WO2020066466A1 - 格子状体の施工方法 - Google Patents

格子状体の施工方法 Download PDF

Info

Publication number
WO2020066466A1
WO2020066466A1 PCT/JP2019/034313 JP2019034313W WO2020066466A1 WO 2020066466 A1 WO2020066466 A1 WO 2020066466A1 JP 2019034313 W JP2019034313 W JP 2019034313W WO 2020066466 A1 WO2020066466 A1 WO 2020066466A1
Authority
WO
WIPO (PCT)
Prior art keywords
lattice
fixing
wire mesh
grid
vertical
Prior art date
Application number
PCT/JP2019/034313
Other languages
English (en)
French (fr)
Inventor
一 米澤
Original Assignee
ライズバレー株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2019058279A external-priority patent/JP7356693B2/ja
Application filed by ライズバレー株式会社 filed Critical ライズバレー株式会社
Publication of WO2020066466A1 publication Critical patent/WO2020066466A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/36Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
    • E04B5/38Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
    • E04B5/40Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element with metal form-slabs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/16Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
    • E04C5/18Spacers of metal or substantially of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/20Clips, i.e. with gripping action effected solely by the inherent resistance to deformation of the material of the fastening
    • F16B2/22Clips, i.e. with gripping action effected solely by the inherent resistance to deformation of the material of the fastening of resilient material, e.g. rubbery material
    • F16B2/24Clips, i.e. with gripping action effected solely by the inherent resistance to deformation of the material of the fastening of resilient material, e.g. rubbery material of metal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/04Clamping or clipping connections
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/22Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections using hooks or like elements

