WO2016038873A1 - 制御装置、制御方法、及び記録媒体 - Google Patents

制御装置、制御方法、及び記録媒体 Download PDF

Info

Publication number
WO2016038873A1
WO2016038873A1 PCT/JP2015/004527 JP2015004527W WO2016038873A1 WO 2016038873 A1 WO2016038873 A1 WO 2016038873A1 JP 2015004527 W JP2015004527 W JP 2015004527W WO 2016038873 A1 WO2016038873 A1 WO 2016038873A1
Authority
WO
WIPO (PCT)
Prior art keywords
ocv
capacity
control
charging
current
Prior art date
Application number
PCT/JP2015/004527
Other languages
English (en)
French (fr)
Inventor
潤一 宮本
祐一 今村
高橋 真吾
翔 大谷
梶谷 浩司
Original Assignee
日本電気株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電気株式会社 filed Critical 日本電気株式会社
Priority to JP2016547696A priority Critical patent/JPWO2016038873A1/ja
Priority to US15/507,912 priority patent/US10444296B2/en
Publication of WO2016038873A1 publication Critical patent/WO2016038873A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3842Arrangements for monitoring battery or accumulator variables, e.g. SoC combining voltage and current measurements
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/385Arrangements for measuring battery or accumulator variables
    • G01R31/387Determining ampere-hour charge capacity or SoC
    • G01R31/388Determining ampere-hour charge capacity or SoC involving voltage measurements

