CN101657585A - 用于降低轨道的方法和机器 - Google Patents

用于降低轨道的方法和机器 Download PDF

Info

Publication number
CN101657585A
CN101657585A CN200880011706A CN200880011706A CN101657585A CN 101657585 A CN101657585 A CN 101657585A CN 200880011706 A CN200880011706 A CN 200880011706A CN 200880011706 A CN200880011706 A CN 200880011706A CN 101657585 A CN101657585 A CN 101657585A
Authority
CN
China
Prior art keywords
track
detecting location
location
molded lines
measuring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200880011706A
Other languages
English (en)
Other versions
CN101657585B (zh
Inventor
约瑟夫·陶依尔
伯恩哈德·利希特伯格
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Publication of CN101657585A publication Critical patent/CN101657585A/zh
Application granted granted Critical
Publication of CN101657585B publication Critical patent/CN101657585B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/20Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B35/00Applications of measuring apparatus or devices for track-building purposes
    • E01B35/06Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction
    • E01B35/08Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction for levelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Paper (AREA)
  • Length Measuring Devices With Unspecified Measuring Means (AREA)

Abstract

为了有控制地降低轨道(2),在测量系统(10)的后探测位置(11)检测并存储所述轨道(2)的纵向坡度(α)。为从后探测位置后退至少10米的一段轨道长度形成当前的高度型线(16)以及计算出叠加该高度型线的、描绘轨道额定位置的后补偿直线(17)。后探测位置(11)在计算上沿着该后补偿直线(17)导引,由此在定位在后和前探测位置(11)之间的一个中间探测位置(11)处获得用于测量弦线(12)位置的补偿值。

