CN102493352A - 利用轮胎式搬运机跨桥施工的方法 - Google Patents

利用轮胎式搬运机跨桥施工的方法 Download PDF

Info

Publication number
CN102493352A
CN102493352A CN2011104411042A CN201110441104A CN102493352A CN 102493352 A CN102493352 A CN 102493352A CN 2011104411042 A CN2011104411042 A CN 2011104411042A CN 201110441104 A CN201110441104 A CN 201110441104A CN 102493352 A CN102493352 A CN 102493352A
Authority
CN
China
Prior art keywords
bridge
carrying implement
tyred
girder
order rubber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011104411042A
Other languages
English (en)
Other versions
CN102493352B (zh
Inventor
李润伟
刘海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 9 Group Co Ltd
Fourth Engineering Co Ltd of China Railway No 9 Group Co Ltd
Original Assignee
China Railway No 9 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 9 Group Co Ltd filed Critical China Railway No 9 Group Co Ltd
Priority to CN201110441104.2A priority Critical patent/CN102493352B/zh
Publication of CN102493352A publication Critical patent/CN102493352A/zh
Application granted granted Critical
Publication of CN102493352B publication Critical patent/CN102493352B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

利用轮胎式搬运机跨桥施工的方法,首先设计和制造高位轮胎式搬运机,利用搬运机架设3孔箱梁作为架桥机始发平台,吊装架桥机和运梁车上桥;搬运机跨桥为运梁车喂梁装车;架桥机和运梁车单侧架梁结束后返回,利用搬运机吊装下桥调头;搬运机架设另侧始发方向3孔梁作为始发平台后,再吊装架桥机和运梁车上桥;2个架梁方向的始发平台间预留2孔梁不架设,作为搬运机横向进入桥梁轴线的通道;架桥机和运梁车结束架梁后由搬运机吊装下桥拆解;搬运机架设最后2孔箱梁。其优点是:用1台高位搬运机实现了常规施工中“搬运机+提梁机”2台设备的功能,降低成本;直接由轮胎式搬运机跨桥装车,压缩了施工环节;采用轮胎式搬运机直接装车,提高了施工效率。