Definitions

  • the present invention relates to a method for constructing a plurality of lattice-like members, such as a welded wire mesh or a net-like fence buried in concrete, in which vertical and horizontal members are arranged in a lattice.
  • FIG. 32 is an explanatory view for explaining a conventional method of constructing a welding wire mesh, in which WM is a welding wire mesh.
  • the welding wire mesh WM is composed of a plurality of vertical strips W1, W1,... And horizontal strips W2, W2,. Are fixed to each other by welding.
  • a not-shown formwork is erected around the construction target area, and a plurality of welded metal meshes WM, WM,... Are laid all over the formwork.
  • the edges of the adjacent welded metal meshes WM, WM overlap each other by a plurality of meshes (the first mesh in FIG. 32).
  • the welding wire meshes WM, WM,... are lifted in order, and spacers 30, 30,... Such as blocks are interposed between the construction target surface and the welding wire meshes WM, WM,.
  • the welding wire meshes WM, WM,... are placed on the spacers 30, 30,. In this manner, by supporting the welded meshes WM, WM,... On the spacers 30, 30,..., The welded meshes WM, WM,.
  • WM for example, a short wire such as a wire is used.
  • a short wire such as a wire is used.
  • the binding members B, B,... are bound together by the binding members B, B,... Using the strip members.
  • concrete is poured into the formwork to a predetermined depth at which the welding meshes WM, WM,. Level the surface.
  • Patent Literature 1 described below includes a plurality of horizontal members made of steel bars for reinforced concrete and a plurality of vertical members formed by forming a synthetic resin material or a metal material into a string shape or a strip shape.
  • a pre-assembled wire mesh connected in the form of a blind has been proposed.
  • the edges of adjacent wire meshes are overlapped with each other, and the overlapped portions of both wire meshes are bound together.
  • the area of the wire mesh is larger than that of the above-described welded wire mesh WM, it is bound. The number of locations is small, so that the time required for the binding operation can be reduced.
  • the wire mesh can be wound in a roll around an axis parallel to the central axis of the horizontal member, the wire mesh can be easily transported, and the wire mesh formed into a roll at the laying place is provided. , The wire mesh can be deployed and laid in the laying area, so that the laying operation can be performed more efficiently than when the above-described welded wire meshes WM, WM,.
  • FIG. 33 is a perspective view showing the manner of using the spacer disclosed in Patent Document 2.
  • the spacer 131 is formed by bending a metal wire having a diameter of about 5 to 6 mm, and is formed between two rising portions 131c, 131c rising up at a predetermined distance, and both rising portions 131c, 131c.
  • the iron wire support 131g has lower horizontal parts 131d, 131d extending horizontally from the upper ends of both rising parts 131c, 131c, and arc-shaped parts that are curved and rise from the lower horizontal parts 131d, 131d, respectively. It has a part 131e, 131e, and a horizontal upper side part 131f that connects between upper ends of both arc-shaped parts 131e, 131e, and has a flat spiral shape in side view.
  • the inner dimension between the lower side portions 131d, 131d and the upper side portion 131f is larger than the outer diameter of the iron wire forming the welded wire mesh.
  • the welding wire mesh WM laid on the deck plate DP is lifted, and the iron wire forming the welding wire mesh WM is inserted into the spiral iron wire support portion 131g, and in this state, the welding is performed.
  • the mounting portions 131b, 131b of the spacer 131 are brought into contact with the deck plate DP, and the spacer 131 is made to stand on the deck plate DP.
  • the iron wire inserted into the iron wire support portion 131g is carried on both lower lateral portions 131d of the spacer 131.
  • the iron wire inserted into the iron wire support portion 131g of the spacer 131 has both lower sideways 131d, 131d.
  • the portion where the spacer 131 was attached to the welding wire mesh WM had to be lifted again, and the spacer 131 had to be readjusted.
  • the present invention has been made in view of such circumstances, and a method capable of reliably performing a plurality of grid-like bodies in a short time without imposing heavy labor on workers, even for inexperienced workers. I will provide a.
  • the method of constructing a lattice-like body according to the present invention comprises joining a portion where a plurality of vertical members and a plurality of horizontal members arranged in a lattice form intersect, and forming each vertical member and each horizontal member.
  • One or a plurality of fixtures each having a fixing portion for fixing to the one lattice-like body and a coupling means for coupling the vertical streak member or the horizontal stripe member of the other lattice-like body, each lattice-like Fixed at a predetermined position on the edge of the body, and in accordance with the arrangement order, on the edge of one lattice-shaped body arranged at the corresponding arrangement position According to the arrangement order, the edge of another lattice-like
  • the intersection of a plurality of vertical members and a plurality of horizontal members arranged in a lattice shape are joined, and each vertical member and each horizontal member are joined.
  • Construction of the lattice is performed on the construction target surface, an arrangement position, which is a position where each lattice is arranged, and an arrangement order, which is an arrangement order of each lattice, are determined in advance.
  • the builder who is the worker only has to arrange each of the lattices in a predetermined arrangement position in a predetermined arrangement order, and even an inexperienced builder can quickly move the plurality of lattices in a short time. Can be arranged reliably.
  • the installer since the predetermined arrangement position and arrangement order of the lattices are acquired as the construction plan, the installer sets each lattice in a predetermined arrangement position according to the construction plan, and is determined in advance. Arrange them in the arrangement order.
  • the fixing device has a fixing portion for fixing to the one grid-like body and a connecting means for connecting the vertical or horizontal members of the other grid-like body.
  • Use multiple fixtures That is, on the construction target surface, the two adjacent grid-like bodies are constructed so that their edges overlap each other, but relatively lower than the one lattice-like body arranged first on the construction target surface.
  • One or a plurality of fixing tools are fixed to predetermined positions of the edge portion using the fixing parts provided on each fixing tool.
  • Each of these fixtures is provided with a connecting means for connecting a vertical or horizontal member constituting another lattice-like body superimposed on the edge of the one lattice-like body.
  • an edge of another lattice-like body arranged at the corresponding arrangement position is superimposed on an edge of one lattice-like body arranged at the corresponding arrangement position according to the arrangement order.
  • the other lattice is fixed to the coupling means of one or more fixing devices fixed to the edge of one lattice.
  • the lattice members are fixed by connecting the vertical or horizontal members of the members.
  • the edge of the other grid-like body is superimposed on the edge of one grid-like body to which the fixture is fixed, and pressure is applied to the edge of the other grid-like body.
  • the two lattices can be connected and fixed with one touch. Since the binding work as in the past is unnecessary, even if an inexperienced constructor can construct a plurality of lattice-shaped bodies in a short time without imposing heavy labor on the constructor.
  • each time the corresponding other lattice-like body is arranged at the arrangement position by applying a pressure to the edge of the other lattice-like body, one lattice-like body arranged earlier and Since the connection can be fixed with one touch, the construction work can be made as efficient as possible.
  • the method of constructing a lattice according to the present invention is characterized in that when determining the arrangement order, the front and back of the lattice are determined.
  • the front and back of the lattice are determined.
  • the table shows the case where each vertical strip of the lattice is on the upper side and each horizontal strip is on the lower side, and vice versa, that is, each vertical strip of the lattice is on the lower side and each horizontal strip is on the lower side.
  • the strip material is on the upper side is the back, one grid-like body is arranged in the front state, and the other grid-like body is arranged in the back state. Since the members are arranged so as to be able to oppose each other, the two grids can be arranged so that they are adjacent to each other in the same plane.
  • the constructor arranges each lattice-shaped body according to the construction plan so as to have a predetermined front and back.
  • the front lattice and the back lattice are alternately arranged in the row direction of the construction surface, and in the column direction of the construction surface. Place the same grid on the front and back, or alternate the grid on the back and the grid on the back in the row direction of the construction surface, and in the row direction on the construction surface, the front and back are the same It is characterized in that a lattice is arranged.
  • each vertical strip of the lattice is the upper side and each horizontal strip is the lower side.
  • Each vertical strip of the lattice is the lower side, and each horizontal strip is the upper side. If the back is the case, and when the two grids adjacent to each other in the row direction are arranged in the order of the front and back, each vertical strip of both the grids is arranged so as to be able to face each other. Both grids can be arranged next to each other in the same plane.
  • both the grids adjacent to each other in the row direction are arranged in the order of front and back, the horizontal members of both the grids are arranged so as to be able to face each other, and they are mutually aligned in the same plane. Both grids can be arranged next to each other. Thereby, the thickness of the portion where one lattice-like body and another lattice-like body are overlapped can be made as small as possible.
  • the front and back lattices are alternately arranged in the column direction of the construction target surface, and the same front and back lattices are arranged in the row direction of the construction target surface.
  • the vertical members of both the grids are arranged so as to be able to face each other.
  • the two grids can be arranged next to each other in the interior.
  • the horizontal members of both the grid members are arranged so as to be able to face each other, and therefore they are mutually aligned in the same plane.
  • Both grids can be arranged next to each other. Thereby, the thickness of the portion where one lattice-like body and another lattice-like body are overlapped can be made as small as possible.
  • the constructor arranges each lattice-like body so as to have a predetermined front and back according to the construction plan.
  • each lattice is determined based on a design drawing of a building relating to the construction target surface when the arrangement position is determined, and the determined shape is determined. It is characterized in that each lattice is processed in advance.
  • each lattice corresponding to the arrangement position is determined based on the design drawing of the building relating to the construction target surface. Then, each lattice is processed into a determined shape. As a result, it is possible to obtain a lattice-like body having a shape corresponding to the design drawing, and it is possible to perform the work of constructing each lattice-like body in a shorter time.
  • the constructor processes each lattice so that the shape conforms to the construction plan.
  • the one lattice and the other lattice may be arranged such that the positions of the two meshes facing the construction target surface are different from each other. It is characterized by being superimposed.
  • one lattice and another lattice are arranged such that the positions of both meshes facing the construction target surface are, for example, 1.5 positions each other. Are superimposed so that they are different from each other. This makes it possible to reduce the overlapping region of the adjacent structural strengths while maintaining a high coupling strength, so that the loss of the lattice can be reduced as much as possible.
  • the constructor constructs each lattice according to the construction plan.
  • the fixing tool a pair of fixing portions for fixing to adjacent vertical members or adjacent horizontal members of one lattice member, respectively.
  • the coupling means uses a fixing tool disposed in a region between the pair of fixing portions.
  • the fixing tool includes a pair of fixing portions for fixing the adjacent grid member or the adjacent horizontal member of the one lattice-shaped body described above, respectively.
  • Coupling means are arranged in the area between the fixing parts.
  • the fixing tool includes a pair of fixing portions for fixing the adjacent grid member or the adjacent horizontal member of the one lattice-shaped body described above, respectively.
  • Coupling means are arranged in the area between the fixing parts.
  • the fixing tool arranged at the edge of one lattice adjacent to the row direction may include a pair of fixing portions adjacent to the lattice adjacent to the lattice.
  • the vertical members of another grid-like body adjacent in the row direction are connected, and the edge of one grid-like body adjacent in the column direction.
  • the fixtures arranged in the fixing means fix the pair of fixing portions to the adjacent horizontal members of the lattice-shaped body, respectively, and connect the fixing means to the coupling means of the other fixtures of the other lattice-shaped bodies adjacent in the row direction. It is characterized by joining horizontal members.
  • the fixtures arranged at the edges of one lattice adjacent to each other in the row direction have a pair of fixing portions adjacent to the lattice.
  • Each of the fixing members is fixed to the vertical members, and the connecting members of the fixing device are connected to the vertical members of another lattice-like body adjacent to each other in the row direction. This prevents the two lattice-like bodies from sliding with each other in the row direction.
  • the fixtures arranged at the edge of one grid-like body adjacent in the row direction fix the pair of fixing portions to the adjacent horizontal members of the grid-like body, respectively.
  • the connecting means is connected to the horizontal members of another lattice-like body adjacent in the row direction. This prevents the two lattice-like bodies from sliding with each other in the column direction. Therefore, each lattice-like body constructed on the construction target surface is prevented from mutually sliding in the row direction and the column direction as a whole.
  • the installer attaches the fixture to each lattice-like body according to the construction plan.
  • a first fixing tool configured to hold the coupling means at a position relatively close to a construction target surface
  • a second fixing device provided with legs for holding the coupling means at a position relatively separated from the construction target surface, and a deck plate provided with ridge-shaped peaks and valleys is used as the construction target surface.
  • the first fixture is disposed at a position facing the crest of the deck plate in the lattice-like body disposed on the deck plate, and faces the valley of the deck plate.
  • the second fixing device is arranged at a position.
  • a first fixing tool configured to hold the coupling means at a position relatively near the construction target surface;
  • a second fixing tool provided with a leg for holding at a position relatively separated from the construction target surface.
  • the lattice-like body as a whole can be carried substantially parallel to the construction target surface. it can.
  • the builder attaches the first fixture or the second fixture to each lattice-like body according to the construction plan. Attach the fixings.
  • the one lattice and the other lattice may be arranged such that the positions of the two meshes facing the construction target surface are substantially the same. It is characterized by being superimposed.
  • one lattice and another lattice are superimposed so that the positions of the two meshes facing the construction target surface substantially coincide with each other.
  • substantially coincide means not only that the positions of the two meshes match, but also that the positions of the two meshes differ by one vertical or horizontal member, that is, the vertical of the two lattice-shaped members. It also includes the case where the strips or the cross strips are overlapped so as to be adjacent to each other in the same plane.
  • a fixing member a pair of fixing portions for fixing to adjacent vertical or horizontal stripes of one lattice-shaped member, respectively.
  • a fixture having a pair of coupling means for coupling adjacent vertical or horizontal stripes of another superposed lattice-like body is used. Accordingly, as described above, even with the construction method in which the edge of another lattice is superimposed on the edge of one lattice so that two meshes coincide with each other, the two lattices can be formed with one touch. It is possible to connect and fix the shaped bodies, and without imposing heavy labor on the constructor, even an inexperienced constructor can surely construct a plurality of lattice-shaped bodies in a short time.
  • two pairs of fixing portions are arranged parallel to each other at a distance, and two pairs of coupling means are provided inside the pair of fixing portions.
  • the fixture is attached to the adjacent vertical or horizontal strips of one lattice-like body, and the two fixing portions of the fixture parallel to each other intersect the vertical and horizontal strips. It is fixed so as to straddle the intersection, and between the pair of connecting means arranged in parallel, the vertical member of one lattice-like member and the vertical member of the other lattice-like member are fitted in parallel with each other.
  • the horizontal strut of one lattice-like material and the horizontal strut of another lattice-like material are fitted in a state of being arranged.
  • two pairs of fixing portions are arranged in parallel with each other at a distance, and two pairs of coupling means extend the distance inside the pair of fixing portions.
  • a fixing member arranged in parallel with each other at a distance so that two vertical members or two horizontal members can be inserted side by side between a pair of connecting means arranged in parallel. Use a tool.
  • the fixing tool is attached to adjacent vertical or horizontal strips of one lattice-like body, and both fixing portions of the fixing tool opposing in parallel straddle an intersection where the vertical and horizontal strips intersect. So that the longitudinal members of one lattice and the longitudinal members of another lattice are arranged and fitted between the pair of connecting means arranged in parallel, or one lattice. The horizontal members of the body and the horizontal members of the other lattice-like body are inserted side by side. As a result, the two grids are prevented from sliding with each other in the row direction and the column direction.
  • a third fixing tool configured to hold the coupling means at a position relatively close to the construction target surface;
  • a fourth fixing tool provided with a leg portion for holding the position at a position relatively separated from the construction target surface.
  • the lattice-like body as a whole can be carried substantially parallel to the construction target surface. it can.
  • the builder since the attachment position of the third fixture and the fourth fixture to each lattice-like body is acquired as a construction plan, the builder attaches the third fixture or the fourth fixture to each lattice-like body according to the construction plan. Attach the fixings.
  • the method for constructing a lattice according to the present invention is a spacer comprising: a fixing portion for fixing the lattice to the lattice; and a supporting portion for retaining the lattice at a position away from the construction target surface. , And a plurality of spacers are attached at an appropriate distance from each other in an area other than the area where adjacent grids of each grid are superimposed.
  • a spacer having a fixing portion for fixing the lattice to the lattice and a supporting portion for supporting the lattice at a position separated from the construction target surface is used. . Then, a plurality of spacers are attached at an appropriate distance from each other in a region other than the region where the adjacent lattices of each lattice are overlapped. Thereby, each grid-like body can be supported as a whole substantially in parallel with the construction target surface.
  • the installer attaches the spacer to each lattice according to the construction plan.
  • the method of constructing a lattice-shaped body according to the present invention comprises joining a portion where a plurality of vertical struts and a plurality of horizontal striations arranged in a lattice form intersect, and forming each vertical strut and each horizontal striation.
  • a method for constructing a lattice-like body for constructing a plurality of lattice-like bodies wherein a placement position, which is a position where each lattice-like body is placed, a shape of the lattice-like body to be placed at each placement position, is related to the construction target surface Determined based on the design drawing of the building, respectively, and also determine the arrangement order, which is the order of arranging each lattice, and the front and back of the lattice arranged at each arrangement position.
  • the fixing part for fixing to the lattice-like body and the vertical or horizontal member of the other lattice-like body are combined. And a fixing portion for fixing the lattice-shaped body to the grid-like body, and a holding portion for supporting the grid-like body at a position separated from the construction target surface.
  • For each type of spacer determine the position to be fixed at the predetermined position of the edge of each lattice, the mounting direction to be attached to the lattice, and the type to be attached to the position, and obtain the construction plan in advance.
  • a plurality of grids are processed, fixing tools and spacers corresponding to each of the processed grids are attached, and each of the grids to which they are attached is applied according to the arrangement order.
  • the edge of one lattice-like body arranged at the arrangement position On the edge of one lattice-like body arranged at the arrangement position, the edge of another lattice-like body arranged at the corresponding arrangement position is superimposed according to the arrangement order, and then the other lattice superimposed.
  • the vertical or horizontal members of the other grid-like body are connected to the connecting means of one or a plurality of fasteners fixed to the edge of one grid-like body. It is characterized in that the lattice is fixed.
  • the intersection of a plurality of vertical members and a plurality of horizontal members arranged in a lattice shape are joined, and each vertical member and each horizontal member are joined.
  • each vertical member and each horizontal member are joined.
  • the construction plan is determined based on the design position of each lattice-shaped body, the shape of the lattice-shaped body arranged at each arrangement position, based on the design drawing of the building related to the construction target surface.
  • the layout is determined by determining the arrangement order, which is the order in which the lattices are arranged, and the front and back sides of the lattices arranged at each arrangement position.
  • a fixing part for fixing the lattice-like body to one lattice-like body, and a vertical part of the other lattice-like body in order to fix one lattice-like body and another lattice-like body to each other, a fixing part for fixing the lattice-like body to one lattice-like body, and a vertical part of the other lattice-like body.
  • a plurality of types of fixing tools having a joining means for joining the strip material or the horizontal strip material
  • a plurality of types of spacers including a fixing portion for fixing and a supporting portion for supporting the lattice at a position separated from the construction target surface are used. For these, a predetermined position of the edge of each lattice is used. The position to be fixed to the grid, the mounting direction to be mounted on the lattice, and the type to be mounted at the position are respectively determined and included in the construction plan.
  • the constructor processes a plurality of lattices, attaches a fixing tool and a spacer corresponding to each of the processed lattices, and places each lattice attached with them in the arrangement order. Accordingly, on the edge of one lattice-like body arranged at the corresponding arrangement position, the edge of another lattice-like body arranged at the corresponding arrangement position is superimposed according to the arrangement order, and then, By applying a pressure to the edge of the other lattice-shaped body, the connecting means of one or more fixing members fixed to the edge of one lattice-like body is connected to the vertical stripe of the other lattice-shaped body.
  • the two grid members are fixed by joining the members or cross members.
  • the constructor only has to carry out the construction of each lattice according to the construction plan, and even an inexperienced constructor can construct a plurality of lattices in a short time.
  • the edge of the other grid-like body is superimposed on the edge of one grid-like body to which the fixture is fixed, and pressure is applied only to the edge of the other grid-like body.
  • the two grids can be connected and fixed with a single touch, eliminating the need for conventional bundling work, and without requiring the builder to perform heavy labor. Work can be done reliably in time.
  • FIG. 4 is a plan view showing one of the welding meshes of FIG. 3. It is explanatory drawing explaining an example of the construction design drawing which determined the order of constructing a welding wire mesh, the front and back of each welding wire mesh, and the attachment position and attachment direction of a fixture and a spacer.
  • FIG. 6 is an explanatory diagram for simplifying and explaining the order of applying the welding wire mesh shown in FIG. 5 and the front and back of each welder.
  • FIG. 13 is a partially enlarged perspective view showing a state in which both welding metal meshes are fixed to each other by the first fixture shown in FIG. 12.
  • FIG. 9 is a partial side view of the first fixing tool shown in FIG. 8 and a welding wire mesh fixed by the first fixing tool.
  • FIG. 6 is a construction design drawing for explaining a construction method according to a second embodiment for carrying out the invention.
  • FIG. 4 is a partially enlarged front view showing a superimposed portion of the front welding metal mesh when the front welding metal mesh is superimposed on the front welding metal mesh. It is the elements on larger scale which show the superimposition part of both when the back welding wire mesh is superimposed on the back welding wire mesh. It is the elements on larger scale which show the superposition part of both when the back welding wire mesh is superimposed on the back welding wire mesh. It is a perspective view showing an example of the 3rd fixture. A partly omitted illustration for explaining an example of a state in which the welded wire gauze to which the third fixing tool shown in FIG.
  • FIG. 24 is attached and another welded wire gauze superimposed on the welded wire gauze are joined and fixed by the third fixture.
  • FIG. 4 is a partial enlarged plan view of a region where two welding meshes, in which a lower welding mesh is a front surface and an upper welding mesh is a back surface, are overlapped.
  • FIG. 27 is a front view of the two welded metal meshes shown in FIG. 26.
  • FIG. 5 is a partially enlarged plan view of a region where two welding meshes in which a lower welding mesh is a back surface and an upper welding mesh is a front surface are superimposed.
  • FIG. 29 is a front view of the two welded metal meshes shown in FIG. 28.
  • FIG. 4 is a partial enlarged plan view of a region where two welding meshes, in which a lower welding mesh is a front surface and an upper welding mesh is a back surface, are overlapped.
  • FIG. 27 is a front view of the two welded metal meshes shown in FIG.
  • FIG. 9 is a partially-omitted partial perspective view for explaining another example of a state in which a welding wire mesh to which a third fixing tool is attached and another welding wire mesh superimposed on the welding wire mesh are fixed by a third fixing tool. is there. It is a perspective view of a 4th fixture. It is explanatory drawing explaining the construction method of the conventional welding wire net.
  • FIG. 10 is a perspective view showing a use mode of the spacer disclosed in Patent Document 2.
  • the method for constructing a lattice according to the present invention will be described in detail with reference to the drawings.
  • the method of constructing a lattice-like body described in the form for carrying out the present invention is an example for explaining the gist of the present invention, and the present invention may not include any modification or modification within a range not departing from the gist. Needless to say.
  • Drawing 1 is a flow chart which shows an example of the procedure for carrying out the construction method of the lattice object concerning the present invention.
  • a welded wire mesh is used as a lattice-like body and is mainly applied to construction of a building floor.
  • the installer arranges a plurality of welding meshes on the construction target surface, a fixing tool for mutually fixing the adjacent welding meshes partially overlapping each other, and the welding mesh from the construction target surface.
  • Construction design is performed to determine the arrangement of the spacers and the like held at a separated height and the arrangement order of the respective welded meshes (step S1).
  • FIG. 2 is a flowchart showing a detailed procedure in implementing the construction design shown in FIG.
  • the builder is required to perform the construction, such as the arrangement of aggregates such as steel frames forming the framework of the building, the arrangement of the walls, columns and stairs, etc. of the building, and the arrangement of a plurality of deck plates erected between the opposing aggregates.
  • a blueprint of the building related to the target surface is given in advance, and the builder arranges a plurality of welding meshes on the target surface specified in the blueprint (step S10). At this time, the adjacent welded metal mesh overlaps a predetermined area of the edge with each other.
  • the constructor determines the shape of each of the welded metal meshes arranged in the design drawing so that there is no portion overlapping the structure (step S11).
  • the design drawing according to the present invention includes design drawing data, an image displaying the design drawing data, and the like, in addition to the printed matter.
  • FIG. 3 is an explanatory view for explaining a state in which a plurality of formed welded metal meshes are arranged on the above-described design drawing.
  • DP is a deck plate.
  • the deck plates DP, DP,... Comprise, for example, two ridges DM, DM, and a valley DB between them, and a half of the valley DB outside the ridges DM, DM.
  • flange portions each having a width dimension and connecting the opposite flange portions of the adjacent deck plates DP, DP, a valley portion DB similar to the above is formed.
  • the deck plate DP is provided with the flange portions on both sides of one ridge portion DM, respectively, and a valley portion DB is formed by connecting both opposed flange portions of two adjacent deck plates DP. It may be configured as follows.
  • a plurality of aggregates are assembled so as to form the framework of the building, and as shown in FIG. 3, deck plates DP, DP,. Therefore, the construction target surface excluding the pillar P and the like is formed.
  • Each of the welded meshes WM, WM,... Has a shape corresponding to the arrangement position as described above, and the adjacent welded meshes WM, WM,.
  • a plurality of meshes M , M,... are provided, and in the case shown in FIG. 3, adjacent welded metal meshes WM, WM,. .
  • FIG. 4 is a plan view showing one of the welding meshes of FIG.
  • the welding wire mesh WM has a plurality of vertical strips W1, W1,... And a plurality of horizontal strips W2, W2,... Arranged at a predetermined distance in a grid pattern. It is. Further, in the welded wire mesh WM, a plurality of meshes M, M,... Surrounded by the respective vertical strips W1, W1,. Have been. Note that the vertical strip W1 and the horizontal strip W2 are named for convenience, and the vertical strip W1 is arranged in the horizontal direction depending on the relative position between the welding wire mesh WM and the observer, and the horizontal strip W2 is vertically aligned. It goes without saying that they may be arranged in different directions.
  • the length of the longitudinal members W1, W1,... Is shorter than the length of the lateral members W2, W2,. Is formed. .. Of the welded wire mesh WM are arranged in the same plane, and the respective horizontal strips W2, W2,... Are arranged in different planes, and the vertical strips W1, W1,.
  • the side located above the horizontal strips W2, W2,... Is a table of the welded mesh WM, the side positioned below the vertical strips W1, W1,. Behind the scenes.
  • the lengths of the vertical members W1, W1,... May be longer than the lengths of the horizontal members W2, W2,.
  • the lengths of the strips W2, W2, ... may be the same.
  • the installer determines the order in which the respective welded meshes are to be constructed, and the front and back of each welded mesh ( Steps S12 and S13). Then, for each of the welded meshes WM, WM,... In which the arrangement position, the arrangement order, and the front and back are determined, a fixture for mutually fixing the welded mesh WM and another welded mesh WM superposed thereon, and welding. A mounting position for mounting a spacer that holds the wire meshes WM at positions separated from the construction target surface is determined (step S14).
  • the constructor selects the first fixture and the first spacer corresponding to the peak DM of the deck plate DP or the second fixture and the second spacer corresponding to the valley DB as described later, and selects the selected second fixture.
  • a construction plan is obtained (steps S15 and S16).
  • FIG. 5 is an explanatory diagram illustrating an example of a construction design drawing in which the order in which the welding meshes are constructed, the front and back of each welding mesh, and the mounting positions and mounting directions of the fixtures and the spacers are determined.
  • FIG. 6 is an explanatory diagram for simplifying and explaining the order of applying the welding wire mesh shown in FIG. 5 and the front and back of each welder.
  • the numbers in the circles indicate the order of construction.
  • the uncolored welded wire mesh WM represents a table in which each vertical strip is positioned above each horizontal strip, while the colored welded wire mesh WM has a reverse on each vertical strip. It shows the back which is in a state located below each horizontal member.
  • a plurality of welding meshes WM, WM,... are arranged in the vertical and horizontal directions, and adjacent welding meshes WM, WM, WM, WM,.
  • the areas of 1.5 squares M of the part are overlapped with each other.
  • the vertical wire members W1, W1,... are located on the side of the horizontal wire members W2, W2,... On the side of the welding wire mesh WM, and the vertical wire members W1, W1,. , The vertical wire members W1, W1,... Are indicated by solid lines, and the horizontal wire members W2, W2,. It is indicated by a broken line. On the other hand, in the back welded wire mesh WM, the vertical strips W1, W1,... Are indicated by broken lines, and the horizontal strips W2, W2,.
  • the relatively upper side is indicated by a solid line
  • the relatively lower side is indicated by a broken line.
  • the vertical strips W1, W1,... And the horizontal strips W2, W2,... are represented by two lines, and in the portion where the vertical strips W1, W1,.
  • the lower two lines may be deleted.
  • the welded wire mesh WM arranged at the upper left corner in FIG. 5 is placed first, and the welded wire mesh WM is arranged in the state of the table. In the back state, the areas of 1.5 cells M of the short side edge are arranged so as to overlap each other. Similarly, a third welded wire mesh WM is arranged in the state of the table on the right of the second welded wire mesh WM.
  • the fourth mesh WM is placed on the lower side in front of the first mesh WM as described above, and the square mesh of 1.5 on the long side of the fourth mesh WM is arranged in the front. M regions are arranged so as to overlap each other.
  • the fifth welded wire mesh WM and the sixth welded wire mesh WM to the right of the fourth welded wire mesh WM are arranged in this order in the same manner as before, with 1.5 mesh cells M on the short side edge thereof.
  • the regions are arranged so as to overlap each other, and the arrangement in the second row is completed.
  • the long edge of the fifth welded wire mesh WM and the sixth welded wire mesh WM, and the long edge of the second welded wire mesh WM and the third welded wire mesh WM are each 1.5 mesh cells.
  • the areas of the eyes M overlap each other.
  • the tenth first welded mesh WM and the twelfth welded wire mesh WM are arranged on the right side of the tenth welded mesh WM in this order in the same manner as before, with 1.5 meshes M on the short side edge thereof.
  • the regions are arranged so as to overlap each other, and the arrangement of all the welding meshes is completed.
  • the odd-numbered rows of the welded meshes WM, WM,... are in the front state, and the even-numbered rows of the welded meshes WM, WM,.
  • the order of arranging such welding meshes WM, WM,... Is as follows: starting from an appropriate position such as a corner as a start position, sequentially arranging in the horizontal or vertical direction, and arranging up to the terminal position of the row or column; It is sufficient to move to the head position corresponding to the start position of the row or column, and to sequentially arrange in the horizontal or vertical direction from the head position.
  • the invention is not limited to this, and the odd-numbered welded wire meshes WM, WM,... May be arranged in the reverse state, and the even-numbered welded wire meshes WM, WM,.
  • the front and back sides may be arranged differently in each of the welded metal meshes WM, WM,... Adjacent in the row direction and the column direction.
  • the area of the region where the four adjacent welded metal meshes WM, WM, WM, WM overlap each other is different. This is preferable because the thickness can be reduced.
  • a fixture for fixing the two welded metal meshes WM, WM to each other is disposed at an appropriate position in the overlapping region of the adjacent welded metal meshes WM, WM, WM, WM, WM,.
  • the arranged position is a position facing the peaks DM, DM,... Of the deck plates DP, DP,. If the arranged position is a position facing the valleys DB, DB,... Of the deck plates DP, DP,... Shown in FIG. 3, a second fixture F2 described later is arranged.
  • Each of the first fixing tool F1 and the second fixing tool F2 is attached to the welding wire mesh WM disposed below the adjacent welding wire meshes WM, WM.
  • the first fixtures F1, F1, ... and / or the second fixtures F2, F2, ... surround the places where the four adjacent welding meshes WM, WM, WM, WM overlap each other. To place. This makes it possible to firmly fix the four adjacent welded metal meshes WM, WM, WM, WM to each other without arranging the first fixture F1 or the second fixture F2 at the location. It is possible to prevent the wire meshes WMWM, WM, WM, WM from being displaced in the vertical and horizontal directions.
  • first spacers SP1, SP1,... Or second spacers SP2, SP2,... are arranged at appropriate intervals in regions other than the overlapping regions of the respective welded metal meshes WM, WM,.
  • first spacer SP1 and the deck plates DP, DP shown in FIG. 3 are provided when the positions are opposite to the peaks DM, DM,... Of the deck plates DP, DP,.
  • the second spacer SP2 is arranged at a position facing the valleys DB, DB,.
  • the second fixtures F2, F2,..., And the first spacers SP1, SP1, Set to 900 mm or less. Accordingly, it is possible to prevent the welding wire mesh WM from being bent.
  • first fixture F1, the second fixture F2, the first spacer SP1, and the second spacer SP2 are fixed to the welding wire meshes WM, WM,..., And prior to the description, the configurations of the first fixture F1, the second fixture F2, the first spacer SP1, and the second spacer SP2 will be described.
  • FIG. 8 is a perspective view showing an example of the first fixture F1.
  • the first fixture F1 includes a pair of first frame members 11, 11 formed by shaping a bar-shaped material into an inverted convex shape, and a pair of short frame-shaped second frame members 12, 12, respectively. At both ends of the frame members 11, 11, fixing portions 11e, 11e, 11e, 11e for fixing to the welding wire mesh are provided.
  • the first frame members 11, 11 and the second frame members 12, 12 are fixed in a grid shape in plan view as described later.
  • the above-mentioned first frame member 11 is formed into a U-shaped body as a whole by forming both ends of a straight-line contact portion 11b capable of contacting the construction target surface into standing portions 11c, 11c. (Supporting portion) 11a. At both ends of the main body 11a, short arms 11d, 11d extend in a direction substantially separated from each other in a posture substantially parallel to the contact portion 11b.
  • the hook-shaped fixing portions 11e, 11e are formed so as to rise in a posture parallel to the rising portions 11c, 11c and to be bent outwardly. That is, both the fixing portions 11e, 11e are both formed to be bent inward.
  • the linear contact portion 11b has been described. However, the present invention is not limited to this, and may have an appropriate shape such as an uneven shape or a wavy shape.
  • the dimension between the inner bottom portions of both fixing portions 11e provided on the first frame member 11 is determined by the outer dimension or adjacent horizontal length between adjacent vertical members constituting the welding wire mesh to which the first fixing tool F1 is attached. It has substantially the same value as the outer dimension between the strips, and the curvature of both fixing portions 11e, 11e has substantially the same value as the curvature of the peripheral surface of the vertical or horizontal strip.
  • the length of the fixing portions 11e, 11e is such that the fixing portions 11e, 11e can be externally fitted to the circumferential surface of the vertical wire member or the circumferential surface of the horizontal wire member in the circumferential direction of the peripheral surface in a range slightly more than 1/4. It is.
  • the tip surfaces ST, ST of the fixing portions 11e, 11e have an angle ⁇ formed by a plane H parallel to a plane formed by the abutting portions 11b, 11b of the main bodies 11a, 11a arranged in parallel.
  • the inclined surface is formed at an angle of about 45 °, so that the distal end portions of the distal end surfaces ST, ST are engaged with the peripheral surface of the vertical or horizontal line members of the welding wire mesh.
  • the dimension between the two first frame members 11, 11 arranged in parallel is shorter than the dimension between adjacent vertical strips or the dimension between adjacent horizontal strips constituting the welding wire mesh to which the first fixture F1 is attached.
  • the two second frame members 12 and 12 are provided on both ends of the main bodies 11a and 11a of the first frame members 11 and 11, respectively.
  • the length dimension of the second frame members 12, 12 is also shorter than the dimension between the adjacent vertical strips or the dimension between the adjacent horizontal strips constituting the welding wire mesh to which the first fixture F1 is attached, Similarly, the dimension between the opposing second frame members 12 and 12 is shorter than the dimension between adjacent vertical strips or the dimension between adjacent horizontal strips.
  • the present invention is not limited to this.
  • the appropriate positions of the rising portions 11c, 11c of the first frame members 11, 11, between the appropriate positions of the contact portions 11b, 11b of the first frame members 11, 11, etc. It can be installed at various positions, such as between appropriate positions of one frame member 11,11.
  • Joining means 14, 14 for joining the members or adjacent cross members are provided respectively.
  • the coupling means 14 is formed by providing a U-shaped notch extending from the ceiling position of the main body 14a to a position near the bottom on the center axis of the rectangular plate-shaped main body 14a which is long in the vertical direction.
  • This notch is an insertion portion 14e into which a vertical or horizontal member of the other welding wire mesh is inserted, and both sides of the insertion portion 14e of the main body 14a are inserted into the insertion portion 14e.
  • a pair of holding portions 14b, 14b for holding the inserted vertical or horizontal members are formed.
  • an insertion port 14c for inserting another vertical or horizontal member of the welding wire mesh into the insertion portion 14e is provided, and the above-described holding portions 14b, 14b are provided.
  • Beak-shaped first retaining portions 14d1 and 14d1 are protruded from portions facing the insertion opening 14c. That is, the width of the insertion opening 14c between the first retaining portions 14d1 and 14d1 is smaller than the width of the insertion portion 14e, whereby the vertical or horizontal members inserted into the insertion portion 14e. The material does not come out of the insertion portion 14e.
  • the ceiling of each of the first retaining portions 14d1 and 14d1 is tapered such that the height position from the bottom of the insertion portion 14e becomes lower toward the insertion opening 14c. The strip or the horizontal strip is guided to the insertion port 14c.
  • the dimensions are substantially the same as the first retaining portions 14d1, 14d1.
  • the second retaining portions 14d2 and 14d2 are provided in a protruding manner.
  • the height dimension from the bottom of the insertion portion 14e to the second retaining portions 14d2, 14d2 is such that the welding wire mesh to which the first fixture F1 is attached and the other welding wire mesh superimposed on the welding wire mesh are first fixed.
  • the peripheral surface of the vertical or horizontal member of another welding wire mesh inserted into the insertion portion 14e is attached to the second retaining portions 14d2, 14d2 of the first fixture F1.
  • the values are abutted.
  • the vertical or horizontal members of another welding wire mesh inserted into the insertion portion 14e are inserted into the bottom side of the insertion portion 14e through the second retaining portions 14d2 and 14d2, and in that state. Since the peripheral surface of the vertical or horizontal member comes into contact with the second retaining portions 14d2, 14d2, even if the worker performs work on another welding wire mesh, the insertion portion is not required. Since play is prevented from occurring in the vertical or horizontal members inserted into the insertion member 14e, there is no hindrance to the work by the worker, and the vertical or horizontal members or the horizontal members inserted in the insertion portion 14e are not hindered. The strip material is further prevented from falling out of the insertion portion 14e.
  • the above-mentioned holding portions 14b, 14b can be bent in directions away from each other, and a pressing force is applied to the vertical or horizontal members of another welding wire mesh guided to the insertion opening 14c. And the holding portions 14b, 14b bend in the direction in which they are separated from each other, so that the width dimension of the insertion port 14c becomes relatively large, and the vertical or horizontal member passes through the insertion port 14c and is inserted into the insertion section 14e. After that, since the holding portions 14b, 14b return to the original posture, the width dimension of the insertion opening 14c also returns to the original position, and the vertical or horizontal member inserted into the insertion portion 14e is inserted into the insertion portion 14e. Is prevented from slipping out. As a result, the vertical or horizontal members are connected to the connecting means 14.
  • the height dimension from the contact part 11b of the first frame member 11 to the ceiling position of the holding part 14b is larger than the height dimension from the contact part 11b to the ceiling position of the fixing part 11e of the first frame member 11.
  • the first fixing tool F1 is fixed to one welding wire mesh in advance, the vertical or horizontal members of another welding wire mesh are used for the connecting means 14 of the first fixing tool F1.
  • the welded wire mesh and another welded wire mesh superposed thereon are fixed to each other.
  • the dimension between the first frame members 11 and 11 arranged opposite to each other is less than ⁇ of the width of the crest of the deck plate.
  • the first frame member 11 located at the shoulder of the portion sinks into the valley of the deck plate, and the welded wire mesh and other welded wire meshes are warped.
  • the dimension between the first frame members 11, 11 of the first fixture F1 is less than 1/2 of the width of the crest of the deck plate, both the first frame members 11, 11 are provided. Since any of 11 is prevented from being located on the shoulder of the peak portion of the deck plate, warpage of the welded wire mesh and other welded wire meshes as described above is avoided.
  • the vertical or horizontal members of the other welding wire mesh are guided to the outer portions of the two holding portions 14b, 14b, that is, the portions of the two holding members 14b, 14b on the side of the second frame members 12, 12, respectively.
  • Triangular guides 14f, 14f protrude.
  • the ceiling side of the guide portion 14f is tapered so that its height decreases as the distance from the holding portion 14b increases, and the length of the guide portion 14f is determined by the first frame member facing the guide portion 14f. 11 is set to a value at which the vertical or horizontal members of the other welding wire mesh cannot enter.
  • the vertical or horizontal members of the other welding wire mesh are paired with the first fixing tool F1.
  • the other wire mesh is moved so that the vertical or horizontal members are located on the holding portions 14b, 14b, 14b, 14b.
  • the holding portions 14b, 14b, 14b, 14b are not provided with the above-described guide portions 14f, 14f, 14f, 14f, the other welding wire meshes may be moved to the holding portions 14b, 14b, 14b, 14b. 14b, smooth parallel movement is hindered.
  • the guides 14f, 14f, 14f, 14f described above are provided in the holding portions 14b, 14b, 14b, 14b, 14b, the vertical streaks of the other welding wire meshes.
  • the material or the horizontal member slides on the ceiling side of the guide portions 14f, 14f, 14f, 14f, and can smoothly translate other welding wire meshes.
  • fixing pieces 14g, 14g, 14g, 14g, 14g for fixing to the corresponding first frame members 11, 11 are provided on the bottom sides of the two main bodies 14a, 14a so that, for example, the side view forms an L-shape.
  • fixing pieces 14g, 14g, 14g, 14g to the corresponding first frame members 11, 11 by welding or bonding.
  • the two main bodies 14a, 14a are fixed inside the corresponding first frame members 11, 11.
  • the fixing piece 14g may have various shapes such as a plate shape and an arch shape, and one or a plurality of fixing pieces 14g may be provided on the main body 14a. Further, in the present embodiment, a case has been described in which the main body 14a and the first frame member 11 are configured separately, but the present invention is not limited to this, and the main body and the first frame member are integrated by casting or the like. It may be configured in a typical manner. Further, in the present embodiment, the case where both main bodies 14a, 14a are fixed inside corresponding first frame members 11, 11 has been described. However, the present invention is not limited to this, and both main bodies 14a, 14a correspond. It may be fixed on the first frame members 11, 11 or outside the corresponding first frame members 11, 11.
  • the guide portions 14f, 14f, 14f, 14f protruding from the pair of holding portions 14b, 14b, 14b, 14b may be in the same level as the corresponding main bodies 14a, 14a.
  • the above-described fixing pieces 14g, 14g, 14g, 14g are fixed to the corresponding first frame members 11, 11 by spot welding. In this case, it is preferable that an accident in which the electrode of the welding machine contacts the guides 14f, 14f, 14f, 14f can be avoided.
  • the fixing pieces 14g, 14g, 14g, 14g are fixed to the main bodies 14a, 14a in order to fix the main bodies 14a, 14a of the coupling means 14, 14 to the corresponding first frame members 11, 11.
  • the present invention is not limited to this, and the first frame member 11 corresponding to the main bodies 14a, 14a of the coupling means 14, 14 is provided without providing the fixing pieces 14g, 14g, 14g, 14g. , 11 may be fixed by arc welding or the like.
  • the guide portions 14f, 14f, 14f, 14f protruding from the pair of holding portions 14b, 14b, 14b, 14b can be in a posture flush with the corresponding main bodies 14a, 14a.
  • first frame members 11 and 11 and the second frame members 12 and 12 are formed of bars, but the present invention is not limited to this, and the first frame members 11 and 11
  • the member may be made of a plate material.
  • FIG. 9 is a perspective view showing an example of the aforementioned second fixture F2.
  • portions corresponding to the divisions shown in FIG. 8 are denoted by the same reference numerals, and description thereof will be omitted.
  • the main bodies 14a, 14a constituting the coupling means 14, 14 respectively extend by an appropriate length to the opposite side of the first frame members 11, 11 to the holding portions 14b, 14b, 14b, 14b. And leg portions are formed, and these leg portions function as second contact portions 15, 15.
  • both side edges of the legs extending from the first frame member 11 of the main body 14a are respectively raised inward or outward (inward in FIG. 9) to be viewed in plan. Are formed in a substantially U-shape, thereby providing a required strength.
  • second fixing pieces 15g, 15g to be fixed to the first frame member 11 are provided so as to face the fixing pieces 14g, 14g with the first frame member 11 interposed therebetween.
  • the second fixing pieces 15g are fixed to the first frame 11 by fixing the second fixing pieces 15g to the first frame member 11 by welding or bonding.
  • the second contact portion 15 contacts the construction target surface.
  • the welded wire mesh fixed at 11e, 11e, 11e and another welded wire mesh connected to the connecting means 14, 14 can be carried at a predetermined height position separated from the valley of the deck plate.
  • the length of the second fixing pieces 15g, 15g is determined according to the depth of the valley DB of the deck plate DP shown in FIG. 3, and is carried by the above-described first fixture F1.
  • the height position of the welded wire mesh and the height position of the welded wire mesh carried by the second fixture F2 are substantially the same.
  • the height of the rising portions 11c, 11c of the main body 11a of the first fixture F1 is substantially the same as the length of the second contact portion 15 provided on the second fixture F2.
  • the fixing tool may be positioned at the valley of the deck plate, in the above-described second fixing tool F2, a portion corresponding to the first fixing tool F1 of the second fixing tool F2 is replaced with the first fixing tool. Since it can be shared with F1, the manufacturing cost can be reduced, which is preferable.
  • FIGS. 10 and 11 are perspective views showing an example of the first spacer SP1 and the second spacer SP2 described above.
  • the first spacer SP1 has substantially the same configuration as that of the first fixture F1 except that the first spacer F1 does not include the coupling means 14 shown in FIG. 8, and the second spacer SP2 has the same structure as the coupling means 14 shown in FIG. , 14 are substantially the same as those of the second fixture F2.
  • the first spacer SP1 is composed of a pair of first frame members 11, 11 formed by shaping a bar-shaped material into an inverted convex shape, and a pair of short frame-shaped second frame members 12, 12, respectively.
  • first frame members 11, 11 formed by shaping a bar-shaped material into an inverted convex shape
  • second frame members 12, 12 respectively.
  • fixing portions 11e, 11e, 11e, 11e for fixing to the welding wire mesh are provided at both ends of the first frame members 11, 11, respectively.
  • the first frame member 11 is provided with rising ends 11c, 11c by raising both ends of a straight contact portion 11b that can contact the construction target surface to form rising portions 11c, 11c. Part) 11a.
  • short arms 11d, 11d extend in a direction substantially separated from each other in a posture substantially parallel to the contact portion 11b.
  • the hook-shaped fixing portions 11e, 11e are formed so as to rise in a posture parallel to the rising portions 11c, 11c and to be bent outwardly.
  • the dimension between the inner bottom portions of both fixing portions 11e provided on the first frame member 11 is determined by the outer dimension or adjacent horizontal length between adjacent vertical members constituting the welding wire mesh to which the first fixing tool F1 is attached. It has substantially the same value as the outer dimension between the strips, and the curvature of both fixing portions 11e, 11e has substantially the same value as the curvature of the peripheral surface of the vertical or horizontal strip.
  • the length of the fixing portions 11e, 11e is such that the fixing portions 11e, 11e can be externally fitted to the circumferential surface of the vertical wire member or the circumferential surface of the horizontal wire member in the circumferential direction of the peripheral surface in a range slightly more than 1/4. It is.
  • the tip surfaces ST, ST of the fixing portions 11e, 11e have an angle ⁇ formed by a plane H parallel to a plane formed by the abutting portions 11b, 11b of the main bodies 11a, 11a arranged in parallel.
  • the inclined surface is formed at an angle of about 45 °, so that the distal end portions of the distal end surfaces ST, ST are engaged with the peripheral surface of the vertical or horizontal line members of the welding wire mesh.
  • the dimension between the two first frame members 11, 11 arranged in parallel is shorter than the dimension between adjacent vertical strips or the dimension between adjacent horizontal strips constituting the welding wire mesh to which the first fixture F1 is attached.
  • the two second frame members 12 and 12 are provided on both ends of the main bodies 11a and 11a of the first frame members 11 and 11, respectively.
  • the length dimension of the second frame members 12, 12 is also shorter than the dimension between the adjacent vertical strips or the dimension between the adjacent horizontal strips constituting the welding wire mesh to which the first fixture F1 is attached, Similarly, the dimension between the opposing second frame members 12 and 12 is shorter than the dimension between adjacent vertical strips or the dimension between adjacent horizontal strips.
  • the fixing portions 11e, 11e, 11e, 11e are externally fitted to the vertical or horizontal members of the welded wire mesh, so that the spacers are formed. Is fixed to the welding wire mesh, and the welding wire mesh is arranged at a predetermined position on the deck plate so that the spacer is located at the peak of the deck plate. The welded wire mesh is held by the spacer at a position separated from the peak portion of the deck plate by a predetermined height.
  • the second spacer SP2 is located at an intermediate position in the longitudinal direction of the abutting portions 11b, 11b of the first frame members 11, 11 similarly to the second fixture F2 of FIG.
  • a leg-like second contact portion 35 is formed by hanging a substantially U-shaped plate material in a plan view by an appropriate length, and the second contact portion 35 has a length dimension of: It is determined according to the depth dimension of the valley DB (see FIG. 3) of the deck plate DP described above.
  • Step S15 the direction in which the first fixing tool F1, the second fixing tool F2, the first spacer SP1 and the second spacer SP2 are attached to the welding wire meshes WM, WM,... Is determined as follows. (Step S15).
  • the welding wire meshes WM, WM,... Is determined such that the pair of first frame members 11, 11 are parallel to the horizontal members W2, W2,... Of the welded wire mesh WM.
  • the pair of first frame members 11, 11 are formed by the vertical strip members W1, W1,. Set parallel posture.
  • the portion where the four welded metal meshes WM, WM, WM, WM adjacent to each other in the horizontal and vertical directions overlap is surrounded by the first fixture F1 and / or the second fixture F2.
  • the first and second fixing members F1 and F2 prevent the welded metal meshes WM and WM, which are arranged adjacent to each other in the horizontal direction, from shifting in the horizontal direction, and are adjacent to each other in the vertical direction.
  • the welded metal meshes WM, WM arranged in the vertical direction are prevented from shifting in the vertical direction by the first fixture F1 or the second fixture F2, so that the four welded meshes WM, WM, WM overlap each other. In this case, both the vertical and horizontal displacements are prevented.
  • the paired first frame members 31a, 31a are set in a posture parallel to the longitudinal direction of the deck plate DP shown in FIG.
  • step S16 When the position and direction in which the first fixture F1, the second fixture F2, the first spacer SP1 and / or the second spacer SP2 are attached to the welded meshes WM, WM,... , Or the first spacers F1, F1,... Or the first spacers SP1, SP1,... Are selected based on the construction plan shown in FIG. .. Or the second spacers SP2, SP2,... Are selected (step S16), and a construction plan to be executed is obtained (step S17).
  • the constructor performs a process of forming a required number of welded metal meshes into a shape designed in the construction design process (step S3) and performs the machining.
  • the first fixture, the second fixture, the first spacer, and / or the second spacer were designed in the construction design process at the front and back of the welded mesh determined in the construction design process, and at each position of the welded mesh. Attach in the direction (step S5).
  • each welded wire mesh and the attachment of the first fixture, the second fixture, the first spacer and / or the second spacer to each formed welded wire mesh are performed at a factory where the welded wire mesh is manufactured. Although high efficiency is preferable, it may be performed at a construction site.
  • step S6 it is determined whether or not the placement of the wire mesh has been completed. If the placement of all the welded meshes has not been completed, the arrangement and the order specified in the above-described construction design drawing (see FIG. 5) apply. (Step S7), and the vertical and / or horizontal members of the welding wire mesh positioned on the first fixing tool and / or the second fixing tool in the overlapping region with the adjacent welding wire mesh.
  • Step S8 the builder repeats the operations from step S6 to step S8 until it is determined in step S6 that the arrangement of all the welding meshes on the construction target surface has been completed.
  • the above-mentioned application of pressure to the vertical and / or horizontal members of the welding wire mesh is performed by stepping on the vertical and horizontal members with the foot of the builder. That is, for example, two installers sandwich one piece of the welding wire mesh, the welding wire mesh at the position defined in the construction design drawing, the edge of one or more welding wire mesh placed earlier. After being arranged so as to overlap with each other, the vertical and / or horizontal members of the welding wire mesh positioned on the first fixing device and / or the second fixing device are trampled, and the connecting means of the first fixing device and / or The vertical and / or horizontal members of the welding wire mesh are connected to the connecting means of the second fixture. Thereby, the arrangement of the new welded mesh and the fixing of the previously placed welded mesh and the new welded mesh can be performed in one operation, and the working efficiency is increased as much as possible. be able to.
  • FIG. 12 is a partially enlarged perspective view showing a state where another welding wire mesh is superimposed on a first fixing device attached to one welding wire mesh
  • FIG. 13 is a partially enlarged view of the first fixing device shown in FIG. It is a partial expansion perspective view which shows the state which fixed the welding wire mesh mutually. Note that, in both figures, parts corresponding to the divisions shown in FIG. 8 are given the same numbers.
  • one welded wire mesh WM is in the state shown in the front, and the arm portions 11d, 11d of the first fixture F1 are attached to adjacent vertical strips W1, W1 of the one welded wire mesh WM.
  • the first fixture F1 is attached to one welded wire mesh WM by externally fitting the fixing portions 11e, 11e, 11e, 11e provided at the tips of 11d, 11d.
  • the welding wire mesh WM is provided at a predetermined position on the construction target surface as described above.
  • this welded wire mesh WM On the edge of this welded wire mesh WM, a predetermined area of the edge of another welded wire mesh WM in a back state is superimposed, and the vertical strip W1 of another welded wire mesh WM is shown in FIG. As described above, they are arranged on the insertion openings 14c, 14c of both the coupling means 14, 14 provided in the first fixture F1.
  • the installer applies a pressure to the longitudinal member W1 by stepping on the longitudinal member W1 of another superimposed welding wire mesh WM, and thereby, as illustrated in FIG.
  • the material W1 is fitted into both connecting means 14 and 14, and the longitudinal member W1 is connected to the connecting means 14 and 14.
  • FIG. 14 is a partial side view of the first fixture F1 shown in FIG. 8 and the welded metal meshes WM, WM fixed by the first fixture F1. This arrangement corresponds to the case where the first fixture F1 is arranged at the position g1 in FIG. 5 described above. In the figure, parts corresponding to FIG. 8 are given the same numbers.
  • the front welded wire mesh WM is laid on the construction target surface side, and the back welded wire mesh WM is superimposed on the welded wire mesh WM.
  • the vertical strip W1 of the upper welded wire mesh WM is located above the strip W2 and the lower side of the corresponding horizontal strip W2.
  • the fixing portions 11e, 11e, 11e, 11e of the first fixing tool F1 are externally fitted to the longitudinal strips W1, W1 of the lower welding metal mesh WM, and the first fixing tool F1 is attached to the welding metal mesh WM in the front.
  • the lower welded wire mesh WM is held at a position separated from the construction target surface.
  • the vertical wire member W1 of the upper welding mesh WM is inserted into the insertion portion 14e provided in the connecting means 14 of the first fixture F1, and the lower welding mesh WM and the upper welding mesh WM are joined. Fixed.
  • FIG. 15 is a partial side view of a first fixing tool F1 arranged at another position of the welding wire mesh and the welding wire meshes WM, WM fixed by the first fixing tool F1. This corresponds to the case where it is arranged at the position g2 in FIG. 5 described above.
  • the back welding wire mesh WM is laid on the construction target surface side, the back welding wire mesh WM is superimposed thereon, and the vertical wire W1 of the lower welding wire mesh WM and the upper welding wire WM are welded.
  • the vertical strip W1 of the wire mesh WM is located below the horizontal strips W2 and W2 corresponding to each other.
  • the fixing portions 11e, 11e, 11e, 11e of the first fixing tool F1 are externally fitted to the horizontal members W2, W2 of the lower welding metal mesh WM, and the first fixing tool F1 is attached to the back welding metal mesh WM.
  • the lower welded wire mesh WM is held at a position separated from the construction target surface.
  • the horizontal member W2 of the upper welding wire mesh WM is inserted into the insertion portion 14e provided in the connecting means 14 of the first fixture F1, and the lower welding wire mesh WM and the upper welding wire mesh WM are joined. Fixed.
  • FIG. 16 is a partial side view of a first fixing tool F1 disposed at still another position of the welding wire mesh and the welding wire meshes WM, WM fixed by the first fixing tool F1. Corresponds to the case where it is arranged at the position g3 in FIG. 5 described above.
  • the back welding wire mesh WM is laid on the construction target surface side, and the welding wire mesh WM in the front is superimposed thereon.
  • the horizontal strip W2 of the lower welded wire mesh WM and the horizontal strip W2 of the upper welded wire mesh WM are at substantially the same height position, and the vertical strip W1 of the lower welded wire mesh WM is the corresponding horizontal strip.
  • the vertical strip W1 of the upper welding wire mesh WM is located above the corresponding horizontal strip W2, respectively.
  • the fixing portions 11e, 11e, 11e, 11e of the first fixing tool F1 are externally fitted to the longitudinal members W1, W1 of the lower welding metal mesh WM, and the first fixing tool F1 is attached to the back welding metal mesh WM.
  • the lower welded wire mesh WM is held at a position separated from the construction target surface.
  • the horizontal member W2 of the upper welding wire mesh WM is inserted into the insertion portion 14e provided in the connecting means 14 of the first fixture F1, and the lower welding wire mesh WM and the upper welding wire mesh WM are joined. Fixed.
  • FIG. 17 is a partial side view of a first fixing tool F1 disposed at another position of the welding wire mesh and the welding wire meshes WM, WM fixed by the first fixing tool F1. This corresponds to the case where it is arranged at the position g4 in FIG. 5 described above.
  • the front welding wire mesh WM is laid on the construction target surface side, and the front welding wire mesh WM is superimposed thereon, and the vertical wire W1 of the lower welding wire mesh WM and the upper welding wire WM are welded.
  • the vertical strip W1 of the wire mesh WM is located above the horizontal strips W2 and W2 corresponding to each other.
  • the fixing portions 11e, 11e, 11e, 11e of the first fixing tool F1 are externally fitted to the horizontal members W2, W2 of the lower welding metal mesh WM, and the first fixing tool F1 is attached to the welding metal mesh WM in the front.
  • the lower welded wire mesh WM is held at a position separated from the construction target surface.
  • the horizontal member W2 of the upper welding wire mesh WM is inserted into the insertion portion 14e provided in the connecting means 14 of the first fixture F1, and the lower welding wire mesh WM and the upper welding wire mesh WM are joined. Fixed.
  • FIG. 18 is a partial side view of the first spacer SP1 attached to the welding wire mesh and the welding wire mesh WM.
  • a front or back (front in FIG. 18) welded wire mesh WM is laid on the construction target surface side.
  • the fixing portions 11e, 11e, 11e, 11e of the first spacer SP1 are externally fitted to the horizontal members W2, W2 or the vertical members W1, W1 (the horizontal members W2, W2 in FIG. 18) of the welding wire mesh WM.
  • the first spacer SP1 is attached to the welded wire mesh WM, whereby the welded wire mesh WM is supported at a position separated from the construction target surface.
  • FIG. 14 to 17 show the case where the first fixture F1 is used, and FIG. 18 shows the case where the first spacer SP1 is used. In these, the first fixture F1 is used. Needless to say, the second fixture F2 can be used instead of the first spacer SP1, and the second spacer SP2 can be used instead of the first spacer SP1.
  • first fixing tool F1 and the second fixing tool F2 the first spacer SP1 and the second spacer SP2 can be applied even in forms other than those described above.
  • the adjacent welded metal meshes WM, WM are arranged such that 1.5 meshes M at the edges thereof overlap, but the present invention is not limited to this.
  • the other meshes WM are superimposed so that the positions of the two meshes M, M facing the construction target surface are shifted from each other, that is, the positions of the two meshes M, M are different.
  • the first fixing member F1 and the second fixing member F2 are located at appropriate positions in the longitudinal direction of the first frame members 11, 11, that is, at positions corresponding to the displacement of the positions of the meshes M, M.
  • Coupling means 14 are provided.
  • the adjacent welded metal meshes WM, WM are connected and fixed by the first fixing tool F1 or the second fixing tool F2 in a state in which the two meshes M, M are not exactly overlapped with each other, but in different positions. Is done.
  • FIG. 19 is a construction design diagram for explaining a construction method according to the second embodiment for carrying out the invention, and the edges of adjacent welding metal meshes are arranged so that the respective meshes overlap each other. It is made to overlap.
  • portions corresponding to the portions shown in FIG. 5 are denoted by the same reference numerals, and description thereof will be omitted.
  • the construction procedure according to this embodiment is substantially the same as that shown in FIGS.
  • a plurality of welding meshes WM, WM,... are arranged in the vertical and horizontal directions, and adjacent welding meshes WM, WM, WM, WM,.
  • the individual meshes M, M are overlapped so as to overlap each other.
  • the welded wire mesh WM arranged in the upper left corner in FIG. 19 is firstly arranged in the state of the table, The area of the two meshes M, M on the short side edge thereof is arranged so as to overlap each other with the second welded wire mesh WM on the right side thereof in the back state. Similarly, a third welded wire mesh WM (not shown) is arranged on the right side of the second welded wire mesh WM in a state of a table.
  • the wire mesh moves to the head position corresponding to the start position in the next row, and the fourth wire mesh WM is located below the first welded mesh WM.
  • the welded wire mesh WM is in a table state, the areas of the two meshes M, M on the long side edges thereof are arranged so as to overlap each other, and the welded wire meshes WM, WM,. Place as before. Then, this operation is repeated to determine the order of construction of all the welded metal meshes WM, WM,...
  • the back welded wire mesh WM when the back welded wire mesh WM is superimposed on the front welded wire mesh WM, the former vertical wire members W1, W1,... And the latter vertical wire members W1, W1,. Make them at the same height so that they do not overlap.
  • the front wire mesh WM is superimposed on the back wire mesh WM, the former horizontal members W2, W2,... And the latter horizontal members W2, W2,. Work so that both do not overlap.
  • the construction is performed so that the meshes M, M of both meshes match. can do.
  • FIGS. 20 and 21 are a partially enlarged plan view and a partially enlarged front view showing a superimposed portion of the front welded wire mesh WM when the front welded wire mesh WM is superimposed on the front welded wire mesh WM.
  • FIG. 7 is a partially enlarged plan view and a partially enlarged front view showing a superposed portion of the back welding wire mesh WM when the back welding wire mesh WM is superimposed on the back welding wire mesh WM.
  • parts corresponding to the parts shown in FIG. 19 are given the same numbers.
  • a fixture for fixing the two welded metal meshes WM, WM to each other is arranged at an appropriate position in an overlapping region of the adjacent welded metal meshes WM, WM, WM, WM, WM, if the arranged position is a position facing the peaks DM, DM,... Of the deck plates DP, DP,. If the set position is a position facing the valleys DB, DB,... Of the deck plates DP, DP,.
  • Each of the third fixing tool and the fourth fixing tool is attached to a welding wire mesh WM arranged below the adjacent welding meshes WM, WM.
  • first spacers SP1, SP1,... Or the second spacers SP2, SP2, Place at intervals.
  • FIG. 24 is a perspective view showing an example of the third fixture.
  • parts corresponding to each other are denoted by the same reference numerals.
  • the third fixing tool F3 includes a pair of first frame members 11, 11 formed by shaping a bar-shaped material into an inverted convex shape, and a short rod-shaped member.
  • the pair of second frame members 12 and 12 are fixed in a grid shape in plan view.
  • the first frame member 11 is provided with a main body (supporting portion) 11a that is formed into a U-shape as a whole by raising both ends of the linear contact portion 11b to form rising portions 11c, 11c.
  • fixing portions 11e, 11e which are raised in a substantially hook shape, extend through arms 11d, 11d in a posture substantially parallel to the contact portions 11b, 11b, respectively.
  • the fixing portions 11e, 11e can be engaged and fixed to the adjacent vertical or horizontal members of the welding wire mesh using the main body 11a as a spring member, similarly to the first fixing member F1.
  • the dimension between the two first frame members 11 and 11 arranged in parallel is the dimension between the adjacent vertical strips or between the adjacent horizontal strips that constitute the welding wire mesh to which the third fixture F3 is attached.
  • the second frame members 12, 12 are shorter than the dimensions, and the two second frame members 12, 12 are peripheral surfaces of the arm portions 11d, 11d, 11d, 11d of the first frame members 11, 11 and are opposite to the fixing portions 11e. It is erected at each direction.
  • the length dimension of the second frame members 12, 12 is also shorter than the dimension between the adjacent vertical strips or the dimension between the adjacent horizontal strips constituting the welding wire mesh to which the third fixture F3 is attached, Similarly, the dimension between the opposing second frame members 12 and 12 is shorter than the dimension between adjacent vertical strips or the dimension between adjacent horizontal strips.
  • the adjacent vertical or horizontal members of another welding wire mesh superimposed on the welding wire mesh to which the third fixing member F3 is attached are connected to the insides of the first frame members 11, 11, respectively.
  • a pair of second coupling means 20, 20 are provided.
  • the second coupling means 20 includes second main bodies 21a, 21a each having a bar formed in an inverted trapezoidal shape and having a spring force.
  • the bottom portion 21b of the second main body 20a is disposed substantially parallel to the contact portion 11b of the first frame member 11, and is fixed to the contact portion 11b by welding or bonding.
  • both leg sides 21c, 21c of the second main body 20a rising from both ends of the bottom 21b pass between the second frame members 12, 12, and are fixed by the fixing portions 11e, 11e of the first frame member 11.
  • the second fixing portion 21e which extends to a high position and engages and fixes an adjacent vertical or horizontal strip of another welding wire mesh to the ends of the two leg sides 21c, 21c, respectively. , 21e are provided.
  • the fixing portions 11e, 11e of the first frame member 11 are bent toward the inside of the U-shaped main body 11a of the first frame member 11 in a posture facing each other, while the second portions of the second coupling means 20 are bent.
  • the fixing portions 21e, 21e are bent outward from the second main body 21a in a posture separated from each other.
  • the curvature of the fixing portions 11e, 11e of the first frame member 11 and the curvature of the second fixing portions 21e, 21e of the second coupling means 20 are determined by the above-described vertical or horizontal members W1 or W2 of the welding wire mesh WM (see FIG. 17 and the like).
  • the fixing portions 11e, 11e and the second fixing portions 21e, 21e are provided on the peripheral surface of the vertical member W1 or the peripheral surface of the horizontal member W2 of the welding wire mesh WM.
  • the length is set to a length that can be externally fitted in a range slightly more than 1/4 in the circumferential direction of the peripheral surface.
  • the distal end surfaces ST, ST of the fixing portions 11e, 11e and the distal end surfaces ST2, ST2 of the second fixing portions 21e, 21e are formed by both abutting portions 11b, 11b of the main bodies 11a, 11a arranged in parallel.
  • the angle ⁇ formed by the plane H parallel to the plane is approximately 45 ° for the former and approximately 135 ° for the latter, so that the front end surfaces ST and ST have their front end portions formed by the third fixture.
  • F3 is engaged with the circumferential surface of the vertical wire W1 or the circumferential surface of the horizontal wire W2 of the welded wire mesh WM to which the tip end surfaces ST2 and ST2 are attached.
  • the other welded wire mesh WM superimposed on the WM is engaged with the peripheral surface of the longitudinal member W1 or the peripheral surface of the horizontal member W2.
  • FIG. 25 is a view for explaining an example of a state in which the welded wire gauze to which the third fixture shown in FIG. 24 is attached and another welded wire mesh superimposed on the welded mesh are joined and fixed by the third fixture.
  • 3 is a partially omitted partial perspective view of FIG.
  • portions corresponding to the portions shown in FIG. 24 are given the same numbers.
  • the lower welded wire mesh WM and the upper welded wire mesh WM are both in the state shown in the table, and the upper welded wire mesh WM is placed on the lower welded wire mesh WM so that the meshes M, M are overlapped, that is, they are overlapped so that the positions of the two meshes M, M coincide with each other vertically.
  • one of the adjacent horizontal wire members W2 constituting the meshes M, M is omitted.
  • the third fixture F3 is attached to the lower welding wire mesh WM. That is, the main bodies 11a, 11a and the second main bodies 21a, 21a of the third fixture F3 are arranged in the meshes M of the lower welding wire mesh WM, and the adjacent vertical strips forming the meshes M are arranged.
  • the fixing portions 11e, 11e, 11e, and 11e of the third fixing tool F3 are externally fitted to the W1 and W1 from the outside to the inside of the mesh M, and the third fixing tool F3 is fixed to the lower welding wire mesh WM. I have.
  • the upper welded wire mesh WM is connected to the second connecting means 20, 20, and the lower welded wire mesh WM and the upper welded wire mesh WM are fixed by the third fixture F3 with one touch.
  • the above-mentioned application of the pressure to the vertical members W1, W1 and / or the horizontal members W2 (W2) of the upper welding wire mesh WM is performed by stepping on the vertical members or the horizontal members with the foot of the constructor. This is preferable.
  • two installers sandwich one welded mesh WM and place the welded mesh WM at a position determined in the construction plan, After the edges of the meshes WM, WM are overlapped so that the meshes M, M of the respective meshes WM, WM are overlapped with one or a plurality of the meshes WM arranged earlier, the welding is positioned on the third fixture F3.
  • the vertical members W1, W1 and / or the horizontal members W2 (W2) of the wire mesh WM are trampled, and the vertical members W1, W1 and / or the welded wire mesh WM are attached to the second coupling means 20, 20 of the third fixture F3.
  • the horizontal member W2 (W2) is bonded.
  • the outer dimension between both end surfaces ST2 and ST2 constituting the second coupling means 20 is the inner dimension between the longitudinal members W1 and W1 or the horizontal members W2 and W2 constituting the mesh M of the welded wire mesh WM. It is slightly larger than the size.
  • the two leg sides 21c, 21c constituting the second coupling means 20 can bend in directions approaching each other, and are placed on the distal end surfaces ST2, ST2 of the second coupling means 20.
  • a pressing force is applied to the vertical strips W1 and W1 of the upper welding wire mesh WM, the leg sides 21c and 21c of the second coupling means 20 bend in directions approaching each other.
  • the dimension between the two second coupling means 20, 20 is slightly larger than twice the outer diameter of the vertical strip W1 or the horizontal strip W2 constituting the welded wire mesh WM.
  • Two vertical members W1, W1 or two horizontal members W2, W2 can be fitted between the two second connecting means 20, 20.
  • both the lower welded wire mesh WM and the upper welded wire mesh WM are on the reverse side.
  • the upper welding mesh WM is superimposed on the lower welding mesh WM so that the two meshes M overlap each other, and the same connection fixing operation as before is performed. Is carried out.
  • FIG. 26 is a partial enlarged plan view of a region in which the lower welded mesh WM is a front surface, and the upper welded mesh WM is in a back state where two welded meshes are superimposed
  • FIG. 27 is shown in FIG. 26. It is a front view of two welding wire nets.
  • FIG. 28 is a partially enlarged plan view of a region in which two welded metal meshes in which the lower welded metal mesh WM is on the back and the upper welded metal mesh WM is in the front state are superimposed
  • FIG. FIG. 2 is a front view of two welded metal meshes shown in FIG.
  • the lower side wire members W2, W2 of the lower side welded wire mesh WM and the lower side wire members W2, W2 of the upper side welded wire mesh WM are connected to the lower side.
  • the vertical strips W1 and W1 of the welded wire mesh WM and the vertical strips W1 and W1 of the upper welded wire mesh WM are sandwiched, and the upper and lower welded wire meshes WM are welded to the vertical strips W1 and W1.
  • the longitudinal members W1 and W1 of the wire mesh WM are adjacent to each other so as not to overlap with each other. Thereby, the thickness dimension constituted by the lower welding mesh WM and the upper welding mesh WM can be made as small as possible.
  • the lower part of the horizontal wire W2 (W2) of the lower welded wire mesh WM and the lower horizontal wire W2 (W2) of the upper welded wire mesh WM are located on the upper side, and the horizontal wire of the lower welded wire mesh WM.
  • W2 (W2) and the horizontal strip W2 (W2) of the upper welding wire mesh WM are adjacent to each other so as not to overlap with each other.
  • FIG. 30 is a partly omitted illustration for explaining another example of a state in which a welded wire gauze to which the third fixing device is attached and another welded wire gauze superimposed on the welded wire gauze are connected and fixed by the third fixation device. It is a partial perspective view. In the figure, parts corresponding to the parts shown in FIG. 25 are given the same numbers.
  • the lower welded wire mesh WM is a front surface
  • the upper welded wire mesh WM is in a reverse state
  • the horizontal members W2 and W2 of the lower welded wire mesh WM and the upper wire mesh WM are on the upper side.
  • the vertical members W1 and W1 of the lower welding wire mesh WM and the vertical members W1 and W1 of the upper welding wire mesh WM are sandwiched.
  • the longitudinal members W1, W1 of the wire mesh WM and the longitudinal members W1, W1 of the upper welding wire mesh WM are adjacent to each other so as not to overlap with each other.
  • the third fixture F3 is provided between the adjacent horizontal members W2 and W2 in a region where the upper welding mesh WM is superimposed on the lower welding mesh WM, and forms a pair of the third fixture F3.
  • the vertical strip W1 is fitted so as to be fitted respectively.
  • the upper metal wire mesh WM is placed on the lower metal wire mesh WM, and the vertical wire members W1, W1 of the lower metal wire mesh WM and the vertical wire members W1, W1 of the upper metal wire mesh WM are adjacent to each other.
  • the peripheral surfaces of the adjacent horizontal strips W2, W2 of the upper welding wire mesh WM constitute the second fixing portions 21e, 21e, 21e constituting the second coupling means 20, 20 of the third fixture F3.
  • 21e are placed on the distal end surfaces ST2, ST2, ST2, ST2, ST2, ST2, ST2, so that by applying a pressure to the upper welding wire mesh WM, the second fixing portions 21e, 21e, 21e are attached to the horizontal strips W2, W2.
  • 21e are externally fitted from inside to outside of the mesh M.
  • the upper welded wire mesh WM is connected to the second connecting means 20, 20, and the lower welded wire mesh WM and the upper welded wire mesh WM are fixed by the third fixture F3 with one touch.
  • the vertical strip W1 forming X is fitted in a manner adjacent to the intersections X, X of the lower welding wire mesh WM already fitted and the vertical strip W1 forming the crossing X. This prevents the upper welded wire mesh WM from shifting in the vertical and horizontal directions.
  • the horizontal members W2 (W2) and Below the horizontal vertical bar W2 (W2) of the upper welded wire mesh WM, the vertical bar W1 (W1) of the lower welded wire mesh WM and the vertical bar W1 (W1) of the upper welded wire mesh WM are located.
  • the horizontal members W2 (W2) of the lower welding wire mesh WM and the horizontal members W2 (W2) of the upper welding wire mesh WM are adjacent to each other so as not to overlap with each other (FIG. 28). And FIG. 29).
  • the third fixture F3 is provided between the adjacent vertical strips W1 and W1 in a region where the upper welded mesh WM is superimposed on the lower welded mesh WM, and the third fixture F3 is paired. Between the second fixing portions 21e, 21e, 21e, 21e to be formed, crossing portions X, X and the crossing portions X, X where the vertical bar W1 and the horizontal bar W2, W2 of the welding wire mesh WM cross each other are formed. The horizontal strips W2 to be inserted are respectively fitted.
  • the upper welding wire mesh WM is placed on the lower welding wire mesh WM, and the horizontal members W2, W2 of the lower welding wire mesh WM and the horizontal members W2, W2 of the upper welding wire mesh WM are adjacent to each other.
  • the peripheral surfaces of the adjacent vertical strips W1, W1 of the upper welding wire mesh WM constitute the second fixing portions 21e, 21e, 21e constituting the second coupling means 20, 20 of the third fixture F3.
  • 21e are placed on the distal end surfaces ST2, ST2, ST2, ST2, ST2, ST2, so that by applying a pressure to the upper welding wire mesh WM, the second fixing portions 21e, 21e, 21e are attached to the longitudinal members W1, W1.
  • intersections X, X of the upper welded wire mesh WM and the horizontal portions forming the intersection X are located between the second fixing portions 21e, 21e, 21e, 21e forming a pair of the third fixing tool F3. Since the strip material W2 is inserted in a manner adjacent to the intersections X, X of the lower welding wire mesh WM already inserted and the horizontal strip material W2 constituting the intersection X, the upper welding wire mesh WM is formed. Is prevented from shifting in the vertical and horizontal directions.
  • the plurality of welded metal meshes WM, WM,... are arranged in the row direction and the column direction on the construction target surface.
  • the welded metal meshes WM, WM,... Arranged in the row direction are arranged so that the front and back are sequentially switched, and are arranged so that the front and back are the same in the column direction.
  • the welding wire meshes WM, WM, WM, WM,... Adjacent in the row direction are connected and fixed by the third fixtures F3, F3,. All of the arranged welded metal meshes WM, WM are prevented from shifting in the vertical and horizontal directions.
  • FIG. 31 is a perspective view of the fourth fixture.
  • portions corresponding to the portions shown in FIG. 24 are denoted by the same reference numerals, and description thereof will be omitted.
  • the fourth fixing device F4 is the same as that described above except that the dimensions of the two leg sides 21c, 21c of the second coupling means 20 are longer than the two leg sides 21c, 21c of the third fixing device F3. It has substantially the same configuration as the third fixing tool F3 described above. That is, both leg sides 21c, 21c constituting the second coupling means 20 of the fourth fixing tool F4 pass between the second frame members 12, 12, as before, and the fixing portions 11e, 11e of the first frame member 11 are formed. It extends to a higher position, and second fixing portions 21e, 21e, 21e, 21e are provided at ends of both leg sides 21c, 21c, respectively.
  • the bottom 21b side of the two leg sides 21c, 21c extends to the position passing through the contact parts 11b, 11b of the first frame members 11, 11 and separated from the contact part 11b by a predetermined dimension.
  • These extended portions of the portions 21c, 21c and the bottom portion 21b of the second coupling means 20 form a leg portion 25 which enters the above-described valley portion DB (see FIG. 3) of the deck plate DP.
  • the two leg sides 21c, 21c and the first frame member 11 are fixed to each other by welding or bonding at appropriate positions where they are opposed to each other.
  • the length of the bottom 21b constituting the leg 25 is determined according to the inclination angle of the two leg sides 21c, 21c and the length of the leg 25, and when the length of the bottom 21b is very short,
  • the leg portion 25 is substantially V-shaped when viewed from the front.
  • the inclination angles of both leg sides 21c, 21c may be constant, but may be changed at appropriate positions in the longitudinal direction.
  • the inclination is made near the position facing the corner formed by the arm 11d of the first frame members 11, 11 and the rising part 11c.
  • the angle is changed, and is relatively obtuse on the second fixing portions 21e and 21e side from the position, and relatively acute on the leg 25 side from the position.
  • the fourth fixing tool F4 is superimposed on the lower welding wire mesh WM to which the fourth fixing tool F4 is attached.
  • the upper welding metal mesh WM can be fixed with one touch.
  • the leg 25 of the fourth fixing tool F4 enters the valley DB (see FIG. 3) of the deck plate DP, the height position of the welding wire mesh to which the fourth fixing tool F4 is attached and other welding.
  • the height position of the wire mesh can be made substantially the same.
  • the first fixing tool F1 to the fourth fixing tool F4 can be applied to not only a welded wire mesh but also another lattice-like body such as a metal or resin net fence.

Abstract

作業員に重労働を強いることなく、未熟な作業員であっても複数の格子状体を短時間で確実に施工することができる方法を提供する。 施工者は、加工した各溶接金網それぞれについて、施工設計工程において決定した溶接金網の表裏、溶接金網の各位置に第1固定具、第2固定具、第1スペーサ及び/又は第2スペーサを、施工設計工程で設計した方向で取り付け(ステップS5)、施工設計図に定められた配置及び順番で、該当する溶接金網を配置し(ステップS7)、相隣る溶接金網との重畳領域において、第1固定具及び/又は第2固定具の上に位置する溶接金網の縦条材及び/又は横条材に押圧を印加して、第1固定具及び/又は第2固定具の結合手段に当該溶接金網の縦条材及び/又は横条材を結合させ、重畳された両溶接金網を互いに固定させる(ステップS8)。

Description

格子状体の施工方法
 本発明は、コンクリート内に埋設される溶接金網又は網状のフェンス等、縦条材と横条材とを格子状に構成してなる複数の格子状体を施工する方法に関する。
 建物の床といった構造物を建造すべくコンクリートを打設する場合、当該構造物の強度を増大させ、また構造物にクラックが発生することを防止するために、コンクリート内に複数枚の溶接金網を埋設させている。
 図32は従来の溶接金網の施工方法を説明する説明図であり、図中、WMは溶接金網である。溶接金網WMは、複数の縦条材W1,W1,…と横条材W2,W2,…とを格子状に配してなり、縦条材W1,W1,…と横条材W2,W2,…とが交差する部分を相互に溶接にて固定してある。
 施工対象領域の周囲に図示しない型枠を立設しておき、当該型枠内の全域に複数の溶接金網WM,WM,…を敷設する。このとき、相隣る溶接金網WM,WMはその縁部が複数の枡目(図32にあっては1枡目)ずつ重畳するようにしてある。次に、溶接金網WM,WM,…を順に持ち上げ、図32に示したように、施工対象面と溶接金網WM,WM,…との間にブロックといったスペーサ30,30,…を介装させ、スペーサ30,30,…上に溶接金網WM,WM,…を載置する。このようにスペーサ30,30,…上に溶接金網WM,WM,…を担持することによって、施工対象面から所定寸法だけ隔てた位置に溶接金網WM,WM,…を保持する。
 そして、相隣る溶接金網WM,WMの重畳部分に、例えば溶接金網上で作業する作業員によって踏まれた場合であっても相互ズレが発生することを防止するために、針金等の短寸の条材を用いてなる結束材B,B,…によって、重畳する両溶接金網WM,WMを相互に結束する。このようにして施工対象領域に溶接金網WM,WM,…への施工が終了した後、型枠内へコンクリートを溶接金網WM,WM,…が埋入する所定深さまで投入し、投入したコンクリートの表面を均すのである。
 しかし、このような結束作業は各溶接金網WM,WM,…が相互に重畳させた全ての領域に対して実施する必要がある上に、各領域それぞれに多くの結束箇所が存在するため、比較的大きな面積の構造物を建造する場合、熟練した作業員が複数人必要となるのに加え、熟練した作業員であっても全ての結束箇所の作業が終了するまでに長時間を要していた。
 そのため、後記する特許文献1には、鉄筋コンクリート用の棒鋼を用いてなる複数の横条材と、合成樹脂材又は金属材を紐状又は帯板状に成形してなる複数の縦条材とを簾状に連結してなる先組みの金網が提案されている。かかる金網にあっては、前同様、相隣る金網の縁部を相互に重畳させ、両金網の重畳部分を互いに結束するが、当該金網の面積は前述した溶接金網WMより面積が広いため結束箇所が少なく、従って結束作業に要する時間を短縮することができる。一方、本金網は、横条材の中心軸と平行をなす軸回りに、ロール状に巻回することができるため、金網の運搬作業が容易になるとともに、敷設場所においてロール状になした金網を巻き戻すことによって、当該金網を敷設領域に展開敷設することができるため、前述した溶接金網WM,WM,…を敷設する場合に比べて、敷設作業を効率的に行うことができる。
 しかしながら、前述したいずれの施工方法にあっても、溶接金網WM又はロール状から展開した金網は、スペーサ30,30,…上に載置するだけであるため、前述した結束材B,B,…による結束作業中に各溶接金網WM,WM,…又は各金網にずれが発生した場合、当該部分に配されたスペーサ30,30,…の位置を再度調整しなければならないという問題があった。そのため、後記する特許文献2には次のようなスペーサが開示されている。
 図33は特許文献2に開示されたスペーサの使用様態を示す斜視図である。スペーサ131は、5~6mm程度の直径の金属線材を屈曲成形してなり、所定距離を隔てて立ち上げた2本の立ち上がり部131c,131cと、両立ち上がり部131c,131cの間に形成され、溶接金網を構成する鉄線を支持する鉄線支持部131gと、両立ち上がり部131c,131cの下端からそれぞれ水平に折曲され、デッキプレートDP上に載置される載置部131b,131bとを備えている。また、前記鉄線支持部131gには、両立ち上がり部131c,131cの上端から水平方向へ延設した下側横向き部131d,131dと、両下側横向き部131d,131dからそれぞれ湾曲して立ち上がった弧状部131e,131eと、両弧状部131e,131eの上端間を繋ぐ水平な上側横向き部131fとを有し、側面視が扁平な螺旋状になしてある。ここで、両下側横向き部131d,131dと上側横向き部131fとの間の内寸は、溶接金網を構成する鉄線の外径より大きくしてある。
 このようなスペーサ131にあっては、デッキプレートDP上に敷設された溶接金網WMを持ち上げ、当該溶接金網WMを構成する鉄線を螺旋状の鉄線支持部131g内へ挿入し、その状態で当該溶接金網WMを下すことによって、スペーサ131の載置部131b,131bをデッキプレートDPに当接させ、スペーサ131をデッキプレートDP上に立脚させる。このとき、鉄線支持部131g内へ挿入された鉄線は、当該スペーサ131の両下側横向き部131d,131d上に担持される。
特開平9-209500号公報 特開2010-189855号公報
 しかしながら、特許文献2に開示されたスペーサ131にあっては、スペーサ131の鉄線支持部131g内へ溶接金網WMの鉄線を挿入させる作業は、前同様、一部を重畳させた各溶接金網WM,WM,…を作業員が持ち上げて行わなければならないため、作業員に重労働を強いるのに加え、溶接金網WMの鉄線へのスペーサ131の取り付け作業に長時間を要するという問題があった。一方、溶接金網WMを構成する鉄線を螺旋状の鉄線支持部131g内へ挿入することによって、それ以後はスペーサ131が溶接金網WMの動きに追従するものの、当該スペーサ131は溶接金網WMに固定されていないため、敷設した溶接金網WMにずれが発生して、当該溶接金網WMの位置を調整する場合に、スペーサ131の鉄線支持部131g内へ挿入された鉄線が両下側横向き部131d,131dからずれることがあり、かかる場合、溶接金網WMのスペーサ131を取り付けた部分を再度持ち上げ、当該スペーサ131を再調整しなければならなかった。
 更に、かかるスペーサ131を用いた場合であっても、複数の溶接金網を施工するには各溶接金網を相互に結束しなければならず、結束作業に伴う前述した問題は解消されていない。
 本発明は斯かる事情に鑑みてなされたものであって、作業員に重労働を強いることなく、未熟な作業員であっても複数の格子状体を短時間で確実に施工することができる方法を提供する。
 (1)本発明に係る格子状体の施工方法は、格子状に配した複数の縦条材及び複数の横条材が交差する部分を接合してなり、各縦条材及び各横条材にて形成された複数の枡目を有する一の格子状体の縁部上に他の格子状体の縁部を重畳させ、両者の重畳部分を互いに固定する操作を繰り返して、施工対象面に複数の格子状体を施工する格子状体の施工方法であって、各格子状体を配置する位置である配置位置、及び各格子状体を配置する順番である配置順を予め定めておき、前記一の格子状体に固定させるための固定部と、前記他の格子状体の縦条材又は横条材を結合させるための結合手段とを有する1又は複数の固定具を、各格子状体の縁部の所定位置に固定し、前記配置順に応じて、該当する配置位置に配置した一の格子状体の縁部上に、前記配置順に応じて、該当する配置位置に配置した他の格子状体の縁部を重畳させ、次に、重畳させた他の格子状体の縁部に押圧を印加することによって、一の格子状体の縁部に固定された1又は複数の固定具の結合手段に、当該他の格子状体の縦条材又は横条材を結合させて、両格子状体を固定することを特徴とする。
 本発明の格子状体の施工方法にあっては、格子状に配した複数の縦条材及び複数の横条材が交差する部分を接合してなり、各縦条材及び各横条材にて形成された複数の枡目を有する一の格子状体の縁部上に他の格子状体の縁部を重畳させ、両者の重畳部分を互いに固定する操作を繰り返して、施工対象面に複数の格子状体を施工する。この際、施工対象面において、各格子状体を配置する位置である配置位置、及び各格子状体を配置する順番である配置順を予め定めておく。従って、作業員たる施工者は予め定められた配置位置に、予め定められた配置順で各格子状体をそれぞれ配置すればよく、未熟な施工者であっても複数の格子状体を短時間で確実に配置することができる。ここで、予め定められた格子状体の配置位置及び配置順は施工設計図として取得されるので、施工者は施工設計図に従って各格子状体を予め定められた配置位置に、予め定められた配置順で配置する。
 また、本発明にあっては、前記一の格子状体に固定させるための固定部と、前記他の格子状体の縦条材又は横条材を結合させるための結合手段とを有する1又は複数の固定具を用いる。即ち、施工対象面に、相隣る両格子状体を両者の縁部が互いに重畳するように施工するが、施工対象面に先に配置される一の格子状体の相対的に下側となる縁部の所定位置に、1又は複数の固定具を各固定具に設けられた各固定部を用いてそれぞれ固定させる。これら各固定具には、当該一の格子状体の縁部上に重畳される他の格子状体を構成する縦条材又は横条材を結合させるための結合手段がそれぞれ設けてある。
 そして、前記配置順に応じて、該当する配置位置に配置した一の格子状体の縁部上に、前記配置順に応じて、該当する配置位置に配置した他の格子状体の縁部を重畳させ、次に、重畳させた他の格子状体の縁部に押圧を印加することによって、一の格子状体の縁部に固定された1又は複数の固定具の結合手段に、当該他の格子状体の縦条材又は横条材を結合させて、両格子状体を固定する。
 このように、固定具を固定した一の格子状体の縁部上に他の格子状体の縁部を重畳させ、他の格子状体の縁部に押圧を印加するだけで、前記固定具にて両格子状体をワンタッチで結合固定することができる。従前のような結束作業が不要であるため、施工者に重労働を強いることなく、未熟な施工者であっても複数の格子状体を短時間で確実に施工することができる。
 加えて、配置順に応じて、該当する他の格子状体を配置位置に配置する都度、当該他の格子状体の縁部に押圧を印加することによって、先に配置した一の格子状体とワンタッチで結合固定することができるため、施工作業を可及的に効率化することができる。
 (2)本発明に係る格子状体の施工方法は、前記配置順を定めるに際して、前記格子状体の表裏を定めることを特徴とする。
 本発明の格子状体の施工方法にあっては、配置順を定めるに際して、前記格子状体の表裏を定める。例えば、格子状体の各縦条材が上側であり、各横条材が下側である場合を表とし、逆の場合、即ち格子状体の各縦条材が下側であり、各横条材が上側である場合を裏とすると、一の格子状体を表の状態で配置し、他の格子状体を裏の状態で配置すると、両格子状体にあって、両者の縦条材が互いに対向し得るように配置されるため、それらを同じ面内で互いに相隣るように両格子状体を配置することができる。なお、表裏の定義は、この逆であってもよい。ここで、定められた格子状体の表裏は施工設計図として取得されるので、施工者は施工設計図に従って各格子状体を予め定められた表裏になるように配置する。
 (3)本発明に係る格子状体の施工方法は、施工対象面の行方向へ、表の格子状体と裏の格子状体とを交互に配置し、また施工対象面の列方向へ、表裏が同じ格子状体を配置する、又は、施工対象面の列方向へ、表の格子状体と裏の格子状体とを交互に配置し、また施工対象面の行方向へ、表裏が同じ格子状体を配置することを特徴とする。
 本発明の格子状体の施工方法にあっては、施工対象面の行方向へ、表の格子状体と裏の格子状体とを交互に配置し、また施工対象面の列方向へ、表裏が同じ格子状体を配置する。前同様、格子状体の各縦条材が上側であり、各横条材が下側である場合を表とし、格子状体の各縦条材が下側であり、各横条材が上側である場合を裏とすると、行方向に相隣る両格子状体が表裏の順に配置されると、両格子状体の各縦条材が互いに対向し得るように配置されるため、それらを同じ面内で互いに相隣るように両格子状体を配置することができる。また、行方向に相隣る両格子状体が裏表の順に配置されると、両格子状体の各横条材が互いに対向し得るように配置されるため、それらを同じ面内で互いに相隣るように両格子状体を配置することができる。これによって、一の格子状体と他の格子状体とを重畳させた部分の厚みを可及的に小さくすることができる。
 又は、施工対象面の列方向へ、表の格子状体と裏の格子状体とを交互に配置し、また施工対象面の行方向へ、表裏が同じ格子状体を配置する。この場合も前同様、列方向に相隣る両格子状体が表裏の順に配置されると、両格子状体の各縦条材が互いに対向し得るように配置されるため、それらを同じ面内で互いに相隣るように両格子状体を配置することができる。また、列方向に相隣る両格子状体が裏表の順に配置されると、両格子状体の各横条材が互いに対向し得るように配置されるため、それらを同じ面内で互いに相隣るように両格子状体を配置することができる。これによって、一の格子状体と他の格子状体とを重畳させた部分の厚みを可及的に小さくすることができる。ここで、前同様、格子状体の表裏は施工設計図として取得されるので、施工者は施工設計図に従って各格子状体を予め定められた表裏になるように配置する。
 (4)本発明に係る格子状体の施工方法は、前記配置位置を定めるに際して、当該施工対象面に係る建築物の設計図に基いて、各格子状体の形状を定め、定めた形状に各格子状体を加工しておくことを特徴とする。
 本発明の格子状体の施工方法にあっては、配置位置を定めるに際して、当該施工対象面に係る建築物の設計図に基いて、当該配置位置に対応する各格子状体の形状を定める。そして、定めた形状に各格子状体を加工しておく。これによって、設計図に応じた形状の格子状体を得ておくことができ、各格子状体の施工作業をより短時間で実施することができる。ここで、各格子状体の形状は施工設計図として取得されるので、施工者は施工設計図に従った形状となるように、各格子状体を加工しておく。
 (5)本発明に係る格子状体の施工方法は、前記一の格子状体と他の格子状体とは、前記施工対象面に対向する両者の枡目の位置が、相互に異なるように重畳させることを特徴とする。
 本発明の格子状体の施工方法にあっては、一の格子状体と他の格子状体とは、前記施工対象面に対向する両者の枡目の位置が、例えば互いに1.5つ分の枡目を重畳させるというように、相互に異なるように重畳させる。これによって、高い結合強度を維持したまま、相隣る構造強度の重畳領域を小さくすることができるため、格子状体のロスを可及的に少なくすることができる。ここで、各格子状体の施工対象面に対向する両者の枡目の位置は施工設計図として取得されるので、施工者は施工設計図に従って各格子状体を施工する。
 (6)本発明に係る格子状体の施工方法は、前記固定具として、一の格子状体の相隣る縦条材又は相隣る横条材にそれぞれ固定させるための対をなす固定部を具備し、前記結合手段は対をなす両固定部の間の領域に配設してある固定具を用いることを特徴とする。
 本発明の格子状体の施工方法にあっては、次のような固定具を用いる。即ち、当該固定具は、前述した一の格子状体の相隣る縦条材又は相隣る横条材にそれぞれ固定させるための対をなす固定部を具備しており、それら対をなす両固定部の間の領域に結合手段が配設してある。前述した如く、一の格子状体と他の格子状体とを、前記施工対象面に対向する両者の枡目の位置が相互に異なるように重畳させた場合、一の格子状体の相隣る縦条材の間、又は相隣る横条材の間に、他の格子状体の縦条材又は横条材が位置するため、当該他の格子状体の縦条材又は横条材と前記固定具の結合手段に結合させる。これによって、ワンタッチで両格子状体を結合固定させることができる。
 (7)本発明に係る格子状体の施工方法は、行方向に相隣る一の格子状体の縁部に配置する固定具は、その対をなす固定部を当該格子状体の相隣る縦条材にそれぞれ固定させ、当該固定具の結合手段に、行方向に相隣る他の格子状体の縦条材を結合させ、列方向に相隣る一の格子状体の縁部に配置する固定具は、その対をなす固定部を当該格子状体の相隣る横条材にそれぞれ固定させ、当該固定具の結合手段に、列方向に相隣る他の格子状体の横条材を結合させることを特徴とする。
 本発明の格子状体の施工方法にあっては、行方向に相隣る一の格子状体の縁部に配置する固定具は、その対をなす固定部を当該格子状体の相隣る縦条材にそれぞれ固定させ、当該固定具の結合手段に、行方向に相隣る他の格子状体の縦条材を結合させる。これによって、両格子状体が行方向へ相互に摺動することが防止される。
 また、列方向に相隣る一の格子状体の縁部に配置する固定具は、その対をなす固定部を当該格子状体の相隣る横条材にそれぞれ固定させ、当該固定具の結合手段に、列方向に相隣る他の格子状体の横条材を結合させる。これによって、両格子状体が列方向へ相互に摺動することが防止される。従って、施工対象面に施工された各格子状体はその全体として行方向及び列方向へ相互に摺動することが防止される。ここで、各格子状体への固定具の取付位置は施工設計図として取得されるので、施工者は施工設計図に従って各格子状体に固定具を取り付けておく。
 (8)本発明に係る格子状体の施工方法は、前記固定具として、前記結合手段を相対的に施工対象面の近くの位置に保持するように構成してなる第1固定具と、前記結合手段を相対的に施工対象面から離隔した位置に保持するための脚部を設けてなる第2固定具とを用い、畝状の山部及び谷部を設けてなるデッキプレートが施工対象面に施設される場合、デッキプレート上に配置される格子状体にあって、当該デッキプレートの山部に対向する位置には前記第1固定具を配置し、当該デッキプレートの谷部に対向する位置には前記第2固定具を配置することを特徴とする。
 本発明の格子状体の施工方法にあっては、固定具として、前記結合手段を相対的に施工対象面の近くの位置に保持するように構成してなる第1固定具と、前記結合手段を相対的に施工対象面から離隔した位置に保持するための脚部を設けてなる第2固定具とを用いる。そして、畝状の山部及び谷部を設けてなるデッキプレートが施工対象面に施設される場合、デッキプレート上に配置される格子状体にあって、当該デッキプレートの山部に対向する位置には前記第1固定具を配置し、当該デッキプレートの谷部に対向する位置には前記第2固定具を配置する。これによって、畝状の山部及び谷部を設けてなるデッキプレート上に格子状体を配置する場合であっても、当該格子状体をその全体として施工対象面と略平行に担持することができる。ここで、各格子状体への第1固定具及び第2固定具の取付位置は施工設計図として取得されるので、施工者は施工設計図に従って各格子状体に第1固定具又は第2固定具を取り付けておく。
 (9)本発明に係る格子状体の施工方法は、前記一の格子状体と他の格子状体とは、前記施工対象面に対向する両者の枡目の位置が、略一致するように重畳させることを特徴とする。
 本発明の格子状体の施工方法にあっては、一の格子状体と他の格子状体とは、前記施工対象面に対向する両者の枡目の位置が、略一致するように重畳させる。ここで、略一致するとは、両者の枡目の位置が一致する場合はもちろん、両者の枡目の位置が縦条材又は横条材の1本分異なる場合、即ち、両格子状体の縦条材又は横条材が、同じ面内で互いに相隣るように重畳された場合も包含している。施工対象面に複数の格子状体を施工する場合、一の格子状体の縁部上に他の格子状体の縁部を、互いに2つの枡目が一致するように重畳させることが実施されているが、このような施工方法に対応するものである。ここで、一の格子状体と他の格子状体とが両者の枡目の位置が、略一致するように重畳させることは施工設計図として取得されるので、施工者は施工設計図に従って両格子状体を施工する。
 (10)本発明に係る格子状体の施工方法は、前記固定具として、一の格子状体の相隣る縦条材又は相隣る横条材にそれぞれ固定させるための対をなす固定部と、重畳された他の格子状体の相隣る縦条材又は相隣る横条材をそれぞれ結合させる対をなす結合手段とを具備する固定具を用いることを特徴とする。
 本発明の格子状体の施工方法にあっては、固定具として、一の格子状体の相隣る縦条材又は相隣る横条材にそれぞれ固定させるための対をなす固定部と、重畳された他の格子状体の相隣る縦条材又は相隣る横条材をそれぞれ結合させる対をなす結合手段とを具備する固定具を用いる。これによって、前述した如き、一の格子状体の縁部上に他の格子状体の縁部を、互いに2つの枡目が一致するように重畳させる施工方法であっても、ワンタッチで両格子状体を結合固定することができ、施工者に重労働を強いることなく、未熟な施工者であっても複数の格子状体を短時間で確実に施工することができる。
 (11)本発明に係る格子状体の施工方法は、2対の固定部が距離を隔てて互いに平行に配設してあり、対をなす固定部の内側に、2対の結合手段が距離を隔てて互いに平行に配設してあり、平行に配された対をなす結合手段の間に2本の縦条材又は2本の横条材を互いに平行に嵌入し得るようになした固定具を用い、一の格子状体の相隣る縦条材又は横条材に前記固定具を、当該固定具の平行に対向する両固定部が、縦条材と横条材とが交叉する交叉部を跨ぐように固定させておき、平行に配された対をなす結合手段の間に、一の格子状体の縦条材及び他の格子状体の縦条材を互いに平行に嵌入させ、又は一の格子状体の横条材及び他の格子状体の横条材を並べた状態で嵌入させることを特徴とする。
 本発明の格子状体の施工方法にあっては、2対の固定部が距離を隔てて互いに平行に配設してあり、対をなす固定部の内側に、2対の結合手段が距離を隔てて互いに平行に配設してあり、平行に配された対をなす結合手段の間に2本の縦条材又は2本の横条材を並べた状態で嵌入し得るようになした固定具を用いる。
 一の格子状体の相隣る縦条材又は横条材に前記固定具を、当該固定具の平行に対向する両固定部が、縦条材と横条材とが交叉する交叉部を跨ぐように固定させておき、平行に配された対をなす結合手段の間に、一の格子状体の縦条材及び他の格子状体の縦条材を並べて嵌入させ、又は一の格子状体の横条材及び他の格子状体の横条材を並べて嵌入させる。これによって、両格子状体は行方向及び列方向へ相互に摺動することが防止される。
 (12)本発明に係る格子状体の施工方法は、前記固定具として、前記結合手段を相対的に施工対象面の近くの位置に保持するように構成してなる第3固定具と、前記結合手段を相対的に施工対象面から離隔した位置に保持するための脚部を設けてなる第4固定具とを用い、畝状の山部及び谷部を設けてなるデッキプレートが施工対象面に施設される場合、デッキプレート上に配置される格子状体にあって、当該デッキプレートの山部に対向する位置には前記第3固定具を配置し、当該デッキプレートの谷部に対向する位置には前記第4固定具を配置することを特徴とする。
 本発明の格子状体の施工方法にあっては、固定具として、前記結合手段を相対的に施工対象面の近くの位置に保持するように構成してなる第3固定具と、前記結合手段を相対的に施工対象面から離隔した位置に保持するための脚部を設けてなる第4固定具とを用いる。そして、畝状の山部及び谷部を設けてなるデッキプレートが施工対象面に施設される場合、デッキプレート上に配置される格子状体にあって、当該デッキプレートの山部に対向する位置には前記第3固定具を配置し、当該デッキプレートの谷部に対向する位置には前記第4固定具を配置する。これによって、畝状の山部及び谷部を設けてなるデッキプレート上に格子状体を配置する場合であっても、当該格子状体をその全体として施工対象面と略平行に担持することができる。ここで、各格子状体への第3固定具及び第4固定具の取付位置は施工設計図として取得されるので、施工者は施工設計図に従って各格子状体に第3固定具又は第4固定具を取り付けておく。
 (13)本発明に係る格子状体の施工方法は、前記格子状体に固定させるための固定部と、当該格子状体を施工対象面から離隔した位置に担持する担持部とを具備するスペーサを用い、各格子状体の相隣る格子状体が重畳される以外の領域に複数のスペーサを互いに適宜の距離を隔てて取り付けておくことを特徴とする。
 本発明の格子状体の施工方法にあっては、格子状体に固定させるための固定部と、当該格子状体を施工対象面から離隔した位置に担持する担持部とを具備するスペーサを用いる。そして、各格子状体の相隣る格子状体が重畳される以外の領域に複数のスペーサを互いに適宜の距離を隔てて取り付けておく。これによって、各格子状体をその全体として施工対象面と略平行に担持することができる。ここで、各格子状体へのスペーサの取付位置は施工設計図として取得されるので、施工者は施工設計図に従って各格子状体にスペーサを取り付けておく。
 (14)本発明に係る格子状体の施工方法は、格子状に配した複数の縦条材及び複数の横条材が交差する部分を接合してなり、各縦条材及び各横条材にて形成された複数の枡目を有する一の格子状体の縁部上に他の格子状体の縁部を重畳させ、両者の重畳部分を互いに固定する操作を繰り返して、施工対象面に複数の格子状体を施工する格子状体の施工方法であって、各格子状体を配置する位置である配置位置、各配置位置に配置する格子状体の形状を、当該施工対象面に係る建築物の設計図に基いてそれぞれ決定し、また、各格子状体を配置する順番である配置順、及び、各配置位置に配置する格子状体の表裏をそれぞれ決定し、更に、前記一の格子状体に固定させるための固定部と、前記他の格子状体の縦条材又は横条材を結合させるための結合手段とを有する複数種類の固定具、及び、前記格子状体に固定させるための固定部と、当該格子状体を施工対象面から離隔した位置に担持する担持部とを具備する複数種類のスペーサについて、各格子状体の縁部の所定位置に固定する位置、格子状体に取り付ける取付方向、及び、当該位置に取り付けるべき種類をそれぞれ決定して施工設計図を予め取得しておき、取得した施工設計図に従って、複数の格子状体を加工し、加工した格子状体それぞれに対応する固定具及びスペーサを取り付け、それらを取り付けた各格子状体を前記配置順に応じて、該当する配置位置に配置した一の格子状体の縁部上に、前記配置順に応じて、該当する配置位置に配置した他の格子状体の縁部を重畳させ、次に、重畳させた他の格子状体の縁部に押圧を印加することによって、一の格子状体の縁部に固定された1又は複数の固定具の結合手段に、当該他の格子状体の縦条材又は横条材を結合させて、両格子状体を固定することを特徴とする。
 本発明の格子状体の施工方法にあっては、格子状に配した複数の縦条材及び複数の横条材が交差する部分を接合してなり、各縦条材及び各横条材にて形成された複数の枡目を有する一の格子状体の縁部上に他の格子状体の縁部を重畳させ、両者の重畳部分を互いに固定する操作を繰り返して、施工対象面に複数の格子状体を施工する。この際、施工設計図を予め取得しておく。
 ここで、施工設計図は、各格子状体を配置する位置である配置位置、各配置位置に配置する格子状体の形状を、当該施工対象面に係る建築物の設計図に基いてそれぞれ決定し、また、各格子状体を配置する順番である配置順、及び、各配置位置に配置する格子状体の表裏をそれぞれ決定することによって策定する。
 また、本発明にあっては、一の格子状体と他の格子状体とを互いに固定するために、一の格子状体に固定させるための固定部と、前記他の格子状体の縦条材又は横条材を結合させるための結合手段とを有する複数種類の固定具を用い、加えて、格子状体を施工対象面から所定寸法隔てた位置に保持するために、格子状体に固定させるための固定部と、当該格子状体を施工対象面から離隔した位置に担持する担持部とを具備する複数種類のスペーサを用いるが、これらについて、各格子状体の縁部の所定位置に固定する位置、格子状体に取り付ける取付方向、及び、当該位置に取り付けるべき種類をそれぞれ決定して、前記施工設計図に包含させておく。
 そして、取得した施工設計図に従って、施工者が、複数の格子状体を加工し、加工した格子状体それぞれに対応する固定具及びスペーサを取り付け、それらを取り付けた各格子状体を前記配置順に応じて、該当する配置位置に配置した一の格子状体の縁部上に、前記配置順に応じて、該当する配置位置に配置した他の格子状体の縁部を重畳させ、次に、重畳させた他の格子状体の縁部に押圧を印加することによって、一の格子状体の縁部に固定された1又は複数の固定具の結合手段に、当該他の格子状体の縦条材又は横条材を結合させて、両格子状体を固定する。
 このように、施工者は施工設計図に従って、各格子状体の施工を実施すればよく、未熟な施工者であっても複数の格子状体を短時間で確実に施工することができる。更に、固定具を固定した一の格子状体の縁部上に他の格子状体の縁部を重畳させ、他の格子状体の縁部に押圧を印加するだけで、前記固定具にて両格子状体をワンタッチで結合固定することができるため、従前のような結束作業が不要であり、施工者に重労働を強いることなく、未熟な施工者であっても複数の格子状体を短時間で確実に施工することができる。
本発明に係る格子状体の施工方法を実施するための手順の一例を示すフローチャートである。 図1に示した施工設計の実施における詳細な手順を示すフローチャートである。 設計図上に、成形した複数の溶接金網を配置した状態を説明する説明図である。 図3の溶接金網の一つを示す平面図である。 溶接金網を施工する順番、各溶接金網の表裏、並びに固定具及びスペーサの取付位置及び取付方向を定めた施工設計図の一例を説明する説明図である。 図5に示した溶接金網の施工順番及び各溶接工の表裏を簡素化して説明するための説明図である。 施工設計図の他例を説明する説明図である。 第1固定具の一例を示す斜視図である。 第2固定具の一例を示す斜視図である。 第1スペーサの一例を示す斜視図である。 第2スペーサの一例を示す斜視図である。 一の溶接金網に取り付けた第1固定具上に他の溶接金網を重畳させた状態を示す部分拡大斜視図である。 図12に示した第1固定具によって両溶接金網を互いに固定した状態を示す部分拡大斜視図である。 図8に示した第1固定具と当該第1固定具によって固定された溶接金網との部分側面図である。 溶接金網の他の位置に配置された第1固定具と当該第1固定具によって固定された溶接金網との部分側面図である。 溶接金網の更に他の位置に配置された第1固定具と当該第1固定具によって固定された溶接金網との部分側面図である。 溶接金網の他の位置に配置された第1固定具と当該第1固定具によって固定された溶接金網との部分側面図である。 溶接金網に取り付けられた第1スペーサと当該溶接金網との部分側面図である。 発明を実施するための第2の形態に係る施工方法を説明するための施工設計図である。 表の溶接金網上に表の溶接金網を重畳させた場合の両者の重畳部分を示す部分拡大平面図である。 表の溶接金網上に表の溶接金網を重畳させた場合の両者の重畳部分を示す部分拡大正面図である。 裏の溶接金網上に裏の溶接金網を重畳させた場合の両者の重畳部分を示す部分拡大平面図である。 裏の溶接金網上に裏の溶接金網を重畳させた場合の両者の重畳部分を示す部分拡大正面図である。 第3固定具の一例を示す斜視図である。 図24に示した第3固定具を取り付けた溶接金網と、該溶接金網上に重畳させた他の溶接金網とを第3固定具にて結合固定した状態の一例を説明するための一部省略部分斜視図である。 下側の溶接金網が表であり、上側の溶接金網が裏の状態である2つの溶接金網を重畳させた領域の部分拡大平面図である。 図26に示した2枚の溶接金網の正面図である。 下側の溶接金網が裏であり、上側の溶接金網が表の状態である2つの溶接金網を重畳させた領域の部分拡大平面図である。 図28に示した2枚の溶接金網の正面図である。 第3固定具を取り付けた溶接金網と、該溶接金網上に重畳させた他の溶接金網とを第3固定具にて結合固定した状態の他例を説明するための一部省略部分斜視図である。 第4固定具の斜視図である。 従来の溶接金網の施工方法を説明する説明図である。 特許文献2に開示されたスペーサの使用様態を示す斜視図である。
 本発明に係る格子状体の施工方法を図面に基いて詳述する。
 なお、本発明を実施するための形態で説明する格子状体の施工方法は、本発明の趣旨を説明する一例であり、本発明はその趣旨を逸脱しない範囲での変形や改造を含むことはいうまでもない。
 (発明を実施するための第1の形態)
 図1は、本発明に係る格子状体の施工方法を実施するための手順の一例を示すフローチャートである。なお、本形態では、格子状体として溶接金網を用い、主に建造物の床の施工に適用する場合について説明する。
 図1に示した如く、施工者は、施工対象面に複数の溶接金網の配置、一部を互いに重畳させた相隣る溶接金網を相互に固定する固定具、及び溶接金網を施工対象面から離隔した高さに保持するスペーサ等の配置、並びに各溶接金網の配置順等を定める施工設計を行う(ステップS1)。
 図2は図1に示した施工設計の実施における詳細な手順を示すフローチャートである。
 施工者には、建造物の骨格を形成する鉄骨といった骨材の配置、当該建造物の壁、柱及び階段等の配置、並びに対向する骨材間に架設する複数のデッキプレートの配置等、施工対象面に係る建築物の設計図が予め与えられており、施工者は、該設計図に規定された施工対象面に複数の溶接金網を配置する(ステップS10)。このとき、相隣る溶接金網はその縁部の予め定めた領域を互いに重畳させる。このように配置された各溶接金網にあっては、建造物の壁、柱、階段等の構造体にその一部が重なる場合があり、かかる溶接金網は該当部分を切り取る成形作業を実施する必要がある。そこで、施工者は、設計図に配置された各溶接金網それぞれについて、構造体に重なる部分が無いように、当該溶接金網の形状を決定する(ステップS11)。ここで、本発明に係る設計図には印刷物以外に、設計図データ及び該設計図データを表示した画像等も含まれる。
 図3は、前述した設計図上に、成形した複数の溶接金網を配置した状態を説明する説明図であり、図中、DPはデッキプレートである。デッキプレートDP,DP,…は、例えば畝状の2本の山部DM,DMとその間の谷部DBとを具備してなり、両山部DM,DMの外側に前記谷部DBの半分の幅寸法になしたフランジ部をそれぞれ設け、相隣るデッキプレートDP,DPの対向する両フランジ部を連結することによって前同様な谷部DBが形成されるようになっている。
 なお、デッキプレートDPは1本の山部DMの両側に前記フランジ部をそれぞれ設け、相隣る2つのデッキプレートDP,DPの対向する両フランジ部を連結することによって谷部DBが形成されるように構成してもよい。
 建造物の骨格を形成するように複数の骨材が組み付けられており、図3に示した如く、対向する骨材の間にデッキプレートDP,DP,…を架設して、建造物の床底とすべく、柱P等を除いた施工対象面が形成されている。各溶接金網WM,WM,…は前述した如くその配置位置に応じた形状になしてあり、相隣る溶接金網WM,WM,…はその縁部の予め定めた領域を互いに重畳させてある。後述するように溶接金網WMには複数の枡目M
,M,…が設けてあり、図3に示した場合にあっては、相隣る溶接金網WM,WM,…はその縁部の1.5枡目M分の領域を互いに重畳させてある。
 図4は図3の溶接金網の一つを示す平面図である。
 溶接金網WMは、複数の縦条材W1,W1,…と、複数の横条材W2,W2,…とを所定距離を隔てて格子状に配してあり、両者の交差部分を溶接固定してある。また、溶接金網WMには、各縦条材W1,W1,…及び各横条材W2,W2,…にて囲まれる複数の枡目M,M,…が複数行複数列になるように形成されている。なお、縦条材W1及び横条材W2は便宜的に名付けたものであり、溶接金網WMと観察者との相対位置によって、縦条材W1が横方向に配置され、横条材W2が縦方向に配置される場合があることはいうまでもない。
 一方、図4に示した溶接金網WMにあっては、縦条材W1,W1,…の長さ寸法は横条材W2,W2,…の長さ寸法より短くしてあり、これによって長方形状の格子状体が形成されている。また、溶接金網WMの各縦条材W1,W1,…は同じ面内に、各横条材W2,W2,…は別の面内に配置されており、縦条材W1,W1,…が横条材W2,W2,…の上に位置する側を溶接金網WMの表とすると、縦条材W1,W1,…が横条材W2,W2,…の下に位置する側が溶接金網WMの裏となる。なお、縦条材W1,W1,…の長さ寸法は横条材W2,W2,…の長さ寸法より長くしてもよく、また、縦条材W1,W1,…の長さ寸法は横条材W2,W2,…の長さ寸法と同じにしてもよい。
 図4に示したように、この溶接金網WMにあっては、その周縁に、建造物の壁の形状及び柱の形状に応じた複数の凹凸が形成されている。
 このようにして、各溶接金網を施工対象面に配置する位置、及び各溶接金網の形状が定められると、施工者は、各溶接金網を施工する順番、及び各溶接金網の表裏を決定する(ステップS12,S13)。そして、配置位置、配置順及び表裏が定められた各溶接金網WM,WM,…それぞれについて、当該溶接金網WMとこれに重畳された他の溶接金網WMとを相互に固定する固定具、及び溶接金網WM,WM,…を施工対象面から離隔した位置に保持するスペーサを取り付ける取付位置を決定する(ステップS14)。そして、施工者は、後述する如くデッキプレートDPの山部DMに対応する第1固定具及び第1スペーサ、又は谷部DBに対応する第2固定具及び第2スペーサを選択し、選択した第1固定具、第1スペーサ、第2固定具又は第2スペーサの取付方向を決定することによって、施工設計図を得る(ステップS15,S16)。
 図5は、溶接金網を施工する順番、各溶接金網の表裏、並びに固定具及びスペーサの取付位置及び取付方向を定めた施工設計図の一例を説明する説明図である。なお、図5及び図6中、図3に示した部分に対応する部分には同じ番号を付してその説明を省略する。また、図6は、図5に示した溶接金網の施工順番及び各溶接工の表裏を簡素化して説明するための説明図である。なお、図5中、円内の数字は施工順番を示している。また、彩色していない溶接金網WMは、各縦条材が各横条材の上側に位置された状態である表を表しており、一方、彩色した溶接金網WMは裏を各縦条材が各横条材の下側に位置された状態である裏を表している。
 図5及び図6に示した如く、複数の溶接金網WM,WM,…が縦方向及び横方向へ配置してあり、相隣る溶接金網WM,WM、WM,WM、…,…はその縁部の1.5個分の枡目Mの領域を互いに重畳させてある。
 また、縦条材W1,W1,…が横条材W2,W2,…の上に位置する側を溶接金網WMの表と、縦条材W1,W1,…が横条材W2,W2,…の下に位置する側が溶接金網WMの裏とした場合、表の溶接金網WMにあっては、縦条材W1,W1,…はそれぞれ実線で表示し、横条材W2,W2,…はそれぞれ破線で表示してある。一方、裏の溶接金網WMにあっては、縦条材W1,W1,…はそれぞれ破線で表示し、横条材W2,W2,…はそれぞれ実線で表示してある。
 なお、本形態では、縦条材W1,W1,…及び横条材W2,W2,…について、相対的に上側に位置する方を実線で、また相対的に下側に位置する方を破線で示したが、これに限らないことは言うまでもない。例えば、縦条材W1,W1,…及び横条材W2,W2,…を二本線で表示し、縦条材W1,W1,…及び横条材W2,W2,…が重なる部分において、相対的に下側に位置する方の二本線を消去するようにしてもよい。
 本例に示した施工設計図にあっては、図5中左上の隅に配置する溶接金網WMを一番目として、表の状態で配置してあり、その右隣に二番目の溶接金網WMを裏の状態で、その短辺縁部の1.5個分の枡目Mの領域が互いに重畳するように配置してある。同様に、二番目の溶接金網WMの右隣に、三番目の溶接金網WMを表の状態で配置してある。
 このようにして、一行目の配置が完了すると、前述した一番目の溶接金網WMの手前下側に四番目の溶接金網WMを表の状態で、その長辺縁部の1.5の枡目Mの領域が互いに重畳するように配置するようになっている。次いで、この四番目の溶接金網WMの右隣に五番目の溶接金網WM、及び六番目の溶接金網WMをこの順に、前同様、その短辺縁部の1.5個分の枡目Mの領域が互いに重畳するように配置して、二行目の配置を完了する。なお、五番目の溶接金網WM及び六番目の溶接金網WMの長辺縁部と、二番目の溶接金網WM及び三番目の溶接金網WMの長辺縁部とは、1.5個分の枡目Mの領域を互いに重畳させてある。
 そして、前述した四番目の溶接金網WMの手前下側に十番目の溶接金網WMを、その長辺縁部の1.5個分の枡目Mの領域が互いに重畳するように配置した後、この十番目の溶接金網WMの右隣に十一番目の溶接金網WM、及び十二番目の溶接金網WMをこの順に、前同様、その短辺縁部の1.5個分の枡目Mの領域が互いに重畳するように配置して、全ての溶接金網の配置を完了する。
 図5に示した如く、本例の場合、奇数列の溶接金網WM,WM,…は表の状態であり、偶数列の溶接金網WM,WM,…は裏の状態である。
 このような各溶接金網WM,WM,…を配置する順番は、角部といった適宜の位置を開始位置として、横方向又は縦方向へ順次配置し、当該行又は列の端末位置まで配置すると、次の行又は列の前記開始位置に対応する先頭位置へ移って、当該先頭位置から横方向又は縦方向へ順次配置するように決定すればよい。
 なお、前述した如く、本形態では、奇数列の溶接金網WM,WM,…は表の状態であり、偶数列の溶接金網WM,WM,…は裏の状態である場合について示したが、本発明はこれに限らず、奇数列の溶接金網WM,WM,…は裏の状態に、偶数列の溶接金網WM,WM,…は表の状態に配置してもよい。一方、図7に示した如く、行方向及び列方向で相隣る各溶接金網WM,WM,…にあって表裏を相異なるように配置してもよい。
 なお、前者の配置例及び図5の本形態で示した配置例の場合、後者の配置例の場合に比べて、相隣る4枚の溶接金網WM,WM,WM,WMが互いに重なる領域の厚み寸法を小さくすることができるため好適である。
 次に、相隣る溶接金網WM,WM、WM,WM、…,…の重畳領域の適宜位置に、両溶接金網WM,WMを互いに固定する固定具を配置する。このとき、配置された位置が、図3に示したデッキプレートDP,DP,…の山部DM,DM,…に対向する位置である場合は、後述する第1固定具F1を配置する一方、配置された位置が、図3に示したデッキプレートDP,DP,…の谷部DB,DB,…に対向する位置である場合は、後述する第2固定具F2を配置する。なお、第1固定具F1又は第2固定具F2はいずれも、相隣る溶接金網WM,WMの内の下側に配置される溶接金網WMに取り付ける。
 このとき、第1固定具F1,F1,…及び/又は第2固定具F2,F2,…は、相隣る4枚の溶接金網WM,WM,WM,WMが互いに重畳する箇所を囲繞するように配置する。これによって、当該箇所に第1固定具F1又は第2固定具F2を配置することなく、相隣る4枚の溶接金網WM,WM,WM,WMを互いに強固に固定することができ、各溶接金網WMWM,WM,WM,WMに縦方向及び横方向へのズレが発生することを防止することができる。
 更に、各溶接金網WM,WM,…の前記重畳領域以外の領域には、後述する第1スペーサSP1,SP1,…又は第2スペーサSP2,SP2,…を適宜の間隔を隔てて配置する。前同様、図3に示したデッキプレートDP,DP,…の山部DM,DM,…に対向する位置である場合は、第1スペーサSP1を、また、図3に示したデッキプレートDP,DP,…の谷部DB,DB,…に対向する位置である場合は、第2スペーサSP2を配置する。
 なお、第1固定具F1,F1,…又は第2固定具F2,F2,…を取付ける間隔、及び第1スペーサSP1,SP1,…又は第2スペーサSP2,SP2,…を取付ける間隔は、いずれも900mm以下に設定する。これによって、溶接金網WMに撓みが発生することを防止することができる。
 次に、第1固定具F1、第2固定具F2、第1スペーサSP1及び第2スペーサSP2
を溶接金網WM,WM,…に取付ける方向を定めるが、その説明に先立って、第1固定具F1、第2固定具F2、第1スペーサSP1及び第2スペーサSP2の構成をそれぞれ説明する。
 図8は第1固定具F1の一例を示す斜視図である。
 第1固定具F1は、棒状材を倒立凸形状に成形してなる一対の第1フレーム部材11,11と、短寸棒状の一対の第2フレーム部材12,12とを備えており、第1フレーム部材11,11の両端部にはそれぞれ、溶接金網に固定するための固定部11e,11e、11e,11eが設けてある。これら第1フレーム部材11,11と第2フレーム部材12,12とは、後述する如く平面視が井桁状に固定してある。
 前述した第1フレーム部材11は、施工対象面に当接可能な直線分状の当接部11bの両端部をそれぞれ立ち上がらせて立上り部11c,11cとし、全体としてU字状に成形された本体(担持部)11aを有している。この本体11aの両端にはそれぞれ、短寸のアーム部11d,11dが前記当接部11bと略平行な姿勢で互いに離隔する方向へ延設してあり、両アーム部11d,11dの先端部分は、前記立上り部11c,11cと平行な姿勢で立ち上がらせるとともに、互いに外側へ湾曲させて前述したフック状の固定部11e,11eが形成されている。すなわち、両固定部11e,11eは共に内巻きに曲成して構成してある。なお、本実施の形態では直線分状の当接部11bを設けた場合について示したが、本発明はこれに限らず、凹凸状又は波線状等、適宜の形状であってもよい。
 第1フレーム部材11に設けられた両固定部11e,11eの内底部間の寸法は、第1固定具F1を取り付ける溶接金網を構成する相隣る縦条材間の外寸又は相隣る横条材間の外寸と略同じ値にしてあり、また、両固定部11e,11eの曲率は前記縦条材又は横条材の周面の曲率と略同じ値にしてある。前記両固定部11e,11eは、前記溶接金網の縦条材の周面又は横条材の周面に、当該周面の周方向へ1/4を少し超える範囲で外嵌し得る長さ寸法にしてある。また、前記両固定部11e,11eの先端面ST,STは、平行配置された本体11a,11aの両当接部11b,11bにて形成される平面と平行な平面Hとのなす角αが略45°になる斜面になしてあり、これによって先端面ST,STの先端部が前記溶接金網の縦条材の周面又は横条材の周面に係合するようになっている。
 平行配置された両第1フレーム部材11,11間の寸法は、第1固定具F1を取り付ける溶接金網を構成する相隣る縦条材間の寸法又は相隣る横条材間の寸法より短くしてあり、前述した両第2フレーム部材12,12が、両第1フレーム部材11,11の本体11a,11aの両端部分にそれぞれ架設してある。この第2フレーム部材12,12の長さ寸法も第1固定具F1を取り付ける溶接金網を構成する相隣る縦条材間の寸法又は相隣る横条材間の寸法より短くしてあり、対向配置された両第2フレーム部材12,12間の寸法も同様に、相隣る縦条材間の寸法又は相隣る横条材間の寸法より短くなしてある。
 なお、図8に示した第1固定具F1では、両第1フレーム部材11,11の本体11a,11aの両端部分にそれぞれ第2フレーム部材12,12を架設した場合について示したが、本発明はこれに限らず、両第1フレーム部材11,11の立上り部11c,11cの適宜位置の間、両第1フレーム部材11,11の当接部11b,11bの適宜位置の間等、両第1フレーム部材11,11の適宜の位置の間等々、種々の位置に架設することができる。
 前述した第1フレーム部材11,11の当接部11b,11bの長手方向の略中央位置には、第1固定具F1を取り付けた溶接金網に重畳される他の溶接金網の相隣る縦条材又は相隣る横条材を結合させる結合手段14,14がそれぞれ設けてある。
 結合手段14は、縦方向に長い長方形板状の本体14aの中心軸上に、当該本体14aの天井位置から底部近傍の位置に亘るU字状の切欠きを設けて構成してある。この切欠きは、その内部に前記他の溶接金網の縦条材又は横条材を挿入させる挿入部14eになっており、本体14aの挿入部14eの両側の部分は、該挿入部14e内に挿入された縦条材又は横条材を保持する一対の保持部14b,14bになしてある。
 挿入部14eの本体14aの天井側には、該挿入部14e内へ他の溶接金網の縦条材又は横条材を挿入させるための挿入口14cが設けてあり、前述した保持部14b,14bの挿入口14cに対向する部分にはそれぞれ、嘴状の第1抜止部14d1,14d1が突設してある。すなわち、両第1抜止部14d1,14d1の間である挿入口14cの幅寸法は、挿入部14eの幅寸法より小さくなっており、これによって挿入部14e内に挿入された縦条材又は横条材が挿入部14eから抜け出ないようになっている。また、両第1抜止部14d1,14d1の天井部はそれぞれ、挿入部14eの底部からの高さ位置が挿入口14cへ向かうに従って低くなるテーパになっており、これによって前記他の溶接金網の縦条材又は横条材は挿入口14cへ案内される。
 更に、保持部14b,14bの挿入部14eに臨む縁部であって、前記第1抜止部14d1,14d1から適宜距離を隔てた高さ位置には、第1抜止部14d1,14d1と略同じ寸法になした第2抜止部14d2,14d2が突設してある。ここで、挿入部14eの底部から第2抜止部14d2,14d2までの高さ寸法は、第1固定具F1を取り付けた溶接金網と当該溶接金網に重畳させた他の溶接金網とを第1固定具F1にて固定させた場合に、挿入部14e内に挿入された他の溶接金網の縦条材又は横条材の周面が、当該第1固定具F1の第2抜止部14d2,14d2に当接する値になしてある。
 このように、挿入部14e内に挿入された他の溶接金網の縦条材又は横条材が、第2抜止部14d2,14d2を通過して挿入部14eの底部側へ挿入され、その状態で当該縦条材又は横条材の周面が第2抜止部14d2,14d2に当接するようになっているため、他の溶接金網上で作業員が作業を行った場合であっても、挿入部14e内に挿入された縦条材又は横条材にガタが生じることが防止されるので、作業員による作業に支障を来さず、また、挿入部14e内に挿入された縦条材又は横条材が挿入部14eから抜け出すことが更に防止される。
 前述した保持部14b,14bは、互いに離隔する方向へ撓むことが可能になっており、挿入口14cへ案内された他の溶接金網の縦条材又は横条材に押力が印加されると、保持部14b,14bが互いに離隔する方向へ撓むため、挿入口14cの幅寸法が相対的に大きくなり、当該縦条材又は横条材が挿入口14cを通過して挿入部14e内へ挿入され、その後、保持部14b,14bが元の姿勢に復帰するため、挿入口14cの幅寸法も元に戻り、挿入部14e内に挿入された縦条材又は横条材が挿入部14eから抜け出ることが防止される。これによって当該縦条材又は横条材が結合手段14に結合される。
 一方、第1フレーム部材11の当接部11bから保持部14bの天井位置までの高さ寸法は、前記当接部11bから第1フレーム部材11の固定部11eの天井位置までの高さ寸法より大きくしてあり、第1固定具F1を溶接金網に固定した場合、第1固定具F1の保持部14b,14b、14b,14bは当該溶接金網から突出した様態になる。
 後述するように第1固定具F1は一の溶接金網に予め固定されているため、当該第1固定具F1の結合手段14,14に他の溶接金網の縦条材又は横条材を前述した如く結合させることによって、当該溶接金網とこれに重畳された他の溶接金網とが相互に固定される。
 ところで、対向配置された第1フレーム部材11,11の間の寸法は、施工対象面が複数の畝状の凹凸を有するデッキプレートである場合、当該デッキプレートの山部の幅の1/2未満の値になしてある。第1固定具F1を構成する一対の第1フレーム部材11,11の内の一方がデッキプレートの山部の肩に位置する場合、後述する如く第1固定具F1を取り付けた溶接金網上に重畳させた他の溶接金網に押圧を印加して当該第1固定具F1の結合手段14,14に他の溶接金網の縦条材又は横条材を結合させようとする際に、デッキプレートの山部の肩に位置する第1フレーム部材11がデッキプレートの谷部へ没入して、前記溶接金網及び他の溶接金網に反りが発生してしまう。これに対して、第1固定具F1の第1フレーム部材11,11の間の寸法がデッキプレートの山部の幅の1/2未満の値になしてある場合、両第1フレーム部材11,11のいずれもが、デッキプレートの山部の肩に位置することが回避されるため、前述した如き溶接金網及び他の溶接金網に反りが生じることが回避される。
 前述した両保持部14b,14bの外側部、即ち両保持部14b,14bの第2フレーム部材12,12側の部分にはそれぞれ、前記他の溶接金網の縦条材又は横条材を案内する三角形状の案内部14f,14fが突設してある。案内部14fの天井辺は、保持部14bから離隔するに従ってその高さ寸法が低くなるテーパになしてあり、また、案内部14fの長さ寸法は、当該案内部14fと対向する第1フレーム部材11との間に、前記他の溶接金網の縦条材又は横条材が進入し得ない値になしてある。
 後述するように、第1固定具F1を取り付けた溶接金網上に他の溶接金網を重畳させた際に、当該他の溶接金網の縦条材又は横条材が、第1固定具F1の対をなす保持部14b,14b、14b,14b上に位置しなかった場合は、他の溶接金網を、当該縦条材又は横条材が保持部14b,14b、14b,14b上に位置するように平行に移動させるが、このとき、保持部14b,14b、14b,14bに前述した案内部14f,14f、14f,14fが設けられていないと、他の溶接金網が保持部14b,14b、14b,14bに当接するため、円滑な平行移動が阻害される。しかしながら、本発明に係る第1固定具1Fにあっては、保持部14b,14b、14b,14bに前述した案内部14f,14f、14f,14fが設けてあるため、他の溶接金網の縦条材又は横条材が案内部14f,14f、14f,14fの天井辺上を摺動し、他の溶接金網を円滑に平行移動させることができる。
 また、両本体14a,14aの底部側には、対応する第1フレーム部材11,11に固着させるための固着用片14g,14g,14g、14gが、例えば側面視がL字を構成するように突設してあり、一又は複数(図1にあっては2個)の固着用片14g,14g、14g,14gを対応する第1フレーム部材11,11に溶接又は接着等によって固着させることによって、両本体14a,14aが対応する第1フレーム部材11,11の内側に固定されている。
 なお、固着用片14gは板形、アーチ形等種々の形状であってよく、本体14aに1又は複数個の固着用片14gを設けてよい。また、本実施の形態では、本体14aと第1フレーム部材11とを別体に構成した場合について示したが、本発明はこれに限らず、鋳造等によって、本体と第1フレーム部材とを一体的に構成してもよい。更に、本実施の形態では、両本体14a,14aを対応する第1フレーム部材11,11の内側に固定した場合について示したが、本発明はこれに限らず、両本体14a,14aを対応する第1フレーム部材11,11上又は対応する第1フレーム部材11,11の外側に固定してもよい。
 ところで、対をなす保持部14b,14b、14b,14bに突設した案内部14f,14f、14f,14fは、対応する本体14a,14aと面一の姿勢になしてもよいが、両第1フレーム部材11,11より外側(図1及び図3参照)又は内側へ屈曲させた場合、前述した固着用片14g,14g、14g,14gを対応する第1フレーム部材11,11にスポット溶接によって固着させる際に、溶接機の電極が案内部14f,14f、14f,14fに接触する事故を回避することができるため好適である。
 なお、本実施の形態では、結合手段14,14の本体14a,14aを対応する第1フレーム部材11,11に固定すべく、当該本体14a,14aに固着用片14g,14g、14g,14gを突設した場合について説明したが、本発明はこれに限らず、固着用片14g,14g、14g,14gを設けることなく、結合手段14,14の本体14a,14aと対応する第1フレーム部材11,11とをアーク溶接等によって固着させてもよい。この場合、対をなす保持部14b,14b、14b,14bに突設した案内部14f,14f、14f,14fは、対応する本体14a,14aと面一の姿勢になすことができる。
 一方、本実施の形態では、第1フレーム部材11,11及び第2フレーム部材12,12を棒材にて構成してあるが、本発明はこれに限らず、第1フレーム部材及び第2フレーム部材を板材で構成してもよい。
 一方、図9は前述した第2固定具F2の一例を示す斜視図である。なお、図9中、図8に示した分部に対応する部分には同じ番号を付してその説明を省略する。
 図9に示した如く、結合手段14,14を構成する本体14a,14aはそれぞれ、第1フレーム部材11,11の前記保持部14b,14b、14b,14bとは反対側へ適宜長さだけ延設して脚部が形成されており、これら脚部は第2当接部15,15として機能している。
 すなわち、第2当接部15にあっては、本体14aの第1フレーム部材11から延設した脚部において両側縁をそれぞれ内側又は外側(図9にあっては内側)へ起立させて平面視が略U字状に成形してなり、これによって所要の強度が付与されている。また、第2当接部15には第1フレーム部材11に固着させる第2固着用片15g,15gが、第1フレーム部材11を挟んで前記固着用片14g,14gに対峙するように突設してあり、該第2固着用片15g,15gを第1フレーム部材11に溶接又は接着等によって固着させることによって、第2当接部15が第1フレーム11に固定されている。
 このような第2当接部15にあっては、前述した第1フレーム部材11の当接部11bに替えて、当該第2当接部15が施工対象面に当接するため、固定部11e,11e、11e,11eにて固定した溶接金網及び結合手段14,14に結合された他の溶接金網を、デッキプレートの谷部から離隔した所定の高さ位置に担持することができる。なお、第2固着用片15g,15gの長さ寸法は、図3に示したデッキプレートDPの谷部DBの深さ寸法に応じて定めてあり、前述した第1固定具F1にて担持された溶接金網の高さ位置と、第2固定具F2にて担持された溶接金網の高さ位置とが略同じになるようにしてある。
 なお、前述した第1固定具F1の本体11aの立上り部11c,11cの高さ寸法を第2固定具F2に設けた第2当接部15の長さ寸法と略同じになし、かかる第1固定具をデッキプレートの谷部に位置させるようにしてもよいが、前述した第2固定具F2にあっては、第2固定具F2の第1固定具F1に相当する部分を第1固定具F1と共有することができるため、製造コストを廉価することができ、好適である。
 一方、図10及び図11は前述した第1スペーサSP1及び第2スペーサSP2の一例を示す斜視図である。第1スペーサSP1は図8に示した結合手段14,14を具備しない以外は、第1固定具F1と略同じ構成をなしており、また、第2スペーサSP2は図9に示した結合手段14,14を具備しない以外は、第2固定具F2と略同じ構成をなしている。
 すなわち、第1スペーサSP1は、図10に示した如く、棒状材を倒立凸形状に成形してなる一対の第1フレーム部材11,11と、短寸棒状の一対の第2フレーム部材12,12とを平面視が井桁状に固定してあり、第1フレーム部材11,11の両端部にはそれぞれ、溶接金網に固定するための固定部11e,11e、11e,11eが設けてある。
 第1フレーム部材11は、施工対象面に当接可能な直線分状の当接部11bの両端部をそれぞれ立ち上がらせて立上り部11c,11cとし、全体としてU字状に成形された本体(担持部)11aを有している。この本体11aの両端にはそれぞれ、短寸のアーム部11d,11dが前記当接部11bと略平行な姿勢で互いに離隔する方向へ延設してあり、両アーム部11d,11dの先端部分は、前記立上り部11c,11cと平行な姿勢で立ち上がらせるとともに、互いに外側へ湾曲させて前述したフック状の固定部11e,11eが形成されている。
 第1フレーム部材11に設けられた両固定部11e,11eの内底部間の寸法は、第1固定具F1を取り付ける溶接金網を構成する相隣る縦条材間の外寸又は相隣る横条材間の外寸と略同じ値にしてあり、また、両固定部11e,11eの曲率は前記縦条材又は横条材の周面の曲率と略同じ値にしてある。前記両固定部11e,11eは、前記溶接金網の縦条材の周面又は横条材の周面に、当該周面の周方向へ1/4を少し超える範囲で外嵌し得る長さ寸法にしてある。また、前記両固定部11e,11eの先端面ST,STは、平行配置された本体11a,11aの両当接部11b,11bにて形成される平面と平行な平面Hとのなす角αが略45°になる斜面になしてあり、これによって先端面ST,STの先端部が前記溶接金網の縦条材の周面又は横条材の周面に係合するようになっている。
 平行配置された両第1フレーム部材11,11間の寸法は、第1固定具F1を取り付ける溶接金網を構成する相隣る縦条材間の寸法又は相隣る横条材間の寸法より短くしてあり、前述した両第2フレーム部材12,12が、両第1フレーム部材11,11の本体11a,11aの両端部分にそれぞれ架設してある。この第2フレーム部材12,12の長さ寸法も第1固定具F1を取り付ける溶接金網を構成する相隣る縦条材間の寸法又は相隣る横条材間の寸法より短くしてあり、対向配置された両第2フレーム部材12,12間の寸法も同様に、相隣る縦条材間の寸法又は相隣る横条材間の寸法より短くなしてある。
 このような第1スペーサSP1にあっては、前述した第1固定具F1と同様、固定部11e,11e、11e,11eを溶接金網の縦条材又は横条材に外嵌させることによって、スペーサを溶接金網に固定しておき、当該溶接金網をデッキプレート上の所定位置に、スペーサがデッキプレートの山部に位置するように配置する。溶接金網はスペーサによって、デッキプレートの山部から所定の高さだけ離隔する位置に保持される。
 一方、図11に示した如く、第2スペーサSP2は、図9の第2固定具F2と略同様、前述した第1フレーム部材11,11の当接部11b,11bの長手方向の中途位置に、平面視が略コ字状の板材を適宜長さだけ垂下してなる脚状の第2当接部35,35を設けて構成してあり、第2当接部35の長さ寸法は、前述したデッキプレートDPの谷部DB(図3参照)の深さ寸法に応じて定めてある。
 そして、図2に示した如く、このような第1固定具F1、第2固定具F2、第1スペーサSP1及び第2スペーサSP2を溶接金網WM,WM,…に取付ける方向を次のように定める(ステップS15)。
 すなわち、図5及び図6に示した如く、第1固定具F1又は第2固定具F2にあっては、横方向に相隣らせて配置される溶接金網WM,WM,…の重畳領域には、対をなす第1フレーム部材11,11が溶接金網WMの横条材W2,W2,…と平行な姿勢に定める。これによって、横方向に相隣らせて配置された溶接金網WM,WM,…に横方向へのずれが生じることを防止することができる。一方、縦方向に相隣らせて配置される溶接金網WM,WM,…の重畳領域には、対をなす第1フレーム部材11,11が溶接金網WMの縦条材W1,W1,…と平行な姿勢に定める。これによって、縦方向に相隣らせて配置された溶接金網WM,WM,…に縦方向へのずれが生じることを防止することができる。
 前述した如く、横方向及び縦方向に互いに相隣る4枚の溶接金網WM,WM,WM,WMが重畳する部分は、第1固定具F1及び/又は第2固定具F2によって取り囲まれるようになっている。そして、横方向に相隣らせて配置された溶接金網WM,WMは、第1固定具F1又は第2固定具F2によって横方向へのずれが防止され、また、縦方向に相隣らせて配置された溶接金網WM,WMは、第1固定具F1又は第2固定具F2によって縦方向へのずれが防止されるため、4枚の溶接金網WM,WM,WM,WMが重畳する部分にあっては、縦方向及び横方向へのずれが共に防止される。
 一方、第1スペーサSP2及び第2スペーサSP2にあっては、対をなす第1フレーム部材31a,31aが、図3に示したデッキプレートDPの長手方向と平行な姿勢に定める。
 このようにして、第1固定具F1、第2固定具F2、第1スペーサSP1及び/又は第2スペーサSP2を溶接金網WM,WM,…に取付ける位置及び方向が定まると、施工者は図5に示した施工設計図に基いて、当該配置がデッキプレートの山部である場合には第1固定具F1,F1,…又は第1スペーサSP1,SP1,…を選定し、当該配置がデッキプレートの谷部である場合には第2固定具F2,F2,…又は第2スペーサSP2,SP2,…を選定して(ステップS16)、実行すべき施工設計図を得る(ステップS17)。
 このようにして、施工設計工程が終了すると、図1に示した如く施工者は、必要数の溶接金網について、施工設計工程で設計した形状に成形する加工を実施し(ステップS3)、加工した各溶接金網それぞれについて、施工設計工程において決定した溶接金網の表裏、溶接金網の各位置に第1固定具、第2固定具、第1スペーサ及び/又は第2スペーサを、施工設計工程で設計した方向で取り付ける(ステップS5)。なお、各溶接金網の成形加工、成形加工した各溶接金網への第1固定具、第2固定具、第1スペーサ及び/又は第2スペーサの取付は、溶接金網を製造する工場で行うと作業効率が高く好適であるが、施工場所で行ってもよい。
 このように、成形加工され、第1固定具、第2固定具、第1スペーサ及び/又は第2スペーサが取り付けられた各溶接金網が得られると、施工者は、施工対象面において全ての溶接金網の配置が完了したか否かを判断し(ステップS6)、全ての溶接金網の配置が完了していない場合、前述した施工設計図(図5参照)に定められた配置及び順番で、該当する溶接金網を配置し(ステップS7)、相隣る溶接金網との重畳領域において、第1固定具及び/又は第2固定具の上に位置する溶接金網の縦条材及び/又は横条材に押圧を印加して、第1固定具及び/又は第2固定具の結合手段に当該溶接金網の縦条材及び/又は横条材を結合させ、重畳された両溶接金網を互いに固定させる(ステップS8)。そして、施工者は、ステップS6で施工対象面において全ての溶接金網の配置が完了したと判断するまで、ステップS6からステップS8までの操作を繰り返す。これによって、施工者及び作業員に重労働を強いることなく、未熟な施工者及び作業員であっても複数の溶接金網を短時間で確実に施工することができる。
 なお、前述した溶接金網の縦条材及び/又は横条材への押圧の印加は、施工者の足で縦条材又は横条材を踏むことによって実施すると好適である。すなわち、例えば、二人の施工者が一枚の溶接金網を挟持して、当該溶接金網を施工設計図に定められた位置に、先に配置された一又は複数の溶接金網にその縁部が重畳するように配置した後、第1固定具及び/又は第2固定具の上に位置する溶接金網の縦条材及び/又は横条材を踏み付けて、第1固定具の結合手段及び/又は第2固定具の結合手段に当該溶接金網の縦条材及び/又は横条材を結合させるのである。これによって、新たな溶接金網の配置、及び、先に配置された溶接金網と当該新たな溶接金網との固定を、一回の作業で実施することができ、作業効率が可及的に高くすることができる。
 図12は、一の溶接金網に取り付けた第1固定具上に他の溶接金網を重畳させた状態を示す部分拡大斜視図であり、図13は、図12に示した第1固定具によって両溶接金網を互いに固定した状態を示す部分拡大斜視図である。なお、両図中、図8に示した分部対応する部分には同じ番号が付してある。
 図12に示したように、一の溶接金網WMは表の状態であり、当該一の溶接金網WMの相隣る縦条材W1,W1に、第1固定具F1のアーム部11d,11d、11d,11d先端に設けた固定部11e,11e、11e,11eを外嵌させて、第1固定具F1が一の溶接金網WMに取り付けられている。かかる溶接金網WMが、前述した如く施工対象面の所定位置に施設されている。
 この溶接金網WMの縁部上に、裏の状態になした他の溶接金網WMの縁部の所定領域が重畳してあり、他の溶接金網WMの縦条材W1が、図12に示したように、前記第1固定具F1に設けられた両結合手段14,14の挿入口14c,14c上に配置されている。
 そして、施工者が、重畳させた他の溶接金網WMの当該縦条材W1を踏み付けることによって、当該縦条材W1に押圧を印加し、これによって、図13に示した如く、当該縦条材W1を両結合手段14,14内へ嵌入させ、縦条材W1を結合手段14,14に結合させる。これによって、未熟な作業員であっても、一の溶接金網WMと他の溶接金網WMとをワンタッチで確実に固定することができる。
 図14は、図8に示した第1固定具F1と当該第1固定具F1によって固定された溶接金網WM,WMとの部分側面図である。かかる配置構成にあっては、第1固定具F1が前述した図5中の位置g1に配置された場合に相当している。なお、図中、図8に対応する部分には同じ番号が付してある。
 図14に示した如く、施工対象面側に表の溶接金網WMを敷設し、その上に裏の溶接金網WMを重畳させてあり、下側の溶接金網WMの縦条材W1は対応する横条材W2の上側に、また上側の溶接金網WMの縦条材W1は対応する横条材W2の下側に位置している。下側の溶接金網WMの縦条材W1,W1に第1固定具F1の固定部11e,11e、11e,11eを外嵌させて、第1固定具F1が表の溶接金網WMに取り付けられており、これによって下側の溶接金網WMが施工対象面から離隔した位置に担持されている。そして、上側の溶接金網WMの縦条材W1が第1固定具F1の結合手段14に設けられた挿入部14e内に挿入されて、下側の溶接金網WMと上側の溶接金網WMとが結合固定されている。
 一方、図15は溶接金網の他の位置に配置された第1固定具F1と当該第1固定具F1によって固定された溶接金網WM,WMとの部分側面図であり、第1固定具F1が前述した図5中の位置g2に配置された場合に相当している。
 図15に示した如く、施工対象面側に裏の溶接金網WMを敷設し、その上に裏の溶接金網WMを重畳させてあり、下側の溶接金網WMの縦条材W1と上側の溶接金網WMの縦条材W1とは互いに対応する横条材W2,W2の下側に位置している。下側の溶接金網WMの横条材W2,W2に第1固定具F1の固定部11e,11e、11e,11eを外嵌させて、第1固定具F1が裏の溶接金網WMに取り付けられており、これによって下側の溶接金網WMが施工対象面から離隔した位置に担持されている。そして、上側の溶接金網WMの横条材W2が第1固定具F1の結合手段14に設けられた挿入部14e内に挿入されて、下側の溶接金網WMと上側の溶接金網WMとが結合固定されている。
 また、図16は溶接金網の更に他の位置に配置された第1固定具F1と当該第1固定具F1によって固定された溶接金網WM,WMとの部分側面図であり、第1固定具F1が前述した図5中の位置g3に配置された場合に相当している。
 図16に示した如く、施工対象面側に裏の溶接金網WMを敷設し、その上に表の溶接金網WMを重畳させてある。下側の溶接金網WMの横条材W2と上側の溶接金網WMの横条材W2とは略同じ高さ位置になっており、また下側の溶接金網WMの縦条材W1は対応する横条材W2の下側に、一方、上側の溶接金網WMの縦条材W1は対応する横条材W2の上側にそれぞれ位置している。下側の溶接金網WMの縦条材W1,W1に第1固定具F1の固定部11e,11e、11e,11eを外嵌させて、第1固定具F1が裏の溶接金網WMに取り付けられており、これによって下側の溶接金網WMが施工対象面から離隔した位置に担持されている。そして、上側の溶接金網WMの横条材W2が第1固定具F1の結合手段14に設けられた挿入部14e内に挿入されて、下側の溶接金網WMと上側の溶接金網WMとが結合固定されている。
 更に、図17は溶接金網の他の位置に配置された第1固定具F1と当該第1固定具F1によって固定された溶接金網WM,WMとの部分側面図であり、第1固定具F1が前述した図5中の位置g4に配置された場合に相当している。
 図17に示した如く、施工対象面側に表の溶接金網WMを敷設し、その上に表の溶接金網WMを重畳させてあり、下側の溶接金網WMの縦条材W1と上側の溶接金網WMの縦条材W1とは互いに対応する横条材W2,W2の上側に位置している。下側の溶接金網WMの横条材W2,W2に第1固定具F1の固定部11e,11e、11e,11eを外嵌させて、第1固定具F1が表の溶接金網WMに取り付けられており、これによって下側の溶接金網WMが施工対象面から離隔した位置に担持されている。そして、上側の溶接金網WMの横条材W2が第1固定具F1の結合手段14に設けられた挿入部14e内に挿入されて、下側の溶接金網WMと上側の溶接金網WMとが結合固定されている。
 一方、図18は溶接金網に取り付けられた第1スペーサSP1と当該溶接金網WMとの部分側面図である。
 図18に示した如く、施工対象面側に表又は裏(図18にあっては表)の溶接金網WMが敷設してある。当該溶接金網WMの横条材W2,W2又は縦条材W1,W1(図18にあっては横条材W2,W2)に第1スペーサSP1の固定部11e,11e、11e,11eを外嵌させて、第1スペーサSP1が当該溶接金網WMに取り付けられており、これによって溶接金網WMが施工対象面から離隔した位置に担持されている。
 なお、図14~図17にあっては第1固定具F1を用いた場合について、また図18にあっては第1スペーサSP1を用いた場合についてそれぞれ示したが、これらにおいて第1固定具F1に替えて第2固定具F2を、また、第1スペーサSP1に替えて第2スペーサSP2を用いることができることは言うまでもない。
 一方、第1固定具F1及び第2固定具F2、第1スペーサSP1及び第2スペーサSP2は、前述した形態以外の形態であっても適用し得る。
 なお、本形態では相隣る溶接金網WM,WMを、その縁部の1.5個分の枡目Mが重畳するように配置した場合について説明したが、本発明はこれに限らず、一の溶接金網WMと他の溶接金網WMとは、施工対象面に対向する両者の枡目M,Mの位置が相互にずれるように、即ち両者の枡目M,Mの位置が異なるように重畳させる場合に適用し得る。この場合、第1固定具F1及び第2固定具F2にあっては、第1フレーム部材11,11の長手方向の適宜位置、即ち両者の枡目M,Mの位置のずれに応じた位置に結合手段14,14を設けておく。これによって、相隣る溶接金網WM,WMは第1固定具F1又は第2固定具F2によって、両者の枡目M,Mが互いに丁度重なり合うこと無く、相互に位置を異ならせた状態で結合固定される。
 (発明を実施するための第2の形態)
 図19は発明を実施するための第2の形態に係る施工方法を説明するための施工設計図であり、相隣る溶接金網にあってその縁部を、それぞれの枡目が互いに重なり合うように重畳させるようにしてある。なお、図19中、図5に示した部分に対応する部分には同じ番号を付してその説明を省略する。また、本形態に係る施工手順は図1及び図2に示したものと実質的に同じである。
 図19に示した如く、複数の溶接金網WM,WM,…が縦方向及び横方向へ配置してあり、相隣る溶接金網WM,WM、WM,WM、…,…はその縁部の2個分の枡目M,Mが互いに重なり合うように重畳させてある。
 本例に示した施工設計図にあっては、図5に示した施工設計図と同様、図19中左上の隅に配置する溶接金網WMを一番目として、表の状態で配置してあり、その右隣に二番目の溶接金網WMを裏の状態で、その短辺縁部の2つの枡目M,Mの領域が互いに重畳するように配置してある。同様に、二番目の溶接金網WMの右隣に、図示しない三番目の溶接金網WMを表の状態で配置してある。
 当該行の端末位置まで溶接金網WM,WM,…を順次配置すると、次の行の前記開始位置に対応する先頭位置へ移って、前述した一番目の溶接金網WMの手前下側に四番目の溶接金網WMを表の状態で、その長辺縁部の2個分の枡目M,Mの領域が互いに重畳するように配置し、当該先頭位置から横方向へ溶接金網WM,WM,…を前同様に配置する。そして、かかる操作を繰り返して、全ての溶接金網WM,WM,…の施工順を定める。
 ここで、本形態にあっては、表の溶接金網WM上に裏の溶接金網WMを重畳させる場合、前者の縦条材W1,W1,…と後者の縦条材W1,W1,…とを同じ高さ位置になして、両者が重ならないように施工する。また、裏の溶接金網WM上に表の溶接金網WMを重畳させる場合、前者の横条材W2,W2,…と後者の横条材W2,W2,…とを同じ高さ位置になして、両者が重ならないように施工する。一方、表の溶接金網WM上に表の溶接金網WMを重畳させる場合、及び裏の溶接金網WM上に裏の溶接金網WMを重畳させる場合、両者の枡目M,Mが一致するように施工することができる。
 図20及び図21は、表の溶接金網WM上に表の溶接金網WMを重畳させた場合の両者の重畳部分を示す部分拡大平面図及び部分拡大正面図であり、また、図22及び図23は、裏の溶接金網WM上に裏の溶接金網WMを重畳させた場合の両者の重畳部分を示す部分拡大平面図及び部分拡大正面図である。なお、これらの図中、図19に示した部分に対応する部分には同じ番号が付してある。
 図20及び図21に示したように、表の溶接金網WM上に表の溶接金網WMを重畳させた場合にあっては、下側の溶接金網WMの縦条材W1,W1及び横条材W2,W2と、上側の溶接金網WMの縦条材W1,W1及び横条材W2,W2とが一致しているため、図20に示したように平面視では、上側の溶接金網WMの縦条材W1,W1及び横条材W2,W2のみが現れている。同様に、裏の溶接金網WM上に裏の溶接金網WMを重畳させた場合にあっても、下側の溶接金網WMの縦条材W1,W1及び横条材W2,W2と、上側の溶接金網WMの縦条材W1,W1及び横条材W2,W2とが一致しているため、図22に示したように平面視では、上側の溶接金網WMの縦条材W1,W1及び横条材W2,W2のみが現れている。
 次に、第1の形態と同様、相隣る溶接金網WM,WM、WM,WM、…,…の重畳領域の適宜位置に、両溶接金網WM,WMを互いに固定する固定具を配置する。このとき、配置された位置が、図3に示したデッキプレートDP,DP,…の山部DM,DM,…に対向する位置である場合は、後述する第3固定具を配置する一方、配置された位置が、図3に示したデッキプレートDP,DP,…の谷部DB,DB,…に対向する位置である場合は、後述する第4固定具を配置する。なお、第3固定具又は第4固定具はいずれも、相隣る溶接金網WM,WMの内の下側に配置される溶接金網WMに取り付ける。
 また、各溶接金網WM,WM,…の前記重畳領域以外の領域には、前述した第1スペーサSP1,SP1,…又は第2スペーサSP2,SP2,…(図10及び図11参照)を適宜の間隔を隔てて配置する。
 なお、第3固定具及び第4固定具、第1スペーサSP1,SP1,…又は第2スペーサSP2,SP2,…を取付ける間隔は、前同様、900mm以下に設定する。これによって、溶接金網WMに撓みが発生することを防止することができる。
 図24は第3固定具の一例を示す斜視図である。なお、図中、相互に対応する部分には同じ番号が付してある。
 図24に示した如く、第3固定具F3は、前述した第1固定具F1と同様に、棒状材を倒立凸形状に成形してなる一対の第1フレーム部材11,11と、短寸棒状の一対の第2フレーム部材12,12とを平面視が井桁状に固定して構成してある。第1フレーム部材11は、直線分状の当接部11bの両端部をそれぞれ立ち上がらせて立上り部11c,11cとし、全体としてU字状に成形された本体(担持部)11aを備えている。本体11aの両端には、当接部11b,11bと略平行な姿勢になしたアーム部11d,11dを介して、略フック状に立ち上がらせた固定部11e,11eがそれぞれ延設してあり、固定部11e,11eは,前記第1固定具F1と同様、本体11aをバネ部材として、溶接金網の相隣る縦条材又は横条材に係合固定し得るようになっている。
 ここで、平行配置された両第1フレーム部材11,11間の寸法は、第3固定具F3を取り付ける溶接金網を構成する相隣る縦条材間の寸法又は相隣る横条材間の寸法より短くしてあり、前述した両第2フレーム部材12,12が、両第1フレーム部材11,11のアーム部11d,11d、11d,11dの周面であって前記固定部11eとは反対向きの位置にそれぞれ架設してある。この第2フレーム部材12,12の長さ寸法も第3固定具F3を取り付ける溶接金網を構成する相隣る縦条材間の寸法又は相隣る横条材間の寸法より短くしてあり、対向配置された両第2フレーム部材12,12間の寸法も同様に、相隣る縦条材間の寸法又は相隣る横条材間の寸法より短くなしてある。
 両第1フレーム部材11,11の内側にはそれぞれ、当該第3固定具F3を取り付けた溶接金網に重畳される他の溶接金網の相隣る縦条材又は相隣る横条材を結合させる一対の第2結合手段20,20が配設してある。第2結合手段20は、棒材を倒立台形状に形成してなりバネ力を有する第2本体21a,21aを具備している。第2本体20aの底部21bは、前記第1フレーム部材11の当接部11bと略平行に配置して当該当接部11bに溶接又は接着等によって固着してある。一方、この底部21bの両端部からそれぞれ立ち上がった第2本体20aの両脚辺部21c,21cは前述した第2フレーム部材12,12の間を通って第1フレーム部材11の固定部11e,11eより高い位置まで延設してあり、両脚辺部21c,21cの端部にはそれぞれ、他の溶接金網の相隣る縦条材又は相隣る横条材を係合固定させる第2固定部21e,21eが設けてある。
 第1フレーム部材11の固定部11e,11eは、互いに対向する姿勢で第1フレーム部材11のコ字状の本体11aの内側へ向かって曲成してある一方、第2結合手段20の第2固定部21e,21eは、互いに離隔する姿勢で第2本体21aの外側へ向かって曲成してある。第1フレーム部材11の固定部11e,11eの曲率及び第2結合手段20の第2固定部21e,21eの曲率は、前述した溶接金網WMの縦条材W1又は横条材W2(図17等参照)の周面の曲率と略同じ値にしてあり、固定部11e,11e及び第2固定部21e,21eは、溶接金網WMの縦条材W1の周面又は横条材W2の周面に、当該周面の周方向へ1/4を少し超える範囲で外嵌し得る長さ寸法にしてある。
 また、固定部11e,11eの先端面ST,ST及び第2固定部21e,21eの先端面ST2,ST2は、平行配置された本体11a,11aの両当接部11b,11bにて形成される平面と平行な平面Hとのなす角αが、前者は略45°に、及び後者は略135°になる斜面になしてあり、これによって先端面ST,STはその先端部が第3固定具F3を取り付けた溶接金網WMの縦条材W1の周面又は横条材W2の周面に係合する一方、先端面ST2,ST2はその先端部が、第3固定具F3を取り付けた溶接金網WMに重畳された他の溶接金網WMの縦条材W1の周面又は横条材W2の周面に係合するようになっている。
 図25は、図24に示した第3固定具を取り付けた溶接金網と、該溶接金網上に重畳させた他の溶接金網とを第3固定具にて結合固定した状態の一例を説明するための一部省略部分斜視図である。なお、図25中、図24に示した部分に対応する部分には同じ番号が付してある。なお、本例にあっては、下側の溶接金網WM及び上側の溶接金網WMは共に表の状態であり、下側の溶接金網WM上に上側の溶接金網WMが、両者の枡目M,Mが重なり合う、即ち両者の枡目M,Mの位置が上下で一致するように重畳させてある。なお、下側の溶接金網WM及び上側の溶接金網WMはいずれも、前記枡目M,Mを構成する相隣る横条材W2の内の一方の横条材を省略してある。
 図25に示したように、第3固定具F3は下側の溶接金網WMに取り付けてある。即ち、下側の溶接金網WMの枡目M内に第3固定具F3の本体11a,11a及び第2本体21a,21aが配してあり、当該枡目Mを構成する相隣る縦条材W1,W1に、第3固定具F3の固定部11e,11e、11e,11eを枡目Mの外側から内側へ向かって外嵌させて、第3固定具F3が下側の溶接金網WMに固定してある。
 この状態で、上側の溶接金網WMを下側の溶接金網WM上に、両者の枡目M,Mが重なり合うように重畳させると、上側の溶接金網WMの当該枡目Mを構成する相隣る縦条材W1,W1の周面が第3固定具F3の第2結合手段20,20を構成する第2固定部21e,21e、21e,21eの先端面ST2,ST2、ST2,ST2上に載置されるので、上側の溶接金網WMに押圧を印加することによって、当該縦条材W1,W1及び/又は横条材W2(W2)に第2固定部21e,21e、21e,21eを、枡目Mの内側から外側へ向かって外嵌させてある。このようにして上側の溶接金網WMが第2結合手段20,20に結合され、下側の溶接金網WMと上側の溶接金網WMとが第3固定具F3にてワンタッチで固定される。これによって、施工者及び作業員に重労働を強いることなく、未熟な施工者及び作業員であっても複数の溶接金網を短時間で確実に施工することができる。
 なお、前述した上側の溶接金網WMの縦条材W1,W1及び/又は横条材W2(W2)への押圧の印加は、施工者の足で縦条材又は横条材を踏むことによって実施すると好適である。前述した第1固定具F1及び第2固定具F2と同様、例えば、二人の施工者が一枚の溶接金網WMを挟持して、当該溶接金網WMを施工設計図に定められた位置に、先に配置された一又は複数の溶接金網WMにその縁部が、各溶接金網WM,WMの枡目M,Mが重なり合うように重畳させた後、第3固定具F3の上に位置する溶接金網WMの縦条材W1,W1及び/又は横条材W2(W2)を踏み付けて、第3固定具F3の第2結合手段20,20に当該溶接金網WMの縦条材W1,W1及び/又は横条材W2(W2)を結合させるのである。これによって、新たな溶接金網の配置、及び、先に配置された溶接金網と当該新たな溶接金網との固定を、一回の作業で実施することができ、作業効率が可及的に高くすることができる。
 ここで、第2結合手段20を構成する両先端面ST2,ST2間の外寸は、溶接金網WMの枡目Mを構成する縦条材W1,W1又は横条材W2,W2の間の内寸より若干大きくしてある。一方、第2結合手段20を構成する両脚辺部21c,21cは、互いに接近する方向へ撓むことが可能になっており、第2結合手段20の先端面ST2,ST2上に載置された上側の溶接金網WMの縦条材W1,W1に押力が印加されると、第2結合手段20の脚辺部21c,21cが互いに接近する方向へ撓むため、上側の溶接金網WMの縦条材W1,W1が第2結合手段20の第2固定部21e,21eを通過し、その後、両脚辺部21c,21cが元の姿勢に復帰するため、上側の溶接金網WMの縦条材W1,W1に第2固定部21e,21eが枡目Mの内側から外側へ向かって外嵌される。
 また、両第2結合手段20,20の間の寸法は溶接金網WMを構成する縦条材W1又は横条材W2の外径の2倍より若干大きい寸法になしてあり、後述するように、両第2結合手段20,20の間に2本の縦条材W1,W1又は2本の横条材W2,W2を嵌入させ得るようになしてある。
 なお、図25にあっては、下側の溶接金網WM及び上側の溶接金網WMが共に表の状態である領域について説明したが、下側の溶接金網WM及び上側の溶接金網WMが共に裏の状態である領域であっても、これと同様に、下側の溶接金網WM上に上側の溶接金網WMを、両者の枡目M,Mが重なり合うように重畳させて、前同様の結合固定操作を実施する。
 一方、下側の溶接金網WMが表であり、上側の溶接金網WMが裏の状態である領域、また、下側の溶接金網WMが表であり、上側の溶接金網WMが裏の状態である領域については、次のように施工する。
 図26は下側の溶接金網WMが表であり、上側の溶接金網WMが裏の状態である2つの溶接金網を重畳させた領域の部分拡大平面図であり、図27は図26に示した2枚の溶接金網の正面図である。また、図28は、下側の溶接金網WMが裏であり、上側の溶接金網WMが表の状態である2つの溶接金網を重畳させた領域の部分拡大平面図であり、図29は図28に示した2枚の溶接金網の正面図である。
 前者にあっては、図26及び図27に示した如く、下側の溶接金網WMの横条材W2,W2と上側の溶接金網WMの横条材W2,W2との間に、下側の溶接金網WMの縦条材W1,W1及び上側の溶接金網WMの縦条材W1,W1が挟持された状態になっており、下側の溶接金網WMの縦条材W1,W1と上側の溶接金網WMの縦条材W1,W1とが互いに重なり合わないように、相隣らせてある。これによって、下側の溶接金網WM及び上側の溶接金網WMによって構成される厚さ寸法を可及的に小さくすることができる。
 同様に、後者にあっては、図28及び図29に示した如く、下側の溶接金網WMの横条材W2(W2)及び上側の溶接金網WMの横縦条材W2(W2)の下上に、下側の溶接金網WMの縦条材W1(W1)及び上側の溶接金網WMの縦条材W1(W1)が位置する状態になっており、下側の溶接金網WMの横条材W2(W2)と上側の溶接金網WMの横条材W2(W2)とが互いに重なり合わないように、相隣らせてある。
 そして、かかる領域では第3固定具F3によって両溶接金網WM,WMを次のように接合固定する。
 図30は、第3固定具を取り付けた溶接金網と、該溶接金網上に重畳させた他の溶接金網とを第3固定具にて結合固定した状態の他例を説明するための一部省略部分斜視図である。なお、図中、図25に示した部分に対応する部分には同じ番号が付してある。
 図30に示したように、下側の溶接金網WMが表であり、上側の溶接金網WMが裏の状態であり、前述した如く、下側の溶接金網WMの横条材W2,W2と上側の溶接金網WMの横条材W2,W2との間に、下側の溶接金網WMの縦条材W1,W1及び上側の溶接金網WMの縦条材W1,W1が挟持され、下側の溶接金網WMの縦条材W1,W1と上側の溶接金網WMの縦条材W1,W1とが互いに重なり合わないように、相隣らせてある。
 第3固定具F3は、下側の溶接金網WMの上側の溶接金網WMが重畳される領域の相隣る横条材W2,W2間に架設してあり、第3固定具F3の対をなす第2固定部21e,21e、21e,21eの間に、当該溶接金網WMの縦条材W1と横条材W2,W2とがそれぞれ交叉する交叉部X,X及び当該交差部X,Xを構成する縦条材W1がそれぞれ嵌入されるように取り付けてある。
 この状態で、上側の溶接金網WMを下側の溶接金網WM上に、下側の溶接金網WMの縦条材W1,W1と上側の溶接金網WMの縦条材W1,W1とが相隣るように重畳させると、上側の溶接金網WMの相隣る横条材W2,W2の周面が第3固定具F3の第2結合手段20,20を構成する第2固定部21e,21e、21e,21eの先端面ST2,ST2、ST2,ST2上に載置されるので、上側の溶接金網WMに押圧を印加することによって、当該横条材W2,W2に第2固定部21e,21e、21e,21eを、枡目Mの内側から外側へ向かって外嵌させてある。このようにして上側の溶接金網WMが第2結合手段20,20に結合され、下側の溶接金網WMと上側の溶接金網WMとが第3固定具F3にてワンタッチで固定される。
 このとき、図30に示したように、第3固定具F3の対をなす第2固定部21e,21e、21e,21eの間に、上側の溶接金網WMの交差部X,X及び当該交差部Xを構成する縦条材W1が、既に嵌入されている下側の溶接金網WMの交差部X,X及び当該交差部Xを構成する縦条材W1と相隣る様態で嵌入されている。これによって、上側の溶接金網WMは縦方向及び横方向へのずれが防止される。
 一方、前述したように、下側の溶接金網WMが裏であり、上側の溶接金網WMが表の状態である場合、前述した如く、下側の溶接金網WMの横条材W2(W2)及び上側の溶接金網WMの横縦条材W2(W2)の下上に、下側の溶接金網WMの縦条材W1(W1)及び上側の溶接金網WMの縦条材W1(W1)が位置する状態になっており、下側の溶接金網WMの横条材W2(W2)と上側の溶接金網WMの横条材W2(W2)とが互いに重なり合わないように、相隣らせる(図28及び図29参照)。
 かかる場合、第3固定具F3は、下側の溶接金網WMの上側の溶接金網WMが重畳される領域の相隣る縦条材W1,W1間に架設し、第3固定具F3の対をなす第2固定部21e,21e、21e,21eの間に、当該溶接金網WMの縦条材W1と横条材W2,W2とが交叉する交叉部X,X及び当該交差部X,Xを構成する横条材W2がそれぞれ嵌入されるように取り付ける。
 この状態で、上側の溶接金網WMを下側の溶接金網WM上に、下側の溶接金網WMの横条材W2,W2と上側の溶接金網WMの横条材W2,W2とが相隣るように重畳させると、上側の溶接金網WMの相隣る縦条材W1,W1の周面が第3固定具F3の第2結合手段20,20を構成する第2固定部21e,21e、21e,21eの先端面ST2,ST2、ST2,ST2上に載置されるので、上側の溶接金網WMに押圧を印加することによって、当該縦条材W1,W1に第2固定部21e,21e、21e,21eを、枡目Mの内側から外側へ向かって外嵌させて、下側の溶接金網WMと上側の溶接金網WMとを第3固定具F3にてワンタッチで固定させる。これによって、施工者及び作業員に重労働を強いることなく、未熟な施工者及び作業員であっても複数の溶接金網を短時間で確実に施工することができる。
 かかる場合も前同様、第3固定具F3の対をなす第2固定部21e,21e、21e,21eの間に、上側の溶接金網WMの交差部X,X及び当該交差部Xを構成する横条材W2が、既に嵌入されている下側の溶接金網WMの交差部X,X及び当該交差部Xを構成する横条材W2と相隣る様態で嵌入されるため、上側の溶接金網WMは縦方向及び横方向へのずれが防止される。
 前述したように、施工対象面には複数の溶接金網WM,WM,…が行方向及び列方向へ配置される。そして、例えば、行方向に配置される溶接金網WM,WM,…はその表裏が順次入れ替わるように配置され、列方向には表裏が互いに同じになるように配置される。このような配置状態において、行方向に相隣る溶接金網WM,WM、WM,WM、…,…が、第3固定具F3,F3,…によって前述した如く結合固定されるため、結果として、配置された全ての溶接金網WM,WMは、縦方向及び横方向へのずれが防止される。
 図31は第4固定具の斜視図である。なお、図中、図24に示した部分に対応する部分には同じ番号を付してその説明を省略する。
 図31に示したように、第4固定具F4は、第2結合手段20の両脚辺部21c,21cの寸法を、第3固定具F3の両脚辺部21c,21cより長くした以外は、前述した第3固定具F3と略同じ構成になしてある。すなわち、第4固定具F4の第2結合手段20を構成する両脚辺部21c,21cは、前同様、第2フレーム部材12,12の間を通って第1フレーム部材11の固定部11e,11eより高い位置まで延設してあり、両脚辺部21c,21cの端部にはそれぞれ第2固定部21e,21e、21e,21eが設けてある。両脚辺部21c,21cの底部21b側は、第1フレーム部材11,11の当接部11b,11bを通過して当接部11bから所定寸法だけ離隔した位置まで延設してあり、両脚辺部21c,21cのこれら延設された部分及び第2結合手段20の底部21bによって、前述したデッキプレートDPの谷部DB(図3参照)に進入させる脚部25が形成されている。
 ここで、両脚辺部21c,21cと第1フレーム部材11とは、両者が対向する適宜の位置で溶接又は接着等によって相互に固定してある。一方、脚部25を構成する底部21bの長さ寸法は両脚辺部21c,21cの傾斜角及び脚部25の長さ寸法に応じて定められ、底部21bの長さ寸法が非常に短い場合、脚部25は正面視が略V字状になる。なお、両脚辺部21c,21cの傾斜角は一定でもよいが、その長手方向の適宜位置で変更させてもよい。図31に示した第4固定具F4の両脚辺部21c,21cにあっては、第1フレーム部材11,11のアーム部11dと立上り部11cとがなす角部に対向する位置付近で、傾斜角を変更しており、当該位置より第2固定部21e,21e側にあっては相対的に鈍角に、当該位置より脚部25側にあっては相対的に鋭角になしてある。
 このような第4固定具F4を用いた場合にあっても、前述した第3固定具F3と同様、当該第4固定具F4を取り付けた下側の溶接金網WMと、その上に重畳させた上側の溶接金網WMとをワンタッチで固定させることができる。一方、第4固定具F4の脚部25が、デッキプレートDPの谷部DB(図3参照)に進入されるため、第4固定具F4が取り付けられた溶接金網の高さ位置と他の溶接金網の高さ位置とを略同じにすることができる。
 なお、第1固定具F1~第4固定具F4は溶接金網以外にも、金属製又は樹脂製の網状のフェンスといった他の格子状体にも適用できることは言うまでもない。
 11   第1フレーム部材
 11a  本体
 11b  当接部
 11c  立上り部
 11d  アーム部
 11e  固定部
 12   第2フレーム部材
 14   結合手段
 14a  本体
 14b  保持部
 14c  挿入口
 20   第2結合手段
 21e  第2固定部
 25   脚部
 F1   第1固定具
 F2   第2固定具
 F3   第3固定具
 F4   第4固定具
 ST   先端面
 ST2  先端面
 SP1  第1スペーサ
 SP2  第2スペーサ
 WM   溶接金網
 W1   縦条材
 W2   横条材
 M    枡目
 H    平面

Claims (14)

  1.  格子状に配した複数の縦条材及び複数の横条材が交差する部分を接合してなり、各縦条材及び各横条材にて形成された複数の枡目を有する一の格子状体の縁部上に他の格子状体の縁部を重畳させ、両者の重畳部分を互いに固定する操作を繰り返して、施工対象面に複数の格子状体を施工する格子状体の施工方法であって、
     各格子状体を配置する位置である配置位置、及び各格子状体を配置する順番である配置順を予め定めておき、
     前記一の格子状体に固定させるための固定部と、前記他の格子状体の縦条材又は横条材を結合させるための結合手段とを有する1又は複数の固定具を、各格子状体の縁部の所定位置に固定し、
     前記配置順に応じて、該当する配置位置に配置した一の格子状体の縁部上に、前記配置順に応じて、該当する配置位置に配置した他の格子状体の縁部を重畳させ、次に、重畳させた他の格子状体の縁部に押圧を印加することによって、一の格子状体の縁部に固定された1又は複数の固定具の結合手段に、当該他の格子状体の縦条材又は横条材を結合させて、両格子状体を固定する
    ことを特徴とする格子状体の施工方法。
  2.  前記配置順を定めるに際して、前記格子状体の表裏を定める請求項1記載の格子状体の施工方法。
  3.  施工対象面の行方向へ、表の格子状体と裏の格子状体とを交互に配置し、また施工対象面の列方向へ、表裏が同じ格子状体を配置する、又は、施工対象面の列方向へ、表の格子状体と裏の格子状体とを交互に配置し、また施工対象面の行方向へ、表裏が同じ格子状体を配置する請求項2記載の格子状体の施工方法。
  4.  前記配置位置を定めるに際して、当該施工対象面に係る建築物の設計図に基いて、各格子状体の形状を定め、定めた形状に各格子状体を加工しておく請求項1から3のいずれかに記載の格子状体の施工方法。
  5.  前記一の格子状体と他の格子状体とは、前記施工対象面に対向する両者の枡目の位置が、相互に異なるように重畳させる請求項1から4のいずれかに記載の格子状体の施工方法。
  6.  前記固定具として、一の格子状体の相隣る縦条材又は相隣る横条材にそれぞれ固定させるための対をなす固定部を具備し、前記結合手段は対をなす両固定部の間の領域に配設してある固定具を用いる請求項5記載の格子状体の施工方法。
  7.  行方向に相隣る一の格子状体の縁部に配置する固定具は、その対をなす固定部を当該格子状体の相隣る縦条材にそれぞれ固定させ、当該固定具の結合手段に、行方向に相隣る他の格子状体の縦条材を結合させ、
     列方向に相隣る一の格子状体の縁部に配置する固定具は、その対をなす固定部を当該格子状体の相隣る横条材にそれぞれ固定させ、当該固定具の結合手段に、列方向に相隣る他の格子状体の横条材を結合させる
    請求項6記載の格子状体の施工方法。
  8.  前記固定具として、前記結合手段を相対的に施工対象面の近くの位置に保持するように構成してなる第1固定具と、前記結合手段を相対的に施工対象面から離隔した位置に保持するための脚部を設けてなる第2固定具とを用い、
     畝状の山部及び谷部を設けてなるデッキプレートが施工対象面に施設される場合、デッキプレート上に配置される格子状体にあって、当該デッキプレートの山部に対向する位置には前記第1固定具を配置し、当該デッキプレートの谷部に対向する位置には前記第2固定具を配置する請求項7記載の格子状体の施工方法。
  9.  前記一の格子状体と他の格子状体とは、前記施工対象面に対向する両者の枡目の位置が、略一致するように重畳させる請求項1から4のいずれかに記載の格子状体の施工方法。
  10.  前記固定具として、一の格子状体の相隣る縦条材又は相隣る横条材にそれぞれ固定させるための対をなす固定部と、重畳された他の格子状体の相隣る縦条材又は相隣る横条材をそれぞれ結合させる対をなす結合手段とを具備する固定具を用いる請求項9記載の格子状体の施工方法。
  11.  2対の固定部が距離を隔てて互いに平行に配設してあり、対をなす固定部の内側に、2対の結合手段が距離を隔てて互いに平行に配設してあり、平行に配された対をなす結合手段の間に2本の縦条材又は2本の横条材を互いに平行に嵌入し得るようになした固定具を用い、
     一の格子状体の相隣る縦条材又は横条材に前記固定具を、当該固定具の平行に対向する両固定部が、縦条材と横条材とが交叉する交叉部を跨ぐように固定させておき、
     平行に配された対をなす結合手段の間に、一の格子状体の縦条材及び他の格子状体の縦条材を互いに平行に嵌入させ、又は一の格子状体の横条材及び他の格子状体の横条材を並べた状態で嵌入させる
    請求項10記載の格子状体の施工方法。
  12.  前記固定具として、前記結合手段を相対的に施工対象面の近くの位置に保持するように構成してなる第3固定具と、前記結合手段を相対的に施工対象面から離隔した位置に保持するための脚部を設けてなる第4固定具とを用い、
     畝状の山部及び谷部を設けてなるデッキプレートが施工対象面に施設される場合、デッキプレート上に配置される格子状体にあって、当該デッキプレートの山部に対向する位置には前記第3固定具を配置し、当該デッキプレートの谷部に対向する位置には前記第4固定具を配置する
    請求項10又は11記載の格子状体の施工方法。
  13.  前記格子状体に固定させるための固定部と、当該格子状体を施工対象面から離隔した位置に担持する担持部とを具備するスペーサを用い、
     各格子状体の相隣る格子状体が重畳される以外の領域に複数のスペーサを互いに適宜の距離を隔てて取り付けておく
    請求項1から12のいずれかに記載の格子状体の施工方法。
  14.  格子状に配した複数の縦条材及び複数の横条材が交差する部分を接合してなり、各縦条材及び各横条材にて形成された複数の枡目を有する一の格子状体の縁部上に他の格子状体の縁部を重畳させ、両者の重畳部分を互いに固定する操作を繰り返して、施工対象面に複数の格子状体を施工する格子状体の施工方法であって、
     各格子状体を配置する位置である配置位置、各配置位置に配置する格子状体の形状を、当該施工対象面に係る建築物の設計図に基いてそれぞれ決定し、
     また、各格子状体を配置する順番である配置順、及び、各配置位置に配置する格子状体の表裏をそれぞれ決定し、
     更に、前記一の格子状体に固定させるための固定部と、前記他の格子状体の縦条材又は横条材を結合させるための結合手段とを有する複数種類の固定具、及び、前記格子状体に固定させるための固定部と、当該格子状体を施工対象面から離隔した位置に担持する担持部とを具備する複数種類のスペーサについて、各格子状体の縁部の所定位置に固定する位置、格子状体に取り付ける取付方向、及び、当該位置に取り付けるべき種類をそれぞれ決定して施工設計図を予め取得しておき、
     取得した施工設計図に従って、複数の格子状体を加工し、加工した格子状体それぞれに対応する固定具及びスペーサを取り付け、それらを取り付けた各格子状体を前記配置順に応じて、該当する配置位置に配置した一の格子状体の縁部上に、前記配置順に応じて、該当する配置位置に配置した他の格子状体の縁部を重畳させ、次に、重畳させた他の格子状体の縁部に押圧を印加することによって、一の格子状体の縁部に固定された1又は複数の固定具の結合手段に、当該他の格子状体の縦条材又は横条材を結合させて、両格子状体を固定する
    ことを特徴とする格子状体の施工方法。
PCT/JP2019/034313 2018-09-28 2019-08-31 格子状体の施工方法 WO2020066466A1 (ja)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2018-185823 2018-09-28
JP2018185823 2018-09-28
JP2019058279A JP7356693B2 (ja) 2018-09-28 2019-03-26 格子状体の施工方法
JP2019-058279 2019-03-26

Publications (1)

Publication Number Publication Date
WO2020066466A1 true WO2020066466A1 (ja) 2020-04-02

Family

ID=69950538

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/034313 WO2020066466A1 (ja) 2018-09-28 2019-08-31 格子状体の施工方法

Country Status (1)

Country Link
WO (1) WO2020066466A1 (ja)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0561316A (ja) * 1991-08-30 1993-03-12 Ricoh Co Ltd 多色画像形成装置
JPH07292864A (ja) * 1994-04-27 1995-11-07 Tooami:Kk 鉄筋用スペーサ
JPH09209500A (ja) * 1996-02-07 1997-08-12 Shigeru Yaguchi Rc構造物用の先組み鉄筋部材
JPH11141056A (ja) * 1997-11-06 1999-05-25 Nishiyama Tetsumou Seisakusho:Kk 配筋用スペーサ及び該配筋用スペーサを用いた配筋方法
JP2013185359A (ja) * 2012-03-08 2013-09-19 Toami Corp デッキ合成スラブ
US20140115995A1 (en) * 2012-10-26 2014-05-01 Edwin Joseph Baldoni Reinforcement Support Member and Kit
WO2018110371A1 (ja) * 2016-12-12 2018-06-21 ライズバレー株式会社 固定具
WO2018168390A1 (ja) * 2017-03-17 2018-09-20 ライズバレー株式会社 固定具
JP2019039287A (ja) * 2017-08-28 2019-03-14 ライズバレー株式会社 固定具

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0561316A (ja) * 1991-08-30 1993-03-12 Ricoh Co Ltd 多色画像形成装置
JPH07292864A (ja) * 1994-04-27 1995-11-07 Tooami:Kk 鉄筋用スペーサ
JPH09209500A (ja) * 1996-02-07 1997-08-12 Shigeru Yaguchi Rc構造物用の先組み鉄筋部材
JPH11141056A (ja) * 1997-11-06 1999-05-25 Nishiyama Tetsumou Seisakusho:Kk 配筋用スペーサ及び該配筋用スペーサを用いた配筋方法
JP2013185359A (ja) * 2012-03-08 2013-09-19 Toami Corp デッキ合成スラブ
US20140115995A1 (en) * 2012-10-26 2014-05-01 Edwin Joseph Baldoni Reinforcement Support Member and Kit
WO2018110371A1 (ja) * 2016-12-12 2018-06-21 ライズバレー株式会社 固定具
WO2018168390A1 (ja) * 2017-03-17 2018-09-20 ライズバレー株式会社 固定具
JP2019039287A (ja) * 2017-08-28 2019-03-14 ライズバレー株式会社 固定具

Similar Documents

Publication Publication Date Title
JP6627066B2 (ja) 固定具
JP6727160B2 (ja) 固定具
JP7356693B2 (ja) 格子状体の施工方法
JP6668284B2 (ja) 格子状体
WO2020066466A1 (ja) 格子状体の施工方法
WO2020066582A1 (ja) 固定具
JP6645795B2 (ja) 網状体の接続構造
JP7149578B2 (ja) 固定具
JP6712632B2 (ja) 格子状体
JP2020056189A (ja) スペーサ
JP6557411B2 (ja) 格子状体
JP2017172148A (ja) 配筋用スペーサおよび合成スラブの施工方法
JP7127827B2 (ja) 固定具
JP6585142B2 (ja) 塔構造物の構造、複合補強材及び複合補強材の製造方法
WO2018110371A1 (ja) 固定具
JPH0336347A (ja) 床構造材
JP3639567B2 (ja) ベタ基礎の配筋方法
JP6476508B2 (ja) 固定具
JP6577513B2 (ja) 固定具
JP2810937B2 (ja) 布基礎配筋の布筋枠配筋方法
JP7401110B2 (ja) スペーサ及び該スペーサの使用方法、並びに格子状体の敷設方法
JP4933847B2 (ja) べた基礎出隅コーナー部ユニット鉄筋の製造方法
JPH04140346A (ja) 床構造材
JP2000192662A (ja) 格子面状体の継手方法及び該格子面状体を用いる壁施工方法
JP2002256567A (ja) 基礎用鉄筋及びこの基礎用鉄筋を用いた基礎鉄筋構造

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19865069

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19865069

Country of ref document: EP

Kind code of ref document: A1