Description

用于降低轨道的方法和机器
本发明涉及一种按权利要求1或4的前序部分特征所述的用于降低轨道的方法及机器。
这种称作轨道稳定器的机器由US5172637公开。该测量系统具有三个可在轨道上滚动的测量轴,所述测量轴分别配属于一个用于检测轨道的横向倾斜度的横向摆动装置。通过这种方式可精确地复制在应用机器之前现有的轨道横向倾斜度,因此该轨道横向倾斜度在机器应用之后不变。
按照GB2268021或GB2268529公知的是,结合碎石道碴清筛装置在每个走行机构上设置两个纵向摆动装置,以便在去除碎石之前确定轨道-实际位置,并且在铺设好清筛后的碎石道碴之后再次建立该轨道实际位置。
现在,本发明所要解决的技术问题是创造一种开头所述类型的方法或机器,通过该方法或机器可在轨道下沉之后改善轨道位置。
按照本发明,该技术问题首先通过一种具有权利要求1所述特征的方法解决。
使用稳定装置之后存在的剩余误差的特殊问题在于,该剩余误差在机器的工作使用过程中会导致对于后面的检测位置有越来越大的不利影响。现在,通过按本发明的方法可以将测量系统后面的检测位置沿着虚拟的补偿直线导引。因此可以可靠地防止,测量系统的精度与借助于稳定装置的轨道下降相关地受残留的剩余误差影响。
上述技术问题相应地按照本发明也通过一种具有权利要求14所述特征的机器解决。
这种设计构造仅需要在结构上略微投入更多些,而不必改变测量系统本身。
本发明的其它优点由各从属权利要求和附图说明得出。
以下根据附图所示的实施形式详细说明本发明。附图中:
图1是一种带有一个用于有控制地降低轨道的测量系统的轨道稳定器的示意性侧视图,
图2是测量系统的示意图,以及
图3和图4分别示出了轨道高度型线的另一示意图。
在图1中所示的、用于控制地降低轨道2的机器1也被称为轨道稳定器。机器1具有支撑在轨道走行机构3上的机械框架4并且可借助于电机5沿工作方向6移动。
可通过驱动器7调整高度的、带有振动驱动器9的稳定装置8位于轨道走行机构3之间。该振动驱动器产生水平以及垂直于轨道纵向作用在轨道2上的横向振动,该横向振动结合通过两个驱动器7的垂直活负荷导致轨道下降。
沿工作方向6看,一个测量系统10具有前探测位置、后探测位置以及定位在两者之间的中间探测位置11,所述探测位置可为探测轨道高度位置分别在轨道2上滚动。在前探测位置和后探测位置11之间拉紧有两个沿机器纵向延伸的测量弦线12,该测量弦线12相对轨道2的高度位置在中间探测位置11被探测。
在每个轨道走行机构3上设置有两个纵向摆15,它们垂直于机械纵向相互间隔。每个纵向摆15用于测量轨道2的纵向坡度。为了检测经过的路程,在中间探测位置11设置一计程器13。一个控制装置14用于存储和处理通过测量系统10测定的测量值。
在图2中示意示出了测量系统10。前探测位置11在通过道床捣固机修正的初步轨道位置上导引。通过定位在稳定装置8区域中的中间探测位置11检测轨道2相对测量弦线12在预给定的下沉度h范围中的下降量。后探测位置11沿着最终的轨道位置导引。
在相对于所述稳定装置8(参见图1)或中间探测位置11处于后面的后轨道走行机构3上设置有检测轨道2的纵向坡度α的后纵向摆动器15。控制装置14设计用于存储纵向坡度α以及用于形成当前的高度型线16和用于计算求出一条叠加在该高度型线16上的、描绘额定位置的补偿直线17。
一旦在(前探测位置11区域中的)初步的轨道位置中由于捣固之后的剩余误差而存在不精确性,这种不精确性在轨道下降的框架内通过稳定装置在一定程度上复制。现在由此产生的特殊问题在于,后探测位置11沿着该复制的错误高度位置(参见图2完整示出的线)导引,并因此进一步使轨道下降的精度变得更坏。
为了排除这种严重的缺点,通过后纵向摆15(根据参考轨道的选择,该后纵向摆15是相应轨道走行机构3的左或右纵向摆15)等距离地(优选20cm的间距)测量轨道2的纵向坡度α,并且结合通过计程器13的行程测量存储在控制装置14中。
由存储的纵向坡度α值和所属的行程测量值,为一段由后探测位置11关于工作方向6回退至少10米的轨道长度形成轨道2的当前高度型线16。接着计算得出叠加在该高度型线16上的、描绘轨道-额度位置的后补偿直线17。
后探测位置11在计算上沿着该虚拟的补偿直线17导引,由此在中间探测位置11获得一个相应的关于测量弦线12的计算位置的补偿值。该计算位置对于测定下沉度h是决定性的,该下沉度是通过稳定装置8使轨道下降的现实高度。
在图3中示出了由捣固轨道2形成的初步轨道位置的前高度型线18。该前高度型线18通过由道床捣固机记录下并传输到控制装置14的测量值得到。如果不是这种情况,可以通过设置在前轨道走行机构3上的纵向摆15和等距测量来探测并存储所述前高度型线18。在回退至少10米的长度上计算形成一条前补偿直线19。沿着该前补偿直线19在计算上导引前探测位置11,以便因此避免剩余误差对测量系统10产生负面影响。
如图4可见,为轨道2的区段a(图1)形成一条定义使用稳定装置8之后的轨道额定位置的、与所述前补偿直线19平行延伸的额定直线20。该额定直线20与前高度型线18之间的差距得到了轨道2下降的下沉度h。为了实现这些不同的下沉度h,要么改变振动驱动器的偏心块的振动频率,要么改变偏心块相对旋转轴的间距。因此,在中间探测位置11测定的、轨道2的额定位置和实际位置之间的差别用作改变动态冲击力的调节量。

Claims (7)

