CN102493352A - 利用轮胎式搬运机跨桥施工的方法 - Google Patents
利用轮胎式搬运机跨桥施工的方法 Download PDFInfo
- Publication number
- CN102493352A CN102493352A CN2011104411042A CN201110441104A CN102493352A CN 102493352 A CN102493352 A CN 102493352A CN 2011104411042 A CN2011104411042 A CN 2011104411042A CN 201110441104 A CN201110441104 A CN 201110441104A CN 102493352 A CN102493352 A CN 102493352A
- Authority
- CN
- China
- Prior art keywords
- bridge
- carrying implement
- tyred
- girder
- order rubber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 238000000034 method Methods 0.000 title claims abstract description 12
- 230000015572 biosynthetic process Effects 0.000 claims description 42
- 238000013461 design Methods 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 4
- 239000000725 suspension Substances 0.000 description 4
- 238000007689 inspection Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 230000002159 abnormal effect Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- IALWCYFULVHLEC-UHFFFAOYSA-N 4-(octyloxy)benzoic acid Chemical compound CCCCCCCCOC1=CC=C(C(O)=O)C=C1 IALWCYFULVHLEC-UHFFFAOYSA-N 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000012669 compression test Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
利用轮胎式搬运机跨桥施工的方法,首先设计和制造高位轮胎式搬运机,利用搬运机架设3孔箱梁作为架桥机始发平台,吊装架桥机和运梁车上桥;搬运机跨桥为运梁车喂梁装车;架桥机和运梁车单侧架梁结束后返回,利用搬运机吊装下桥调头;搬运机架设另侧始发方向3孔梁作为始发平台后,再吊装架桥机和运梁车上桥;2个架梁方向的始发平台间预留2孔梁不架设,作为搬运机横向进入桥梁轴线的通道;架桥机和运梁车结束架梁后由搬运机吊装下桥拆解;搬运机架设最后2孔箱梁。其优点是:用1台高位搬运机实现了常规施工中“搬运机+提梁机”2台设备的功能,降低成本;直接由轮胎式搬运机跨桥装车,压缩了施工环节;采用轮胎式搬运机直接装车,提高了施工效率。
Description
技术领域
本发明涉及一种用于高速铁路施工中,箱梁梁场设置于桥梁段时,利用轮胎式搬运机进行箱梁场内倒运、架桥机和运梁车吊装上下桥、箱梁跨桥装车施工的方法。
背景技术
在高速铁路箱梁架设施工中,梁场位于桥梁段时,通常采用两台450T门式起重机架设3—5片箱梁,作为架桥机的始发平台,架桥机和运梁车的吊装上下桥以及箱梁装车均由450T门式起重机来完成。梁场需另外配置轮胎式搬运机进行场内箱梁的倒运。450T门式起重机设备投入较大,基础处理复杂,箱梁需要用搬运机倒换到临时台座之后,再由提梁机提升上桥装车,增加了施工环节,导致施工成本加大。
发明内容
本发明的目的是在高速铁路梁场位于桥梁段施工时,利用轮胎式搬运机实现场内移梁和箱梁跨桥装车等功能,取消2台450T门式起重机,以节约设备投资和施工成本,提高施工效率。
本发明的目的是通过下述的技术方案实现的:利用轮胎式搬运机跨桥施工的方法,其步骤如下:
(1)施工准备:设计高位轮胎式搬运机,根据施工现场,计算轮胎搬运机的起升高度及跨度;
(2)安装及调试高位轮胎式搬运机:按照步骤(1)计算的起升高度,将轮胎搬运机的支腿高度加高,跨度加宽;
