WO2018131651A1 - 電池パック及び電源システム - Google Patents

電池パック及び電源システム Download PDF

Info

Publication number
WO2018131651A1
WO2018131651A1 PCT/JP2018/000496 JP2018000496W WO2018131651A1 WO 2018131651 A1 WO2018131651 A1 WO 2018131651A1 JP 2018000496 W JP2018000496 W JP 2018000496W WO 2018131651 A1 WO2018131651 A1 WO 2018131651A1
Authority
WO
WIPO (PCT)
Prior art keywords
charge
secondary battery
battery pack
calculation unit
state
Prior art date
Application number
PCT/JP2018/000496
Other languages
English (en)
French (fr)
Inventor
勇樹 橘
大和 宇都宮
佐田 岳士
Original Assignee
株式会社デンソー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社デンソー filed Critical 株式会社デンソー
Publication of WO2018131651A1 publication Critical patent/WO2018131651A1/ja
Priority to US16/511,920 priority Critical patent/US10996280B2/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/13Maintaining the SoC within a determined range
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/14Preventing excessive discharging
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L58/00Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
    • B60L58/10Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
    • B60L58/12Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
    • B60L58/15Preventing overcharging
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • H01M10/441Methods for charging or discharging for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • H01M10/482Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte for several batteries or cells simultaneously or sequentially
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M50/00Constructional details or processes of manufacture of the non-active parts of electrochemical cells other than fuel cells, e.g. hybrid cells
    • H01M50/20Mountings; Secondary casings or frames; Racks, modules or packs; Suspension devices; Shock absorbers; Transport or carrying devices; Holders
    • H01M50/202Casings or frames around the primary casing of a single cell or a single battery
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0013Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries acting upon several batteries simultaneously or sequentially
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • H02J7/0049Detection of fully charged condition
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/005Detection of state of health [SOH]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/14Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle
    • H02J7/1423Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries for charging batteries from dynamo-electric generators driven at varying speed, e.g. on vehicle with multiple batteries
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/547Voltage
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/40Drive Train control parameters
    • B60L2240/54Drive Train control parameters related to batteries
    • B60L2240/549Current
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L2240/00Control parameters of input or output; Target parameters
    • B60L2240/80Time limits
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3828Arrangements for monitoring battery or accumulator variables, e.g. SoC using current integration
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3842Arrangements for monitoring battery or accumulator variables, e.g. SoC combining voltage and current measurements
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4271Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries

Definitions

  • This disclosure relates to a battery pack and a power supply system.
  • Patent Document 1 discloses a configuration of a control device for a secondary battery mounted on a vehicle. In the configuration disclosed in Patent Document 1, in the trip period from the ignition on to the off of the vehicle, the difference in the control center of the SOC in the first trip and the second trip is about 10% before and after the trip of the second trip. ⁇ SOC is calculated, and the full charge capacity of the secondary battery is calculated from the ⁇ SOC and the integrated current amount ⁇ Idt.
  • the current sensor used for calculating the integrated current amount ⁇ Idt has an offset error.
  • both charging and discharging of the secondary battery are performed during the trip period to be measured. For this reason, the measurement period of the current value by the current sensor is long, and the offset error of the current sensor is accumulated in the integrated current amount. As a result, since the error included in the integrated current amount is large, there is room for improvement in accurately calculating the full charge capacity.
  • the present disclosure is intended to provide a battery pack having a secondary battery and capable of accurately calculating the full charge capacity of the secondary battery.
  • One embodiment of the present disclosure includes a secondary battery, A voltage detector for detecting a terminal voltage of the secondary battery; A charging state calculation unit that calculates a charging state of the secondary battery based on the terminal voltage detected by the voltage detection unit; A current detector for detecting a current flowing in the secondary battery; A charge / discharge control unit for controlling charge / discharge of the secondary battery; The first charge state calculated based on the first terminal voltage detected at the first detection timing by the voltage detection unit, and the second terminal voltage detected by the voltage detection unit at the second detection timing.
  • a differential charge state calculation unit for calculating a differential charge state from the second charge state;
  • An integrated current amount calculation unit that calculates an integrated amount of current detected by the current detection unit in a target period from the first detection timing to the second detection timing;
  • a full charge capacity calculation unit for calculating a full charge capacity of the secondary battery based on the differential charge state calculated by the differential charge state calculation unit and the integrated current amount calculated by the integrated current amount calculation unit; ,
  • the charge / discharge control unit is in a battery pack configured to regulate either charging or discharging of the secondary battery in the target period.
  • FIG. 1 is a block diagram illustrating a configuration of a battery pack and a power supply system in Embodiment 1.
  • FIG. 2 is a control flow diagram of the battery pack according to the first embodiment.
  • FIG. 3 is a diagram illustrating a time chart in the battery pack according to the first embodiment.
  • FIG. 4 is a diagram illustrating the SOC change in the state where charging is regulated in the first embodiment.
  • FIG. 5 is a diagram illustrating a change in SOC in the state where discharge is regulated in the first embodiment.
  • FIG. 6 is a control flow diagram in the battery pack according to the first modification.
  • FIG. 7 is a control flow diagram of the battery pack according to the second modification.
  • FIG. 8 is a control flow diagram in the battery pack according to the third modification.
  • FIG. 9 is a control flow diagram in the battery pack according to the fourth modification.
  • the battery pack 1 of the present embodiment includes a secondary battery 10, a voltage detection unit 11, a current detection unit 12, a charge state calculation unit 13, an integrated current amount calculation unit 14, a differential charge state calculation unit 15, A full charge capacity calculation unit 16 and a charge / discharge control unit 20 are provided.
  • the voltage detection unit 11 detects the terminal voltage of the secondary battery 10.
  • the charging state calculation unit 13 calculates the charging state SOC, that is, State Of Charge, based on the terminal voltage of the secondary battery 10.
  • the current detection unit 12 detects the current that flows through the secondary battery 10.
  • the charge / discharge control unit 20 controls charge / discharge of the secondary battery 10.
  • the differential charge state calculation unit 15 includes a first charge state SOC1 calculated based on the first terminal voltage OCV1 detected by the voltage detection unit 11 at the first detection timing t2, and the voltage detection unit 11 at the second detection timing t7. A difference state of charge ⁇ SOC with respect to the second state of charge SOC2 calculated based on the detected second terminal voltage OCV2 is calculated.
  • the integrated current amount calculation unit 14 calculates the integrated amount ⁇ Idt of the current detected by the current detection unit 12 in the target period T from the first detection timing t2 to the second detection timing t7.
  • the full charge capacity calculation unit 16 is based on the difference charge state ⁇ SOC calculated by the difference charge state calculation unit 15 and the accumulated current amount ⁇ Idt calculated by the accumulated current amount calculation unit 14. Calculate the charge capacity.
  • the charge / discharge control unit 20 is configured to regulate either charging or discharging of the secondary battery 10 during the target period t2 to t7.
  • the battery pack 1 of the present embodiment is mounted on a vehicle, and as shown in FIG. 1, a vehicle rotating machine 101 is connected via a pack terminal 30 provided in the battery pack 1, and the pack terminal 31 is used.
  • the electric load 102 and the Pb battery 103 are connected. Thereby, the power supply system 100 is configured.
  • the secondary battery 10 provided in the battery pack 1 is connected to pack terminals 30 and 31 via switches 104 and 105. On / off of the charge / discharge restriction switch 104 and the charge / discharge prohibition switch 105 is controlled by the charge / discharge control unit 20 included in the control unit 2 of the battery pack 1.
  • the kind of the secondary battery 10 is not limited, for example, it can be a non-aqueous secondary battery. In the present embodiment, a lithium ion battery is adopted as the secondary battery 10.
  • a voltage detector 11 is connected to the secondary battery 10.
  • a known voltage sensor can be used as the voltage detector 11, and the voltage detector 11 can detect the terminal voltage OCV of the secondary battery 10, that is, the Open Circuit Voltage, at a predetermined detection timing.
  • the terminal voltage detected by the voltage detection unit 11 is stored in the OCV storage unit 41 included in the storage unit 4 of the battery pack 1.
  • the charging state calculation unit 13 provided in the calculation unit 3 of the battery pack 1 charges the secondary battery 10 at the predetermined detection timing based on the terminal voltage at the predetermined detection timing stored in the OCV storage unit 41.
  • a state SOC is calculated.
  • the charging state calculation unit 13 stores in advance OCV-SOC conversion means based on the correspondence between the terminal voltage OCV and the charging state SOC in the secondary battery 10.
  • the charging state calculation unit 13 can calculate the SOC at the predetermined detection timing from the OCV at the predetermined detection timing based on the OCV-SOC conversion means.
  • the SOC calculated by the charging state calculation unit 13 is stored in the SOC storage unit 42 included in the storage unit 4.
  • a current detector 12 is connected to the secondary battery 10.
  • a known current sensor can be used as the current detection unit 12, and the current detection unit 12 can detect the current I flowing in the secondary battery 10 in a predetermined period.
  • the current I detected by the current detection unit 12 is stored in the current amount storage unit 43 included in the storage unit 4.
  • the accumulated current amount calculation unit 14 provided in the calculation unit 3 of the battery pack 1 integrates the secondary battery 10 in the predetermined period based on the current I that flows in the predetermined period stored in the current storage unit.
  • the amount of current ⁇ Idt can be calculated.
  • the integrated current amount ⁇ Idt calculated by the integrated current amount calculation unit 14 is stored in the ⁇ Idt storage unit 44 of the storage unit 4.
  • the calculation unit 3 of the battery pack 1 includes a differential charge state calculation unit 15.
  • the differential charge state calculation unit 15 calculates a differential charge state ⁇ SOC that is a difference between the SOC1 at the first detection timing and the SOC2 at the second detection timing, which is stored in the SOC storage unit 42.
  • the calculated ⁇ SOC is stored in the ⁇ SOC storage unit 45 included in the storage unit 4.
  • the full charge capacity calculation unit 16 included in the calculation unit 3 reads ⁇ Idt in a predetermined period stored in the ⁇ Idt storage unit 44 and ⁇ SOC in a predetermined period stored in the ⁇ SOC storage unit 45, and from these Calculate the full charge capacity.
  • the calculation of the full charge capacity in the full charge capacity calculation unit 16 is calculated from the following formula 1, which is a relational expression of the full charge capacity, ⁇ Idt, and ⁇ SOC.
  • Full charge capacity ( ⁇ Idt / ⁇ SOC) ⁇ 100 (Equation 1)
  • FIG. The battery pack 1 includes a determination unit 5 that performs a determination described later based on the calculated value.
  • the battery pack 1 has a charge / discharge control unit 20 in the control unit 2.
  • the charge / discharge control unit 20 can regulate one of charging and discharging of the secondary battery 10 in a target period described later.
  • the charge / discharge control unit 20 performs the regulation by turning on or off the switches 104 and 105 and permitting or regulating the generation of regenerative energy in the rotating machine 101.
  • a charge / discharge prohibition switch 105 described later is turned on and the charge / discharge restriction switch 104 is turned off to supply power to the electric load 102 and the Pb battery 103. And the generation of regenerative energy by the rotating machine 101 is permitted.
  • the regenerative energy output from the rotating machine 101 is input to the secondary battery 10, and the secondary battery 10 is charged.
  • the generation of regenerative energy by the rotating machine 101 is regulated, and the electric load 102, the Pb battery 103, It is possible to supply power to the rotating machine 101. Thereby, the charge to the secondary battery 10 will be controlled.
  • the charge / discharge control unit 20 can control the on / off of the charge / discharge prohibition switch 105 connected to the secondary battery 10. As a result, the charge / discharge control unit 20 can simultaneously inhibit both charging and discharging of the secondary battery 10.
  • step S1 the ignition IG of the vehicle is turned ON.
  • step S2 the timing when the IG is turned on is t1.
  • step S2 the voltage detection unit 11 acquires the first terminal voltage OCV1 of the secondary battery 10 in step S2 shown in FIG.
  • step S3 shown in FIG. 2 it is determined whether or not the polarization of the secondary battery 10 has been eliminated.
  • the polarization of the secondary battery 10 is eliminated when one hour or more has elapsed since the end of the previous use of the secondary battery 10.
  • the elapsed time can be measured using a counter (not shown) provided in the vehicle.
  • the polarization may be forcibly eliminated by applying power to the secondary battery 10 or the like.
  • step S3 If it is determined in step S3 that the polarization is not eliminated, the control is terminated. On the other hand, if it is determined in step S3 that the polarization has been eliminated, the charging state calculation unit 13 calculates the first charging state SOC1 based on OCV1 in step S4 shown in FIG. The timing for calculating the SOC1 is t3 shown in FIG. Note that step S3 may be performed before step S2 and step S4 may be performed after step S2.
  • step S5 shown in FIG. 2 it is determined whether or not the absolute value of the difference between the SOC1 and the use lower limit SOC is equal to or greater than the required differential charge state, that is, the required ⁇ SOC.
  • the necessary ⁇ SOC is a ⁇ SOC used for calculating the full charge capacity, and defines the size required to reduce the calculation error.
  • the required ⁇ SOC includes the type of the secondary battery 10, the configuration of the power supply system 100, It can be set in advance as appropriate according to the usage environment of the battery pack 1 and the like.
  • step S6 the charge / discharge control unit 20 selects to perform control to restrict charging. Then, at the timing t4 shown in FIG. 3C, the charging regulation of the charging / discharging regulation control is turned ON. Thereby, only the discharge of the secondary battery 10 is permitted. In addition, in the state where charge regulation is ON, the state where discharge is not performed is also permitted. That is, as shown in FIG. 4, there may be a state in which discharge does not occur and the SOC does not decrease and remains flat after t5 when the charging regulation is turned on.
  • step S5 the charge / discharge control unit 20 performs control for regulating discharge in step S7. Choose that. Then, the discharge regulation of the charge / discharge regulation control is turned ON. Thereby, only charging of the secondary battery 10 is permitted. In the state where the discharge regulation is ON, a state where charging is not performed is also allowed. That is, as shown in FIG. 5, there may be a state in which charging does not occur after t5 when the discharge regulation is turned on and the SOC is leveled off without increasing.
  • step S8 it is determined whether or not charging of the secondary battery 10 is started. In the present embodiment, it is determined whether regenerative energy from the rotating machine 101 is applied to the secondary battery 10.
  • step S9 the integrated current amount calculation unit 14 starts integrating the amount of current and starts the counter 17.