1.一种用于有控制地降低轨道(2)的方法,其中,借助于动态冲击力使轨道处于横向振动中并且给该轨道加载一垂直的活负荷,通过一个探测所述轨道位置的测量系统(10)控制定义轨道下降的下沉度(h),该测量系统具有沿机器纵向延伸的测量弦线(12)以及可在所述轨道(2)上滚动的探测位置(11),其特征在于,该方法包括以下步骤:
a)在所述测量系统(10)关于工作方向(6)处于后面的一个后探测位置(11)处,结合路程测量,检测并存储所述轨道(2)的纵向坡度(α),
b)由所存储的所述纵向坡度(α)的值和路程测量值,为从所述后探测位置(11)关于所述工作方向(6)后退至少10米的一段轨道长度,形成当前的高度型线(16)以及计算出一条叠加在该高度型线(16)上的、描绘轨道额定位置的后补偿直线(17),
c)在计算上沿着所述后补偿直线(17)导引所述后探测位置(11),由此在所述后探测位置和一个前探测位置(11)之间定位的一个中间探测位置(11)处获得用于所述测量弦线(12)位置的补偿值。
2.如权利要求1所述的方法,其特征在于,该方法还包括以下步骤:
a)在所述测量系统(10)关于所述工作方向(6)处于前面的一个前探测位置(11)处,结合路程测量,检测并存储所述轨道(2)的纵向坡度(α),
b)由所检测并存储的所述纵向坡度(α)的值和所述路程测量值,为从所述前探测位置(11)关于所述工作方向后退至少10米的一段轨道长度,形成当前的高度型线(18)以及计算出一条叠加在该高度型线(18)上的、描绘轨道额定位置的前补偿直线(19),
c)在计算上沿着所述前补偿直线(19)导引所述前探测位置(11),由此在所述中间探测位置(11)获得用于所述测量弦线(12)位置的相应补偿值。
3.如权利要求1或2所述的方法,其特征在于,使用在所述中间探测位置(11)处求得的、轨道(2)的所述额定位置和所述实际位置之间的差别作为改变所述动态冲击力的调节量。
4.一种用于有控制地降低轨道的机器,带有设置在轨道走行机构(3)之间可与所述轨道(2)形状闭合地接合的、产生动态冲击力的稳定装置(8),以及带有用于检测所述轨道(2)的纵向坡度(α)的测量系统(10),该测量系统关于工作方向(6)具有可分别在所述轨道(2)上滚动的、前和后探测位置(11)以及定位在所述前探测位置和后探测位置之间的中间探测位置(11)和计程器(13),其特征在于:
a)在相对于所述稳定装置(8)处于后面的后轨道走行机构(3)上设置用于检测轨道(2)的纵向坡度(α)的纵向摆(15),
b)具有控制装置(14),该控制装置(14)设计用于存储纵向坡度(α)以及用于形成当前的高度型线(16)并且用于计算确定叠加在该当前高度型线(16)上的、描绘额定位置的后补偿直线(17)。
5.如权利要求4所述的机器,其特征在于,在相对于所述稳定装置(8)处于前面的前轨道走行机构(3)上设置用于检测所述轨道(2)的纵向坡度(α)的纵向摆(15),并且设置用于存储所述纵向坡度(α)和用于形成当前的高度型线(18)以及计算确定叠加在该当前的高度型线(18)上的、描绘额定位置的前补偿直线(19)的控制装置(14)。
6.如权利要求4或5所述的机器,其特征在于,在每个轨道走行机构(3)上设置两个沿轨道横向相互间隔的、用于检测所述轨道(2)的纵向坡度(α)的纵向摆(15)。
7.如权利要求4,5或6所述的机器,其特征在于,所述测量系统(10)的中间探测位置和前探测位置(11)之间的间距(a)小于中间探测位置和后探测位置(11)之间的间距(b)。
CN2008800117060A 2007-04-12 2008-03-04 用于降低轨道的方法和机器 Expired - Fee Related CN101657585B (zh)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
AT0056307A AT504517B1 (de) 2007-04-12 2007-04-12 Verfahren und maschine zur absenkung eines gleises
ATA563/2007 2007-04-12
PCT/EP2008/001698 WO2008125168A1 (de) 2007-04-12 2008-03-04 Verfahren und maschine zur absenkung eines gleises

Publications (2)

Publication Number Publication Date
CN101657585A true CN101657585A (zh) 2010-02-24
CN101657585B CN101657585B (zh) 2012-06-27

Family

ID=39467225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008800117060A Expired - Fee Related CN101657585B (zh) 2007-04-12 2008-03-04 用于降低轨道的方法和机器

Country Status (16)

