WO2020105494A1 - 超純水製造装置の立ち上げ方法及び超純水製造装置 - Google Patents

超純水製造装置の立ち上げ方法及び超純水製造装置

Info

Publication number
WO2020105494A1
WO2020105494A1 PCT/JP2019/044156 JP2019044156W WO2020105494A1 WO 2020105494 A1 WO2020105494 A1 WO 2020105494A1 JP 2019044156 W JP2019044156 W JP 2019044156W WO 2020105494 A1 WO2020105494 A1 WO 2020105494A1
Authority
WO
WIPO (PCT)
Prior art keywords
ultrapure water
water
flow path
starting
production system
Prior art date
Application number
PCT/JP2019/044156
Other languages
English (en)
French (fr)
Inventor
恭則 松井
Original Assignee
野村マイクロ・サイエンス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 野村マイクロ・サイエンス株式会社 filed Critical 野村マイクロ・サイエンス株式会社
Priority to KR1020217006613A priority Critical patent/KR20210091115A/ko
Priority to CN201980063396.5A priority patent/CN112770825B/zh
Publication of WO2020105494A1 publication Critical patent/WO2020105494A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D61/00Processes of separation using semi-permeable membranes, e.g. dialysis, osmosis or ultrafiltration; Apparatus, accessories or auxiliary operations specially adapted therefor
    • B01D61/58Multistep processes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D19/00Degasification of liquids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D61/00Processes of separation using semi-permeable membranes, e.g. dialysis, osmosis or ultrafiltration; Apparatus, accessories or auxiliary operations specially adapted therefor
    • B01D61/14Ultrafiltration; Microfiltration
    • B01D61/145Ultrafiltration
    • B01D61/146Ultrafiltration comprising multiple ultrafiltration steps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D61/00Processes of separation using semi-permeable membranes, e.g. dialysis, osmosis or ultrafiltration; Apparatus, accessories or auxiliary operations specially adapted therefor
    • B01D61/14Ultrafiltration; Microfiltration
    • B01D61/147Microfiltration
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D61/00Processes of separation using semi-permeable membranes, e.g. dialysis, osmosis or ultrafiltration; Apparatus, accessories or auxiliary operations specially adapted therefor
    • B01D61/14Ultrafiltration; Microfiltration
    • B01D61/22Controlling or regulating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D65/00Accessories or auxiliary operations, in general, for separation processes or apparatus using semi-permeable membranes
    • B01D65/02Membrane cleaning or sterilisation ; Membrane regeneration
    • B01D65/022Membrane sterilisation
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/30Treatment of water, waste water, or sewage by irradiation
    • C02F1/32Treatment of water, waste water, or sewage by irradiation with ultraviolet light
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/42Treatment of water, waste water, or sewage by ion-exchange
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/44Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/44Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis
    • C02F1/444Treatment of water, waste water, or sewage by dialysis, osmosis or reverse osmosis by ultrafiltration or microfiltration
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2311/00Details relating to membrane separation process operations and control
    • B01D2311/25Recirculation, recycling or bypass, e.g. recirculation of concentrate into the feed
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2313/00Details relating to membrane modules or apparatus
    • B01D2313/18Specific valves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2313/00Details relating to membrane modules or apparatus
    • B01D2313/50Specific extra tanks
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2313/00Details relating to membrane modules or apparatus
    • B01D2313/56Specific mechanisms for loading the membrane in a module
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2313/00Details relating to membrane modules or apparatus
    • B01D2313/57Tools used for removal of membranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D61/00Processes of separation using semi-permeable membranes, e.g. dialysis, osmosis or ultrafiltration; Apparatus, accessories or auxiliary operations specially adapted therefor
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/02Non-contaminated water, e.g. for industrial water supply
    • C02F2103/04Non-contaminated water, e.g. for industrial water supply for obtaining ultra-pure water

