CN102162225A - Ecological bank protection method of riverway roofthrust position - Google Patents

Ecological bank protection method of riverway roofthrust position Download PDF

Info

Publication number
CN102162225A
CN102162225A CN 201110040863 CN201110040863A CN102162225A CN 102162225 A CN102162225 A CN 102162225A CN 201110040863 CN201110040863 CN 201110040863 CN 201110040863 A CN201110040863 A CN 201110040863A CN 102162225 A CN102162225 A CN 102162225A
Authority
CN
China
Prior art keywords
river course
bar cage
pine
riverway
piece stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201110040863
Other languages
Chinese (zh)
Inventor
王超
王沛芳
侯俊
敖艳辉
吴建成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN 201110040863 priority Critical patent/CN102162225A/en
Publication of CN102162225A publication Critical patent/CN102162225A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention relates to an ecological bank protection method of a riverway roofthrust position. The method comprises the steps of constructing a riverway roofthrust ecological revetment at the riverway roofthrust position; arranging a row of pine fences along a bank foot line of the riverway roofthrust position; laying geotextiles at the side against water of the pine fences; arranging ripraps at an included angle between the side toward water of the pine fences and a riverbed; laying crushed stone cushions on a slope; stacking blocks of stone gabions on the crushed stone cushions; fixing the blocks of stone gabions on the bank slope with pine spiles; clamping willow bundles and wide-leaf grass bundles between adjacent blocks of stone gabions near a flood stage of the riverway; clamping emerged plant roots and humid soil in the block of stone gabions near an ordinary water level of the riverway; and clamping submerged plant seeds and the humid soil in the blocks of stone gabions near a low water level of the riverway. The method of the invention has the advantages of building a fine habitat environment for riverbank living creatures, creating a riverbank green barrier, and beautifying riverbank landscape. Plants, stones and microorganisms adhered thereto have a purifying effect on pollutants, intercept source pollutants flowing into the river and improve water quality of the river.

