6A CN201910906592A CN110562386A CN 110562386 A CN110562386 A CN 110562386A CN 201910906592 A CN201910906592 A CN 201910906592A CN 110562386 A CN110562386 A CN 110562386A
Authority
CN
China
Prior art keywords
deck section
section
deck
superstructure
sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910906592.6A
Other languages
English (en)
Inventor
杨聪
储年生
袁欢
郭磊
刘学军
张立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CN201910906592.6A priority Critical patent/CN110562386A/zh
Publication of CN110562386A publication Critical patent/CN110562386A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种大型船舶上层建筑的预总组方法,该大型船舶上层建筑包括:第一甲板分段、第二甲板分段、第三甲板分段、第四甲板分段、第五甲板分段、驾驶桥楼甲板分段和罗经甲板分段;其中驾驶桥楼甲板分段包括第一子分段和第二子分段;该预总组方法包括以下步骤:(1)吊运第一甲板分段作为定位分段进行上胎定位;(2)依次吊运第二甲板分段、第三甲板分段、第四甲板分段、第五甲板分段、第一子分段、第二子分段和罗经甲板分段进行定位安装。本发明通过预总组建造方式,实现和主船体并行建造,大大降低了船坞内安装周期及人工成本,通过工序前移能够满足生产节点,大大缩短了船坞内的施工周期。避免了受场地限制而影响施工进度的窘境,无论从安全、质量、环境及经济效益方面都得到了大幅度提升。

Description

一种大型船舶上层建筑的预总组方法
技术领域
本发明涉及一种大型船舶上层建筑的预总组方法。
背景技术
大型船舶建造搭载一般在船坞内船舶上层建筑以各层甲板(分段)单独搭载方式进行。随着现代造船厂管理提升、生产效率加快、建造周期缩短,船坞资源匮乏的情况,这种传统建造搭载方式直接影响船坞施工周期和船舶建造计划。
发明内容
本发明的目的,就是为了解决上述问题而提供了一种大型船舶上层建筑的预总组方法,大大降低了船坞内安装周期及人工成本。
本发明的目的是这样实现的:
本发明的一种大型船舶上层建筑的预总组方法,该大型船舶上层建筑包括:第一甲板分段、第二甲板分段、第三甲板分段、第四甲板分段、第五甲板分段、驾驶桥楼甲板分段和罗经甲板分段;其中驾驶桥楼甲板分段包括第一子分段和第二子分段;该预总组方法包括以下步骤:
(1)吊运第一甲板分段作为定位分段进行上胎定位;
(2)依次吊运第二甲板分段、第三甲板分段、第四甲板分段、第五甲板分段、第一子分段、第二子分段和罗经甲板分段进行定位安装。
上述的大型船舶上层建筑的预总组方法种步骤(2)同时进行甲板分段内部或相邻甲板分段的船舶铁舾件、船舶管系、船舶电气和船舶涂装工作。
本发明的大型船舶上层建筑通过预总组建造方式,实现和主船体并行建造,大大降低了船坞内安装周期及人工成本,通过工序前移能够满足生产节点,大大缩短了船坞内的施工周期。避免了受场地限制而影响施工进度的窘境,无论从安全、质量、环境及经济效益方面都得到了大幅度提升。
附图说明
图1是本发明的大型船舶上层建筑的结构示意图;
图2是本发明的大型船舶上层建筑的总装图。
具体实施方式
下面将结合附图,对本发明作进一步说明。
本发明的大型船舶上层建筑包括:第一甲板分段1、第二甲板分段2、第三甲板分段3、第四甲板分段4、第五甲板分段5、驾驶桥楼甲板分段6和罗经甲板分段7;其中驾驶桥楼甲板分段6包括第一子分段61和第二子分段62;本发明的大型船舶上层建筑的预总组方法包括以下步骤:
(1)吊运第一甲板分段1作为定位分段进行上胎定位;
(2)依次第二甲板分段2、第三甲板分段3、第四甲板分段4、第五甲板分段5、第一子分段61、第二子分段62和罗经甲板分段7进行定位安装。同时进行甲板分段内部或相邻甲板分段的船舶铁舾件、船舶管系、船舶电气、船舶涂装工作,直至整个大型船舶上层建筑区域各专业的完整性施工和交付。
本发明的大型船舶上层建筑通过预总组建造方式,实现和主船体并行建造,大大降低了船坞内安装周期及人工成本,通过工序前移能够满足生产节点,大大缩短了船坞内的施工周期。避免了受场地限制而影响施工进度的窘境,无论从安全、质量、环境及经济效益方面都得到了大幅度提升。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变型,因此所有等同的技术方案也应该属于本发明的范畴,应由各权利要求所限定。