Description

利用轮胎式搬运机跨桥施工的方法
技术领域
本发明涉及一种用于高速铁路施工中,箱梁梁场设置于桥梁段时,利用轮胎式搬运机进行箱梁场内倒运、架桥机和运梁车吊装上下桥、箱梁跨桥装车施工的方法。
背景技术
在高速铁路箱梁架设施工中,梁场位于桥梁段时,通常采用两台450T门式起重机架设3—5片箱梁,作为架桥机的始发平台,架桥机和运梁车的吊装上下桥以及箱梁装车均由450T门式起重机来完成。梁场需另外配置轮胎式搬运机进行场内箱梁的倒运。450T门式起重机设备投入较大,基础处理复杂,箱梁需要用搬运机倒换到临时台座之后,再由提梁机提升上桥装车,增加了施工环节,导致施工成本加大。
发明内容
本发明的目的是在高速铁路梁场位于桥梁段施工时,利用轮胎式搬运机实现场内移梁和箱梁跨桥装车等功能,取消2台450T门式起重机,以节约设备投资和施工成本,提高施工效率。
本发明的目的是通过下述的技术方案实现的:利用轮胎式搬运机跨桥施工的方法,其步骤如下:
(1)施工准备:设计高位轮胎式搬运机,根据施工现场,计算轮胎搬运机的起升高度及跨度;
(2)安装及调试高位轮胎式搬运机:按照步骤(1)计算的起升高度,将轮胎搬运机的支腿高度加高,跨度加宽;
(3)利用高位轮胎式搬运机架设第一方向3孔箱梁作为架桥机始发平台,用搬运机将架桥机和运梁车吊装上桥,然后跨桥为运梁车喂梁装车; 
(4)第一方向3孔箱梁架设完毕后,利用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下,架桥机和运梁车调头;
(5)利用高位轮胎式搬运机架设第二方向3孔箱梁作为架桥机反向始发平台,其中第二方向与第一方向中间预留2孔箱梁不架设,作为高位轮胎式搬运机横向驶入通道;再次利用高位轮胎式搬运机将架桥机和运梁车吊装上桥,然后跨桥为运梁车喂梁装车;
(6) 第二方向3孔箱梁架设完毕后,利用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下拆解;
(7)利用高位轮胎式搬运机架设最后2孔箱梁:
(7.1)利用高位轮胎式搬运机将末1孔箱梁吊装至已经架完的桥面上;
(7.2)利用高位轮胎式搬运机将末2孔箱梁吊装,架设到对应墩位,完成末2孔箱梁架设;
(7.3)高位轮胎式搬运机纵向走行,吊装末1孔箱梁,跨桥走行到对应墩位,完成架设;
(8)跨桥拆解高位轮胎式搬运机。
本发明施工方法,首先设计和制造高位轮胎式搬运机,加大搬运机的起升高度和轮组跨度,以满足提升架桥机上桥和跨桥墩纵向走行的能力;搬运机架设3孔箱梁作为架桥机始发平台,然后利用搬运机吊装架桥机和运梁车上桥;搬运机跨桥装车为运梁车喂梁;架桥机和运梁车单侧架梁结束后返回,利用搬运机吊装下桥调头;搬运机架设另侧始发方向3孔梁作为始发平台后,再吊装架桥机和运梁车上桥;2个架梁方向的始发平台间预留2孔梁不架设,作为搬运机横向进入桥梁轴线的通道;架桥机和运梁车结束架梁后由搬运机吊装下桥拆解;搬运机架设最后2孔箱梁。其中最后2孔箱梁的架设工艺的巧妙解决是本施工方法的关键步骤:先将末1孔箱梁置于已架完的桥梁顶面,再提取末2箱孔,架设完末2孔箱梁后,搬运机跨桥纵向走行,提取桥面上的末1孔箱梁,纵向走行到位架设完成后,搬运机跨桥拆除。
与现有施工方法相比,其优点是:1、通过高位轮胎式搬运机实现了搬运机和2台450t龙门吊的双重功能,减少了设备的投入,节省投资1300余万元。2、箱梁不用通过转换台座在搬运机和龙门吊之间倒运,直接由轮胎式搬运机跨桥装车,压缩了施工环节,节约了施工成本,降低了材料支出,减少了施工人员的投入。3、采用轮胎式搬运机直接装车,取消了箱梁转换倒运的环节,使箱梁装车一步到位,从而消除了反复吊装和提梁机运行时多个重大危险源,提高箱梁架设的安全性,也同时提高了施工效率。
附图说明
图1是本发明利用轮胎式搬运机跨桥施工方法的流程图。
图2是用高位轮胎式搬运机架设末2孔箱梁示意图。
具体实施方式
本发明利用轮胎式搬运机跨桥施工方法:
步骤如下:1.施工准备。
1.1、设计高位轮胎式搬运机,是轮胎式搬运机跨桥装车的重要施工工序,它的设计直接影响搬运机架梁、装车施工的顺利进行,在设计中,为确保始发平台架设和跨桥装车顺利进行,对高位轮胎式搬运机在施工中涉及的各种施工工况做理论计算,计算出轮胎搬运机所需的起升高度及跨度。
1.2、高位轮胎式搬运机对始发平台箱梁架设及跨桥装车的施工场地要求:施工路面必须采用混凝土硬化,承载力达到0.6MP,且水平度要好,无明显的纵横坡;
2. 高位轮胎式搬运机现场安装
2.1.选择开阔、平整的场地拼装搬运机,检查地面基础承载力是否满足要求。对运到工地的设备进行开箱检查,清点技术资料及设备部件是否齐全。