(3)利用高位轮胎式搬运机架设第一方向3孔箱梁作为架桥机始发平台,用搬运机将架桥机和运梁车吊装上桥,然后跨桥为运梁车喂梁装车;
(4)第一方向3孔箱梁架设完毕后,利用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下,架桥机和运梁车调头;
(5)利用高位轮胎式搬运机架设第二方向3孔箱梁作为架桥机反向始发平台,其中第二方向与第一方向中间预留2孔箱梁不架设,作为高位轮胎式搬运机横向驶入通道;再次利用高位轮胎式搬运机将架桥机和运梁车吊装上桥,然后跨桥为运梁车喂梁装车;
(6) 第二方向3孔箱梁架设完毕后,利用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下拆解;
(7)利用高位轮胎式搬运机架设最后2孔箱梁:
(7.1)利用高位轮胎式搬运机将末1孔箱梁吊装至已经架完的桥面上;
(7.2)利用高位轮胎式搬运机将末2孔箱梁吊装,架设到对应墩位,完成末2孔箱梁架设;
(7.3)高位轮胎式搬运机纵向走行,吊装末1孔箱梁,跨桥走行到对应墩位,完成架设;
(8)跨桥拆解高位轮胎式搬运机。
本发明施工方法,首先设计和制造高位轮胎式搬运机,加大搬运机的起升高度和轮组跨度,以满足提升架桥机上桥和跨桥墩纵向走行的能力;搬运机架设3孔箱梁作为架桥机始发平台,然后利用搬运机吊装架桥机和运梁车上桥;搬运机跨桥装车为运梁车喂梁;架桥机和运梁车单侧架梁结束后返回,利用搬运机吊装下桥调头;搬运机架设另侧始发方向3孔梁作为始发平台后,再吊装架桥机和运梁车上桥;2个架梁方向的始发平台间预留2孔梁不架设,作为搬运机横向进入桥梁轴线的通道;架桥机和运梁车结束架梁后由搬运机吊装下桥拆解;搬运机架设最后2孔箱梁。其中最后2孔箱梁的架设工艺的巧妙解决是本施工方法的关键步骤:先将末1孔箱梁置于已架完的桥梁顶面,再提取末2箱孔,架设完末2孔箱梁后,搬运机跨桥纵向走行,提取桥面上的末1孔箱梁,纵向走行到位架设完成后,搬运机跨桥拆除。
与现有施工方法相比,其优点是:1、通过高位轮胎式搬运机实现了搬运机和2台450t龙门吊的双重功能,减少了设备的投入,节省投资1300余万元。2、箱梁不用通过转换台座在搬运机和龙门吊之间倒运,直接由轮胎式搬运机跨桥装车,压缩了施工环节,节约了施工成本,降低了材料支出,减少了施工人员的投入。3、采用轮胎式搬运机直接装车,取消了箱梁转换倒运的环节,使箱梁装车一步到位,从而消除了反复吊装和提梁机运行时多个重大危险源,提高箱梁架设的安全性,也同时提高了施工效率。
附图说明
图1是本发明利用轮胎式搬运机跨桥施工方法的流程图。
图2是用高位轮胎式搬运机架设末2孔箱梁示意图。
具体实施方式
本发明利用轮胎式搬运机跨桥施工方法:
步骤如下:1.施工准备。
1.1、设计高位轮胎式搬运机,是轮胎式搬运机跨桥装车的重要施工工序,它的设计直接影响搬运机架梁、装车施工的顺利进行,在设计中,为确保始发平台架设和跨桥装车顺利进行,对高位轮胎式搬运机在施工中涉及的各种施工工况做理论计算,计算出轮胎搬运机所需的起升高度及跨度。
1.2、高位轮胎式搬运机对始发平台箱梁架设及跨桥装车的施工场地要求:施工路面必须采用混凝土硬化,承载力达到0.6MP,且水平度要好,无明显的纵横坡;
2. 高位轮胎式搬运机现场安装。
2.1.选择开阔、平整的场地拼装搬运机,检查地面基础承载力是否满足要求。对运到工地的设备进行开箱检查,清点技术资料及设备部件是否齐全。
2.2.将左右四台走行台车放置在平整的地面上,调整台车水平,水平距离和对角线距离误差在±3mm以内,两侧台车标高误差控制在±5mm以内。以方便支腿和主梁等结构安装。
2.3.在地面组装支腿结构,用50T吊车逐节安装支腿立柱,立柱连接完毕后,揽风固定。水平误差控制在±2mm以内;当支腿立柱拼装完成后,采用2台200吨汽车吊安装支腿横梁。
2.4.主梁运至现场后,在地面支起各段主梁、调整高度进行对接,对接后进行测量使主梁上拱值与水平值满足跨度的设计要求。
2.5.主梁按工艺安装好后,用两台200吨汽车吊吊装主梁,用经纬仪复核,使安装参数的偏差在规定范围之内。
2.6.主梁安装完成后,吊装卷扬机、起重小车、转向滑轮等机构至主梁上。然后进行钢丝绳和吊具的安装。
2.7.结构和机械部分组装完成后,进行液压和电气系统的安装,调试液压回路系统压力,检查各回路确保无漏油现象;检查电路系统,对载荷限位器、起升限制开关、制动系统、急停按钮等单独检查,确保电气系统正常工作;
3. 首先利用高位轮胎式搬运机架设第一方向3孔箱梁作为架桥机始发平台,然后利用高位轮胎式搬运机吊装架桥机和运梁车上桥,再利用高位轮胎式搬运机倒运箱梁、跨桥喂梁装车。
3.1利用高位轮胎式搬运机架设第一方向3孔箱梁作为架桥机始发平台。