Definitions

  • the present invention relates to a control device, a control method, and a recording medium that are connected to a device that holds power, such as a storage battery, and that process information related to the capacity of the device.
  • Storage batteries used for home or industrial use have a problem that the capacity when fully charged decreases with repeated charging and discharging (charging / discharging). Therefore, a technique for estimating the full capacity of the storage battery is used (see, for example, Patent Documents 1 and 2).
  • the method for calculating the remaining capacity of a storage battery described in Patent Document 1 discharges the storage battery until the voltage reaches a discharge alarm voltage. Thereafter, the method described in Patent Document 1 charges the storage battery until it is fully charged. And the method of patent document 1 calculates the charge capacity until it fully charges from the state in which the voltage of the storage battery fell to the discharge alarm voltage as a supplementary charge capacity. And the method of patent document 1 calculates the value which added auxiliary charge capacity to the discharge warning capacity which is the remaining amount of the battery in the state discharged to the discharge warning voltage as a new learning capacity of a storage battery.
  • the method described in Patent Document 1 calculates a new learning capacity of a battery by adding a supplementary charging capacity to a discharge alarm capacity that is a remaining amount of a storage battery at the end of discharge. Therefore, the method described in Patent Document 1 can calculate the learning capacity even in a deteriorated storage battery. Furthermore, in the method described in Patent Document 1, the remaining capacity of the storage battery is calculated by subtracting the discharge capacity from the charging capacity of the storage battery, and the remaining capacity (SOC: State Of is calculated based on the ratio between the calculated remaining capacity and the learning capacity. Charge) is calculated. Therefore, the method described in Patent Literature 1 can particularly accurately calculate the remaining capacity at the end of discharge.
  • the full charge capacity detection method of the storage battery described in Patent Document 2 includes the first no-load voltage (V OCV1 ) of the storage battery at the first no-load timing that is the no-load state of the storage battery, and the second no-load.
  • a second no-load voltage (V OCV2 ) of the storage battery at the timing is detected.
  • the method described in Patent Document 2 determines whether or not the detected first no-load voltage (V OCV1 ) is within a predetermined voltage range. Then, when the first no-load voltage (V OCV1 ) is within a predetermined voltage range, the method described in Patent Document 2 uses the detected first no-load voltage (V OCV1 ) to determine the first of the storage battery. Remaining capacity (SOC 1 [%]) is determined.
  • the method described in Patent Document 2 further determines the second remaining capacity (SOC 2 [%]) of the storage battery from the second no-load voltage (V OCV2 ).
  • the method disclosed in Patent Document 2 is based on the difference between the first remaining capacity (SOC 1 [%]) and the second remaining capacity (SOC 2 [%]).
  • Change rate ( ⁇ S [%]) Furthermore, the method described in Patent Literature 2 is based on the integrated value of the charging current and discharging current of the storage battery to be charged / discharged between the first no-load timing and the second no-load timing. A change value ( ⁇ Ah) is calculated.
  • the method described in Patent Document 2 determines the first and second remaining capacities based on the first and second no-load voltages at the first and second no-load timings. And the method of patent document 2 calculates the capacity
  • the storage battery is discharged until the voltage reaches the discharge alarm voltage, then charged until the battery is fully charged, and the full capacity is calculated using the charging capacity therebetween.
  • the discharge current varies depending on the load connected to the storage battery. Therefore, the method described in Patent Document 1 has a problem that the discharge time until the discharge alarm voltage is reached becomes long when the discharge current is small.
  • the storage battery is discharged until the voltage reaches the discharge alarm voltage, and then charged to full charge. Therefore, the method described in Patent Document 1 further has a problem that the charging time becomes longer and the time for a series of full capacity detection processes of discharging and charging becomes longer.
  • Patent Document 2 it is necessary to provide a no-load state during charging and to detect no-load voltage at the first and second no-load timings.
  • the method described in Patent Document 2 stops charging during charging, and then performs a predetermined time (for example, about 1 hour in some cases). It is necessary to continue the no-load state. Therefore, the method described in Patent Document 2 has a problem that it takes a long time to charge.
  • the methods described in Patent Document 1 and Patent Document 2 calculate the capacity based on the integrated value of the charging current.
  • the measured value generally includes an error (for example, an offset error).
  • the measured value of the charging current includes a positive offset error
  • the measured value of the charging current is larger by the offset error value than the actual value (true value) of the charging current.
  • the measured value of the charging current includes a negative offset error
  • the measured value of the charging current is smaller by the offset error value than the actual value (true value) of the charging current. Therefore, according to the methods described in Patent Document 1 and Patent Document 2, the integrated capacity calculated as the integrated value of the measured value of the charging current becomes larger or smaller than the actual capacity.
  • the methods described in Patent Document 1 and Patent Document 2 have a problem in that the full charge capacity cannot be calculated correctly.
  • An object of the present invention is to provide a control device, a control method, and a recording medium that solve the above-described problem and calculate the full capacity in a short time and with high accuracy even when the measurement current for calculating the integrated capacity has an offset error.
  • the purpose is to do.
  • a control device includes an OCV estimation unit that estimates an open circuit voltage (OCV) of a control target device based on a voltage value and a current value of the control target device, and a current of the control target device.
  • Capacity calculating means for calculating the integrated capacity of the device to be controlled based on the value, control of charging and discharging of the device to be controlled, predetermined first OCV and predetermined second during discharging or charging of the device to be controlled
  • the first SOC and the second SOC which are remaining capacities (SOC: State Of Charge) in the OCV, and the first and second cumulative capacities that are the cumulative capacities in the first OCV and the second OCV during discharge
  • a control means for calculating the full capacity of the device to be controlled based on the accumulated capacity and the third accumulated capacity and the fourth accumulated capacity, which are accumulated capacity in the second OCV and the first OCV during charging. including.
  • the control device controls the OCV estimation unit that estimates the open circuit voltage (OCV) of the control target device based on the voltage value and the current value of the control target device, and the current value of the control target device.
  • Capacity calculation means for calculating the integrated capacity of the target device, and charging and discharging of the control target device, and remaining capacity in the predetermined first OCV and the predetermined second OCV during discharging or charging of the control target device.
  • the first integrated capacity and the second integrated capacity that are integrated capacities in the first OCV and the second OCV at the time of discharging, and the first SOC at the time of charging.
  • a control device including control means for calculating the full capacity of the control target device based on the third cumulative capacity and the fourth cumulative capacity, which are cumulative capacities in the second OCV and the first OCV, and the control target device And the voltage value of the control target device Comprising a voltage measuring means for constant, current measuring means for measuring a current value of the control target device, and a charge and discharge control means for controlling the charging and discharging operation of the control target apparatus based on an instruction of the control means.
  • a data processing method estimates an open circuit voltage (OCV) of a control target device based on a voltage value and a current value of the control target device, and controls the control target device based on a current value of the control target device. Is calculated, the charge and discharge of the control target device are controlled, and the remaining capacity (SOC) in the predetermined first OCV and the predetermined second OCV during discharge or charge of the control target device is calculated.
  • OCV open circuit voltage
  • SOC remaining capacity
  • 1 SOC and 2nd SOC 1st accumulated capacity and 2nd accumulated capacity which are accumulated capacity in 1st OCV and 2nd OCV at the time of discharge, 2nd OCV and 1st at the time of charge
  • the full capacity of the device to be controlled is calculated based on the third integrated capacity and the fourth integrated capacity, which are integrated capacities in the OCV.
  • a recording medium a process for estimating an open circuit voltage (OCV) of a control target device based on a voltage value and a current value of the control target device, and a control target device based on a current value of the control target device And the remaining capacity (SOC) in the predetermined first OCV and the predetermined second OCV during the discharge or charging of the control target device.
  • OCV open circuit voltage
  • a first SOC and a second SOC a first integrated capacity and a second integrated capacity that are integrated capacities in the first OCV and the second OCV at the time of discharging, a second OCV at the time of charging, and Based on the third integrated capacity and the fourth integrated capacity, which are integrated capacities in the first OCV, a program for causing the computer to execute a process of calculating the full capacity of the control target device is recorded so that the computer can read the program. .
  • the present invention even when the measurement current has an offset error, it is possible to provide an effect that the full capacity can be accurately calculated in a short time.
  • FIG. 1 is a block diagram showing an example of the configuration of the control device according to the first embodiment of the present invention.
  • FIG. 2 is a diagram illustrating an example of a signal flow of the control device according to the first embodiment.
  • FIG. 3 is a diagram illustrating an example of a relationship of the remaining capacity SOC [%] with respect to the open circuit voltage OCV in the first embodiment.
  • FIG. 4 is a diagram for explaining the operation of the control device according to the first embodiment.
  • FIG. 5 is a block diagram illustrating an example of another configuration of the control device according to the first embodiment.
  • FIG. 6 is a block diagram illustrating an example of another configuration of the control device according to the first embodiment.
  • FIG. 7 is a diagram for explaining the operation of the control device according to the second embodiment.
  • FIG. 8 is a diagram for explaining the operation of the control device according to the third embodiment.
  • a storage battery is used for explanation.
  • the device to be controlled by the control device of the present invention is not limited to a storage battery, but may be any device that stores (charges) and discharges (discharges) electric power.
  • the target device may be a capacitive device such as an electric double layer capacitor, or a hybrid device of a storage battery and a capacitor such as a lithium ion capacitor.
  • OCV Open circuit voltage
  • “Remaining capacity (SOC: State Of Charge)” is a charge rate of the storage battery, and is a ratio of the current charge state (charge capacity) to full charge. Since the SOC normally uses a percentage, it may be expressed as “SOC [%]”.
  • Integrated capacity (Q) is the capacity of the storage battery obtained by integrating the current value (I).
  • Q full is a full capacity.
  • Q r is the reset integrated capacity.
  • OCV r and SOC r are an open circuit voltage and a remaining capacity for obtaining Q r , respectively.
  • Constant current (I CC )” indicates current in constant current (CC) charging and constant current discharging (CC discharge).
  • the variable “i” is used as a general current.
  • T indicates discharge time or charge time.
  • ⁇ T is a difference time on the time axis.
  • t is used for general time.
  • the unit of time is “seconds”. However, this is for convenience of explanation.
  • the control apparatus 10 according to the present embodiment is not limited to “seconds”, and other units of time may be used. In that case, the control apparatus 10 should just change the numerical formula used for calculation according to the unit of time.
  • DC (Direct Current) / DC converter is a converter that converts a DC voltage into another DC voltage.
  • AC (Alternating Current) / DC converter is a converter that converts an AC voltage into a DC voltage.
  • control device 10 First, the configuration of the control device 10 according to the first embodiment will be described.
  • FIG. 1 is a block diagram showing an example of the configuration of the control device 10 according to the first embodiment.
  • Control device 10 includes a storage battery 20, a voltage measurement unit 30, a current measurement unit 40, an OCV estimation unit 50, a capacity calculation unit 60, a charge / discharge control unit 70, and a control unit 80.
  • the storage battery 20 includes a secondary battery 21.
  • the secondary battery 21 is, for example, a lithium ion secondary battery.
  • the configuration of the secondary battery 21 included in the storage battery 20 is not particularly limited.
  • the storage battery 20 may include a secondary battery 21 connected in series or in parallel.
  • the storage battery 20 may include a secondary battery 21 in which a set of secondary batteries 21 connected in series or in parallel is further connected in series or in parallel.
  • the storage battery 20 is connected to a negative electrode terminal 90 ⁇ / b> A and a positive electrode terminal 90 ⁇ / b> B that are electrically connected to a load external to the control device 10.
  • the storage battery 20 charges the secondary battery 21 with the electric power supplied from the negative electrode terminal 90 ⁇ / b> A and the positive electrode terminal 90 ⁇ / b> B based on the control of the charge / discharge control unit 70. Moreover, the storage battery 20 discharges the electric power stored in the secondary battery 21 from the negative electrode terminal 90A and the positive electrode terminal 90B based on the control of the charge / discharge control unit 70.
  • the voltage measuring unit 30 measures the voltage between the positive electrode and the negative electrode of the secondary battery 21 included in the storage battery 20.
  • the voltage measurement unit 30 transmits the measured voltage value (information or signal indicating the value) to the OCV estimation unit 50 and the control unit 80.
  • the current measuring unit 40 measures the current that flows when the storage battery 20 is charged or discharged.
  • the current measurement unit 40 may use, for example, a galvanometer, a galvanometer using a shunt resistor, or a clamp meter as current measurement means. However, this embodiment is not limited to these detection devices.
  • the current measuring unit 40 of this embodiment may use any means as long as it is a means for measuring a current value.
  • the current measurement unit 40 transmits the measured current value (information or signal indicating the value) to the capacity calculation unit 60 and the control unit 80.
  • the OCV estimation unit 50 estimates the open circuit voltage (OCV) of the storage battery 20 based on the voltage measured by the voltage measurement unit 30 and the current measured by the current measurement unit 40.
  • the OCV estimation unit 50 transmits the estimated OCV to the control unit 80.
  • the capacity calculation unit 60 calculates the accumulated capacity (Q) of the storage battery 20 based on the current measured by the current measurement unit 40.
  • the capacity calculation unit 60 transmits the calculated integrated capacity (Q) to the control unit 80.
  • the charge / discharge control unit 70 controls charging and discharging operations of the storage battery 20 based on an instruction for controlling the storage battery 20 from the control unit 80.
  • the charge / discharge control unit 70 is a power conversion unit such as a bidirectional DC / DC converter or an AC / DC converter, for example. More specifically, the charge / discharge control unit 70 controls the current, voltage, and / or power in charging and discharging the storage battery 20 based on an instruction from the control unit 80.
  • the control unit 80 is based on the voltage measured by the voltage measuring unit 30, the current measured by the current measuring unit 40, the open circuit voltage (OCV) estimated by the OCV estimating unit 50, and the integrated capacity (Q) calculated by the capacity calculating unit 60. In addition, an instruction is transmitted to the charge / discharge control unit 70 to control charging and discharging of the storage battery 20. Then, the control unit 80 calculates the full capacity of the storage battery 20. Details of the operation of the control unit 80 will be described later.
  • the control unit 80 may receive a control signal (or control command) from an external device (not shown) and operate based on the control signal (or control command).
  • FIG. 2 is a diagram illustrating an example of a signal flow of the control device 10 according to the present embodiment.
  • the voltage measurement unit 30 measures the voltage between the terminals of each secondary battery 21 at a predetermined timing (for example, at regular intervals). Then, the voltage measurement unit 30 transmits the measured voltage value to the OCV estimation unit 50 and the control unit 80 as voltage information.
  • the voltage information transmitted to the OCV estimation unit 50 and the control unit 80 is distinguished, the voltage information transmitted to the OCV estimation unit 50 is “V a ” and the voltage information transmitted to the control unit 80 is “ V g ”.
  • the voltage measuring unit 30 may transmit the measured value of each voltage of the secondary battery as voltage information. Alternatively, the voltage measuring unit 30 may transmit an average value of a predetermined number of voltage values as voltage information.
  • the voltage measurement unit 30 preferably transmits voltage information to the OCV estimation unit 50 and the control unit 80 in synchronization with the current measurement unit 40. However, the voltage measurement unit 30 may transmit the voltage information at a timing different from that of the current measurement unit 40.
  • the voltage measurement unit 30 may transmit voltage information based on a request from the OCV estimation unit 50 or the control unit 80.
  • the voltage measurement unit 30 may start voltage measurement based on a request from the OCV estimation unit 50 or the control unit 80. In this case, the voltage measuring unit 30 transmits the measured voltage information after the measurement is completed.
  • the current measuring unit 40 measures the values of the charging current and discharging current (hereinafter collectively referred to as “charging / discharging current”) of the storage battery 20 at a predetermined timing (for example, at regular intervals). Then, the current measurement unit 40 transmits the measured current value to the OCV estimation unit 50, the capacity calculation unit 60, and the control unit 80 as current information.
  • the current information transmitted to the OCV estimation unit 50, the capacity calculation unit 60, and the control unit 80 is distinguished, the current information transmitted to the OCV estimation unit 50 is transmitted to the capacity calculation unit 60 as “I b ”.
  • I d the current information that the current information is transmitted to the control unit 80 is referred to as "I h".
  • the current measuring unit 40 may transmit the measured current value as current information. Alternatively, the current measuring unit 40 may transmit an average value of current values of a predetermined number of times as current information.