2.2.将左右四台走行台车放置在平整的地面上,调整台车水平,水平距离和对角线距离误差在±3mm以内,两侧台车标高误差控制在±5mm以内。以方便支腿和主梁等结构安装。
2.3.在地面组装支腿结构,用50T吊车逐节安装支腿立柱,立柱连接完毕后,揽风固定。水平误差控制在±2mm以内;当支腿立柱拼装完成后,采用2台200吨汽车吊安装支腿横梁。
2.4.主梁运至现场后,在地面支起各段主梁、调整高度进行对接,对接后进行测量使主梁上拱值与水平值满足跨度的设计要求。
2.5.主梁按工艺安装好后,用两台200吨汽车吊吊装主梁,用经纬仪复核,使安装参数的偏差在规定范围之内。
2.6.主梁安装完成后,吊装卷扬机、起重小车、转向滑轮等机构至主梁上。然后进行钢丝绳和吊具的安装。 
2.7.结构和机械部分组装完成后,进行液压和电气系统的安装,调试液压回路系统压力,检查各回路确保无漏油现象;检查电路系统,对载荷限位器、起升限制开关、制动系统、急停按钮等单独检查,确保电气系统正常工作;
3. 首先利用高位轮胎式搬运机架设第一方向3孔箱梁作为架桥机始发平台,然后利用高位轮胎式搬运机吊装架桥机和运梁车上桥,再利用高位轮胎式搬运机倒运箱梁、跨桥喂梁装车。
3.1利用高位轮胎式搬运机架设第一方向3孔箱梁作为架桥机始发平台。
3.1.1.实测支撑垫石坐标、标高以及箱梁实际外形尺寸,查阅施工图计算箱梁顶面的设计高程,推算出支座灌浆料厚度,控制架设梁面的高程。
3.1.2.检查搬运机运行无异常现象,吊起已安装桥梁支座的箱梁至架设位置,到位后进行梁体对位,落梁至离支撑垫石5cm时进行梁体横向、纵向的精确对位。达到规范要求时,落梁至千斤顶上,调整好支座四角高差,锁定千斤顶。
3.1.3.安装支座灌浆模板,从支座中心部位向四周灌注砂浆(灌浆口不得低于梁面),直至钢模与支座板周边间隙灌浆材料全部灌满为止。
3.1.4.砂浆灌注2小时后,进行同条件试件抗压试验,强度满足20MPa,方可撤出千斤顶,拆除模板。
3.1.5.首孔架设完成后,重复上述架梁施工步骤,完成3孔梁架设,形成架桥机架梁和跨桥装车的始发平台。
3.1.6.冬季架梁施工时,应根据当地气候实施保温措施。夏天架梁施工时,应根据现场温度做好砂浆的养护工作。
3.2利用高位轮胎式搬运机吊装架桥机和运梁车上桥。
3.2.1、在桥下梁场场地内完成架桥机和运梁车的整体组装。
3.2.2、将高位搬运机箱梁吊杆与架桥机吊装扁担连接,整体吊起架桥机,提升至就位高度,通过横向通道进入桥梁轴线位置,然后纵向走行至始发平台上方,将架桥机整体放置于始发平台上,拆开吊杆连接,架桥机自走行就位。
3.2.3、将高位搬运机箱梁吊杆与运梁车吊装扁担连接,整体吊起运梁车,提升至就位高度,通过横向通道进入桥梁轴线位置,然后纵向走行至始发平台上方,将运梁车放置于始发平台上,拆开吊杆连接,运梁车就位。
3.3利用高位轮胎式搬运机倒运箱梁、跨桥喂梁装车。
3.3.1.确定待架箱梁梁场存放位置,并确认已经组织验收合格后,在箱梁底部安装桥梁支座,并把箱梁架设所需材料准备齐全,放置梁内。
3.3.2.检查搬运机运行无异常现象,提升箱梁离开台座20cm处暂停,确保刹车良好后继续提升至指定高度。
3.3.3、将运梁车空车停放就位于始发平台位置的桥面上。
3.3.4、搬运机吊装梁体从梁场存梁台座驶出,通过横向通道进入桥梁轴线位置,然后走行至始发平台上方,调整箱梁好与运梁车相对位置,对准运梁车托梁支座中心位置后,低速缓慢落梁。
3.3.5.梁体落稳至运梁车上,摘除吊具,搬运机退出,完成跨桥装车;
4. 架桥机、运梁车下桥、调头:第一方向架梁完成后,架桥机由运梁车驮运返回梁场,分别用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下,通过梁场“人”字型场地调头;
5.利用高位轮胎式搬运机反向架设。
5.1、利用高位轮胎式搬运机架设第二方向的3孔梁,作为架桥机反向始发平台。其中两个架梁方向中间预留2孔梁不架,作为搬运机横向驶入通道。
5.2、再次利用高位轮胎式搬运机吊装架桥机、运梁车上桥,组装调试后形成架梁能力。
5.3、高位轮胎式搬运机跨桥喂梁装车,正常架梁;
6.架桥机架梁完成返回梁场,拆装解体。
6.1、第二方向架梁完成后,架桥机由运梁车驮运返回梁场,分别用搬运机将架桥机和运梁车从桥上吊装至桥下。
6.2、利用高位轮胎式搬运机协助拆解运梁车、架桥机;
7. 高位轮胎式搬运机架设最后2孔箱梁,如图2所示。
7.1、用高位轮胎式搬运机将末1孔箱梁吊装至桥面,存放于已架完梁面之上。
7.2、用高位轮胎式搬运机将末2孔箱梁吊装,架设到其对应的墩位,完成末2孔箱梁架设。
7.3、用高位轮胎式搬运机纵向走行,吊装末1孔箱梁,跨桥走行至对应墩位,架设完成;
8.跨桥拆解高位轮胎式搬运机。