3.1.1.实测支撑垫石坐标、标高以及箱梁实际外形尺寸,查阅施工图计算箱梁顶面的设计高程,推算出支座灌浆料厚度,控制架设梁面的高程。
3.1.2.检查搬运机运行无异常现象,吊起已安装桥梁支座的箱梁至架设位置,到位后进行梁体对位,落梁至离支撑垫石5cm时进行梁体横向、纵向的精确对位。达到规范要求时,落梁至千斤顶上,调整好支座四角高差,锁定千斤顶。
3.1.3.安装支座灌浆模板,从支座中心部位向四周灌注砂浆(灌浆口不得低于梁面),直至钢模与支座板周边间隙灌浆材料全部灌满为止。
3.1.4.砂浆灌注2小时后,进行同条件试件抗压试验,强度满足20MPa,方可撤出千斤顶,拆除模板。
3.1.5.首孔架设完成后,重复上述架梁施工步骤,完成3孔梁架设,形成架桥机架梁和跨桥装车的始发平台。
3.1.6.冬季架梁施工时,应根据当地气候实施保温措施。夏天架梁施工时,应根据现场温度做好砂浆的养护工作。
3.2利用高位轮胎式搬运机吊装架桥机和运梁车上桥。
3.2.1、在桥下梁场场地内完成架桥机和运梁车的整体组装。
3.2.2、将高位搬运机箱梁吊杆与架桥机吊装扁担连接,整体吊起架桥机,提升至就位高度,通过横向通道进入桥梁轴线位置,然后纵向走行至始发平台上方,将架桥机整体放置于始发平台上,拆开吊杆连接,架桥机自走行就位。
3.2.3、将高位搬运机箱梁吊杆与运梁车吊装扁担连接,整体吊起运梁车,提升至就位高度,通过横向通道进入桥梁轴线位置,然后纵向走行至始发平台上方,将运梁车放置于始发平台上,拆开吊杆连接,运梁车就位。
3.3利用高位轮胎式搬运机倒运箱梁、跨桥喂梁装车。
3.3.1.确定待架箱梁梁场存放位置,并确认已经组织验收合格后,在箱梁底部安装桥梁支座,并把箱梁架设所需材料准备齐全,放置梁内。
3.3.2.检查搬运机运行无异常现象,提升箱梁离开台座20cm处暂停,确保刹车良好后继续提升至指定高度。
3.3.3、将运梁车空车停放就位于始发平台位置的桥面上。
3.3.4、搬运机吊装梁体从梁场存梁台座驶出,通过横向通道进入桥梁轴线位置,然后走行至始发平台上方,调整箱梁好与运梁车相对位置,对准运梁车托梁支座中心位置后,低速缓慢落梁。
3.3.5.梁体落稳至运梁车上,摘除吊具,搬运机退出,完成跨桥装车;
4. 架桥机、运梁车下桥、调头:第一方向架梁完成后,架桥机由运梁车驮运返回梁场,分别用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下,通过梁场“人”字型场地调头;
5.利用高位轮胎式搬运机反向架设。
5.1、利用高位轮胎式搬运机架设第二方向的3孔梁,作为架桥机反向始发平台。其中两个架梁方向中间预留2孔梁不架,作为搬运机横向驶入通道。
5.2、再次利用高位轮胎式搬运机吊装架桥机、运梁车上桥,组装调试后形成架梁能力。
5.3、高位轮胎式搬运机跨桥喂梁装车,正常架梁;
6.架桥机架梁完成返回梁场,拆装解体。
6.1、第二方向架梁完成后,架桥机由运梁车驮运返回梁场,分别用搬运机将架桥机和运梁车从桥上吊装至桥下。
6.2、利用高位轮胎式搬运机协助拆解运梁车、架桥机;
7. 高位轮胎式搬运机架设最后2孔箱梁,如图2所示。
7.1、用高位轮胎式搬运机将末1孔箱梁吊装至桥面,存放于已架完梁面之上。
7.2、用高位轮胎式搬运机将末2孔箱梁吊装,架设到其对应的墩位,完成末2孔箱梁架设。
7.3、用高位轮胎式搬运机纵向走行,吊装末1孔箱梁,跨桥走行至对应墩位,架设完成;
8.跨桥拆解高位轮胎式搬运机。
Claims (1)
1.利用轮胎式搬运机跨桥施工的方法,其步骤如下:
(1)施工准备:设计高位轮胎式搬运机,根据施工现场,计算轮胎搬运机的起升高度及跨度;
(2)安装及调试高位轮胎式搬运机:按照步骤(1)计算的起升高度,将轮胎搬运机的支腿高度加高,跨度加宽;
(3)利用高位轮胎式搬运机架设第一方向3孔箱梁作为架桥机始发平台,用搬运机将架桥机和运梁车吊装上桥,然后跨桥为运梁车喂梁装车;
(4)第一方向3孔箱梁架设完毕后,利用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下,架桥机和运梁车调头;
(5)利用高位轮胎式搬运机架设第二方向3孔箱梁作为架桥机反向始发平台,其中第二方向与第一方向中间预留2孔箱梁不架设,作为高位轮胎式搬运机横向驶入通道;再次利用高位轮胎式搬运机将架桥机和运梁车吊装上桥,然后跨桥为运梁车喂梁装车;
(6) 第二方向3孔箱梁架设完毕后,利用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下拆解;
(7)利用高位轮胎式搬运机架设最后2孔箱梁:
(7.1)利用高位轮胎式搬运机将末1孔箱梁吊装至已经架完的桥面上;
(7.2)利用高位轮胎式搬运机将末2孔箱梁吊装,架设到对应墩位,完成末2孔箱梁架设;