Definitions

  • the present invention relates to a method for starting up an ultrapure water manufacturing apparatus, which is used, for example, when newly installing and starting up the ultrapure water manufacturing apparatus, and an ultrapure water manufacturing apparatus to which this starting method can be applied.
  • An ultrapure water production system used in semiconductor manufacturing processes uses a flow path for water to be treated that goes to the point of use (place of use) and a water treatment system that includes various types of treatment equipment to remove the water to be treated that flows through the flow path. Water treatment is performed to obtain ultrapure water.
  • This type of ultrapure water production system mainly includes a primary pure water production unit and a secondary pure water production unit.
  • the primary pure water production section includes, for example, a pretreatment section for removing suspended substances in raw water, a reverse osmosis membrane device and an ion exchange apparatus for removing total organic carbon (TOC) components and ionic components in the pretreated water. It is used to produce primary pure water.
  • the secondary pure water producing section produces secondary pure water (ultra pure water) by removing fine particles, colloidal substances, organic substances, metals, anions and the like remaining in the primary pure water.
  • the fine particles in the water treatment system for example, in order to newly install and start up the ultrapure water production apparatus, for example, when performing an assembly operation of the ultrapure water production apparatus at the installation location, the fine particles in the water treatment system, viable bacteria, There are problems such as mixing of all organic carbon components and elution of metal components from the pipes forming the flow path of the water to be treated. Therefore, as a countermeasure against this, prior to the normal operation of the ultrapure water production system, the water treatment system in the ultrapure water production system is washed in advance (for example, refer to Patent Document 1).
  • the ultrapure water produced by the ultrapure water production system may not be within the intended production specifications.
  • the connection points of pipes in the ultrapure water production system are complicatedly connected or when there is a problem in the cleanliness of the environment in which the ultrapure water production system is installed, for example, if the particle size is relatively small, Large metal particles, sand, etc. may be present in the water treatment system in a state of being trapped by the ultrafiltration membrane device or the like arranged before the point of use.
  • the elution of components such as metal particles continues for a long time in the water treatment system, and as a result, the water quality of the ultrapure water produced is continuously deteriorated.
  • the present invention has been made to solve the above problems, and provides a method for starting up an ultrapure water production system and an ultrapure water production system that can shorten the startup period of the ultrapure water production system.
  • the purpose is to
  • a method for starting up an ultrapure water production system is an ultrafiltration membrane device which is provided on a flow path for flowing water to be treated and which is provided on the flow path and treats the water to be treated before a point of use.
  • a method for starting up an ultrapure water production apparatus having a water treatment system including at least the following: a step of installing a temporary filter device before the ultrafiltration membrane device on the flow path, and After the provisional filter device is installed, the step of cleaning the water treatment system by starting water supply along the flow path, and the provisional filter device after a lapse of a predetermined period from the start of cleaning by the water supply Is separated from the ultrapure water producing apparatus.
  • the above-mentioned cleaning preferably includes sterilization. Further, after the step of separating, it is preferable to carry out the step of starting the water supply along the flow path and performing the water treatment until ultrapure water within the intended manufacturing specifications is obtained. Further, the ultrapure water producing apparatus further comprises a tank upstream of the temporarily placed filter device on the flow path, and the flow path is in the tank after passing through the ultrafiltration membrane device. It is preferable to have a return circulation line and to circulate the fed water in the circulation line in the cleaning. Further, it is preferable that the predetermined period is a period in which the number of circulations calculated from the amount and flow rate of water in the circulation line is, for example, 0.5 to 2,200 when the cleaning is started.
  • the ultrapure water producing apparatus of the present invention a flow path for flowing the water to be treated, an ultrafiltration membrane device which is provided on the flow path and water-treats the water to be treated at a stage before the use point, A filter attachment / detachment mechanism, which is provided in the preceding stage of the ultrafiltration membrane device on the flow channel and allows a filter device temporarily placed in the flow channel to be attached / detached, is provided.
  • the above-mentioned temporary filter device is preferably, for example, a microfiltration membrane device.
  • the flow path is configured by a first pipe, while the filter attachment / detachment mechanism branches once from the flow path and merges on the downstream side of the flow path via the temporarily placed filter device.
  • a pair of second on-off valves and the like are provided on the second pipe before and after the temporarily placed filter device.
  • the present invention it is possible to provide an ultrapure water production system startup method and an ultrapure water production system that can shorten the startup period of the ultrapure water production system.
  • FIG. 1 is a block diagram schematically showing the configuration of an ultrapure water production system according to an embodiment of the present invention.
  • the block diagram which shows the structure of the secondary pure water production part with which the ultrapure water production apparatus of FIG. 1 is equipped.
  • the flowchart which shows the starting method of the ultrapure water manufacturing apparatus which concerns on embodiment of this invention.
  • an ultrapure water production system 10 is a device for treating treated water with water to obtain ultrapure water, and includes a pretreatment unit 12, a primary pure water production unit 14, A water treatment system 15 including a flow path 31 for the water to be treated, a tank 16, and a secondary pure water producing section 18 is provided.
  • the pretreatment unit 12 introduces raw water such as city water, well water, and industrial water.
  • the pretreatment unit 12 has an appropriate configuration according to the water quality of the raw water, and removes suspended substances of the raw water to generate pretreated water.
  • the pretreatment unit 12 includes, for example, a sand filtration device, a microfiltration device, and the like, and further includes a heat exchanger for adjusting the temperature of the water to be treated as necessary.
  • the primary pure water producing unit 14 removes organic components, ionic components, dissolved gas, etc. in the pretreated water to produce primary pure water, and supplies the primary pure water to the tank (TK) 16.
  • the primary pure water producing unit 14 includes, for example, a reverse osmosis membrane device, an ion exchange device (a cation exchange device, an anion exchange device, a mixed bed type ion exchange device, etc.), an ultraviolet oxidation device, and a deaeration device (vacuum deaeration). Device, deaeration membrane device, etc.).
  • the primary pure water has, for example, a total organic carbon (TOC) concentration of 5 ⁇ g C / L or less and a resistivity of 17 M ⁇ ⁇ cm or more.
  • the tank 16 stores the primary pure water and supplies the required amount thereof to the secondary pure water producing unit 18.
  • the secondary pure water producing unit 18 removes impurities in the primary pure water produced by the primary pure water producing unit 14 to produce secondary pure water to be ultra pure water, and the place where the ultra pure water is used. It is supplied to the point of use (POU: Point Of Use) 20.