Claims (1)

1.利用轮胎式搬运机跨桥施工的方法,其步骤如下:
(1)施工准备:设计高位轮胎式搬运机,根据施工现场,计算轮胎搬运机的起升高度及跨度;
(2)安装及调试高位轮胎式搬运机:按照步骤(1)计算的起升高度,将轮胎搬运机的支腿高度加高,跨度加宽;
(3)利用高位轮胎式搬运机架设第一方向3孔箱梁作为架桥机始发平台,用搬运机将架桥机和运梁车吊装上桥,然后跨桥为运梁车喂梁装车; 
(4)第一方向3孔箱梁架设完毕后,利用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下,架桥机和运梁车调头;
(5)利用高位轮胎式搬运机架设第二方向3孔箱梁作为架桥机反向始发平台,其中第二方向与第一方向中间预留2孔箱梁不架设,作为高位轮胎式搬运机横向驶入通道;再次利用高位轮胎式搬运机将架桥机和运梁车吊装上桥,然后跨桥为运梁车喂梁装车;
(6) 第二方向3孔箱梁架设完毕后,利用高位轮胎式搬运机将架桥机和运梁车从桥上吊装至桥下拆解;
(7)利用高位轮胎式搬运机架设最后2孔箱梁:
(7.1)利用高位轮胎式搬运机将末1孔箱梁吊装至已经架完的桥面上;
(7.2)利用高位轮胎式搬运机将末2孔箱梁吊装,架设到对应墩位,完成末2孔箱梁架设;
(7.3)高位轮胎式搬运机纵向走行,吊装末1孔箱梁,跨桥走行到对应墩位,完成架设;
(8)跨桥拆解高位轮胎式搬运机。
CN201110441104.2A 2011-12-26 2011-12-26 利用轮胎式搬运机跨桥施工的方法 Expired - Fee Related CN102493352B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110441104.2A CN102493352B (zh) 2011-12-26 2011-12-26 利用轮胎式搬运机跨桥施工的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110441104.2A CN102493352B (zh) 2011-12-26 2011-12-26 利用轮胎式搬运机跨桥施工的方法

Publications (2)

Publication Number Publication Date
CN102493352A true CN102493352A (zh) 2012-06-13
CN102493352B CN102493352B (zh) 2014-02-12

Family

ID=46185208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110441104.2A Expired - Fee Related CN102493352B (zh) 2011-12-26 2011-12-26 利用轮胎式搬运机跨桥施工的方法

Country Status (1)