  • the current measurement unit 40 preferably transmits current information to the OCV estimation unit 50, the capacity calculation unit 60, and the control unit 80 in synchronization with the voltage measurement unit 30. However, the current measurement unit 40 may transmit the current information at a timing different from that of the voltage measurement unit 30.
  • the current measurement unit 40 may transmit current information based on a request from the OCV estimation unit 50, the capacity calculation unit 60, or the control unit 80.
  • the current measurement unit 40 may start measuring the current value based on a request from the OCV estimation unit 50, the capacity calculation unit 60, or the control unit 80. In this case, the current measuring unit 40 transmits the measured current information after the measurement is completed.
  • the OCV estimation unit 50 receives voltage information (V a ) between terminals of the secondary battery 21 constituting the storage battery 20 from the voltage measurement unit 30.
  • the OCV estimation unit 50 receives current information (I b ) at the time of charging or discharging the storage battery 20 from the current measurement unit 40.
  • the OCV estimation unit 50 receives the measurement values of the voltage information (V a ) and the current information (I b ) at the same synchronized time.
  • OCV estimating unit 50 includes a voltage information (V a), on the basis of the current information (I b), to estimate the open-circuit voltage of the secondary battery 21 (OCV). Then, the OCV estimation unit 50 transmits the estimated OCV information (hereinafter referred to as “OCV c ”) to the control unit 80.
  • the estimation method of the OCV estimation unit 50 is not particularly limited.
  • the OCV estimation unit 50 may estimate the OCV information based on the equivalent circuit model of the secondary battery 21.
  • the OCV estimation unit 50 may estimate the OCV information based on the internal resistance of the secondary battery 21.
  • the OCV estimation unit 50 dynamically calculates the parameter in the equivalent circuit model of the secondary battery 21 or the internal resistance of the secondary battery 21 as the storage battery 20 is used, and uses the calculated value to obtain OCV information. May be estimated.
  • the capacity calculation unit 60 receives current information (I d ) during charging or discharging of the storage battery 20 from the current measurement unit 40.
  • the capacity calculation unit 60 calculates a capacity as an integrated value of current based on the current information (I d ), and calculates the integrated capacity by integrating the calculated capacity. Then, the capacity calculation unit 60 transmits the calculated integrated capacity to the control unit 80 as integrated capacity information (hereinafter referred to as “Q e ”). For example, the capacity calculation unit 60 calculates the integrated capacity by multiplying the current value at the current time by the difference time between the current time and the previous calculation time. That is, the capacity calculation unit 60 calculates the integrated capacity as an integral value of the current value for each time in the current information (I d ). [Ah] is usually used as a unit of the integration capacity. For example, the capacity calculation unit 60 calculates the integrated capacity by integrating the calculated capacities with the current in the charging direction as positive and the current in the discharging direction as negative.
  • the control unit 80 receives OCV information (OCV c ) from the OCV estimation unit 50.
  • control unit 80 of the present embodiment stores the remaining capacity SOC [%] with respect to the open circuit voltage OCV of the secondary battery 21 in advance as a function or a lookup table.
  • the control unit 80 stores a function or a lookup table in a memory connected to the control unit 80 or the control unit 80 (not shown), for example.
  • FIG. 3 is a diagram illustrating an example of the relationship of the remaining capacity SOC [%] (hereinafter referred to as “OCV-SOC [%]”) with respect to the open circuit voltage OCV.
  • the control unit 80 stores a lookup table created based on the OCV-SOC [%] relationship shown in FIG. 3 or a function representing the OCV-SOC [%] relationship shown in FIG. Then, the control unit 80 calculates the remaining capacity SOC for the received OCV information (OCV c ) based on the stored function or lookup table.
  • OCV c the remaining capacity SOC for the received OCV information
  • the control unit 80 calculates an average value of the open-circuit voltage OCV of the secondary battery 21, and uses the calculated average value as the open-circuit voltage OCV.
  • the SOC [%] may be calculated.
  • control unit 80 receives accumulated capacity information (Q e ) from the capacity calculation unit 60.
  • the control unit 80 transmits charge / discharge control information (hereinafter referred to as “Con f ”) to the charge / discharge control unit 70.
  • the charge / discharge control information (Con f ) includes setting of an operation mode of the charge / discharge control unit 70 such as a discharge mode in which the charge / discharge control unit 70 discharges the storage battery 20 or a charge mode in which the storage battery 20 is charged.
  • the charge / discharge control information (Con f ) includes a discharge setting at the time of discharge of the charge / discharge control unit 70 or a charge setting at the time of charge.
  • the control unit 80 may receive measurement information such as current or voltage that the charge / discharge control unit 70 acquires in the charge / discharge control of the storage battery 20 from the charge / discharge control unit 70.
  • control unit 80 desirably receives the voltage information (V g ) from the voltage measurement unit 30 and the OCV information (OCV c ) of the OCV estimation unit 50 synchronously.
  • the control unit 80 holds in advance a voltage range in which the secondary battery 21 constituting the storage battery 20 can be charged and discharged. For example, when the secondary battery 21 is a single battery of a lithium ion secondary battery, the chargeable / dischargeable voltage range is 2.5V to 4.2V. And the control part 80 determines whether the voltage value of the secondary battery 21 in the voltage information ( Vg ) received from the voltage measurement part 30 is in the range of the voltage which can be charged / discharged. When the voltage value of the secondary battery 21 is outside the range of the chargeable / dischargeable voltage, the control unit 80 transmits an instruction to the charge / discharge control unit 70 and stops charging or discharging the storage battery 20. Based on this operation, the control unit 80 prevents overdischarge and overcharge during charging and discharging.
  • Vg voltage information
  • control unit 80 holds in advance a current range that is allowed when the storage battery 20 is charged and discharged. Then, the control unit 80 determines whether or not the current value of the current information (I h ) received from the current measurement unit 40 is within the allowable current range. When the current of the storage battery 20 is outside the allowable current range, the control unit 80 transmits an instruction to the charge / discharge control unit 70 to stop charging or discharging the storage battery 20. Based on this operation, the control unit 80 controls the secondary battery 21 included in the storage battery 20 not to flow an overcurrent exceeding the specification.
  • control device 10 Next, the operation of the control device 10 will be described with reference to the drawings.
  • FIG. 4 is a diagram for explaining the operation of the control device 10 according to the present embodiment.
  • FIG. 4 shows a time change of the remaining capacity SOC [%] calculated from the open circuit voltage OCV for the discharging operation and the charging operation in the operation in which the control device 10 detects the full capacity.
  • the remaining capacity SOC calculated from the open circuit voltage OCV is represented as “SOC (@OCV)”.
  • the control unit 80 instructs the charge / discharge control unit 70 to perform a discharge mode.
  • the charge / discharge control unit 70 in the discharge mode performs the discharge from the storage battery 20 without charging the storage battery 20.
  • the control unit 80 instructs the charge / discharge control unit 70 to discharge at a constant current (I CC ), that is, CC discharge at least between the first open circuit voltage OCV 1 and the second open circuit voltage OCV 2 .
  • I CC constant current
  • the first open-circuit voltage OCV 1 and the second open-circuit voltage OCV 2 are two arbitrary voltages within the OCV voltage range corresponding to 0 to 100% of the remaining capacity SOC [%].
  • the first open-circuit voltage OCV 1 and the second open-circuit voltage OCV 2 are arbitrary within 3.0V to 4.1V. These are two voltage points. If the first open-circuit voltage OCV 1 and the second open-circuit voltage OCV 2 are voltages that pass during charging and discharging in the use of a normal storage battery, the control unit 80 may One open circuit voltage OCV 1 and a second open circuit voltage OCV 2 can be detected.
  • the control unit 80 receives OCV information (OCV c ) from the OCV estimation unit 50 during discharging. Then, when the OCV c becomes the first open circuit voltage OCV 1 , the control unit 80 calculates the first remaining capacity SOC 1 [%] based on the stored OCV-SOC [%] relationship. . Further, the control unit 80 receives the accumulated capacity information (Q e ) from the capacity calculation unit 60. The accumulated capacity information (Q e ) at this time is hereinafter referred to as a first accumulated capacity (Q 1 ).
  • control unit 80 continues discharging.
  • the control unit 80 receives OCV c from the OCV estimation unit 50.
  • the control unit 80 calculates the second remaining capacity SOC 2 [%] based on the stored OCV-SOC [%] relationship.
  • the control unit 80 receives the accumulated capacity information (Q e ) from the capacity calculation unit 60.
  • the accumulated capacity information (Q e ) at this time is hereinafter referred to as a second accumulated capacity (Q 2 ).
  • control unit 80 instructs the charge / discharge control unit 70 to stop discharging. Then, the control unit 80 instructs the charge / discharge control unit 70 in the charge mode. Further, the control unit 80 instructs the charge / discharge control unit 70 to charge at a constant current (I CC ) between the first open circuit voltage OCV 1 and the second open circuit voltage OCV 2 , that is, CC charge.
  • I CC constant current
  • the control unit 80 receives OCV information (OCV c ) from the OCV estimation unit 50 during charging. Then, when the OCV c becomes the second open circuit voltage OCV 2 , the control unit 80 calculates the second remaining capacity SOC 2 [%] based on the stored OCV-SOC [%] relationship. To do. The SOC 2 “%” at this time is the same as the SOC 2 “%” at the time of discharge. Therefore, the control unit 80 may omit the calculation of SOC 2 “%” during charging. Alternatively, the control unit 80 omits the calculation of the SOC 2 "%" at the time of discharge, it may be calculated SOC 2 "%" during charging.
  • OCV information OCV information
  • control unit 80 receives the accumulated capacity information (Q e ) from the capacity calculation unit 60.
  • the accumulated capacity information (Q e ) at this time is hereinafter referred to as a third accumulated capacity (Q ′ 2 ).
  • control unit 80 continues charging.
  • the control unit 80 receives OCV c from the OCV estimation unit 50.
  • the control unit 80 calculates the first remaining capacity SOC 1 [%] based on the stored OCV-SOC [%] relationship. .
  • the SOC 1 [%] at this time is the same as the SOC 1 [%] during discharge. Therefore, the control unit 80 may omit the calculation of SOC 1 “%” at the time of charging.
  • the controller 80 may omit the calculation of SOC 1 “%” during discharging and may calculate SOC 1 “%” during charging.
  • control unit 80 receives the accumulated capacity information (Q e ) from the capacity calculation unit 60.
  • the accumulated capacity information (Q e ) at this time is hereinafter referred to as a fourth accumulated capacity (Q ′ 1 ).
  • the control unit 80 controls the first remaining capacity SOC 1 [%], the second remaining capacity SOC 2 [%], the first accumulated capacity Q 1 , the second accumulated capacity Q 2 , and the third accumulated capacity.
  • a full capacity Q full is calculated based on the capacity Q ′ 2 and the fourth integrated capacity Q ′ 1 .
  • the control unit 80 calculates the full capacity Q full using Equation 1 shown below.
  • Equation 2 i (t) [A] as a current measured at the time of discharging in the current measuring unit 40, and i '(t) [A] as a current measured at the time of charging are expressed by the following Equation 2.
  • i offset [A] is an offset included in the current value measured by the current measurement unit 40.
  • i real (t) [A] and i ′ real (t) [A] are values obtained by removing an offset from the current measured during discharging and charging.
  • t is a variable indicating time as already described.
  • the time at the time of the first open circuit voltage OCV 1 [V] is set to “0” at the time of discharging.
  • the time at the time of the second open circuit voltage OCV 2 [V] is set to “0”.
  • the charging time and discharging time are “ ⁇ T (unit: seconds)” as already described. That is, the range of the time “t” in the charge time and the discharge time is “0 ⁇ t ⁇ ⁇ T”.
  • Equation 3 the amount of change in the integrated capacity at the time of discharging from the first open circuit voltage OCV 1 [V] to the second open circuit voltage OCV 2 [V] is expressed by Equation 3 below.
  • Equation 4 the amount of change in the accumulated capacity at the time of charging is given by Equation 4 below.
  • Equation 5 the average value of the change amount of the integrated capacity at the time of discharging and at the time of charging is given by Equation 5 below.
  • the offset component is offset by the current value measured by the current measuring unit 40.
  • the control unit 80 uses the average value of the change amount of the integrated capacity during discharging and the change amount of the integrated capacity during charging, the control unit 80 can calculate the change amount of the integrated capacity without the influence of the offset.
  • the full capacity (Q full ) is expressed by the following Expression 6 from the calculated change amount of the integrated capacity.
  • Formula 6 is the same as Formula 1.
  • control unit 80 can calculate the correct full capacity even when the current value measured by the current measurement unit 40 includes an offset.
  • control unit 80 may include a full capacity detection mode separately from the normal operation mode. For example, the control unit 80 shifts the operation mode of the control device 10 from the normal operation mode to the full capacity detection mode, executes the discharge and charge of the storage battery 20 related to the detection of the full capacity, calculates the full capacity, and calculates After that, it may operate to return to the normal operation mode.
  • control unit 80 may perform discharging and charging of the storage battery 20 related to full capacity detection during the normal operation mode in which normal charging / discharging is performed.
  • the storage battery 20 installed for home use usually charges electricity generated by solar power generation in the daytime, discharges the daytime charge for use in the home at night, Repeat the charging operation at a time when electricity charges are cheap. Therefore, the control device 10 can detect the full capacity of the storage battery 20 installed for home use during normal use.
  • control device 10 may change the order of discharging and charging. That is, the control device 10 may control the storage battery 20 in the order of charging and discharging in the calculation of the full capacity.
  • the control device 10 according to the first embodiment can achieve the effect of correctly calculating the full capacity even when the measured current value includes an offset. Furthermore, the control device 10 according to the first embodiment can achieve the effect of calculating the full capacity in a short time.
  • the voltage measurement unit 30 measures the voltage (V a and V g ) of the secondary battery 21 included in the storage battery 20.
  • the current measuring unit 40 measures the current (I b , I d and I h ) of the storage battery 20.
  • the OCV estimation unit 50 estimates the open circuit voltage (OCV c ) based on the voltage (V a ) and the current (I b ).
  • the capacity calculation unit 60 calculates the integrated capacity (Q e ) based on the current (I d ).
  • control part 80 controls the charging / discharging control part 70 based on a voltage ( Vg ) and an electric current ( Ih ), and discharges and charges the storage battery 20.
  • Vg voltage
  • Ih electric current
  • the control unit 80 controls the charging / discharging control part 70 based on a voltage ( Vg ) and an electric current ( Ih ), and discharges and charges the storage battery 20.
  • the control unit 80 the remaining capacity at a given first OCV in the discharge of the battery 20 and charging (first open circuit voltage OCV 1) and a predetermined second OCV (second open-circuit voltage OCV 2)
  • First SOC and second SOC which are (SOC) are calculated.
  • the first SOC and the second SOC respectively correspond to the first remaining capacity SOC 1 and the second SOC 2 in the above description.
  • control unit 80 receives from the capacity calculation unit 60 a first integrated capacity (Q 1 ) and a second integrated capacity (Q a ) that are integrated capacities (Q a ) in the first OCV and the second OCV during discharge. Q 2) to receive. Furthermore, the control unit 80 receives from the capacity calculation unit 60 a third integrated capacity (Q ′ 2 ) and a fourth integrated capacity that are integrated capacities (Q a ) in the second and first OCVs during charging. (Q ′ 1 ) is received. Then, the control unit 80 calculates the full capacity (Q full ) based on the first SOC, the second SOC, and the first to fourth integrated capacities.
  • the calculation of the full capacity using the first SOC, the second SOC, and the first to fourth accumulated capacities in the control unit 80 is performed by calculating the accumulated capacity (Q e ) at the time of discharging and charging the storage battery 20. This is equivalent to calculating the full capacity (Q full ) using the average value of the change amounts.
  • the average value of the change amount of the integrated capacity (Q e ) during discharging and charging cancels the current offset (I offset ). That is, the control unit 80 can calculate the correct full capacity even when the measurement current has an offset.
  • control device 10 does not need to provide a standby time for measuring the no-load voltage. Therefore, the control device 10 can shorten the calculation time of the full capacity.
  • each component of the control device 10 may be configured with a hardware circuit.
  • control device 10 may be configured using a plurality of devices in which the respective components of the control device 10 are connected via a network or a bus.
  • FIG. 5 is a block diagram illustrating an example of the configuration of the control device 11 according to the first modification.
  • the control device 11 shown in FIG. 5 includes an OCV estimation unit 50, a capacity calculation unit 60, and a control unit 80.
  • the control device 11 is connected to the storage battery 20 mounted on another device (not shown), the voltage measurement unit 30, the current measurement unit 40, and the charge / discharge control unit 70 via a network or a bus.
  • FIG. 5 Each configuration shown in FIG. 5 is the same as each configuration shown in FIG.
  • the OCV estimation unit 50 receives a voltage value (V a ) from a voltage measurement unit 30 (not shown) and a current value (I b ) from the current measurement unit 40.
  • the capacity calculation unit 60 receives a current value (I d ) from a current measurement unit 40 (not shown).
  • the control unit 80 transmits a charge / discharge control signal (Con f ) to a charge / discharge control unit 70 (not shown), operates in the same manner as the control unit 80 of the control device 10, and calculates the full capacity of the storage battery 20 (not shown).
  • the control device 11 configured in this way can achieve the same effects as the control device 10.
  • control device 11 can realize the same functions as the OCV estimation unit 50, the capacity calculation unit 60, and the control unit 80 included in the control device 10.
  • the control device 11 is the minimum configuration of the present invention.
  • control device 10 may be configured by a single piece of hardware.
  • control device 10 may be realized as a computer device including a CPU (Central Processing Unit), a ROM (Read Only Memory), and a RAM (Random Access Memory).
