WO2018070234A1 - 部品発注方式選定装置、部品発注方式選定方法およびプログラム - Google Patents

部品発注方式選定装置、部品発注方式選定方法およびプログラム Download PDF

Info

Publication number
WO2018070234A1
WO2018070234A1 PCT/JP2017/034626 JP2017034626W WO2018070234A1 WO 2018070234 A1 WO2018070234 A1 WO 2018070234A1 JP 2017034626 W JP2017034626 W JP 2017034626W WO 2018070234 A1 WO2018070234 A1 WO 2018070234A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
ordering method
product
order
ordering
Prior art date
Application number
PCT/JP2017/034626
Other languages
English (en)
French (fr)
Inventor
将貴 田中
森澤 利浩
寛之 柳平
裕之 瀬谷
Original Assignee
株式会社日立製作所
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日立製作所 filed Critical 株式会社日立製作所
Priority to US16/335,286 priority Critical patent/US20200020003A1/en
Publication of WO2018070234A1 publication Critical patent/WO2018070234A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Definitions

  • the present invention relates to a parts ordering method selection device, a parts ordering method selection method, and a program.
  • the present invention claims the priority of Japanese Patent Application No. 2016-200266 filed on October 12, 2016, and for the designated countries where weaving by reference of documents is permitted, the contents described in the application are as follows: Is incorporated into this application by reference.
  • Patent Document 1 relates to a high-mix low-volume production method. “Manufacturing management number corresponding to an order code indicating the order received for the standard unit and the custom unit by dividing the product to be ordered into a standard unit and a custom unit. The standard unit is allocated or purchased, and the custom unit is designed and manufactured after receiving an individual order, and the manufactured custom unit having the manufacturing control number and the manufacture And a step of assembling a product having the order code using the reserved or purchased standard unit having a control number. "Manufacturing management number corresponding to an order code indicating the order received for the standard unit and the custom unit by dividing the product to be ordered into a standard unit and a custom unit. The standard unit is allocated or purchased, and the custom unit is designed and manufactured after receiving an individual order, and the manufactured custom unit having the manufacturing control number and the manufacture And a step of assembling a product having the order code using the reserved or purchased standard unit having a control number. "Manufacturing management number corresponding to an order code indicating the order received for the standard unit and
  • Patent Document 1 In the method described in Patent Document 1, a method is described in which products are classified into standard units and custom-made units, and the respective parts are allocated and parts are designed and arranged after individual orders are received.
  • the method of Patent Document 1 it is appropriate to determine whether to have inventory or to design and arrange individually for individual order-designed products in which the applicability of the standard unit changes according to the customer's required specifications. It is difficult to place an order for simple parts. Also, in the method of Patent Document 1, it is difficult to determine how long to keep the parts inventory for the standard unit of the old design when the standard unit is gradually switched between new and old by design improvement.
  • the present invention has been made in view of the above problems, and based on a future production plan, evaluates the relationship between the procurement cost of parts and the amount of inventory, and can select a more appropriate ordering method.
  • the purpose is to provide a system selection device.
  • a part ordering method selection device includes a product design assignment unit that assigns a predetermined design pattern to a product component at a predetermined application rate based on a future design plan, and the product component.
  • a procurement cost calculation unit for calculating the procurement cost of the parts used for each ordering method
  • an inventory amount calculation unit for calculating the inventory amount of the parts for each ordering method
  • an ordering method evaluation for evaluating the ratio between the procurement cost and the inventory amount A section.
  • part ordering method selection apparatus it is possible to evaluate the relationship between the procurement cost of parts and the stock amount based on a future production plan, and to select a more appropriate ordering method.
  • FIG. 1 is a functional block diagram showing an example of a functional configuration of the part ordering method selection device 1.
  • the part ordering method selection device 1 includes an input receiving unit 10, an information acquisition unit 20, an output processing unit 30, a calculation unit 40, a communication unit 50, and a storage unit 60.
  • the input receiving unit 10 is a functional unit that receives input of various information from an input device included in the part ordering method selecting device 1 or an external device connected via the communication unit 50.
  • the input receiving unit 10 receives an input of information such as a period to be subjected to the part ordering method selection process and an instruction to execute the process from an input device such as a keyboard, a mouse, and a touch panel or an external device. Further, the input receiving unit 10 passes the received information to a corresponding predetermined function unit.
  • the information acquisition unit 20 is a functional unit that acquires predetermined input information. Specifically, when the part ordering method selection process is started, the information acquisition unit 20 acquires the input information stored in the storage unit 60 and transfers this to a predetermined functional unit. Details of the input information will be described later.
  • the output processing unit 30 generates screen information to be displayed on an output device included in the part ordering method selection device 1 or an external device. Specifically, the output processing unit 30 generates screen information indicating the evaluation result and the inventory transition using the output information generated by the calculation unit 40, and outputs and displays these on the output device.
  • the calculation unit 40 includes a product design assignment unit 41, a part configuration specifying unit 42, a part ordering time calculation unit 43, a procurement cost calculation unit 44, an inventory amount calculation unit 45, and an ordering method evaluation unit 46. ing.
  • the product design assignment unit 41 is a functional unit that assigns a predetermined design pattern to product components (for example, units constituting the product). Specifically, the product design assigning unit 41 uses a predetermined input information (for example, production plan information, product configuration information, design pattern information, and design drawing information) based on a future production plan, and each product unit. Are assigned a predetermined design pattern at a predetermined application rate.
  • a predetermined input information for example, production plan information, product configuration information, design pattern information, and design drawing information
  • the component configuration specifying unit 42 is a functional unit that specifies the type of component used in the design pattern assigned to the unit. Specifically, the component configuration specifying unit 42 specifies the type of component using predetermined information (for example, product design assignment information and design drawing information). Further, the part configuration specifying unit 42 calculates the order quantity and the order amount of parts.
  • the part ordering time calculation unit 43 is a functional unit that calculates the part ordering time and the like. Specifically, the part ordering time calculation unit 43 calculates the part ordering time and the like using predetermined information (for example, product design assignment information and part ordering information).
  • the procurement cost calculation unit 44 is a functional unit that calculates the procurement cost of parts. Specifically, the procurement cost calculation unit 44 uses predetermined information (for example, procurement cost transition information) to calculate a procurement cost based on the order amount for each part and each ordering method.
  • predetermined information for example, procurement cost transition information
  • the inventory amount calculation unit 45 is a functional unit that calculates the amount of parts inventory. Specifically, the inventory amount calculation unit 45 calculates inventory amounts for each part and each ordering method using predetermined information (for example, part inventory transition information).
  • the ordering system evaluation unit 46 is a functional unit that evaluates the procurement cost and inventory amount of parts. Specifically, the ordering method evaluation unit 46 performs a predetermined calculation using the procurement cost and the inventory amount, thereby evaluating the relationship between the procurement cost and the inventory amount for each part.
  • the storage unit 60 is a functional unit that stores various information.
  • the storage unit 60 stores input information 61 and output information 62. Specifically, the storage unit 60 stores the production plan information 100, the product configuration information 110, the design pattern information 120, the design drawing information 130, and the part ordering information 140 as input information 61 in advance. These pieces of information are used for the part ordering method selection process described later.
  • the storage unit 60 stores product design assignment information 150, parts ordering time calculation information 160, procurement cost transition information 170, parts inventory transition information 180, and order-specific evaluation information 190 as output information 62. Details of the output information 62 will be described later.
  • FIG. 2 is a diagram showing an example of the production plan information 100.
  • the production plan information 100 is information for managing a future production plan of the product.
  • the production plan information 100 includes a record in which an order ID 101, a product model ID 102, an order quantity 103, a process name 104, a start date 105, and a completion date 106 are associated with each other. .
  • the order ID 101 is information for identifying each order.
  • the product model ID 102 is information for identifying the model of the product for which an order has been received.
  • the order quantity 103 is information indicating the production quantity of the ordered product.
  • the process name 104 is information for specifying a name indicating the production process of the ordered product.
  • the process name 104 includes, for example, procurement, production, testing, and shipping.
  • the start date 105 is information indicating a date on which work for the associated process name 104 is started.
  • the completion date 106 is information indicating a date for completing the work of the associated process name 104.
  • the order ID is “SO01”
  • the product model ID “PM01” is ordered “2 (unit)”
  • the “procurement” process is “2015/11/30”. It is shown that the plan is to start by “2016/1/30”.
  • FIG. 3 is a diagram showing an example of the product configuration information 110.
  • the product configuration information 110 is information for managing product components such as units.
  • the product configuration information 110 has a record in which a product model ID 111, a product configuration ID 112, and a configuration number 113 are associated with each other.
  • the product type ID 111 is information for identifying the product type, and is information common to the product type ID 102 of the production plan information 100.
  • the product configuration ID 112 is information for identifying a component such as a unit constituting the product.
  • the number of components 113 is information indicating the number of components included in the product.
  • the product with the product type ID “PM01” includes the unit “1 (unit)” with the product configuration ID “PC10” and the unit “1 (unit)” with the product configuration ID “PC11”. ”And the unit“ 2 (unit) ”of the product configuration ID“ PC12 ”.
  • FIG. 4 is a diagram showing an example of the design pattern information 120.
  • the design pattern information 120 is information for managing a design pattern to be applied to components such as units constituting a product.
  • the design pattern information 120 includes a record in which a product model ID 121, a product configuration ID 122, a design pattern ID 123, and an application rate 124 are associated with each other.
  • the product model ID 121 is information for identifying the product model, and is information common to the product model ID 102 of the production plan information 100.
  • the product configuration ID 122 is information for identifying a component such as a unit constituting the product, and is information common to the product configuration ID 112 of the product configuration information 110.
  • Design pattern ID 123 is information for identifying a design pattern to be applied to a component such as a unit constituting a product. For example, as shown in records b and c in FIG. 4, a plurality of design patterns may be associated with the same unit. The difference in these design patterns is due to, for example, the difference in the module type used for the unit, the difference between the design pattern applied to the old product and the design pattern to be applied to the new product.
  • the application rate 124 is information indicating the application rate of the design pattern applied to the unit.
  • the application rate 124 is set based on a ratio obtained by calculating a module type applied to a product from a past order rate, or based on a production ratio of an old product and a new product based on a future production plan. and so on.
  • the records b and c in FIG. 4 have two design patterns “DP10-1” and “DP10-2” to be applied to the unit having the product model ID “PM01” and the product configuration ID “PC10”.
  • Each application rate is “60%” and “40%”.
  • FIG. 5 is a diagram showing an example of the design drawing information 130.
  • the design drawing information 130 is information for managing parts used in each design pattern, arrangement drawings, and the like.
  • the design drawing information 130 includes a record in which a design pattern ID 131, a drawing ID 132, a component ID 133, and an arrangement number 134 are associated with each other.
  • the design pattern ID 131 is information for identifying a design pattern applied to a component such as a unit constituting a product, and is information common to the design pattern ID 123 of the design pattern information 120.
  • Drawing ID132 is information which identifies the arrangement drawing in which the components used for the corresponding design pattern were described.
  • the component ID 133 is information for identifying a component.
  • the arrangement number 134 is information indicating the number of parts used in the corresponding design pattern.
  • the drawing ID of the arrangement drawing with the design pattern ID “DP10-1” is “D101”, and the arrangement number of the component ID “P001” is “5 (pieces)” in the drawing. It is shown that it is described.
  • FIG. 6 is a diagram showing an example of the part ordering information 140.
  • the part ordering information 140 is information for managing ordering rules for each part.
  • the part ordering information 140 includes a record in which a part ID 141, an ordering method 142, a unit price 143, a lead time 144, and a lot size 145 are associated with each other.
  • the part ID 141 is information for identifying a part, and is information common to the part ID 133 of the design drawing information 130.
  • the ordering method 142 is information indicating the ordering method, and includes “individual”, “quantitative”, and “periodic”. Note that “individual” refers to placing an order in a small lot size according to individual design or parts arrangement. “Quantitative” refers to placing an order for a certain amount when the inventory amount falls to a predetermined level. “Periodically” means that an ordering interval of a certain period is determined and an order is placed each time.
  • the unit price 143 is information indicating the unit price of the component specified by the component ID.
  • the lead time 144 is information indicating a lead time from ordering to arrival.
  • the lot size 145 is information indicating the order quantity of the minimum unit that is ordered in one order.
  • the unit price is “1 (k ⁇ )”, the lead time is “5 (day)”, and the lot size is “1 (pieces). ) ”Or more.
  • the unit price is “0.8 (k ⁇ )”, the lead time is “4 (day)”, and the lot size is “20 (pieces)”. ] Or more.
  • the communication unit 50 is a functional unit that performs information communication with a predetermined external device. For example, when the communication unit 50 acquires information corresponding to the input information 61 from an external device, the communication unit 50 outputs the information to the information acquisition unit 20. For example, when the communication unit 50 obtains a transmission request for predetermined information such as the output information 62 from the external device, the communication unit 50 transmits the corresponding predetermined information to the external device.
  • FIG. 7 is a diagram illustrating an example of a hardware configuration of the part ordering method selection device 1.