  • the flow path 31 is a flow path for flowing the water to be treated, and is the water treated by the pretreatment unit 12, the primary pure water production unit 14, and the secondary pure water production unit 18 which constitute the water treatment system 15. The treated water is sent to the use point 20. Further, as shown in FIGS. 1 and 2, the above-described tank 16 is provided on the upstream side of a microfiltration membrane device (temporary filter device) 27 described later on the flow path 31.
  • the flow path 31 has a circulation line 31b which returns to the tank 16 after passing through the ultrafiltration membrane device 28 described later.
  • the circulation line 31b is moved from the position of the use point 20 located at the most downstream side to the position of the use point 20 via the tank 16 and the secondary pure water producing unit 18. It constitutes the return path. That is, the surplus ultrapure water that has passed the use point 20 is collected in the tank 16 through the circulation line 31 b of the flow path 31.
  • the secondary pure water producing unit 18 includes a circle pump (treated water supply pump) 22, a heat exchanger (HEX: Heat Exchanger) 23, an ultraviolet oxidation device ( A TOC-UV) 24, a membrane degasifier (MDG) 25, a polisher 26, a filter attaching / detaching mechanism 30, an ultrafiltration membrane (UF) device 28, and a fine particle meter 29 are provided.
  • a circle pump treated water supply pump
  • HEX Heat Exchanger
  • a TOC-UV ultraviolet oxidation device
  • MDG membrane degasifier
  • polisher 26 a filter attaching / detaching mechanism
  • UF ultrafiltration membrane
  • the circle pump 22 is a treated water supply pump that supplies the treated water (primary pure water) stored in the tank 16 to the heat exchanger 23.
  • the heat exchanger 23 adjusts the temperature of the water to be treated supplied from the circle pump 22. At this time, the temperature of the water to be treated is preferably adjusted to 25 ⁇ 3 ° C. by the heat exchanger 23.
  • the ultraviolet oxidizer 24 irradiates the water to be treated (primary pure water) whose temperature has been adjusted by the heat exchanger 23 with ultraviolet rays to decompose and remove a trace amount of organic substances in the water to be treated.
  • the ultraviolet oxidation device 24 has, for example, an ultraviolet lamp and generates ultraviolet light having a wavelength of around 185 nm.
  • the ultraviolet oxidation device 24 may generate ultraviolet light having a wavelength near 254 nm.
  • the membrane degassing device 25 is a device that depressurizes the secondary side of a gas-permeable membrane to allow only the dissolved gas in the water to be treated flowing through the primary side to permeate to the secondary side.
  • the polisher 26 has a mixed-bed type ion exchange resin in which a cation exchange resin and an anion exchange resin are mixed, and is a non-regeneration that adsorbs and removes a minute amount of cation component and anion component in water to be treated. It is a mixed bed type ion exchange device.
  • a filter attachment / detachment mechanism (filter attachment / removal mechanism) 30, which will be described in detail later, is provided in the preceding stage (immediately before) of the ultrafiltration membrane device 28 on the flow passage 31 of the water to be treated, and Thus, the microfiltration membrane device 27 can be attached and detached.
  • the ultrafiltration membrane device 28 is provided on the flow path 31 in front of (just before) the most downstream use point 20.
  • the ultrafiltration membrane device 28 has a plurality of hollow fiber modules, and the water flow rate per hollow fiber module is 5 m 3 / h or more. Generally, it is 10 m 3 / h or more.
  • This ultrafiltration membrane device 28 provided on the flow path 31 is formed by further treating the water to be treated by the polisher 26 (or the microfiltration membrane device 27 at the time of mounting) before the point of use 20, for example, Ultrafine water (secondary pure water) is obtained by removing fine particles having a particle diameter of 50 nm or more.
  • the number of particles having a particle diameter of 50 nm or more is 200 particles / L or less.
  • the total organic carbon concentration is 1 ⁇ g C / L or less, and the resistivity is 18 M ⁇ ⁇ cm or more.
  • the fine particle meter 29 measures the particle size of particles in the secondary pure water (ultra pure water) that has been water-treated by the ultrafiltration membrane device 28.
  • the filter attaching / detaching mechanism 30 includes a plurality of joints 36, 37, 41, 42 and an opening / closing valve (first opening / closing valve) 33.
  • the microfiltration membrane (MF) device 27 is provided with a membrane having a pore diameter larger than that of the membrane of the ultrafiltration membrane device 28 in the subsequent stage.
  • the pore size of the microfiltration membrane is not particularly limited, but it is more preferable that the microfiltration membrane has filtration accuracy for separating particles of 0.2 ⁇ m or more.
  • the causative substance that inhibits early start-up is relatively large particles, so a microfiltration membrane having a relatively large pore size is sufficient. Further, in such a microfiltration membrane, since the number of membranes is substantially reduced and the pressure loss is reduced, good water permeation performance can be obtained.
  • the microfiltration membrane may be either a surface filtration type or a depth filtration type.
  • the latter depth filtration type microfiltration membrane is more preferable because it can secure a large amount of water flow rate, and thus the number of membranes used is small and the cost is low.
  • the depth filtration type microfiltration membrane is generally used in the pre-stage side of the ultrapure water production system, for example, in a reverse osmosis membrane guard filter installed in the primary pure water production section, or in the pretreatment section.
  • a reverse osmosis membrane guard filter installed in the primary pure water production section, or in the pretreatment section.
  • the surface filtration type microfiltration membranes include HDCII series, Polyfine II series (all manufactured by Pall), and the depth filtration type microfiltration membranes include Betafine series (manufactured by 3M Japan), Profile II, Nexis series, Profile UP series (all manufactured by Pall) can be preferably used.
  • the microfiltration membrane device 27 is mixed in the water treatment system 15 from the installation environment of the ultrapure water producing device 10 or the metal particles (foreign matter) desorbed from, for example, the pipes in the ultrapure water producing device 10. It becomes possible to capture sand and the like.
  • the microfiltration membrane device 27 is a temporary (temporary) protection filter (Temporary Guard Filter) device. Although this microfiltration membrane device 27 is attached to the ultrapure water production device 10 when the ultrapure water production device 10 is newly installed and started up, for example, after the ultrapure water production device 10 is completely started up, Is removed (removed) from the ultrapure water producing apparatus 10 via the filter attaching / detaching mechanism 30.
  • Temporary Guard Filter Temporary Guard Filter
  • the flow path 31 of the water to be treated is constituted by the pipe 31a. Further, in order to temporarily place the microfiltration membrane device 27, a branch flow channel 32 is formed that branches from the flow channel 31 and merges on the downstream side of the flow channel 31 via the microfiltration membrane device 27. Piping (second piping) 32a is prepared. That is, the microfiltration membrane device 27 is interposed in the middle of the pipe 32a.
  • the joints 41 and 42 detachably connect the pipe 32a to the pipe 31a.
  • the joints 36 and 37 also detachably connect the pipe 32a to the pipe 31a.
  • the joints 36 and 37 allow the pipe 32a together with the on-off valves 34 and 35 to be removed from the pipe 31a.
  • FIG. 3 a mode in which the pipe 32a and the temporarily placed microfiltration membrane device 27 are mainly removed via the joints 41 and 42 is illustrated.
  • the on-off valve 33 is provided between the branch position and the merging position in the pipe 31a, and switches between water passage and interruption (non-water passage) in the pipe 31a. Further, a pair of open / close valves (second open / close valves) 34 and 35 are provided on the pipe 32 a before and after the temporarily placed microfiltration membrane device 27, respectively. The on-off valves 34 and 35 switch between water passage and interruption (non-water passage) in the pipe 32a.
  • the flow path 31 is once branched, and then passes through the branch flow channel 32 and the microfiltration membrane device 27 to the downstream side of the flow channel 31.
  • the on-off valve 33 is closed, while the on-off valves 34 and 35 are opened.