  • FIG. 3D shows the current when charging is restricted, and the timing at which the current starts to be detected is t5. Then, as shown in FIG. 3 (e), current amount integration and a counter are started at t5.
  • step S10 shown in FIG. 2 it is determined whether or not the terminal voltage of the secondary battery 10 has reached a predetermined end voltage X.
  • the end voltage X can be set as appropriate.
  • the end voltage X is an OCV equivalent to the use lower limit SOC or the use upper limit SOC derived by the OCV-SOC conversion means based on the use lower limit SOC or the use upper limit SOC.
  • the OCV corresponding to the use lower limit SOC is set as the end voltage X
  • the discharge regulation is performed
  • the OCV corresponding to the use upper limit SOC is set as the end voltage X.
  • FIG. 3 (f) shows the SOC change when charging regulation is performed, and it is determined that the terminal voltage of the secondary battery 10 has reached the end voltage X when the SOC has reached the use lower limit SOC at t6. is doing.
  • Step S10 shown in FIG. 2 when it is determined that the terminal voltage of the secondary battery 10 has not reached the end voltage X, the process returns to Step S10 again. If it is determined in step S10 that the terminal voltage of the secondary battery 10 has reached the end voltage X, both charging and discharging of the secondary battery 10 are prohibited in step S11. That is, as shown in FIG. 3B, the charge / discharge inhibition control is turned ON at t6. As a result, as shown in FIG. 3D, the current value is not detected at t6.
  • step S12 shown in FIG. 2 as shown in FIG. 3E, the integration of the current amount and the counter 17 are finished at t6.
  • step S13 shown in FIG. 2 at t6, as shown in FIG. 3C, when the charge regulation of step S6 is performed, the charge regulation is canceled, and when the discharge regulation of step S7 is performed, the discharge regulation is performed. Is released.
  • step S14 shown in FIG. 2 it is determined whether or not the polarization of the secondary battery 10 has been eliminated.
  • the voltage detection unit 11 detects the second terminal voltage OCV2 that is the terminal voltage of the secondary battery 10 in step S15 shown in FIG. To do. That is, in FIGS.
  • t7 is set as the second detection timing t7.
  • step S16 shown in FIG. 2 the charge / discharge prohibition is canceled. That is, as shown in FIG. 3B, the charge / discharge inhibition control is turned off at t8.
  • step S17 shown in FIG. 2 the charge condition calculation part 13 acquires 2nd charge condition SOC2 based on OCV2. Further, in step S18, a difference ⁇ SOC between SOC1 and SOC2 is calculated. The acquisition of SOC2 and the calculation of ⁇ SOC may be performed after t7 in FIG.
  • step S19 shown in FIG. 2 the accumulated time calculated by the accumulated time calculating unit 18 is equal to or greater than the predetermined value C, the voltage detecting unit 11 is abnormal, and the current detecting unit 12 is abnormal. It is determined whether or not any of the three determination items. If it is determined in step S19 that any of the above determination items is met, the control is terminated.
  • the determination method of the presence or absence of abnormality in the voltage detection part 11 and the current detection part 12 is not specifically limited, For example, the detection value by the voltage detection part 11 and the current detection part 12 by the determination part 5 and the normal set in advance By comparing with the value range, when the detected value is within the normal value range, it can be determined that there is no abnormality, and when the detected value is not within the normal value range, it can be determined that there is an abnormality.
  • step S20 the full charge capacity calculation unit 16 calculates the full charge capacity, and the control for calculating the full charge capacity ends. To do. Thereafter, in step S21, after t9 shown in FIG. 3, charging / discharging of the secondary battery 10 is started under normal control.
  • the effect in the battery pack 1 of this embodiment is explained in full detail.
  • charging / discharging of the secondary battery 10 is restricted to one during the target period t5 to t6 in which the accumulated current amount is calculated.
  • the charge / discharge period required to obtain the predetermined ⁇ SOC can be shortened, so that the offset error of the current sensor accumulated in the integrated current amount ⁇ Idt can be reduced.
  • the full charge capacity of the secondary battery 10 can be accurately calculated from the relational expression between ⁇ SOC and the integrated current amount ⁇ Idt.
  • the second terminal voltage is detected as the second detection timing t7 when the differential charge state ⁇ SOC is equal to or greater than the required ⁇ SOC, and the charge / discharge control unit 20 detects the first charge state SOC1 and the required ⁇ SOC. Based on the above, it is configured to determine which of charging and discharging is to be regulated. As a result, ⁇ SOC can always be greater than or equal to the required ⁇ SOC, so that the value of ⁇ SOC can be increased. As a result, an error in calculating the full charge capacity can be reduced as compared with a case where ⁇ SOC is small.
  • the charge / discharge control unit 20 has an absolute value of a difference between the first charge state SOC1 and the lower limit charge state in which the use of the secondary battery 10 is allowed, that is, the use lower limit SOC is greater than or equal to the required ⁇ SOC.
  • the charging of the secondary battery 10 is restricted.
  • ⁇ SOC that is greater than or equal to the required ⁇ SOC can be acquired in a short time, so that an error in calculating the full charge capacity can be reduced.
  • the charge / discharge control unit 20 is configured such that the absolute value of the difference between the first charge state SOC1 and the upper limit charge state in which the use of the secondary battery 10 is allowed, that is, the use upper limit SOC is greater than or equal to the required ⁇ SOC.
  • the secondary battery 10 is configured to be restricted from discharging. As a result, when the first state of charge SOC1 is relatively small, ⁇ SOC that is greater than or equal to the required ⁇ SOC can be acquired in a short time, and therefore an error in calculating the full charge capacity can be reduced.
  • the secondary battery 10 is in an unloaded state and the polarization of the secondary battery 10 is eliminated. It has become. Thereby, since the detection error of the terminal voltage resulting from the polarization of the secondary battery 10 can be reduced, the error in calculating the full charge capacity can be reduced. In particular, in the present embodiment, since both the first detection timing t2 and the second detection timing t7 are in a no-load state and the polarization of the secondary battery 10 is eliminated, The error in calculating the full charge capacity can be further reduced. Note that the polarization of the secondary battery 10 does not necessarily have to be completely eliminated, and may be eliminated to the extent that required SOC accuracy can be ensured.
  • the charge / discharge control unit 20 is configured to release the charge regulation and the discharge regulation at the second detection timing t7. As a result, normal charge / discharge control can be performed at an early stage, and no waste occurs. In this embodiment mounted on a vehicle, a reduction in fuel consumption of the vehicle can be suppressed.
  • the current detection unit 12 has an integration time calculation unit 18 that calculates the integration time when the current is detected, and when the integration time calculated by the integration time calculation unit 18 is a predetermined value C or more, When it is determined that there is an abnormality in the detection unit 11 and / or when it is determined that there is an abnormality in the current detection unit 12, the charge / discharge control unit 20 does not regulate the above.
  • the full charge capacity calculation unit 16 is configured not to calculate the full charge capacity. When the accumulated time at which the current is detected is equal to or greater than the predetermined value C, the offset error of the current sensor accumulated in the accumulated current amount ⁇ Idt becomes relatively large.
  • the magnitude of the predetermined value C is not particularly limited, but in the present embodiment, a value in the range of 20 to 30 minutes is set.
  • the battery pack 1, the rotating machine 101 that is electrically connected to the battery pack 1 and capable of generating power input to the battery pack 1, and the battery pack 1 are electrically connected.
  • the power supply system 100 having such a configuration it is possible to efficiently use energy in the entire power supply system 100 by accurately calculating the full charge capacity of the battery pack 1.
  • the power supply system 100 since the power supply system 100 is mounted on the vehicle, the fuel efficiency can be improved by efficiently using energy by the power supply system 100.
  • the battery pack 1 capable of accurately calculating the full charge capacity of the secondary battery 10.
  • step S5 when it is determined in step S5 that the absolute value of the difference between the SOC1 and the use lower limit SOC is equal to or greater than the required ⁇ SOC, the process proceeds to step S6. It was decided to proceed to S7.
  • the charge / discharge control unit 20 may restrict one of charging and discharging and not the other as in Modification 1 and Modification 2 below.
  • step S51 shown in FIG. 6 instead of going to step S5. If it is determined in step S51 that the absolute value of the difference between the SOC1 and the use lower limit SOC is equal to or greater than the required ⁇ SOC, the process proceeds to step S6 and subsequent steps as in the present embodiment, but the SOC1 and the use lower limit SOC If it is determined that the absolute value of the difference is not equal to or greater than the required ⁇ SOC, the process proceeds to step S21 shown in FIG. 2 instead of proceeding to step S7, and charging / discharging is started under normal control to calculate the full charge capacity. To finish the control. Therefore, in the first modification, the charge / discharge control unit 20 regulates charging, but does not regulate discharging.
  • step S52 shown in FIG. 7 instead of going to step S5. If it is determined in step S52 that the absolute value of the difference between the SOC1 and the use upper limit SOC is equal to or larger than the required ⁇ SOC, the process proceeds to step S7 and subsequent steps shown in FIG. If it is determined that the absolute value of the difference from the use upper limit SOC is not equal to or greater than the required ⁇ SOC, the control is terminated. Therefore, in the second modification, the charge / discharge control unit 20 regulates discharging but does not regulate charging.
  • the charge / discharge control unit 20 since the charge / discharge control unit 20 performs only discharge regulation or charge regulation, the charge / discharge control unit 20 has a configuration for implementing both charge regulation and discharge regulation. Compared to the above, the configuration of the charge / discharge control unit 20 can be simplified, and charge / discharge control is also facilitated.
  • step S53 if it is determined that the absolute value of the difference between SOC1 and the lower limit of use SOC is greater than or equal to the required ⁇ SOC, the process proceeds to step S6 and subsequent steps as in the present embodiment. If it is determined that the absolute value of the difference is not greater than or equal to the required ⁇ SOC, the process proceeds to step S54.
  • step S54 If it is determined in step S54 that the absolute value of the difference between the SOC1 and the use upper limit SOC is equal to or greater than the required ⁇ SOC, the process proceeds to step S7 and subsequent steps shown in FIG. When it is determined that the absolute value of the difference from the use upper limit SOC is not equal to or greater than the required ⁇ SOC, the process proceeds to step S21 shown in FIG. 2, and charging / discharging is started by normal control, and the control for calculating the full charge capacity is ended. .
  • step S54 is performed, and if it is determined in step S54 that the absolute value of the difference between SOC1 and the use upper limit SOC is not greater than or equal to the required ⁇ SOC, step S53 is performed. If it is determined in step S53 that the absolute value of the difference between SOC1 and the lower limit of use SOC is not greater than or equal to the required ⁇ SOC, the process may proceed to step S21 shown in FIG.
  • the control flow according to the third modification is suitable when the required ⁇ SOC is larger than the median value between the upper limit SOC and the lower limit SOC.
  • the absolute value of the difference between the value of SOC1 from both the upper limit SOC and the lower limit SOC is less than the required ⁇ SOC.
  • control is performed so as not to calculate the full charge capacity.
  • ⁇ SOC is a relatively large value greater than or equal to the required ⁇ SOC
  • the full charge capacity is calculated, so that ⁇ SOC is close to the full charge capacity and the error in calculating the full charge capacity is reduced. be able to.
  • step S201 it is determined whether or not the first detection timing t2 corresponds to a specific timing.
  • the process proceeds to step S2 and subsequent steps shown in FIG. 2, and after step S2 is performed as in the present embodiment, control for calculating the full charge capacity is performed.
  • step S21 shown in FIG. 2, and normal charging / discharging is started to calculate the full charge capacity. End control.
  • the calculation of the full charge capacity is performed when the first detection timing t2 corresponds to the specific timing, and is not performed in other cases. As a result, it is possible to prevent the opportunity for calculating the full charge capacity from being increased more than necessary, and to efficiently use energy.
  • the setting of the specific timing can be appropriately adjusted according to the required calculation frequency of the full charge capacity.
  • a state in which the number of arrivals of the trip period from on to off of the IG reaches a predetermined number can be set as the specific timing.
  • the full charge capacity is calculated when it falls under a specific trip at a specific timing, and the full charge capacity is not calculated for other trips. This can prevent unnecessary fuel consumption reduction.