  • the parts ordering method selection device 1 is realized by an information processing device such as a personal computer, a workstation, or a server device, for example.
  • the part ordering method selection device 1 includes an input device 201, an output device 202, an external storage device 203, an arithmetic device 204, a main storage device 205, a communication device 206, and electrically these components. And an interconnecting bus 207.
  • the input device 201 is a pointing device such as a keyboard, a mouse, or a touch panel, or a microphone that is a voice input device.
  • the output device 202 is a display, a printer, or a speaker that is an audio output device.
  • the external storage device 203 is a non-volatile storage device such as a so-called hard disk (Hard Disk Drive), SSD (Solid State Drive) or flash memory capable of storing digital information.
  • a hard disk Hard Disk Drive
  • SSD Solid State Drive
  • flash memory capable of storing digital information.
  • the computing device 204 is, for example, a CPU (Central Processing Unit).
  • the main storage device 205 is a memory device such as a RAM (Random Access Memory) or a ROM (Read Only Memory).
  • the communication device 206 is a communication module for performing information communication with an external device.
  • the input reception unit 10, the information acquisition unit 20, the output processing unit 30, and the calculation unit 40 are realized by a program that causes the calculation device 204 to perform processing, for example.
  • This program is stored in the main storage device 205 or the external storage device 203, loaded on the main storage device 205 when the program is executed, and executed by the arithmetic device 204.
  • the storage unit 60 is realized by the main storage device 205, the external storage device 203, or a combination thereof.
  • the communication unit 50 is realized by the communication device 206.
  • each of the above-described configurations, functions, processing units, processing means, and the like may be realized by hardware by designing a part or all of them with, for example, an integrated circuit.
  • the above configuration and functions may be realized by software by the processor interpreting and executing a program that realizes each function.
  • Information such as programs, tables, and files for realizing each function can be stored in a storage device such as a memory, a hard disk, and an SSD, or a recording medium such as an IC card, an SD card, and a DVD.
  • FIG. 8 is a diagram showing an example of an instruction input screen 250 for receiving an instruction to execute a part ordering method selection process.
  • the instruction input screen 250 displays an input field 251 for inputting a processing target period, an input field 252 for inputting a component ID, and an execution button 253 for instructing the execution of the process.
  • the output processing unit 30 receives a display request for the instruction input screen 250 from the user via the input receiving unit 10, the output processing unit 30 generates the screen information and displays it on the output device 202 of the part ordering method selection device 1.
  • the input receiving unit 10 receives an input of at least one of the target period or the component ID and an instruction to execute the process by pressing the execution button 253, the input receiving unit 10 starts the component ordering method selection process.
  • FIG. 9 is a flowchart showing an example of the part ordering method selection process.
  • the information acquisition unit 20 acquires the input information 61 from the storage unit 60 (step S100). Specifically, the information acquisition unit 20 acquires production plan information 100, product configuration information 110, design pattern information 120, design drawing information 130, and part ordering information 140. Note that the information acquisition unit 20 may not acquire the input information 61 from the storage unit 60, but may acquire the input information 61 from, for example, an external device connected via a communication unit.
  • the product design assigning unit 41 assigns a design pattern to the units constituting each product based on the future production plan (step S200). Specifically, the product design assigning unit 41 specifies the order ID, the product model ID, the number of orders received, and the completion date of the record in which “procurement” is associated with the process name 104 of the production plan information 100. To do.
  • the product design assignment unit 41 corresponds to the order IDs “SO01”, “SO02”, “SO03”, “SO04”, and “SO05”, and the respective order IDs.
  • the product design assigning unit 41 specifies the product configuration ID associated with the specified product type ID from the product configuration information 110.
  • the product design assignment unit 41 identifies the product configuration IDs “PC10”, “PC11”, and “PC12” associated with the product type ID “PM01”. .
  • the product design assignment unit 41 specifies the design pattern ID and application rate associated with the specified product configuration ID from the design pattern information 120.
  • the product design assignment unit 41 uses the design associated with the product configuration ID “PC10”.
  • the pattern IDs “DP10-1” and “DP10-2” and the application rates “60%” and “40%” associated with each design pattern ID are specified.
  • the product design assignment unit 41 generates product design assignment information 150 in which the design pattern ID is assigned to the product configuration ID based on the specified application rate.
  • the product design assigning unit 41 applies an application rate of “60%” to the order IDs “SO01” to “SO05” that are order orders of the product model ID “PM01” including the product configuration ID “PC10”.
  • Design pattern IDs “DP10-1” and “DP10-2” are randomly assigned so as to be “40%” and “40%”.
  • the product design assignment unit 41 generates product design assignment information 150 by associating the specified number of received orders with the specified completion date as a procurement deadline for each order ID. That is, in the product design assignment information 150, one design pattern ID is associated with each product configuration ID of each order item.
  • FIG. 10 is a diagram showing an example of the product design assignment information 150.
  • the product design assignment information 150 is information for managing the design of the ordered product.
  • the product design assignment information 150 includes a record in which an order ID 151, a product model ID 152, an order quantity 153, a product configuration ID 154, a design pattern ID 155, and a procurement deadline 156 are associated with each other. Yes.
  • the order ID 151 is information for identifying each order, and is information common to the order ID 101 of the production plan information 100.
  • the product model ID 152 is information for identifying the model of the ordered product, and is information common to the product model ID 102 of the production plan information 100.
  • the order quantity 153 is information indicating the production quantity of the ordered product, and is information common to the order quantity 103 of the production plan information 100.
  • the product configuration ID 154 is information for identifying a component such as a unit constituting the product, and is information common to the product configuration ID 112 of the product configuration information 110.
  • the design pattern ID 155 is information for identifying a design pattern to be applied to a component such as a unit constituting the product, and is information common to the design pattern ID 123 of the design pattern information 120.
  • the procurement deadline 156 is information indicating the procurement deadline of the part specified by the design pattern ID, and is information corresponding to the completion date 106 of the production plan information 100 in which “procurement” is associated with the process name.
  • the order ID is “SO01”
  • the product model ID “PM01” is ordered “2 (units)”
  • the design pattern is assigned to the unit of the product configuration ID “PC10”.
  • the ID “DP10-1” is applied, and the parts used for the design pattern are procured by “2016/1/30”.
  • the part configuration specifying unit 42 calculates the order quantity and the order amount of each part, and the part ordering time calculating unit 43 calculates the ordering and receiving time (step S300). Specifically, the part configuration specifying unit 42 specifies the part ID and the number of arrangements associated with the design pattern ID of the product design assignment information 150 from the design drawing information 130. In addition, the part configuration specifying unit 42 specifies the number of orders received for each order item and the design pattern ID associated therewith from the product design assignment information 150. Further, the part configuration specifying unit 42 calculates the order quantity of parts used for each design pattern by multiplying the specified order quantity by the number of parts arranged for each design pattern ID.
  • the part configuration specifying unit 42 when the order quantity of a part is calculated for the order ID “SO01” in the product design assignment information 150 shown in FIG. 10, the part configuration specifying unit 42 designs the design pattern ID “DP10-1” associated with the order ID. "Is associated with the component ID” P001 "and the number of arrangement” 5 "from the design drawing information 130. Further, the part configuration specifying unit 42 specifies the order quantity “2 (unit)” and the design pattern ID “DP10-1” associated with the order ID “SO01”. Further, the part configuration specifying unit 42 calculates the order quantity of the parts used in the design pattern as 10 (pieces) by multiplying the order quantity “2 (units)” by the order quantity “5 (pieces)”. .
  • the component configuration specifying unit 42 calculates the order amount of the component. Specifically, the part configuration specifying unit 42 specifies, from the part ordering information 140, the unit price of the record in which the part ID of the part for which the order quantity has been calculated is associated and the ordering method is “individual”. Further, the component configuration specifying unit 42 calculates the order amount by multiplying the calculated order quantity by the specified unit price.
  • the component configuration specifying unit 42 when calculating the order amount of the component ID “P001” whose order quantity is “10 (pieces)”, the component configuration specifying unit 42 is associated with the component ID and the ordering method is “individual”.
  • the unit price “1 (k ⁇ )” of a certain record is specified from the part ordering information 140. Further, the part configuration specifying unit 42 calculates the order amount “10 (k ⁇ )” by multiplying the order quantity “10 (pieces)” by the unit price “1 (k ⁇ )”.
  • the parts ordering time calculation unit 43 calculates the ordering and arrival times. Specifically, the part ordering time calculation unit 43 specifies the lead time of the record in which the part ID for which the order quantity is calculated is associated and the ordering method is “individual” from the part ordering information 140. Further, the part ordering time calculation unit 43 specifies the procurement deadline of the part ID from the product design assignment information 150, and calculates the date obtained by subtracting the lead time from the procurement deadline as the ordering date. Further, the part ordering time calculation unit 43 calculates the date of the procurement deadline as the arrival date.
  • the ordering method includes “quantitative” and “periodic” in addition to the above-mentioned “individual”.
  • the part configuration specifying unit 42 and the part ordering time calculation unit 43 calculate the order quantity, the order amount, the order date and the arrival date in the “quantitative” or “periodic” ordering system, for example, MRP (Material Requirements Planning: Materials A predetermined method such as a requirement plan) may be used.
  • the part ordering time calculation unit 43 assigns an order ID for each part ID, and generates part ordering time calculation information 160 in which the ordering method is associated with the order quantity, the order amount, the order date, and the arrival date.
  • the part ordering time calculation unit 43 associates the part ID “P001” for which the order quantity has been calculated.
  • the lead time “5 (days)” of the record whose ordering method is “individual” is specified from the part ordering information 140.
  • the part ordering time calculation unit 43 specifies the procurement deadline “2016/1/30” of the part ID from the product design assignment information 150, and subtracts “5 (days)” from the procurement deadline “2016/1/30”. 1/25 "is calculated as the order date.
  • the part ordering time calculation unit 43 calculates “2016/1/30”, which is the procurement deadline, as the arrival date.
  • the part ordering time calculation unit 43 associates a predetermined order ID with the part ID “P001”, orders the order (in this case, “individual”), the order quantity “10 (pieces)”, and the order amount “10 ( k ⁇ ) ”, the order date“ 2016/1/25 ”, and the arrival date“ 2016/1/30 ”are associated with each other.
  • FIG. 11 is a diagram showing an example of the part ordering time calculation information 160.
  • the part ordering time calculation information 160 is information for managing the order quantity and ordering time of parts. Specifically, in the part ordering time calculation information 160, a part ID 161, an ordering method 162, an order ID 163, an order date 164, an arrival date 165, an order quantity 166, and an order amount 167 are associated with each other. Have a record.
  • the part ID 161 is information for identifying a part, and is information common to the part ID 133 of the design drawing information 130.
  • the ordering method 162 is information indicating a part ordering method, and is information common to the ordering method 142 of the part ordering information 140.
  • the order ID 163 is information for identifying the part order, and a common ID is used for each part ID.
  • the order date 164 is information indicating a part order date.
  • the arrival date 165 is information indicating the arrival date of parts.
  • the order quantity 166 is information indicating the order quantity of parts.
  • the order amount 167 is information indicating the order amount of the part.
  • the record j in FIG. 11 is an order with the order ID “PO01”, and the part with the part ID “P001” is ordered “2016 (1/25)” in the “individual” ordering method.
  • the order amount is “10 (k ⁇ )”, which indicates that the order will be received on “2016/1/30”.
  • the ordering method evaluation unit 46 evaluates the ratio between the procurement cost and the stock amount for each part, and specifies the order of priority for ordering method selection (step S400).
  • the procurement cost calculation unit 44 generates procurement cost transition information 170. Specifically, the procurement cost calculation unit 44 extracts a part ID, an ordering method, an order ID, an arrival date, an order quantity, and an order amount from the part order timing calculation information 160, and associates them. Procurement cost transition information 170 is generated.
  • FIG. 12 is a diagram showing an example of the procurement cost transition information 170.
  • the procurement cost transition information 170 is information indicating a transition of procurement costs that occur on the basis of the arrival date of parts. Specifically, the procurement cost transition information 170 has a record in which a component ID 171, an ordering method 172, an order ID 173, an arrival date 174, an order quantity 175, and an order amount 176 are associated with each other. .
  • the part ID 171 is information for identifying a part, and is information common to the part ID 133 of the design drawing information 130.
  • the ordering method 172 is information indicating a part ordering method, and is information common to the ordering method 142 of the part ordering information 140.
  • the order ID 173 is information for identifying the part order, and a common ID is used for each part ID.
  • the arrival date 174 is information indicating the arrival date of parts.
  • the order quantity 175 is information indicating the order quantity of parts.
  • the order amount 176 is information indicating the part order amount.
  • the record k in FIG. 12 is an order with the order ID “PO01”, and the part with the part ID “P001” is ordered “10 (pieces)” by the “individual” ordering method, and the order amount is “10 ( k ⁇ ) ”and“ 2016/1/30 ”.
  • the inventory amount calculation unit 45 generates the parts inventory transition information 180. Specifically, the inventory amount calculation unit 45 determines each product configuration ID from the record of the product design assignment information 150 in which the order ID and the product type ID of the record whose process name is “procurement” in the production plan information 100 are associated with each other. Design pattern ID is specified. In addition, the stock amount calculation unit 45 identifies a component ID associated with the design pattern ID from the design drawing information 130. In addition, the stock price calculation unit 45 specifies the unit price associated with the specified component ID from the component ordering information 140 for each ordering method. In addition, the stock amount calculation unit 45 uses the part order timing calculation information 160 to specify the ordering method, the arrival date, and the order quantity from the record associated with the specified part ID.
