CN104790346B - Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination - Google Patents

Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination Download PDF

Info

Publication number
CN104790346B
CN104790346B CN201510230832.7A CN201510230832A CN104790346B CN 104790346 B CN104790346 B CN 104790346B CN 201510230832 A CN201510230832 A CN 201510230832A CN 104790346 B CN104790346 B CN 104790346B
Authority
CN
China
Prior art keywords
gabion box
deal pile
planted
retaining wall
bank slope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510230832.7A
Other languages
Chinese (zh)
Other versions
CN104790346A (en
Inventor
陈洪凯
吴帆
唐红梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510230832.7A priority Critical patent/CN104790346B/en
Publication of CN104790346A publication Critical patent/CN104790346A/en
Application granted granted Critical
Publication of CN104790346B publication Critical patent/CN104790346B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The present invention proposes a kind of reservoir drawdown band bank slope protection deal pile gabion box combination and plants raw retaining wall, including, gabion box, deal pile, graded broken stone layer, anti-filter geotextiles and GSZ;Gabion box, for using braided steel wire or being welded into the netted boxes and baskets of rectangle, is ladder-like arranged from lower to upper along retaining wall longitudinal axis and the two rows fissure of displacement is staggered;Rows of deal pile is set in gabion box inner side and outer side, between adjacent deal pile, connects into entirety with the rope made of hemp;Graded broken stone layer it is provided with between the soil body after inner side deal pile and wall;It is provided with anti-filter geotextiles between the soil body between outside deal pile and gabion box and after graded broken stone layer and wall;Between adjacent layer gabion box and after adjacent layer wall, between the soil body, GSZ is set.The method have the benefit that whole structural stability is good, it is possible to opposing sluicing suffered by bank slope, river course bank slope can be played preferable protective action;There is greening environment, purify air and water body, the effect of solid soil moisturizing.

