KR20090129467A - 트랙의 하강을 위한 기계장치 및 방법 - Google Patents

트랙의 하강을 위한 기계장치 및 방법 Download PDF

Info

Publication number
KR20090129467A
KR20090129467A KR1020097021218A KR20097021218A KR20090129467A KR 20090129467 A KR20090129467 A KR 20090129467A KR 1020097021218 A KR1020097021218 A KR 1020097021218A KR 20097021218 A KR20097021218 A KR 20097021218A KR 20090129467 A KR20090129467 A KR 20090129467A
Authority
KR
South Korea
Prior art keywords
track
tracing point
longitudinal
straight line
vertical profile
Prior art date
Application number
KR1020097021218A
Other languages
English (en)
Other versions
KR101596050B1 (ko
Inventor
조셉 테울러
베른하르트 리히트베르거
Original Assignee
프란츠 플라세 바흔바우마쉬넨-인두스트리게젤샤프트 엠. 베. 하
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 프란츠 플라세 바흔바우마쉬넨-인두스트리게젤샤프트 엠. 베. 하 filed Critical 프란츠 플라세 바흔바우마쉬넨-인두스트리게젤샤프트 엠. 베. 하
Publication of KR20090129467A publication Critical patent/KR20090129467A/ko
Application granted granted Critical
Publication of KR101596050B1 publication Critical patent/KR101596050B1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/20Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B35/00Applications of measuring apparatus or devices for track-building purposes
    • E01B35/06Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction
    • E01B35/08Applications of measuring apparatus or devices for track-building purposes for measuring irregularities in longitudinal direction for levelling

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Paper (AREA)
  • Length Measuring Devices With Unspecified Measuring Means (AREA)

Abstract

트랙(track)(2)의 하강을 제어하기 위해, 측정시스템(measuring system)(10)의 후방 트레이싱 포인트(11)에서 트랙(2)의 종방향 경사(α)가 탐지 저장된다. 적어도 후방 10m 뒤에 달하는 트랙 길이에 대해, 현재의 수직 프로파일(16)이 생성되고, 그 위에 중첩되면서 트랙의 목표 위치를 제시해 주는 후방 보정라인(rear compensation line)(17)이 계산된다. 후방 트레이싱 포인트(11)는, 계산에 의해, 상기 후방 보정라인(17)을 따라 유도되어서, 후방 및 전방 트레이싱 포인트(11)들 사이에 위치한 중간 트레이싱 포인트(11)에서, 측정 코드(측정 축)(12) 위치에 대한 보정값이 도출된다.
트랙, 측정시스템, 보정라인, 보정값, 트랙 스태빌라이저, 펜듈럼