  • the inventory amount calculation unit 45 also identifies the identified part ID, its ordering method, receipt / shipment classification (in this case, receipt), receipt / shipment date (in this case, the date of receipt date identified), and receipt / shipment quantity. (In this case, the specified order quantity), the inventory quantity (the quantity of the specified order quantity plus the original inventory quantity), and the inventory amount (the price of the corresponding ordering method multiplied by the inventory quantity) Are generated.
  • the inventory amount calculation unit 45 specifies the number of orders received and the completion date of the record whose process name in the production plan information 100 is “shipment”. In addition, the inventory amount calculation unit 45 specifies a design pattern ID for each product configuration ID from the record of the product design assignment information 150 in which the order ID and product type ID of the record are associated with each other. Further, the stock amount calculation unit 45 specifies the part ID and the number of arrangements of the record associated with the design pattern ID from the design drawing information 130. In addition, the stock price calculation unit 45 specifies the unit price associated with the specified component ID from the component ordering information 140 for each ordering method.
  • the inventory amount calculation unit 45 also identifies the identified part ID, its ordering method, receipt / shipment classification (in this case, shipment), receipt / shipment date (in this case, the specified completion date), and receipt / shipment quantity. (In this case, the quantity of shipments obtained by multiplying the number of specified orders by the number of arrangements), the quantity of inventory (the quantity obtained by subtracting the quantity of shipment from the original inventory quantity), and the inventory value (inventory to the unit price of the corresponding ordering method) A record in which the amount multiplied by the number is associated with the part inventory transition information 180 is generated.
  • FIG. 13 is a diagram showing an example of the parts inventory transition information 180.
  • the parts inventory transition information 180 is information indicating a transition of parts inventory. As described above, the parts inventory transition information 180 is associated with the part ID 181, the ordering method 182, the receipt / shipment classification 183, the receipt / shipment date 184, the receipt / shipment quantity 185, the inventory quantity 186, and the inventory amount 187. Has a record.
  • the part ID 181 is information for identifying a part, and is information common to the part ID 133 of the design drawing information 130.
  • the ordering method 182 is information indicating a part ordering method, and is information common to the ordering method 142 of the part ordering information 140.
  • the receipt / shipment division 183 is information indicating either receipt or shipment of a part.
  • the receipt / shipment date 184 is information indicating the date of arrival or shipment of a part.
  • the receipt / shipment quantity 185 is information indicating either the number of parts received or the number of shipments.
  • the stock quantity 186 is information indicating the number of stocks.
  • the stock price 187 is information indicating the total price of stock parts, that is, the price obtained by multiplying the stock quantity of the corresponding ordering method by the stock quantity.
  • the record l in FIG. 13 is a record indicating the category of “arrival”, and the part with the part ID “P001” ordered by the “individual” ordering method is “10 (1/30)” In stock), the stock quantity becomes “10 (pieces)”, and the stock price is “10 (k ⁇ )”.
  • the record m in FIG. 13 is a record indicating a classification of “shipment”, and is produced by using “10 (pieces)” of the part ID “P001” ordered by the “individual” ordering method.
  • the shipment date of the product is “2016/3/3”, indicating that the number of stocks and the stock amount are “0 (piece)” and “0 (k ⁇ )” on the shipment date, respectively.
  • the ordering method evaluation unit 46 evaluates the relationship between the procurement cost and the stock amount for each part.
  • the procurement cost calculation unit 44 calculates the procurement cost using the procurement cost transition information 170.
  • the inventory price calculation unit 45 calculates the inventory price using the parts inventory transition information 180. The calculation of the procurement cost and the stock amount will be described later.
  • the ordering method evaluation unit 46 uses the following formula (1) to calculate an evaluation coefficient that evaluates the relationship between the procurement cost and the stock amount for each part.
  • the subscript j indicates the component ID.
  • Cja represents a procurement cost obtained by adding up the order amount by the “individual” order method and the order amount by the “quantitative” order method.
  • C jb represents a procurement cost that is the sum of the order amount in the “quantitative” order method and the order amount when the “individual” order method is switched to the “quantitative” order method.
  • Ija represents an inventory amount obtained by adding up the inventory amount based on the “individual” ordering method and the inventory amount based on the “quantitative” ordering method.
  • I jb represents an inventory amount obtained by adding up the inventory amount by the “quantitative” ordering method and the inventory amount when the “individual” ordering method is switched to the “quantitative” ordering method.
  • E j indicates an evaluation coefficient.
  • the procurement cost calculation unit 44 calculates the procurement cost C ja by adding the order amount of the “individual” ordering method of the procurement cost transition information 170 and the order amount of the “quantitative” ordering method.
  • procurement costs C niv component ID "P001” is a order amount by ordering scheme “individual,””10 (k ⁇ )", the order of the "quantitative”
  • the sum of the order amount “16 (k ⁇ )” according to the method is “26 (k ⁇ )”.
  • "individual” if and ordering by ordering scheme "quantitative” there are a plurality of each, it is possible to calculate the C niv by summing these order amount.
  • the procurement cost calculation unit 44 sets the order quantity associated with the “individual” ordering method of the procurement cost transition information 170 to the minimum lot size when placing an order with the “quantitative” ordering method, and the ordering method is “
  • the procurement cost C jb is calculated by adding the order amount calculated by multiplying the unit price “quantitative” and the order amount according to the “quantitative” ordering method of the procurement cost transition information 170. For example, when the procurement cost transition information 170 of FIG. 12 is used, the procurement cost C jb of the component ID “P001” is “quantitative” for the order quantity “10 (pieces)” associated with the “individual” ordering method.
  • the inventory price calculation unit 45 adds the inventory price I ja by adding the period average of the inventory price by the “individual” ordering method of the parts inventory transition information 180 and the period average of the inventory price by the “quantitative” ordering method. calculate. For example, when calculating the monthly average of the inventory value by order, add the inventory value at the end of the month (or the first day of each month) for each part and order method, and divide it by the number of months to place an order for each part. The average of the inventory amount by method can be calculated.
  • the inventory price calculation unit 45 calculates the period average of the inventory price according to the “quantitative” ordering method of the part inventory transition information 180 and the period average of the inventory price associated with the “individual” ordering method as “quantitative”.
  • the inventory amount I jb is calculated by adding the period average when converted to the inventory amount by the ordering method. Note that the part unit price by the “quantitative” ordering method is lower than the part unit price by the “individual” ordering method. However, since the minimum lot size increases, I jb usually increases from I ja. Many.
  • the ordering method evaluation unit 46 calculates the evaluation coefficient E j by applying the procurement costs C ja and C jb and the inventory amounts I ja and I jb thus calculated to the equation (1). As a result, it is possible to evaluate the reduction effect of the procurement cost and the ratio of the increase in the stock amount when the ordering method is changed from “individual” to “quantitative”. In other words, the larger the value of E j is, the greater the effect of reducing the procurement cost with respect to the increase in the stock amount, and the higher the order of priority for ordering method switching.
  • the ordering method evaluation unit 46 generates order-specific evaluation information 190 including an evaluation result for each part.
  • FIG. 14 is a diagram showing an example of the order-specific evaluation information 190.
  • the order-by-order evaluation information 190 is information including an evaluation result of each part. Specifically, the order-specific evaluation information 190 is associated with a part ID 191, a method A procurement cost 192, a method A inventory amount 193, a method B procurement cost 194, a method B inventory amount 195, and an evaluation result 196. Has a record.
  • the component ID 191 is information for identifying a component, and is information common to the component ID 133 of the design drawing information 130.
  • the method A procurement cost 192 is information indicating the sum of the order amounts according to the “individual” and “quantitative” ordering methods (that is, C ja ).
  • the method A stock amount 193 is information indicating the sum of stock amounts (that is, I ja ) according to the “individual” and “quantitative” ordering methods.
  • Method B procurement cost 194 is information indicating the sum (ie, C jb ) of the order amount in the “quantitative” order method and the order amount when the “individual” order method is switched to the “quantitative” order method. It is.
  • Method B stock amount 195 is information indicating the sum (ie, I jb ) of the stock amount in the “quantitative” ordering method and the stock amount when the “individual” ordering method is switched to the “quantitative” ordering method. It is.
  • the evaluation result 196 is information indicating an evaluation coefficient (that is, E j ) for evaluating the relationship between the procurement cost and the stock amount.
  • the sum of the order amount and the inventory amount according to the order method of “individual” and “quantitative” is “100 (k ⁇ )” and “10 (k), respectively. ⁇ ) ”, and the sum of the order amount and the stock amount when the“ individual ”order method is switched to the“ quantitative ”order method is“ 90 (k ⁇ ) ”and“ 110 (k ⁇ ) ”, respectively.
  • the evaluation coefficient is “0.1”.
  • the output processing unit 30 uses the order-based evaluation information 190 to generate screen-order information indicating the order-by-order evaluation result and the inventory transition. Further, the output processing unit 30 displays the generated screen information on the output device 202 or the like (step S500).
  • FIG. 15 is a screen example 300 showing the evaluation result by order and the inventory transition by part.
  • the screen example 300 includes an evaluation result display area 310 and an inventory transition display area 330.
  • the evaluation result display area 310 includes a period 311 indicating the evaluation target period and a result display table 312 indicating the evaluation result.
  • the period is an evaluation target period received via the input screen of FIG.
  • the result display table 312 includes a component ID 313, a procurement cost 317 including an individual order 314, a quantitative order 315, and a reduction effect 316, a period average 321 of inventory amounts including an individual order 318, a quantitative order 319, and an increase 320, and a ratio. 322 has a record associated with it.
  • the component ID 313 is information for identifying a component, and is information common to the component ID 133 of the design drawing information 130.
  • the procurement cost individual order 314 is information indicating the sum (that is, C ja ) of the order amount by the “individual” order method and the order amount by the “quantitative” order method.
  • the procurement cost quantitative order 315 indicates the sum (ie, C jb ) of the order amount in the “quantitative” order method and the order amount when the “individual” order method is switched to the “quantitative” order method.
  • the reduction effect 316 is a value obtained by subtracting the quantitative order from the individual order of the procurement cost, and is information indicating the effect of reducing the procurement cost when the ordering method is switched from “individual” to “quantitative”.
  • the individual order 318 of the inventory amount is information indicating the sum of the inventory amount based on the “individual” ordering method and the inventory amount based on the “quantitative” ordering method (that is, I ja ).
  • the stock price fixed amount order 319 indicates the sum (ie, I jb ) of the stock amount in the “quantitative” order method and the stock amount when the “individual” order method is switched to the “quantitative” order method.
  • the ratio 322 is information indicating an evaluation coefficient (that is, E j ) for evaluating the relationship between the procurement cost and the stock amount for each part.
  • the procurement cost reduction effect 316, the stock amount increase 320, and the ratio 322 can be filtered or sorted by displaying a pull-down menu by pressing a pull-down box.
  • parts that cannot be expected to reduce procurement costs by more than a certain amount, parts that have an increase in inventory exceeding a certain amount, and parts that have a small effect on reducing procurement costs for an increase in inventory value are excluded from display. Or can be rearranged in the order of parts having a large reduction effect.
  • the inventory transition display area 330 includes a component ID 331, a display button 332, and an inventory transition graph 333.
  • a pull-down menu for a component ID 331 is pressed to display a pull-down menu and a predetermined component ID is selected and a display button 332 is pressed, an inventory transition graph 333 of the component is displayed.
  • the vertical axis represents the stock amount
  • the horizontal axis represents each month.
  • the broken line graph represents the sum of the inventory amount by the “individual” ordering method and the inventory amount by the “quantitative” ordering method (ie, I ja ).
  • the solid line represents the sum (ie, I jb ) of the inventory amount based on the “quantitative” ordering method and the inventory amount when the “individual” ordering method is switched to the “quantitative” ordering method.
  • the inventory transition graph visualizes the time-series inventory transition for each part ID for each ordering method. As a result, it is possible to manage in advance the peak time of inventory when the ordering method is switched.
  • the part ordering method selection device 1 According to such a part ordering method selecting apparatus 1, it is possible to evaluate the relationship between the procurement cost of parts and the stock amount based on a future production plan, and to select a more appropriate ordering method.
  • the design pattern is randomly assigned to each product unit according to a predetermined application rate.
  • the design pattern applied to the old product and the new product are to be applied.
  • the revision information indicating the new and old of each design pattern is associated with the design drawing information 130, and the design pattern with the oldest revision is sequentially ordered from the component of the product scheduled to be produced most recently according to a predetermined application rate. May be preferentially assigned.
  • the transition of the parts inventory in the above embodiment is based on the arrival date of the parts and the shipping date of the product using the parts.
  • the inventory amount calculation unit 45 replaces the part date with the part date.
  • the part weight, size, and storage cost related to inventory management in the warehouse may be used as evaluation indices instead of the stock amount.
  • the part ordering information 140 may have information on the storage cost for each part.
  • this invention is not limited to the above-mentioned Example, Various modifications are included.
  • the above-described embodiments have been described in detail for easy understanding of the present invention, and are not necessarily limited to those having all the configurations described.
  • a part of the configuration of one embodiment can be replaced with the configuration of another embodiment, and the configuration of another embodiment can be added to the configuration of one embodiment.
  • control lines and information lines indicate what is considered necessary for the description, and not all control lines and information lines on the product are necessarily shown. In practice, it can be considered that almost all the components are connected to each other.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Business, Economics & Management (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Manufacturing & Machinery (AREA)
  • General Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