Abstract

本実施形態の電池パック(1)は、二次電池(10)、充電状態算出部(13)、積算電流量算出部(14)、差分充電状態算出部(15)、満充電容量算出部(16)、充放電制御部(20)を備える。差分充電状態算出部(15)は第1検出タイミングでの第1充電状態(SOC1)と第2検出タイミングでの第2充電状態(SOC2)との差分充電状態(ΔSOC)を算出する。積算電流量算出部(14)は、第1検出タイミング~第2検出タイミングの対象期間において、二次電池(10)に流れた電流の積算量(∫Idt)を算出する。満充電容量算出部(16)は、差分充電状態(ΔSOC)と積算電流量(∫Idt)とに基づき、二次電池(10)の満充電容量を算出する。充放電制御部(20)は対象期間において二次電池(10)の充電及び放電のいずれか一方を規制するように構成されている。

Description

電池パック及び電源システム 関連出願の相互参照
 本出願は、2017年1月13日に出願された日本出願番号2017-3837号に基づくもので、ここにその記載内容を援用する。
 本開示は、電池パック及び電源システムに関する。
 従来、二次電池を有する電池パックにおいて、当該二次電池の満充電容量を算出する方法として、第1検出タイミングにおける二次電池の充電状態であるSOC1と、その後の第2検出タイミングにおける充電状態であるSOC2との差分ΔSOCと、第1検出タイミングから第2検出タイミングまでの二次電池における積算電流量∫Idtとの関係式を用いる方法が知られている。例えば、特許文献1には、車両に搭載された二次電池の制御装置の構成が開示されている。特許文献1に開示の構成では、車両のイグニッションオンからオフまでのトリップ期間において、第1トリップと第2トリップにおけるSOCの制御中心に差を付けることで第2トリップのトリップ前後で10%程度のΔSOCを算出し、当該ΔSOCと積算電流量∫Idtとから二次電池の満充電容量を算出している。
特開2003-134678号公報
 特許文献1に開示の構成では、積算電流量∫Idtの算出に使用される電流センサはオフセット誤差を有する。そして、特許文献1に開示の構成では、測定対象となるトリップ期間中に二次電池の充電と放電の両方を行っている。そのため、電流センサによる電流値の測定期間が長くなっており、電流センサのオフセット誤差が積算電流量において積み上がっている。その結果、積算電流量に含まれる誤差が大きくなっているため、満充電容量を正確に算出するには改善の余地がある。
 本開示は、二次電池を有する電池パックであって、当該二次電池の満充電容量を正確に算出することができる電池パックを提供しようとするものである。
 本開示の一態様は、二次電池と、
 該二次電池の端子電圧を検出する電圧検出部と、
 上記電圧検出部が検出した端子電圧に基づいて上記二次電池の充電状態を算出する充電状態算出部と、
 上記二次電池に流れた電流を検出する電流検出部と、
 上記二次電池の充放電を制御する充放電制御部と、
 上記電圧検出部が第1検出タイミングで検出した第1端子電圧に基づいて算出された第1充電状態と、上記電圧検出部が第2検出タイミングで検出した第2端子電圧に基づいて算出された第2充電状態との差分充電状態を算出する差分充電状態算出部と、
 上記第1検出タイミングから上記第2検出タイミングまでの対象期間において、上記電流検出部で検出された電流の積算量を算出する積算電流量算出部と、
 上記差分充電状態算出部により算出された差分充電状態と、上記積算電流量算出部により算出された積算電流量とに基づいて、上記二次電池の満充電容量を算出する満充電容量算出部と、
を備え、
 上記充放電制御部は、上記対象期間において上記二次電池における充電及び放電のいずれか一方を規制するように構成されている、電池パックにある。
 上記電池パックにおいては、積算電流量が算出される対象期間において、二次電池の充放電が一方に規制されている。これにより、所定の差分充電状態ΔSOCを取得するのに要する充放電の時間を短くすることができるため、積算電流量∫Idtに積み上がる電流センサのオフセット誤差を小さくすることができる。その結果、ΔSOCと∫Idtとの関係式から二次電池の満充電容量を正確に算出することができる。
 以上のごとく、本開示によれば、二次電池を有し、当該二次電池の満充電容量を正確に算出することができる電池パックを提供することができる。
 なお、請求の範囲に記載した括弧内の符号は、後述する実施形態に記載の具体的手段との対応関係を示すものであり、本開示の技術的範囲を限定するものではない。
 本開示についての上記目的およびその他の目的、特徴や利点は、添付の図を参照しながら下記の詳細な記述により、より明確になる。その図は、
図1は、実施形態1における、電池パックと電源システムの構成を示すブロック図であり、 図2は、実施形態1における、電池パックにおける制御フロー図であり、 図3は、実施形態1における、電池パックにおけるタイムチャートを示す図であり、 図4は、実施形態1における、充電が規制された状態でのSOC変化を表す図であり、 図5は、実施形態1における、放電が規制された状態でのSOC変化を表す図であり、 図6は、変形形態1における、電池パックにおける制御フロー図であり、 図7は、変形形態2における、電池パックにおける制御フロー図であり、 図8は、変形形態3における、電池パックにおける制御フロー図であり、 図9は、変形形態4における、電池パックにおける制御フロー図である。
(実施形態1)
上記電池パックの実施形態について、図1~図5を用いて説明する。
 本実施形態の電池パック1は、図1に示すように二次電池10、電圧検出部11、電流検出部12、充電状態算出部13、積算電流量算出部14、差分充電状態算出部15、満充電容量算出部16、充放電制御部20を備える。
 電圧検出部11は、二次電池10の端子電圧を検出する。
 充電状態算出部13は、二次電池10の端子電圧に基づいて充電状態SOC、すなわちState Of Chargeを算出する。
 電流検出部12は、二次電池10に流れた電流を検出する。
 充放電制御部20は、二次電池10の充放電を制御する。
 差分充電状態算出部15は、電圧検出部11が第1検出タイミングt2で検出した第1端子電圧OCV1に基づいて算出された第1充電状態SOC1と、電圧検出部11が第2検出タイミングt7で検出した第2端子電圧OCV2に基づいて算出された第2充電状態SOC2との差分充電状態ΔSOCを算出する。
 積算電流量算出部14は、第1検出タイミングt2から第2検出タイミングt7までの対象期間Tにおいて、電流検出部12で検出された電流の積算量∫Idtを算出する。
 満充電容量算出部16は、差分充電状態算出部15により算出された差分充電状態ΔSOCと、積算電流量算出部14により算出された積算電流量∫Idtとに基づいて、二次電池10の満充電容量を算出する。
 そして、充放電制御部20は、対象期間t2~t7において、二次電池10における充電及び放電のいずれか一方を規制するように構成されている。
 以下、本実施形態の電池パック1について、詳述する。
 本実施形態では電池パック1は車両に搭載され、図1に示すように、電池パック1に設けられたパック端子30を介して、車両の回転機101が接続されており、パック端子31を介して電気負荷102、Pb電池103が接続されている。これにより、電源システム100が構成されている。
 図1に示すように、電池パック1に備えられる二次電池10は、スイッチ104、105を介してパック端子30、31に接続されている。充放電規制スイッチ104、充放電禁止スイッチ105におけるオンオフは、電池パック1の制御部2が有する充放電制御部20により制御される。二次電池10の種類は限定されないが、例えば、非水系二次電池とすることができ、本実施形態では、二次電池10としてリチウムイオン電池を採用している。
 図1に示すように、二次電池10には電圧検出部11が接続されている。電圧検出部11として公知の電圧センサを用いることができ、電圧検出部11によって所定の検出タイミングで当該二次電池10の端子電圧OCV、すなわちOpen Circuit Voltageを検出することができる。電圧検出部11によって検出された端子電圧は、電池パック1の記憶部4が有するOCV記憶部41に記憶される。
 そして、電池パック1の演算部3に備えられた充電状態算出部13により、OCV記憶部41に記憶された所定検出タイミングでの端子電圧に基づいて、所定検出タイミングでの二次電池10の充電状態SOCが算出される。充電状態算出部13には二次電池10における端子電圧OCVと充電状態SOCとの対応関係に基づいたOCV-SOC変換手段が予め記憶されている。充電状態算出部13はOCV-SOC変換手段に基づいて、所定検出タイミングでのOCVから所定検出タイミングでのSOCを算出することができる。充電状態算出部13により算出されたSOCは記憶部4が有するSOC記憶部42に記憶される。
 図1に示すように、二次電池10には電流検出部12が接続されている。電流検出部12として公知の電流センサを用いることができ、電流検出部12によって所定期間において二次電池10に流れた電流Iを検出することができる。電流検出部12によって検出された電流Iは、記憶部4が有する電流量記憶部43に記憶される。
 そして、電池パック1の演算部3に備えられた積算電流量算出部14により、電流記憶部に記憶された所定期間に流れた電流Iに基づいて、所定期間における二次電池10に流れた積算電流量∫Idtを算出することができる。積算電流量算出部14によって算出された積算電流量∫Idtは記憶部4が有する∫Idt記憶部44に記憶される。
 図1に示すように、電池パック1の演算部3には差分充電状態算出部15が備えられている。差分充電状態算出部15は、SOC記憶部42に記憶された、第1検出タイミングにおけるSOC1と第2検出タイミングにおけるSOC2との差分である差分充電状態ΔSOCを算出する。そして、算出されたΔSOCは記憶部4が有するΔSOC記憶部45に記憶される。
 そして、演算部3が有する満充電容量算出部16は、∫Idt記憶部44に記憶された所定期間における∫Idtと、ΔSOC記憶部45に記憶された所定期間におけるΔSOCとを読み出すとともに、これらから満充電容量を算出する。満充電容量算出部16における満充電容量の算出は、満充電容量と∫Idtと及びΔSOCとの関係式である以下の式1から算出される。