Description

트랙의 하강을 위한 기계장치 및 방법{METHOD AND MACHINE FOR LOWERING A TRACK}
본 발명은 청구항 1항 및 청구항 4항의 각각의 전제부에 인용된 특징에 따른 트랙의 하강을 제어하기 위한 장치 및 방법에 관한 것이다.
트랙 스태빌라이저(track stabiliser)라고 일컫는 형태의 기계장치가 미국 특허 5 172 637에 공지되어 있는데, 측정 시스템(measuring system)에는, 트랙상에서 회전하게 설계된 3개의 측정축(measuring axles)들이 포함되어 있는데, 상기 측정축들 각각에는, 트랙의 횡방향 경사(transverse inclination)를 탐지하기 위해 각각의 횡방향 펜듈럼(pendulum)이 연결되어 있다. 이런방식으로, 기계장치의 작동 이전에 존재한 횡방향의 트랙 경사를 정밀하게 카피(copy)하는 것이 가능하며, 상기 경사는 기계장치의 작동 후에도 변하지 않는다.
영국 특허 2 268 021 또는 2 268 529에 따르면, 밸러스트(ballast)의 세척과 관련하여, 밸러스트의 제거 이전에 트랙의 실제 위치를 탐지하고, 상기 위치를 새로운 밸러스트의 도입 후에 재생하기 위해, 각각의 온-트랙 언더캐리지(on-track undercarriage) 상에 2개의 종방향 펜듈럼들을 배열하는 것이 공지되어 있다.
본 발명의 목적은, 트랙의 하강후에 트랙위치가 개선될 수 있도록, 서두에 언급한 종류의 기계장치 또는 방법을 안출하는데 있다.
본 발명에 따라, 상기 목적은 청구항 1항의 특징부에 인용된 특성들로 명시된 종류의 방법으로 달성된다.
스태빌라이징 유닛(stabilising unit)을 사용한 후 존재하는 잔여 결점에 의해 내포되는 특별한 문제점은, 상기 결점으로 인해, 기계장치를 작동하는 동안에, 후방 트레이싱 포인트(rear tracing point)에 부정적인 영향이 계속 증가될 수 있다는 것이다. 본 발명에 따른 방법으로써, 측정시스템의 후방 트레이싱 포인트를 가상의 보정 직선 라인(virtual compensation straight line)을 따라 유도하는 것이 가능해진다. 이로써, 스태빌라이징 유닛의 도움을 받아 트랙을 하강시키는 것에 관련하여, 측정시스템의 정밀도가 잔여 결점에 의해 손상받는 것이 확실히 배제될 수 있다.
또한 상기 목적은, 본 발명에 따른 청구항 4항의 특징부에 인용된 특성들로 명시된 형태의 기계장치로 달성된다.
본 실시예는, 측정시스템 자체에 대해 어떠한 변경도 필요 없으며, 단지 약간의 추가적인 구조상의 비용만을 필요로 한다.
본 발명의 추가적인 장점은 종속항들 및 도면 설명으로 명백해진다.
도면으로 도시된 실시예를 참조하여, 하기에서 본 발명에 대해 더욱 상세히 설명될 것이다.
도 1은 트랙의 하강을 제어하기 위한 측정시스템을 지닌 트랙 스태빌라이저의 개략적인 측면도이다.
도 2는 측정시스템을 도시한 개략도이다.
도 3 및 도 4 각각은 트랙의 수직 프로파일(profile)에 대한 개략도이다.
도 1에 도시된, 트랙(2)의 하강을 제어하기 위한 기계장치(1)는 트랙 스태빌라이저(track stabiliser)라고도 불린다. 상기 기계장치(1)는 온-트랙 언더캐리지(3, on-track undercarriage)들에 지지되어, 모터(5)의 도움으로 작업방향(6)으로 이동할 수 있는 기계장치 프레임(4)을 포함한다.