  • FIG. 3 a state in which the microfiltration membrane device 27 is separated (removed) from the ultrapure water production device 10, or a state in which the microfiltration membrane device 27 is installed as shown in FIG.
  • the open / close valve 33 is opened while the open / close valves 34 and 35 are closed.
  • FIGS. 1 to 3 a method for starting up the ultrapure water production system 10 according to the present embodiment (a method for producing ultrapure water by the ultrapure water production system 10) is added to FIGS. 1 to 3 and based on the flowchart shown in FIG. explain.
  • the filter attaching / detaching mechanism 30 is used to perform the operation shown in FIGS.
  • a temporary microfiltration membrane device 27 is installed (assembled) in the main body of the ultrapure water production system 10 (S1).
  • the on-off valves 33 on the pipe 31a are closed, while the on-off valves 34, 35 on the pipe 32a (branch flow path 32) are opened.
  • the microfiltration membrane device 27 captures, for example, metal particles desorbed from the pipes in the ultrapure water production apparatus 10 and sand mixed in the water treatment system 15.
  • primary pure water is preferable as the water for supplying water (cleaning water) for cleaning the water treatment system 15. Further, in such cleaning, with the start of the cleaning, water for cleaning (cleansing water) that has passed through the position of the use point 20 reaches the position of the use point 20 at least once through the circulation line 31b. Return It will be implemented for a predetermined period or longer.
  • the number of circulations calculated from the amount and flow rate of water in the circulation line 31b is preferably 0.5 to 2200 times, more preferably 1 to 1000 times, and even more preferably 40 to 500 times.
  • the water passage time is preferably 0.25 hours to 1000 hours, more preferably 0.5 hours to 720 hours, still more preferably 24 hours to 170 hours. Since a large amount of foreign matter is contained on the upstream side of the circulation system, the effect can be obtained even when the number of circulations is 0.5, but the effect becomes large when the number of circulations exceeds 1.
  • the predetermined period may be, for example, one week.
  • the respective devices in the pretreatment unit 12, the primary pure water producing unit 14, and the secondary pure water producing unit 18 are in the operating state.
  • metal particles desorbed from the pipes in the ultrapure water producing apparatus 10 are captured by the microfiltration membrane device 27.
  • the microfiltration membrane device 27 that has captured metal particles and the like is removed (separated) from the ultrapure water production device 10 (S4). Specifically, after stopping the water supply, the on-off valves 34 and 35 on the pipe 32a (branch flow path 32) are closed. Further, as shown in FIG. 3, the temporary placement microfiltration membrane device 27 is removed together with the pipe 32 a via the joints 41 and 42.
  • the on-off valve 33 is opened, and each device in the pretreatment unit 12, the primary pure water production unit 14, and the secondary pure water production unit 18 is put into operation, and the circulation line 31b is further installed.
  • Water supply (supply of raw water to the pretreatment unit 12) is started along the flow path 31 including the water treatment system 15 to carry out water treatment (S5). Note that it is possible to perform cleaning without stopping the water supply between the operation of removing (S4) and the step of performing water treatment (S5).
  • the on-off valve 33 is opened, and at the same time or after that, the on-off valves 34 and 35 are closed. Then, the microfiltration membrane device 27 may be removed.
  • cleaning of the water treatment system 15 is started with the microfiltration membrane device 27 installed in front of (just before) the ultrafiltration membrane device 28. Then, after the lapse of a predetermined period of time, the microfiltration membrane device 27 that has captured, for example, metal particles or sand is removed (separated) from the ultrapure water producing device 10 and then water treatment is performed.
  • the above-mentioned metal particles and sand can be removed from the inside.
  • the start-up method of the ultrapure water production system 10 of the present embodiment elution of components such as sand and metal particles that may be present in the water treatment system 15 continues, and the water quality of the ultrapure water deteriorates. It is possible to avoid being left as it is. That is, in the water treatment after the removal of the microfiltration membrane device 27, ultrapure water that fits within the intended manufacturing specifications can be quickly obtained, which can shorten the startup period of the ultrapure water production device 10. it can.
  • a line (not shown) that bypasses the polisher 26 and / or the ultrafiltration membrane device 28 is used to connect the polisher 26 and / or the ultrafiltration membrane device 28 to the system (water treatment system 15 ), And hydrogen peroxide is added to the system using one of the secondary pure water producing units 18, for example, a branch valve provided on the suction side of the tank 16 or the pump 22. After that, circulation is performed for a predetermined time. After sufficient sterilization treatment, hydrogen peroxide solution is drained from somewhere. After the hydrogen peroxide in the system is exhausted, the bypass of the polisher 26 and / or the ultrafiltration membrane device 28 is stopped.
  • the water treatment system 15 including the polisher 26 is washed in a state where the ion exchange resin is not filled in the main body of the polisher 26, and at any stage.
  • the cleaning operation may be stopped and the polisher 26 main body may be filled with the ion exchange resin.
  • the above operation is described by applying the circulation line 31b including the use point 20, but it is also possible to use the circulation line 31c bypassing the use point 20 as shown in FIG. In that case, the operation of including the use point 20 in the circulation line is performed at any stage. In order to further shorten the rising time, it is preferable to select a starting method in the circulation line 31b including the use point 20.
  • a booster pump 43 may be provided between the polisher 26 and the joint 36 as shown in FIG.
  • Such a booster pump 43 can be added to the secondary pure water producing unit illustrated in FIGS. 2 and 3 or the secondary pure water producing unit shown in FIG. 6 described later.
  • an ultrapure water production apparatus that does not include the above-mentioned temporary filter device (microfiltration membrane device 27) was used for cleaning with cleaning water. It has been verified that when water treatment is performed, ultrapure water that falls within the manufacturing specifications cannot be obtained even if such cleaning and water treatment are continued for a period of, for example, 4 months. In this case, the hollow fiber type module in the ultrafiltration membrane device 28 is still trapped with metal powder, sand, etc., and the trapped foreign matter is crushed with time and flows out to the subsequent stage. It didn't fit within the manufacturing specifications. Therefore, by replacing all the hollow fiber modules in the ultrafiltration membrane device 28 with new ones and performing the water treatment again, it was possible to finally obtain ultrapure water within the manufacturing specifications.
  • the start-up method of the ultrapure water production system 10 of the present embodiment after the cleaning with the cleaning liquid containing hydrogen peroxide is performed for one week in the state where the microfiltration membrane device 27 is installed.
  • the microfiltration membrane device 27 that has captured, for example, metal particles or sand from the ultrapure water production device 10 and then performing water treatment, ultrapure water that fits within the production specifications is immediately obtained. Have been verified.
  • the temporary filter device (the microfiltration membrane) is used.
  • the start-up period of the ultrapure water producing device 10 can be shortened.
  • the filter attaching / detaching mechanism 40 can be applied to an ultrapure water producing apparatus and its starting method as shown in FIG.
  • this filter attachment / detachment mechanism 40 After closing the opening / closing valves 34, 35, the pipe 32 (branch flow channel 32a) and the microfiltration membrane device 27 are removed together with the opening / closing valves 34, 35 via the joints 36, 37 ( Be separated). After removing the temporarily placed microfiltration membrane device 27 together with the on-off valves 34, 35 and the pipe 32a from the ultrapure water producing device 10, for example, a plug (stop) at the portion of the joint 36, 37 where the pipe 32a was attached. Stoppers) 38, 39, etc. will be attached.