Description

The top, river course is towards position ecological revetment method
Technical field
What the present invention relates to is that a kind of river course pushes up towards position ecological revetment method, belongs to ecological river shore protection constructing technology field.
Background technology
The concave bank dike section of crooked river gesture complexity in the river course, often main flow is forced bank, and bank slope is corroded in current scour.Torrent pushes up the effect of dashing to be subjected to circulation to wash away particularly, and the bank slope scour is comparatively serious usually.The scouring force of current in case bank foot protection facility never can resist, spats be destroyed, and the gradient that makes the bank pin is steepening gradually, causes the bank slope unstable failure until disequilibrium.Therefore, need paste the slope protection in the above certain limit of toe near water towards the position to the top, river course, reach Gu Po, subtract dash, the purpose of antiseepage, generally include revetment modes such as placed rockfill bank protection, cemented rock bank protection, cast-in-situ concrete bank protection pattern, precast concrete block.Sloping near water revetment is at Gu Po, subtract and dash, aspects such as antiseepage have all obtained good effect, river course safety has been brought into play huge effect, but simultaneously also in varying degrees to the ecology of bank slope, environment and view have produced harmful effect: its hard material and enclosed construction have destroyed the staggered band in land and water, river course, make bank biological habitat in shore lose, animals and plants are difficult in this existence procreation, heavy damage bio-diversity, cause the self-purification capacity of river water body obviously to descend, the pollutant that enters the river course with face source form is difficult to remove, and its smooth and dull apparent landscape effect that has a strong impact on the river course.
For overcoming the defective of hard type shore protection, repair shore, river course bank band ecological environment, people bring into use the ecology typed bank revetment technology, as Impurifying source ecological bank-protection combined system (ZL200610096765.5), landscape type multi-stage stepwise artificial wetland protection slope forming method (ZL200410065916.1), the slope type ecological revetment (ZL200710036262.3) of band barricade, the construction method ZL200810238006.7 of framed structure ecological riverway embankment), environmental polygon concrete revetment plate with holes and the application process in shore protection (ZL 200610148054.8) thereof, environmental concrete revetment cylindrical shell and the application process in shore protection (ZL 200610148053.3) thereof, the engineering method (ZL 200410010692.4) etc. that recovers the degeneration riverbank with reed protects the river course bank slope, these technology are at the bank slope view, collaborative aspect ecological and clean dirty function has obtained good effect, but be mainly used in the less section side slope of flow velocity, owing to be subjected to the influence of erosion resistibility, can't be applied to the top, river course in the ecological protection of position.At present, the top, river course is towards a collaborative technical barrier that is still of the scour protection and the restoration of the ecosystem at position.
Summary of the invention
What the present invention proposed is that top, a kind of river course is towards position ecological revetment method, its purpose just is to overcome the defective of above-mentioned sloping revetment technology and ecological revetment technology near water, can on the river course bank slope, form green graceful naturally view, build the biological habitat of the staggered band in good land and water, riverbank, make that the shore aquatic ecosystem is recovered; Plant, building stones and surface attachment biology thereof can purify pollutant by effects such as interception, absorption and degradeds, can hold back into river surface source pollutants matter and improve water quality of river.
Technical solution of the present invention: it is characterized in that making up the top, river course towards the position towards the position ecological revetment on the top, river course, along the river a row pine fence is made a call to towards position bank payment to a porter in the top, road, lay geotextiles in pine fence backwater one side, towards the angle in water one side and riverbed jackstone is set at the pine fence, on domatic, lay hardcore bed, lay tired folded piece stone bar cage on the hardcore bed, with the pine stake piece stone bar cage is fixed on the river course bank slope, between near the adjacent block stone bar cage the river flood position, fold up willow bundle and wide leaf bale, fold up reed near the river course ordinary water level the piece stone bar cage, calamus emergent aquactic plant root system and the humid soil that accounts for piece stone bar cage 10% space fold up water caltrop near the piece stone bar cage the river course low water level, hornwort submerged plant seed and the humid soil that accounts for piece stone bar cage 10% space.
Advantage of the present invention and effect are: this shore protection adopts piece stone bar cage (gauze wire cloth+piece stone) to be the protection form of main body, can resist the sluicing suffered towards the position of top, river course, can play protective action preferably to the river course bank slope.Water level situation during according to river course difference regimen, disposed the phytobiocoenose system of hygrophyte (willow bundle and wide leaf bale)-emergent aquactic plant (reed, calamus)-submerged plant (water caltrop, hornwort), built the biological habitat in good riverbank, form shore bank green screen one, beautified the riverbank view; On the other hand, the microorganism of plant, building stones and surface attachment thereof has clean-up effect preferably to pollutant, can hold back into river surface source pollutants matter and river training water quality.In addition, construction of this shore protection and maintenance management are all very convenient, are very suitable for the restoration of the ecosystem of top, river course towards the protection at position.
Description of drawings
Fig. 1 is the floor map of top, river course towards the position ecological revetment.
Fig. 2 is the sectional schematic diagram of top, river course towards the position ecological revetment.
Fig. 3 is near the thin portion schematic diagram of the present invention extreme high water position.
Fig. 4 is that the top, river course is towards near the thin portion schematic diagram of the position ecological revetment low water level position.
Fig. 5 is a piece stone bar cage schematic diagram.
Among the figure 1 is the river course, the 2nd, and the river course pushes up towards the position ecological revetment, and the 3rd, river course bank slope, the 4th, pine fence, the 5th, jackstone, the 6th, hardcore bed, the 7th, piece stone bar cage, the 8th, pine stake, the 9th, willow bundle, the 10th, wide leaf bale, the 11st, emergent aquactic plant, the 12nd, submerged plant, the 13rd, gauze wire cloth, the 14th, piece stone.
The specific embodiment
Contrast accompanying drawing 1-4, the top, river course is towards position ecological revetment method, be that 1 top makes up the top, river course towards position ecological revetment 2 towards the position in the river course, along the river a row pine fence 4 is made a call to towards 3 payment to a porter of position bank in the top, road, lay geotextiles in pine fence 4 backwaters one side, towards the angle in water one side and riverbed the jackstone 5 that particle diameter is 200-300mm is set at pine fence 4, on domatic, lay hardcore bed 6, ballast grain sizes is 50~100mm, tired folded piece stone bar cage 7 on the hardcore bed 6, with diameter is 100mm, the pine stake 8 of long 1500mm is fixed in piece stone bar cage 7 on the river course bank slope 3, and the spacing on each piece stone bar cage 7 between the pine stake 8 is 3000mm.Fold up willow bundle 9 and wide leaf bale 10 between near the adjacent block stone bar cage 7 the river flood position, both arrange at interval that on domatic the spacing of willow bundle 9 or wide leaf bale 10 is 600mm on each piece stone bar cage 7; The humid soil that folds up emergent aquactic plant 11 (reed, calamus) root system and account for piece stone bar cage 10% space near the river course ordinary water level the piece stone bar cage 7; The humid soil that folds up submerged plant 12 (water caltrop, hornwort) seed and account for piece stone bar cage 10% space near the river course low water level the piece stone bar cage 7.
The diameter of pine stake is 100mm, long 1500mm, and the spacing on each piece stone bar cage between the pine stake is 3000mm.
The willow bundle arranges that with wide leaf bale the spacing of willow bundle or wide leaf bale is 600mm on each piece stone bar cage on domatic at interval.
The jackstone particle diameter is 200-300mm, and ballast grain sizes is 50-100mm.
Contrast accompanying drawing 5, piece stone bar cage 7 usefulness braided steel wire ramifies are the gauze wire cloth 13 of 100 * 100mm, fill the piece stone 14 of particle diameter 150-200mm in the gauze wire cloth 13.
After the moulding of the present invention,, the sluicing suffered of top, river course can be resisted, protective action preferably can be played the river course bank slope towards the position based on the protection form of piece stone bar cage (gauze wire cloth+piece stone).Willow bundle 8 and wide leaf bale 9 go out root system and branches and leaves with ramp, and the reinforcement effect of root system has further ensured bank stability and protection against erosion ability.After growing up 1 year, willow bundle 8 and wide leaf bale 9 branches and leaves, emergent aquactic plant 11 (reed, calamus) root system, submerged plant 12 (water caltrop, hornwort) seed can form the phytobiocoenose system of luxuriant " hygrophyte (willow and wide leaf grass)-emergent aquactic plant (reed, calamus)-submerged plant (water caltrop, hornwort) " on the riverbank, on the river course bank slope, formed green graceful naturally view, built the biological habitat of the staggered band in good land and water, riverbank, made that the shore aquatic ecosystem is recovered; Plant, building stones and surface attachment biology thereof can purify pollutant by effects such as interception, absorption and degradeds, have good effect to holding back into river surface source pollutants matter and improving water quality of river.