 満充電容量=(∫Idt/ΔSOC)×100    (式1)
 また、本実施形態では、図1に示すように、二次電池10に電流が流れた時間を計測するためのカウンタ17と、積算電流量算出部14の算出対象となる積算時間を算出する積算時間算出部18と、積算時間算出部18の算出結果を記憶する積算時間記憶部46とを有する。そして、電池パック1には、上記算出された値に基づいて後述の判定を行う判定部5が備えられている。
 図1に示すように、電池パック1は制御部2に充放電制御部20を有する。充放電制御部20は後述の対象期間において、二次電池10の充電及び放電の一方を規制することができる。本実施形態では、上述のように、充放電制御部20はスイッチ104、105をオンまたはオフすること及び回転機101における回生エネルギーの発生を許可または規制することにより、上記規制を行う。具体的には、二次電池10の放電を規制する場合には、後述する充放電禁止スイッチ105をオンにするとともに充放電規制スイッチ104をオフにして電気負荷102やPb電池103への電力供給を遮断し、回転機101による回生エネルギーの発生を許可する。これにより、回転機101から出力される回生エネルギーが二次電池10に入力されて二次電池10の充電が行われる。一方、二次電池10の充電を規制する場合には、回転機101による回生エネルギーの発生を規制し、充放電禁止スイッチ105及び充放電規制スイッチ104をオンにして電気負荷102、Pb電池103や回転機101への電力供給を可能とする。これにより、二次電池10への充電は規制されることとなる。
 本実施形態では、図1に示すように、充放電制御部20は、二次電池10に接続された充放電禁止スイッチ105のオンオフを制御することができる。これにより、充放電制御部20は、二次電池10における充電及び放電の両方を同時禁止することができるようになっている。
 次に、電池パック1における二次電池10の満充電容量を算出するための制御について、図2及び図3を用いて説明する。
 図2に示すように、まず、ステップS1において、車両のイグニッションIGをONにする。図3(a)に示すように、IGがONとなるタイミングをt1とする。その後、第1検出タイミングt2が到来すると、図2に示すステップS2において、電圧検出部11により二次電池10の第1端子電圧OCV1を取得する。
 次に、図2に示すステップS3において、二次電池10の分極が解消した状態であるか判定する。本実施形態では、二次電池10の前回の使用終了時から1時間以上経過している場合に二次電池10の分極が解消した状態であると判定する。当該経過時間の計測は、車両に備えられた図示しないカウンタを用いて行うことができる。なお、二次電池10に電力を印加する等して強制的に分極を解消するようにしてもよい。
 そして、ステップS3において分極が解消した状態ではないと判定した場合は、当該制御を終了する。一方、ステップS3において分極が解消した状態であると判定した場合は、図2に示すステップS4において、充電状態算出部13によりOCV1に基づいて第1充電状態SOC1を算出する。SOC1を算出するタイミングを図2に示すt3とする。なお、ステップS3はステップS2の前に実施するとともにステップS2の後にステップS4を実施するようにしてもよい。
 その後、図2に示すステップS5において、SOC1と使用下限SOCとの差分の絶対値が、必要差分充電状態、すなわち必要ΔSOC以上か否か判定する。必要ΔSOCは、満充電容量の算出に利用されるΔSOCとして、算出誤差を小さくするために必要とされる大きさを規定するものであって、二次電池10の種類、電源システム100の構成、電池パック1の使用環境等に応じて、適宜予め設定することができる。ステップS5において、SOC1と使用下限SOCとの差分の絶対値が必要ΔSOC以上であると判定した場合は、ステップS6において、充放電制御部20において、充電を規制する制御を行うことを選択する。そして、図3(c)に示すタイミングt4において、充放電規制制御の充電規制をONにする。これにより、二次電池10の放電のみが許可される。なお、充電規制がONの状態では、放電が行われていない状態も許容される。すなわち、図4に示すように、充電規制がONとなったt5以降に、放電が生じず、SOCが低下せずに横ばいとなる状態があってもよい。
 一方、図2に示すステップS5において、SOC1と使用下限SOCとの差分の絶対値が必要ΔSOC以上でないと判定した場合は、ステップS7において、充放電制御部20において、放電を規制する制御を行うことを選択する。そして、充放電規制制御の放電規制をONにする。これにより、二次電池10の充電のみが許可される。なお、放電規制がONの状態では、充電が行われていない状態も許容される。すなわち、図5に示すように、放電規制がONとなったt5以降に充電が生じず、SOCが上昇せずに横ばいとなる状態があってもよい。
 その後、ステップS8において、二次電池10の充電が開始されたか否かを判定する。本実施形態では、回転機101による回生エネルギーが二次電池10に印加されたか否かを判定する。ステップS8において二次電池10の充電が開始されたと判定した場合、すなわち、図3(d)に示すようにt5において、電流検出部12により二次電池10に流れる電流が検出された場合には、図2に示すステップS9において、積算電流量算出部14により電流量の積算を開始し、カウンタ17をスタートさせる。図3(d)では充電が規制される場合の電流を表しており、電流が検出され始めたタイミングをt5とする。そして、図3(e)に示すようにt5において電流量の積算とカウンタを開始する。
 そして、図2に示すステップS10において、二次電池10の端子電圧が所定の終了電圧Xに到達したか否か判定する。終了電圧Xは適宜設定することができるが、本実施形態では、使用下限SOC又は使用上限SOCに基づいて、OCV-SOC変換手段により導き出される使用下限SOC又は使用上限SOC相当のOCVとしている。そして、充電規制を行った場合は使用下限SOC相当のOCVを終了電圧Xとし、放電規制を行った場合は使用上限SOC相当のOCVを終了電圧Xとする。図3(f)では、充電規制を行った場合のSOC変化を示しており、t6においてSOCが使用下限SOCに到達したときを、二次電池10の端子電圧が終了電圧Xに到達したと判定している。
 図2に示すステップS10において、二次電池10の端子電圧が終了電圧Xに到達していないと判定した場合は、再度ステップS10に戻る。そして、ステップS10において、二次電池10の端子電圧が終了電圧Xに到達したと判定した場合は、ステップS11において、二次電池10の充電及び放電の両方を禁止する。すなわち、図3(b)に示すように、t6において充放電禁止制御をONとする。これにより、図3(d)に示すように、t6において電流値が検出されなくなる。
 そして、図2に示すステップS12において、図3(e)に示すようにt6で電流量の積算及びカウンタ17を終了する。これとともに図2に示すステップS13において、図3(c)に示すようにt6で、ステップS6の充電規制を行った場合は充電規制を解除し、ステップS7の放電規制を行った場合は放電規制を解除する。
 その後、図2に示すステップS14において、二次電池10の分極が解消した否か判定する。本実施形態では、ステップS11における二次電池10の充放電の禁止開始から5分以上経過している場合に二次電池10の分極が解消した状態であると判定する。ステップS14において、二次電池10の分極が解消していないと判断した場合は、再度ステップS14に戻る。一方、ステップS14において、二次電池10の分極が解消したと判断した場合は、図2に示すステップS15において、電圧検出部11により二次電池10の端子電圧である第2端子電圧OCV2を検出する。すなわち、図3(a)~(f)において、t7を第2検出タイミングt7とする。そして、図2に示すステップS16において、充放電の禁止を解除する。すなわち、図3(b)に示すようにt8で充放電の禁止制御をOFFにする。
 そして、図2に示すステップS17において、充電状態算出部13によりOCV2に基づいて第2充電状態SOC2を取得する。さらにステップS18において、SOC1とSOC2との差分ΔSOCを算出する。なお、SOC2の取得及びΔSOCの算出は、図3(f)におけるt7以降であればよい。
 その後、図2に示すステップS19において、積算時間算出部18により算出された積算時間が所定値C以上であること、電圧検出部11に異常があること、及び電流検出部12に異常があることの3つの判定事項のいずれかに該当するか否か判定する。ステップS19において、上記判定事項のいずれかに該当すると判定された場合は、制御を終了する。なお、電圧検出部11及び電流検出部12における異常の有無の判定方法は特に限定されないが、例えば、判定部5により、電圧検出部11及び電流検出部12による検出値と、予め設定された正常値範囲とを比較して、検出値が当該正常値範囲内である場合は異常がないと判定し、当該正常値範囲内でない場合は異常があると判定することができる。
 一方、ステップS19において、上記判定事項のいずれにも該当しないと判定された場合は、ステップS20において、満充電容量算出部16により満充電容量を算出し、満充電容量の算出を行う制御が終了する。その後は、ステップS21において、図3に示すt9以降は、通常制御で二次電池10の充放電を開始する。
 次に、本実施形態の電池パック1における作用効果について、詳述する。
 電池パック1では、積算電流量が算出される対象期間t5~t6において、二次電池10の充放電が一方に規制されている。これにより、所定のΔSOCを取得するのに要する充放電の期間を短くすることができるため、積算電流量∫Idtに積み上がる電流センサのオフセット誤差を小さくすることができる。その結果、ΔSOCと積算電流量∫Idtとの関係式から二次電池10の満充電容量を正確に算出することができる。