将来の生産計画に基づいて、部品の調達コストと在庫金額との関係を評価し、より適切な発注方式を選定することができる。 将来の設計計画に基づく所定の適用率で製品構成要素に所定の設計パターンを割り付ける製品設計割付部と、前記製品構成要素に用いられる部品の調達コストを発注方式別に算出する調達コスト算出部と、前記部品の在庫金額を発注方式別に算出する在庫金額算出部と、前記調達コストおよび前記在庫金額の比率を評価する発注方式評価部と、を備える。

Description

部品発注方式選定装置、部品発注方式選定方法およびプログラム
 本発明は、部品発注方式選定装置、部品発注方式選定方法およびプログラムに関する。本発明は2016年10月12日に出願された日本国特許の出願番号2016-200626の優先権を主張し、文献の参照による織り込みが認められる指定国については、その出願に記載された内容は参照により本出願に織り込まれる。
 特許文献1には、多品種少量生産方法に関し、「受注する製品を標準ユニットと特注ユニットとに区分して、前記標準ユニットと特注ユニットに対して前記受注を示す受注コードに対応する製造管理番号を付与し、前記標準ユニットについては在庫品の引当て若しくは購買手配を行い、前記特注ユニットについては個別受注を待って設計製造を行い、前記製造管理番号を有する生産された特注ユニットと、前記製造管理番号を有する引当て若しくは購買された前記標準ユニットとを用いて前記受注コードを有する製品を組立てる工程を有している。」と記載されている。
特開2003-58225号公報
 特許文献1に記載の方法では、製品を標準ユニットと特注ユニットとに区分して、各々在庫品の引当てや個別受注後の部品設計および手配を行う方法が記載されている。しかしながら、特許文献1の方法では、顧客の要求仕様に応じて標準ユニットの適用可否が変わるような個別受注設計品において、在庫を持つべきか又は個別に設計して手配すべきかを判断して適切な部品の発注を行うことが難しい。また、特許文献1の方法では、設計改良により標準ユニットの新旧切り替えを徐々に行っていく場合において、旧設計の標準ユニットに対する部品在庫をいつまで持ち続けるのが良いかを判断することが難しい。
 本発明は、上記課題に鑑みてなされたものであり、将来の生産計画に基づいて、部品の調達コストと在庫金額との関係を評価し、より適切な発注方式を選定することができる部品発注方式選定装置の提供を目的とする。
 上記課題を解決するため、本発明に係る部品発注方式選定装置は、将来の設計計画に基づく所定の適用率で製品構成要素に所定の設計パターンを割り付ける製品設計割付部と、前記製品構成要素に用いられる部品の調達コストを発注方式別に算出する調達コスト算出部と、前記部品の在庫金額を発注方式別に算出する在庫金額算出部と、前記調達コストおよび前記在庫金額の比率を評価する発注方式評価部と、を備える。
 本発明に係る部品発注方式選定装置によれば、将来の生産計画に基づいて、部品の調達コストと在庫金額との関係を評価し、より適切な発注方式を選定することができる。
 なお、上記した以外の課題、構成および効果は、以下の実施形態の説明により明らかにされる。
部品発注方式選定装置の機能構成の一例を示した機能ブロック図である。 生産計画情報の一例を示した図である。 製品構成情報の一例を示した図である。 設計パターン情報の一例を示した図である。 設計図面情報の一例を示した図である。 部品発注情報の一例を示した図である。 部品発注方式選定装置のハードウェア構成の一例を示した図である。 部品発注方式選定処理の実行指示を受け付けるための指示入力画面の一例を示した図である。 部品発注方式選定処理の一例を示したフロー図である。 製品設計割付情報の一例を示した図である。 部品発注時期算定情報の一例を示した図である。 調達コスト推移情報の一例を示した図である。 部品在庫推移情報の一例を示した図である。 発注別評価情報の一例を示した図である。 発注別評価結果および部品別の在庫推移を示した画面例である。
 以下、本発明の一実施形態について図面を用いて説明する。
 図1は、部品発注方式選定装置1の機能構成の一例を示した機能ブロック図である。部品発注方式選定装置1は、入力受付部10と、情報取得部20と、出力処理部30と、演算部40と、通信部50と、記憶部60とを有している。
 入力受付部10は、部品発注方式選定装置1が有する入力装置や通信部50を介して接続される外部装置から様々な情報の入力を受け付ける機能部である。例えば、入力受付部10は、キーボードやマウス、タッチパネルといった入力装置あるいは外部装置から、部品発注方式選定処理の対象となる期間や処理の実行指示といった情報の入力を受け付ける。また、入力受付部10は、受け付けた情報を対応する所定の機能部に受け渡す。
 情報取得部20は、所定の入力情報を取得する機能部である。具体的には、情報取得部20は、部品発注方式選定処理が開始されると、記憶部60に格納されている入力情報を取得し、これを所定の機能部に受け渡す。なお、入力情報の詳細は後述する。
 出力処理部30は、部品発注方式選定装置1や外部装置が有する出力装置に表示させる画面情報を生成する。具体的には、出力処理部30は、演算部40により生成された出力情報を用いて、評価結果および在庫推移を示す画面情報を生成し、これらを出力装置に出力表示する。
 演算部40は、製品設計割付部41と、部品構成特定部42と、部品発注時期算定部43と、調達コスト算出部44と、在庫金額算出部45と、発注方式評価部46とを有している。
 製品設計割付部41は、製品の構成要素(例えば、製品を構成するユニット)に所定の設計パターンを割り付ける機能部である。具体的には、製品設計割付部41は、将来の生産計画に基づき、所定の入力情報(例えば、生産計画情報、製品構成情報、設計パターン情報および設計図面情報)を用いて、各製品のユニットに所定の設計パターンを所定の適用率で割り付ける。
 部品構成特定部42は、ユニットに割り付けられた設計パターンで用いられる部品の種類を特定する機能部である。具体的には、部品構成特定部42は、所定情報(例えば、製品設計割付情報および設計図面情報)を用いて部品の種類を特定する。また、部品構成特定部42は、部品の発注数量および発注金額を算出する。
 部品発注時期算定部43は、部品の発注時期等を算定する機能部である。具体的には、部品発注時期算定部43は、所定情報(例えば、製品設計割付情報および部品発注情報)を用いて、部品の発注時期等を算定する。
 調達コスト算出部44は、部品の調達コストを算出する機能部である。具体的には、調達コスト算出部44は、所定情報(例えば、調達コスト推移情報)を用いて、部品別、発注方式別の発注金額に基づく調達コストを算出する。
 在庫金額算出部45は、部品在庫の金額を算出する機能部である。具体的には、在庫金額算出部45は、所定情報(例えば、部品在庫推移情報)を用いて、部品別、発注方式別の在庫金額を算出する。
 発注方式評価部46は、部品の調達コストと在庫金額とを評価する機能部である。具体的には、発注方式評価部46は、調達コストと在庫金額とを用いて所定の演算を行うことにより、部品ごとに調達コストと在庫金額との関係を評価する。
 記憶部60は、様々な情報を格納する機能部である。記憶部60は、入力情報61および出力情報62を格納する。具体的には、記憶部60は、生産計画情報100と、製品構成情報110と、設計パターン情報120と、設計図面情報130と、部品発注情報140とを入力情報61として予め格納している。なお、これらの情報は、後述の部品発注方式選定処理に用いられる。
 また、記憶部60は、製品設計割付情報150と、部品発注時期算定情報160と、調達コスト推移情報170と、部品在庫推移情報180と、発注別評価情報190とを出力情報62として格納する。出力情報62の詳細については後述する。
 図2は、生産計画情報100の一例を示した図である。生産計画情報100は、製品の将来の生産計画を管理する情報である。具体的には、生産計画情報100は、受注ID101と、製品型式ID102と、受注台数103と、工程名104と、開始日105と、完了日106とが対応付けられたレコードを有している。
 受注ID101は、受注の各々を識別する情報である。製品型式ID102は、受注した製品の型式を識別する情報である。受注台数103は、受注した製品の生産台数を示す情報である。工程名104は、受注製品の生産工程を示す名称を特定する情報である。工程名104には、例えば、調達、生産、試験および出荷がある。開始日105は、対応付けられている工程名104の作業を開始する日付を示す情報である。完了日106は、対応付けられている工程名104の作業を完了する日付を示す情報である。
 例えば、図2のレコードaは、受注IDが「SO01」であって、製品型式ID「PM01」の製品を「2(台)」受注しており、「調達」工程を「2015/11/30」から開始して、「2016/1/30」までに完了させる計画であることを示している。
 図3は、製品構成情報110の一例を示した図である。製品構成情報110は、ユニットなど製品の構成要素を管理する情報である。具体的には、製品構成情報110は、製品型式ID111と、製品構成ID112と、構成数113とが対応付けられたレコードを有している。
 製品型式ID111は、製品の型式を識別する情報であって、生産計画情報100の製品型式ID102と共通の情報である。製品構成ID112は、製品を構成するユニットなどの構成要素を識別する情報である。構成数113は、製品に含まれる構成要素の数量を示す情報である。
 例えば、図3の製品構成情報110では、製品型式ID「PM01」の製品は、製品構成ID「PC10」のユニット「1(台)」と、製品構成ID「PC11」のユニット「1(台)」と、製品構成ID「PC12」のユニット「2(台)」とから構成されていることを示している。
 図4は、設計パターン情報120の一例を示した図である。設計パターン情報120は、製品を構成するユニットなどの構成要素に適用する設計パターンなどを管理する情報である。具体的には、設計パターン情報120は、製品型式ID121と、製品構成ID122と、設計パターンID123と、適用率124とが対応付けられたレコードを有している。
 製品型式ID121は、製品の型式を識別する情報であって、生産計画情報100の製品型式ID102と共通の情報である。製品構成ID122は、製品を構成するユニットなどの構成要素を識別する情報であって、製品構成情報110の製品構成ID112と共通の情報である。
 設計パターンID123は、製品を構成するユニットなどの構成要素に適用する設計パターンを識別する情報である。例えば、図4のレコードbおよびcに示すように、同じユニットに対して複数の設計パターンが対応付けられている場合がある。これらの設計パターンの違いは、例えば、ユニットに用いるモジュールタイプの違いや、旧製品に適用されている設計パターンと、新製品に適用しようとする設計パターンの違いによるものである。
 適用率124は、ユニットに適用する設計パターンの適用率を示す情報である。適用率124は、例えば、製品に適用されるモジュールタイプを過去のオーダ率から割り出した比率に基づき設定する場合や、将来の生産計画に基づき、旧製品と新製品の生産割合に基づき設定する場合などがある。
 例えば、図4のレコードbおよびcは、製品型式ID「PM01」、製品構成ID「PC10」のユニットに対して適用する設計パターンが「DP10-1」と「DP10-2」の2つあり、各々の適用率が「60%」と「40%」であること示している。