Description

Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination
Invention field
The present invention relates to reservoir drawdown band bank slope protection technology, be related specifically to a kind of reservoir drawdown band bank slope protection deal pile-stone Raw retaining wall is planted in the combination of cage net.
Background technology
Reservoir drawdown band, also known as eat and flow zone or fluctuation district, refers to that reservoir makes periphery flood soil periodically because of seasonal fluctuation in stage Ground exposure is in a special region of the water surface.Falling zone formed between reservoir area water body and land bank huge ring storehouse ecological every From band, it is that a kind of special land and water interlocks wetlands ecosystems.Three Gorges Reservoir takes the operating scheme of " clear row is turbid for poultry ", causes Upstream occurs that drop reaches the falling zone of 30 meters.Periodically washed away by water body due to bank slope and flood, in region, falling zone originally Plant gradually dead disappear, cause a large amount of earth exposed, severe water and soil erosion, induce many places collapse on the bank, landslide, threaten water Normal performance, the life property safety of the people and the sustainable development of ecology in reservoir area system of diuretic electrical engineering function.Falling zone is subject to Storehouse bank runoff and reservoir water wave impact erosion, be more likely formed soil erosion, bank body avalanche, not only can not play the isolation to water body Defencive function, can carry more pollutant on the contrary and silt threatens reservoir area water quality and the safety of dam.Meanwhile, former in falling zone The terrestial enviornment come changes into water winter, land summer alternate environment, has the features such as flooding time length, fluctuation in stage amplitude are big.Typically plant Thing is difficult in adapt to, and often falls after rise in naked state water level, and arid is thin and weak, is then flooded for a long time after rising of groundwater level.And usual water plant Not drought resisting, xerophyte is weak to flood, and lean thin domatic environment more limits plant growing, similar " desertification " view of generation Inharmonious also by the development of restriction Reservoir region tourist industry, administer and there is the biggest difficulty.
At present, reservoir drawdown band bank slope protection technology the most only puts undue emphasis on the functions such as flood control, diversion, water drainage, water-retention, less Consider the harmony in river and the ecological environment of periphery.Bank is carried out frequently with the rigid protection means such as concrete, cemented rock Slope is protected, and only payes attention to the flood control function of bank protection structure, have ignored the ecological effect in river, river completely by manual, channelization, Destroying original ecological balance, and its volume, weight are big, material therefor is many, and operating expenses is high, and artificial trace is serious, does not has There are ecology and landscape function;After rigid protection builds molding by laying bricks or stones, making water system be separated with soil and biotic environment thereof, many moving is planted Thing cannot be survived, and breaks the ring biological chain of natural river, and bank slope of reservoir can not filter rainwash and purify water, destroying life State environment;And traditional stone is gloomy with concrete color, surface is dull, gives stiff, coarse, the vision effect of ash cooling Really, it is impossible to play the effect beautified the environment, more can not adapt with surrounding enviroment.Obviously, prior art reservoir drawdown band bank slope Means of defence also exists the ecological environment etc. of functions such as only focusing on flood control, diversion, water drainage, water-retention, less consideration river and periphery Problem.
Summary of the invention
The functions such as flood control, diversion, water drainage, water-retention are only focused on for what solution prior art reservoir drawdown band bank slope protection method existed, The problems such as the ecological environment of less consideration river and periphery, the present invention proposes a kind of reservoir drawdown band bank slope protection deal pile-gabion box Raw retaining wall is planted in combination.Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination, including, gabion box, Deal pile, graded broken stone layer, anti-filter geotextiles and GSZ;Gabion box is to use braided steel wire or the rectangle that is welded into netted Boxes and baskets, are ladder-like arranged from lower to upper along retaining wall longitudinal axis and the two rows fissure of displacement is staggered, and fill inside gabion box Having can the packeted soil of cultivated plant;Rows of deal pile is set in gabion box inner side and outer side, is positioned at the gabion box two of basic part The deal pile of side inserts in ground, and the outside deal pile being positioned at upper strata gabion box inserts in lower floor's gabion box, and inner side deal pile inserts After wall in the soil body, between adjacent deal pile, connect into entirety with the rope made of hemp;It is provided with grating between the soil body after inner side deal pile and wall Metalling;It is provided with anti-filter geotextiles between the soil body between outside deal pile and gabion box and after graded broken stone layer and wall;In phase Between adjacent bed gabion box and after adjacent layer wall, between the soil body, GSZ is set;The width of described graded broken stone layer is 20cm~40cm.
Further, reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination plants raw retaining wall, at bottom gabion box Inner side is provided with Masson Pine frame, is provided with plant floating bed at Masson Pine arch, and Masson Pine frame is fixed up with plant floating bed rope;Institute Stating Masson Pine frame is that to form cross sectional shape be trapezoidal casing in Masson Pine colligation, is filled with cobblestone in casing;Plant floating bed for arranging There is the floating mat of implantation hole, filling soil in implantation hole, and plantation emergent aquactic plant.
Further, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination, and the steel wire of gabion box is High-strength corrosion-resistant steel wire or be coated with the high-tensile steel wires of PVC;The height of gabion box is 80cm~120cm, and height and wall The height of the rear soil body matches.
Further, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination, and each gabion box is upper and lower With the high-tensile steel wires being coated with PVC, adjacent gabion box colligation is connected at four angles.
Further, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination, and deal pile inserts ground Or the degree of depth in the soil body is not less than 80cm in lower floor's gabion box or after wall.
Further, reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination plants raw retaining wall, between adjacent deal pile Entirety is connected into rope.
Further, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination, one end of GSZ It is mixed between upper and lower two-layer gabion box, and with rope, GSZ is tightened with gabion box.
Further, reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination plants raw retaining wall, at low water level gabion box Middle kind of planting submerged plant, plants emergent aquactic plant in ordinary water level gabion box, plants hygrophyte in high water level gabion box.
Further, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination, and diameter selected by Masson Pine frame The Masson Pine colligation of 5~10cm, Masson Pine arch width and height are 80~120cm, and bottom width is 150~200cm, height At least 1/2 embedment ground;Further, the side that meets water at Masson Pine frame is provided with between fish nest hole and connection cobble the Porous space formed.
Further, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination, uses bamboo, timber Or one or more in polystyrene foam plastics make plant floating bed, plant floating bed width is 80~120cm, a length of 150cm~250cm;Implantation hole is that hoop is uniformly distributed, bore dia 5~10cm, the degree of depth 8~15cm.
