CN111806653B - 一种邮轮舷侧总段的预总组方法 - Google Patents
一种邮轮舷侧总段的预总组方法 Download PDFInfo
- Publication number
- CN111806653B CN111806653B CN202010722723.8A CN202010722723A CN111806653B CN 111806653 B CN111806653 B CN 111806653B CN 202010722723 A CN202010722723 A CN 202010722723A CN 111806653 B CN111806653 B CN 111806653B
- Authority
- CN
- China
- Prior art keywords
- segment
- section
- double
- bilge
- layer bottom
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/20—Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T70/00—Maritime or waterways transport
- Y02T70/10—Measures concerning design or construction of watercraft hulls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Revetment (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
本发明公开了一种邮轮舷侧总段的预总组方法,邮轮舷侧总段包括第一双层底分段、第二双层底分段、第一舭部分段、第二舭部分段、第一纵舱壁分段、第二纵舱壁分段和横舱壁分段,所述的预总组方法包括:将第一双层底分段、第二双层底分段、第一舭部分段和第二舭部分段组成预总段A;将第一纵舱壁分段、第二纵舱壁分段和横舱壁分段组成预总段B;将预总段A和预总段B组成邮轮舷侧总段。本发明具有通用性,提高生产效率。
Description
技术领域
本发明涉及船舶建造领域,具体涉及一种邮轮舷侧总段的建造方法。
背景技术
如图2所示,邮轮的舷侧总段C包括第一双层底分段1、第二双层底分段2、第一舭部分段3、第二舭部分段4、第一纵舱壁分段5、第二纵舱壁分段6、横舱壁分段7。目前,将其总组的顺序如下:首先吊运第一双层底分段1和第二双层底分段2焊接;然后依次吊运第一舭部分段3和第二舭部分段4、横舱壁分段7、第一纵舱壁分段5和第二纵舱壁分段6,分别进行固定安装。如此,在龙门吊吊力受限时,一般需要拆除横舱壁分段7、第一纵舱壁分段5和第二纵舱壁分段6,对其进行单独搭载。这种方法通用性较差,并且生产效率低下。
发明内容
本发明的目的在于提供一种邮轮舷侧总段的预总组方法,具有通用性,提高生产效率。
实现上述目的的技术方案是:
一种邮轮舷侧总段的预总组方法,邮轮舷侧总段包括第一双层底分段、第二双层底分段、第一舭部分段、第二舭部分段、第一纵舱壁分段、第二纵舱壁分段和横舱壁分段,所述的预总组方法包括:
将第一双层底分段、第二双层底分段、第一舭部分段和第二舭部分段组成预总段A;
将第一纵舱壁分段、第二纵舱壁分段和横舱壁分段组成预总段B;
将预总段A和预总段B组成邮轮舷侧总段。
优选的,组成预总段A时,利用龙门吊先吊起第一双层底分段至第一安装位置,
再利用龙门吊吊起第一舭部分段至第一安装位置,工作人员将第一舭部分段固定安装于第一双层底分段侧边;
接着利用龙门吊吊起第二双层底分段至第一安装位置,工作人员将第二双层底分段与第一双层底分段固定连接;
最后利用龙门吊吊起第二舭部分段到第一安装位置,工作人员将第二舭部分段分别与第二双层底分段以及第一舭部分段固定连接,组成预总段A。
优选的,组成预总段B时,利用龙门吊将第一纵舱壁分段吊到第二安装位置;
再利用龙门吊将第二纵舱壁分段吊至第二安装位置,工作人员将第二纵舱壁分段与第一纵舱壁分段水平固定连接;
最后利用龙门吊将横舱壁分段吊至第二安装位置,工作人员将横舱壁分段垂直安装在第一纵舱壁分段上,组成预总段B。
优选的,利用龙门吊将预总段A吊到船体安装位置,工作人员按预设方案进行固定;
利用龙门吊将预总段B吊到船体安装位置,工作人员将预总段B固定安装到预总段A上,组成邮轮舷侧总段。
本发明的有益效果是:本发明将总组过程分为预总段A和预总段B,再将预总段A和预总段B进行总组。避免龙门吊吊力受限的问题。具有通用性,打破了场地限制,优化了工艺流程,提高了生产效率。
附图说明
图1是本发明邮轮舷侧总段的预总组方法的过程示意图;
图2是现有技术中邮轮舷侧总段的总组过程示意图。
具体实施方式
下面将结合附图对本发明作进一步说明。
请参阅图1,邮轮舷侧总段包括第一双层底分段1、第二双层底分段2、第一舭部分段3、第二舭部分段4、第一纵舱壁分段5、第二纵舱壁分段6和横舱壁分段7。本发明的邮轮舷侧总段的预总组方法包括:
一、将第一双层底分段1、第二双层底分段2、第一舭部分段3和第二舭部分段4组成预总段A,具体地,
利用龙门吊先吊起第一双层底分段1至第一安装位置,
再利用龙门吊吊起第一舭部分段3至第一安装位置,工作人员将第一舭部分段3固定安装于第一双层底分段1侧边;
接着利用龙门吊吊起第二双层底分段2至第一安装位置,工作人员将第二双层底分段2与第一双层底分段1固定连接;
最后利用龙门吊吊起第二舭部分段4到第一安装位置,工作人员将第二舭部分段4分别与第二双层底分段2以及第一舭部分段3固定连接,组成预总段A。