Country Link
US (1) US8186070B2 (zh)
EP (1) EP2147160B1 (zh)
JP (1) JP2010523854A (zh)
KR (1) KR101596050B1 (zh)
CN (1) CN101657585B (zh)
AT (2) AT504517B1 (zh)
AU (1) AU2008238402B2 (zh)
BR (1) BRPI0810169B1 (zh)
CA (1) CA2679645C (zh)
DK (1) DK2147160T3 (zh)
EA (1) EA015007B1 (zh)
ES (1) ES2379026T3 (zh)
HR (1) HRP20120239T1 (zh)
PL (1) PL2147160T3 (zh)
RS (1) RS52207B (zh)
WO (1) WO2008125168A1 (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102899993A (zh) * 2011-07-27 2013-01-30 常州市瑞泰工程机械有限公司 稳定道岔区轨道的作业方法
CN104818656A (zh) * 2014-01-30 2015-08-05 系统7-铁路维护有限责任公司 用于压实轨道道床的装置
CN105220589A (zh) * 2014-06-27 2016-01-06 系统7-铁路维护有限责任公司 轨道测量装置
CN105960490A (zh) * 2014-02-20 2016-09-21 普拉塞-陶依尔铁路出口股份有限公司 由应变仪测取机械框架变形时借助激光扫描仪测量轨道位置的方法
CN106012720A (zh) * 2016-07-22 2016-10-12 株洲时代电子技术有限公司 一种轨道动力稳定车作业方法
CN110267861A (zh) * 2017-02-15 2019-09-20 普拉塞-陶伊尔铁路机械出口股份有限公司 用于记录竖直轨道位置的轨道测量车辆和方法
CN111566286A (zh) * 2018-01-22 2020-08-21 Hp3真实有限责任公司 通过可轨道行驶的轨道捣固机改善轨道位置的方法

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT504517B1 (de) * 2007-04-12 2008-06-15 Plasser Bahnbaumasch Franz Verfahren und maschine zur absenkung eines gleises
AT509481B1 (de) * 2010-08-27 2011-09-15 Plasser Bahnbaumasch Franz Messvorrichtung und verfahren zur abtastung von schwellen
CN103866658B (zh) * 2012-12-14 2015-11-25 昆明中铁大型养路机械集团有限公司 一种正线道岔稳定车及其作业方法
AT514718B1 (de) * 2013-09-11 2015-06-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Verfahren für die Korrektur eines Gleises
CN106120498B (zh) * 2016-07-22 2018-04-03 株洲时代电子技术有限公司 一种轨道动力稳定车作业系统
US10787771B2 (en) * 2016-08-05 2020-09-29 Harsco Technologies LLC Rail vehicle having stabilizer workhead with powered axles
AT519003B1 (de) * 2016-12-19 2018-03-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Messvorrichtung und Verfahren zum Erfassen einer Gleisgeometrie
AT520795B1 (de) * 2017-12-21 2020-03-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Gleisbaumaschine und Verfahren zum Nivellieren eines Gleises
CN112048952A (zh) * 2020-09-16 2020-12-08 中铁四局集团有限公司 一种高铁运营线无砟轨道破除及外运施工方法