온-트랙 언더캐리지(3)들 사이에는, 드라이브(7, drive)들에 의해 수직으로 조정가능하고, 진동 드라이브(9, vibration drive)를 지닌 스태빌라이징 유닛(8, stabilising unit)이 위치한다. 상기 후자는, 2개의 드라이브(7)들의 수직 정하중(static load)과 연관하여, 종방향에 수직이며 수평방향으로 트랙(2)에 작용하는 횡방향 진동(transverse vibrations)을 일으키고, 트랙의 하강을 야기시킨다.
측정시스템(10)은 작업방향(6)에 대하여, 전방 트레이싱 포인트(11, front tracing point), 후방 트레이싱 포인트(11, rear tracing point) 및 중간 트레이싱 포인트(11, middle tracing point)를 포함하며, 상기 중간 트레이싱 포인트는 전방 트레이싱 포인트 및 후방 트레이싱 포인트 사이에 위치하고, 이들 각각은 트랙의 수직 위치를 트레이싱(tracing)하기 위해, 트랙(2)상에서 회전하도록 설계되어 있다. 기계장치의 종방향으로 뻗어 있는 2개의 측정코드(12, measuring chord)들은 전방 및 후방 트레이싱 포인트(11)들 사이에서 팽팽하게 펴져 있으며, 중간 트레이싱 포인트(11)에서 트랙(2)에 대한 측정코드(12)의 수직위치가 트레이싱된다.
각각의 온-트랙 언더캐리지(3)에는, 2개의 종방향 펜듈럼(15, pendulums)들이 기계장치의 종방향에 수직하게 서로 이격되어 배열된다. 각각의 종방향 펜듈럼(15)은 트랙(2)의 종방향 경사를 측정하는 데 소용된다. 이동거리(distance travelled)를 탐지하기 위해 오도미터(13, odometer)가 중간 트레이싱 포인트(11)에 제공되어 있다. 제어장치(14, control device)는 측정시스템(10)에서 측정된 데이타를 저장하고 처리하는 데 소용된다.
상기 측정시스템은 도 2에 개략적으로 도시되어 있다. 전방 트레이싱 포인트(11)는 탬핑머신(tamping machine)에 의해 수정된 초기 트랙 위치(preliminary track position) 상에 안내된다. 스태빌라이징 유닛(8) 영역에 위치하는 중간 트레이싱 포인트(11)에 의해, 측정코드(12)에 대해 규정된 쎄틀먼트(settlement) h 의 범위내에서 트랙(2)의 하강이 탐지된다. 후방 트레이싱 포인트(11)는 최종 트랙 위치를 따라 안내된다.
스태빌라이징 유닛(8)(도 1 참조) 또는 중간 트레이싱 포인트(11)에 대해 후 방에는, 후방 종방향 펜듈럼(15)이 트랙(2)의 종방향 경사 α를 탐지하기 위해 제공되어 있다. 제어장치(14,control device)는, 종방향 경사 α를 저장하고, 현재의 수직 프로파일(16)을 형성하고, 상기 수직 프로파일(16)에 중첩되어 목표 위치(target position)를 제공하는 보정 직선 라인(17, compensation straight line)을 계산에 의해 결정하도록 설계되어 있다.