Country Link
CN (1) CN102493352B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103485280A (zh) * 2013-09-10 2014-01-01 苏州荣生大方路桥建设工程有限公司 跨线桥梁快速施工工法
CN103498427A (zh) * 2013-10-29 2014-01-08 苏州荣生大方路桥建设工程有限公司 跨线桥梁梁段的快速更换方法
CN103510470A (zh) * 2012-06-29 2014-01-15 秦皇岛天业通联重工股份有限公司 一种架桥机的液压变跨装置
CN103590337A (zh) * 2012-08-17 2014-02-19 秦皇岛天业通联重工股份有限公司 一种架桥机系统及其转移方法
CN104499433A (zh) * 2014-11-04 2015-04-08 中铁二十四局集团有限公司 一种成锐角交叉下穿高铁低净空架梁施工方法
CN104790295A (zh) * 2014-12-17 2015-07-22 中铁六局集团海外工程有限公司 轮胎式龙门吊架梁设施工工法
CN109356031A (zh) * 2018-11-19 2019-02-19 北京城建道桥建设集团有限公司 轨道交通高架桥面错车运梁平台及其方法
CN110055902A (zh) * 2019-05-23 2019-07-26 中铁二局集团有限公司 一种大吨位箱梁正位提梁上桥施工方法及其架设方法
CN110509424A (zh) * 2019-08-23 2019-11-29 中铁六局集团有限公司 双轨道台车横向移梁施工工法
CN111395821A (zh) * 2020-03-23 2020-07-10 中电建十一局工程有限公司 一种复杂地形条件40mT梁预制场地布置及安装施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280327A (ja) * 1997-04-07 1998-10-20 Nkk Corp 高所橋梁の架設工法
JP2007211552A (ja) * 2006-02-13 2007-08-23 Sumitomo Mitsui Construction Co Ltd 連続高架橋
CN101260650A (zh) * 2008-04-21 2008-09-10 中铁二局股份有限公司 50m/1430t双幅整体箱梁架设工艺
CN101392501A (zh) * 2007-09-17 2009-03-25 上海远东国际桥梁建设有限公司 一种大跨度钢箱桥梁的架设方法
CN101476291A (zh) * 2009-01-21 2009-07-08 中铁一局集团有限公司 一种节段拼装简支箱梁移动膺架施工方法
CN101476287A (zh) * 2008-11-26 2009-07-08 中铁二局股份有限公司 轮胎式门吊搬运大型箱梁的施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10280327A (ja) * 1997-04-07 1998-10-20 Nkk Corp 高所橋梁の架設工法
JP2007211552A (ja) * 2006-02-13 2007-08-23 Sumitomo Mitsui Construction Co Ltd 連続高架橋
CN101392501A (zh) * 2007-09-17 2009-03-25 上海远东国际桥梁建设有限公司 一种大跨度钢箱桥梁的架设方法
CN101260650A (zh) * 2008-04-21 2008-09-10 中铁二局股份有限公司 50m/1430t双幅整体箱梁架设工艺
CN101476287A (zh) * 2008-11-26 2009-07-08 中铁二局股份有限公司 轮胎式门吊搬运大型箱梁的施工方法
CN101476291A (zh) * 2009-01-21 2009-07-08 中铁一局集团有限公司 一种节段拼装简支箱梁移动膺架施工方法