Landscapes

  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Organic Chemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Toxicology (AREA)
  • Separation Using Semi-Permeable Membranes (AREA)
  • Degasification And Air Bubble Elimination (AREA)
  • Treatment Of Water By Ion Exchange (AREA)
  • Physical Water Treatments (AREA)

Abstract

純水製造装置の立ち上げ期間の短縮化を図る。 本発明の超純水製造装置の立ち上げ方法は、被処理水を流すための流路と、前記流路上に設けられ、前記被処理水をユースポイントの前段で水処理する限外ろ過膜装置と、を少なくとも含む水処理系を備えた超純水製造装置の立ち上げ方法であって、前記流路上における前記限外ろ過膜装置の前段に、仮置きのフィルタ装置を設置する工程と、前記仮置きのフィルタ装置の設置後に、前記流路に沿って送水を開始することにより前記水処理系を洗浄する工程と、前記送水による洗浄の開始から所定の期間経過後に、前記仮置きのフィルタ装置を前記超純水製造装置から分離する工程と、を有する。

Description

超純水製造装置の立ち上げ方法及び超純水製造装置
 本発明は、超純水製造装置を例えば新規に設置して立ち上げる際に用いられる超純水製造装置の立ち上げ方法、及びこの立ち上げ方法を適用可能な超純水製造装置に関する。
 半導体の製造工程などで利用される超純水製造装置は、ユースポイント(使用場所)へ向う被処理水の流路と、各種処理装置を含む水処理系によって、流路上を流れる被処理水を水処理して超純水を得る。この種の超純水製造装置は、一次純水製造部及び二次純水製造部を主に備えている。一次純水製造部は、例えば原水中の懸濁物質を除去する前処理部と、前処理水中の全有機炭素(TOC)成分やイオン成分を除去する逆浸透膜装置やイオン交換装置と、を用いて一次純水を製造する。一方、二次純水製造部は、一次純水中に残留する微粒子、コロイダル物質、有機物、金属、陰イオンなどを除去することによって二次純水(超純水)を製造する。
 ここで、超純水製造装置を例えば新規に設置して立ち上げるために、その設置場所で超純水製造装置の例えば組み立て作業を行う場合に、上記した水処理系内に対する微粒子、生菌、全有機炭素成分の混入や、被処理水の流路を構成している配管からの金属成分の溶出などが生じるといった課題がある。そこで、この対策として、超純水製造装置の通常運転に先立ち、超純水製造装置内の水処理系を予め洗浄することが行われている(例えば特許文献1参照)。
特開2004-122020号公報
 しかしながら、上述した洗浄を長期間にわたって継続させた後でも、超純水製造装置で製造された超純水が、所期の製造スペック内に収まらないことがある。例えば、超純水製造装置内の配管類の接続箇所などが煩雑に接続された場合や、超純水製造装置を設置する環境の清浄性に課題がある場合には、例えば粒径の比較的大きい金属粒子や砂などが、ユースポイントの前段に配置された限外ろ過膜装置などに捕捉されたままの状態で水処理系内に存在していることがある。この際、金属粒子などの成分の溶出が水処理系内で長期間続き、この結果、製造される超純水の水質は、継続的に悪化した状態となる。
 本発明は、上記課題を解決するためになされたものであり、超純水製造装置の立ち上げ期間を短縮することができる超純水製造装置の立ち上げ方法及び超純水製造装置を提供することを目的とする。
 本発明の超純水製造装置の立ち上げ方法は、被処理水を流すための流路と、前記流路上に設けられ、前記被処理水をユースポイントの前段で水処理する限外ろ過膜装置と、を少なくとも含む水処理系を備えた超純水製造装置の立ち上げ方法であって、前記流路上における前記限外ろ過膜装置の前段に、仮置きのフィルタ装置を設置する工程と、前記仮置きのフィルタ装置の設置後に、前記流路に沿って送水を開始することにより前記水処理系を洗浄する工程と、前記送水による洗浄の開始から所定の期間経過後に、前記仮置きのフィルタ装置を前記超純水製造装置から分離する工程と、を有している。
 前述した洗浄は、殺菌処理を含むことが好ましい。さらに、前記分離する工程の後、前記流路に沿った送水を開始し、所期の製造スペック内に収まる超純水が得られるまで水処理を行う工程を実施することが好ましい。また、前記超純水製造装置は、前記流路上における前記仮置きのフィルタ装置の上流側にタンクをさらに備え、また、前記流路は、前記限外ろ過膜装置を通過した後、前記タンクに戻る循環ラインを有し、前記洗浄において、前記送水された水を前記循環ラインに循環させることが好ましい。さらに、前記所定の期間は、前記洗浄の開始に伴い、前記循環ライン内の水量と流量から計算される循環回数が、例えば0.5~2200回となる期間であることが望ましい。
 一方、本発明の超純水製造装置は、被処理水を流すための流路と、前記流路上に設けられ、前記被処理水をユースポイントの前段で水処理する限外ろ過膜装置と、前記流路上における前記限外ろ過膜装置の前段に設けられ、前記流路に対して仮置きのフィルタ装置の着脱を可能にするフィルタ着脱機構と、を備えている。
 上述した仮置きのフィルタ装置は、例えば精密ろ過膜装置であることが好ましい。また、前記流路は、第1の配管で構成され、一方、前記フィルタ着脱機構は、前記流路から一旦分岐すると共に前記仮置きのフィルタ装置を経由しつつ前記流路の下流側で合流する分岐流路を構成した第2の配管を、前記第1の配管に対して、取り外し可能に接続する複数の継手と、前記第1の配管における前記分岐の位置と前記合流の位置との間に設けられた第1の開閉弁と、を備えていることが好ましい。さらに、前記第2の配管上には、例えば、前記仮置きのフィルタ装置の前後に一対の第2の開閉弁などがそれぞれ設けられていることが好ましい。
 本発明によれば、超純水製造装置の立ち上げ期間を短縮することができる超純水製造装置の立ち上げ方法及び超純水製造装置を提供することが可能である。
本発明の実施形態に係る超純水製造装置の構成を概略的に示すブロック図。 図1の超純水製造装置が備える二次純水製造部の構成を示すブロック図。 図2の二次純水製造部から仮置きの精密ろ過膜装置を分離した状態を示す図。 本発明の実施形態に係る超純水製造装置の立ち上げ方法を示すフローチャート。 図2の二次純水製造部とは、被処理水の循環ラインが一部異なる構成例を示した図。 図3の精密ろ過膜装置の分離状態とは異なる他の分離状態を例示した図。
 以下、本発明の実施の形態を図面に基づき説明する。
 図1に示すように、本実施形態に係る超純水製造装置10は、被処理水を水処理して超純水を得る装置であって、前処理部12、一次純水製造部14、被処理水の流路31、タンク16、二次純水製造部18、を含む水処理系15を備えている。前処理部12は、原水として、市水、井水、工業用水などを導入する。この前処理部12は、原水の水質などに応じて適宜の構成を有し、原水の懸濁物質を除去して前処理水を生成する。前処理部12は、例えば砂ろ過装置や精密ろ過装置などを備え、さらに、必要に応じて被処理水の温度を調節するための熱交換器などを有している。
 一次純水製造部14は、前処理水中の有機成分、イオン成分、溶存ガスなどを除去して一次純水を製造し、この一次純水をタンク(TK)16に供給する。一次純水製造部14は、例えば、逆浸透膜装置、イオン交換装置(陽イオン交換装置、陰イオン交換装置、混床式イオン交換装置など)、紫外線酸化装置、及び脱気装置(真空脱気装置、脱気膜装置など)のうちの1つ以上を適宜組み合わせて構成される。一次純水は、例えば全有機炭素(TOC:Total Organic Carbon)濃度が5μgC/L以下、抵抗率が17MΩ・cm以上である。タンク16は、一次純水を貯留し、その必要量を二次純水製造部18に供給する。
 一方、二次純水製造部18は、一次純水製造部14により製造された一次純水中の不純物を除去して超純水となる二次純水を製造し、超純水の使用場所であるユースポイント(POU:Point Of Use)20に供給する。流路31は、被処理水を流すための流路であって、水処理系15を構成する前処理部12、一次純水製造部14及び二次純水製造部18によって水処理された被処理水をユースポイント20へ向けて送る。また、図1、図2に示すように、上記したタンク16は、流路31上における後記の精密ろ過膜装置(仮置きのフィルタ装置)27の上流側に備えられている。さらに、流路31は、後記の限外ろ過膜装置28を通過した後、タンク16に戻る循環ライン31bを有している。ここで、図1、図2の例では、循環ライン31bは、最下流に位置するユースポイント20の位置から、タンク16及び二次純水製造部18を経由して、ユースポイント20の位置へ戻る経路を構成している。つまり、ユースポイント20を通過した余剰分の超純水は、流路31の循環ライン31bを通ってタンク16にて回収される。