Family Cites Families (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2434073C2 (de) * 1974-07-16 1982-03-18 Franz Plasser Bahnbaumaschinen-Industriegesellschaft mbH, 1010 Wien Verfahren zum Richten und bzw. oder Längsnivellieren von Eisenbahngleisen mittels einer schienenfahrbaren Gleisstopf-Richt-Nivelliermaschine und Vorrichtung zur Durchführung des Verfahrens
AT343165B (de) * 1975-01-31 1978-05-10 Plasser Bahnbaumasch Franz Fahrbare schotterbett-verdichtmaschine zur korrektur der gleislage
AT372725B (de) * 1981-02-12 1983-11-10 Plasser Bahnbaumasch Franz Gleisverfahrbare einrichtung zur lage-ermittlung zum nachbargleis
CA1276836C (en) * 1985-11-18 1990-11-27 Ra Nova Inc. Relaying railway switches
ES2035646T3 (es) * 1989-03-10 1993-04-16 Franz Plasser Bahnbaumaschinen- Industriegesellschaft M.B.H. Maquina bateadora, niveladora y alineadora de vias, movil, con equipos bateadores giratorios.
AT401398B (de) * 1990-02-06 1996-08-26 Plasser Bahnbaumasch Franz Kontinuierlich verfahrbare gleisbaumaschine zum verdichten der schotterbettung
AT400162B (de) * 1990-02-06 1995-10-25 Plasser Bahnbaumasch Franz Verfahren und gleisbaumaschine zur messung des querverschiebewiderstandes
US5025566A (en) * 1990-03-09 1991-06-25 Fiechter Rene A Electronic gage and levelmeter
US5172637A (en) * 1991-02-01 1992-12-22 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track surfacing machine for the controlled lowering of the track
AT402952B (de) * 1991-03-26 1997-10-27 Plasser Bahnbaumasch Franz Gleisbaumaschine zum kontrollierten absenken einesgleises
US5094004A (en) * 1991-06-21 1992-03-10 The United States Of America As Represented By The Secretary Of The Army Railroad track gager/leveler/linear measurer
AT401399B (de) * 1992-06-19 1996-08-26 Plasser Bahnbaumasch Franz Gleisbaumaschine mit einem laser-bezugsystem
AT403387B (de) 1992-06-19 1998-01-26 Plasser Bahnbaumasch Franz Maschine zur behandlung der schotterbettung
EP0609647B1 (de) * 1993-01-29 1997-09-10 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Maschine zum Erneuern bzw. Reinigen einer Schotterbettung
DE9305927U1 (de) * 1993-04-20 1994-05-26 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H., Wien Maschine zum Erneuern bzw. Verlegen eines Eisenbahngleises
USRE35788E (en) * 1994-06-13 1998-05-12 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H Method of and arrangement for rehabilitating a ballast bed of a track
JP3486239B2 (ja) * 1994-11-11 2004-01-13 東日本旅客鉄道株式会社 軌道狂い測定装置及び方法並びに曲率測定方法
AT409979B (de) * 1997-10-06 2002-12-27 Plasser Bahnbaumasch Franz Gleisbaumaschine mit einem bezugsystem zur steuerung eines arbeitsaggregates und verfahren
DE59907764D1 (de) * 1998-03-27 2003-12-24 Plasser Bahnbaumasch Franz Verfahren zur Gleislagekorrektur
FR2798347B1 (fr) * 1999-09-09 2001-11-30 Matisa Materiel Ind Sa Vehicule de mesure de l'etat geometrique d'une voie ferree
AT3879U3 (de) * 2000-06-09 2001-03-26 Plasser Bahnbaumasch Franz Maschine zur erneuerung eines gleises
AT3878U3 (de) * 2000-06-09 2001-02-26 Plasser Bahnbaumasch Franz Maschine und verfahren zum entfernen eines altgleises und zur verlegung eines neugleises
AT3919U3 (de) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz Maschine zum abbau eines alten und verlegen eines neuen gleises
AT3917U3 (de) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz Maschine zur erneuerung eines gleises
AT3918U3 (de) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz Maschine zur erneuerung eines gleises
JP2002146702A (ja) * 2000-11-08 2002-05-22 Nagoya Railroad Co Ltd 道床のつき固め方法及び道床のつき固め装置
AT5769U3 (de) * 2002-09-05 2003-09-25 Plasser Bahnbaumasch Franz Maschine zum abbau und verlegen eines gleises und verfahren
GB0402643D0 (en) * 2004-02-09 2004-03-10 Jarvis Fastline Ltd Rail track delivery and removal
DE502005003071D1 (de) * 2004-09-22 2008-04-17 Plasser Bahnbaumasch Franz Verfahren zum Abtasten einer Gleislage
DE502006008191D1 (de) * 2005-08-11 2010-12-09 Plasser Bahnbaumasch Franz Maschine zum erneuern eines gleises
AT504517B1 (de) * 2007-04-12 2008-06-15 Plasser Bahnbaumasch Franz Verfahren und maschine zur absenkung eines gleises
ES2308949B2 (es) * 2008-06-10 2010-02-11 Tecsa Empresa Constructora, S.A. "maquina de descarga y posicionado de carriles sobre traviesas en vias ferreas".
ES2319953B1 (es) * 2008-10-21 2010-07-07 Tecsa Empresa Constructora, S.A. Dispositivo para descarga y colocacion de carriles en una via paralela a otra existente.
DE102009051583A1 (de) * 2009-10-21 2011-04-28 IPR-Intelligente Peripherien für Roboter GmbH Robotersystem und Verfahren zum Verlegen eines Schienenstrangs