It is that structure is overall that the Advantageous Effects of raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination Good stability, it is possible to opposing sluicing suffered by bank slope, can play preferable protective action to river course bank slope;Gabion box and planting Vegetation is completely covered on thing floating bed surface, clear layer, in picturesque disorder, plays greening environment, purifies air, the work of solid soil moisturizing With, plant can also intercept rainwash pollution of area source, purifying water body.
Accompanying drawing explanation
Accompanying drawing 1 is the diagrammatic side-view cross-sectional schematic diagram that raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination;
Accompanying drawing 2 is the front elevational schematic that raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination;
Accompanying drawing 3 is the schematic three dimensional views of Masson Pine frame of the present invention;
Accompanying drawing 4 is the diagrammatic side-view cross-sectional schematic diagram that the present invention is plant floating bed.
Below in conjunction with the accompanying drawings and raw gear soil is planted in the combination of reservoir drawdown band bank slope protection deal pile of the present invention-gabion box by specific embodiment Wall is further described.
Detailed description of the invention
Accompanying drawing 1 is the diagrammatic side-view cross-sectional schematic diagram that raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination, Accompanying drawing 2 is the front elevational schematic that raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination, and accompanying drawing 3 is The schematic three dimensional views of Masson Pine frame of the present invention, accompanying drawing 4 is the diagrammatic side-view cross-sectional schematic diagram that the present invention is plant floating bed;In figure, 1 is gabion Net 2 is deal pile, 3 for graded broken stone layer, 4 be anti-filter geotextiles, and 5 is GSZ, and 6 is packeted soil, and 7 is native after wall Body, 8 is Masson Pine frame, and 9 is plant floating bed, and 10 is rope, and 11 is cobblestone, and 12 is implantation hole, and 13 is submerged plant, 14 For emergent aquactic plant, 15 is hygrophyte, and 16 is fish nest hole.As seen from the figure, reservoir drawdown band bank slope protection deal pile of the present invention- Raw retaining wall is planted in gabion box combination, including, gabion box 1, deal pile 2, graded broken stone layer 3, anti-filter geotextiles 4 and geotechnique's lattice Grid 5;Gabion box 1 is to use braided steel wire or the netted boxes and baskets of rectangle being welded into, along retaining wall longitudinal axis from lower to upper in ladder Shape is arranged and the two rows fissure of displacement is staggered, and being filled with inside gabion box 1 can the packeted soil 6 of cultivated plant;At gabion box 1 Inner side and outer side arranges rows of deal pile 2, and the deal pile 2 of gabion box 1 both sides being positioned at basic part inserts in ground, position Outside deal pile 2 in upper strata gabion box 1 inserts in lower floor's gabion box, and inner side deal pile 2 inserts after wall in the soil body 7, adjacent Entirety is connected into the rope made of hemp between deal pile 2;Graded broken stone layer 3 it is provided with between the soil body 7 after inner side deal pile 2 and wall; It is provided with anti-filter geotextiles 4 between the soil body 7 between outside deal pile 2 and gabion box 1 and after graded broken stone layer 3 and wall;? GSZ 5 is set between the soil body 7 between adjacent layer gabion box 1 and after adjacent layer wall;The width of described graded broken stone layer 3 For 20cm~40cm.It addition, reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination plants raw retaining wall, at bottom stone The inner side of cage net 1 is provided with Masson Pine frame 8, is provided with plant floating bed 9 at Masson Pine frame 8 top, and Masson Pine frame 8 is used with plant floating bed 9 Rope 10 connects;It is trapezoidal casing that described Masson Pine frame 5 forms cross sectional shape for Masson Pine colligation, is filled with cobblestone in casing 11;Plant floating bed 9 is the floating mat being provided with implantation hole 12, filling soil in implantation hole 12, and plantation emergent aquactic plant 14. The combination of reservoir drawdown band bank slope protection deal pile of the present invention-gabion box is planted raw retaining wall and is used deal pile to insert after wall the soil body and adjacent Connect into entirety with the rope made of hemp between deal pile, be effectively increased retaining wall erosion resistibility and stability, and there is good view effect Really.For ensureing the service life of gabion box, it is ensured that the stability in the large of gabion box and impact resistance, the gabion box of the present invention Steel wire is high-strength corrosion-resistant steel wire or the high-tensile steel wires being coated with PVC, with being coated with at upper and lower four angles of each gabion box The high-tensile steel wires of PVC connect adjacent gabion box colligation, and deal pile inserts in ground or lower floor's gabion box or after wall in the soil body The degree of depth is not less than 80cm, connects into entirety with rope between adjacent deal pile.Further, the height of gabion box is 80cm~120cm, And the height of the soil body 7 matches after height and wall.For increasing reservoir drawdown band bank slope protection deal pile-gabion box of the present invention further The bulk strength of raw retaining wall is planted in combination, and the present invention arranges wide graded broken stone layer after retaining wall, has drainage drainage, lotus Under load effect, metalling adapts to deformation, moreover it is possible to absorb water impact energy, improves erosion resistibility;Outside deal pile backwater one It is provided with anti-filter geotextiles after side and graded broken stone layer, prevents the loss of earth material, it is ensured that seep water permeable patency;Every calculus cage After net laying has set, the back-filling in layers soil body grinding compacting, and it is spaced one layer of GSZ of laying, one end of GSZ is mingled with Between upper and lower two-layer gabion box, and with rope, GSZ is tightened with gabion box, to strengthen level to stability in the large. For improving the ecological environment, recover riparian ecosystem bio-diversity, the present invention according to the water level conditions during difference regimen of falling zone, In low water level gabion box, plant planting submerged plant, ordinary water level gabion box is planted emergent aquactic plant, plants in high water level gabion box Hygrophyte, forms phytobiocoenose system, defines one shore bank green screen, beautified riverside landscape.Masson Pine frame of the present invention Selecting the Masson Pine colligation of diameter 5~10cm, Masson Pine arch width and height is 80~120cm, and bottom width is 150~200cm, At least 1/2 embedment ground of height;Further, the side that meets water at Masson Pine frame is provided with between fish nest hole and connection cobble the porous formed Matter space.Further, one or more in bamboo, timber or polystyrene foam plastics are used to make plant floating bed 9, plant The width of floating bed 9 is 80~120cm, a length of 150cm~250cm;Implantation hole 16 is uniformly distributed in hoop, bore dia 5~10cm, The degree of depth 8~15cm.The aquatic animals such as fish nest hole is Fish provide habitat, and plant can also intercept rainwash pollution of area source and purify water Body, not only improves monolithic stability and the local stability of slope body, is conducive to again recovering riparian ecosystem bio-diversity.
Obviously, the Advantageous Effects of raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile of the present invention-gabion box combination is structure Stability in the large is good, it is possible to opposing sluicing suffered by bank slope, and river course bank slope can be played preferable protective action;Gabion box It is completely covered with plant floating bed surface vegetation, clear layer, in picturesque disorder, play greening environment, purify air, the moisturizing of solid soil Effect, plant can also intercept rainwash pollution of area source, purifying water body.