 図5は、設計図面情報130の一例を示した図である。設計図面情報130は、各設計パターンに用いられる部品や手配図面などを管理する情報である。具体的には、設計図面情報130は、設計パターンID131と、図面ID132と、部品ID133と、手配数134とが対応付けられたレコードを有している。
 設計パターンID131は、製品を構成するユニットなどの構成要素に適用する設計パターンを識別する情報であって、設計パターン情報120の設計パターンID123と共通の情報である。図面ID132は、対応する設計パターンに用いられる部品が記載された手配図面を識別する情報である。部品ID133は、部品を識別する情報である。手配数134は、対応する設計パターンに用いられる部品の数量を示す情報である。
 例えば、図5のレコードdは、設計パターンID「DP10-1」の手配図面の図面IDは「D101」であって、かかる図面には部品ID「P001」の手配数が「5(個)」と記載されていることを示している。
 図6は、部品発注情報140の一例を示した図である。部品発注情報140は、各部品の発注ルールなどを管理する情報である。具体的には、部品発注情報140は、部品ID141と、発注方式142と、単価143と、リードタイム144と、ロットサイズ145とが対応付けられたレコードを有している。
 部品ID141は、部品を識別する情報であって、設計図面情報130の部品ID133と共通の情報である。発注方式142は、発注方式を示す情報であって、「個別」と、「定量」と、「定期」とがある。なお、「個別」は、個別の設計や部品手配に応じて小ロットサイズで発注することである。「定量」は、在庫量が所定の水準まで下がった時に一定量を発注することである。「定期」は、一定期間の発注間隔を定めてその都度発注することである。単価143は、部品IDで特定される部品の単価を示す情報である。リードタイム144は、発注から入荷までのリードタイムを示す情報である。ロットサイズ145は、1回の注文で発注する最小単位の発注数量を示す情報である。
 例えば、図6のレコードeは、部品ID「P001」の部品を個別発注する場合、単価は「1(k¥)」で、リードタイムは「5(日)」、ロットサイズは「1(個)」以上であることを示している。また、レコードfは、部品ID「P001」の部品を定量発注する場合、単価は「0.8(k¥)」で、リードタイムは「4(日)」、ロットサイズは「20(個)」以上であることを示している。
 図1に戻って説明する。通信部50は、所定の外部装置と情報通信を行う機能部である。例えば、通信部50は、外部装置から入力情報61に相当する情報を取得すると、これを情報取得部20に出力する。また、例えば、通信部50は、外部装置から出力情報62など所定情報の送信要求を取得すると、対応する所定情報を外部装置に送信する。
 以上、部品発注方式選定装置1の機能構成の一例について説明した。
 図7は、部品発注方式選定装置1のハードウェア構成の一例を示した図である。部品発注方式選定装置1は、例えば、パーソナルコンピュータやワークステーション、サーバ装置などの情報処理装置により実現される。
 図示するように、部品発注方式選定装置1は、入力装置201と、出力装置202と、外部記憶装置203と、演算装置204と、主記憶装置205と、通信装置206と、これらを電気的に相互接続するバス207とを有している。
 入力装置201は、キーボードやマウス、タッチパネルなどのポインティングデバイスあるいは音声入力装置であるマイクなどである。出力装置202は、ディスプレイやプリンタあるいは音声出力装置であるスピーカなどである。
 外部記憶装置203は、デジタル情報を記憶可能ないわゆるハードディスク(Hard Disk Drive)やSSD(Solid State Drive)あるいはフラッシュメモリなどの不揮発性記憶装置である。
 演算装置204は、例えば、CPU(Central Processing Unit)である。主記憶装置205は、RAM(Random Access Memory)やROM(Read Only Memory)などのメモリ装置である。通信装置206は、外部装置との間で情報通信を行うための通信モジュールなどである。
 なお、入力受付部10、情報取得部20、出力処理部30および演算部40は、例えば、演算装置204に処理を行わせるプログラムによって実現される。このプログラムは、主記憶装置205あるいは外部記憶装置203に記憶され、プログラムの実行にあたって主記憶装置205上にロードされ、演算装置204により実行される。また、記憶部60は、主記憶装置205または外部記憶装置203あるいはこれらの組合せにより実現される。また、通信部50は、通信装置206により実現される。
 また、上記の各構成、機能、処理部および処理手段等は、それらの一部または全部を、例えば集積回路で設計する等によりハードウェアで実現しても良い。また、上記構成、機能は、プロセッサがそれぞれの機能を実現するプログラムを解釈し、実行することによりソフトウェアで実現しても良い。各機能を実現するプログラム、テーブル、ファイル等の情報は、メモリやハードディスク、SSD等の記憶装置またはICカード、SDカードおよびDVD等の記録媒体に置くことができる。
 [動作の説明]次に、部品発注方式選定処理について説明する。
 図8は、部品発注方式選定処理の実行指示を受け付けるための指示入力画面250の一例を示した図である。図示するように、指示入力画面250には、処理の対象期間を入力する入力欄251と、部品IDを入力する入力欄252と、処理の実行指示を行う実行ボタン253とが表示されている。出力処理部30は、入力受付部10を介して指示入力画面250の表示要求をユーザから受け付けると、かかる画面情報を生成し、部品発注方式選定装置1の出力装置202などに表示する。入力受付部10は、対象期間あるいは部品IDの少なくとも一方の入力と、実行ボタン253の押下による処理の実行指示を受け付けると、部品発注方式選定処理を開始する。
 図9は、部品発注方式選定処理の一例を示したフロー図である。処理が開始されると、情報取得部20は、記憶部60から入力情報61を取得する(ステップS100)。具体的には、情報取得部20は、生産計画情報100と、製品構成情報110と、設計パターン情報120と、設計図面情報130と、部品発注情報140とを取得する。なお、情報取得部20は、記憶部60から入力情報61を取得せず、例えば、通信部を介して接続されている外部装置から入力情報61を取得しても良い。
 次に、製品設計割付部41は、将来の生産計画に基づき、各製品を構成するユニットに設計パターンを割り付ける(ステップS200)。具体的には、製品設計割付部41は、生産計画情報100の工程名104に「調達」が対応付けられているレコードの受注IDと、製品型式IDと、受注台数と、完了日とを特定する。
 例えば、製品設計割付部41は、図2の生産計画情報100を用いた場合、受注ID「SO01」、「SO02」、「SO03」、「SO04」および「SO05」と、各々の受注IDに対応付けられている製品型式ID「PM01」と、各々の受注IDおよび製品型式IDに対応付けられている受注台数「2(台)」と、各々の完了日「2016/1/30」、「2016/3/1」、「2016/4/1」、「2016/5/1」および「2016/6/1」とを特定する。
 次に、製品設計割付部41は、特定した製品型式IDが対応付けられている製品構成IDを製品構成情報110から特定する。
 例えば、製品設計割付部41は、図3の製品構成情報110を用いた場合、製品型式ID「PM01」が対応付けられている製品構成ID「PC10」、「PC11」および「PC12」を特定する。
 次に、製品設計割付部41は、特定した製品構成IDが対応付けられている設計パターンIDおよび適用率を設計パターン情報120から特定する。
 例えば、図4の設計パターン情報120を用いて製品構成ID「PC10」の設計パターンIDおよび適用率を特定する場合、製品設計割付部41は、製品構成ID「PC10」が対応付けられている設計パターンID「DP10-1」および「DP10-2」と、各々の設計パターンIDに対応付けられている適用率「60%」および「40%」とを特定する。
 次に、製品設計割付部41は、特定した適用率に基づいて、製品構成IDに設計パターンIDを割り付けた製品設計割付情報150を生成する。
 具体的には、製品設計割付部41は、製品構成ID「PC10」を含む製品型式ID「PM01」の受注案件である受注ID「SO01」~「SO05」に対し、適用率が各々「60%」および「40%」となるように設計パターンID「DP10-1」および「DP10-2」をランダムに割り付ける。また、製品設計割付部41は、各受注IDに対し、特定した受注台数と、特定した完了日を調達期限として対応付けて製品設計割付情報150を生成する。すなわち、製品設計割付情報150では、各受注案件の製品構成IDごとに1つの設計パターンIDが対応付けられている。
 図10は、製品設計割付情報150の一例を示した図である。製品設計割付情報150は、受注製品の設計を管理する情報である。具体的には、製品設計割付情報150は、受注ID151と、製品型式ID152と、受注台数153と、製品構成ID154と、設計パターンID155と、調達期限156とが対応付けられたレコードを有している。
 受注ID151は、受注の各々を識別する情報であって、生産計画情報100の受注ID101と共通の情報である。製品型式ID152は、受注した製品の型式を識別する情報であって、生産計画情報100の製品型式ID102と共通の情報である。受注台数153は、受注した製品の生産台数を示す情報であって、生産計画情報100の受注台数103と共通の情報である。製品構成ID154は、製品を構成するユニットなどの構成要素を識別する情報であって、製品構成情報110の製品構成ID112と共通の情報である。設計パターンID155は、製品を構成するユニットなどの構成要素に適用する設計パターンを識別する情報であって、設計パターン情報120の設計パターンID123と共通の情報である。調達期限156は、設計パターンIDにより特定される部品の調達期限を示す情報であって、工程名に「調達」が対応付けられている生産計画情報100の完了日106に対応する情報である。
 例えば、図10のレコードiは、受注IDが「SO01」であって、製品型式ID「PM01」の製品を「2(台)」受注しており、製品構成ID「PC10」のユニットに設計パターンID「DP10-1」を適用し、かかる設計パターンに用いる部品を「2016/1/30」までに調達することを示している。
 図9に戻って説明する。次に、部品構成特定部42は、各部品の発注量および発注金額を算出し、部品発注時期算定部43は、発注および入荷の時期を算定する(ステップS300)。具体的には、部品構成特定部42は、製品設計割付情報150の設計パターンIDが対応付けられた部品IDおよび手配数を設計図面情報130から特定する。また、部品構成特定部42は、各受注案件の受注台数と、これに対応付けられている設計パターンIDとを製品設計割付情報150から特定する。また、部品構成特定部42は、設計パターンIDごとに、特定した受注台数に部品の手配数を掛け合わせることにより、各設計パターンに用いられる部品の発注数量を算出する。