  • control device 10 may be realized as a computer device that further includes an input / output connection circuit (IOC: Input : / Output Circuit) and a network interface circuit (NIC: Network : Interface Circuit).
  • IOC Input : / Output Circuit
  • NIC Network : Interface Circuit
  • FIG. 6 is a block diagram showing an example of the configuration of the control device 600 according to this modification.
  • the control device 600 includes a CPU 610, a ROM 620, a RAM 630, an internal storage device 640, an IOC 650, and a NIC 680, and constitutes a computer device.
  • the storage battery 20 and the like are omitted.
  • the CPU 610 reads a program from ROM 620.
  • the CPU 610 controls the RAM 630, the internal storage device 640, the IOC 650, and the NIC 680 based on the read program.
  • the computer including the CPU 610 controls these configurations, and implements the functions of the OCV estimation unit 50, the capacity calculation unit 60, and the control unit 80 shown in FIGS.
  • the computer including the CPU 610 may realize at least a part of the functions as the voltage measurement unit 30, the current measurement unit 40, and the charge / discharge control unit 70.
  • the control device 600 may include a DC / DC converter (not shown) and control the DC / DC converter to realize the function of the charge / discharge control unit 70.
  • the control device 600 may realize a function as the charge / discharge control unit 70 by controlling a converter (not shown) connected to the storage battery 20.
  • the CPU 610 may use the RAM 630 or the internal storage device 640 as a temporary storage of a program when realizing each function.
  • the CPU 610 may read a program included in the storage medium 700 storing the program so as to be readable by a computer by using a storage medium reading device (not shown). Alternatively, the CPU 610 may receive a program from an external device (not shown) via the NIC 680, store the program in the RAM 630, and operate based on the stored program.
  • ROM 620 stores programs executed by CPU 610 and fixed data.
  • the ROM 620 is, for example, a P-ROM (Programmable-ROM) or a flash ROM.
  • the RAM 630 temporarily stores programs executed by the CPU 610 and data.
  • the RAM 630 is, for example, a D-RAM (Dynamic-RAM).
  • the internal storage device 640 stores data and programs stored in the control device 600 for a long time. Further, the internal storage device 640 may operate as a temporary storage device for the CPU 610.
  • the internal storage device 640 is, for example, a hard disk device, a magneto-optical disk device, an SSD (Solid State Drive), or a disk array device.
  • the ROM 620 and the internal storage device 640 are nonvolatile storage media.
  • the RAM 630 is a volatile storage medium.
  • the CPU 610 can operate based on a program stored in the ROM 620, the internal storage device 640, or the RAM 630. That is, the CPU 610 can operate using a nonvolatile storage medium or a volatile storage medium.
  • the IOC 650 mediates data between the CPU 610, the input device 660, and the display device 670.
  • the IOC 650 is, for example, an IO interface card or a USB (Universal Serial Bus) card.
  • the input device 660 is a device that receives an input instruction from the operator of the control device 600.
  • the input device 660 is, for example, a keyboard, a mouse, or a touch panel.
  • the display device 670 is a device that displays information to the operator of the control device 600.
  • the display device 670 is a liquid crystal display, for example.
  • the NIC 680 relays data exchange with an external device (not shown) via the network.
  • the NIC 680 is, for example, a LAN (Local Area Network) card.
  • control device 600 configured as described above can achieve the same effects as the control device 10 and the control device 11.
  • the CPU 610 of the control device 600 can realize the same functions as the OCV estimation unit 50, the capacity calculation unit 60, the charge / discharge control unit 70, and the control unit 80 in the control device 10 and the control device 11 based on the program. It is. Furthermore, it is because CPU610 of the control apparatus 600 can implement
  • control device 10 Since the configuration of the control device 10 according to the present embodiment is the same as that of the control device 10 according to the first embodiment, a detailed description of the configuration is omitted. Moreover, the variables in the description are the same as those in the first embodiment. In addition, the control apparatus 10 of this embodiment may be implement
  • FIG. 7 is a diagram for explaining the operation of the control device 10 according to the present embodiment.
  • FIG. 7 shows a time change of the remaining capacity SOC [%] calculated from the open circuit voltage OCV for the discharge operation and the charge operation in the operation in which the control device 10 of the present embodiment detects the full capacity (Q full ).
  • control unit 80 instructs the charge / discharge control unit 70 to perform a discharge mode.
  • the charge / discharge control unit 70 in the discharge mode performs the discharge from the storage battery 20 without charging the storage battery 20.
  • the control unit 80 receives OCV information (OCV c ) from the OCV estimation unit 50 during discharging. Then, when the OCV c becomes the first open circuit voltage OCV 1 , the control unit 80 calculates the first remaining capacity SOC 1 [%] based on the stored OCV-SOC [%] relationship. . Further, the control unit 80 receives the accumulated capacity information (Q e ) from the capacity calculation unit 60. The accumulated capacity information (Q e ) at this time is the first accumulated capacity (Q 1 ).
  • control unit 80 instructs the charge / discharge control unit 70 to start calculating the average current when the OCV c reaches the first open circuit voltage OCV 1 .
  • the charge / discharge control unit 70 starts an average discharge current calculation process based on an instruction from the control unit 80.
  • control unit 80 continues discharging.
  • the control unit 80 receives OCV c from the OCV estimation unit 50.
  • the control unit 80 calculates the second remaining capacity SOC 2 [%] based on the stored OCV-SOC [%] relationship.
  • the control unit 80 receives the accumulated capacity information (Q e ) from the capacity calculation unit 60.
  • the accumulated capacity information (Q e ) at this time is the second accumulated capacity (Q 2 ).
  • control unit 80 instructs the charge / discharge control unit 70 to end the average current calculation when the OCV c reaches the second open circuit voltage OCV 2 .
  • the charge / discharge control unit 70 calculates the average current from the start instruction to the end instruction based on the instruction from the control unit 80. This average current is the average current of the discharge. Then, the charge / discharge control unit 70 transmits the calculated average discharge current to the control unit 80. The charge / discharge control unit 70 may hold the calculated average discharge current.
  • the control unit 80 instructs the charge / discharge control unit 70 to stop discharging. Then, the control unit 80 instructs the charge / discharge control unit 70 in the charge mode. Furthermore, the control unit 80 instructs the charge / discharge control unit 70 to perform charging with a constant current, that is, CC charging.
  • the absolute value of the current value here is the same as the absolute value of the discharge average current received from the charge / discharge control unit 70 by the control unit 80.
  • the control unit 80 may charge / discharge control unit 70 such that the absolute value of the average current value (hereinafter referred to as “charge average current”) in the charge performed by charge / discharge control unit 70 is equal to the absolute value of the discharge average current. You may instruct.
  • charge average current the control unit 80 may instruct charging with the average current held in the charge / discharge control unit 70.
  • the control unit 80 receives OCV information (OCV c ) from the OCV estimation unit 50 during charging. Then, when the OCV c becomes the second open circuit voltage OCV 2 , the control unit 80 calculates the second remaining capacity SOC 2 [%] based on the stored OCV-SOC [%] relationship. To do. Further, the control unit 80 receives the accumulated capacity information (Q e ) from the capacity calculation unit 60. The accumulated capacity information (Q e ) at this time is the third accumulated capacity (Q ′ 2 ).
  • control unit 80 continues charging.
  • the control unit 80 receives OCV c from the OCV estimation unit 50.
  • the control unit 80 calculates the first remaining capacity SOC 1 [%] based on the stored OCV-SOC [%] relationship.
  • the control unit 80 receives the accumulated capacity information (Q e ) from the capacity calculation unit 60.
  • the accumulated capacity information (Q e ) at this time is the fourth accumulated capacity (Q ′ 1 ).
  • the control unit 80 controls the first remaining capacity SOC 1 [%], the second remaining capacity SOC 2 [%], the first accumulated capacity Q 1 , the second accumulated capacity Q 2 , and the third accumulated capacity. Based on the capacity Q ′ 2 and the fourth integrated capacity Q ′ 1 , the full capacity Q full is calculated using Formula 1.
  • control device 10 of the present embodiment reduces current control in the measurement range (discharge or charge between the first open-circuit voltage OCV 1 and the second open-circuit voltage OCV 2 ). Then, the effect can be achieved.
  • the charge / discharge control part 70 of the control apparatus 10 of this embodiment calculates the average electric current in discharge. Therefore, the controller 80 does not need to instruct the charge / discharge controller 70 to discharge at a constant current. Furthermore, the charge / discharge control unit 70 charges with an average current having the same value (absolute value) as the average current of discharge. Therefore, since the charging time and the discharging time are equal, the control device 10 can calculate the full capacity (Q full ) using the same calculation formula of the first embodiment.
  • control device 10 Since the configuration of the control device 10 according to the present embodiment is the same as that of the control device 10 according to the first and second embodiments, a detailed description of the configuration is omitted. Moreover, the variables in the description are the same as those in the first embodiment. In addition, the control apparatus 10 of this embodiment may be implement
  • FIG. 8 is a diagram for explaining the operation of the control device 10 according to the present embodiment.
  • FIG. 8 shows the time change of the remaining capacity SOC [%] calculated from the open circuit voltage OCV for the discharging operation and the charging operation in the operation in which the control device 10 of the present embodiment detects the full capacity.
  • control unit 80 instructs the charge / discharge control unit 70 to perform a discharge mode.
  • the charge / discharge control unit 70 in the discharge mode performs the discharge from the storage battery 20 without charging the storage battery 20.
  • the control unit 80 receives OCV information (OCV c ) from the OCV estimation unit 50 during discharging. Then, when the OCV c becomes the first open circuit voltage OCV 1 , the control unit 80 calculates the first remaining capacity SOC 1 [%] based on the stored OCV-SOC [%] relationship. . Further, the control unit 80 receives the accumulated capacity information (Q e ) from the capacity calculation unit 60. The accumulated capacity information (Q e ) at this time is the first accumulated capacity Q 1 .
  • control unit 80 receives the time when the first open-circuit voltage OCV 1 is obtained from the OCV estimation unit 50, and stores it as the first time.
  • control unit 80 continues discharging.
  • the control unit 80 receives OCV c from the OCV estimation unit 50.
  • the control unit 80 calculates the second remaining capacity SOC 2 [%] in the same manner as the first remaining capacity.
  • the control unit 80 receives the second integrated capacity Q2 from the capacity calculation unit 60.
  • the control part 80 memorize
  • control unit 80 calculates and stores the first time ⁇ T [seconds] as the time difference between the second time and the first time.
  • control unit 80 instructs the charge / discharge control unit 70 to stop discharging. Then, the control unit 80 instructs the charge / discharge control unit 70 in the charge mode. The charge / discharge control unit 70 starts charging.
  • the control unit 80 receives OCV information (OCV c ) from the OCV estimation unit 50 during charging. Then, when the OCV c becomes the second open circuit voltage OCV 2 , the control unit 80 calculates the second remaining capacity SOC 2 [%] based on the stored OCV-SOC [%] relationship. . Further, the control unit 80 obtains the third integrated capacity (Q ′ 2 ) at that time from the capacity calculation unit 60.
  • control unit 80 stores the time when the second open circuit voltage OCV 2 is obtained from the OCV estimation unit 50 as the third time.
  • control unit 80 continues charging.
  • the control unit 80 receives OCV c from the OCV estimation unit 50.
  • the control unit 80 calculates the first remaining capacity SOC 1 [%] in the same manner as the second remaining capacity.
  • the control unit 80 obtains the fourth integrated capacity Q ′ 1 from the capacity calculation unit 60.
  • the control unit 80 stores the time when the first open circuit voltage OCV 1 is obtained from the OCV estimation unit 50 as the fourth time.
  • control unit 80 calculates and stores the second time ⁇ T ′ [seconds] as the time difference between the fourth time and the third time.
  • the control unit 80 controls the first remaining capacity SOC 1 [%], the second remaining capacity SOC 2 [%], the first accumulated capacity Q 1 , the second accumulated capacity Q 2 , and the third accumulated capacity.
  • the full capacity Q full is calculated using Q ′ 2 , the fourth integrated capacity Q ′ 1 , the first time ⁇ T, and the second time ⁇ T ′.
  • the control unit 80 uses the following formula 7 for calculating the full capacity Qfull .
  • control device 10 of the third embodiment in the first open circuit voltage OCV 1 [V] and a second open-circuit voltage OCV 2 [V] between the current measured during discharge at a current measuring unit 40 i (T) [A] and the current measured during charging is i ′ (t) [A].
  • control device 10 sets the offset included in the current value measured by the current measurement unit 40 as i offset [A]. Then, in this case, each current has a value represented by Formula 2.
  • Equation 3 the amount of change in the integrated capacity at the time of discharging between the first open-circuit voltage OCV 1 [V] and the second open-circuit voltage OCV 2 [V] at this time is expressed by Equation 3.
  • the change amount of the integrated capacity at the time of charging according to the present embodiment is represented by the following formula 8.
  • Equation 9 the weighted average value of the accumulated capacity time at the time of discharging and at the time of charging according to the present embodiment is expressed by Equation 9 below.
  • I cc and I ′ cc represent absolute values of average current during discharging and charging.
  • Formula 9 takes a weighted average value of the change amount of the accumulated capacity at the time of discharging and the change amount of the accumulated capacity at the time of charging. Therefore, the control device 10 can correctly calculate the amount of change in the integrated capacity by eliminating the influence of the offset even when the current value measured by the current measuring unit 40 includes an offset using Equation 9. .
  • control device 10 can calculate the full capacity using the following formula 10 based on the calculated change amount of the integrated capacity.
  • the control apparatus 10 can calculate the full capacity correctly even when an offset is included in the current value measured by the current measurement unit 40 using Equation 10.
  • control device 10 performs discharging and charging between the first open-circuit voltage OCV 1 and the second open-circuit voltage OCV 2.
  • charge / discharge control such as a constant current is unnecessary.
  • control unit 80 calculates the discharge time and the charge time based on the accumulated capacity time, and uses the calculated time for the calculation of the full capacity.
  • control device 10 of the present embodiment Since the configuration of the control device 10 of the present embodiment is the same as that of the control device 10 of the first to third embodiments, detailed description of the configuration is omitted. Moreover, the variables in the description are the same as those in the first embodiment. In addition, the control apparatus 10 of this embodiment may be implement
  • the control unit 80 of the control device 10 of the present embodiment calculates a current offset when calculating the full capacity.
  • the control unit 80 transmits the calculated current offset to the capacity calculation unit 60.
  • the capacity calculation unit 60 stores the current offset received from the control unit 80. Then, the capacity calculation unit 60 sets a value obtained by subtracting the current offset from the charge / discharge current of the storage battery 20 received from the current measurement unit 40 as a new current. And the capacity
  • the capacity calculation unit 60 may transmit the current offset received from the control unit 80 to the current measurement unit 40.
  • the current measurement unit 40 stores the current offset received from the capacity calculation unit 60.
  • the current measurement part 40 makes the value which subtracted the current offset from the measured electric current value a new electric current value, when measuring the charging / discharging electric current of the storage battery 20.
  • the current measuring unit 40 transmits a new current value to the capacity calculating unit 60 or the control unit 80.
  • control unit 80 may directly transmit the calculated current offset to the current measurement unit 40.
  • the current offset (i offset ) is as follows. That is, the current offset (i offset ) includes the first accumulated capacity Q 1 , the second accumulated capacity Q 2 , the third accumulated capacity Q ′ 2 , the fourth accumulated capacity Q ′ 1 , the first time ⁇ T, And, using the second time ⁇ T ′, the following Expression 11 is obtained.
  • the control device 10 of the present embodiment When the control device 10 of the present embodiment operates in the same manner as the control device 10 of the first or second embodiment, the control device 10 is between the first open-circuit voltage OCV 1 and the second open-circuit voltage OCV 2 .
  • the charging time ( ⁇ T) or the discharging time ( ⁇ T) is calculated in the same manner as in the third embodiment. Then, the control device 10 converts the current offset (i offset ) into the first accumulated capacity Q 1 , the second accumulated capacity Q 2 , the third accumulated capacity Q ′ 2 , the fourth accumulated capacity Q ′ 1 , and
  • the ⁇ T of the charging time or discharging time can be calculated by applying the following Expression 12.
  • control device 10 of the present embodiment can detect the charge / discharge current more accurately. Furthermore, since the control device 10 of the present embodiment calculates the integrated capacity by integrating the capacity calculated as the accurate integral value of the current, it is possible to calculate the more accurate integrated capacity.
  • control unit 80 After detecting the full capacity, the control unit 80 obtains the open circuit voltage OCV r from the OCV estimation unit 50, and based on the OCV-SOC [%] relationship stored in the control unit 80, the remaining capacity SOC r [ %] Is calculated. Further, the control unit 80, a reset accumulated capacity Q r, is calculated using Equation 13 shown below.
  • control unit 80 transmits the calculated reset integrated capacity to the capacity calculation unit 60.
  • the capacity calculation unit 60 resets the accumulated capacity using the received reset accumulated capacity.
  • capacitance calculation part 60 calculates an integrated capacity
  • control device 10 of the present embodiment can produce an effect that a more accurate integrated capacity can be calculated.
  • control unit 80 calculates the reset integrated capacity
  • capacity calculating unit 60 calculates the integrated capacity after resetting, that is, using the current excluding the current offset.
  • control device 10 of the present embodiment can also calculate the remaining capacity based on the ratio between the full capacity and the integrated capacity.
  • Control apparatus 11 Control apparatus 20 Storage battery 21 Secondary battery 30 Voltage measurement part 40 Current measurement part 50 OCV estimation part 60 Capacity calculation part 70 Charge / discharge control part 80 Control part 90A Negative electrode terminal 90B Positive electrode terminal 600 Control apparatus 610 CPU 620 ROM 630 RAM 640 Internal storage device 650 IOC 660 Input device 670 Display device 680 NIC 700 storage media