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102899993A (zh) * 2011-07-27 2013-01-30 常州市瑞泰工程机械有限公司 稳定道岔区轨道的作业方法
CN102899993B (zh) * 2011-07-27 2014-09-24 常州市瑞泰工程机械有限公司 稳定道岔区轨道的作业方法
CN104818656A (zh) * 2014-01-30 2015-08-05 系统7-铁路维护有限责任公司 用于压实轨道道床的装置
CN105960490A (zh) * 2014-02-20 2016-09-21 普拉塞-陶依尔铁路出口股份有限公司 由应变仪测取机械框架变形时借助激光扫描仪测量轨道位置的方法
CN105220589A (zh) * 2014-06-27 2016-01-06 系统7-铁路维护有限责任公司 轨道测量装置
CN106012720A (zh) * 2016-07-22 2016-10-12 株洲时代电子技术有限公司 一种轨道动力稳定车作业方法
CN106012720B (zh) * 2016-07-22 2018-10-12 株洲时代电子技术有限公司 一种轨道动力稳定车作业方法
CN110267861A (zh) * 2017-02-15 2019-09-20 普拉塞-陶伊尔铁路机械出口股份有限公司 用于记录竖直轨道位置的轨道测量车辆和方法
CN111566286A (zh) * 2018-01-22 2020-08-21 Hp3真实有限责任公司 通过可轨道行驶的轨道捣固机改善轨道位置的方法

Also Published As

Publication number Publication date
PL2147160T3 (pl) 2012-05-31
BRPI0810169B1 (pt) 2018-07-03
KR101596050B1 (ko) 2016-02-19
KR20090129467A (ko) 2009-12-16
EP2147160A1 (de) 2010-01-27
US8186070B2 (en) 2012-05-29
CN101657585B (zh) 2012-06-27
JP2010523854A (ja) 2010-07-15
RS52207B (en) 2012-10-31
AU2008238402B2 (en) 2013-05-02
AT504517A4 (de) 2008-06-15
WO2008125168A1 (de) 2008-10-23
DK2147160T3 (da) 2012-04-02
EP2147160B1 (de) 2011-12-28
AU2008238402A1 (en) 2008-10-23
HRP20120239T1 (hr) 2012-04-30
BRPI0810169A2 (pt) 2014-12-30
CA2679645C (en) 2014-10-28
EA200901287A1 (ru) 2010-04-30
AT504517B1 (de) 2008-06-15
CA2679645A1 (en) 2008-10-23
EA015007B1 (ru) 2011-04-29
US20100018432A1 (en) 2010-01-28
ES2379026T3 (es) 2012-04-20
ATE539198T1 (de) 2012-01-15

Similar Documents

Publication Publication Date Title
CN101657585B (zh) 用于降低轨道的方法和机器
CN100501001C (zh) 双块式无碴轨道轨排精确调整施工方法
CN102390405B (zh) 用于轨道参数约束测量的检测方法及轨道检查仪
CN201107030Y (zh) 轨道平直度数字测量装置
AU2018246236B2 (en) Track geometry measurement system with inertial measurement
SE508826C2 (sv) Kontinuerligt rörlig rälsbyggnadsmaskin för komprimering av makadambädden till en räls samt förfarande för korrigering av sidoläget hos en räls
CN104775342A (zh) 轨道几何状态快速测量仪
AU2017315963B2 (en) Inertial track measurement system and methods
PL176678B1 (pl) Sposób oraz maszyna do ciągłego pomiaru oporu poprzecznego przemieszczania toru
CN106383945A (zh) 隧道与地下空间深、浅埋垂直围岩压力通用设计计算方法
CN109958017A (zh) 一种具有称重传感器的路面结构及其施工方法
US20180327004A1 (en) Course correction procedure generation device, course correction procedure generation system, course correction procedure generation method, and program
CN104501768A (zh) 基于机器视觉的轨道刚度测量方法
CN202187257U (zh) 一种用于客运专线无砟轨道长钢轨的轨距调整装置
CN208777090U (zh) 一种铁路轨道几何参数测量装置
CN203259122U (zh) 一种有关地铁隧道内的疏散平台的测量装置
CN209326501U (zh) 一种道岔组装用多功能空间尺寸测量尺
CN206308568U (zh) 一种辅助轨排粗调的测量装置
CN103255689A (zh) 一种无砟轨道底座板高程快速检测车
CN105841592B (zh) 一种顶进轴线偏移量的测量装置及其使用方法
JP4094578B2 (ja) 走行式マクラギ判定装置
KR20100048328A (ko) 안내 궤도식 고무차륜 경전철의 주행로 배근 시공장치
CN104129405A (zh) 基于钢轨变形速度的轨道刚度快速测量方法
CN110130167A (zh) 一种铁路轨道几何参数测量装置及起拨道控制方法
CN118391014A (zh) 一种基旋转惯导的采煤机的找直设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120627

CF01 Termination of patent right due to non-payment of annual fee