 例えば、図10に示す製品設計割付情報150の受注ID「SO01」について部品の発注数量を算出する場合、部品構成特定部42は、かかる受注IDに対応付けられている設計パターンID「DP10-1」が対応付けられた部品ID「P001」および手配数「5」を設計図面情報130から特定する。また部品構成特定部42は、受注ID「SO01」に対応付けられている受注台数「2(台)」および設計パターンID「DP10-1」を特定する。また、部品構成特定部42は、受注台数「2(台)」に手配数「5(個)」を掛け合わせることにより、かかる設計パターンに用いられる部品の発注数量を10(個)と算出する。
 また、部品構成特定部42は、部品の発注金額を算出する。具体的には、部品構成特定部42は、発注数量を算出した部品の部品IDが対応付けられ、発注方式が「個別」であるレコードの単価を部品発注情報140から特定する。また、部品構成特定部42は、算出した発注数量に特定した単価を掛け合わせることにより、発注金額を算出する。
 例えば、発注数量が「10(個)」である部品ID「P001」の発注金額を算出する場合、部品構成特定部42は、かかる部品IDが対応付けられ、かつ、発注方式が「個別」であるレコードの単価「1(k¥)」を部品発注情報140から特定する。また、部品構成特定部42は、発注数量「10(個)」に単価「1(k¥)」を掛け合わせることにより、発注金額「10(k¥)」を算出する。
 次に、部品発注時期算定部43は、発注および入荷の時期を算定する。具体的には、部品発注時期算定部43は、発注数量を算出した部品IDが対応付けられ、発注方式が「個別」であるレコードのリードタイムを部品発注情報140から特定する。また、部品発注時期算定部43は、かかる部品IDの調達期限を製品設計割付情報150から特定し、調達期限からリードタイムを引いた日付を発注日として算定する。また、部品発注時期算定部43は、かかる調達期限の日付を入荷日として算定する。
 なお、発注方式には、上述の「個別」以外に「定量」や「定期」などがある。部品構成特定部42および部品発注時期算定部43は、「定量」や「定期」の発注方式における発注数量、発注金額、発注日および入荷日などを求める場合、例えば、MRP(Material Requirement Planning:資材所要量計画)といった所定の方法を用いれば良い。
 また、部品発注時期算定部43は、部品IDごとに注文IDを付与し、発注方式と、発注数量、発注金額、発注日および入荷日を対応付けた部品発注時期算定情報160を生成する。
 例えば、図10に示す製品設計割付情報150の受注ID「SO01」について部品の発注および入荷時期を算定する場合、部品発注時期算定部43は、発注数量を算出した部品ID「P001」が対応付けられ、発注方式が「個別」であるレコードのリードタイム「5(日)」を部品発注情報140から特定する。また、部品発注時期算定部43は、かかる部品IDの調達期限「2016/1/30」を製品設計割付情報150から特定し、かかる調達期限から「5(日)」を引いた日付「2016/1/25」を発注日として算定する。また、部品発注時期算定部43は、調達期限である「2016/1/30」を入荷日として算定する。また、部品発注時期算定部43は、部品ID「P001」に所定の注文IDを対応付け、発注方式(この場合「個別」)と、発注数量「10(個)」と、発注金額「10(k¥)」と、発注日「2016/1/25」と、入荷日「2016/1/30」とを対応付けた部品発注時期算定情報160を生成する。
 図11は、部品発注時期算定情報160の一例を示した図である。部品発注時期算定情報160は、部品の発注数量や発注時期を管理する情報である。具体的には、部品発注時期算定情報160は、部品ID161と、発注方式162と、注文ID163と、発注日164と、入荷日165と、発注数量166と、発注金額167とが対応付けられたレコードを有している。
 部品ID161は、部品を識別する情報であって、設計図面情報130の部品ID133と共通の情報である。発注方式162は、部品の発注方式を示す情報であって、部品発注情報140の発注方式142と共通の情報である。注文ID163は、部品の注文を識別する情報であって、部品IDごとに共通のIDが用いられる。発注日164は、部品の発注日を示す情報である。入荷日165は、部品の入荷日を示す情報である。発注数量166は、部品の発注数量を示す情報である。発注金額167は、部品の発注金額を示す情報である。
 例えば、図11のレコードjは、注文ID「PO01」の注文であって、部品ID「P001」の部品を「個別」の発注方式で「2016/1/25」に「10(個)」発注し、発注金額は「10(k¥)」であって、「2016/1/30」に入荷することを示している。
 図9に戻って説明する。次に、発注方式評価部46は、調達コストおよび在庫金額の比率を部品ごとに評価して、発注方式選定の優先順位を特定する(ステップS400)。評価にあたり、調達コスト算出部44は、調達コスト推移情報170を生成する。具体的には、調達コスト算出部44は、部品発注時期算定情報160から部品IDと、発注方式と、注文IDと、入荷日と、発注数量と、発注金額とを抽出し、これらを対応付けた調達コスト推移情報170を生成する。
 図12は、調達コスト推移情報170の一例を示した図である。調達コスト推移情報170は、部品の入荷日を基準に発生する調達コストの推移を示した情報である。具体的には、調達コスト推移情報170は、部品ID171と、発注方式172と、注文ID173と、入荷日174と、発注数量175と、発注金額176とが対応付けられたレコードを有している。
 部品ID171は、部品を識別する情報であって、設計図面情報130の部品ID133と共通の情報である。発注方式172は、部品の発注方式を示す情報であって、部品発注情報140の発注方式142と共通の情報である。注文ID173は、部品の注文を識別する情報であって、部品IDごとに共通のIDが用いられる。入荷日174は、部品の入荷日を示す情報である。発注数量175は、部品の発注数量を示す情報である。発注金額176は、部品の発注金額を示す情報である。
 例えば、図12のレコードkは、注文ID「PO01」の注文であって、部品ID「P001」の部品を「個別」の発注方式で「10(個)」注文し、発注金額は「10(k¥)」であって、「2016/1/30」に入荷することを示している。
 また、上述の評価にあたり、在庫金額算出部45は、部品在庫推移情報180を生成する。具体的には、在庫金額算出部45は、生産計画情報100の工程名が「調達」であるレコードの受注IDおよび製品型式IDが対応付けられた製品設計割付情報150のレコードから製品構成IDごとに設計パターンIDを特定する。また、在庫金額算出部45は、かかる設計パターンIDが対応付けられた部品IDを設計図面情報130から特定する。また、在庫金額算出部45は、特定した部品IDが対応付けられている単価を発注方式別に部品発注情報140から特定する。また、在庫金額算出部45は、部品発注時期算定情報160を用いて、特定した部品IDが対応付けられているレコードから発注方式と、入荷日と、発注数量とを特定する。
 また、在庫金額算出部45は、特定した部品IDと、その発注方式と、入出荷区分(この場合、入荷)と、入出荷日(この場合、特定した入荷日の日付)と、入出荷数量(この場合、特定した発注数量)と、在庫数(特定した発注数量に元の在庫数を足し合わせた数量)と、在庫金額(対応する発注方式の単価に在庫数を掛け合わせた金額)とを対応付けた部品在庫推移情報180を生成する。
 また、在庫金額算出部45は、生産計画情報100の工程名が「出荷」であるレコードの受注台数および完了日を特定する。また、在庫金額算出部45は、かかるレコードの受注IDおよび製品型式IDが対応付けられた製品設計割付情報150のレコードから製品構成IDごとに設計パターンIDを特定する。また、在庫金額算出部45は、かかる設計パターンIDが対応付けられたレコードの部品IDおよび手配数を設計図面情報130から特定する。また、在庫金額算出部45は、特定した部品IDが対応付けられている単価を発注方式別に部品発注情報140から特定する。
 また、在庫金額算出部45は、特定した部品IDと、その発注方式と、入出荷区分(この場合、出荷)と、入出荷日(この場合、特定した完了日の日付)と、入出荷数量(この場合、特定した受注台数に手配数を掛け合わせた出荷の数量)と、在庫数(元の在庫数から出荷の数量を減算した数量)と、在庫金額(対応する発注方式の単価に在庫数を掛け合わせた金額)とを対応付けたレコードを部品在庫推移情報180に生成する。
 図13は、部品在庫推移情報180の一例を示した図である。部品在庫推移情報180は、部品在庫の推移を示した情報である。上述の通り、部品在庫推移情報180は、部品ID181と、発注方式182と、入出荷区分183と、入出荷日184と、入出荷数量185と、在庫数186と、在庫金額187とが対応付けられたレコードを有している。
 部品ID181は、部品を識別する情報であって、設計図面情報130の部品ID133と共通の情報である。発注方式182は、部品の発注方式を示す情報であって、部品発注情報140の発注方式142と共通の情報である。入出荷区分183は、部品の入荷または出荷のいずれかを示す情報である。入出荷日184は、部品の入荷または出荷の日付を示す情報である。入出荷数量185は、部品の入荷数または出荷数のいずれかを示す情報である。在庫数186は、在庫の数を示す情報である。在庫金額187は、在庫部品の総単価すなわち対応する発注方式の単価を在庫数に掛け合わせた金額を示す情報である。
 例えば、図13のレコードlは、「入荷」の区分を示したレコードであって、「個別」の発注方式で発注した部品ID「P001」の部品が「2016/1/30」に「10(個)」入荷して在庫数が「10(個)」となり、その在庫金額が「10(k¥)」であることを示している。
 また、図13のレコードmは、「出荷」の区分を示したレコードであって、「個別」の発注方式で発注した部品ID「P001」の部品を「10(個)」使用して生産した製品の出荷日が「2016/3/3」であり、かかる出荷日に在庫数および在庫金額が各々「0(個)」および「0(k¥)」になることを示している。
 また、発注方式評価部46は、調達コストと在庫金額との関係を部品ごとに評価する。かかる評価にあたり、調達コスト算出部44は、調達コスト推移情報170を用いて調達コストを算出する。また、在庫金額算出部45は、部品在庫推移情報180を用いて在庫金額を算出する。調達コストおよび在庫金額の算出については後述する。
 発注方式評価部46は、以下の式(1)を用いて、調達コストと在庫金額との関係を部品ごとに評価した評価係数を算出する。
Figure JPOXMLDOC01-appb-M000001
 式(1)において、添字jは、部品IDを示している。また、Cjaは、「個別」の発注方式による発注金額と、「定量」の発注方式による発注金額とを合算した調達コストを示している。また、Cjbは、「定量」の発注方式による発注金額と、「個別」の発注方式を「定量」の発注方式に切り替えた場合の発注金額とを合算した調達コストを示している。また、Ijaは、「個別」の発注方式による在庫金額と、「定量」の発注方式による在庫金額とを合算した在庫金額を示している。また、Ijbは、「定量」の発注方式による在庫金額と、「個別」の発注方式を「定量」の発注方式に切り替えた場合の在庫金額とを合算した在庫金額を示している。また、Eは、評価係数を示している。以下、Cja、Cjb、IjaおよびIjbの算出方法について説明する。