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Secondary Cells (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Tests Of Electric Status Of Batteries (AREA)

Abstract

 測定電流にオフセット誤差がある場合でも、蓄電池の満容量を短時間に正確に算出するため、本発明の制御装置は、制御対象装置の電圧値と電流値とを基に制御対象装置の開放電圧(OCV)を推定するOCV推定手段と、制御対象装置の電流値を基に制御対象装置の積算容量を算出する容量算出手段と、制御対象装置の充電及び放電を制御し、制御対象装置の放電中又は充電中の所定の第1のOCV及び所定の第2のOCVにおける残容量(SOC)である第1のSOC及び第2のSOCと、放電時の第1のOCV及び第2のOCVにおける積算容量である第1の積算容量及び第2の積算容量と、充電時の第2のOCV及び第1のOCVにおける積算容量である第3の積算容量及び第4の積算容量とを基に、制御対象装置の満容量を算出する制御手段とを含む。

Description

制御装置、制御方法、及び記録媒体
 本発明は、蓄電池など電力を保持する装置に接続され、その装置の容量に関する情報を処理する制御装置、制御方法、及び記録媒体に関する。
 家庭又は産業用に用いられる蓄電池は、充電及び放電(充放電)の繰り返しに伴い、満充電した際の容量が減少するという問題がある。そのため、蓄電池の満容量を見積もる技術が、用いられている(例えば、特許文献1及び2を参照)。
 特許文献1に記載の蓄電池の残容量演算方法は、蓄電池を、電圧が放電警報電圧となるまで放電する。その後、特許文献1に記載の方法は、蓄電池を、満充電となるまで充電する。そして、特許文献1に記載の方法は、補充電容量として、蓄電池の電圧が放電警報電圧に低下した状態から満充電されるまでの充電容量を演算する。そして、特許文献1に記載の方法は、蓄電池の新たな学習容量として、放電警報電圧まで放電された状態における電池の残量である放電警報容量に補充電容量を加算した値を演算する。
 特許文献1に記載の方法は、放電末期の蓄電池の残量である放電警報容量に補充電容量を加算して、電池の新学習容量を演算する。そのため、特許文献1に記載の方法は、劣化した蓄電池においても、学習容量を算出できる。さらに、特許文献1に記載の方法は、蓄電池の充電容量から放電容量を減算して蓄電池の残量を演算し、演算した残量と学習容量との比率を基に残容量(SOC:State Of Charge)を演算する。そのため、特許文献1に記載の方法は、特に、放電末期の残容量を正確に演算できる。
 また、特許文献2に記載の蓄電池の満充電容量検出方法は、蓄電池の無負荷状態である第1の無負荷タイミングにおける蓄電池の第1の無負荷電圧(VOCV1)と、第2の無負荷タイミングにおける蓄電池の第2の無負荷電圧(VOCV2)とを検出する。そして、特許文献2に記載の方法は、検出された第1の無負荷電圧(VOCV1)が所定の電圧範囲に入っているか否かを判定する。そして、第1の無負荷電圧(VOCV1)が所定の電圧範囲に入っている場合、特許文献2に記載の方法は、検出された第1の無負荷電圧(VOCV1)から蓄電池の第1の残容量(SOC[%])を判定する。そして、特許文献2に記載の方法は、さらに、第2の無負荷電圧(VOCV2)から蓄電池の第2の残容量(SOC[%])を判定する。そして、特許文献2に記載の方法は、第1の残容量(SOC[%])と第2の残容量(SOC[%])との差を基に、残容量(SOC[%])の変化率(δS[%])を演算する。さらに、特許文献2に記載の方法は、第1の無負荷タイミングと第2の無負荷タイミングとの間において、充放電される蓄電池の充電電流と放電電流の積算値を基に、蓄電池の容量変化値(δAh)を演算する。そして、特許文献2に記載の方法は、残容量(SOC[%])の変化率(δS[%])と容量変化値(δAh)とを、数式「Ahf=δAh/(δS/100)」に適用して、蓄電池の満充電容量(Ahf)を演算する。
 特許文献2に記載の方法は、第1と第2の無負荷タイミングにおける第1と第2の無負荷電圧を基に、第1と第2の残容量を判定する。そして、特許文献2に記載の方法は、第1と第2の無負荷タイミングとの間において充放電される蓄電池の充電電流と放電電流の積算値を基に、蓄電池の容量変化値を演算する。そして、特許文献2に記載の方法は、第1と第2の無負荷タイミングとの間における残容量の変化率と容量変化値を基に、蓄電池の満充電容量を演算する。そのため、特許文献2に記載の方法は、蓄電池の完全な放電後の満充電を用いずに、蓄電池の満充電容量を演算できる。
特開2002-236155号公報 特開2008-261669号公報
 特許文献1に記載の方法は、蓄電池を、電圧が放電警報電圧となるまで放電させた後、引き続いて満充電となるまで充電し、その間の充電容量を用いて満容量を演算する。しかし、放電警報電圧までの放電の際、放電電流は、蓄電池に接続される負荷に応じて変動する。そのため、特許文献1に記載の方法は、放電電流が小さい場合、放電警報電圧に達するまでの放電時間が長くなるという問題があった。さらに、特許文献1に記載の方法は、蓄電池を、電圧が放電警報電圧となるまで放電させた後、満充電まで充電する。そのため、特許文献1に記載方法は、さらに、充電時間も長くなり、放電と充電という一連の満容量検出処理の時間が長くなってしまうという問題点があった。
 特許文献2は、充電中に無負荷状態を設けて、第1と第2の無負荷タイミングにおける無負荷電圧を検出する必要がある。ここで、正確な無負荷状態における無負荷電圧を検出するために、特許文献2に記載の方法は、充電中に充電を停止し、その後、所定の時間(例えば、場合によっては1時間程度)の無負荷状態の継続が必要である。そのため、特許文献2に記載の方法は、充電に掛かる時間が長くなってしまうという問題点があった。
 また、特許文献1及び特許文献2に記載の方法は、充電電流の積算値を基に、容量を算出する。しかし、測定値は、一般的に、誤差(例えば、オフセット誤差)を含む。充電電流の測定値がプラスのオフセット誤差を含む場合、充電電流の測定値は、充電電流の実際の値(真値)に比べ、オフセット誤差の値分、大きくなる。反対に、充電電流の測定値がマイナスのオフセット誤差を含む場合、充電電流の測定値は、充電電流の実際の値(真値)に比べ、オフセット誤差の値分、小さくなる。そのため、特許文献1及び特許文献2に記載の方法は、充電電流の測定値の積算値として算出する積算容量が、実際の容量に比べ、大きくなったり、小さくなったりする。このように、特許文献1及び特許文献2に記載の方法は、満充電容量を正しく算出できないという問題点があった。
 本発明の目的は、上述した課題を解決し、積算容量を算出する測定電流にオフセット誤差がある場合でも、短時間及び高精度に満容量を算出する制御装置、制御方法、及び記録媒体を提供することを目的とする。
 本発明の一形態のおける制御装置は、制御対象装置の電圧値と電流値とを基に制御対象装置の開放電圧(OCV:Open Circuit Voltage)を推定するOCV推定手段と、制御対象装置の電流値を基に制御対象装置の積算容量を算出する容量算出手段と、制御対象装置の充電及び放電を制御し、制御対象装置の放電中又は充電中の所定の第1のOCV及び所定の第2のOCVにおける残容量(SOC:State Of Charge)である第1のSOC及び第2のSOCと、放電時の第1のOCV及び第2のOCVにおける積算容量である第1の積算容量及び第2の積算容量と、充電時の第2のOCV及び第1のOCVにおける積算容量である第3の積算容量及び第4の積算容量とを基に、制御対象装置の満容量を算出する制御手段とを含む。
 本発明の一形態における制御装置は、制御対象装置の電圧値と電流値とを基に制御対象装置の開放電圧(OCV)を推定するOCV推定手段と、制御対象装置の電流値を基に制御対象装置の積算容量を算出する容量算出手段と、制御対象装置の充電及び放電を制御し、制御対象装置の放電中又は充電中の所定の第1のOCV及び所定の第2のOCVにおける残容量(SOC)である第1のSOC及び第2のSOCと、放電時の第1のOCV及び第2のOCVにおける積算容量である第1の積算容量及び第2の積算容量と、充電時の第2のOCV及び第1のOCVにおける積算容量である第3の積算容量及び第4の積算容量とを基に、制御対象装置の満容量を算出する制御手段とを含む制御装置と、制御対象装置と、制御対象装置の電圧値を測定する電圧測定手段と、制御対象装置の電流値を測定する電流測定手段と、制御手段の指示を基に制御対象装置の充電及び放電の動作を制御する充放電制御手段とを含む。
 本発明の一形態のおけるデータ処理方法は、制御対象装置の電圧値と電流値とを基に制御対象装置の開放電圧(OCV)を推定し、制御対象装置の電流値を基に制御対象装置の積算容量を算出し、制御対象装置の充電及び放電を制御し、制御対象装置の放電中又は充電中の所定の第1のOCV及び所定の第2のOCVにおける残容量(SOC)である第1のSOC及び第2のSOCと、放電時の第1のOCV及び第2のOCVにおける積算容量である第1の積算容量及び第2の積算容量と、充電時の第2のOCV及び第1のOCVにおける積算容量である第3の積算容量及び第4の積算容量とを基に、制御対象装置の満容量を算出する。
 本発明の一形態のおける記録媒体、制御対象装置の電圧値と電流値とを基に制御対象装置の開放電圧(OCV)を推定する処理と、制御対象装置の電流値を基に制御対象装置の積算容量を算出する処理と、制御対象装置の充電及び放電を制御し、制御対象装置の放電中又は充電中の所定の第1のOCV及び所定の第2のOCVにおける残容量(SOC)である第1のSOC及び第2のSOCと、放電時の第1のOCV及び第2のOCVにおける積算容量である第1の積算容量及び第2の積算容量と、充電時の第2のOCV及び第1のOCVにおける積算容量である第3の積算容量及び第4の積算容量とを基に、制御対象装置の満容量を算出する処理とをコンピュータに実行させるプログラムをコンピュータが読み取り可能に記録する。
 本発明によれば、測定電流にオフセット誤差がある場合でも、満容量を、短時間で正確に算出できるとの効果を提供できる。
図1は、本発明における第1の実施形態に係る制御装置の構成に一例を示すブロック図である。 図2は、第1の実施形態に係る制御装置の信号の流れの一例を示す図である。 図3は、第1の実施形態における開放電圧OCVに対する残容量SOC[%]の関係の一例を示す図である。 図4は、第1の実施形態に係る制御装置の動作を説明するための図である。 図5は、第1の実施形態に係る制御装置の別の構成の一例を示すブロック図である。 図6は、第1の実施形態に係る制御装置の別の構成の一例を示すブロック図である。 図7は、第2の実施形態に係る制御装置の動作を説明するための図である。 図8は、第3の実施形態に係る制御装置の動作を説明するための図である。
 次に、本発明の実施形態について図面を参照して説明する。
 なお、各図面は、本発明の実施形態を説明するものである。ただし、本発明は、以下の各図面の記載に限られるわけではない。また、各図面の同様の構成には、同じ番号を付し、その繰り返しの説明を、省略する場合がある。
 また、以下の説明に用いる図面において、本発明の説明に関係しない部分の構成については、記載を省略し、図示しない場合もある。
 また、以下の説明では、蓄電池を用いて説明する。しかし、これは、本発明の制御装置の制御の対象を、蓄電池に限定するものではない。本発明の制御装置の制御対象の装置は、蓄電池に限らず、電力を蓄積(充電)及び放出(放電)する装置であればよい。例えば、対象装置は、電気二重層コンデンサのような容量装置、又は、リチウムイオンキャパシタのような蓄電池とコンデンサとのハイブリッド装置でもよい。
 まず、以下の説明で用いる用語及び変数をまとめておく。
 「開放電圧(OCV:Open Circuit Voltage)」とは、蓄電池に負荷を接続しない状態での蓄電池両端の電圧である。
 「残容量(SOC:State Of Charge)」とは、蓄電池の充電率であり、満充電に対する現在の充電状態(充電容量)の比率である。SOCは、通常、パーセンテージを用いるため「SOC[%]」と表現する場合もある。
 「積算容量(Q)」は、電流値(I)を積算して求めた蓄電池の容量である。「Qfull」は、満容量である。「Q」は、リセット積算容量である。「OCV」及び「SOC」は、それぞれ、Qを求めるための開放電圧と残容量である。
 「定電流(ICC)」とは、定電流(CC:Constant Current)充電及び定電流放電(CC放電)における電流を示す。なお、以下の説明において、一般的な電流には、変数「i」を用いる。
 「T」は、放電時間又は充電時間を示す。「ΔT」は、時間軸上の差分時間である。なお、一般的な時間には、変数「t」を用いる。なお、以下の説明では、時間の単位を「秒」とする。ただし、これは、説明の便宜のためである。本実施形態に係る制御装置10は、「秒」に限らず、その他の時間の単位を用いてもよい。その場合、制御装置10は、算出に用いる数式を、時間の単位に合わせて変更すればよい。
 「DC(Direct Current)/DCコンバータ」は、直流電圧を別の直流電圧に変換する変換器である。
 「AC(Alternating Current)/DCコンバータ」は、交流電圧を直流電圧に変換する変換器である。
 <第1の実施形態>
 次に、本発明のおける第1の実施形態について図面を参照して説明する。
 まず、第1の実施形態に係る制御装置10の構成について説明する。
 図1は、第1の実施形態に係る制御装置10の構成の一例を示すブロック図である。
 制御装置10は、蓄電池20と、電圧測定部30と、電流測定部40と、OCV推定部50と、容量算出部60と、充放電制御部70と、制御部80とを含む。
 蓄電池20は、二次電池21を含む。ここで、二次電池21は、例えば、リチウムイオン二次電池である。蓄電池20に含まれる二次電池21の構成には、特に、制限はない。例えば、蓄電池20は、直列又は並列に接続した二次電池21を含んでもよい。さらに、蓄電池20は、直列又は並列に接続した二次電池21の組をさらに直列又は並列に接続した二次電池21を含んでもよい。蓄電池20は、制御装置10の外部の負荷と電気的に接続する負極端子90A及び正極端子90Bと接続する。
 そして、蓄電池20は、充放電制御部70の制御に基づいて、負極端子90A及び正極端子90Bから供給される電力を二次電池21に充電する。また、蓄電池20は、充放電制御部70の制御に基づいて、二次電池21が蓄積した電力を、負極端子90A及び正極端子90Bから放電する。
 電圧測定部30は、蓄電池20が含む二次電池21の正極及び負極との間の電圧を測定する。電圧測定部30は、測定した電圧の値(値を示す情報又は信号)をOCV推定部50及び制御部80に送信する。
 電流測定部40は、蓄電池20を充電又は放電するときに流れる電流を測定する。電流測定部40は、電流の測定手段として、例えば、検流計、シャント抵抗を用いた検流器、又は、クランプメータを用いてもよい。ただし、本実施形態は、これらの検出機器に限定されない。本実施形態の電流測定部40は、電流値を測定する手段であれば、どのような手段を用いてもよい。電流測定部40は、測定した電流の値(値を示す情報又は信号)を容量算出部60及び制御部80に送信する。
 OCV推定部50は、電圧測定部30が測定した電圧と、電流測定部40が測定した電流とを基に、蓄電池20の開放電圧(OCV)を推定する。OCV推定部50は、推定したOCVを制御部80に送信する。
 容量算出部60は、電流測定部40が測定した電流を基に、蓄電池20の積算容量(Q)を算出する。容量算出部60は、算出した積算容量(Q)を制御部80に送信する。
 充放電制御部70は、制御部80からの蓄電池20を制御するための指示に基づいて、蓄電池20の充電及び放電の動作を制御する。充放電制御部70は、例えば、双方向のDC/DCコンバータ又はAC/DCコンバータのような電力変換部である。より具体的には、充放電制御部70は、制御部80からの指示に基づいて、蓄電池20の充電及び放電における、電流、電圧、及び/又は電力を制御する。
 制御部80は、電圧測定部30が測定した電圧、電流測定部40が測定した電流、OCV推定部50が推定した開放電圧(OCV)、容量算出部60が算出した積算容量(Q)を基に、充放電制御部70に指示を送信し、蓄電池20の充電及び放電を制御する。そして、制御部80は、蓄電池20の満容量を算出する。制御部80の動作の詳細については、後ほど説明する。なお、制御部80は、図示しない外部の装置から制御信号(又は制御命令)を受信し、その制御信号(又は制御命令)に基づいて動作してもよい。
 次に、本実施形態に係る制御装置10の信号(情報)の流れについて説明する。
 図2は、本実施形態に係る制御装置10の信号の流れの一例を示す図である。
 電圧測定部30は、所定のタイミング(例えば、一定間隔)で各二次電池21の端子間の電圧を測定する。そして、電圧測定部30は、電圧情報として、測定した電圧値をOCV推定部50及び制御部80に送信する。以下、OCV推定部50と制御部80とに送信される電圧情報を区別する場合、OCV推定部50に送信される電圧情報を「V」と、制御部80に送信される電圧情報を「V」と呼ぶ。
 電圧測定部30は、電圧情報として、測定した二次電池の各電圧の値を送信してもよい。あるいは、電圧測定部30は、電圧情報として、所定の数の電圧値の平均値を送信してもよい。
 なお、電圧測定部30は、電流測定部40と同期して、OCV推定部50及び制御部80に電圧情報を送信することが望ましい。ただし、電圧測定部30は、電圧情報を、電流測定部40とは異なるタイミングで送信してもよい。
 また、電圧測定部30は、OCV推定部50又は制御部80からの要求を基に、電圧情報を送信してもよい。
 あるいは、電圧測定部30は、OCV推定部50又は制御部80からの要求を基に、電圧の測定を開始してもよい。この場合、電圧測定部30は、測定完了後に、測定した電圧情報を送信する。
 電流測定部40は、所定のタイミング(例えば、一定間隔)で蓄電池20の充電電流及び放電電流(以下、まとめて「充放電電流」と呼ぶ)の値を測定する。そして、電流測定部40は、電流情報として、測定した電流値をOCV推定部50と容量算出部60と制御部80とに送信する。以下、OCV推定部50と容量算出部60と制御部80とに送信される電流情報を区別する場合、OCV推定部50に送信される電流情報を「I」、容量算出部60に送信される電流情報を「I」、制御部80に送信される電流情報を「I」と呼ぶ。
 電流測定部40は、電流情報として、測定した電流の値を送信してもよい。あるいは、電流測定部40は、電流情報として、所定の回数の電流値の平均値を送信してもよい。