탬핑후에 잔여 결점(residual faults)의 결과로 전방 트레이싱 포인트(11)의 영역에서 부정확성(오류)이 발생되자마자, 스태빌라이징 유닛에 의해 트랙이 하강하는 동안에 상기 부정확성은 그대로 카피(copiy)가 된다. 이로 인해 야기되는 특별한 문제점은, 후방 트레이싱 포인트(11)가 카피된 수직 위치의 오류에 따라 안내되고(도 2에 실선 참조), 따라서 트랙의 하강 정밀성이 추가적으로 손상받게 된다는 것이다.
이러한 중대한 단점을 제거하기 위해서, 후방 종방향 펜듈럼(15)(기준레일(reference rail)의 선정에 따라, 해당되는 온-트랙 언더캐리지(3)의 좌측 또는 우측 종방향 펜듈럼(15))에 의해, 등간격으로(바람직하게는 20㎝ 거리) 트랙(2)의 종방향 경사 α가 측정되고, 오도미터(13, odometer)에 의해 측정된 거리와 연계되어 제어장치(14)에 저장된다.
종방향 경사 α 및 연계된 측정 거리에 대한 저장값으로부터, 트랙(2)의 현재 수직 프로파일(16)이 작업방향(6)에 대해 후방 트레이싱 포인트(11)로 부터 적어도 10m 뒤에 달하는 트랙 길이에 대해 형성된다. 이어서, 후방 보정 직선라인(17)이 계산되며, 이는 상기 수직 프로파일(16) 위에 중첩되어, 목표 트랙 위 치(target track position)를 제시하게 된다.
후방 트레이싱 포인트(11)는 계산에 의해 가상의 보정 직선라인(17)을 따라 유도되어서, 중간 트레이싱 포인트(11)에서 측정코드(12)의 계산된 위치를 위한 해당 보정값이 나오게 된다. 이 위치는, 쎄틀먼트 h, 즉 스태빌라이징 유닛(8)에 의해 하강되는 트랙의 실제 높이를 결정하는 데 관련된다.
도 3에는, 트랙(2)의 탬핑으로부터 야기된 초기 트랙 위치의 전방 수직 프로파일(18)이 도시되어 있다. 이러한 전방 수직 프로파일(18)은 탬핑머신에 의해 기록된 측정치로부터 제공되어, 제어장치(14)로 전송된다. 이렇지 않은 경우에는, 전방의 온-트랙 언더캐리지(3)에 있는 종방향 펜듈럼(15)에 의한 등거리 측정으로, 상기 전방 수직 프로파일(18)이 트레이싱되어 저장될 수 있다. 적어도 10m 이상의 길이를 뒤로 거슬러 올라, 전방 보정 직선라인(19)이 계산에 의해 형성된다. 상기 전방 보정 직선라인(19)을 따라, 전방 트레이싱 포인트(11)가 계산에 의해 유도되어서, 잔여 결점으로 인해 측정시스템(10)에 어떠한 부정적 영향이 미치는 것을 방지할 수 있다.
도 4에서 보여지듯이, 전방 보정 직선라인(front compensation straight line)과 평행하게 연장되고, 스태빌라이징 유닛(8)의 작동 후의 목표 위치를 정해주는 목표 직선라인(20, target straight line)이 트랙(2)의 섹션 a (도 2) 구간에 형성된다. 상기 목표 직선라인(20)과 전방 수직 프로파일(18) 사이의 차이로부터, 트랙(2)의 하강을 위한 각각의 쎄틀먼트 h가 생성된다. 이런 변화하는 쎄틀먼트 h 를 현실화하기 위해서, 진동 드라이브의 불균형 질량(unbalanced mass)에 대한 주 파수, 또는 회전축에 대한 불균형 질량의 거리를 변경시킨다. 따라서, 중간 트레이싱 포인트(11)에서 정해지는, 목표 위치 및 트랙(2)의 실제 위치 사이의 차이가 동적인 타격력(dynamic striking force)을 변화시키기 위한 제어 변수(control variable)로 사용된다.