 調達コスト算出部44は、調達コスト推移情報170の「個別」の発注方式による発注金額と、「定量」の発注方式による発注金額とを合算することにより調達コストCjaを算出する。例えば、図12の調達コスト推移情報170を用いた場合、部品ID「P001」の調達コストCjaは、「個別」の発注方式による発注金額「10(k¥)」と、「定量」の発注方式による発注金額「16(k¥)」とを合計した金額「26(k¥)」となる。なお、「個別」や「定量」の発注方式による発注が各々複数ある場合、これらの発注金額を合算することによりCjaを算出することができる。
 また、調達コスト算出部44は、調達コスト推移情報170の「個別」の発注方式が対応付けられている発注数量を「定量」の発注方式で発注する場合の最小ロットサイズに、発注方式が「定量」の単価を掛け合わせて算出した発注金額と、調達コスト推移情報170の「定量」の発注方式による発注金額とを合算して調達コストCjbを算出する。例えば、図12の調達コスト推移情報170を用いた場合、部品ID「P001」の調達コストCjbは、「個別」の発注方式が対応付けられている発注数量「10(個)」を「定量」の発注方式で発注する場合の最小ロットサイズ「20(個)」に、発注方式が「定量」の単価「0.8(k¥)」を掛け合わせて算出した発注金額「8(k¥)」と、調達コスト推移情報170の「定量」の発注方式の発注金額「16(k¥)」とを合算した「24(k¥)」となる。なお、例えば、「個別」や「定量」の発注方式による発注が各々複数ある場合、「個別」の発注方式による発注金額を上述と同様に「定量」の発注方式による発注金額に変換し、これらの発注金額を合算することによりCjbを算出することができる。
 在庫金額算出部45は、部品在庫推移情報180の「個別」の発注方式による在庫金額の期間平均と、「定量」の発注方式による在庫金額の期間平均とを合算することにより在庫金額Ijaを算出する。例えば、在庫金額の月単位の期間平均を求める場合、部品別、発注方式別に各月の月末日(または月始日)における在庫金額を合算し、それを月数で割ることにより部品別、発注方式別の在庫金額の期間平均を算出できる。また、在庫金額の日単位の期間平均を求める場合、部品別、発注方式別に入荷時の在庫金額と出荷時の在庫金額とを合算し、それを入出荷があった日数で割ることにより部品別、発注方式別の在庫金額の期間平均を算出できる。
 また、在庫金額算出部45は、部品在庫推移情報180の「定量」の発注方式による在庫金額の期間平均と、「個別」の発注方式が対応付けられている在庫金額の期間平均を「定量」の発注方式による在庫金額に変換した場合の期間平均とを合算することにより在庫金額Ijbを算出する。なお、「定量」の発注方式による部品単価は、「個別」の発注方式による部品単価に比べて安くなるが、最小ロットサイズが増加するため、通常、Ijbは、Ijaから増加する場合が多い。
 発注方式評価部46は、このようにして算出された調達コストCja、Cjbおよび在庫金額Ija、Ijbを式(1)に適用することにより、評価係数Eを算出する。これにより、発注方式を「個別」から「定量」に変更した場合の調達コストの低減効果と在庫金額の増加分の比率を評価することができる。つまり、Eの値が大きい程、在庫金額の増加に対する調達コストの低減効果が大きく、発注方式切り替えの優先順位が高いことを示している。
 また、発注方式評価部46は、部品ごとの評価結果を含む発注別評価情報190を生成する。
 図14は、発注別評価情報190の一例を示した図である。発注別評価情報190は、各部品の評価結果を含む情報である。具体的には、発注別評価情報190は、部品ID191、方式A調達コスト192と、方式A在庫金額193と、方式B調達コスト194と、方式B在庫金額195と、評価結果196とが対応付けられたレコードを有している。
 部品ID191は、部品を識別する情報であって、設計図面情報130の部品ID133と共通の情報である。方式A調達コスト192は、「個別」および「定量」の発注方式による発注金額の和(すなわち、Cja)を示す情報である。方式A在庫金額193は、「個別」および「定量」の発注方式による在庫金額の和(すなわち、Ija)を示す情報である。方式B調達コスト194は、「定量」の発注方式による発注金額と、「個別」の発注方式を「定量」の発注方式に切り替えた場合の発注金額との和(すなわち、Cjb)を示す情報である。方式B在庫金額195は、「定量」の発注方式による在庫金額と、「個別」の発注方式を「定量」の発注方式に切り替えた場合の在庫金額との和(すなわち、Ijb)を示す情報である。評価結果196は、調達コストと在庫金額との関係を評価した評価係数(すなわち、E)を示す情報である。
 例えば、図14のレコードnは、部品ID「P001」の部品について、「個別」および「定量」の発注方式による発注金額および在庫金額の和が各々「100(k¥)」と「10(k¥)」であり、「個別」の発注方式を「定量」の発注方式に切り替えた場合の発注金額および在庫金額の和が各々「90(k¥)」と「110(k¥)」であって、その評価係数が「0.1」であることを示している。
 図9に戻って説明する。次に、出力処理部30は、発注別評価情報190を用いて発注別評価結果および在庫推移を示す画面情報を生成する。また、出力処理部30は、生成した画面情報を出力装置202などに表示する(ステップS500)。
 図15は、発注別評価結果および部品別の在庫推移を示した画面例300である。かかる画面例300は、評価結果表示領域310と、在庫推移表示領域330とを有している。また、評価結果表示領域310は、評価の対象期間を示す期間311と、評価結果を示す結果表示テーブル312とを有している。期間は、図8の入力画面を介して受け付けた評価の対象期間である。結果表示テーブル312は、部品ID313と、個別発注314、定量発注315および低減効果316を含む調達コスト317と、個別発注318、定量発注319および増加分320を含む在庫金額の期間平均321と、比率322とが対応付けられたレコードを有している。
 部品ID313は、部品を識別する情報であって、設計図面情報130の部品ID133と共通の情報である。調達コストの個別発注314は、「個別」の発注方式による発注金額と、「定量」の発注方式による発注金額との和(すなわち、Cja)を示す情報である。調達コストの定量発注315は、「定量」の発注方式による発注金額と、「個別」の発注方式を「定量」の発注方式に切り替えた場合の発注金額との和(すなわち、Cjb)を示す情報である。低減効果316は、調達コストの個別発注から定量発注を引いた値であって、発注方式を「個別」から「定量」に切り替えた場合の調達コストの低減効果を示す情報である。
 また、在庫金額の個別発注318は、「個別」の発注方式による在庫金額および「定量」の発注方式による在庫金額の和(すなわち、Ija)を示す情報である。在庫金額の定量発注319は、「定量」の発注方式による在庫金額と、「個別」の発注方式を「定量」の発注方式に切り替えた場合の在庫金額との和(すなわち、Ijb)を示す情報である。比率322は、調達コストと在庫金額との関係を部品ごとに評価した評価係数(すなわち、E)を示す情報である。
 なお、調達コストの低減効果316、在庫金額の増加分320および比率322は各々、プルダウンボックスの押下によりプルダウンメニューを表示させ、フィルターまたはソートを行うことが可能である。これにより、例えば、一定金額以上の調達コストの低減効果が見込めない部品、在庫の増加分が一定金額を超える部品および在庫金額の増加分に対する調達コストの低減効果が小さい部品を表示の対象外としたり、低減効果が大きい部品の順に並べ替えることができる。
 また、在庫推移表示領域330は、部品ID331と、表示ボタン332と、在庫推移グラフ333とを有している。部品ID331のプルダウンボックスを押下してプルダウンメニューを表示させ、所定の部品IDを選択した上で表示ボタン332を押下すると、かかる部品の在庫推移グラフ333が表示される。在庫推移グラフ333は、縦軸が在庫金額を表し、横軸が各月を表している。また、破線のグラフが「個別」の発注方式による在庫金額および「定量」の発注方式による在庫金額の和(すなわち、Ija)を表している。また、実線が「定量」の発注方式による在庫金額と、「個別」の発注方式を「定量」の発注方式に切り替えた場合の在庫金額との和(すなわち、Ijb)を表している。このように、在庫推移グラフは、部品ID別の時系列の在庫推移を発注方式別に可視化している。これにより、発注方式を切り替えた際の在庫のピーク時期などを先手管理することができる。
 以上、本実施形態に係る部品発注方式選定装置1について説明した。このような部品発注方式選定装置1によれば、将来の生産計画に基づいて、部品の調達コストと在庫金額との関係を評価し、より適切な発注方式を選定することができる。
 なお、本発明は、上記実施形態に限られるものではなく、様々な変形例が可能である。例えば、上記実施形態では、所定の適用率に応じて各製品のユニットに設計パターンをランダムに割り付けたが、上述の通り、旧製品に適用されている設計パターンと、新製品に適用しようとする設計パターンとがある場合、各設計パターンの新旧を表すレビジョン情報を設計図面情報130に対応付け、所定の適用率に応じて、直近に生産する予定の製品の構成要素から順にレビジョンの古い設計パターンを優先的に割り付けるようにしても良い。これにより、レビジョンの古い設計パターンから順次、新しい設計パターンに移行する場合の部品別、発注方式別の調達コストおよび在庫金額の関係を評価することができる。
 また、上記実施形態における部品在庫の推移は、部品の入荷日と、部品を使用した製品の出荷日とを基準としたが、在庫金額算出部45は、出荷日の基準に代えて、部品を倉庫から出庫(生産の開始)する出庫日を基準とし、倉庫での在庫管理に関わる部品重量やサイズ、保管コストを在庫金額に代わる評価指標としても良い。この場合、例えば、部品発注情報140は、部品別の保管コストに関する情報を有していれば良い。これにより、一般に、大型部品や特殊部品などで在庫管理コストが大きくなる個別受注設計品の生産において、倉庫での管理コストを加味した部品の発注方式を選定することができる。
 なお、本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。例えば、上記した実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、また、ある実施例の構成に他の実施例の構成を加えることも可能である。また、各実施例の構成の一部について、他の構成の追加、削除、置換をすることが可能である。
 また、上記説明では、制御線や情報線は、説明上必要と考えられるものを示しており、製品上必ずしも全ての制御線や情報線を示しているとは限らない。実際には殆ど全ての構成が相互に接続されていると考えて良い。
1・・・部品発注方式選定装置、10・・・入力受付部、20・・・情報取得部、30・・・出力処理部、40・・・演算部、41・・・製品設計割付部、42・・・部品構成特定部、43・・・部品発注時期算定部、44・・・調達コスト算出部、45・・・在庫金額算出部、46・・・発注方式評価部、50・・・通信部、60・・・記憶部、61・・・入力情報、62・・・出力情報、100・・・生産計画情報、110・・・製品構成情報、120・・・設計パターン情報、130・・・設計図面情報、140・・・部品発注情報、150・・・製品設計割付情報、160・・・部品発注時期算定情報、170・・・調達コスト推移情報、180・・・部品在庫推移情報、190・・・発注別評価情報、201・・・入力装置、202・・・出力装置、203・・・外部記憶装置、204・・・演算装置、205・・・主記憶装置、206・・・通信装置