Claims (10)

1. raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination, it is characterised in that this gear soil Wall includes, gabion box, deal pile, graded broken stone layer, anti-filter geotextiles and GSZ;Gabion box is compiled for using steel wire The netted boxes and baskets of rectangle knitted or be welded into, are ladder-like arranged from lower to upper along retaining wall longitudinal axis and the two rows fissure of displacement is handed over Staggered arrangement arranges, and being filled with inside gabion box can the packeted soil of cultivated plant;In gabion box inner side and outer side, rows of pine is set Timber, the deal pile of the gabion box both sides being positioned at basic part inserts in ground, is positioned at the outside deal pile of upper strata gabion box Insert in lower floor's gabion box, after inner side deal pile insertion wall in the soil body, between adjacent deal pile, connect into entirety with the rope made of hemp; Graded broken stone layer it is provided with between the soil body after inner side deal pile and wall;Between outside deal pile and gabion box and grating is broken Anti-filter geotextiles it is provided with between the soil body after rock layers and wall;Between adjacent layer gabion box and after adjacent layer wall between the soil body GSZ is set;The width of described graded broken stone layer is 20cm~40cm.
The most according to claim 1, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination, and it is special Levy and be, the inner side of bottom gabion box is provided with Masson Pine frame, be provided with plant floating bed at Masson Pine arch, Masson Pine frame with Plant floating bed rope is fixed up;Described Masson Pine frame is that to form cross sectional shape be trapezoidal casing in Masson Pine colligation, at casing Inside it is filled with cobblestone;The plant floating bed floating mat being to be provided with implantation hole, filling soil in implantation hole, and plantation very water Plant.
The most according to claim 1, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination, and it is special Levying and be, the steel wire of gabion box is high-strength corrosion-resistant steel wire or the high-tensile steel wires being coated with PVC;The height of gabion box Degree is for 80cm~120cm, and after height and wall, the height of the soil body matches.
Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile the most according to claim 1 or claim 2-gabion box combination, It is characterized in that, with being coated with the high-tensile steel wires of PVC adjacent gabion box colligation at upper and lower four angles of each gabion box Connect.
The most according to claim 1, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination, and it is special Levying and be, deal pile inserts in ground or lower floor's gabion box or after wall, the degree of depth in the soil body is not less than 80cm.
The most according to claim 1, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination, and it is special Levy and be, between adjacent deal pile, connect into entirety with rope.
The most according to claim 1, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination, and it is special Levying and be, one end of GSZ is mixed between upper and lower two-layer gabion box, and with rope GSZ and gabion box Tighten.
The most according to claim 1, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination, and it is special Levy and be, low water level gabion box is planted planting submerged plant, ordinary water level gabion box is planted emergent aquactic plant, at high water level Gabion box is planted hygrophyte.
The most according to claim 2, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination, and it is special Levying and be, Masson Pine frame selects the Masson Pine colligation of diameter 5~10cm, Masson Pine arch width and height to be 80~120cm, the end Portion's width is 150~200cm, at least 1/2 embedment ground of height;Further, the side that meets water at Masson Pine frame is provided with fish nest The Porous space formed between hole and connection cobble.
The most according to claim 2, raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination, its Being characterised by, using one or more in bamboo, timber or polystyrene foam plastics to make plant floating bed, plant floats The width of bed is 80~120cm, a length of 150cm~250cm;Implantation hole is that hoop is uniformly distributed, bore dia 5~10cm, The degree of depth 8~15cm.
CN201510230832.7A 2015-05-08 2015-05-08 Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination Expired - Fee Related CN104790346B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510230832.7A CN104790346B (en) 2015-05-08 2015-05-08 Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510230832.7A CN104790346B (en) 2015-05-08 2015-05-08 Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination

Publications (2)

Publication Number Publication Date
CN104790346A CN104790346A (en) 2015-07-22
CN104790346B true CN104790346B (en) 2016-08-24

Family

ID=53555504

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510230832.7A Expired - Fee Related CN104790346B (en) 2015-05-08 2015-05-08 Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination

Country Status (1)

Country Link
CN (1) CN104790346B (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178245A (en) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 Large filling bag ecological embankment and revetment building method for river lake channel
CN105284380A (en) * 2015-11-11 2016-02-03 浙江人文园林有限公司 Construction method for configuring gradient of aquatic plants of water-level-fluctuating zone
CN105484199B (en) * 2015-12-28 2017-09-22 陈桂腾 A kind of dam configuration and its construction method
CN105821798A (en) * 2016-05-30 2016-08-03 广东红日节能环保科技有限公司 Vegetation restoration method of reservoir soft soil slope water-level-fluctuating zone
CN106120651A (en) * 2016-08-26 2016-11-16 北京顺景园林有限公司 A kind of colonnade formula stacked arrangement ecological revetment and construction method thereof
CN106702980B (en) * 2016-11-21 2019-02-19 上海夕露环境科技有限公司 Prevent the agricultural ecological drainage ditch construction method of furrow bank soil losses
CN106592512A (en) * 2016-11-25 2017-04-26 上海市政工程设计研究总院(集团)有限公司 Reinforced concrete and gabion combined ecological flood control wall structure and construction method thereof
CN107476253A (en) * 2017-08-25 2017-12-15 交通运输部天津水运工程科学研究所 A kind of ecological revetment casing and the bank protection structure using the casing
CN107386202A (en) * 2017-08-30 2017-11-24 北京顺景园林股份有限公司 A kind of water ecology repairs integrated system
CN107857368A (en) * 2017-11-18 2018-03-30 中国电建集团贵阳勘测设计研究院有限公司 A kind of Water Ecological Recovery device in hard revetment river course
CN108374389A (en) * 2018-04-25 2018-08-07 广州市市政工程设计研究总院 A kind of the ecology structure and remodeling method of tidal reach vertical type embankment
CN109197238A (en) * 2018-11-07 2019-01-15 台州科技职业学院 A kind of rigidity revetment type riverbank ecology constructs structure and construction method
CN109811723B (en) * 2019-03-07 2024-05-14 杭州中联筑境建筑设计有限公司 Stepped ecological landscape slope protection
CN109778881B (en) * 2019-03-13 2020-12-29 北京市密云区水土保持工作站 Ecological tree tray for sloping field economic forest and application
CN110284461B (en) * 2019-07-12 2021-05-07 郑州大学 Ecological spur dike for improving aquatic organism habitat of medium and small rivers
CN110800538A (en) * 2019-11-28 2020-02-18 中国科学院、水利部成都山地灾害与环境研究所 Reservoir hydro-fluctuation belt slope protection structure and reservoir hydro-fluctuation belt slope vegetation recovery method
CN111764412A (en) * 2020-07-14 2020-10-13 中国水利水电科学研究院 Reservoir area falling zone slope protection system
CN112252272B (en) * 2020-10-31 2022-04-15 扬州大学 Russian diamond series hollow ecological brick and application method thereof
CN114182689A (en) * 2021-12-12 2022-03-15 黑龙江茂程科技有限责任公司 Assembled ecological revetment for purifying urban inland river water body
CN114197393B (en) * 2021-12-17 2023-08-08 浙江工业大学 Anti-filtering layer-based hydro-fluctuation belt slope ecological treatment method
CN114398708B (en) * 2022-01-14 2024-06-25 上海园林(集团)有限公司 Construction method of water-based landscape for improving regional water resource environmental protection performance
CN117587750B (en) * 2023-12-26 2024-06-04 中建三局集团华南有限公司 River ecological slope protection construction device and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101078205A (en) * 2007-07-20 2007-11-28 北京市水利科学研究所 Reservoir bank ecological protection system
CN202298560U (en) * 2011-09-20 2012-07-04 北京正和恒基滨水生态环境治理有限公司 Wood stake ecological revetment
CN202718138U (en) * 2012-08-23 2013-02-06 浙江祥生建设工程有限公司 Self-locking type ecological retaining wall structure
CN203866858U (en) * 2014-03-18 2014-10-08 惠州市东江园林工程有限公司 Riverway revetment plant-growing retaining wall