 具体的には、図2、図3に示すように、二次純水製造部18は、サークルポンプ(被処理水供給ポンプ)22、熱交換器(HEX:Heat Exchanger)23、紫外線酸化装置(TOC-UV)24、膜脱気装置(MDG:membrane degasifier)25、ポリッシャ26、フィルタ着脱機構30、限外ろ過膜(UF:Ultrafiltration Membrane)装置28、及び微粒子計29を備えている。
 サークルポンプ22は、タンク16内に収容された被処理水(一次純水)を熱交換器23に供給する被処理水供給ポンプである。熱交換器23は、サークルポンプ22から供給された被処理水の温度を調節する。この際、被処理水は、熱交換器23によって例えば25±3℃に温度調節されることが好ましい。
 紫外線酸化装置24は、熱交換器23で温度調節された被処理水(一次純水)に紫外線を照射して、被処理水中の微量有機物を分解除去する。紫外線酸化装置24は、例えば紫外線ランプを有し、波長185nm付近の紫外線を発生させる。紫外線酸化装置24は、波長254nm付近の紫外線を発生させるものであってもよい。このような紫外線酸化装置24内で被処理水に紫外線が照射されると、紫外線が水分子を分解してOHラジカルを生成し、このOHラジカルが、被処理水中の有機物を酸化分解する。
 膜脱気装置25は、気体透過性の膜の二次側を減圧して、一次側を通流する被処理水中の溶存ガスのみを二次側に透過させて除去する装置である。ポリッシャ26は、陽イオン交換樹脂と陰イオン交換樹脂とが混合された混床式のイオン交換樹脂を有し、被処理水の中の微量の陽イオン成分及び陰イオン成分を吸着除去する非再生型の混床式イオン交換装置である。
 後に詳述するフィルタ着脱機構(フィルタ取付・取外機構)30は、被処理水の流路31上における限外ろ過膜装置28の前段(直前)に設けられており、前記流路31に対して、精密ろ過膜装置27の着脱を可能にする。限外ろ過膜装置28は、流路31上における最下流のユースポイント20の前段(直前)に設けられている。
 限外ろ過膜装置28は、複数の中空糸型モジュールを有しており、この中空糸型モジュールの1つあたりの通水流量は、5m3/h以上である。一般的には10m3/h以上である。流路31上に設けられたこの限外ろ過膜装置28は、ポリッシャ26(又は装着時の精密ろ過膜装置27)による被処理水を、ユースポイント20の前段でさらに水処理することにより、例えば粒子径50nm以上の微粒子を除去して超純水(二次純水)を得る。
 ここで、本実施形態の超純水製造装置10における製造スペック内の超純水(所期の水質条件を満足する超純水)は、粒子径50nm以上の粒子の数が200個/L以下であり、また、全有機炭素濃度が1μgC/L以下であり、さらには抵抗率が18MΩ・cm以上である。微粒子計29は、限外ろ過膜装置28によって水処理された二次純水(超純水)中の粒子の粒径を計測する。
 次に、フィルタ着脱機構30及び仮置きの精密ろ過膜装置27について詳述する。フィルタ着脱機構30は、図2、図3に示すように、複数の継手36、37、41、42及び開閉弁(第1の開閉弁)33を備えている。一方、精密ろ過膜(MF:Microfiltration Membrane)装置27は、後段の限外ろ過膜装置28の膜の孔径よりも大きい孔径の膜を備えている。この精密ろ過膜の孔径は、特に限定されないものの、0.2μm以上の粒子を分離するろ過精度を有しているものがより好ましい。これは、本発明において早期立ち上がりを阻害する原因物質が、比較的大きな微粒子であることから、比較的大きい孔径の精密ろ過膜で十分だからである。さらに、このような精密ろ過膜は、実質的に膜本数が低減されて圧力損失が小さくなるため、良好な通水性能が得られる。
 精密ろ過膜としては、表層ろ過式のものでも、デプスろ過式のものでもよい。後者のデプスろ過式の精密ろ過膜は、多くの通水流量を確保でき、これにより、使用する膜本数が少なく安価なため、より好ましい。
 なお、デプスろ過式の精密ろ過膜は、一般的に、超純水製造装置の前段側、例えば、一次純水製造部に設置される逆浸透膜のガードフィルター等、もしくは前処理部に用いられるが、本実施形態のように二次純水製造部に適用しようとする場合、デプスろ過式の精密ろ過膜では孔径が大きすぎるため、微細微粒子の除去は期待できないと考えていたので、立ち上げにて効果を示すことは意外性を持つものであった。
 表層ろ過式の精密ろ過膜としては、HDCIIシリーズ、ポリファインIIシリーズ(以上Pall社製)など、デプスろ過式の精密ろ過膜としては、Betafineシリーズ(スリーエムジャパン社製)、プロファイルII、ネクシスシリーズ、プロファイルUPシリーズ(以上Pall社製)等を好適に用いることが可能である。
 つまり、精密ろ過膜装置27は、超純水製造装置10内の例えば配管類から脱離した金属粒子(異物)や、超純水製造装置10の設置環境中から水処理系15内に混入した砂など、を捕捉することが可能となる。
 精密ろ過膜装置27は、仮置きの(一時的な)保護フィルタ(Temporary Guard Filter)装置である。この精密ろ過膜装置27は、超純水製造装置10を例えば新規に設置して立ち上げる際には、超純水製造装置10に取り付けられているものの、超純水製造装置の立ち上げ完了後には、超純水製造装置10から、フィルタ着脱機構30を介して、取り外し(撤去)される。
 ここで、被処理水の流路31は、配管31aによって構成されている。また、精密ろ過膜装置27を仮置きするために、流路31から一旦分岐すると共に精密ろ過膜装置27を経由しつつ当該流路31の下流側で合流する分岐流路32を構成するための配管(第2の配管)32aが用意されている。つまり、精密ろ過膜装置27は、配管32aの途中に介在される。
 図2、図3に示すように、継手41、42は、配管32aを、配管31aに対して、取り外し可能に接続する。また、継手36、37も、配管32aを、配管31aに対して、取り外し可能に接続している。具体的には、継手36、37は、開閉弁34、35と共に配管32aを、配管31aから取り外し可能としている。本実施形態では、図3に示すように、主に、継手41、42を介して、配管31aから、配管32a及び仮置きの精密ろ過膜装置27を取り外す態様を例示する。
 開閉弁33は、配管31aにおける前記分岐の位置と前記合流の位置との間に設けられており、配管31a内に対する通水と遮断(非通水)とを切り換える。また、配管32a上には、仮置きの精密ろ過膜装置27の前後に一対の開閉弁(第2の開閉弁)34、35がそれぞれ設けられている。開閉弁34、35は、配管32a内に対する通水と遮断(非通水)とを切り換える。
 したがって、図2に示すように、例えば、精密ろ過膜装置27が設置されている状態で、流路31から一旦分岐し分岐流路32及び精密ろ過膜装置27を経て流路31の下流側で合流する経路で送水する場合には、開閉弁33が閉じられる一方で、開閉弁34、35が開かれる。また、図3に示すように、超純水製造装置10から精密ろ過膜装置27が分離(撤去)されている状態や、図2に示すように、精密ろ過膜装置27が設置されている状態を含めて、分岐流路32及び精密ろ過膜装置27を経由させない経路で流路31に対して送水する場合には、開閉弁33が開かれる一方で、開閉弁34、35が閉じられる。
 なお、この場合、継手36から開閉弁34の区間、及び、開閉弁35から継手37の区間がデッドスペースとなり、水が滞留することによる水質の悪化が懸念される。そこで、配管32aと共に仮置きの精密ろ過膜装置27を撤去したのち、分離した配管32aの代わりに細い配管を取り付けて、継手36から継手37へ小流量流れるようにして、水の滞留を防ぐことも可能である。
 次に、本実施形態に係る超純水製造装置10の立ち上げ方法(超純水製造装置10による超純水の製造方法)を、図1~図3に加え、図4に示すフローチャートに基づき説明する。超純水製造装置10の立ち上げに際して、まず、ポリッシャ26、限外ろ過膜装置28、流路31(配管31a)などの組み付けに加え、フィルタ着脱機構30を介して、図2、図4に示すように、超純水製造装置10本体に仮置きの精密ろ過膜装置27を設置(組み付け)する(S1)。
 精密ろ過膜装置27の設置後には、配管31a上の開閉弁33を閉じる一方で、配管32a(分岐流路32)上の開閉弁34、35を開く。精密ろ過膜装置27のこのような設置後に、例えば前処理部12の前段から、分岐流路32及び循環ライン31bを含む流路31に沿って送水を開始することにより、図1、図2、図4に示すように、前処理部12、一次純水製造部14内の各装置、上記した流路31、ポリッシャ26、限外ろ過膜装置28などを含む水処理系15を洗浄する(S2)。この際、超純水製造装置10内の例えば配管類から脱離した金属粒子や、水処理系15に混入した砂などが、精密ろ過膜装置27によって捕捉される。
 前述した洗浄において、水処理系15を洗浄するための送水用の水(洗浄水)は、一次純水がよい。また、このような洗浄は、当該洗浄の開始に伴い、ユースポイント20の位置を通過した洗浄のための水(洗浄水)が、少なくとも、循環ライン31bを一巡して前記ユースポイント20の位置へ戻る所定の期間以上実施される。