Claims (5)

1. the top, river course is towards position ecological revetment method, it is characterized in that making up the top, river course towards the position towards the position ecological revetment on the top, river course, along the river a row pine fence is made a call to towards position bank payment to a porter in the top, road, lay geotextiles in pine fence backwater one side, towards the angle in water one side and riverbed jackstone is set at the pine fence, on domatic, lay hardcore bed, lay tired folded piece stone bar cage on the hardcore bed, with the pine stake piece stone bar cage is fixed on the river course bank slope, between near the adjacent block stone bar cage the river flood position, fold up willow bundle and wide leaf bale, fold up reed near the river course ordinary water level the piece stone bar cage, calamus emergent aquactic plant root system and the humid soil that accounts for piece stone bar cage 10% space fold up water caltrop near the piece stone bar cage the river course low water level, hornwort submerged plant seed and the humid soil that accounts for piece stone bar cage 10% space.
2. top, river course according to claim 1 is characterized in that towards position ecological revetment method piece stone bar cage is the gauze wire cloth of 100 * 100mm with the braided steel wire ramify, fills the piece stone of particle diameter 150-200mm in the gauze wire cloth.
3. top, river course according to claim 1 is towards position ecological revetment method, and the diameter that it is characterized in that the pine stake is 100mm, long 1500mm, and the spacing on each piece stone bar cage between the pine stake is 3000mm.
4. top, river course according to claim 1 is characterized in that towards position ecological revetment method willow is tied and wide leaf bale is arranged at interval on domatic, the spacing of willow bundle or wide leaf bale is 600mm on each piece stone bar cage.
5. top, river course according to claim 1 is characterized in that towards position ecological revetment method the jackstone particle diameter is 200-300mm, and ballast grain sizes is 50-100mm.
CN 201110040863 2011-02-21 2011-02-21 Ecological bank protection method of riverway roofthrust position Pending CN102162225A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110040863 CN102162225A (en) 2011-02-21 2011-02-21 Ecological bank protection method of riverway roofthrust position

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110040863 CN102162225A (en) 2011-02-21 2011-02-21 Ecological bank protection method of riverway roofthrust position

Publications (1)

Publication Number Publication Date
CN102162225A true CN102162225A (en) 2011-08-24

Family

ID=44463656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110040863 Pending CN102162225A (en) 2011-02-21 2011-02-21 Ecological bank protection method of riverway roofthrust position

Country Status (1)