(7.3)高位轮胎式搬运机纵向走行,吊装末1孔箱梁,跨桥走行到对应墩位,完成架设;
(8)跨桥拆解高位轮胎式搬运机。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110441104.2A CN102493352B (zh) | 2011-12-26 | 2011-12-26 | 利用轮胎式搬运机跨桥施工的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110441104.2A CN102493352B (zh) | 2011-12-26 | 2011-12-26 | 利用轮胎式搬运机跨桥施工的方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102493352A true CN102493352A (zh) | 2012-06-13 |
CN102493352B CN102493352B (zh) | 2014-02-12 |
Family
ID=46185208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110441104.2A Expired - Fee Related CN102493352B (zh) | 2011-12-26 | 2011-12-26 | 利用轮胎式搬运机跨桥施工的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102493352B (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103485280A (zh) * | 2013-09-10 | 2014-01-01 | 苏州荣生大方路桥建设工程有限公司 | 跨线桥梁快速施工工法 |
CN103498427A (zh) * | 2013-10-29 | 2014-01-08 | 苏州荣生大方路桥建设工程有限公司 | 跨线桥梁梁段的快速更换方法 |
CN103510470A (zh) * | 2012-06-29 | 2014-01-15 | 秦皇岛天业通联重工股份有限公司 | 一种架桥机的液压变跨装置 |
CN103590337A (zh) * | 2012-08-17 | 2014-02-19 | 秦皇岛天业通联重工股份有限公司 | 一种架桥机系统及其转移方法 |
CN104499433A (zh) * | 2014-11-04 | 2015-04-08 | 中铁二十四局集团有限公司 | 一种成锐角交叉下穿高铁低净空架梁施工方法 |
CN104790295A (zh) * | 2014-12-17 | 2015-07-22 | 中铁六局集团海外工程有限公司 | 轮胎式龙门吊架梁设施工工法 |
CN109356031A (zh) * | 2018-11-19 | 2019-02-19 | 北京城建道桥建设集团有限公司 | 轨道交通高架桥面错车运梁平台及其方法 |
CN110055902A (zh) * | 2019-05-23 | 2019-07-26 | 中铁二局集团有限公司 | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 |
CN110509424A (zh) * | 2019-08-23 | 2019-11-29 | 中铁六局集团有限公司 | 双轨道台车横向移梁施工工法 |
CN111395821A (zh) * | 2020-03-23 | 2020-07-10 | 中电建十一局工程有限公司 | 一种复杂地形条件40mT梁预制场地布置及安装施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10280327A (ja) * | 1997-04-07 | 1998-10-20 | Nkk Corp | 高所橋梁の架設工法 |
JP2007211552A (ja) * | 2006-02-13 | 2007-08-23 | Sumitomo Mitsui Construction Co Ltd | 連続高架橋 |
CN101260650A (zh) * | 2008-04-21 | 2008-09-10 | 中铁二局股份有限公司 | 50m/1430t双幅整体箱梁架设工艺 |
CN101392501A (zh) * | 2007-09-17 | 2009-03-25 | 上海远东国际桥梁建设有限公司 | 一种大跨度钢箱桥梁的架设方法 |
CN101476291A (zh) * | 2009-01-21 | 2009-07-08 | 中铁一局集团有限公司 | 一种节段拼装简支箱梁移动膺架施工方法 |
