CN101260650A - 50m/1430t双幅整体箱梁架设工艺 - Google Patents
50m/1430t双幅整体箱梁架设工艺 Download PDFInfo
- Publication number
- CN101260650A CN101260650A CNA2008100442586A CN200810044258A CN101260650A CN 101260650 A CN101260650 A CN 101260650A CN A2008100442586 A CNA2008100442586 A CN A2008100442586A CN 200810044258 A CN200810044258 A CN 200810044258A CN 101260650 A CN101260650 A CN 101260650A
- Authority
- CN
- China
- Prior art keywords
- bridge
- machine
- bridge formation
- formation machine
- erecting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title abstract description 49
- 238000000034 method Methods 0.000 title abstract description 25
- 238000005516 engineering process Methods 0.000 claims abstract description 21
- 238000004642 transportation engineering Methods 0.000 claims abstract description 19
- 230000015572 biosynthetic process Effects 0.000 claims description 67
- 238000005755 formation reaction Methods 0.000 claims description 66
- 239000000725 suspension Substances 0.000 claims description 24
- 238000004873 anchoring Methods 0.000 claims description 18
- 210000003284 Horns Anatomy 0.000 claims description 17
- 210000001364 Upper Extremity Anatomy 0.000 claims description 9
- 239000004744 fabric Substances 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 description 4
- 210000001331 Nose Anatomy 0.000 description 3
- 238000005452 bending Methods 0.000 description 3
- 239000004567 concrete Substances 0.000 description 3
- 238000007667 floating Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000009415 formwork Methods 0.000 description 2
- 239000011513 prestressed concrete Substances 0.000 description 2
- 230000000452 restraining Effects 0.000 description 2
- 230000000153 supplemental Effects 0.000 description 2
- 210000003128 Head Anatomy 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000005183 dynamical system Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 230000002194 synthesizing Effects 0.000 description 1
Abstract
Description
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100442586A CN101260650B (zh) | 2008-04-21 | 2008-04-21 | 50m/1430t双幅整体箱梁架设工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100442586A CN101260650B (zh) | 2008-04-21 | 2008-04-21 | 50m/1430t双幅整体箱梁架设工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101260650A true CN101260650A (zh) | 2008-09-10 |
CN101260650B CN101260650B (zh) | 2010-09-15 |
Family
ID=39961320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100442586A Active CN101260650B (zh) | 2008-04-21 | 2008-04-21 | 50m/1430t双幅整体箱梁架设工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101260650B (zh) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101864734A (zh) * | 2010-06-28 | 2010-10-20 | 中铁二局股份有限公司 | 一种高速铁路分体式箱梁的横移架设方法 |
CN101684638B (zh) * | 2008-09-23 | 2011-06-08 | 中交第三航务工程局有限公司 | 一种节段箱梁的拼装方法 |
CN101713168B (zh) * | 2008-10-06 | 2011-08-10 | 中交第三航务工程局有限公司 | 一种节段箱梁制作模板的安装工艺 |
CN102493352A (zh) * | 2011-12-26 | 2012-06-13 | 中铁九局集团有限公司 | 利用轮胎式搬运机跨桥施工的方法 |
CN103184721A (zh) * | 2013-01-25 | 2013-07-03 | 中铁大桥局集团第一工程有限公司 | 预制节段拼装pc连续箱梁逐块悬挂、胶拼线形控制方法 |
CN103410099A (zh) * | 2013-08-20 | 2013-11-27 | 江苏恩纳斯重工机械有限公司 | 架桥机 |
CN103952981A (zh) * | 2014-05-16 | 2014-07-30 | 山东恒堃机械有限公司 | 一种双幅移动模架外模板折叠装置 |
CN106320181A (zh) * | 2016-09-14 | 2017-01-11 | 中交第航务工程局有限公司 | 一种采用架桥机安装预制梁板的施工工法 |
CN106480825A (zh) * | 2016-10-31 | 2017-03-08 | 中铁六局集团有限公司 | 铁路非标梁架设施工工法 |
CN107165055A (zh) * | 2017-07-07 | 2017-09-15 | 中铁二局集团有限公司 | 一种大吨位、非对称、分幅预制箱梁梁上运梁及整孔架设施工方法 |