Claims (7)

  1. 트랙(track)이 동적인 타격력(dynamic striking force)으로 횡방향 진동을 받고, 수직 정하중(vertical static load)을 받으며,
    기계장치의 종방향으로 뻗어 있는 측정코드(measuring cord)(12)를 지니고, 상기 트랙(2) 상에서 회전하도록 설계된 트레이싱 포인트(tracing point)(11)들을 포함하는 측정시스템(measuring system)(10)이 트랙 위치를 트레이싱(tracing)하여, 트랙의 하강을 정해주는 쎄틀먼트(settlement)(h)를 제어하는,
    트랙(2)의 하강을 제어하기 위한 방법(A method for the controlled lowering of a track)에 있어서,
    a) 작업방향(6)에 대하여, 측정시스템(10)의 후방 트레이싱 포인트(rear tracing point)(11)에서, 트랙(2)의 종방향 경사(α)가 거리 측정과 연계되어 탐지되고 저장되며;
    b) 종방향 경사(α) 및 거리 측정에 대한 저장 값으로부터, 작업방향(6)에 대하여 후방 트레이싱 포인트(11)로부터 적어도 10m 뒤에 달하는 트랙 길이에 대해, 트랙(2)의 현재의 수직 프로파일(current vertical profile)(18)이 형성되고, 후방 보정 직선라인(rear compensation straight line)(17)이 계산되어, 수직 프로파일(16) 위에 중첩되고, 목표 트랙 위치(target track position)을 제시하여 주며;
    c) 상기 후방 트레이싱 포인트(11)는 계산에 의해서 상기 후방 보정 직선라 인(17)을 따라 유도되어서, 전방 트레이싱 포인트(front tracing point)(11) 및 후방 트레이싱 포인트(11) 사이에 위치하는 중간 트레이싱 포인트(middle tracing point)(11)에서 측정코드(12)의 위치에 대한 보정값이 나오게 되는 것;을 특징으로 하는 방법.
  2. 제 1항에 있어서,
    상기 방법은,
    a) 작업방향(6)에 대하여, 측정시스템(10)의 전방 트레이싱 포인트(11)에서, 트랙(2)의 종방향 경사(α)가 거리 측정과 연계되어 탐지되고 저장되며;
    b) 종방향 경사(α) 및 거리측정에 대한 탐지값 및 저장값으로부터, 작업방향(6)에 대하여 전방 트레이싱 포인트(11)로부터 적어도 10m 뒤에 달하는 트랙 길이에 대해, 트랙(2)의 현재의 수직 프로파일(current vertical profile)(18)이 형성되고, 전방 보정 직선라인(front compensation straight line)(19)이 계산되어, 수직 프로파일(18) 위에 중첩되고, 목표 트랙 위치를 제시하여 주며;
    c) 상기 전방 트레이싱 포인트(11)는 계산에 의해서 상기 전방 보정 직선라인(19)을 따라 유도되어서, 중간 트레이싱 포인트(11)에서 측정코드(12)의 위치에 대한 해당 보정값이 나오게 되는 것;을 특징으로 하는 방법.
  3. 제 1항 또는 제 2항에 있어서,
    중간 트레이싱 포인트(11)에서 정해지는, 트랙(2)의 목표위치 및 실제 위치 사이의 차이점이 동적인 타격력(dynamic striking force)를 변화시키기 위한 제어 변수(control variable)로서 사용되는 것을 특징으로 하는 방법.
  4. 온-트랙 언더캐리지(on-track undercarriage)(3)들 사이에 배치되어, 트랙(2)에 형태적으로 꼭 맞게 적용되고 동적인 타격력을 발생시키게끔 설계된 스태빌라이징 유닛(8)을 포함하고, 각각 트랙(2) 상에서 회전하도록 설계된, 작업방향(6)에 대하여 전방 트레이싱 포인트(11) 및 후방 트레이싱 포인트(11), 상기 전방 및 후방 트레이싱 포인트 사이에 위치하는 중간 트레이싱 포인트(11)와 오도미터(odometer)(13)를 포함하면서, 트랙(2)의 종방향 경사(α)를 탐지하는 측정시스템(10)을 포함하는 트랙의 하강을 제어하는 기계장치(A machine for the controlled lowering of a track)에 있어서,
    a) 트랙(2)의 종방향 경사(α)를 탐지하기 위한 종방향 펜듈럼(longitudinal pendulum)(15)이, 스태빌라이징 유닛(8)에 대하여 후방 온-트랙 언더캐리지(3) 상에 제공되며;
    b) 제어장치(control device)(14)는, 상기 종방향 경사(α)를 저장하여, 현재의 수직 프로파일(current vertical profile)(16)을 형성(forming)하고, 계산에 의해 후방 보정 직선라인(rear compensation straight line)(17)을 결정하도록 설 계되며, 상기 후방 보정 직선라인(17)은 상기 현재의 수직 프로파일(16)에 중첩되어 목표 위치(target position)를 제공하는 것;을 특징으로 하는 기계장치.
  5. 제 4항에 있어서,
    트랙(2)의 종방향 경사(α)를 탐지하기 위한 종방향 펜듈럼(longitudinal pendulum)(15)이, 스태빌라이징 유닛(8)에 대하여 전방 온-트랙 언더캐리지(3) 상에 제공되며,
    그리고 제어장치(14)는, 상기 종방향 경사(α)를 저장하여, 현재의 수직 프로파일(18)을 형성(forming)하고, 전방 보정 직선라인(front compensation straight line)(19)을 계산하도록 설계되며, 상기 전방 보정 직선라인(19)은 상기 현재의 수직 프로파일(18)에 중첩되어 목표 위치(target position)를 제공하는 것을 특징으로 하는 기계장치.
  6. 제 4항 또는 제 5항 중 어느 한항에 있어서,
    각각의 온-트랙 언더캐리지(3) 상에는, 트랙(2)의 종방향 경사(α)를 탐지하기위해, 2개의 종방향 펜듈럼(15)이 트랙의 횡방향으로 서로 이격되어 제공되어 있는 것을 특징으로 하는 기계장치.
  7. 제 4항, 제 5항 또는 제 6항 중 어느 한 항에 있어서,
    측정시스템(10)에서, 전방 트레이싱 포인트(11)와 중간 트레이싱 포인트(11) 사이의 거리(a)는, 후방 트레이싱 포인트(11)와 중간 트레이싱 포인트(11) 사이의 거리(b) 보다 작은 것을 특징으로 하는 기계장치.
KR1020097021218A 2007-04-12 2008-03-04 궤도의 하강을 위한 기계장치 및 방법 KR101596050B1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT0056307A AT504517B1 (de) 2007-04-12 2007-04-12 Verfahren und maschine zur absenkung eines gleises
ATA563/2007 2007-04-12