 なお、電流測定部40は、電圧測定部30と同期して、OCV推定部50、容量算出部60及び制御部80に電流情報を送信することが望ましい。ただし、電流測定部40は、電流情報を、電圧測定部30とは異なるタイミングで送信してもよい。
 また、電流測定部40は、OCV推定部50、容量算出部60又は制御部80からの要求を基に、電流情報を送信してもよい。
 あるいは、電流測定部40は、OCV推定部50、容量算出部60又は制御部80からの要求を基に、電流の値の測定を開始してもよい。この場合、電流測定部40は、測定完了後に、測定した電流情報を送信する。
 OCV推定部50は、電圧測定部30から、蓄電池20を構成する二次電池21の端子間の電圧情報(V)を受信する。
 また、OCV推定部50は、電流測定部40から、蓄電池20の充電又は放電時の電流情報(I)を受信する。
 なお、繰り返しとなるが、OCV推定部50は、同期した同じ時刻で、電圧情報(V)と電流情報(I)との測定値を受信することが望ましい。
 そして、OCV推定部50は、電圧情報(V)と、電流情報(I)とに基づき、二次電池21の開放電圧(OCV)を推定する。そして、OCV推定部50は、推定したOCVの情報(以下、「OCV」と呼ぶ)を制御部80に送信する。ここで、OCV推定部50の推定手法は、特に制限はない。例えば、OCV推定部50は、二次電池21の等価回路モデルに基づき、OCV情報を推定してもよい。あるいは、OCV推定部50は、二次電池21の内部抵抗に基づき、OCV情報を推定してもよい。また、OCV推定部50は、二次電池21の等価回路モデルにおけるパラメータ又は二次電池21の内部抵抗を、蓄電池20の使用に伴って動的に算出し、算出された値を用いてOCV情報を推定してもよい。
 容量算出部60は、電流測定部40から、蓄電池20の充電又は放電時の電流情報(I)を受信する。
 容量算出部60は、電流情報(I)に基づき、電流の積分値として容量を算出し、算出した容量を積算して積算容量を算出する。そして、容量算出部60は、算出した積算容量を、積算容量情報(以下、「Q」と呼ぶ)として制御部80に送信する。容量算出部60は、例えば、積算容量を、現在時刻での電流値に、現在時刻と1つ前の算出時刻との差分時間を掛け合わせたものとして算出する。つまり、容量算出部60は、積算容量を、電流情報(I)における電流値の時間毎の積分値として算出する。積分容量の単位は、通常、[Ah]を用いる。例えば、容量算出部60は、充電方向の電流をプラス、及び、放電方向の電流をマイナスとして算出した容量を積算して、積算容量を算出する。
 制御部80は、OCV推定部50からOCV情報(OCV)を受信する。
 ここで、本実施形態の制御部80は、予め、関数又はルックアップテーブルとして、二次電池21の開放電圧OCVに対する残容量SOC[%]を記憶している。制御部80は、例えば、制御部80内又は図示しない制御部80に接続されたメモリに、関数又はルックアップテーブルを記憶している。
 図3は、開放電圧OCVに対する残容量SOC[%](以下、「OCV-SOC[%]」とする)の関係の一例を表す図である。
 制御部80は、図3に示すOCV-SOC[%]の関係を基に作成されたルックアップテーブル又は図3に示すOCV-SOC[%]の関係を表す関数を記憶する。そして、制御部80は、記憶している関数又はルックアップテーブルを基に、受信したOCV情報(OCV)に対する残容量SOCを算出する。蓄電池20が、直列に接続した複数の二次電池21を含む場合、制御部80は、二次電池21の開放電圧OCVの平均値を算出し、算出した平均値を開放電圧OCVとして、残容量SOC[%]を算出してもよい。
 また、制御部80は、容量算出部60から積算容量情報(Q)を受信する。
 そして、制御部80は、充放電制御部70に、充放電制御情報(以下、「Con」と呼ぶ)を送信する。充放電制御情報(Con)は、充放電制御部70が蓄電池20を放電する放電モード又は充電する充電モードといった、充放電制御部70の動作モードの設定を含む。あるいは、充放電制御情報(Con)は、充放電制御部70の放電時の放電設定又は充電時の充電設定を含む。
 なお、制御部80は、充放電制御部70から、充放電制御部70が蓄電池20の充放電の制御において取得する電流又は電圧等の計測情報を受信してもよい。
 なお、繰り返しとなるが、制御部80は、電圧測定部30からの電圧情報(V)とOCV推定部50のOCVの情報(OCV)とを、同期して受信することが望ましい。
 さらに、制御部80は、予め、蓄電池20を構成する二次電池21の充放電可能な電圧の範囲を保持する。例えば、二次電池21がリチウムイオン二次電池の単電池の場合、充放電可能な電圧の範囲は、2.5V~4.2Vである。そして、制御部80は、電圧測定部30から受信した電圧情報(V)における二次電池21の電圧値が、充放電可能な電圧の範囲内か否かを判定する。二次電池21の電圧値が、充放電可能な電圧の範囲外の場合、制御部80は、充放電制御部70に指示を送信し、蓄電池20の充電又は放電を停止する。この動作を基に、制御部80は、充電中及び放電中の過放電及び過充電を防止する。
 さらに、制御部80は、予め、蓄電池20の充電時及び放電時に許容される電流の範囲を保持する。そして、制御部80は、電流測定部40から受信した電流情報(I)の電流値が、許容されている電流の範囲内か否かを判定する。蓄電池20の電流が、許容されている電流の範囲外の場合、制御部80は、充放電制御部70に指示を送信し、蓄電池20への充電又は放電を停止する。この動作を基に、制御部80は、蓄電池20に含まれる二次電池21に、仕様を超えた過電流を流さないよう制御する。
 次に、制御装置10の動作について図面を参照して説明する。
 図4は、本実施形態に係る制御装置10の動作を説明するための図である。図4は、制御装置10が、満容量を検出する動作における放電動作及び充電動作に対する開放電圧OCVから算出される残容量SOC[%]の時間変化を示す。なお、図4において、開放電圧OCVから算出される残容量SOCを「SOC(@OCV)」と表す。
 まず、制御部80は、充放電制御部70に放電モードを指示する。放電モード中の充放電制御部70は、蓄電池20に充電を行わず、蓄電池20からの放電を行う。さらに、制御部80は、少なくとも、第1の開放電圧OCVと第2の開放電圧OCV間において、一定電流(ICC)での放電、すなわちCC放電を充放電制御部70に指示する。ここで、第1の開放電圧OCVと第2の開放電圧OCVは、残容量SOC[%]の0~100%に対応するOCVの電圧範囲内の任意の2点の電圧である。例えば、二次電池21がリチウムイオン二次電池の単電池の場合、第1の開放電圧OCVと第2の開放電圧OCV(<OCV)は、3.0V~4.1V内の任意の2点の電圧である。第1の開放電圧OCVと第2の開放電圧OCVが、通常の蓄電池の使用における充電中及び放電中に経由する電圧であれば、制御部80は、通常の蓄電池の使用中に、第1の開放電圧OCVと第2の開放電圧OCVとを検出可能である。
 制御部80は、放電中にOCV推定部50からOCV情報(OCV)を受信する。そして、制御部80は、OCVが第1の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に第1の残容量SOC[%]を算出する。さらに、制御部80は、容量算出部60から積算容量情報(Q)を受信する。このときの積算容量情報(Q)を、以下、第1の積算容量(Q)と呼ぶ。
 引き続き、制御部80は、放電を継続する。制御部80は、OCV推定部50からOCVを受信する。そして、制御部80は、OCVが第2の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に第2の残容量SOC[%]を算出する。さらに、制御部80は、容量算出部60から積算容量情報(Q)を受信する。このときの積算容量情報(Q)を、以下、第2の積算容量(Q)と呼ぶ。
 次に、制御部80は、充放電制御部70に放電の停止を指示する。そして、制御部80は、充放電制御部70に充電モードを指示する。さらに、制御部80は、第1の開放電圧OCVと第2の開放電圧OCV間において一定電流(ICC)で充電、すなわちCC充電を充放電制御部70に指示する。
 制御部80は、充電中にOCV推定部50からOCV情報(OCV)を受信する。そして、制御部80は、OCVが第2の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に、第2の残容量SOC[%]を算出する。このときのSOC「%」は、放電時のSOC「%」と同じである。そのため、制御部80は、充電時のSOC「%」の算出を省略してもよい。あるいは、制御部80は、放電時のSOC「%」の算出を省略し、充電時にSOC「%」を算出してもよい。
 さらに、制御部80は、容量算出部60から積算容量情報(Q)を受信する。このときの積算容量情報(Q)を、以下、第3の積算容量(Q’)と呼ぶ。
 引き続き、制御部80は、充電を継続する。制御部80は、OCV推定部50からOCVを受信する。そして、制御部80は、OCVが第1の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に第1の残容量SOC[%]を算出する。このときのSOC[%]は、放電時のSOC[%]と同じである。そのため、制御部80は、充電時のSOC「%」の算出を省略してもよい。あるいは、制御部80は、放電時のSOC「%」の算出を省略し、充電時にSOC「%」を算出してもよい。
 さらに、制御部80は、容量算出部60から積算容量情報(Q)を受信する。このときの積算容量情報(Q)を以下、第4の積算容量(Q’)と呼ぶ。
 そして、制御部80は、第1の残容量SOC[%]、第2の残容量SOC[%]と、第1の積算容量Q、第2の積算容量Q、第3の積算容量Q’、第4の積算容量Q’とを基に、満容量Qfullを算出する。例えば、制御部80は、次に示す数式1を用いて、満容量Qfullを算出する。
 [数式1]
Figure JPOXMLDOC01-appb-I000001
 第1の開放電圧OCV[V]と第2の開放電圧OCV[V]と間において、一定電流値(ICC(>0)[A])で充電及び放電する場合、第1の開放電圧OCVと第2の開放電圧OCV間の充電時間と放電時間は、等しい。以下、この充電時間及び放電時間を「ΔT(単位は、秒)」と呼ぶ。
 また、電流測定部40において放電時に測定される電流をi(t)[A]、及び、充電時に測定される電流をi’(t)[A]は、次に示す数式2となる。
 [数式2]
Figure JPOXMLDOC01-appb-I000002
 数式2において、ioffset[A]は、電流測定部40において測定される電流値に含まれるオフセットである。ireal(t)[A]及びi’real(t)[A]は、放電時及び充電時に測定される電流から、オフセットを除いた値である。
 なお、tは、既に説明したとおり、時間を示す変数である。また、説明の便宜上、放電時は、第1の開放電圧OCV[V]の時点の時刻を「0」とする。また、充電時は、第2の開放電圧OCV[V]の時点の時刻を「0」とする。また、充電時間及び放電時間は、既に記載のとおり「ΔT(単位は、秒)」である。つまり、充電時間及び放電時間における時間「t」の範囲は、「0≦t≦ΔT」となる。
 このとき、第1の開放電圧OCV[V]から第2の開放電圧OCV[V]までの放電時における積算容量の変化量は、次に示す数式3となる。
 [数式3]
Figure JPOXMLDOC01-appb-I000003
 一方、充電時における積算容量の変化量は、次に示す数式4となる。
 [数式4]
Figure JPOXMLDOC01-appb-I000004
 そして、放電時と充電時における積算容量の変化量の平均値は、次に示す数式5となる。
 [数式5]
Figure JPOXMLDOC01-appb-I000005
 放電時の積算容量の変化量と充電時の積算容量の変化量との平均値は、電流測定部40において測定された電流値にオフセット成分が相殺される。このように、制御部80は、放電時の積算容量の変化量と充電時の積算容量の変化量との平均値を用いるため、オフセットの影響をなくした積算容量の変化量を算出できる。
 さらに、算出した積算容量の変化量から、満容量(Qfull)は、次に示す数式6となる。
 [数式6]
Figure JPOXMLDOC01-appb-I000006
 数式6は、数式1と同じである。
 このように、制御部80は、電流測定部40において測定される電流値にオフセットが含まれている場合でも、正しい満容量を算出できる。
 なお、制御部80は、通常の運用モードとは別に、満容量検出モードを備えてもよい。例えば、制御部80は、制御装置10の運用モードを通常運転モードから満容量検出モードへ移行し、満容量の検出に関連する蓄電池20の放電及び充電を実行し、満容量を算出し、算出後、通常運転モードに戻すように動作してもよい。
 あるいは、制御部80は、通常の充放電を行う通常運転モード中に満容量の検出に関連する蓄電池20の放電及び充電を実行してもよい。例えば、家庭用に設置される蓄電池20は、通常、昼間に太陽光発電等で発電された電気を充電し、夜間に家庭内で使用するために昼間充電した電気を放電し、さらに、深夜の電気料金が安い時間帯に充電する動作を繰り返す。そのため、制御装置10は、家庭用に設置された蓄電池20の満容量を、通常使用時に検出可能である。
 なお、制御装置10は、放電と充電の順番を入れ替えてもよい。つまり、制御装置10は、満容量の算出において、充電及び放電の順に、蓄電池20を制御してもよい。
 次に、本実施形態の効果を説明する。
 第1の実施形態に係る制御装置10は、測定される電流値にオフセットが含まれている場合でも、正しく満容量を算出するとの効果を奏することができる。さらに、第1の実施形態に係る制御装置10は、短時間で満容量を算出するとの効果を奏することができる。
 その理由は、次のとおりである。
 電圧測定部30は、蓄電池20に含まれる二次電池21の電圧(V及びV)を測定する。電流測定部40は、蓄電池20の電流(I、I及びI)を測定する。OCV推定部50は、電圧(V)と電流(I)とを基に、開放電圧(OCV)を推定する。容量算出部60は、電流(I)を基に、積算容量(Q)を算出する。
 そして、制御部80は、電圧(V)と電流(I)を基に、充放電制御部70を制御して、蓄電池20を放電及び充電する。そして、制御部80は、蓄電池20の放電中及び充電中の所定の第1のOCV(第1の開放電圧OCV)及び所定の第2のOCV(第2の開放電圧OCV)における残容量(SOC)である第1のSOC及び第2のSOCを算出する。なお、第1のSOC及び第2のSOCは、それぞれ、上記の説明における第1の残容量SOC及び第2のSOCに相当する。さらに、制御部80は、容量算出部60から、放電時の第1のOCV及び第2のOCVにおける積算容量(Q)である第1の積算容量(Q)及び第2の積算容量(Q)を受信する。さらに、制御部80は、容量算出部60から、充電時の第2のOCV及び第1のOCVにおける積算容量(Q)である第3の積算容量(Q’)及び第4の積算容量(Q’)を受信する。そして、制御部80は、第1のSOC、第2のSOC、及び、第1ないし第4の積算容量を基に、満容量(Qfull)を算出する。上記の、制御部80における第1のSOC、第2のSOC、及び、第1ないし第4の積算容量を用いた満容量の算出は、蓄電池20の放電及び充電時における積算容量(Q)の変化量の平均値を用いて満容量(Qfull)を算出することに相当する。ここで、放電及び充電時における積算容量(Q)の変化量の平均値は、電流のオフセット(Ioffset)を相殺する。つまり、制御部80は、測定電流にオフセットがある場合でも、正しい満容量を算出できるためである。
 さらに、第1の実施形態に係る制御装置10は、無負荷電圧を測定するための待機時間を設ける必要がない。そのため、制御装置10は、満容量の算出時間を短縮できるためである。
 [変形例1]
 以上のように説明した制御装置10は、次のように構成される。
 例えば、制御装置10の各構成部は、ハードウェア回路で構成されてもよい。
 また、制御装置10は、制御装置10の各構成部をネットワーク又はバスを介して接続した複数の装置を用いて構成されてもよい。
 図5は、本変形例1に係る制御装置11の構成の一例を示すブロック図である。
 図5に示されている制御装置11は、OCV推定部50と、容量算出部60と、制御部80とを含む。制御装置11は、図示しない別装置に搭載された蓄電池20と、電圧測定部30と、電流測定部40と、充放電制御部70とネットワーク又はバスを介して接続する。
 図5に示されている各構成は、図1に示されている各構成と同様の構成である。
 より詳細には、次のとおりである。
 OCV推定部50は、図示しない電圧測定部30から電圧値(V)と、電流測定部40から電流値(I)を受信する。
 容量算出部60は、図示しない電流測定部40から電流値(I)を受信する。
 制御部80は、図示しない充放電制御部70に充放電制御信号(Con)を送信し、制御装置10の制御部80同様に動作し、図示しない蓄電池20の満容量を算出する。
 このように構成された制御装置11は、制御装置10と同様の効果を奏することができる。
 その理由は、制御装置11が、制御装置10に含まれるOCV推定部50と容量算出部60と制御部80と、同様の機能を実現できるためである。
 なお、制御装置11は、本発明の最小構成である。
 [変形例2]
 また、制御装置10は、複数の構成部を1つのハードウェアで構成されてもよい。
 また、制御装置10は、CPU(Central Processing Unit)と、ROM(Read Only Memory)と、RAM(Random Access Memory)とを含むコンピュータ装置として実現されてもよい。制御装置10は、上記構成に加え、さらに、入出力接続回路(IOC:Input / Output Circuit)と、ネットワークインターフェース回路(NIC:Network Interface Circuit)とを含むコンピュータ装置として実現されてもよい。
 図6は、本変形例に係る制御装置600の構成の一例を示すブロック図である。
 制御装置600は、CPU610と、ROM620と、RAM630と、内部記憶装置640と、IOC650と、NIC680とを含み、コンピュータ装置を構成している。なお、図6において、蓄電池20などは、省略されている。
 CPU610は、ROM620からプログラムを読み込む。そして、CPU610は、読み込んだプログラムに基づいて、RAM630と、内部記憶装置640と、IOC650と、NIC680とを制御する。そして、CPU610を含むコンピュータは、これらの構成を制御し、図1及び図5に示す、OCV推定部50と、容量算出部60と、制御部80としての各機能を実現する。なお、CPU610を含むコンピュータは、電圧測定部30と、電流測定部40と、充放電制御部70としての機能の少なくとも一部を実現してよい。例えば、制御装置600は、図示しないDC/DCコンバータを含み、DC/DCコンバータを制御して、充放電制御部70の機能を実現してもよい。あるいは、制御装置600は、蓄電池20の接続した図示しないコンバータを制御して充放電制御部70としての機能を実現してもよい。