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3079246B2 (en) * 1995-07-13 2000-08-21 太平洋セメント株式会社 Slope green retaining wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101078205A (en) * 2007-07-20 2007-11-28 北京市水利科学研究所 Reservoir bank ecological protection system
CN202298560U (en) * 2011-09-20 2012-07-04 北京正和恒基滨水生态环境治理有限公司 Wood stake ecological revetment
CN202718138U (en) * 2012-08-23 2013-02-06 浙江祥生建设工程有限公司 Self-locking type ecological retaining wall structure
CN203866858U (en) * 2014-03-18 2014-10-08 惠州市东江园林工程有限公司 Riverway revetment plant-growing retaining wall

Also Published As

Publication number Publication date
CN104790346A (en) 2015-07-22

Similar Documents

Publication Publication Date Title
CN104790346B (en) Raw retaining wall is planted in reservoir drawdown band bank slope protection deal pile-gabion box combination
CN100398753C (en) Reservoir bank ecological protection system
CN211368589U (en) Compound ecological revetment structure
CN108130888B (en) Soft ecological bank protection structure and construction method thereof
CN102704441A (en) Arrangement method of ecological gabion chamber revetment type
CN112211157A (en) Ecological restoration method for micro-topography of abandoned sand pit of riparian zone in high-altitude area
CN103774627A (en) Method for constructing anti-seepage type ecological channel in irrigation region
CN100445470C (en) Underwater groins system for growing various living things
CN207003363U (en) Barrier wall structure and channel revetment system
CN104234007B (en) A kind of river saline-alkali soil levee slope greening method
CN206015604U (en) A kind of colonnade formula stacked arrangement ecological revetment
CN103774608B (en) A kind of city river desilting and shoal-pool rebuilding series method for combined use
CN103061310B (en) Ecological habitat revetment
CN105804033B (en) Integral type W type agricultural ecological water-break irrigation canals and ditches
CN106219763A (en) The prevention and cure of pollution method that lake, a kind of river ecological revetment combines with shoal floating bed reparation
CN108643118A (en) A kind of staged ecological bank protection structure
CN209760145U (en) Stepped ecological landscape slope protection
CN209873714U (en) River bank protection structure for urban mountain area
CN114586591B (en) River channel ecological management method and system
CN109629510A (en) A kind of ecological revetment system and its method of construction
CN212506106U (en) Stepped ecological revetment structure
CN103981836B (en) Construction method of wet land type river bank check net retaining wall
CN208235679U (en) The landscape effect lifting system of falling zone
KR101350359B1 (en) A river having natural fishways and riffles, and the method for constructing the same
RU2451129C2 (en) Erosion-preventive structure of biopositive design

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824