Publications (2)

Publication Number Publication Date
KR20090129467A true KR20090129467A (ko) 2009-12-16
KR101596050B1 KR101596050B1 (ko) 2016-02-19

Family

ID=39467225

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020097021218A KR101596050B1 (ko) 2007-04-12 2008-03-04 궤도의 하강을 위한 기계장치 및 방법

Country Status (16)

Country Link
US (1) US8186070B2 (ko)
EP (1) EP2147160B1 (ko)
JP (1) JP2010523854A (ko)
KR (1) KR101596050B1 (ko)
CN (1) CN101657585B (ko)
AT (2) AT504517B1 (ko)
AU (1) AU2008238402B2 (ko)
BR (1) BRPI0810169B1 (ko)
CA (1) CA2679645C (ko)
DK (1) DK2147160T3 (ko)
EA (1) EA015007B1 (ko)
ES (1) ES2379026T3 (ko)
HR (1) HRP20120239T1 (ko)
PL (1) PL2147160T3 (ko)
RS (1) RS52207B (ko)
WO (1) WO2008125168A1 (ko)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT504517B1 (de) * 2007-04-12 2008-06-15 Plasser Bahnbaumasch Franz Verfahren und maschine zur absenkung eines gleises
AT509481B1 (de) * 2010-08-27 2011-09-15 Plasser Bahnbaumasch Franz Messvorrichtung und verfahren zur abtastung von schwellen
CN102899993B (zh) * 2011-07-27 2014-09-24 常州市瑞泰工程机械有限公司 稳定道岔区轨道的作业方法
CN103866658B (zh) * 2012-12-14 2015-11-25 昆明中铁大型养路机械集团有限公司 一种正线道岔稳定车及其作业方法
AT514718B1 (de) * 2013-09-11 2015-06-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Verfahren für die Korrektur eines Gleises
NO2902546T3 (ko) * 2014-01-30 2018-03-24
AT515208B1 (de) * 2014-02-20 2015-07-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Gleisbaumaschine zur Durchführung von Gleislagekorrekturen und Verfahren
ES2646607T3 (es) * 2014-06-27 2017-12-14 Hp3 Real Gmbh Dispositivo para medir vías férreas
CN106012720B (zh) * 2016-07-22 2018-10-12 株洲时代电子技术有限公司 一种轨道动力稳定车作业方法
CN106120498B (zh) * 2016-07-22 2018-04-03 株洲时代电子技术有限公司 一种轨道动力稳定车作业系统
CA3032145A1 (en) * 2016-08-05 2018-02-08 Harsco Technologies LLC Rail vehicle having stabilizer workhead with powered axles
AT519003B1 (de) * 2016-12-19 2018-03-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Messvorrichtung und Verfahren zum Erfassen einer Gleisgeometrie
AT519575B1 (de) * 2017-02-15 2018-08-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Gleismessfahrzeug und Verfahren zur Erfassung einer vertikalen Gleislage
AT520795B1 (de) * 2017-12-21 2020-03-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Gleisbaumaschine und Verfahren zum Nivellieren eines Gleises
AT520894B1 (de) * 2018-01-22 2021-01-15 Hp3 Real Gmbh Verfahren zur Gleislageverbesserung durch eine gleisfahrbare Gleisstopfmaschine
CN112048952A (zh) * 2020-09-16 2020-12-08 中铁四局集团有限公司 一种高铁运营线无砟轨道破除及外运施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2434073A1 (de) * 1974-07-16 1976-01-29 Deutsche Bundesbahn Verfahren zum richten, laengsnivellieren und/oder quernivellieren von eisenbahngleisen mittels schienenfahrbarer gleisstopfmaschine und vorrichtung zur durchfuehrung des verfahrens
DE4102872A1 (de) * 1990-02-06 1991-08-08 Plasser Bahnbaumasch Franz Kontinuierlich verfahrbare gleisbaumaschine zum verdichten der schotterbettung
US5172637A (en) * 1991-02-01 1992-12-22 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track surfacing machine for the controlled lowering of the track
GB2268021A (en) * 1992-06-19 1993-12-22 Plasser Bahnbaumasch Franz Laser reference for railway track maintenance