 CPU610は、各機能を実現する際に、RAM630又は内部記憶装置640を、プログラムの一時記憶として使用してもよい。
 また、CPU610は、コンピュータで読み取り可能にプログラムを記憶した記憶媒体700が含むプログラムを、図示しない記憶媒体読み取り装置を用いて読み込んでもよい。あるいは、CPU610は、NIC680を介して、図示しない外部の装置からプログラムを受け取り、RAM630に保存して、保存したプログラムを基に動作してもよい。
 ROM620は、CPU610が実行するプログラム及び固定的なデータを記憶する。ROM620は、例えば、P-ROM(Programmable-ROM)又はフラッシュROMである。
 RAM630は、CPU610が実行するプログラム及びデータを一時的に記憶する。RAM630は、例えば、D-RAM(Dynamic-RAM)である。
 内部記憶装置640は、制御装置600が長期的に保存するデータ及びプログラムを記憶する。また、内部記憶装置640は、CPU610の一時記憶装置として動作してもよい。内部記憶装置640は、例えば、ハードディスク装置、光磁気ディスク装置、SSD(Solid State Drive)又はディスクアレイ装置である。
 ここで、ROM620と内部記憶装置640は、不揮発性の記憶媒体である。一方、RAM630は、揮発性の記憶媒体である。そして、CPU610は、ROM620、内部記憶装置640、又は、RAM630に記憶されているプログラムを基に動作可能である。つまり、CPU610は、不揮発性記憶媒体又は揮発性記憶媒体を用いて動作可能である。
 IOC650は、CPU610と、入力機器660及び表示機器670とのデータを仲介する。IOC650は、例えば、IOインターフェースカード又はUSB(Universal Serial Bus)カードである。
 入力機器660は、制御装置600の操作者からの入力指示を受け取る機器である。入力機器660は、例えば、キーボード、マウス又はタッチパネルである。
 表示機器670は、制御装置600の操作者に情報を表示する機器である。表示機器670は、例えば、液晶ディスプレイである。
 NIC680は、ネットワークを介した図示しない外部の装置とのデータのやり取りを中継する。NIC680は、例えば、LAN(Local Area Network)カードである。
 このように構成された制御装置600は、制御装置10及び制御装置11と同様の効果を奏することができる。
 その理由は、制御装置600のCPU610が、プログラムに基づいて制御装置10及び制御装置11におけるOCV推定部50と容量算出部60と充放電制御部70と制御部80と同様の機能を実現できるためである。さらに、制御装置600のCPU610が、プログラムに基づいて、制御装置10における電圧測定部30と、電流測定部40と、充放電制御部70と同様の機能を実現できるためである。
 <第2の実施形態>
 次に、本発明の第2の実施形態について説明する。
 本実施形態に係る制御装置10の構成は、第1の実施形態の制御装置10と同様のため、構成の詳細な説明を省略する。また、説明中の変数は、第1の実施形態と同様である。なお、本実施形態の制御装置10は、図6に示すコンピュータを用いて実現されてもよい。
 図7は、本実施形態に係る制御装置10の動作を説明するための図である。図7は、本実施形態の制御装置10が、満容量(Qfull)を検出する動作における放電動作及び充電動作に対する開放電圧OCVから算出される残容量SOC[%]の時間変化を示す。
 まず、制御部80は、充放電制御部70に放電モードを指示する。放電モード中の充放電制御部70は、蓄電池20に充電を行わず、蓄電池20からの放電を行う。
 制御部80は、放電中にOCV推定部50からOCV情報(OCV)を受信する。そして、制御部80は、OCVが第1の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に第1の残容量SOC[%]を算出する。さらに、制御部80は、容量算出部60から積算容量情報(Q)を受信する。このときの積算容量情報(Q)が、第1の積算容量(Q)である。
 そして、制御部80は、OCVが第1の開放電圧OCVとなった時点で、充放電制御部70に平均電流算出の開始を指示する。
 充放電制御部70は、制御部80からの指示を基に、放電の平均電流の算出処理を開始する。
 引き続き、制御部80は、放電を継続する。制御部80は、OCV推定部50からOCVを受信する。そして、制御部80は、OCVが第2の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に第2の残容量SOC[%]を算出する。さらに、制御部80は、容量算出部60から積算容量情報(Q)を受信する。このときの積算容量情報(Q)は、第2の積算容量(Q)である。
 そして、制御部80は、OCVが第2の開放電圧OCVとなった時点で、充放電制御部70に平均電流算出の終了を指示する。
 充放電制御部70は、制御部80からの指示を基に、開始の指示から終了の指示までの平均電流を算出する。この平均電流は、放電の平均電流である。そして、充放電制御部70は、制御部80に算出した放電の平均電流を送信する。充放電制御部70は、算出した放電の平均電流を保持してもよい。
 次に、制御部80は、充放電制御部70に放電の停止を指示する。そして、制御部80は、充放電制御部70に充電モードを指示する。さらに、制御部80は、一定電流での充電、すなわちCC充電を充放電制御部70に指示する。ただし、ここでの電流値の絶対値は、制御部80が充放電制御部70から受信した放電平均電流の絶対値と同じである。あるいは、制御部80は、充放電制御部70が実施する充電における平均電流値(以下、「充電平均電流」)の絶対値が、放電平均電流の絶対値と等しくなるように充放電制御部70に指示してもよい。なお、充放電制御部70が、放電の平均電流を保持する場合、制御部80は、充放電制御部70に保持されている平均電流での充電を指示してもよい。
 制御部80は、充電中にOCV推定部50からOCV情報(OCV)を受信する。そして、制御部80は、OCVが第2の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に、第2の残容量SOC[%]を算出する。さらに、制御部80は、容量算出部60から積算容量情報(Q)を受信する。このときの積算容量情報(Q)は、第3の積算容量(Q’)である。
 引き続き、制御部80は、充電を継続する。制御部80は、OCV推定部50からOCVを受信する。そして、制御部80は、OCVが第1の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に第1の残容量SOC[%]を算出する。さらに、制御部80は、容量算出部60から積算容量情報(Q)を受信する。このときの積算容量情報(Q)は、第4の積算容量(Q’)である。
 そして、制御部80は、第1の残容量SOC[%]、第2の残容量SOC[%]と、第1の積算容量Q、第2の積算容量Q、第3の積算容量Q’、第4の積算容量Q’とを基に、数式1を用いて、満容量Qfullを算出する。
 次に、第2の実施形態の効果について説明する。
 本実施形態の制御装置10は、第1の実施形態の効果に加え、計測範囲(第1の開放電圧OCVと第2の開放電圧OCVと間の放電又は充電)における電流の制御を軽減するとの効果を奏することができる。
 その理由は、次のとおりである。
 本実施形態の制御装置10の充放電制御部70は、放電における平均電流を算出する。そのため、制御部80は、充放電制御部70に、一定電流での放電を指示する必要がないためである。さらに、充放電制御部70は、放電の平均電流と同じ値(絶対値)の平均電流で充電する。そのため、制御装置10は、充電時間と放電時間とが等しいため、第1の実施形態の同様の算出式を用いて満容量(Qfull)を算出できるためである。
 <第3の実施形態>
 次に、本発明の第3の実施形態について説明する。
 本実施形態に係る制御装置10の構成は、第1及び第2の実施形態の制御装置10と同様のため、構成の詳細な説明を省略する。また、説明中の変数は、第1の実施形態と同様である。なお、本実施形態の制御装置10は、図6に示すコンピュータを用いて実現されてもよい。
 図8は、本実施形態に係る制御装置10の動作を説明するための図である。図8は、本実施形態の制御装置10が、満容量を検出する動作における放電動作及び充電動作に対する開放電圧OCVから算出される残容量SOC[%]の時間変化を示す。
 まず、制御部80は、充放電制御部70に放電モードを指示する。放電モード中の充放電制御部70は、蓄電池20に充電を行わず、蓄電池20からの放電を行う。
 制御部80は、放電中にOCV推定部50からOCV情報(OCV)を受信する。そして、制御部80は、OCVが第1の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に第1の残容量SOC[%]を算出する。さらに、制御部80は、容量算出部60から積算容量情報(Q)を受信する。このときの積算容量情報(Q)が、第1の積算容量Qである。
 さらに、制御部80は、OCV推定部50から第1の開放電圧OCVを得た時刻を受信し、第1の時刻として記憶する。
 引き続き、制御部80は、放電を継続する。制御部80は、OCV推定部50からOCVを受信する。そして、制御部80は、OCVが第2の開放電圧OCVとなった場合、第1の残容量と同様に、第2の残容量SOC[%]を算出する。さらに、制御部80は、容量算出部60から第2の積算容量Qを受信する。そして、制御部80は、OCV推定部50から第2の開放電圧OCVを得た時刻を第2の時刻として記憶する。
 そして、制御部80は、第2の時刻と第1の時刻との時間差として、第1の時間ΔT[秒]を算出し、記憶する。
 次に、制御部80は、充放電制御部70に放電の停止を指示する。そして、制御部80は、充放電制御部70に充電モードを指示する。充放電制御部70は、充電を開始する。
 制御部80は、充電中に、OCV推定部50からOCV情報(OCV)を受信する。そして、制御部80は、OCVが第2の開放電圧OCVとなった場合、記憶しているOCV-SOC[%]の関係を基に第2の残容量SOC[%]を算出する。さらに、制御部80は、容量算出部60からそのときの第3の積算容量(Q’)を得る。
 さらに、制御部80は、OCV推定部50から第2の開放電圧OCVを得た時刻を、第3の時刻として記憶する。
 引き続き、制御部80は、充電を継続する。制御部80は、OCV推定部50からOCVを受信する。そして、制御部80は、OCVが第1の開放電圧OCVとなった場合、第2の残容量と同様に、第1の残容量SOC[%]を算出する。そして、制御部80は、容量算出部60から第4の積算容量Q’を得る。さらに、制御部80は、OCV推定部50から第1の開放電圧OCVを得た時刻を、第4の時刻として記憶する。
 そして、制御部80は、第4の時刻と第3の時刻との時間差として、第2の時間ΔT’[秒]を算出し、記憶する。
 そして、制御部80は、第1の残容量SOC[%]、第2の残容量SOC[%]、第1の積算容量Q、第2の積算容量Q、第3の積算容量Q’、第4の積算容量Q’、第1の時間ΔT、及び、第2の時間ΔT’を用いて満容量Qfullを算出する。制御部80は、満容量Qfullの算出に、次に示す数式7を用いる。
 [数式7]
Figure JPOXMLDOC01-appb-I000007
 そして、第3の実施形態の制御装置10は、第1の開放電圧OCV[V]と第2の開放電圧OCV[V]間において、電流測定部40において放電時に測定される電流をi(t)[A]、充電時に測定される電流をi’(t)[A]とする。
 さらに、第3の実施形態の制御装置10は、電流測定部40において測定される電流値に含まれるオフセットを、ioffset[A]とする。すると、この場合、各電流は、数式2で表される値となる。
 そして、このときの第1の開放電圧OCV[V]と第2の開放電圧OCV[V]間の放電時における積算容量の変化量は、数式3となる。
 一方、本実施形態の充電時における積算容量の変化量は、次に示す数式8となる。
 [数式8]
Figure JPOXMLDOC01-appb-I000008
 その結果、本実施形態の放電時と充電時における積算容量の時間の加重平均値は、次に示す数式9となる。なお、Icc及びI’ccは、放電中及び充電中の平均電流の絶対値を表している。
 [数式9]
Figure JPOXMLDOC01-appb-I000009
なお、数式9において[0からΔT']の積分と[0からΔT]の積分とが、どちらもΔQ12になるのは、同じSOC(又はOCV)間の積算容量のためである。
 数式9は、放電時の積算容量の変化量と充電時の積算容量の変化量との加重平均値を取っている。したがって、制御装置10は、数式9を用いて、電流測定部40において測定された電流値にオフセットが含まれている場合でも、オフセット分の影響をなくして、積算容量の変化量を正しく算出できる。
 さらに、制御装置10は、算出した積算容量の変化量を基に、満容量を、次に示す数式10を用いて算出できる。
 [数式10]
Figure JPOXMLDOC01-appb-I000010
 制御装置10は、数式10を用いて、電流測定部40において測定される電流値にオフセットが含まれている場合でも、正しく満容量を算出できる。
 次に、第3の実施形態の効果について説明する。
 第3の実施形態に係る制御装置10は、第1及び第2の実施形態と同様の効果に加え、第1の開放電圧OCVと第2の開放電圧OCV間において放電及び充電する際に、一定電流といった充放電制御を不要とする効果を奏することができる。
 その理由は、次のとおりである。
 制御部80が、積算容量の時刻を基に、放電時間及び充電時間を算出し、算出した時間を満容量の算出に用いるためである。
 <第4の実施形態>
 次に、本発明の第4の実施形態について説明する。
 本実施形態の制御装置10の構成は、第1ないし第3の実施形態の制御装置10と同様のため、構成の詳細な説明を省略する。また、説明中の変数は、第1の実施形態と同様である。なお、本実施形態の制御装置10は、図6に示すコンピュータを用いて実現されてもよい。
 本実施形態の制御装置10の制御部80は、満容量を算出する際に、電流オフセットを算出する。制御部80は、算出した電流オフセットを容量算出部60に送信する。
 容量算出部60は、制御部80から受信した電流オフセットを記憶する。そして、容量算出部60は、電流測定部40から受信した蓄電池20の充放電電流から電流オフセットを減算した値を新たな電流とする。そして、容量算出部60は、電流の積分値として容量を算出する。そして、容量算出部60は、算出した容量を積算して積算容量を算出する。
 あるいは、容量算出部60は、制御部80から受信した電流オフセットを、電流測定部40へ送信してもよい。この場合、電流測定部40は、容量算出部60から受信した電流オフセットを記憶する。そして、電流測定部40は、蓄電池20の充放電電流を測定する際に、測定した電流値から電流オフセットを減算した値を新たな電流値とする。そして、電流測定部40は、新たな電流値を、容量算出部60又は制御部80に送信する。
 あるいは、制御部80は、直接的に、電流測定部40に、算出した電流オフセットを送信してもよい。
 本実施形態の制御装置10が、第3の実施形態の制御装置10と同様に動作する場合、電流オフセット(ioffset)は、次のとおりである。すなわち、電流オフセット(ioffset)は、第1の積算容量Q、第2の積算容量Q、第3の積算容量Q’、第4の積算容量Q’、第1の時間ΔT、及び、第2の時間ΔT’を用いて、次に示す数式11となる。
 [数式11]
Figure JPOXMLDOC01-appb-I000011
 本実施形態の制御装置10が、第1又は第2の実施形態の制御装置10と同様に動作する場合、制御装置10は、第1の開放電圧OCVと第2の開放電圧OCV間の充電時間(ΔT)又は放電時間(ΔT)を、第3の実施形態と同様に算出する。そして、制御装置10は、電流オフセット(ioffset)を、第1の積算容量Q、第2の積算容量Q、第3の積算容量Q’、第4の積算容量Q’、及び、充電時間又は放電時間のΔTを、次に示す数式12に適用して、算出できる。
 [数式12]
Figure JPOXMLDOC01-appb-I000012
 以上の動作を基に、本実施形態の制御装置10は、充放電電流を、より正確に検出できる。さらに、本実施形態の制御装置10は、正確な電流の積分値として算出した容量を積算して積算容量を算出するため、さらに、正確な積算容量を算出できる。
 また、満容量検出後に、制御部80は、OCV推定部50から開放電圧OCVを得て、制御部80に記憶されているOCV-SOC[%]の関係を基に、残容量SOC[%]を算出する。さらに、制御部80は、リセット積算容量Qを、次に示す数式13を用いて算出する。
 [数式13]
Figure JPOXMLDOC01-appb-I000013
 次に、制御部80は、算出したリセット積算容量を容量算出部60に送信する。容量算出部60は、受信したリセット積算容量を用いて、積算容量をリセットする。そして、容量算出部60は、リセット後の積算容量、つまり、電流オフセットを除いた電流を用いて積算容量を算出する。
 次に、第4の実施形態の効果について説明する。
 本実施形態の制御装置10は、第1ないし第3の実施形態の効果に加え、より正確な積算容量を算出できるとの効果を奏することができる。
 その理由は、制御部80がリセット積算容量を算出し、容量算出部60が、リセット後、つまり、電流オフセットを除いた電流を用いて積算容量を算出するためである。
 さらに、本実施形態の制御装置10は、残容量を、満容量と上記の積算容量との比を基に算出することもできる。
 以上、実施形態を参照して本願発明を説明したが、本願発明は上記実施形態に限定されるものではない。本願発明の構成及び詳細には、本願発明のスコープ内で当業者が理解し得る様々に変更をすることができる。
 この出願は、2014年9月12日に出願された日本出願特願2014-185979を基礎とする優先権を主張し、その開示の全てをここに取り込む。
 10 制御装置
 11 制御装置
 20 蓄電池
 21 二次電池
 30 電圧測定部
 40 電流測定部
 50 OCV推定部
 60 容量算出部
 70 充放電制御部
 80 制御部
 90A 負極端子
 90B 正極端子
 600 制御装置
 610 CPU
 620 ROM
 630 RAM
 640 内部記憶装置
 650 IOC
 660 入力機器
 670 表示機器
 680 NIC
 700  記憶媒体