 前記洗浄の開始に伴い、循環ライン31b内の水量と流量から計算される循環回数は、0.5~2200回が好ましく、1~1000回がより好ましく、40~500回がさらに好ましい。また、通水時間は、0.25時間~1000時間が好ましく、0.5時間~720時間がより好ましく、24時間~170時間がさらに好ましい。なお、異物は循環系の前段側に多く含まれているため、循環回数が0.5回でも効果は得られるが、1回を超えると効果は大きくなる。
 循環回数や通水時間が少ない場合、精密ろ過膜で異物を十分補足できないため、立ち上げ時間の短縮効果が得られなくなる。一方、循環回数や通水時間が多い場合、精密ろ過膜に捕捉された異物が例えば粉砕されて後段に流出するため、立ち上げ時間の短縮効果が得られなくなる。なお、敷設された配管の長さや口径、分岐の数などによって最も適した条件は異なってくるのが、上記範囲のなかで適宜条件を選定して洗浄を実施する。
 ここで、所定の期間は、例えば一週間などであってもよい。また、洗浄中については、前処理部12、一次純水製造部14及び二次純水製造部18内の各装置は、稼働状態とされる。前述したような洗浄により、超純水製造装置10内の例えば配管類から脱離した金属粒子などが精密ろ過膜装置27によって捕捉される。
 洗浄の開始から所定の期間経過後に(S3のYES)、金属粒子などを捕捉した精密ろ過膜装置27を超純水製造装置10から撤去(分離)する(S4)。具体的には、送水を停止した後、配管32a(分岐流路32)上の開閉弁34、35を閉じる。さらに、図3に示すように、継手41、42を介して、配管32aと共に仮置きの精密ろ過膜装置27の取り外しを行う。
 精密ろ過膜装置27を撤去した後、開閉弁33を開くとともに、前処理部12、一次純水製造部14及び二次純水製造部18内の各装置を稼働状態にし、さらに循環ライン31bを含む流路31に沿った送水(前処理部12への原水の供給)を開始して、水処理系15による水処理を実施する(S5)。なお、撤去するステップ(S4)と水処理を実施するステップ(S5)との操作の間、送水を停止せずに洗浄を行うことも可能である。その場合、開閉弁33を開き、同時に、もしくは、しかる後、開閉弁34、35を閉じる。そして、精密ろ過膜装置27の取り外しを行えばよい。この水処理は、先に例示した所期の製造スペック内に収まる超純水が得られる(超純水の水質がスペックインする)まで、継続される(S6)。この際、二次純水(超純水)中の粒子の粒径が製造スペック内であるか否かについては、微粒子計29によって計測される。この後、製造スペック内に収まる超純水が得られた場合(S6のYES)、超純水製造装置10の立ち上げが完了となる(S7)。
 ここで、本実施形態の超純水製造装置10の立ち上げ方法では、限外ろ過膜装置28の前段(直前)に精密ろ過膜装置27を設置した状態で水処理系15内の洗浄を開始し、所定の期間経過後に、例えば金属粒子や砂などを捕捉した精密ろ過膜装置27を、超純水製造装置10から撤去(分離)したうえで、水処理を実施するので、水処理系15内から上記した金属粒子や砂などを取り去ることができる。したがって、本実施形態の超純水製造装置10の立ち上げ方法によれば、水処理系15内に存在し得る例えば砂や金属粒子の成分の溶出などが続き、超純水の水質が低下したままの状態になることなどを回避できる。すなわち、精密ろ過膜装置27の撤去後の水処理では、所期の製造スペック内に収まる超純水が迅速に得られ、これにより、超純水製造装置10の立ち上げ期間を短縮することができる。
 なお、本操作のいずれかの段階で、過酸化水素等による二次純水製造部18内の殺菌操作を行うことが可能である。この場合、ポリッシャ26、及び/もしくは、限外ろ過膜装置28をバイパスするライン(図示していない)を用いて、ポリッシャ26、及び/もしくは、限外ろ過膜装置28を系(水処理系15)から外し、二次純水製造部18のいずれか、例えば、タンク16、もしくはポンプ22の吸入側に設けられた分岐バルブを用いて、系内に過酸化水素を添加する。しかる後、所定時間循環を行なう。十分な殺菌処理が行われた後、過酸化水素水をいずれかの場所から排水する。系内の過酸化水素がなくなった後、ポリッシャ26及び/もしくは、限外ろ過膜装置28のバイパスを行うことを停止する。
 また、本発明の超純水製造装置の立ち上げ方法において、イオン交換樹脂をポリッシャ26本体内に充填していない状態でポリッシャ26を含めた水処理系15の洗浄を行い、いずれかの段階で洗浄操作を止めてポリッシャ26本体内にイオン交換樹脂を充填するようにしてもよい。
 さらに、以上の操作は、ユースポイント20を含む循環ライン31bを適用して説明したが、図5に示すように、ユースポイント20をバイパスした循環ライン31cを用いることも可能である。その場合には、いずれかの段階で、循環ライン内にユースポイント20を含ませる操作をすることになる。なお、より立ち上がりの時間を短縮するためには、ユースポイント20を含んだ循環ライン31bでの立ち上げ方法を選択することが好ましい。
 また、サークルポンプ22による給水を補足するために、図5に示すように、ポリッシャ26と継手36との間にブースタポンプ43を設けてもよい。このようなブースタポンプ43は、図2、図3に例示した二次純水製造部や、後述する図6に示す二次純水製造部に、追加することも可能である。
 一方、超純水製造装置10の装置構成に対して、上述したような仮置きのフィルタ装置(精密ろ過膜装置27)を備えていない超純水製造装置を用い、洗浄水による洗浄を行ったうえで、水処理を実施した場合、このような洗浄及び水処理を例えば4カ月の期間、継続したとしても、製造スペック内に収まる超純水が得られないことが検証されている。この場合、限外ろ過膜装置28内の中空糸型モジュールに金属粉や砂などが捕捉されたままの状態となっており、捕捉された異物が時間とともに粉砕され後段に流出することが原因で製造スペック内に収まらなかったのである。そこで、限外ろ過膜装置28内の全ての中空糸型モジュールを新品と交換して再度の水処理を実施したことで、ようやく製造スペック内に収まる超純水が得られた。
 また、超純水製造装置10と同じ装置構成の超純水製造装置を用い、精密ろ過膜装置27を取り付けた状態のまま、洗浄水による洗浄、及び水処理も実施した場合、このような洗浄及び水処理を例えば3カ月の期間、継続したとしても、製造スペック内に収まる超純水が得られないことが検証されている。この場合、精密ろ過膜装置27内に例えば目視可能なサイズの金属粉や砂などが捕捉されており、精密ろ過膜装置27を撤去した後、再度の水処理を実施したことで、ようやく製造スペック内に収まる超純水が得られた。
 これに対して、本実施形態の超純水製造装置10の立ち上げ方法によれば、精密ろ過膜装置27を設置した状態で、過酸化水素を含む洗浄液を用いた洗浄を1週間行った後、超純水製造装置10から、例えば金属粒子や砂などを捕捉した精密ろ過膜装置27を、撤去したうえで、水処理を実施することで、直ちに、製造スペック内に収まる超純水が得られたことが検証されている。
 既述したように、本実施形態の超純水製造装置10の立ち上げ方法(及びこの立ち上げ方法を適用可能な超純水製造装置10)によれば、仮置きのフィルタ装置(精密ろ過膜装置27)及びフィルタ着脱機構30を有効に活用した洗浄及び水処理を実施することで、超純水製造装置10の立ち上げ期間の短縮化を図ることができる。なお、図3に示したフィルタ着脱機構30に代えて、図6に示すように、フィルタ着脱機構40を超純水製造装置及びその立ち上げ方法に適用することも可能である。このフィルタ着脱機構40の場合、開閉弁34、35を閉じた後、継手36、37を介して、開閉弁34、35と共に、配管32(分岐流路32a)及び精密ろ過膜装置27が撤去(分離)される。開閉弁34、35及び配管32aと共に仮置きの精密ろ過膜装置27を、超純水製造装置10から撤去した後には、継手36、37における配管32aを取り付けていた部位に、例えば閉塞プラグ(止め栓)38、39などが取り付けられることになる。
 以上、本発明を実施の形態により具体的に説明したが、本発明は、この実施形態そのままに限定されるものではなく、実施段階ではその要旨を逸脱しない範囲で種々変更可能である。例えば、実施形態に示される全構成要素からいくつかの構成要素を削除してもよいし、上記実施形態に開示した複数の構成要素を適宜組み合わせることも可能である。
 10…超純水製造装置、12…前処理部、14…一次純水製造部、15…水処理系、16…タンク(TK)、18…二次純水製造部、20…ユースポイント(POU)、22…サークルポンプ、23…熱交換器(HEX)、24…紫外線酸化装置(TOC-UV)、25…膜脱気装置(MDG)、26…ポリッシャ、27…精密ろ過膜装置(MF)、28…限外ろ過膜装置(UF)、29…微粒子計、30,40…フィルタ着脱機構、31…流路、31a…配管(第1の配管)、31b,31c…循環ライン、32…分岐流路、32a…配管(第2の配管)、33…開閉弁(第1の開閉弁)、34,35……開閉弁(第2の開閉弁)、36,37,41,42…継手、38,39…閉塞プラグ。