Claims (9)

  1.  将来の設計計画に基づく所定の適用率で製品構成要素に所定の設計パターンを割り付ける製品設計割付部と、
     前記製品構成要素に用いられる部品の調達コストを発注方式別に算出する調達コスト算出部と、
     前記部品の在庫金額を発注方式別に算出する在庫金額算出部と、
     前記調達コストおよび前記在庫金額の比率を評価する発注方式評価部と、を備える
    ことを特徴とする部品発注方式選定装置。
  2.  請求項1に記載の部品発注方式選定装置であって、
     前記設計パターンには、旧製品の前記製品構成要素に適用されている第1の設計パターンと、新製品の前記製品構成要素に適用しようとする第2の設計パターンとがあり、
     前記製品設計割付部は、
     前記第1の設計パターンおよび前記第2の設計パターンを、将来の生産計画に基づく所定の適用率で前記製品構成要素に割り付ける
    ことを特徴とする部品発注方式選定装置。
  3.  請求項2に記載の部品発注方式選定装置であって、
     前記発注方式評価部は、
     個別の発注方式から定量の発注方式に変更した場合の調達コストの低減分と在庫金額の増加分との比率を算出する
    ことを特徴とする部品発注方式選定装置。
  4.  請求項3に記載の部品発注方式選定装置であって、
     前記調達コスト算出部は、
     個別の発注方式による発注金額と、定量の発注方式による発注金額とを合算した調達コストから、定量の発注方式による発注金額と、個別の発注方式を定量の発注方式に切り替えた場合の発注金額とを合算した調達コストを引くことにより、前記調達コストの低減分を算出する
    ことを特徴とする部品発注方式選定装置。
  5.  請求項3に記載の部品発注方式選定装置であって、
     前記在庫金額算出部は、
     個別の発注方式による在庫金額と、定量の発注方式による在庫金額とを合算した在庫金額を、定量の発注方式による在庫金額と、個別の発注方式を定量の発注方式に切り替えた場合の在庫金額とを合算した在庫金額から引くことにより、前記在庫金額の増加分を算出する
    ことを特徴とする部品発注方式選定装置。
  6.  請求項2に記載の部品発注方式選定装置であって、
     前記設計パターンは、設計の新旧を表すレビジョン情報を有し、
     前記製品設計割付部は、
     所定の適用率に応じて、直近に生産する予定の製品の構成要素から順に前記レビジョン情報の古い前記第1の設計パターンを優先的に割り付ける
    ことを特徴とする部品発注方式選定装置。
  7.  請求項1に記載の部品発注方式選定装置であって、
     前記在庫金額算出部は、
     前記在庫金額に代えて、部品の入荷から、部品を倉庫から出庫するまでにかかる保管コストを発注方式別に算出し、
     前記発注方式評価部は、
     前記調達コストおよび前記保管コストの比率を評価する
    ことを特徴とする部品発注方式選定装置。
  8.  部品発注方式選定装置が行う部品発注方式選定方法であって、
     将来の設計計画に基づく所定の適用率で製品構成要素に所定の設計パターンを割り付ける製品設計割付ステップと、
     前記製品構成要素に用いられる部品の調達コストを発注方式別に算出する調達コスト算出ステップと、
     前記部品の在庫金額を発注方式別に算出する在庫金額算出ステップと、
     前記調達コストおよび前記在庫金額の比率を評価する発注方式評価ステップと、を有する
    ことを特徴とする部品発注方式選定方法。
  9.  コンピュータを、部品発注方式選定装置として機能させるプログラムであって、
     前記コンピュータを、
     将来の設計計画に基づく所定の適用率で製品構成要素に所定の設計パターンを割り付ける製品設計割付部と、
     前記製品構成要素に用いられる部品の調達コストを発注方式別に算出する調達コスト算出部と、
     前記部品の在庫金額を発注方式別に算出する在庫金額算出部と、
     前記調達コストおよび前記在庫金額の比率を評価する発注方式評価部として機能させる
    ことを特徴とするプログラム。
PCT/JP2017/034626 2016-10-12 2017-09-26 部品発注方式選定装置、部品発注方式選定方法およびプログラム WO2018070234A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US16/335,286 US20200020003A1 (en) 2016-10-12 2017-09-26 Component ordering mode selection device, component ordering mode selection method, and program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2016200626A JP6744191B2 (ja) 2016-10-12 2016-10-12 部品発注方式選定装置、部品発注方式選定方法およびプログラム
JP2016-200626 2016-10-12

Publications (1)

Publication Number Publication Date
WO2018070234A1 true WO2018070234A1 (ja) 2018-04-19

Family

ID=61905326

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2017/034626 WO2018070234A1 (ja) 2016-10-12 2017-09-26 部品発注方式選定装置、部品発注方式選定方法およびプログラム

Country Status (3)

Country Link
US (1) US20200020003A1 (ja)
JP (1) JP6744191B2 (ja)
WO (1) WO2018070234A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001253512A (ja) * 2000-03-14 2001-09-18 Rinku:Kk 在庫管理システムとその在庫管理方法及び在庫管理用プログラムを記録した記録媒体
WO2004027532A1 (ja) * 2002-09-19 2004-04-01 Honda Giken Kogyo Kabushiki Kaisha 部品発注量算出装置
JP2010262539A (ja) * 2009-05-08 2010-11-18 Hitachi Ltd 業務支援システム、業務支援プログラムおよび記録媒体
JP2016099739A (ja) * 2014-11-19 2016-05-30 富士通株式会社 発注量決定装置、発注量決定方法および発注量決定プログラム

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8032406B2 (en) * 2005-07-28 2011-10-04 Sap Ag System and method of assortment, space, and price optimization in retail store
US20170140405A1 (en) * 2012-03-01 2017-05-18 o9 Solutions, Inc. Global market modeling for advanced market intelligence
WO2015027196A1 (en) * 2013-08-22 2015-02-26 Bespoke, Inc. Method and system to create custom products
JP6457745B2 (ja) * 2014-05-26 2019-01-23 株式会社日立製作所 地域間供給調整装置およびプログラム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001253512A (ja) * 2000-03-14 2001-09-18 Rinku:Kk 在庫管理システムとその在庫管理方法及び在庫管理用プログラムを記録した記録媒体
WO2004027532A1 (ja) * 2002-09-19 2004-04-01 Honda Giken Kogyo Kabushiki Kaisha 部品発注量算出装置
JP2010262539A (ja) * 2009-05-08 2010-11-18 Hitachi Ltd 業務支援システム、業務支援プログラムおよび記録媒体
JP2016099739A (ja) * 2014-11-19 2016-05-30 富士通株式会社 発注量決定装置、発注量決定方法および発注量決定プログラム

Also Published As

Publication number Publication date
US20200020003A1 (en) 2020-01-16
JP2018063511A (ja) 2018-04-19
JP6744191B2 (ja) 2020-08-19

Similar Documents

Publication Publication Date Title
WO2004022463A1 (ja) 安全在庫量算出方法、安全在庫量算出装置、発注点算出方法、発注点算出装置及び発注量算出方法
JP4847030B2 (ja) 受発注システム及び受発注方法
WO2018150646A1 (ja) 連結経営管理装置、連結経営管理支援システム、連結経営管理支援方法及びプログラム
Yang et al. A model to create an efficient and equitable admission policy for patients arriving to the cardiothoracic ICU
TW202203102A (zh) 用於分配快遞員之電子設備及其操作方法
Chhaochhria et al. A forecast-driven tactical planning model for a serial manufacturing system
JP2021005186A (ja) サプライチェーン設計システム及びサプライチェーン設計方法
JP6612114B2 (ja) 部品発注制御装置および部品発注制御方法
Koh MRP-controlled batch-manufacturing environment under uncertainty
WO2010018709A1 (ja) 生産計画立案プログラム、装置及び方法
WO2018070234A1 (ja) 部品発注方式選定装置、部品発注方式選定方法およびプログラム
JP5487699B2 (ja) 在庫管理装置、在庫管理方法及びそのプログラム
JP2016194900A (ja) 生産計画自動立案装置、生産計画自動立案方法、及び、生産計画自動立案プログラム
Sato et al. Agile production planning and control with advance notification to change schedule
Sawik Multi-objective due-date setting in a make-to-order environment
JP7226117B2 (ja) 受注入力装置、受注入力方法及び受注入力プログラム
JP7063781B2 (ja) 並列分散処理制御システム、プログラム、及び並列分散処理制御方法
JP5678729B2 (ja) 情報処理装置、作業重視度算出方法、および作業重視度算出プログラム
JP6951080B2 (ja) 発注業務支援装置、発注業務支援方法および発注業務支援プログラム
JP4460329B2 (ja) 部品供給システムおよび部品供給方法
JP7392070B1 (ja) 計画立案支援装置、計画立案支援方法、および計画立案支援プログラム
JP6016657B2 (ja) データ処理装置及びプログラム
JP2020004196A (ja) 業務関連情報管理支援装置、業務関連情報管理支援方法および業務関連情報管理支援プログラム
JP6526896B1 (ja) 株主優待システムおよび株主優待方法
JP5037449B2 (ja) 生産計画支援装置、生産計画支援プログラム、生産計画支援方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17859450

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17859450

Country of ref document: EP

Kind code of ref document: A1