Family Cites Families (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT343165B (de) * 1975-01-31 1978-05-10 Plasser Bahnbaumasch Franz Fahrbare schotterbett-verdichtmaschine zur korrektur der gleislage
AT372725B (de) * 1981-02-12 1983-11-10 Plasser Bahnbaumasch Franz Gleisverfahrbare einrichtung zur lage-ermittlung zum nachbargleis
CA1276836C (en) * 1985-11-18 1990-11-27 Ra Nova Inc. Relaying railway switches
ATE81369T1 (de) * 1989-03-10 1992-10-15 Plasser Bahnbaumasch Franz Fahrbare gleisstopf-, nivellier- und richtmaschine mit verschwenkbaren stopfaggregaten.
AT400162B (de) * 1990-02-06 1995-10-25 Plasser Bahnbaumasch Franz Verfahren und gleisbaumaschine zur messung des querverschiebewiderstandes
US5025566A (en) * 1990-03-09 1991-06-25 Fiechter Rene A Electronic gage and levelmeter
AT402952B (de) * 1991-03-26 1997-10-27 Plasser Bahnbaumasch Franz Gleisbaumaschine zum kontrollierten absenken einesgleises
US5094004A (en) * 1991-06-21 1992-03-10 The United States Of America As Represented By The Secretary Of The Army Railroad track gager/leveler/linear measurer
AT403387B (de) 1992-06-19 1998-01-26 Plasser Bahnbaumasch Franz Maschine zur behandlung der schotterbettung
DE59307342D1 (de) * 1993-01-29 1997-10-16 Plasser Bahnbaumasch Franz Maschine zum Erneuern bzw. Reinigen einer Schotterbettung
DE9305927U1 (de) * 1993-04-20 1994-05-26 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H., Wien Maschine zum Erneuern bzw. Verlegen eines Eisenbahngleises
USRE35788E (en) * 1994-06-13 1998-05-12 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H Method of and arrangement for rehabilitating a ballast bed of a track
JP3486239B2 (ja) * 1994-11-11 2004-01-13 東日本旅客鉄道株式会社 軌道狂い測定装置及び方法並びに曲率測定方法
AT409979B (de) * 1997-10-06 2002-12-27 Plasser Bahnbaumasch Franz Gleisbaumaschine mit einem bezugsystem zur steuerung eines arbeitsaggregates und verfahren
DK0952254T3 (da) * 1998-03-27 2004-03-15 Plasser Bahnbaumasch Franz Fremgangsmåde til sporpositionskorrektion
FR2798347B1 (fr) * 1999-09-09 2001-11-30 Matisa Materiel Ind Sa Vehicule de mesure de l'etat geometrique d'une voie ferree
AT3878U3 (de) * 2000-06-09 2001-02-26 Plasser Bahnbaumasch Franz Maschine und verfahren zum entfernen eines altgleises und zur verlegung eines neugleises
AT3879U3 (de) * 2000-06-09 2001-03-26 Plasser Bahnbaumasch Franz Maschine zur erneuerung eines gleises
AT3918U3 (de) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz Maschine zur erneuerung eines gleises
AT3919U3 (de) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz Maschine zum abbau eines alten und verlegen eines neuen gleises
AT3917U3 (de) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz Maschine zur erneuerung eines gleises
JP2002146702A (ja) * 2000-11-08 2002-05-22 Nagoya Railroad Co Ltd 道床のつき固め方法及び道床のつき固め装置
AT5769U3 (de) * 2002-09-05 2003-09-25 Plasser Bahnbaumasch Franz Maschine zum abbau und verlegen eines gleises und verfahren
GB0402643D0 (en) * 2004-02-09 2004-03-10 Jarvis Fastline Ltd Rail track delivery and removal
DE502005003071D1 (de) * 2004-09-22 2008-04-17 Plasser Bahnbaumasch Franz Verfahren zum Abtasten einer Gleislage
EP1920113B1 (de) * 2005-08-11 2010-10-27 Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. Maschine zum erneuern eines gleises
AT504517B1 (de) * 2007-04-12 2008-06-15 Plasser Bahnbaumasch Franz Verfahren und maschine zur absenkung eines gleises
ES2308949B2 (es) * 2008-06-10 2010-02-11 Tecsa Empresa Constructora, S.A. "maquina de descarga y posicionado de carriles sobre traviesas en vias ferreas".
ES2319953B1 (es) * 2008-10-21 2010-07-07 Tecsa Empresa Constructora, S.A. Dispositivo para descarga y colocacion de carriles en una via paralela a otra existente.
DE102009051583A1 (de) * 2009-10-21 2011-04-28 IPR-Intelligente Peripherien für Roboter GmbH Robotersystem und Verfahren zum Verlegen eines Schienenstrangs