Claims (2)

1.一种大型船舶上层建筑的预总组方法,该大型船舶上层建筑包括:第一甲板分段、第二甲板分段、第三甲板分段、第四甲板分段、第五甲板分段、驾驶桥楼甲板分段和罗经甲板分段;其中所述驾驶桥楼甲板分段包括第一子分段和第二子分段;其特征在于,所述预总组方法包括以下步骤:
(1)吊运所述第一甲板分段作为定位分段进行上胎定位;
(2)依次吊运所述第二甲板分段、第三甲板分段、第四甲板分段、第五甲板分段、第一子分段、第二子分段和罗经甲板分段进行定位安装。
2.如权利要求1所述的大型船舶上层建筑的预总组方法,其特征在于,步骤(2)同时进行甲板分段内部或相邻甲板分段的船舶铁舾件、船舶管系、船舶电气和船舶涂装工作。
CN201910906592.6A 2019-09-24 2019-09-24 一种大型船舶上层建筑的预总组方法 Pending CN110562386A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910906592.6A CN110562386A (zh) 2019-09-24 2019-09-24 一种大型船舶上层建筑的预总组方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910906592.6A CN110562386A (zh) 2019-09-24 2019-09-24 一种大型船舶上层建筑的预总组方法

Publications (1)

Publication Number Publication Date
CN110562386A true CN110562386A (zh) 2019-12-13

Family

ID=68782112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910906592.6A Pending CN110562386A (zh) 2019-09-24 2019-09-24 一种大型船舶上层建筑的预总组方法

Country Status (1)

Country Link
CN (1) CN110562386A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111422321A (zh) * 2020-04-17 2020-07-17 上海外高桥造船有限公司 一种散货船艏部总段的总组方法
CN111806653A (zh) * 2020-07-24 2020-10-23 上海外高桥造船有限公司 一种邮轮舷侧总段的预总组方法
CN111846142A (zh) * 2020-07-31 2020-10-30 宜昌兴达船务有限公司 一种船舶尾楼建造施工方法
CN112429172A (zh) * 2020-12-08 2021-03-02 中船澄西扬州船舶有限公司 船舶上建平移吊安装方法
CN113247175A (zh) * 2021-06-08 2021-08-13 上海外高桥造船海洋工程有限公司 预制隔舱及包含其的船舶上层建筑及其安装方法
CN114228944A (zh) * 2022-01-04 2022-03-25 江南造船(集团)有限责任公司 艏部上层建筑一体化建造的方法
CN114313144A (zh) * 2021-12-22 2022-04-12 扬州中远海运重工有限公司 一种大型集装箱船上建的升降过桥方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102490863A (zh) * 2011-12-14 2012-06-13 扬州大洋造船有限公司 一种船舶上层建筑的整体吊装方法
CN103910033A (zh) * 2014-04-15 2014-07-09 南通长航船舶配件有限公司 自航耙吸挖泥船机上层建筑建造方法
CN105947109A (zh) * 2016-06-21 2016-09-21 江苏海通海洋工程装备有限公司 一种船舶上层建筑生活区总组段吊装工艺
CN107914823A (zh) * 2018-01-09 2018-04-17 上海外高桥造船有限公司 一种大型散货船的上层建筑
CN109895948A (zh) * 2019-04-02 2019-06-18 上海外高桥造船有限公司 一种防积水的船舶上层建筑分段结构