CN101476287A (zh) * | 2008-11-26 | 2009-07-08 | 中铁二局股份有限公司 | 轮胎式门吊搬运大型箱梁的施工方法 |
-
2011
- 2011-12-26 CN CN201110441104.2A patent/CN102493352B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10280327A (ja) * | 1997-04-07 | 1998-10-20 | Nkk Corp | 高所橋梁の架設工法 |
JP2007211552A (ja) * | 2006-02-13 | 2007-08-23 | Sumitomo Mitsui Construction Co Ltd | 連続高架橋 |
CN101392501A (zh) * | 2007-09-17 | 2009-03-25 | 上海远东国际桥梁建设有限公司 | 一种大跨度钢箱桥梁的架设方法 |
CN101260650A (zh) * | 2008-04-21 | 2008-09-10 | 中铁二局股份有限公司 | 50m/1430t双幅整体箱梁架设工艺 |
CN101476287A (zh) * | 2008-11-26 | 2009-07-08 | 中铁二局股份有限公司 | 轮胎式门吊搬运大型箱梁的施工方法 |
CN101476291A (zh) * | 2009-01-21 | 2009-07-08 | 中铁一局集团有限公司 | 一种节段拼装简支箱梁移动膺架施工方法 |
Cited By (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510470A (zh) * | 2012-06-29 | 2014-01-15 | 秦皇岛天业通联重工股份有限公司 | 一种架桥机的液压变跨装置 |
CN103510470B (zh) * | 2012-06-29 | 2016-08-24 | 秦皇岛天业通联重工科技有限公司 | 一种架桥机的液压变跨装置 |
CN103590337B (zh) * | 2012-08-17 | 2016-06-15 | 秦皇岛天业通联重工科技有限公司 | 一种架桥机系统及其转移方法 |
CN103590337A (zh) * | 2012-08-17 | 2014-02-19 | 秦皇岛天业通联重工股份有限公司 | 一种架桥机系统及其转移方法 |
CN103485280A (zh) * | 2013-09-10 | 2014-01-01 | 苏州荣生大方路桥建设工程有限公司 | 跨线桥梁快速施工工法 |
CN103485280B (zh) * | 2013-09-10 | 2015-05-13 | 苏州荣生大方路桥建设工程有限公司 | 跨线桥梁快速施工工法 |
CN103498427A (zh) * | 2013-10-29 | 2014-01-08 | 苏州荣生大方路桥建设工程有限公司 | 跨线桥梁梁段的快速更换方法 |
CN104499433A (zh) * | 2014-11-04 | 2015-04-08 | 中铁二十四局集团有限公司 | 一种成锐角交叉下穿高铁低净空架梁施工方法 |
CN104499433B (zh) * | 2014-11-04 | 2016-03-30 | 中铁二十四局集团有限公司 | 一种成锐角交叉下穿高铁低净空架梁施工方法 |
CN104790295A (zh) * | 2014-12-17 | 2015-07-22 | 中铁六局集团海外工程有限公司 | 轮胎式龙门吊架梁设施工工法 |
CN109356031A (zh) * | 2018-11-19 | 2019-02-19 | 北京城建道桥建设集团有限公司 | 轨道交通高架桥面错车运梁平台及其方法 |
CN109356031B (zh) * | 2018-11-19 | 2023-10-31 | 北京城建道桥建设集团有限公司 | 轨道交通高架桥面错车运梁平台及其方法 |
CN110055902A (zh) * | 2019-05-23 | 2019-07-26 | 中铁二局集团有限公司 | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 |
WO2020233501A1 (zh) * | 2019-05-23 | 2020-11-26 | 中铁二局集团有限公司 | 一种大吨位箱梁正位提梁上桥施工方法及其架设方法 |