Claims (13)

  1.  被処理水を流すための流路と、前記流路上に設けられ、前記被処理水をユースポイントの前段で水処理する限外ろ過膜装置と、を少なくとも含む水処理系を備えた超純水製造装置の立ち上げ方法であって、
     前記流路上における前記限外ろ過膜装置の前段に、仮置きのフィルタ装置を設置する工程と、
     前記仮置きのフィルタ装置の設置後に、前記流路に沿って送水を開始することにより前記水処理系を洗浄する工程と、
     前記送水による洗浄の開始から所定の期間経過後に、前記仮置きのフィルタ装置を前記超純水製造装置から分離する工程と、
     を有する超純水製造装置の立ち上げ方法。
  2.  前記洗浄は、殺菌処理を含む、
     請求項1に記載の超純水製造装置の立ち上げ方法。
  3.  前記分離する工程の後、前記流路に沿った送水を開始し所期の製造スペック内に収まる超純水が得られるまで水処理を行う工程、
     をさらに有する請求項1又は2に記載の超純水製造装置の立ち上げ方法。
  4.  前記超純水製造装置は、前記流路上における前記仮置きのフィルタ装置の上流側にタンクをさらに備え、
     前記流路は、前記限外ろ過膜装置を通過した後、前記タンクに戻る循環ラインを有し、
     前記洗浄において、前記送水された水を前記循環ラインに循環させる、
     請求項1から3までのいずれか1項に記載の超純水製造装置の立ち上げ方法。
  5.  前記所定の期間は、前記洗浄の開始に伴い、前記循環ライン内の水量と流量から計算される循環回数が、0.5~2200回となる期間である、
     請求項4に記載の超純水製造装置の立ち上げ方法。
  6.  前記仮置きのフィルタ装置は、0.2μm以上の粒子を分離するろ過精度を有する、
     請求項1から5までのいずれか1項に記載の超純水製造装置の立ち上げ方法。
  7.  前記限外ろ過膜装置は、複数の中空糸型モジュールを有し、
     前記中空糸型モジュールの1つあたりの通水流量は、10m3/h以上である、
     請求項1から6までのいずれか1項に記載の超純水製造装置の立ち上げ方法。
  8.  所期の製造スペック内に収まる超純水は、粒子径50nm以上の粒子の数が200個/L以下である、
     請求項1から7までのいずれか1項に記載の超純水製造装置の立ち上げ方法。
  9.  被処理水を流すための流路と、
     前記流路上に設けられ、前記被処理水をユースポイントの前段で水処理する限外ろ過膜装置と、
     前記流路上における前記限外ろ過膜装置の前段に設けられ、前記流路に対して仮置きのフィルタ装置の着脱を可能にするフィルタ着脱機構と、
     を備える超純水製造装置。
  10.  前記仮置きのフィルタ装置は、精密ろ過膜装置である、
     請求項9に記載の超純水製造装置。
  11.  前記流路は、第1の配管で構成され、
     前記フィルタ着脱機構は、
     前記流路から一旦分岐すると共に前記仮置きのフィルタ装置を経由しつつ前記流路の下流側で合流する分岐流路を構成した第2の配管を、前記第1の配管に対して、取り外し可能に接続する複数の継手と、
     前記第1の配管における前記分岐の位置と前記合流の位置との間に設けられた第1の開閉弁と、
     を備える請求項9又は10に記載の超純水製造装置。
  12.  前記第2の配管上には、前記仮置きのフィルタ装置の前後に一対の第2の開閉弁がそれぞれ設けられている、
     請求項11に記載の超純水製造装置。
  13.  前記流路上における前記仮置きのフィルタ装置の上流側にタンクをさらに備え、
     前記流路は、前記限外ろ過膜装置を通過した後、前記タンクに戻る循環ラインを有する、請求項9から12までのいずれか1項に記載の超純水製造装置。
PCT/JP2019/044156 2018-11-22 2019-11-11 超純水製造装置の立ち上げ方法及び超純水製造装置 WO2020105494A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
KR1020217006613A KR20210091115A (ko) 2018-11-22 2019-11-11 초순수 제조 장치의 기동 방법 및 초순수 제조 장치
CN201980063396.5A CN112770825B (zh) 2018-11-22 2019-11-11 超纯水制造装置的启动方法以及超纯水制造装置

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2018-219467 2018-11-22
JP2018219467A JP7171386B2 (ja) 2018-11-22 2018-11-22 超純水製造装置の立ち上げ方法及び超純水製造装置

Publications (1)

Publication Number Publication Date
WO2020105494A1 true WO2020105494A1 (ja) 2020-05-28

Family

ID=70773693

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/044156 WO2020105494A1 (ja) 2018-11-22 2019-11-11 超純水製造装置の立ち上げ方法及び超純水製造装置

Country Status (4)

Country Link
JP (1) JP7171386B2 (ja)
KR (1) KR20210091115A (ja)
CN (1) CN112770825B (ja)
WO (1) WO2020105494A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7033691B1 (ja) 2021-10-29 2022-03-10 野村マイクロ・サイエンス株式会社 温超純水製造システムの立ち上げ方法、立ち上げプログラム、及び温超純水製造システム

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003010849A (ja) * 2001-07-02 2003-01-14 Kurita Water Ind Ltd 二次純水製造装置
JP2014217830A (ja) * 2013-04-11 2014-11-20 栗田工業株式会社 超純水製造システム及び超純水製造供給システム
JP2018144014A (ja) * 2017-03-09 2018-09-20 オルガノ株式会社 中空糸膜装置の洗浄方法、限外ろ過膜装置、超純水製造装置及び中空糸膜装置の洗浄装置

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2960258B2 (ja) * 1992-07-03 1999-10-06 オルガノ株式会社 超純水製造装置
JP4661009B2 (ja) * 2001-09-04 2011-03-30 栗田工業株式会社 超純水製造システム
JP4480061B2 (ja) 2002-10-03 2010-06-16 オルガノ株式会社 超純水製造装置及び該装置における超純水製造供給システムの洗浄方法
JP4034668B2 (ja) * 2003-03-04 2008-01-16 オルガノ株式会社 超純水製造システムおよびその運転方法
JP5733482B1 (ja) * 2013-07-24 2015-06-10 栗田工業株式会社 超純水製造供給システム及びその洗浄方法
KR102092441B1 (ko) * 2013-10-04 2020-03-23 쿠리타 고교 가부시키가이샤 초순수 제조 장치

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003010849A (ja) * 2001-07-02 2003-01-14 Kurita Water Ind Ltd 二次純水製造装置
JP2014217830A (ja) * 2013-04-11 2014-11-20 栗田工業株式会社 超純水製造システム及び超純水製造供給システム
JP2018144014A (ja) * 2017-03-09 2018-09-20 オルガノ株式会社 中空糸膜装置の洗浄方法、限外ろ過膜装置、超純水製造装置及び中空糸膜装置の洗浄装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7033691B1 (ja) 2021-10-29 2022-03-10 野村マイクロ・サイエンス株式会社 温超純水製造システムの立ち上げ方法、立ち上げプログラム、及び温超純水製造システム
JP2023066522A (ja) * 2021-10-29 2023-05-16 野村マイクロ・サイエンス株式会社 温超純水製造システムの立ち上げ方法、立ち上げプログラム、及び温超純水製造システム
US11926536B2 (en) 2021-10-29 2024-03-12 Nomura Micro Science Co., Ltd. Method for starting up hot ultrapure water production system, and hot ultrapure water production system

Also Published As

Publication number Publication date
TW202039065A (zh) 2020-11-01
JP2020081957A (ja) 2020-06-04
KR20210091115A (ko) 2021-07-21
JP7171386B2 (ja) 2022-11-15
CN112770825B (zh) 2023-05-12
CN112770825A (zh) 2021-05-07

Similar Documents

Publication Publication Date Title
KR102092441B1 (ko) 초순수 제조 장치
KR102027026B1 (ko) 초순수 제조 시스템, 초순수 제조 공급 시스템 및 그 세정 방법
JP6225487B2 (ja) 超純水製造システム及び超純水製造供給システム
JP6350719B2 (ja) 超純水製造装置
WO2018051551A1 (ja) 超純水製造装置
KR20190005843A (ko) 초순수 제조 장치의 기동 방법
JP5293551B2 (ja) 水処理システム
WO2020105494A1 (ja) 超純水製造装置の立ち上げ方法及び超純水製造装置
JP2005000828A (ja) 純水製造装置
JP5962135B2 (ja) 超純水製造装置
JP5915295B2 (ja) 純水製造方法
TWI851623B (zh) 超純水製造裝置之啟動方法及超純水製造裝置
JP2018038943A (ja) 非再生型イオン交換樹脂の洗浄装置及び超純水製造システム
JP3985500B2 (ja) 超純水供給方法
JP2013252505A (ja) 透析用水製造装置
KR20210145125A (ko) 막 탈기 장치의 세정 방법 및 초순수 제조 시스템
KR101334651B1 (ko) 저류조가 없는 정수처리장치 및 이를 이용한 정수처리방법
JP5319583B2 (ja) 膜ろ過装置の逆洗方法
JP6981331B2 (ja) 超純水供給装置
JP2020037088A (ja) 超純水製造装置の運転方法
KR102549174B1 (ko) 한외여과막 모듈의 세정 방법 및 이를 이용한 초순수 제조 시스템의 관리 방법
JP7109505B2 (ja) 超純水製造装置
WO2024024158A1 (ja) 水処理システムおよび水処理システムの運転方法
WO2020241476A1 (ja) 超純水製造システム及び超純水製造方法
JP6897392B2 (ja) 超純水製造装置の運転方法及び超純水製造装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19887827

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19887827

Country of ref document: EP

Kind code of ref document: A1