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102490863A (zh) * 2011-12-14 2012-06-13 扬州大洋造船有限公司 一种船舶上层建筑的整体吊装方法
CN103910033A (zh) * 2014-04-15 2014-07-09 南通长航船舶配件有限公司 自航耙吸挖泥船机上层建筑建造方法
CN105947109A (zh) * 2016-06-21 2016-09-21 江苏海通海洋工程装备有限公司 一种船舶上层建筑生活区总组段吊装工艺
CN107914823A (zh) * 2018-01-09 2018-04-17 上海外高桥造船有限公司 一种大型散货船的上层建筑
CN109895948A (zh) * 2019-04-02 2019-06-18 上海外高桥造船有限公司 一种防积水的船舶上层建筑分段结构

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111422321A (zh) * 2020-04-17 2020-07-17 上海外高桥造船有限公司 一种散货船艏部总段的总组方法
CN111422321B (zh) * 2020-04-17 2021-06-25 上海外高桥造船有限公司 一种散货船艏部总段的总组方法
CN111806653A (zh) * 2020-07-24 2020-10-23 上海外高桥造船有限公司 一种邮轮舷侧总段的预总组方法
CN111806653B (zh) * 2020-07-24 2022-08-16 上海外高桥造船有限公司 一种邮轮舷侧总段的预总组方法
CN111846142A (zh) * 2020-07-31 2020-10-30 宜昌兴达船务有限公司 一种船舶尾楼建造施工方法
CN112429172A (zh) * 2020-12-08 2021-03-02 中船澄西扬州船舶有限公司 船舶上建平移吊安装方法
CN113247175A (zh) * 2021-06-08 2021-08-13 上海外高桥造船海洋工程有限公司 预制隔舱及包含其的船舶上层建筑及其安装方法
CN114313144A (zh) * 2021-12-22 2022-04-12 扬州中远海运重工有限公司 一种大型集装箱船上建的升降过桥方法
CN114313144B (zh) * 2021-12-22 2023-09-01 扬州中远海运重工有限公司 一种大型集装箱船上建的升降过桥方法
CN114228944A (zh) * 2022-01-04 2022-03-25 江南造船(集团)有限责任公司 艏部上层建筑一体化建造的方法

Similar Documents

Publication Publication Date Title
CN110562386A (zh) 一种大型船舶上层建筑的预总组方法
CN109850066B (zh) 一种船舶总组搭载方法
CN204548395U (zh) 一种带侧推船艏分段制作工艺
CN108189961B (zh) 一种舵桨一体化推进系统的安装方法
CN110466680A (zh) 一种双排舱型船总段的搭载方法
CN109625157B (zh) 大型集装箱船翼桥分段一体化建造的方法
CN109319045B (zh) 一种双相不锈钢化学品船隔舱中间产品的建造方法
CN113581408B (zh) 一种船舶总段划分方法
CN111634368B (zh) 一种船舶压载舱结构及其加工方法
CN110182313B (zh) 30万吨浮式生产储油轮艏货舱舷侧总段异地总组工艺
CN103010404B (zh) 一种铝合金上层建筑分段总组方法
CN102849627A (zh) 电解槽集中大修转运系统阴极搬运天车
CN102887220A (zh) 一种电力推进器基座及其装焊方法
KR20090063564A (ko) 앵커 및 앵커체인 설치 선행화 공법
CN100398393C (zh) 带有挂舵臂的分段与带有舵机平台的分段组装工艺
CN110282077B (zh) 一种造船过程中绑扎桥分段的建造方法
CN101092161A (zh) 横隔舱与甲板在船舶上的总组方法
CN110877688A (zh) 双相不锈钢化学品船舷侧横隔舱分段的吊装及加强方法
CN104691704B (zh) 一种内河船舶的建造方法
CN112429172B (zh) 船舶上建平移吊安装方法
CN114179994A (zh) 一种船舶建造管系安装精度控制方法
CN111806653B (zh) 一种邮轮舷侧总段的预总组方法
CN102050377B (zh) 一种组合吊机及采油平台钻井设备的安装方法
CN112455620A (zh) 一种特殊上建总装吊耳结构
CN112124518A (zh) 一种可用于双相不锈钢槽型分段加强的控制方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191213