Claims (10)

  1.  制御対象装置の電圧値と電流値とを基に前記制御対象装置の開放電圧(OCV)を推定するOCV推定手段と、
     前記制御対象装置の電流値を基に前記制御対象装置の積算容量を算出する容量算出手段と、
     前記制御対象装置の充電及び放電を制御し、前記制御対象装置の放電中又は充電中の所定の第1のOCV及び所定の第2のOCVにおける残容量(SOC)である第1のSOC及び第2のSOCと、放電時の前記第1のOCV及び第2のOCVにおける積算容量である第1の積算容量及び第2の積算容量と、充電時の前記第2のOCV及び第1のOCVにおける積算容量である第3の積算容量及び第4の積算容量とを基に、前記制御対象装置の満容量を算出する制御手段と
     を含む制御装置。
  2.  前記制御手段が、
     前記第1の積算容量と前記第2の積算容量との差分である第1の積算容量変化量と、前記第3の積算容量と前記第4の積算容量との差分である第2の積算容量変化量とを基に前記満容量を算出する
     請求項1に記載の制御装置。
  3.  前記制御対象装置として蓄電池を制御する
     請求項1又は請求項2に記載の制御装置。
  4.  前記制御手段が、
     前記制御対象装置の制御として、前記第1のOCVと前記第2のOCVの間において定電流充電及び定電流放電を制御する
     請求項1ないし請求項3のいずれか1項に記載の制御装置。
  5.  前記制御手段が、
     前記制御対象装置の制御として、放電中の前記第1のOCVと前記第2のOCVの間の平均電流で、前記第1のOCVと前記第2のOCVの間を充電するように制御する
     請求項1ないし請求項3のいずれか1項に記載の制御装置。
  6.  前記制御手段が、
     放電中及び充電中の前記第1のOCVと前記第2のOCVとの間の時間を算出し、
     前記算出した時間を用いて前記満容量を算出する
     請求項1ないし請求項3のいずれか1項に記載の制御装置。
  7.  前記制御手段が、
     放電中又は充電中の前記第1のOCVと前記第2のOCVとの間の時間を算出し、
     前記時間と前記第1ないし第4の積算容量とを基に、前記制御対象装置の積算容量の補正値を算出し、
     前記容量算出手段が
     前記補正値を基に前記積算容量を補正する
     請求項1ないし請求項6のいずれか1項に記載の制御装置。
  8.  請求項1ないし7のいずれか1項に記載の制御装置と、
     前記制御対象装置と、
     前記制御対象装置の電圧値を測定する電圧測定手段と、
     前記制御対象装置の電流値を測定する電流測定手段と、
     前記制御手段の指示を基に前記制御対象装置の充電及び放電の動作を制御する充放電制御手段と
     を含む制御装置。
  9.  制御対象装置の電圧値と電流値とを基に前記制御対象装置の開放電圧(OCV)を推定し、
     前記制御対象装置の電流値を基に前記制御対象装置の積算容量を算出し、
     前記制御対象装置の充電及び放電を制御し、前記制御対象装置の放電中又は充電中の所定の第1のOCV及び所定の第2のOCVにおける残容量(SOC)である第1のSOC及び第2のSOCと、放電時の前記第1のOCV及び第2のOCVにおける積算容量である第1の積算容量及び第2の積算容量と、充電時の前記第2のOCV及び第1のOCVにおける積算容量である第3の積算容量及び第4の積算容量とを基に、前記制御対象装置の満容量を算出する
     制御方法。
  10.  制御対象装置の電圧値と電流値とを基に前記制御対象装置の開放電圧(OCV)を推定する処理と、
     前記制御対象装置の電流値を基に前記制御対象装置の積算容量を算出する処理と、
     前記制御対象装置の充電及び放電を制御し、前記制御対象装置の放電中又は充電中の所定の第1のOCV及び所定の第2のOCVにおける残容量(SOC)である第1のSOC及び第2のSOCと、放電時の前記第1のOCV及び第2のOCVにおける積算容量である第1の積算容量及び第2の積算容量と、充電時の前記第2のOCV及び第1のOCVにおける積算容量である第3の積算容量及び第4の積算容量とを基に、前記制御対象装置の満容量を算出する処理と
     をコンピュータに実行させるプログラムをコンピュータ読み取り可能に記録した不揮発性記録媒体。
PCT/JP2015/004527 2014-09-12 2015-09-07 制御装置、制御方法、及び記録媒体 WO2016038873A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2016547696A JPWO2016038873A1 (ja) 2014-09-12 2015-09-07 制御装置、制御方法、及びプログラム
US15/507,912 US10444296B2 (en) 2014-09-12 2015-09-07 Control device, control method, and recording medium

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-185979 2014-09-12
JP2014185979 2014-09-12

Publications (1)

Publication Number Publication Date
WO2016038873A1 true WO2016038873A1 (ja) 2016-03-17

Family

ID=55458644

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/004527 WO2016038873A1 (ja) 2014-09-12 2015-09-07 制御装置、制御方法、及び記録媒体

Country Status (3)

Country Link
US (1) US10444296B2 (ja)
JP (1) JPWO2016038873A1 (ja)
WO (1) WO2016038873A1 (ja)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017223537A (ja) * 2016-06-15 2017-12-21 本田技研工業株式会社 電池状態推定装置および電池状態推定方法
WO2018131651A1 (ja) * 2017-01-13 2018-07-19 株式会社デンソー 電池パック及び電源システム
JP2018119839A (ja) * 2017-01-24 2018-08-02 日本電気株式会社 蓄電制御装置、サーバ、蓄電制御方法及びプログラム
JP2019211291A (ja) * 2018-06-01 2019-12-12 マツダ株式会社 バッテリ容量推定装置、およびバッテリ容量推定方法
US11196271B2 (en) * 2018-10-09 2021-12-07 Toyota Jidosha Kabushiki Kaisha Full-charge-capacity estimating device for power supply device

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6615011B2 (ja) * 2016-03-09 2019-12-04 日立オートモティブシステムズ株式会社 電池管理システム、電池システムおよびハイブリッド車両制御システム
US20180120382A1 (en) * 2016-10-27 2018-05-03 Motorola Solutions, Inc. Battery capacity estimation for a battery pack
KR102458526B1 (ko) * 2018-02-07 2022-10-25 주식회사 엘지에너지솔루션 배터리의 동작 상태에 따라 soc를 추정하는 장치 및 방법
CN116338469A (zh) * 2020-02-27 2023-06-27 凹凸电子(武汉)有限公司 估算电池可用荷电状态的设备、方法和系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008026476A1 (fr) * 2006-08-29 2008-03-06 Nec Corporation Procédé et dispositif pour estimer une valeur d'état de charge de batterie secondaire et procédé et dispositif de jugement de dégradation
JP2013250071A (ja) * 2012-05-30 2013-12-12 Sanyo Electric Co Ltd 満充電容量検出装置及び蓄電池システム

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4259768B2 (ja) 2001-02-07 2009-04-30 三洋電機株式会社 電池の残容量演算方法
JP4130425B2 (ja) * 2003-07-29 2008-08-06 パナソニックEvエナジー株式会社 二次電池の充放電電気量推定方法および装置、二次電池の分極電圧推定方法および装置、並びに二次電池の残存容量推定方法および装置
JP4916240B2 (ja) 2006-07-21 2012-04-11 矢崎総業株式会社 液面レベルセンサ
JP6300567B2 (ja) * 2014-02-24 2018-03-28 日立オートモティブシステムズ株式会社 二次電池システム

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008026476A1 (fr) * 2006-08-29 2008-03-06 Nec Corporation Procédé et dispositif pour estimer une valeur d'état de charge de batterie secondaire et procédé et dispositif de jugement de dégradation
JP2013250071A (ja) * 2012-05-30 2013-12-12 Sanyo Electric Co Ltd 満充電容量検出装置及び蓄電池システム

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017223537A (ja) * 2016-06-15 2017-12-21 本田技研工業株式会社 電池状態推定装置および電池状態推定方法
WO2018131651A1 (ja) * 2017-01-13 2018-07-19 株式会社デンソー 電池パック及び電源システム
JP2018112501A (ja) * 2017-01-13 2018-07-19 株式会社デンソー 電池パック及び電源システム
JP2018119839A (ja) * 2017-01-24 2018-08-02 日本電気株式会社 蓄電制御装置、サーバ、蓄電制御方法及びプログラム
JP2019211291A (ja) * 2018-06-01 2019-12-12 マツダ株式会社 バッテリ容量推定装置、およびバッテリ容量推定方法
JP7172145B2 (ja) 2018-06-01 2022-11-16 マツダ株式会社 バッテリ容量推定装置、およびバッテリ容量推定方法
US11196271B2 (en) * 2018-10-09 2021-12-07 Toyota Jidosha Kabushiki Kaisha Full-charge-capacity estimating device for power supply device

Also Published As

Publication number Publication date
US20170254857A1 (en) 2017-09-07
JPWO2016038873A1 (ja) 2017-06-29
US10444296B2 (en) 2019-10-15

Similar Documents

Publication Publication Date Title
WO2016038873A1 (ja) 制御装置、制御方法、及び記録媒体
JP6763376B2 (ja) 蓄電池制御装置、蓄電システム、制御方法及びコンピュータ可読媒体
US10989761B2 (en) Method for estimating the state of health of a battery
US10845417B2 (en) Battery state estimation device, battery control device, battery system, battery state estimation method
JP6119402B2 (ja) 内部抵抗推定装置及び内部抵抗推定方法
EP2851700B1 (en) Method and terminal for displaying capacity of battery
JP5897701B2 (ja) 電池状態推定装置
TWI478418B (zh) 放電曲線的校正系統與電池的放電曲線的校正方法
US20140055100A1 (en) Battery state estimation system, battery control system, battery system, and battery state estimation method
JP2008253129A (ja) リチウム系二次電池の急速充電方法およびそれを用いる電子機器
EP3107146B1 (en) Secondary battery internal temperature estimation device and secondary battery internal temperature estimation method
JP2006242880A (ja) 電源装置用状態検知装置,電源装置及び電源装置に用いられる初期特性抽出装置
WO2012169061A1 (ja) 電池制御装置、電池システム
WO2019230033A1 (ja) パラメータ推定装置、パラメータ推定方法及びコンピュータプログラム
KR20150024561A (ko) 배터리 관리 시스템 및 그 구동방법
JP6896965B2 (ja) バッテリーのための等価回路モデルのパラメータ推定方法及びバッテリー管理システム
JP7172013B2 (ja) バッテリー管理装置、バッテリー管理方法及びバッテリーパック
JP6350174B2 (ja) 電池システム用制御装置および電池システムの制御方法
JP5851514B2 (ja) 電池制御装置、二次電池システム
JP2018119839A (ja) 蓄電制御装置、サーバ、蓄電制御方法及びプログラム
JP6821525B2 (ja) 二次電池制御装置
WO2016035337A1 (ja) 情報処理装置、情報処理方法、及び、記録媒体
JP2014109535A (ja) 内部抵抗推定装置、充電装置、放電装置、内部抵抗推定方法
JP2018146343A (ja) バッテリ管理装置及びバッテリ管理方法
JP2018169238A (ja) 蓄電制御装置、蓄電制御システム、サーバ、蓄電制御方法及びプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15840265

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016547696

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15507912

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 15840265

Country of ref document: EP

Kind code of ref document: A1