Country Link
CN (1) CN102162225A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619217A (en) * 2012-03-10 2012-08-01 张振华 Underwater silt pile
CN103711103A (en) * 2013-12-26 2014-04-09 江苏美尚生态景观股份有限公司 Setting method for hydro-fluctuation belt plants of ecological bank protection
CN104126393A (en) * 2014-07-25 2014-11-05 同济大学 Method for planting aquatic plants in upright bank water
CN104790348A (en) * 2015-05-05 2015-07-22 苏交科集团股份有限公司 Bank protecting method
CN106245585A (en) * 2016-08-02 2016-12-21 黑龙江省水利科学研究院 A kind of anti-ice erosion in Han Qu riverbank means of defence
CN108532540A (en) * 2018-05-16 2018-09-14 江苏省盐城市航道管理处 Cotton stalk encircles water draining waterway revetment system and its construction method
CN109056755A (en) * 2018-09-12 2018-12-21 吉林省水土保持科学研究院 A kind of ecology ditch slope and its construction method
CN111501670A (en) * 2020-05-27 2020-08-07 中国十七冶集团有限公司 Waterfront river course slope protection structure and construction method thereof
CN112391997A (en) * 2020-10-23 2021-02-23 上海市政工程设计研究总院(集团)有限公司 Ecological river bank structure for sponge city construction
CN113250134A (en) * 2021-04-28 2021-08-13 华能澜沧江水电股份有限公司 Fish habitat protection system and construction method thereof
CN113367014A (en) * 2021-06-11 2021-09-10 中国林业科学研究院热带林业研究所 Method for ecologically repairing hardened river bank by mangrove forest plants
CN113481938A (en) * 2021-07-10 2021-10-08 绿美艺环境建设集团有限公司 Silty river stone cage combined plant-growing protection pad ecological revetment and construction method thereof
CN114182686A (en) * 2021-09-15 2022-03-15 同济大学 Log frame and recycled concrete combined structure ecological slope protection and construction method thereof
CN114215003A (en) * 2021-11-30 2022-03-22 上海市园林设计研究总院有限公司 Construction method of water and soil conservation ecological system during construction of landscape terrain in estuary region
CN115387287A (en) * 2022-09-08 2022-11-25 北京正和恒基国际城市规划设计有限公司 Grid bush cluster slope protection method and grid bush cluster ecological slope
CN117569258A (en) * 2023-11-28 2024-02-20 甘肃省水利厅讨赖河流域水资源利用中心 Ecological embankment and construction method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040075807A (en) * 2004-08-02 2004-08-30 주식회사 케이.씨 리버텍 Shore line structure capable of natural habitants for various lives
CN1559708A (en) * 2004-02-19 2005-01-05 杨海军 Engineering method of recovering degraduted river bank by reed
CN2775132Y (en) * 2005-02-03 2006-04-26 中国水利水电科学研究院 Water purifying stone cage
KR100656817B1 (en) * 2005-11-18 2006-12-14 주식회사 케이.씨 리버텍 Plantation process on the surface of the concrete block intalled around the river side
CN101713182A (en) * 2009-11-18 2010-05-26 河海大学 Method for forming ecological embankment of vertical revetment live branch bundles

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1559708A (en) * 2004-02-19 2005-01-05 杨海军 Engineering method of recovering degraduted river bank by reed
KR20040075807A (en) * 2004-08-02 2004-08-30 주식회사 케이.씨 리버텍 Shore line structure capable of natural habitants for various lives
CN2775132Y (en) * 2005-02-03 2006-04-26 中国水利水电科学研究院 Water purifying stone cage
KR100656817B1 (en) * 2005-11-18 2006-12-14 주식회사 케이.씨 리버텍 Plantation process on the surface of the concrete block intalled around the river side
CN101713182A (en) * 2009-11-18 2010-05-26 河海大学 Method for forming ecological embankment of vertical revetment live branch bundles