二、将第一纵舱壁分段5、第二纵舱壁分段6和横舱壁分段7组成预总段B。具体地,利用龙门吊将第一纵舱壁分段5吊到第二安装位置;
再利用龙门吊将第二纵舱壁分段6吊至第二安装位置,工作人员将第二纵舱壁分段6与第一纵舱壁分段5水平固定连接;
最后利用龙门吊将横舱壁分段7吊至第二安装位置,工作人员将横舱壁分段7垂直安装在第一纵舱壁分段5上,组成预总段B。
三、将预总段A和预总段B组成邮轮舷侧总段。具体地,利用龙门吊将预总段A吊到船体安装位置,工作人员按预设方案进行固定;
利用龙门吊将预总段B吊到船体安装位置,工作人员将预总段B固定安装到预总段A上,组成邮轮舷侧总段。
综上,现有技术中需要七个分段完工后运输到船坞平台进行总组作业,占用龙门吊时间较长。现在预总段A、预总段B可以在其他场地进行建造并总组,并能实现对预总段B进行涂装,然后运输到船坞平台。
以上实施例仅供说明本发明之用,而非对本发明的限制,有关技术领域的技术人员,在不脱离本发明的精神和范围的情况下,还可以作出各种变换或变型,因此所有等同的技术方案也应该属于本发明的范畴,应由各权利要求所限定。
Claims (1)
1.一种邮轮舷侧总段的预总组方法,邮轮舷侧总段包括第一双层底分段、第二双层底分段、第一舭部分段、第二舭部分段、第一纵舱壁分段、第二纵舱壁分段和横舱壁分段,其特征在于,所述的预总组方法包括:
将第一双层底分段、第二双层底分段、第一舭部分段和第二舭部分段组成预总段A;
将第一纵舱壁分段、第二纵舱壁分段和横舱壁分段组成预总段B;
将预总段A和预总段B组成邮轮舷侧总段;
组成预总段A时,利用龙门吊先吊起第一双层底分段至第一安装位置,
再利用龙门吊吊起第一舭部分段至第一安装位置,工作人员将第一舭部分段固定安装于第一双层底分段侧边;
接着利用龙门吊吊起第二双层底分段至第一安装位置,工作人员将第二双层底分段与第一双层底分段固定连接;
最后利用龙门吊吊起第二舭部分段到第一安装位置,工作人员将第二舭部分段分别与第二双层底分段以及第一舭部分段固定连接,组成预总段A;
组成预总段B时,利用龙门吊将第一纵舱壁分段吊到第二安装位置;
再利用龙门吊将第二纵舱壁分段吊至第二安装位置,工作人员将第二纵舱壁分段与第一纵舱壁分段水平固定连接;
最后利用龙门吊将横舱壁分段吊至第二安装位置,工作人员将横舱壁分段垂直安装在第一纵舱壁分段上,组成预总段B;
利用龙门吊将预总段A吊到船体安装位置,工作人员按预设方案进行固定;
利用龙门吊将预总段B吊到船体安装位置,工作人员将预总段B固定安装到预总段A上,组成邮轮舷侧总段。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010722723.8A CN111806653B (zh) | 2020-07-24 | 2020-07-24 | 一种邮轮舷侧总段的预总组方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010722723.8A CN111806653B (zh) | 2020-07-24 | 2020-07-24 | 一种邮轮舷侧总段的预总组方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111806653A CN111806653A (zh) | 2020-10-23 |
CN111806653B true CN111806653B (zh) | 2022-08-16 |
Family
ID=72860986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010722723.8A Active CN111806653B (zh) | 2020-07-24 | 2020-07-24 | 一种邮轮舷侧总段的预总组方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111806653B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113815807B (zh) * | 2021-11-08 | 2022-08-16 | 江南造船(集团)有限责任公司 | 集装箱船舭部转圆分段结构及其分段建造方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3759207A (en) * | 1970-03-07 | 1973-09-18 | Kawasaki Heavy Ind Ltd | Apparatus for assembling curved skin block frames of a hull and a method therefor |
JPS5853590A (ja) * | 1981-09-28 | 1983-03-30 | Mitsubishi Heavy Ind Ltd | 船体機関室の船体ブロツク組立て方法 |
CN101544268A (zh) * | 2009-05-05 | 2009-09-30 | 沪东中华造船(集团)有限公司 | 船舶建造中半宽型双跨总组搭载方法 |
CN109895945A (zh) * | 2019-04-02 | 2019-06-18 | 上海外高桥造船有限公司 | 一种矿砂船舷侧总段的纵横舱壁预组装方法 |
CN110182313A (zh) * | 2019-06-06 | 2019-08-30 | 上海外高桥造船有限公司 | 30万吨浮式生产储油轮艏货舱舷侧总段异地总组工艺 |
CN110182307A (zh) * | 2019-06-05 | 2019-08-30 | 上海外高桥造船海洋工程有限公司 | 船舶舷侧的分段建造方法 |