CN107653783A (zh) * | 2017-09-29 | 2018-02-02 | 中交第二航务工程局有限公司 | 双幅桥尾部喂梁吊装方法 |
CN111747313A (zh) * | 2020-06-28 | 2020-10-09 | 中天建设集团有限公司 | 一种仓储物流建筑中预制梁吊装施工方法 |
CN112853989A (zh) * | 2021-01-15 | 2021-05-28 | 中铁九局集团有限公司 | 高速铁路后张法预应力简支箱梁单双线首孔过渡架设方法 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797226B (zh) * | 2012-07-26 | 2014-07-23 | 中铁六局集团有限公司 | 60米钢箱梁整体架设施工方法 |
-
2008
- 2008-04-21 CN CN2008100442586A patent/CN101260650B/zh active Active
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101684638B (zh) * | 2008-09-23 | 2011-06-08 | 中交第三航务工程局有限公司 | 一种节段箱梁的拼装方法 |
CN101713168B (zh) * | 2008-10-06 | 2011-08-10 | 中交第三航务工程局有限公司 | 一种节段箱梁制作模板的安装工艺 |
CN101864734A (zh) * | 2010-06-28 | 2010-10-20 | 中铁二局股份有限公司 | 一种高速铁路分体式箱梁的横移架设方法 |
CN102493352B (zh) * | 2011-12-26 | 2014-02-12 | 中铁九局集团有限公司 | 利用轮胎式搬运机跨桥施工的方法 |
CN102493352A (zh) * | 2011-12-26 | 2012-06-13 | 中铁九局集团有限公司 | 利用轮胎式搬运机跨桥施工的方法 |
CN103184721B (zh) * | 2013-01-25 | 2015-02-18 | 中铁大桥局集团第一工程有限公司 | 预制节段拼装pc连续箱梁逐块悬挂、胶拼线形控制方法 |
CN103184721A (zh) * | 2013-01-25 | 2013-07-03 | 中铁大桥局集团第一工程有限公司 | 预制节段拼装pc连续箱梁逐块悬挂、胶拼线形控制方法 |
CN103410099A (zh) * | 2013-08-20 | 2013-11-27 | 江苏恩纳斯重工机械有限公司 | 架桥机 |
CN103952981A (zh) * | 2014-05-16 | 2014-07-30 | 山东恒堃机械有限公司 | 一种双幅移动模架外模板折叠装置 |
CN103952981B (zh) * | 2014-05-16 | 2015-12-23 | 长安大学 | 一种双幅移动模架外模板折叠装置 |
CN106320181A (zh) * | 2016-09-14 | 2017-01-11 | 中交第航务工程局有限公司 | 一种采用架桥机安装预制梁板的施工工法 |
CN106480825A (zh) * | 2016-10-31 | 2017-03-08 | 中铁六局集团有限公司 | 铁路非标梁架设施工工法 |
CN107165055A (zh) * | 2017-07-07 | 2017-09-15 | 中铁二局集团有限公司 | 一种大吨位、非对称、分幅预制箱梁梁上运梁及整孔架设施工方法 |
CN107653783A (zh) * | 2017-09-29 | 2018-02-02 | 中交第二航务工程局有限公司 | 双幅桥尾部喂梁吊装方法 |
CN111747313A (zh) * | 2020-06-28 | 2020-10-09 | 中天建设集团有限公司 | 一种仓储物流建筑中预制梁吊装施工方法 |
CN112853989A (zh) * | 2021-01-15 | 2021-05-28 | 中铁九局集团有限公司 | 高速铁路后张法预应力简支箱梁单双线首孔过渡架设方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101260650B (zh) | 2010-09-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101260650B (zh) | 50m/1430t双幅整体箱梁架设工艺 | |
CN101586330B (zh) | 预应力砼连续梁桥挂篮后退施工方法 | |
CN106978784B (zh) | 一种大跨径公路悬索桥拆除施工方法 | |
CN100543235C (zh) | 斜拉索辅助全悬臂架设钢桁梁的方法及系统 | |
CN201003145Y (zh) | 上行自行式移动模架 | |
CN104631335A (zh) | 新型大吨位架桥机及其施工方法 | |
CN203049466U (zh) | 一种下行式牛腿自行移动模架造桥机 | |
CN101736703B (zh) | 120米跨度双层四线公铁两用钢桁桥整孔架设之3000吨级特种架桥机 | |
CN201106155Y (zh) | 斜拉索辅助全悬臂架设钢桁梁装置 | |
CN201250064Y (zh) | 一种用于架设桥梁的前导梁式架桥机 | |
CN102953343A (zh) | 一种下行式牛腿自行移动模架造桥机 | |
CN109653105A (zh) | 箱梁桥悬臂施工挂篮主桁系统及其使用方法 | |
CN201151881Y (zh) | 轮轨式提梁机 | |
CN110468743B (zh) | 一种用于旧桥墩帽改造的移动式吊架及施工方法 | |
CN109680614B (zh) | 装配式钢混组合桥梁超大型架桥机快速转移方法及设备 | |
CN105019357B (zh) | 一种拱桥敞口格构式钢梁上异形预制桥面板的安装方法 | |
CN100497833C (zh) | 高空框架式简易架板机 | |
CN102134832A (zh) | 活动支架辅助不变幅架梁吊机架设钢箱梁方法及活动支架 | |
CN107747280A (zh) | 整孔架设钢管混凝土桁架梁的架桥机 | |
CN102206934A (zh) | 一种采用军用桁架移模分块浇筑砼连续梁桥的方法 | |
CN204418034U (zh) | 新型大吨位架桥机 | |
CN110820602A (zh) | 一种单台节段箱梁架桥机及其操作方法 | |
CN210368669U (zh) | 用于组合梁两跨连做的吊装设备 | |
CN207108292U (zh) | 新型u型梁架设设备 | |
CN201598572U (zh) | 大跨度节段拼装造桥机 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160125 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. Address before: 610041 high building, No. nine Hing Road, Chengdu hi tech Development Zone, Sichuan, 6 Patentee before: China Railway Erju Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder |
Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee after: China Railway No. 2 Engineering Group Co., Ltd. Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD. |
|
CP01 | Change in the name or title of a patent holder |