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
《城市水生态系统建设与管理》 20040630 王超,王沛芳 城市水生态系统修复技术 科学出版社 , 第一版 *
《广东水利水电》 20101130 张颖 广州市城市河涌整治工程设计的实践 , 第11期 *
《河海大学学报(自然科学版)》 20070531 王艳颖等人 木栅栏砾石笼生态护岸技术及其应用 第35卷, 第3期 *
《河海大学硕士学位论文》 20070915 侯俊 生态型河道构建原理及应用技术研究 , *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619217A (en) * 2012-03-10 2012-08-01 张振华 Underwater silt pile
CN103711103A (en) * 2013-12-26 2014-04-09 江苏美尚生态景观股份有限公司 Setting method for hydro-fluctuation belt plants of ecological bank protection
CN103711103B (en) * 2013-12-26 2016-04-06 江苏美尚生态景观股份有限公司 The method to set up of a kind of ecological revetment falling zone plant
CN104126393A (en) * 2014-07-25 2014-11-05 同济大学 Method for planting aquatic plants in upright bank water
CN104790348A (en) * 2015-05-05 2015-07-22 苏交科集团股份有限公司 Bank protecting method
CN106245585A (en) * 2016-08-02 2016-12-21 黑龙江省水利科学研究院 A kind of anti-ice erosion in Han Qu riverbank means of defence
CN108532540B (en) * 2018-05-16 2024-02-20 江苏省盐城市航道管理处 Cotton straw arch dredging pile channel bank protection system and construction method thereof
CN108532540A (en) * 2018-05-16 2018-09-14 江苏省盐城市航道管理处 Cotton stalk encircles water draining waterway revetment system and its construction method
CN109056755A (en) * 2018-09-12 2018-12-21 吉林省水土保持科学研究院 A kind of ecology ditch slope and its construction method
CN111501670A (en) * 2020-05-27 2020-08-07 中国十七冶集团有限公司 Waterfront river course slope protection structure and construction method thereof
CN112391997A (en) * 2020-10-23 2021-02-23 上海市政工程设计研究总院(集团)有限公司 Ecological river bank structure for sponge city construction
CN113250134A (en) * 2021-04-28 2021-08-13 华能澜沧江水电股份有限公司 Fish habitat protection system and construction method thereof
CN113367014A (en) * 2021-06-11 2021-09-10 中国林业科学研究院热带林业研究所 Method for ecologically repairing hardened river bank by mangrove forest plants
CN113481938A (en) * 2021-07-10 2021-10-08 绿美艺环境建设集团有限公司 Silty river stone cage combined plant-growing protection pad ecological revetment and construction method thereof
CN114182686A (en) * 2021-09-15 2022-03-15 同济大学 Log frame and recycled concrete combined structure ecological slope protection and construction method thereof
CN114215003A (en) * 2021-11-30 2022-03-22 上海市园林设计研究总院有限公司 Construction method of water and soil conservation ecological system during construction of landscape terrain in estuary region
CN115387287A (en) * 2022-09-08 2022-11-25 北京正和恒基国际城市规划设计有限公司 Grid bush cluster slope protection method and grid bush cluster ecological slope
CN117569258A (en) * 2023-11-28 2024-02-20 甘肃省水利厅讨赖河流域水资源利用中心 Ecological embankment and construction method thereof

Similar Documents

Publication Publication Date Title
CN102162225A (en) Ecological bank protection method of riverway roofthrust position
CN101713182B (en) Method for forming ecological embankment of vertical revetment live branch bundles
CN104790346B (en) Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination
CN101973638B (en) Ecological percolating type water purification groin system
KR100817471B1 (en) Stone net for river bulkhead and this construction technique
CN101705666A (en) Construction method of live branch frame type plane source retaining purified ecological revetment
CN101078205A (en) Reservoir bank ecological protection system
CN102220745A (en) Small and medium straight river longitudinal winding form construction method
CN102070245A (en) Riverway ecological decontaminating type square frame body and construction, combination and dam fending method thereof
CN102086643A (en) Ecological engineering technology for stopping riverway coastal pollutants from entering rivers and restoring vegetation communities
CN106120651A (en) A kind of colonnade formula stacked arrangement ecological revetment and construction method thereof
CN102704441A (en) Arrangement method of ecological gabion chamber revetment type
CN207959233U (en) Ecological grid structures
CN206015604U (en) A kind of colonnade formula stacked arrangement ecological revetment
NL2027250B1 (en) Comprehensive ecological treatment system for river channels in mountainous areas and construction method thereof
CN101545252B (en) Solid ecological repairing bamboo raft member in riverbank and manufacturing method thereof
KR100574741B1 (en) Various function of eco-ripple using fabric form and method for constructing the same
CN106869079A (en) A kind of water course in situ purification and water storage system
JP2963654B2 (en) Ishiwari net revetment method
CN107938592B (en) Ecological transformation structure of linear type urban river
CN105297676A (en) River ecological bank protection system formed by triangular pyramidal wood pile stone cage frames and construction method
CN109252487B (en) I-shaped dam for ecological restoration and protection and ecological construction method thereof
CN114215002B (en) Ecological seawall system combining submerged dike, mangrove forest and double-row steel sheet piles
CN213926080U (en) Basalt fiber composite rib gabion net cage and soil anchor cooperative supporting structure
CN110512568B (en) Flexible ecological revetment construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110824