 また、本実施形態では、差分充電状態ΔSOCが必要ΔSOC以上であるときを第2検出タイミングt7として、第2端子電圧を検出するとともに、充放電制御部20は、第1充電状態SOC1と必要ΔSOCとに基づいて、充電及び放電のいずれを規制するかを決定するように構成されている。これにより、ΔSOCを必ず必要ΔSOC以上とすることができるため、ΔSOCの値を大きくすることができる。その結果、ΔSOCが小さい場合に比べて、満充電容量を算出する際の誤差を小さくすることができる。
 また、本実施形態では、充放電制御部20は、第1充電状態SOC1と、二次電池10の使用が許容される下限の充電状態すなわち使用下限SOCとの差分の絶対値が必要ΔSOC以上であるときは、二次電池10の充電を規制するように構成されている。これにより、第1充電状態SOC1が比較的大きい場合において、短い時間で必要ΔSOC以上のΔSOCを取得することができるため、満充電容量を算出する際の誤差を小さくすることができる。
 また、本実施形態では、充放電制御部20は、第1充電状態SOC1と、二次電池10の使用が許容される上限の充電状態すなわち使用上限SOCとの差分の絶対値が必要ΔSOC以上であるときは、二次電池10の放電を規制するように構成されている。これにより、第1充電状態SOC1が比較的小さい場合において、短い時間で必要ΔSOC以上のΔSOCを取得することができるため、満充電容量を算出する際の誤差を小さくすることができる。
 また、本実施形態では、第1検出タイミングt2及び第2検出タイミングt7の少なくとも一方において、二次電池10は無負荷の状態であって、かつ、二次電池10の分極が解消している状態となっている。これにより、二次電池10の分極に起因して生じる端子電圧の検出誤差を低減することができるため、満充電容量を算出する際の誤差を小さくすることができる。特に、本実施形態では、第1検出タイミングt2及び第2検出タイミングt7の両方において、無負荷の状態であって、かつ、二次電池10の分極が解消している状態となっているため、満充電容量の算出の誤差を一層小さくできる。なお、二次電池10の分極は必ずしも完全に解消していなくてもよく、必要なSOC精度を確保できる程度に解消していればよい。
 また、本実施形態では、充放電制御部20は、第2検出タイミングt7において、充電規制及び放電規制が解除されている状態にするように構成されている。これにより早期に通常の充放電制御とすることができるため、無駄が生じない。車両に搭載された本実施形態においては、車両の燃費の低下を抑制することができる。
 また、本実施形態では、電流検出部12が電流を検出した積算時間を算出する積算時間算出部18を有し、積算時間算出部18が算出した積算時間が所定値C以上であるとき、電圧検出部11に異常があると判定されたとき、及び電流検出部12に異常があると判定されたときの少なくともいずれか一つに該当するときは、充放電制御部20が上記規制をせずに満充電容量算出部16が満充電容量を算出しないように構成されている。電流を検出した積算時間が所定値C以上であるときは、積算電流量∫Idtに積み上がる電流センサのオフセット誤差が比較的大きくなる。また、電圧検出部11又は電流検出部12に異常があるときには、算出される満充電容量の精度が低くなる。そのため、これらの場合には、満充電容量を算出しないことにより、満充電容量の算出精度を高い状態で維持することができる。なお、所定値Cの大きさは特に限定されないが、本実施形態では20~30分の範囲の値が設定されている。
 また、本実施形態では、電池パック1と、電池パック1に電気的に接続されるとともに電池パック1に入力される電力を発生可能な電力発生部である回転機101と、電池パック1に電気的に接続されるとともに、電池パック1から出力される電力を消費可能な電気負荷102とを有する電源システム100を構成している。かかる構成を有する電源システム100において、電池パック1の満充電容量を正確に算出することにより、電源システム100全体においてエネルギーを効率的に利用することができる。さらに、本実施形態では、電源システム100が車両に搭載されているため、電源システム100によりエネルギーを効率的に利用することにより、燃費の向上を図ることができる。
 以上のごとく、本実施形態によれば、二次電池10の満充電容量を正確に算出することができる電池パック1を提供することができる。
 なお、本実施形態では、図2に示すように、ステップS5において、SOC1と使用下限SOCとの差分の絶対値が必要ΔSOC以上であると判定した場合はステップS6へ進み、そうでない場合はステップS7に進むこととした。これに替えて、以下の変形形態1及び変形形態2のように充放電制御部20が充電及び放電の一方を規制し、他方を規制しないようにしてもよい。
 変形形態1では、本実施形態の場合と同様に図2に示すステップS1~ステップS4を実施した後、ステップS5に進むのに替えて、図6に示すステップS51に進む。そして、ステップS51において、SOC1と使用下限SOCとの差分の絶対値が必要ΔSOC以上であると判定した場合は、本実施形態の場合と同様にステップS6以降に進むが、SOC1と使用下限SOCとの差分の絶対値が必要ΔSOC以上ではないと判定した場合は、ステップS7に進むのに替えて、図2に示すステップS21に進み、通常制御で充放電を開始して、満充電容量を算出する制御を終了する。従って、変形形態1では、充放電制御部20は充電の規制を行うが、放電の規制は行わない。
 また、変形形態2では、本実施形態の場合と同様に図2に示すステップS1~ステップS4を実施した後、ステップS5に進むのに替えて、図7に示すステップS52に進む。そして、ステップS52において、SOC1と使用上限SOCとの差分の絶対値が必要ΔSOC以上であると判定した場合は、本実施形態の場合と同様に図2に示すステップS7以降に進むが、SOC1と使用上限SOCとの差分の絶対値が必要ΔSOC以上ではないと判定した場合は、制御を終了する。従って、変形形態2では、充放電制御部20は放電の規制を行うが、充電の規制は行わない。
 以上のように、変形形態1、2では、充放電制御部20は放電規制又は充電規制しか行わないため、充放電制御部20が充電規制及び放電規制の両方を実施するために構成を有する場合に比べて、充放電制御部20の構成を簡素化することができ、充放電制御も容易となる。
 また、以下の変形形態3のようにしてもよい。変形形態3では、本実施形態の場合と同様に図2に示すステップS1~ステップS4を実施した後、ステップS5に進むのに替えて、図8に示すステップS53に進む。そして、ステップS53において、SOC1と使用下限SOCとの差分の絶対値が必要ΔSOC以上であると判定した場合は、本実施形態の場合と同様にステップS6以降に進むが、SOC1と使用下限SOCとの差分の絶対値が必要ΔSOC以上ではないと判定した場合は、ステップS54に進む。そして、ステップS54において、SOC1と使用上限SOCとの差分の絶対値が必要ΔSOC以上であると判定した場合は、本実施形態の場合と同様に図2に示すステップS7以降に進むが、SOC1と使用上限SOCとの差分の絶対値が必要ΔSOC以上ではないと判定した場合は、図2に示すステップS21に進み、通常制御で充放電を開始して、満充電容量を算出する制御を終了する。
 なお、変形形態3において、ステップS4の後、ステップS54を実施し、ステップS54でSOC1と使用上限SOCとの差分の絶対値が必要ΔSOC以上ではないと判定した場合にはステップS53を実施し、ステップS53でSOC1と使用下限SOCとの差分の絶対値が必要ΔSOC以上ではないと判定した場合には図2に示すステップS21に進むようにしてもよい。
 変形形態3の制御フローでは、必要ΔSOCが、使用上限SOCと使用下限SOCとの中央値よりも大きい場合に適している。かかる場合には、SOC1の値が使用上限SOC及び使用下限SOCのどちらとの差分の絶対値も必要ΔSOC未満となる場合が生じうる。そして、このような場合には、ΔSOCを必要ΔSOC以上にすることができないため、満充電容量の算出を行わないように制御する。これにより、ΔSOCが必要ΔSOC以上の比較的大きな値である場合に満充電容量の算出を行うことにより、ΔSOCを満充電容量に近い値にして、満充電容量の算出の際の誤差を小さくすることができる。
 また、以下の変形形態4のようにしてもよい。変形形態4では、本実施形態の場合と同様に図2に示すステップS1を実施した後、ステップS2に進むのに替えて、図9に示すステップS201に進む。ステップS201では、第1検出タイミングt2が特定タイミングに該当するか否かを判定する。第1検出タイミングt2が特定タイミングに該当するときは、図2に示すステップS2以降に進み、本実施形態と同様にステップS2以降を実施して、満充電容量の算出を行う制御をする。一方、図9に示すように、第1検出タイミングt2が特定タイミングに該当しないと判定した場合は、図2に示すステップS21に進み、通常の充放電を開始して、満充電容量を算出する制御を終了する。
 変形形態4の制御フローによれば、満充電容量の算出は、第1検出タイミングt2が特定タイミングに該当したときに行われ、それ以外の場合には行われないこととなる。その結果、満充電容量の算出を行う機会が必要以上に多くなることを防止して、エネルギーの効率的な利用を図ることができる。
 特定タイミングの設定は、要求される満充電容量の算出頻度に応じて適宜調整することができる。例えば、本実施形態のように車両に搭載された電池パック1においては、IGのオンからオフまでのトリップ期間の到来数が所定数に達した状態を特定タイミングとすることができる。この場合には、特定タイミングである特定のトリップに該当する場合に満充電容量の算出が行われ、その他のトリップでは満充電容量の算出が行われないため、必要以上に満充電容量を算出することが防止でき、不要な燃費低下を防止できる。
 本開示は上記実施形態及び変形形態に限定されるものではなく、その要旨を逸脱しない範囲において種々の実施形態及び変形形態に適用することが可能である。
 本開示は、実施形態に準拠して記述されたが、本開示は当該実施形態や構造に限定されるものではないと理解される。本開示は、様々な変形形態や均等範囲内の変形をも包含する。加えて、様々な組み合わせや形態、さらには、それらに一要素のみ、それ以上、あるいはそれ以下、を含む他の組み合わせや形態をも、本開示の範疇や思想範囲に入るものである。