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2434073A1 (de) * 1974-07-16 1976-01-29 Deutsche Bundesbahn Verfahren zum richten, laengsnivellieren und/oder quernivellieren von eisenbahngleisen mittels schienenfahrbarer gleisstopfmaschine und vorrichtung zur durchfuehrung des verfahrens
DE4102872A1 (de) * 1990-02-06 1991-08-08 Plasser Bahnbaumasch Franz Kontinuierlich verfahrbare gleisbaumaschine zum verdichten der schotterbettung
US5172637A (en) * 1991-02-01 1992-12-22 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track surfacing machine for the controlled lowering of the track
GB2268021A (en) * 1992-06-19 1993-12-22 Plasser Bahnbaumasch Franz Laser reference for railway track maintenance

Also Published As

Publication number Publication date
US8186070B2 (en) 2012-05-29
AT504517A4 (de) 2008-06-15
JP2010523854A (ja) 2010-07-15
KR101596050B1 (ko) 2016-02-19
AU2008238402B2 (en) 2013-05-02
EP2147160A1 (de) 2010-01-27
HRP20120239T1 (hr) 2012-04-30
EA200901287A1 (ru) 2010-04-30
AT504517B1 (de) 2008-06-15
US20100018432A1 (en) 2010-01-28
EA015007B1 (ru) 2011-04-29
CA2679645A1 (en) 2008-10-23
AU2008238402A1 (en) 2008-10-23
WO2008125168A1 (de) 2008-10-23
CN101657585A (zh) 2010-02-24
PL2147160T3 (pl) 2012-05-31
ES2379026T3 (es) 2012-04-20
CA2679645C (en) 2014-10-28
BRPI0810169B1 (pt) 2018-07-03
CN101657585B (zh) 2012-06-27
DK2147160T3 (da) 2012-04-02
EP2147160B1 (de) 2011-12-28
RS52207B (en) 2012-10-31
ATE539198T1 (de) 2012-01-15
BRPI0810169A2 (pt) 2014-12-30

Similar Documents

Publication Publication Date Title
KR101596050B1 (ko) 궤도의 하강을 위한 기계장치 및 방법
JP7146818B2 (ja) 軌道道床を締め固めるための方法および装置
DK174908B1 (da) Kontinuerligt kørbar sporarbejdsmaskine til komprimering af et spors skærveballastlag
RU2293154C1 (ru) Способ и устройство для сканирования положения пути
JP7037948B2 (ja) 最適な軌道を算出するための方法
CN109844224B (zh) 线路上部工程用机械和运行线路上部工程用机械的方法
US5481982A (en) Track surfacing machine and method for correcting the track geometry based on track cant and measured lining force
JP2021510778A (ja) 軌道を走行可能な軌道タンピング機械による軌道位置を改善するための方法
US20180327004A1 (en) Course correction procedure generation device, course correction procedure generation system, course correction procedure generation method, and program
JP2584823B2 (ja) 舗装厚測定装置
SE508824C2 (sv) Förfarande för komprimering av makadambädd med en kontinuerligt körbar spårbyggnadsmaskin
CN1102980C (zh) 轨道施工机械及恢复轨道位置的方法
RU2149940C1 (ru) Путеукладочная машина с базовой системой для управления рабочим агрегатом и способ
JP3947988B2 (ja) 道路の路盤等のたわみ量測定機
JP2023532795A (ja) 軌道のバラスト道床を締め固めるための機械および方法
CN208033017U (zh) 清筛机测量监控系统
JP4304681B2 (ja) 軌道の曲線線形データ作成方法
JPH11100809A (ja) 道路形状測定方法
JP2001098762A (ja) 勾配面のコンクリート均し工法およびその装置
CN118792920A (zh) 一种道床清筛机作业落道量的检测方法及装置
JP2598805B2 (ja) 舗装厚測定装置
JPS6057005B2 (ja) 軌道整正機のレベリング検測方法およびレベリング装置
JPS6160921B2 (ko)
DK174874B1 (da) Fremgangsmåde til kontinuerlig sænkning og stabilisering af et spor
JPS6057006B2 (ja) 軌道整正機のレベリング検測装置

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
FPAY Annual fee payment

Payment date: 20181214

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20191219

Year of fee payment: 5