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510470A (zh) * 2012-06-29 2014-01-15 秦皇岛天业通联重工股份有限公司 一种架桥机的液压变跨装置
CN103510470B (zh) * 2012-06-29 2016-08-24 秦皇岛天业通联重工科技有限公司 一种架桥机的液压变跨装置
CN103590337B (zh) * 2012-08-17 2016-06-15 秦皇岛天业通联重工科技有限公司 一种架桥机系统及其转移方法
CN103590337A (zh) * 2012-08-17 2014-02-19 秦皇岛天业通联重工股份有限公司 一种架桥机系统及其转移方法
CN103485280A (zh) * 2013-09-10 2014-01-01 苏州荣生大方路桥建设工程有限公司 跨线桥梁快速施工工法
CN103485280B (zh) * 2013-09-10 2015-05-13 苏州荣生大方路桥建设工程有限公司 跨线桥梁快速施工工法
CN103498427A (zh) * 2013-10-29 2014-01-08 苏州荣生大方路桥建设工程有限公司 跨线桥梁梁段的快速更换方法
CN104499433A (zh) * 2014-11-04 2015-04-08 中铁二十四局集团有限公司 一种成锐角交叉下穿高铁低净空架梁施工方法
CN104499433B (zh) * 2014-11-04 2016-03-30 中铁二十四局集团有限公司 一种成锐角交叉下穿高铁低净空架梁施工方法
CN104790295A (zh) * 2014-12-17 2015-07-22 中铁六局集团海外工程有限公司 轮胎式龙门吊架梁设施工工法
CN109356031A (zh) * 2018-11-19 2019-02-19 北京城建道桥建设集团有限公司 轨道交通高架桥面错车运梁平台及其方法
CN109356031B (zh) * 2018-11-19 2023-10-31 北京城建道桥建设集团有限公司 轨道交通高架桥面错车运梁平台及其方法
CN110055902A (zh) * 2019-05-23 2019-07-26 中铁二局集团有限公司 一种大吨位箱梁正位提梁上桥施工方法及其架设方法
WO2020233501A1 (zh) * 2019-05-23 2020-11-26 中铁二局集团有限公司 一种大吨位箱梁正位提梁上桥施工方法及其架设方法
US11391004B1 (en) 2019-05-23 2022-07-19 China Railway No. 2 Engineering Group Co. LTD. Construction method for upright lifting of large-tonnage box girder to bridge, and erection method for large-tonnage box girder
CN110509424A (zh) * 2019-08-23 2019-11-29 中铁六局集团有限公司 双轨道台车横向移梁施工工法
CN110509424B (zh) * 2019-08-23 2021-11-05 中铁六局集团有限公司 双轨道台车横向移梁施工工法
CN111395821A (zh) * 2020-03-23 2020-07-10 中电建十一局工程有限公司 一种复杂地形条件40mT梁预制场地布置及安装施工方法
CN111395821B (zh) * 2020-03-23 2021-08-24 中电建十一局工程有限公司 一种复杂地形条件40mT梁预制场地布置及安装施工方法

Also Published As

Publication number Publication date
CN102493352B (zh) 2014-02-12

Similar Documents

Publication Publication Date Title
CN102493352B (zh) 利用轮胎式搬运机跨桥施工的方法
CN101787678B (zh) 大跨度节段拼装造桥机及其拼装施工工艺
CN101462672B (zh) 大起重量及大起升高度吊装起重机
CN201338911Y (zh) 大起重量及大起升高度吊装起重机
CN105781124A (zh) 一种超高层双塔楼钢结构连廊安装方法
CN106930541A (zh) 一种吊挂式钢连廊的施工方法
CN107060070A (zh) 荷载转移装置及用该装置吊装钢连廊的施工方法
CN102979313A (zh) 转换层超重钢桁架高空吊装施工方法
CN201367728Y (zh) 用于钢筋混凝土水塔支筒施工中的无井架液压滑模装置
CN105386411A (zh) 悬索桥墩顶多功能门架装置
CN101566005B (zh) 烟囱液压提模装置
CN103899093A (zh) 巨型框架钢桁架梁分步吊装施工工法
CN205205685U (zh) 悬索桥墩顶多功能门架装置
CN202482776U (zh) 一种大风及高空条件下桥梁施工用腹板式造桥机
CN103086276B (zh) 一种吊装高层井塔型建筑物内桥式起重机的施工方法
CN102777044B (zh) 尿素造粒塔钢结构喷淋层吊装方法
CN108625270A (zh) 导梁门吊安装桥梁预制箱梁施工方法
CN205444975U (zh) 一种带有观景平台的大型屋盖钢结构施工支撑系统
CN108518071B (zh) 双层大跨度钢结构通廊的安装方法
CN206692230U (zh) 一种高层建筑行吊
CN105625732B (zh) 超高悬挑钢结构桁架无支撑施工方法
CN103743581B (zh) 内爬塔式起重机试验平台装置及试验方法
CN208152583U (zh) 一种高层建筑施工辅助设备
CN201598572U (zh) 大跨度节段拼装造桥机
CN201891087U (zh) 辅助运架一体机的喂梁平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180516

Address after: 110013, 3-1, Jing Jie street, Shenhe District, Liaoning, Shenyang

Co-patentee after: CHINA RAILWAY NO. 9 GROUP NO.4 ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY NO.9 GROUP Co.,Ltd.

Address before: 110013, 3-1, Jing Jie street, Shenhe District, Liaoning, Shenyang

Patentee before: CHINA RAILWAY NO.9 GROUP Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212