CN110562386A (zh) * | 2019-09-24 | 2019-12-13 | 上海外高桥造船有限公司 | 一种大型船舶上层建筑的预总组方法 |
KR20200046462A (ko) * | 2018-10-24 | 2020-05-07 | 삼성중공업 주식회사 | 선박의 호퍼 블록과 더블 바텀용 블록의 결합 구조 |
CN111422321A (zh) * | 2020-04-17 | 2020-07-17 | 上海外高桥造船有限公司 | 一种散货船艏部总段的总组方法 |
-
2020
- 2020-07-24 CN CN202010722723.8A patent/CN111806653B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3759207A (en) * | 1970-03-07 | 1973-09-18 | Kawasaki Heavy Ind Ltd | Apparatus for assembling curved skin block frames of a hull and a method therefor |
JPS5853590A (ja) * | 1981-09-28 | 1983-03-30 | Mitsubishi Heavy Ind Ltd | 船体機関室の船体ブロツク組立て方法 |
CN101544268A (zh) * | 2009-05-05 | 2009-09-30 | 沪东中华造船(集团)有限公司 | 船舶建造中半宽型双跨总组搭载方法 |
KR20200046462A (ko) * | 2018-10-24 | 2020-05-07 | 삼성중공업 주식회사 | 선박의 호퍼 블록과 더블 바텀용 블록의 결합 구조 |
CN109895945A (zh) * | 2019-04-02 | 2019-06-18 | 上海外高桥造船有限公司 | 一种矿砂船舷侧总段的纵横舱壁预组装方法 |
CN110182307A (zh) * | 2019-06-05 | 2019-08-30 | 上海外高桥造船海洋工程有限公司 | 船舶舷侧的分段建造方法 |
CN110182313A (zh) * | 2019-06-06 | 2019-08-30 | 上海外高桥造船有限公司 | 30万吨浮式生产储油轮艏货舱舷侧总段异地总组工艺 |
CN110562386A (zh) * | 2019-09-24 | 2019-12-13 | 上海外高桥造船有限公司 | 一种大型船舶上层建筑的预总组方法 |
CN111422321A (zh) * | 2020-04-17 | 2020-07-17 | 上海外高桥造船有限公司 | 一种散货船艏部总段的总组方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111806653A (zh) | 2020-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109850066B (zh) | 一种船舶总组搭载方法 | |
CN101596925B (zh) | 艏侧推装置在船体分段上的预装工艺 | |
CN110562386A (zh) | 一种大型船舶上层建筑的预总组方法 | |
CN106335603A (zh) | 一种槽型舱壁总段的组装方法 | |
CN110466680A (zh) | 一种双排舱型船总段的搭载方法 | |
CN111806653B (zh) | 一种邮轮舷侧总段的预总组方法 | |
CN107235117B (zh) | 一种锚穴的制作安装方法 | |
CN110182313B (zh) | 30万吨浮式生产储油轮艏货舱舷侧总段异地总组工艺 | |
CN103693170A (zh) | 一种漂浮式海上风电组装平台及用该平台组装海上风机的方法 | |
CN109533196A (zh) | 一种船体钢结构铰链式安装方法 | |
CN111392594A (zh) | 一种散货船机舱总段的吊装方法以及利用其建造的散货船 | |
CN101092161A (zh) | 横隔舱与甲板在船舶上的总组方法 | |
CN102632965A (zh) | 一种组合式模块船及其模块连接方式 | |
CN102050377B (zh) | 一种组合吊机及采油平台钻井设备的安装方法 | |
CN105667709A (zh) | 一种船体制造方法 | |
CN103708000B (zh) | 船体总段吊装固定保护器及船体总段吊装方法 | |
CN107387954A (zh) | 一种钢结构缓冲支承装置 | |
CN209814201U (zh) | 一种船舶用散装零件固定装置 | |
CN112455620A (zh) | 一种特殊上建总装吊耳结构 | |
CN207241954U (zh) | 一种船舶燃油加热模块起吊及运输用工装 | |
CN220465720U (zh) | 一种用于集装箱船船体横舱壁的专用吊马 | |
CN203601538U (zh) | 一种海上风电组装平台 | |
CN218201738U (zh) | 一种用于高压线下方的预制梁板吊装机构 | |
CN112124518A (zh) | 一种可用于双相不锈钢槽型分段加强的控制方法 | |
CN216232819U (zh) | 船体结构集成吊耳 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |