WO2016104402A1 - サーバ、ユーザ端末、及びプログラム - Google Patents

サーバ、ユーザ端末、及びプログラム Download PDF

Info

Publication number
WO2016104402A1
WO2016104402A1 PCT/JP2015/085634 JP2015085634W WO2016104402A1 WO 2016104402 A1 WO2016104402 A1 WO 2016104402A1 JP 2015085634 W JP2015085634 W JP 2015085634W WO 2016104402 A1 WO2016104402 A1 WO 2016104402A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
smart meter
server
user terminal
power reduction
Prior art date
Application number
PCT/JP2015/085634
Other languages
English (en)
French (fr)
Inventor
三浩 北地
Original Assignee
京セラ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 京セラ株式会社 filed Critical 京セラ株式会社
Priority to JP2016566333A priority Critical patent/JP6343030B2/ja
Priority to US15/537,554 priority patent/US10365623B2/en
Priority to EP15872970.7A priority patent/EP3240140A4/en
Publication of WO2016104402A1 publication Critical patent/WO2016104402A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • H02J3/144Demand-response operation of the power transmission or distribution network
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2639Energy management, use maximum of cheap power, keep peak load low
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/50The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
    • H02J2310/56The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads characterised by the condition upon which the selective controlling is based
    • H02J2310/58The condition being electrical
    • H02J2310/60Limiting power consumption in the network or in one section of the network, e.g. load shedding or peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention relates to a server, a user terminal, and a program used in a power control system.
  • EMS Energy Management System
  • demand response (DR: Demand Response) is attracting attention as a method of power control.
  • the demand response is “changing a power consumption pattern so that a consumer (user) suppresses the use of power according to a request from a power supplier”.
  • the management device reduces power consumption during the time period specified in the power reduction request from the power supplier server managed by the power company. According to the contribution of this reduction in power consumption, the consumer can acquire an incentive (for example, Patent Document 1).
  • a first feature is a server, a notification unit that notifies a user terminal of a consumer of a power reduction request, and smart meter information that is notified from the user terminal when the consumer responds to the power reduction request
  • the smart meter information is information related to a smart meter of a customer facility that is a target of power reduction
  • the control unit is configured to use the customer facility based on the smart meter information.
  • the gist is to determine the actual power of reduction.
  • the second feature is a user terminal of a consumer, and when the consumer responds to a power reduction request from a server, control for acquiring smart meter information related to a smart meter of a consumer facility targeted for power reduction
  • the control unit is configured to notify the server of the smart meter information.
  • a third feature is a program, in which smart meter information related to a smart meter of a consumer facility targeted for power reduction is transmitted to a user terminal of the consumer when the consumer responds to a power reduction request from a server.
  • the gist is to execute a procedure to acquire and a procedure to notify the server of the smart meter information.
  • FIG. 1 is a system configuration diagram according to the first embodiment.
  • FIG. 2 is a block diagram of the user terminal according to the first embodiment.
  • FIG. 3 is a block diagram of the power management server according to the first embodiment.
  • FIG. 4 is a block diagram of the power supplier server according to the first embodiment.
  • FIG. 5 is a sequence diagram according to the first embodiment (operation example 1).
  • FIG. 6 is a sequence diagram according to the first embodiment (operation example 2).
  • FIG. 7 is a diagram showing a display screen of the user terminal.
  • FIG. 8 is a system configuration diagram according to the second embodiment.
  • FIG. 9 is a sequence diagram according to the second embodiment.
  • FIG. 10 is a system configuration diagram according to the third embodiment.
  • FIG. 11 is a sequence diagram according to the third embodiment.
  • FIG. 1 is a system configuration diagram according to the first embodiment.
  • the system includes a power supplier server 100, an aggregator server 110, a power management server (user terminal management server) 120, a user terminal 130, a smart meter 140, A home NW 150 and a device 160 are included. Smart meter 140, home NW 150, and device 160 are installed in customer facility 170.
  • the customer facility 170 is a facility that receives power supply from a power supply company.
  • the customer facility 170 is, for example, a house or a building. In the first embodiment, an example in which the customer facility 170 is a house will be described.
  • the power supplier server 100, the aggregator server 110, the power management server 120, and the user terminal 130 are connected via, for example, an outside NW.
  • the power supplier server 100 and the smart meter 140 are also connected via an outside NW.
  • the outside NW is the Internet, a private network, a dedicated line, or the like.
  • Smart meter 140 and device 160 are connected via home NW 150.
  • the home NW 150 is a wired LAN or a wireless LAN.
  • the in-home NW 150 is used by the smart meter 140 to acquire power used by the device 160 used in the customer facility 170.
  • a smart meter 140 and a device 160 are connected to the home NW 150.
  • the power supplier server 100 transmits a power control request message including a power control request time zone to the user terminal 130.
  • the “power control request” includes two concepts of a power reduction request for reducing the power usage and a power usage request for increasing the power usage.
  • an example of a power control request is a power reduction request for reducing the power usage.
  • requires what the minimum amount of electric power usage is requested
  • the power supplier server 100 transmits a power reduction request message including a power reduction request time zone to the user terminal 130.
  • the user terminal 130 acquires the power usage from the smart meter 140 and notifies the power supplier server 100 of the acquired power usage as the first power usage.
  • the power supplier server 100 acquires the used power as the second used power from the smart meter 140 in the power reduction request time zone, and calculates the actual power of reduction from the first used power and the second used power.
  • the power reduction request time zone is a time zone in which the power supplier requests the customer to reduce the power used.
  • the power supplier designates a time zone in which the demand for power increases in the afternoon of midsummer days and the power supply amount is expected to be tight as the power reduction request time zone.
  • the power supplier server 100 is a server managed by a power supplier such as an electric power company.
  • the power supplier server 100 measures the power used by the customer facility 170 from the smart meter 140 and makes a power reduction request to the user terminal 130. Further, the power management server 120 is notified of the power consumption reduced in the customer facility 170 (hereinafter referred to as “reduced performance power”).
  • the aggregator server 110 is a server installed by an aggregator that collects electric power used in a predetermined area.
  • the predetermined area is an area where the aggregator provides services, and an area such as a prefecture or a municipality is assumed.
  • the power supplier server 100 makes a power reduction request without going through the aggregator server 110, the aggregator server 110 is unnecessary.
  • the power management server 120 is assumed to be operated by an operator of a predetermined service facility such as a convenience store or a shopping mall.
  • the power management server 120 manages member information of consumers who use the user terminal 130.
  • the power management server 120 holds information necessary for transmitting a power reduction request message to the user terminal 130 such as a mail address of the user terminal 130.
  • the power management server 120 gives the user terminal 130 an incentive according to the reduction actual power.
  • An incentive is, for example, a monetary incentive or a non-monetary incentive. More specifically, the incentive is, for example, a point that can be used at a facility operated by the operator of the power management server 120, or a discount when purchasing a product.
  • the user terminal 130 notifies the power supplier server 100 of the used power acquired from the smart meter 140.
  • the user terminal 130 acquires the incentive or the content of the incentive from the power management server 120.
  • the user terminal 130 may be a terminal that can communicate with the power management server 120 as well as a HEMS (Home Energy Management System) terminal installed in the customer facility 170.
  • a user terminal 130 for example, it is assumed that a terminal carried by a consumer (user) such as a smartphone, a mobile phone, a personal computer, a tablet, or a wearable terminal is used as the user terminal 130.
  • a customer carries a terminal, it is not limited to going out, and includes cases where the user is in a customer facility.
  • the user terminal 130 and the power management server 120 communicate with each other using, for example, a public general line.
  • the smart meter 140 measures the power used by the device 160 connected via the home NW 150. In addition, the smart meter 140 notifies the power usage in response to an inquiry from the power supplier server 100 or the user terminal 130.
  • the device 160 is an electric device used in the customer facility 170.
  • the A route and the B route are used to acquire the power used by the customer facility 170.
  • the A route is a route for connecting the power supplier server 100 and the smart meter 140.
  • the A route is used when data such as used power is transmitted from the smart meter 140 to the power supplier server 100.
  • the B route is a route that connects between the smart meter 140 and a HEMS terminal or a BEMS (Building Energy Management System) terminal.
  • the user terminal 130 acquires power usage from the smart meter 140 through the B route.
  • the user terminal 130 includes a reception unit 131, an acquisition unit 132, a notification unit 133, a display unit 134, and a control unit 135.
  • the reception unit 131, the acquisition unit 132, the notification unit 133, and the control unit 135 are configured by, for example, a CPU or a memory.
  • Examples of the display unit 134 include a TV, a liquid crystal device, a tablet different from the user terminal, and a mobile terminal.
  • the receiving unit 131 receives a power reduction request message including a power reduction request time zone from the power supplier server 100.
  • the power reduction request message may be, for example, the power reduction request on the current day (for example, 5 minutes before the start time) or the day before the power reduction is performed.
  • the power reduction request message is transmitted / notified by e-mail or an application.
  • the acquisition unit 132 acquires the power used from the smart meter 140 in the customer facility 170 in response to receiving the power reduction request message.
  • the acquisition unit 132 may acquire an incentive corresponding to the reduction actual power from the power management server 120 that acquired the actual reduction power.
  • the notification unit 133 notifies the power supplier server 100 of the power usage acquired by the acquisition unit 132.
  • the notification unit 133 may be configured to notify the power supplier server 100 of the used power acquired by the acquisition unit 132 via the power management server 120.
  • the display unit 134 may be, for example, a liquid crystal display or a touch panel.
  • the display unit may include various buttons for receiving an operation of a consumer (user).
  • the control unit 135 controls the reception unit 131, the acquisition unit 132, the notification unit 133, and the display unit 134.
  • the control unit 135 includes the smart meter 140 of the consumer facility 170 that is the target of power reduction. To obtain the smart meter information related to the smart meter 140.
  • the control unit 135 acquires smart meter information of the smart meter 140 at home.
  • the control unit 135 acquires smart meter information of the smart meter 140 of the outing facility.
  • the customer may select whether to reduce the power usage at the facility outside the home or to reduce the power usage at home. Only one side or both sides may be used to reduce power consumption when the customer goes out.
  • the server may include information on a facility that desires to reduce power consumption when transmitting a power reduction request to a consumer. Specifically, it is desired to reduce the electric power used by one or both of the facility outside the home and the home. Alternatively, facilities that are desired to be reduced may be listed based on the location information of the user terminal 130. As the position information, for example, position information such as an address registered in advance or position information by GPS (Global Positioning System) can be used. For example, when the customer reduces the electric power used at the out-of-home facility, it is assumed that the electric power is reduced at the office facility, or the electric power is reduced at the out-of-house facility.
  • GPS Global Positioning System
  • the smart meter information includes at least one of identification information of the smart meter 140 and electric power used by the smart meter 140.
  • the identification information of the smart meter 140 only needs to be able to be identified by the smart meter 140, and may be, for example, an identifier (SM-ID) of the smart meter 140 or an address (IP address or the like) of the smart meter 140.
  • the control unit 135 notifies the server (the power supplier server 100, the aggregator server 110, or the power management server 120) of the smart meter information. When the server directly accesses the smart meter 140 to measure the power consumption, only the smart meter 140 identification information is transmitted to the server as smart meter information.
  • control unit 135 performs control to acquire an incentive according to the actual power reduction of the customer facility 170.
  • the planned power reduction amount may be transmitted when transmitting the smart meter information to the server.
  • the planned reduction amount may be, for example, power (XX kW) or a reduction ratio (XX%) with respect to the current power consumption. Note that the planned reduction amount is not limited to transmitting the smart meter information together with the server, and may be transmitted individually after transmitting the smart meter information to the server.
  • the power management server 120 according to the first embodiment will be described with reference to FIG.
  • the power management server 120 includes a receiving unit 121, a notification unit 123, and a control unit 122.
  • the receiving unit 121, the notification unit 123, and the control unit 122 are configured by, for example, a CPU or a memory.
  • the receiving unit 121 uses the power consumed by the customer facility 170 (smart meter information) acquired from the smart meter 140 in the customer facility 170. ) From the user terminal 130.
  • the reception unit 121 may acquire a reduction actual power that is a difference between the power used and the power used in the power reduction request time zone from the power supplier server 100.
  • the notification unit 123 notifies the power supplier server 100 of the power used (smart meter information).
  • the notification unit 123 may notify the user terminal 130 of an incentive corresponding to the reduction actual power.
  • the control unit 122 controls the reception unit 121 and the notification unit 123.
  • the power supplier server 100 includes a receiving unit 101, a notification unit 103, and a control unit 102.
  • the receiving unit 101, the notification unit 103, and the control unit 102 are configured by, for example, a CPU or a memory.
  • the notification unit 103 notifies the customer user terminal 130 of the power reduction request via the power management server 120.
  • the receiving unit 101 receives the smart meter information notified from the user terminal 130 via the power management server 120 when the consumer responds to the power reduction request.
  • the control unit 102 acquires smart meter information, accesses the smart meter 140 based on the smart meter information, and determines the reduction power consumption of the customer facility 170.
  • the control unit 102 calculates the reduction actual power from the used power (first used power) notified from the user terminal 130 and the used power (second used power) acquired from the smart meter 140. Alternatively, the control unit 102 may calculate the actual reduction power from only the used power acquired from the smart meter 140. In this case, the control unit 102 does not have to acquire the used power (first used power) from the user terminal 130.
  • control unit 102 when the power consumption of the customer facility 170 is reduced according to the power reduction request, the control unit 102 performs a process for giving the customer an incentive according to the reduction actual power. For example, the control unit 102 notifies the power management server 120 of the reduction actual power in order to give an incentive to the consumer.
  • the power supplier server 100 determines the reduction actual power
  • the aggregator server 110 may determine the reduction actual power.
  • the operation of the power supplier server 100 described above may be performed by the aggregator server 110 instead of the power supplier server 100.
  • step S400 the user terminal 130 transmits a “power reduction request message reception” registration request to the power management server 120.
  • the “power reduction request message reception” registration request is a request for the user terminal 130 to register the information of the user terminal 130 and the information of the smart meter 140 in the power management server 120.
  • the information of the user terminal 130 is an address of the user terminal 130, for example, an e-mail address.
  • the information of the smart meter 140 is SM-ID that is an identifier of the smart meter 140.
  • a power reduction request is transmitted.
  • the out-of-home facility may be additionally registered.
  • the out-of-home facility may be additionally registered.
  • the smart meter information of the facility outside the home is acquired, and the acquired smart meter information is transmitted to the power management server 120.
  • SM-ID smart meter information
  • the power management server 120 When the power management server 120 receives the “power reduction request message reception” registration request, the power management server 120 registers the user terminal 130 as a target of “power reduction request message reception”.
  • step S401 the power supplier server 100 transmits a power reduction request message to the power management server 120.
  • the power reduction request message includes information indicating a power reduction request time zone.
  • step S402 when receiving the power reduction request message from the power supplier server 100, the power management server 120 transmits the power reduction request message to the registered user terminal 130.
  • the power reduction request message may be transmitted by e-mail.
  • the user terminal 130 that has received the power reduction request message performs display according to the power reduction request.
  • step S ⁇ b> 403 when the consumer (user) approves the power reduction request, the user terminal 130 makes an inquiry about power usage to the smart meter 140.
  • the power consumption inquiry may be made using the B route.
  • step S404 the smart meter 140 transmits a response to the used power inquiry to the user terminal 130.
  • the response includes smart meter information.
  • the smart meter information includes the SM-ID and the current power consumption (for example, XXXkw).
  • step S405 the user terminal 130 transmits a response (power reduction response) indicating that it responds to the power reduction request to the power management server 120.
  • the response includes smart meter information (SM-ID and power usage).
  • the user terminal 130 may transmit a response by accessing a URL described in a power reduction request message received by e-mail.
  • the user terminal 130 may transmit a response using a dedicated application.
  • step S406 the power management server 120 transmits the response received from the user terminal 130 to the power supplier server 100.
  • the response includes smart meter information (SM-ID and power usage).
  • step S407 the power supplier server 100 acquires the power used from the smart meter 140.
  • the smart meter 140 is specified based on the SM-ID.
  • the use of power in step S407 may be acquired using the A route.
  • the smart meter 140 transmits a response to the power supplier server 100.
  • the response includes the SM-ID and the current used power, that is, the used power (for example, YYYkw) in the power reduction request time zone.
  • the response may include a history of power used in a past fixed period (for example, power used every 30 minutes).
  • the power supplier server 100 calculates a reduction actual power.
  • the reduction actual power is the difference between the power used when the power reduction request message is received and the power used in the power reduction request time zone.
  • the actual reduction power is XXX-YYYkw.
  • the power supplier server 100 calculates the difference between the used power before the power reduction request time zone and the used power during the power reduction request time zone as the reduction actual power based on the history of the used power in the past certain period. May be.
  • step S409 the power supplier server 100 notifies the power management server 120 of the reduction actual power.
  • the notification of the reduction actual power includes SM-ID and reduction actual power (XXX-YYYkw).
  • the power management server 120 When the power management server 120 receives the reduction actual power notification from the power supplier server 100, the power management server 120 calculates an incentive to be given to the user terminal 130 based on the actual reduction power.
  • step S410 the power management server 120 gives an incentive to the user terminal 130.
  • the user terminal 130 performs “power reduction request message reception” registration in the power supplier server 100.
  • step S500 the user terminal 130 transmits a “power reduction request message reception” registration request to the power management server 120.
  • the information included in the “power reduction request message reception” registration request is the same as in the first operation example.
  • step S ⁇ b> 501 the power management server 120 transmits the “power reduction request message reception” registration request received from the user terminal 130 to the power supplier server 100.
  • the power supplier server 100 can directly transmit the power reduction request message to the user terminal 130.
  • step S502 the power supplier server 100 transmits a power reduction request message to the user terminal 130.
  • Step S503 and step S504 are the same as step S403 and step S404.
  • step S505 the user terminal 130 transmits a response to the power supplier server 100.
  • the response includes the used power (XXXkw) acquired from the smart meter 140 and the SMID.
  • Steps S506 to S509 are the same as steps S407 to S410.
  • FIG. 7 is a diagram illustrating an example of a display screen of the display unit 134 when the user terminal 130 is given an incentive from the power management server 120.
  • the “OO store” registered as a member by the user terminal 130 operates the power management server 120.
  • the points to be returned XXX points
  • the power control method according to the first embodiment is a power control method for controlling the power used by the customer facility 170 in response to a request from the power supplier server 100, and the power supplier server 100 requests a power reduction request.
  • the power supplier server 100 calculates a reduction actual power from the first power usage and the second power usage; A.
  • the user terminal 130 is a user terminal 130 of a customer facility 170 that is used when controlling power usage of the customer facility 170 in response to a request from the power supplier server 100,
  • the receiving unit 131 that receives the power reduction request message including the reduction request time period from the power supplier server 100, and the smart meter 140 in the customer facility 170 receives the power used in response to the reception of the power reduction request message. It has the acquisition part 132 which acquires, and the notification part 133 which notifies the electric power supplier server 100 of the acquired electric power used.
  • the power management server 120 manages the user terminal 130 of the customer facility 170 used when controlling the power consumption of the customer facility 170 in response to a request from the power supplier server 100. I do. Use of the customer facility 170 acquired from the smart meter 140 in the customer facility 170 in response to the user terminal 130 receiving a power reduction request message including the power reduction request time zone from the power supplier server 100. It has the receiving part 121 which receives electric power from the user terminal 130, and the notification part 123 which notifies the electric power supplier server 100 of electric power used.
  • a user having the user terminal 130 that can acquire the used power from the smart meter 140 can respond to the power reduction request.
  • the user terminal 130 only needs to be able to receive the power reduction request message and respond to the power supply server 100 or the like in addition to being able to acquire the power usage from the smart meter 140.
  • the user terminal 130 may be a mobile phone or a smartphone. As a result, the number of target users can be increased. For this reason, it can be expected that the effect of power reduction is increased.
  • the power reduction request message can be received even at a facility outside the office, so that the amount of power consumption reduction during the power reduction request time zone can be increased.
  • the second embodiment is different from the first embodiment in that a store terminal (incentive granting terminal) 200 is installed in a store (predetermined service facility) such as a convenience store or a shopping mall.
  • a store predetermined service facility
  • Other configurations are the same as those in the first embodiment.
  • the power management server 120 is operated by an operator of a predetermined service facility such as a convenience store or a shopping mall, and the store terminal 200 is installed in the facility (store) of the operator.
  • the store terminal 200 is operated by the same operator as the power management server 120.
  • the power management server 120 acquires smart meter information from the user terminal 130 via the store terminal 200 and gives an incentive to the user terminal 130 (customer) via the store terminal 200 in the power reduction request time zone.
  • the store terminal 200 acquires an incentive to be given to the user terminal 130 from the power management server 120. Further, the store terminal 200 gives an incentive to the user terminal 130 in response to a request from the user terminal 130.
  • Store terminal 200 communicates with user terminal 130 by wireless communication such as NFC (Near Field Communication) or wired communication.
  • step S400 to step S408 in FIG. 9 is the same as the procedure from step S400 to step S408 in FIG.
  • the method of giving an incentive to the user terminal 130 is different from the first embodiment.
  • the user terminal 130 does not need to notify smart meter information to the power management server 120 in step S405. That is, in step S405, the user terminal 130 only has to notify the power management server 120 that it responds to the power reduction request.
  • a user who responds to a power reduction request visits a facility (store) where the store terminal 200 is installed with the user terminal 130.
  • step S600 the power supplier server 100 transmits a reduction actual power notification to the power management server 120.
  • the reduction actual power notification includes SM-ID and reduction actual power (XXX-YYYkw).
  • the power management server 120 calculates an incentive to be given to the user terminal 130 (customer) from the reduced actual power.
  • step S601 the user terminal 130 transmits an incentive grant request to the store terminal 200.
  • the incentive grant request includes smart meter information (SM-ID).
  • step S602 the store terminal 200 makes an incentive inquiry about the SM-ID that has received the incentive grant request to the power management server 120.
  • step S ⁇ b> 603 the power management server 120 that has received the incentive grant inquiry transmits an incentive inquiry response to the store terminal 200.
  • the incentive inquiry response includes an SM-ID and an incentive to be given (for example, the number of points).
  • step S604 the store terminal 200 gives an incentive such as the number of points to the user terminal 130.
  • step S400 to step S408 in FIG. 9 is replaced with step S500 to step S507 in FIG.
  • the shop terminal 200 is installed in a predetermined service facility operated by the operator of the power management server 120.
  • the predetermined service facility operated by the operator of the power management server 120 is assumed to be a convenience store or a shopping mall.
  • the user visits the facility in order to obtain points.
  • the operator of the power management server 120 (operator of a predetermined service facility) can expect an effect of attracting customers. It also provides an incentive to encourage customers to request power reduction.
  • the store terminal 200A is installed in the store A
  • the store terminal 200B is installed in the store B.
  • the power management server 120A and the store terminal 200A are operated by an operator of the store A.
  • the power management server 120B and the store terminal 200B are operated by an operator of the store B.
  • Each of the power management server 120A and the power management server 120B transmits a power reduction request message to the user terminal 130 in response to the power reduction request message from the power supplier server 100 (or the aggregator server 110).
  • the power management server 120A gives the user terminal 130 by communicating with the power management server 120B. Allocate the incentives that should be done. For example, the power management server 120A distributes incentives to be given to the user terminal 130 (customer) based on the amount of money used by the user terminal 130 (customer) for each store or the staying time.
  • step S501 the power management server 120A transmits a power reduction request message to the user terminal 130 in response to the power reduction request message from the power supplier server 100.
  • the power reduction request message includes information indicating a power reduction request time zone (for example, 13:00 to 15:00 today).
  • step S502 the power management server 120B transmits a power reduction request message to the user terminal 130 in response to the power reduction request message from the power supplier server 100.
  • the power reduction request message includes information indicating a power reduction request time zone (for example, 13:00 to 15:00 today).
  • the user terminal 130 displays a plurality of power reduction requests, and prompts the consumer to determine whether or not to respond to the plurality of power reduction requests.
  • it is determined that the consumer responds to a plurality of power reduction requests and the description is made on the assumption that the consumer has performed an operation on the user terminal 130 to respond to the plurality of power reduction requests.
  • step S503 the user terminal 130 transmits a response A to the power management server 120A to respond to the power reduction request.
  • the user terminal 130 makes a response A via the Web browser with the URL described or attached to the e-mail.
  • the user terminal 130 may perform the response A using a dedicated application.
  • step S504 the user terminal 130 transmits a response B indicating that the power reduction request is satisfied to the power management server 120B.
  • the user terminal 130 includes information indicating the responded power management server 120 in the response B. That is, the user terminal 130 includes in the response B information indicating that the response A is being made to the power management server 120A.
  • step S505 the power management server 120B confirms that the user terminal 130 is responding to the power management server 120A based on the response B from the user terminal 130, and indicates that there is a response B. Is transmitted to the power management server 120A.
  • step S506 the user terminal 130 inquires of the smart meter 140 about power consumption.
  • the inquiry about power consumption may be made using the B route.
  • step S507 the smart meter 140 transmits a response to the used power inquiry to the user terminal 130.
  • the response includes smart meter information.
  • the smart meter information includes the SM-ID and the current power consumption (for example, XXXkw).
  • steps S508 to S513 are performed in the power reduction request time zone.
  • the customer visits the store A and the store B in this order after reducing the power used in the customer facility 170 in the power reduction request time zone.
  • step S508 the user terminal 130 accesses the store terminal 200A of the store A and transmits a power transaction confirmation message indicating that incentive transaction is performed to the store terminal 200A.
  • the power transaction confirmation message includes smart meter information.
  • the user terminal 130 may display a display screen as shown in FIG. 7 in response to accessing the store terminal 200A.
  • step S509 the store terminal 200A transfers the power transaction confirmation message to the power management server 120A.
  • the power management server 120A confirms that the user terminal 130 (customer) has visited the store A based on the power transaction confirmation message.
  • step S510 the power management server 120A transmits a confirmation notification A indicating that the user terminal 130 (customer) has visited the store A to the power management server 120B. Based on the confirmation notification A, the power management server 120B confirms that the user terminal 130 (customer) has visited the store A.
  • step S511 the user terminal 130 accesses the store terminal 200B of the store B, and transmits a power transaction confirmation message indicating that incentive transaction is performed to the store terminal 200B.
  • the power transaction confirmation message includes smart meter information.
  • the user terminal 130 may display a display screen as shown in FIG. 7 in response to accessing the store terminal 200B.
  • step S512 the store terminal 200B transfers the power transaction confirmation message to the power management server 120B.
  • the power management server 120B confirms that the user terminal 130 (customer) has visited the store B based on the power transaction confirmation message.
  • step S513 the power management server 120B transmits a confirmation notification B indicating that the user terminal 130 (customer) has visited the store B to the power management server 120A. Based on the confirmation notification B, the power management server 120A confirms that the user terminal 130 (customer) has visited the store B.
  • the power management server 120B accesses the smart meter 140 based on the smart meter information.
  • the power management server 120B may directly access the smart meter 140.
  • the smart meter 140 may be accessed via an electric power company (C route).
  • the smart meter 140 may be accessed via HEMS in the customer facility 170.
  • step S515 the smart meter 140 transmits a power value notification including a history of power used in a past fixed period (for example, power used every 30 minutes) to the power management server 120B.
  • the smart meter 140 transmits a power value notification including information on power used during the power reduction request time period to the power management server 120B.
  • the power management server 120B calculates the difference between the used power before the power reduction request time zone and the used power during the power reduction request time zone as the reduction actual power based on the history of the used power acquired from the smart meter 140. Alternatively, the power management server 120B may calculate the difference between the power used before the power reduction request time period acquired in step S512 and the power used during the power reduction request time period acquired in step S515 as the reduction actual power. .
  • the power management server 120B transmits a power transaction value confirmation message to the power management server 120A.
  • the power transaction value confirmation message includes information on the reduction actual power and information on the contribution amount in the store B of the consumer (contribution amount information B).
  • the contribution amount information B is the amount used by the customer at the store B or the time when the customer stayed at the store B.
  • the contribution amount information B may include the frequency with which the customer visits the store B.
  • the power management server 120B acquires the contribution amount information B from the store terminal 200B, and includes the contribution amount information B in the power transaction value confirmation message.
  • the power management server 120A transmits a power transaction value confirmation message to the power management server 120B.
  • the power transaction value confirmation message includes information on the contribution amount in the store A of the consumer (contribution amount information A).
  • the contribution amount information A is the amount used by the customer at the store A or the time when the customer stayed at the store A.
  • the contribution amount information A may include the frequency with which the customer visits the store A.
  • the power management server 120A acquires the contribution amount information A from the store terminal 200A, for example, and includes the contribution amount information A in the power transaction value confirmation message.
  • the power management server 120B distributes incentives to be given to consumers based on the contribution amount information A and the contribution amount information B. For example, the reduction actual power is divided according to the ratio of the contribution amount information A and the contribution amount information B, and the reduction actual power A due to the contribution of the store A and the reduction actual power B due to the contribution of the store B are derived. From the customer's point of view, the incentive according to the reduced actual power is divided into an incentive corresponding to the store A and an incentive corresponding to the store B. Incentives are given by points, for example.
  • step S518, the power management server 120B transmits a power transaction value response message to the power management server 120A.
  • the power transaction value response message includes the reduction actual power A due to the contribution of the store A.
  • the power transaction value response message may include the reduction actual power B due to the contribution of the store B.
  • step S519 the power management server 120A determines an incentive for the consumer based on the reduction actual power A due to the contribution of the store A.
  • step S520 the power management server 120B determines an incentive for the consumer based on the actual power B reduced by the contribution of the store B.
  • the user terminal 130 receives power transaction request messages from two power management servers 120.
  • the user terminal 130 receives power transaction request messages from three or more power management servers 120. You may receive it.
  • the power management server 120A communicates with the power management server 120B.
  • the incentive to be given to the user terminal 130 (customer) is distributed. Thereby, even if it is a case where a consumer responds to a some electric power reduction request
  • the power reduction request message is transmitted from the power supplier server 100 installed by the power supplier.
  • the transmission source of the power reduction request message may be the aggregator server 110 installed by the aggregator.
  • the power management server 120 that has received the power reduction request message can appropriately adjust the timing or number of times the power management server 120 transmits the power reduction request message to the user terminal 130.
  • the power management server 120 transmits a power reduction request message to the user terminal 130 at the timing or the number of times that power can be reduced most effectively.
  • the present invention can be realized even when the operator of the power management server 120 and the operator of the incentive granting terminal 200 are different.
  • a program (application) for causing the user terminal 130 to execute the operation according to the above-described embodiment may be provided.
  • the power usage of the customer facility 170 is acquired from the power supplier server 100 to the smart meter 140 via the A route.
  • the present invention is not limited to this, and the aggregator server 110 (or the power management server 120). ) May be used to acquire power used by the customer facility 170. Moreover, you may acquire the electric power used of the consumer facility 170 using both A route and C route.
  • the electric power used by the customer facility 170 the electric power used before the electric power reduction request time zone and the electric power used during the electric power reduction request time zone can be considered. Both of these used powers may be acquired by the A route, and both of these used powers may be acquired by the C route. Alternatively, one of these used powers may be acquired by the A route, and the other of these used powers may be acquired by the C route.
  • the usage power acquisition route is not particularly limited, but in the above-described embodiment, the power usage before the power reduction request time zone is acquired by the C route, and the power usage before the power reduction request time zone is obtained by the A route. The case to be acquired is illustrated.
  • the smart meter information includes at least one of identification information of the smart meter 140 and electric power used by the smart meter 140.
  • the server the power supplier server 100 or the power management server 120
  • the smart meter information includes the identification information of the smart meter 140
  • the server By accessing 140, the power used measured by the smart meter 140 can be acquired.
  • the smart meter information may include the identification information of the smart meter 140 without including the power consumption measured by the smart meter 140.
  • the server can be used even if the smart meter information includes the identification information of the smart meter 140. Cannot access the smart meter 140.
  • the smart meter information may include the power used measured by the smart meter 140 without including the identification information of the smart meter 140.
  • the power usage measured by the smart meter 140 may be power usage before the power reduction request time zone or power usage during the power reduction request time zone.
  • kW is used as a unit of used power and reduced actual power, but kWh may be used as a unit of used power and reduced actual power.
  • the used power and the actual reduction power may be read as the used electric power and the actual reduction power.
  • a program for causing a computer to execute each process performed by the user terminal 130 may be provided.
  • the program may be recorded on a computer readable medium. If a computer-readable medium is used, a program can be installed in the computer.
  • the computer-readable medium on which the program is recorded may be a non-transitory recording medium.
  • the non-transitory recording medium is not particularly limited, but may be a recording medium such as a CD-ROM or a DVD-ROM.
  • a chip configured by a memory that stores a program for executing each process performed by the user terminal 130 and a processor that executes the program stored in the memory may be provided.
  • the embodiment it is possible to provide a server, a user terminal, and a program that can appropriately control power usage in response to a request regarding power control from a power supplier.

Abstract

 サーバは、需要家のユーザ端末に電力削減要求を通知する通知部と、前記需要家が前記電力削減要求に応じる場合において、前記ユーザ端末から通知されるスマートメータ情報を取得する制御部と、を備える。前記スマートメータ情報は、電力削減の対象とする需要家施設のスマートメータに関する情報であり、前記制御部は、前記スマートメータ情報に基づいて、前記需要家施設の削減実績電力を判断する。

Description

サーバ、ユーザ端末、及びプログラム
 本発明は、電力制御システムに用いられるサーバ、ユーザ端末、及びプログラムに関する。
 近年、電力の需要家施設に設けられた機器を管理する管理装置(EMS:Energy Manegement System)が注目されている。
 また、電力制御の方法としてデマンドレスポンス(DR:Demand Response)が注目されている。デマンドレスポンスとは、「電力供給者の要求に応じて、需要家(ユーザ)が電力の使用を抑制するよう電力消費パターンを変化させること」である。
 デマンドレスポンスでは、電力会社等が管理する電力供給者サーバからの電力削減要求で指定された時間帯において、管理装置が使用電力を削減する。この使用電力削減の貢献に応じて、需要家はインセンティブを取得することができる(例えば、特許文献1)。
 上述したデマンドレスポンスに対して、需要家が適切に使用電力を制御することができる方法等が求められている。
特開2013-229995号公報
 第1の特徴は、サーバであって、需要家のユーザ端末に電力削減要求を通知する通知部と、前記需要家が前記電力削減要求に応じる場合において、前記ユーザ端末から通知されるスマートメータ情報を取得する制御部と、を備え、前記スマートメータ情報は、電力削減の対象とする需要家施設のスマートメータに関する情報であり、前記制御部は、前記スマートメータ情報に基づいて、前記需要家施設の削減実績電力を判断することを要旨とする。
 第2の特徴は、需要家のユーザ端末であって、前記需要家がサーバからの電力削減要求に応じる場合において、電力削減の対象とする需要家施設のスマートメータに関するスマートメータ情報を取得する制御部を備え、前記制御部は、前記スマートメータ情報を前記サーバに通知することを要旨とする。
 第3の特徴は、プログラムであって、需要家のユーザ端末に、前記需要家がサーバからの電力削減要求に応じる場合において、電力削減の対象とする需要家施設のスマートメータに関するスマートメータ情報を取得する手順と、前記スマートメータ情報を前記サーバに通知する手順と、を実行させることを要旨とする。
図1は、第1実施形態に係るシステム構成図である。 図2は、第1実施形態に係るユーザ端末のブロック図である。 図3は、第1実施形態に係る電力管理サーバのブロック図である。 図4は、第1実施形態に係る電力供給者サーバのブロック図である。 図5は、第1実施形態に係るシーケンス図である(動作例1)。 図6は、第1実施形態に係るシーケンス図である(動作例2)。 図7は、ユーザ端末の表示画面を示す図である。 図8は、第2実施形態に係るシステム構成図である。 図9は、第2実施形態に係るシーケンス図である。 図10は、第3実施形態に係るシステム構成図である。 図11は、第3実施形態に係るシーケンス図である。
 以下において、本発明の実施形態について、図面を参照しながら説明する。なお、以下の図面の記載において、同一または類似の部分には、同一または類似の符号を付している。
 [1.第1実施形態]
 (1.1 システム構成)
 図1を参照して、第1実施形態のシステム構成を説明する。
 (1.1.1 全体構成)
 図1は、第1実施形態に係るシステム構成図である。
 図1に示すように、第1実施形態に係るシステムは、電力供給者サーバ100と、アグリゲータサーバ110と、電力管理サーバ(ユーザ端末管理サーバ)120と、ユーザ端末130と、スマートメータ140と、宅内NW150と、機器160とを有する。スマートメータ140と、宅内NW150と、機器160とは、需要家施設170内に設置される。
 需要家施設170は、電力供給事業者から電力の供給を受ける施設である。需要家施設170は、例えば住宅またはビル等である。第1実施形態では、需要家施設170が住宅である一例を説明する。
 電力供給者サーバ100と、アグリゲータサーバ110と、電力管理サーバ120と、ユーザ端末130とは、例えば宅外NWを介して接続されている。また、電力供給者サーバ100とスマートメータ140も宅外NWを介して接続されている。宅外NWとは、インターネット、プライベートネットワーク、専用線等である。
 スマートメータ140と、機器160は、宅内NW150を介して接続される。宅内NW150とは、有線LANまたは無線LAN等である。宅内NW150は、需要家施設170で使用される機器160の使用電力をスマートメータ140が取得するために用いられる。宅内NW150には、スマートメータ140と機器160が接続される。
 ここで、第1実施形態に係るシステムの動作の一例を説明する。
 電力供給者サーバ100は、電力制御要求時間帯を含む電力制御要求メッセージをユーザ端末130に送信する。ここで、「電力制御要求」とは電力使用量を削減する電力削減要求と、電力使用量を増やす電力使用要求との2つの概念を含むものである。第1実施形態においては、電力制御要求の一例として電力使用量を削減する電力削減要求の場合である。なお、電力使用要求は、例えば、各需要家に対して、電力使用量の最低量がどれくらいかを要求する場合などが想定される。
 まず、電力供給者サーバ100は、電力削減要求時間帯を含む電力削減要求メッセージをユーザ端末130に送信する。ユーザ端末130は、電力削減要求メッセージの受信に応じて、スマートメータ140から使用電力を取得し、取得した使用電力を第1使用電力として、電力供給者サーバ100に通知する。電力供給者サーバ100は、電力削減要求時間帯において、スマートメータ140から使用電力を第2使用電力として取得し、第1使用電力と第2使用電力とから、削減実績電力を算出する。
 ここで、電力削減要求時間帯とは、電力供給者が需要家に対して、使用電力の削減を要求する時間帯である。例えば、真夏日の午後等の電力需要が増加し、電力供給量が逼迫することが予想される時間帯を、電力供給者は電力削減要求時間帯として指定する。
 (1.1.2 各装置の説明)
 上述した動作を実現するために、第1実施形態に係るシステムを構成する各装置について説明する。