Claims (9)

  1.  二次電池(10)と、
     該二次電池の端子電圧を検出する電圧検出部(11)と、
     上記電圧検出部が検出した端子電圧に基づいて上記二次電池の充電状態(SOC)を算出する充電状態算出部(13)と、
     上記二次電池に流れた電流を検出する電流検出部(12)と、
     上記二次電池の充放電を制御する充放電制御部(20)と、
     上記電圧検出部が第1検出タイミング(t2)で検出した第1端子電圧(OCV1)に基づいて算出された第1充電状態(SOC1)と、上記電圧検出部が第2検出タイミング(t7)で検出した第2端子電圧(OCV2)に基づいて算出された第2充電状態(SOC2)との差分充電状態(ΔSOC)を算出する差分充電状態算出部(15)と、
     上記第1検出タイミングから上記第2検出タイミングまでの対象期間において、上記電流検出部で検出された電流の積算量(∫Idt)を算出する積算電流量算出部(14)と、
     上記差分充電状態算出部により算出された差分充電状態と、上記積算電流量算出部により算出された積算電流量とに基づいて、上記二次電池の満充電容量を算出する満充電容量算出部(16)と、
    を備え、
     上記充放電制御部は、上記対象期間において上記二次電池における充電及び放電のいずれか一方を規制するように構成されている、電池パック(1)。
  2.  上記差分充電状態が所定の必要差分充電状態以上となるときを上記第2検出タイミングとするとともに、上記充放電制御部は上記第1充電状態と上記必要差分充電状態とに基づいて、上記充電及び上記放電のいずれを規制するかを決定するように構成されている、請求項1に記載の電池パック。
  3.  上記充放電制御部は、上記第1充電状態と、上記二次電池の使用が許容される下限の充電状態との差分の絶対値が上記必要差分充電状態以上であるときは、上記二次電池の充電を規制するように構成されている、請求項2に記載の電池パック。
  4.  上記充放電制御部は、上記第1充電状態と、上記二次電池の使用が許容される上限の充電状態との差分の絶対値が上記必要差分充電状態以上であるときは、上記二次電池の放電を規制するように構成されている、請求項2に記載の電池パック。
  5.  上記第1検出タイミング及び上記第2検出タイミングの少なくとも一方において、上記二次電池は無負荷の状態であって、かつ、上記二次電池の分極が解消している状態となるように構成されている、請求項1~4のいずれか一項に記載の電池パック。
  6.  上記充放電制御部は、上記第2検出タイミングにおいて上記規制が解除されている状態にするように構成されている、請求項1~5のいずれか一項に記載の電池パック。
  7.  上記電流検出部が上記電流を検出した積算時間を算出する積算時間算出部(18)を有し、
     該積算時間算出部が算出した上記積算時間が所定値以上であるとき、上記電圧検出部に異常があると判定されたとき、及び上記電流検出部に異常があると判定されたときの少なくともいずれか一つに該当するときは、上記充放電制御部が上記規制をせずに上記満充電算出部が上記満充電容量を算出しないように構成されている、請求項1~6のいずれか一項に記載の電池パック。
  8.  上記第1検出タイミングが特定タイミングに該当するとき、上記充放電制御部は上記規制をするとともに、上記満充電算出部が上記満充電容量を算出し、
     上記第1検出タイミングが上記特定タイミングに該当しないとき、上記充放電制御部が上記規制をしないとともに上記満充電算出部は上記満充電容量を算出しないように構成されている、請求項1~7のいずれか一項に記載の電池パック。
  9.  請求項1~8のいずれか一項に記載の上記電池パックと、該電池パックに電気的に接続されるとともに上記電池パックに入力される電力を発生可能な電力発生部と、上記電池パックに電気的に接続されるとともに、上記電池パックから出力される電力を消費可能な電気負荷と、を有する電源システム(100)。
PCT/JP2018/000496 2017-01-13 2018-01-11 電池パック及び電源システム WO2018131651A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/511,920 US10996280B2 (en) 2017-01-13 2019-07-15 Battery pack that calculates full charge capacity of a battery based on a state of charge

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2017003837A JP6776904B2 (ja) 2017-01-13 2017-01-13 電池パック及び電源システム
JP2017-003837 2017-01-13

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US16/511,920 Continuation US10996280B2 (en) 2017-01-13 2019-07-15 Battery pack that calculates full charge capacity of a battery based on a state of charge

Publications (1)

Publication Number Publication Date
WO2018131651A1 true WO2018131651A1 (ja) 2018-07-19

Family

ID=62839508

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/000496 WO2018131651A1 (ja) 2017-01-13 2018-01-11 電池パック及び電源システム

Country Status (3)

Country Link
US (1) US10996280B2 (ja)
JP (1) JP6776904B2 (ja)
WO (1) WO2018131651A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI670506B (zh) * 2018-07-27 2019-09-01 連恩微電子有限公司 電池管理系統
CN110518299A (zh) * 2019-06-17 2019-11-29 连恩微电子有限公司 电池管理系统

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102244140B1 (ko) * 2017-12-21 2021-04-22 주식회사 엘지화학 배터리의 충전 상태를 캘리브레이션하기 위한 방법 및 배터리 관리 시스템
KR102563753B1 (ko) * 2017-12-29 2023-08-04 삼성전자주식회사 배터리 충전 방법 및 장치
CN111142028B (zh) * 2020-02-20 2022-02-08 广东天波信息技术股份有限公司 一种锂电池电量的测量方法及装置

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010026868A1 (ja) * 2008-09-05 2010-03-11 オムロンヘルスケア株式会社 測定値の信頼性を向上させる電子血圧計
US20110279094A1 (en) * 2010-05-14 2011-11-17 Toshiyuki Nakatsuji Full charge capacity correction circuit, charging system, battery pack and full charge capacity correction method
WO2013141100A1 (ja) * 2012-03-21 2013-09-26 三洋電機株式会社 電池状態推定装置
WO2013157050A1 (ja) * 2012-04-20 2013-10-24 トヨタ自動車株式会社 車両
WO2014155434A1 (ja) * 2013-03-25 2014-10-02 トヨタ自動車株式会社 車両
JP2015170138A (ja) * 2014-03-07 2015-09-28 日産自動車株式会社 車両走行制御情報収集装置
WO2016038873A1 (ja) * 2014-09-12 2016-03-17 日本電気株式会社 制御装置、制御方法、及び記録媒体

Family Cites Families (73)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5999941A (ja) * 1982-11-26 1984-06-08 株式会社デンソー 車両用充電制御装置
US4665354A (en) * 1984-08-08 1987-05-12 Nippondenso Co., Ltd. Battery voltage regulator for vehicles
US5280231A (en) * 1990-07-02 1994-01-18 Nippondenso Co., Ltd. Battery condition detecting apparatus and charge control apparatus for automobile
JP3164998B2 (ja) * 1995-04-07 2001-05-14 矢崎総業株式会社 電池残存容量測定装置
JP3932632B2 (ja) * 1997-11-28 2007-06-20 株式会社デンソー 車両用電源装置
JP4186092B2 (ja) * 1999-08-18 2008-11-26 ソニー株式会社 バッテリー機器及びバッテリーの管理方法
TW535308B (en) * 2000-05-23 2003-06-01 Canon Kk Detecting method for detecting internal state of a rechargeable battery, detecting device for practicing said detecting method, and instrument provided with said
DE60140640D1 (de) * 2000-05-29 2010-01-14 Panasonic Corp Batterieladeverfahren
JP4292721B2 (ja) * 2001-02-14 2009-07-08 株式会社日本自動車部品総合研究所 ハイブリッド車の電池状態制御方法
JP3629553B2 (ja) * 2001-05-08 2005-03-16 インターナショナル・ビジネス・マシーンズ・コーポレーション 電源供給システム、コンピュータ装置、電池、異常充電の保護方法、およびプログラム
US6639385B2 (en) * 2001-08-07 2003-10-28 General Motors Corporation State of charge method and apparatus
JP3770137B2 (ja) 2001-10-17 2006-04-26 トヨタ自動車株式会社 車両用二次電池制御装置
JP4157317B2 (ja) * 2002-04-10 2008-10-01 株式会社日立製作所 状態検知装置及びこれを用いた各種装置
JP2004251744A (ja) * 2003-02-20 2004-09-09 Toyota Motor Corp 二次電池の制御装置および制御方法
US7317300B2 (en) * 2003-06-23 2008-01-08 Denso Corporation Automotive battery state monitor apparatus
US7521896B2 (en) * 2004-07-20 2009-04-21 Panasonic Ev Energy Co., Ltd. Abnormal voltage detector apparatus for detecting voltage abnormality in assembled battery
US7233128B2 (en) * 2004-07-30 2007-06-19 Ford Global Technologies, Llc Calculation of state of charge offset using a closed integral method
US7630842B2 (en) * 2005-01-27 2009-12-08 Panasonic Ev Energy Co., Ltd. Secondary battery charge/discharge electricity amount estimation method and device, secondary battery polarization voltage estimation method and device and secondary battery remaining capacity estimation method and device
JP4623448B2 (ja) * 2005-04-20 2011-02-02 株式会社デンソー 二次電池の残存容量演算方法
JP5170876B2 (ja) * 2005-06-03 2013-03-27 古河電気工業株式会社 充電率/残存容量推定方法、電池の状態検知センサ及び電池電源システム
JP4830382B2 (ja) * 2005-07-19 2011-12-07 日産自動車株式会社 二次電池の充電率推定装置
US7507497B2 (en) * 2005-09-06 2009-03-24 Denso Corporation Method and apparatus for judging degradation of storage battery
JP2007121030A (ja) * 2005-10-26 2007-05-17 Denso Corp 車両用蓄電装置の内部状態検出装置
KR100669470B1 (ko) * 2005-12-22 2007-01-16 삼성에스디아이 주식회사 배터리의 soo 보정 방법 및 이를 이용한 배터리 관리시스템
JP4984527B2 (ja) * 2005-12-27 2012-07-25 トヨタ自動車株式会社 二次電池の充電状態推定装置および充電状態推定方法
JP2008253129A (ja) * 2007-03-07 2008-10-16 Matsushita Electric Ind Co Ltd リチウム系二次電池の急速充電方法およびそれを用いる電子機器
JP4544273B2 (ja) * 2007-06-20 2010-09-15 トヨタ自動車株式会社 車両用電源装置および車両用電源装置における蓄電装置の充電状態推定方法
JP4650483B2 (ja) * 2007-12-12 2011-03-16 株式会社デンソー 車両走行制御装置
US8788225B2 (en) * 2008-06-27 2014-07-22 Johnson Controls-Saft Advanced Power Solutions Llc Cell diagnostic system and method
US8084996B2 (en) * 2008-06-27 2011-12-27 GM Global Technology Operations LLC Method for battery capacity estimation
JP5159498B2 (ja) * 2008-07-29 2013-03-06 三洋電機株式会社 ハイブリッドカーの電源装置における電池の充放電制御方法
JP2010104175A (ja) * 2008-10-24 2010-05-06 Panasonic Corp 故障診断回路、電源装置、及び故障診断方法
US8374807B2 (en) * 2008-11-13 2013-02-12 Lockheed Martin Corporation Method and apparatus that detects state of charge (SOC) of a battery
JP4868088B2 (ja) * 2009-03-05 2012-02-01 トヨタ自動車株式会社 ハイブリッド車両の充放電制御システムおよびその制御方法
JP5439126B2 (ja) * 2009-03-31 2014-03-12 株式会社日立製作所 電源装置用状態検知装置
JP4978662B2 (ja) * 2009-06-24 2012-07-18 トヨタ自動車株式会社 充電状態推定装置および充電状態推定方法
DE102009045526A1 (de) * 2009-10-09 2011-04-14 SB LiMotive Company Ltd., Suwon Verfahren zur Initialisierung und des Betriebs eines Batteriemanagementsystems
JP5570782B2 (ja) * 2009-10-16 2014-08-13 三洋電機株式会社 電源装置及びこれを備える車両並びに電源装置の充放電制御方法
JP5375538B2 (ja) * 2009-11-13 2013-12-25 オムロンヘルスケア株式会社 電子血圧計
JP5537913B2 (ja) * 2009-11-30 2014-07-02 三洋電機株式会社 均等化装置、それを備えたバッテリシステムおよび電動車両
EP2551686B1 (en) * 2010-03-26 2014-05-07 Mitsubishi Electric Corporation Charge state estimation apparatus
JP5672778B2 (ja) * 2010-06-08 2015-02-18 日産自動車株式会社 バッテリ容量表示装置およびバッテリ容量表示方法
JP5567956B2 (ja) * 2010-09-16 2014-08-06 矢崎総業株式会社 複数組電池のセル電圧均等化装置
TWI428622B (zh) * 2010-11-25 2014-03-01 Ind Tech Res Inst 一種藉由電池充放電特性檢控容量與功率的方法
JP5318128B2 (ja) * 2011-01-18 2013-10-16 カルソニックカンセイ株式会社 バッテリの充電率推定装置
US8645088B2 (en) * 2011-05-13 2014-02-04 GM Global Technology Operations LLC Systems and methods for determining the state of charge of a battery utilizing confidence values
US9037426B2 (en) * 2011-05-13 2015-05-19 GM Global Technology Operations LLC Systems and methods for determining cell capacity values in a multi-cell battery
JP2012247339A (ja) * 2011-05-30 2012-12-13 Renesas Electronics Corp 半導体集積回路およびその動作方法
CN103635822B (zh) * 2011-08-30 2016-02-10 三洋电机株式会社 电池系统、电动车辆、移动体、电力储存装置以及电源装置
US9746525B2 (en) * 2011-09-08 2017-08-29 Hitachi Automotive Systems, Ltd. Battery system monitoring device
WO2013051241A1 (ja) * 2011-10-07 2013-04-11 カルソニックカンセイ株式会社 バッテリの充電率推定装置及び充電率推定方法
JP5393837B2 (ja) * 2012-05-11 2014-01-22 カルソニックカンセイ株式会社 バッテリの充電率推定装置
KR20150029204A (ko) * 2013-09-09 2015-03-18 삼성에스디아이 주식회사 배터리 팩, 배터리 팩을 포함하는 장치, 및 배터리 팩의 관리 방법
JP6098496B2 (ja) * 2013-12-06 2017-03-22 トヨタ自動車株式会社 蓄電システム
JP6300567B2 (ja) * 2014-02-24 2018-03-28 日立オートモティブシステムズ株式会社 二次電池システム
JP2015178963A (ja) * 2014-03-18 2015-10-08 株式会社東芝 算出装置及び算出方法
AU2015342321B2 (en) * 2014-11-03 2019-09-12 Dalian Rongkepower Co., Ltd Method and system for monitoring state of charge (SOC) of flow battery system, flow battery based on redundancy design of SOC detection device, method and device for determining actual capacity of flow battery, and method and system for estimating input-output characteristic of flow battery alternating current side
JP6490414B2 (ja) * 2014-12-05 2019-03-27 古河電気工業株式会社 二次電池状態検出装置および二次電池状態検出方法
WO2016129248A1 (ja) * 2015-02-13 2016-08-18 パナソニックIpマネジメント株式会社 二次電池の充電状態推定装置および充電状態推定方法
DE112016000834T5 (de) * 2015-02-19 2017-11-30 Mitsubishi Electric Corporation Vorrichtung zum einschätzen eines batteriestatus
CN107431367B (zh) * 2015-03-02 2020-08-11 日本汽车能源株式会社 电池控制装置和车辆系统
US20160276843A1 (en) * 2015-03-20 2016-09-22 Ford Global Technologies, Llc Battery Charge Strategy Using Discharge Cycle
JP2016211924A (ja) * 2015-05-01 2016-12-15 カルソニックカンセイ株式会社 二次電池の充電率算出装置、及び蓄電池システム
WO2017046870A1 (ja) * 2015-09-15 2017-03-23 株式会社 東芝 蓄電池制御装置、制御方法、プログラム、蓄電システム、電力システム
US10322634B2 (en) * 2015-10-14 2019-06-18 Ford Global Technologies, Llc Estimating battery capacity in an electric vehicle
JP2018046667A (ja) * 2016-09-14 2018-03-22 株式会社東芝 充電パターン作成装置、充電制御装置、充電パターン作成方法、プログラム、及び蓄電システム
JP2018048911A (ja) * 2016-09-21 2018-03-29 株式会社豊田自動織機 満充電容量推定装置
JP6665757B2 (ja) * 2016-11-08 2020-03-13 株式会社デンソー 電源制御装置、及び電池ユニット
JP6677177B2 (ja) * 2017-01-13 2020-04-08 株式会社デンソー 制御装置
JP6567582B2 (ja) * 2017-03-08 2019-08-28 株式会社東芝 充放電制御装置、使用条件作成装置、プログラム、及び蓄電システム
JP6567583B2 (ja) * 2017-03-15 2019-08-28 株式会社東芝 電池安全性評価装置、電池制御装置、電池安全性評価方法、プログラム、制御回路及び蓄電システム
JP6939057B2 (ja) * 2017-04-27 2021-09-22 トヨタ自動車株式会社 車載の電池システムおよび電池の経年劣化推定方法
JP7087610B2 (ja) * 2018-04-11 2022-06-21 株式会社デンソー 電池制御装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010026868A1 (ja) * 2008-09-05 2010-03-11 オムロンヘルスケア株式会社 測定値の信頼性を向上させる電子血圧計
US20110279094A1 (en) * 2010-05-14 2011-11-17 Toshiyuki Nakatsuji Full charge capacity correction circuit, charging system, battery pack and full charge capacity correction method
WO2013141100A1 (ja) * 2012-03-21 2013-09-26 三洋電機株式会社 電池状態推定装置
WO2013157050A1 (ja) * 2012-04-20 2013-10-24 トヨタ自動車株式会社 車両
WO2014155434A1 (ja) * 2013-03-25 2014-10-02 トヨタ自動車株式会社 車両
JP2015170138A (ja) * 2014-03-07 2015-09-28 日産自動車株式会社 車両走行制御情報収集装置
WO2016038873A1 (ja) * 2014-09-12 2016-03-17 日本電気株式会社 制御装置、制御方法、及び記録媒体

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI670506B (zh) * 2018-07-27 2019-09-01 連恩微電子有限公司 電池管理系統
CN110518299A (zh) * 2019-06-17 2019-11-29 连恩微电子有限公司 电池管理系统
CN110518299B (zh) * 2019-06-17 2022-12-09 连恩微电子有限公司 电池管理系统

Also Published As

Publication number Publication date
US10996280B2 (en) 2021-05-04
JP6776904B2 (ja) 2020-10-28
US20190339332A1 (en) 2019-11-07
JP2018112501A (ja) 2018-07-19

Similar Documents

Publication Publication Date Title
WO2018131651A1 (ja) 電池パック及び電源システム
JP5304880B2 (ja) 電池の残存容量検出装置
JP5248764B2 (ja) 蓄電素子の異常検出装置、蓄電素子の異常検出方法及びその異常検出プログラム
JP5619744B2 (ja) 蓄電デバイスの状態検知方法及びその装置
JP2010249797A (ja) 二次電池の状態判定装置及び制御装置
US20120161709A1 (en) Secondary-battery control apparatus
JP5704108B2 (ja) 電池システムおよび推定方法
JP5397013B2 (ja) 組電池の制御装置
EP3110654B1 (en) Vehicle charge control device
JP2010098866A (ja) 不均衡判定回路、不均衡低減回路、電池電源装置、及び不均衡判定方法
JP2018112501A5 (ja)
JP5823292B2 (ja) 蓄電デバイスの状態検知方法及びその装置
WO2010010662A1 (ja) 不均衡判定回路、電源装置、及び不均衡判定方法
JP2012253975A (ja) アルカリ蓄電池の充放電制御方法および充放電システム
JP5959566B2 (ja) 蓄電池の制御装置
JP4494454B2 (ja) 車載二次電池の内部状態検出装置
JP5131533B2 (ja) バッテリの充放電制御方法及び充放電制御装置
JP2010281723A (ja) 蓄電デバイスの状態検知方法及びその装置
JP6500795B2 (ja) 車載バッテリのsoc管理システム
JP4016881B2 (ja) 電池の残量計測装置
JP6011265B2 (ja) 電池システム
JP6672976B2 (ja) 充電量算出装置、コンピュータプログラム及び充電量算出方法
JP6834409B2 (ja) バッテリシステム
JP6631377B2 (ja) 充電量算出装置、コンピュータプログラム及び充電量算出方法
JP2020048318A (ja) 二次電池装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18739253

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 18739253

Country of ref document: EP

Kind code of ref document: A1