US11391004B1 (en) | 2019-05-23 | 2022-07-19 | China Railway No. 2 Engineering Group Co. LTD. | Construction method for upright lifting of large-tonnage box girder to bridge, and erection method for large-tonnage box girder |
CN110509424A (zh) * | 2019-08-23 | 2019-11-29 | 中铁六局集团有限公司 | 双轨道台车横向移梁施工工法 |
CN110509424B (zh) * | 2019-08-23 | 2021-11-05 | 中铁六局集团有限公司 | 双轨道台车横向移梁施工工法 |
CN111395821A (zh) * | 2020-03-23 | 2020-07-10 | 中电建十一局工程有限公司 | 一种复杂地形条件40mT梁预制场地布置及安装施工方法 |
CN111395821B (zh) * | 2020-03-23 | 2021-08-24 | 中电建十一局工程有限公司 | 一种复杂地形条件40mT梁预制场地布置及安装施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102493352B (zh) | 2014-02-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102493352B (zh) | 利用轮胎式搬运机跨桥施工的方法 | |
CN101787678B (zh) | 大跨度节段拼装造桥机及其拼装施工工艺 | |
CN101462672B (zh) | 大起重量及大起升高度吊装起重机 | |
CN201338911Y (zh) | 大起重量及大起升高度吊装起重机 | |
CN105781124A (zh) | 一种超高层双塔楼钢结构连廊安装方法 | |
CN106930541A (zh) | 一种吊挂式钢连廊的施工方法 | |
CN107060070A (zh) | 荷载转移装置及用该装置吊装钢连廊的施工方法 | |
CN102979313A (zh) | 转换层超重钢桁架高空吊装施工方法 | |
CN201367728Y (zh) | 用于钢筋混凝土水塔支筒施工中的无井架液压滑模装置 | |
CN105386411A (zh) | 悬索桥墩顶多功能门架装置 | |
CN101566005B (zh) | 烟囱液压提模装置 | |
CN103899093A (zh) | 巨型框架钢桁架梁分步吊装施工工法 | |
CN205205685U (zh) | 悬索桥墩顶多功能门架装置 | |
CN202482776U (zh) | 一种大风及高空条件下桥梁施工用腹板式造桥机 | |
CN103086276B (zh) | 一种吊装高层井塔型建筑物内桥式起重机的施工方法 | |
CN102777044B (zh) | 尿素造粒塔钢结构喷淋层吊装方法 | |
CN108625270A (zh) | 导梁门吊安装桥梁预制箱梁施工方法 | |
CN205444975U (zh) | 一种带有观景平台的大型屋盖钢结构施工支撑系统 | |
CN108518071B (zh) | 双层大跨度钢结构通廊的安装方法 | |
CN206692230U (zh) | 一种高层建筑行吊 | |
CN105625732B (zh) | 超高悬挑钢结构桁架无支撑施工方法 | |
CN103743581B (zh) | 内爬塔式起重机试验平台装置及试验方法 | |
CN208152583U (zh) | 一种高层建筑施工辅助设备 | |
CN201598572U (zh) | 大跨度节段拼装造桥机 | |
CN201891087U (zh) | 辅助运架一体机的喂梁平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180516 Address after: 110013, 3-1, Jing Jie street, Shenhe District, Liaoning, Shenyang Co-patentee after: CHINA RAILWAY NO. 9 GROUP NO.4 ENGINEERING Co.,Ltd. Patentee after: CHINA RAILWAY NO.9 GROUP Co.,Ltd. Address before: 110013, 3-1, Jing Jie street, Shenhe District, Liaoning, Shenyang Patentee before: CHINA RAILWAY NO.9 GROUP Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140212 |