 電力供給者サーバ100は、電力会社等の電力供給者が管理するサーバである。電力供給者サーバ100は、スマートメータ140から需要家施設170の使用電力を計測すると共に、ユーザ端末130に対して、電力削減要求を行う。また、需要家施設170で削減した使用電力(以下、「削減実績電力」という)を、電力管理サーバ120に通知する。
 アグリゲータサーバ110は、所定の地域における使用電力を取りまとめるアグリゲータが設置するサーバである。所定の地域とは、アグリゲータがサービスを提供する地域であって、都道府県、市町村等の地域が想定されている。電力供給者サーバ100が、アグリゲータサーバ110を介さないで電力削減要求を行う場合、アグリゲータサーバ110は不要である。
 電力管理サーバ120は、コンビニエンスストア、ショッピングモール等の所定のサービス施設の運営者が運用することが想定されている。電力管理サーバ120は、ユーザ端末130を使用する需要家の会員情報等を管理する。電力管理サーバ120は、ユーザ端末130のメールアドレス等、電力削減要求メッセージをユーザ端末130に送信するのに必要な情報を保持している。
 また、電力管理サーバ120は、削減実績電力に応じたインセンティブをユーザ端末130に付与する。インセンティブとは、例えば金銭的インセンティブまたは非金銭的インセンティブである。より具体的に、インセンティブとは、例えば電力管理サーバ120運営者が運営する施設で使用可能なポイント、または商品購入時の割引である。
 ユーザ端末130は、スマートメータ140から取得した使用電力を電力供給者サーバ100に通知する。また、ユーザ端末130は、電力管理サーバ120からインセンティブまたはインセンティブの内容を取得する。第1実施形態において、ユーザ端末130としては、需要家施設170に設置されたHEMS(Home Energy Management System)端末のみならず、電力管理サーバ120と通信可能な端末であればよい。このようなユーザ端末130としては、例えば、スマートフォン、携帯電話、パーソナルコンピュータ、タブレット、またはウエアラブル端末等の、需要家(ユーザ)が携帯する端末をユーザ端末130として使用することを想定している。需要家が端末を携帯する場合には、外出時に限られず、需要家施設内にいる場合も含まれるものである。このような携帯する端末をユーザ端末130として用いる場合には、ユーザ端末130と電力管理サーバ120とは、例えば公衆一般回線を用いて通信される。
 スマートメータ140は、宅内NW150を介して接続される機器160の使用電力を計測する。また、スマートメータ140は、電力供給者サーバ100またはユーザ端末130からの問い合わせに応じて使用電力を通知する。
 機器160は、需要家施設170で使用される電気機器である。
 (1.1.3 使用電力の取得ルート)
 需要家施設170の使用電力の取得には、Aルート及びBルートが用いられる。
 Aルートは、電力供給者サーバ100とスマートメータ140とを接続するルートである。Aルートは、スマートメータ140から電力供給者サーバ100に使用電力などのデータを送信する際に用いられる。
 Bルートは、スマートメータ140とHEMS端末またはBEMS(Building Energy Management System)端末との間を接続するルートである。第1実施形態では、ユーザ端末130は、スマートメータ140から使用電力をBルートで取得する。
 (1.2 ユーザ端末の構成)
 図2を参照して、第1実施形態に係るユーザ端末130について説明する。
 ユーザ端末130は、受信部131と、取得部132と、通知部133と、表示部134と、制御部135とを有する。受信部131と、取得部132と、通知部133と、制御部135とは、例えば、CPUまたはメモリから構成されている。表示部134は、例えば、TV、液晶装置、ユーザ端末と異なるタブレット、携帯端末等が挙げられる。
 受信部131は、電力供給者サーバ100から電力削減要求時間帯を含む電力削減要求メッセージを受信する。電力削減要求メッセージは、例えば、電力削減要求が当日(例えば、開始時間の5分前)であったり、電力削減が行われる前日であったりしてもよい。電力削減要求メッセージは電子メールまたはアプリケーション等で送信・通知される。
 取得部132は、電力削減要求メッセージの受信に応じて、需要家施設170内のスマートメータ140から、使用電力を取得する。取得部132は、削減実績電力を取得した電力管理サーバ120から、削減実績電力に応じたインセンティブを、取得してもよい。
 通知部133は、取得部132が取得した使用電力を、電力供給者サーバ100に通知する。通知部133は、取得部132が取得した使用電力を、電力管理サーバ120を介して電力供給者サーバ100に通知するように構成してもよい。
 表示部134は、例えば、液晶ディスプレイであってもよいし、タッチパネルであってもよい。表示部は、需要家(ユーザ)の操作を受け付ける各種ボタンを含んでもよい。
 制御部135は、受信部131と、取得部132と、通知部133と、表示部134とを制御する。制御部135は、需要家がサーバ(電力供給者サーバ100、アグリゲータサーバ110、または電力管理サーバ120)からの電力削減要求に応じる場合において、電力削減の対象とする需要家施設170のスマートメータ140にアクセスし、スマートメータ140に関するスマートメータ情報を取得する制御を行う。
 例えば、電力削減要求に応じて需要家が自宅の使用電力を削減する場合、制御部135は、自宅のスマートメータ140のスマートメータ情報を取得する。一方、電力削減要求に応じて需要家が外出先施設(オフィス等)の使用電力を削減する場合、制御部135は、外出先施設のスマートメータ140のスマートメータ情報を取得する。
 需要家は、外出先施設の使用電力を削減するのか、自宅の使用電力を削減するのかを選択してもよい。需要家が外出の際に使用電力を削減するのは、一方のみであってもよいし、両方であってもよい。サーバは、電力削減要求を需要者に送信する際に、使用電力の削減を希望する施設に関する情報を含めてもよい。具体的には、外出先施設および自宅のいずれか一方または両方の使用電力の削減を希望する。他には、削減を希望する施設として、ユーザ端末130の位置情報に基づいて、リストアップしてもよい。位置情報としては、例えば、予め登録された住所等の位置情報またはGPS(Global Positioning System)による位置情報を用いることができる。需要家が外出先施設の使用電力を削減する場合は、例えば、勤務先の施設において電力を削減する場合、外出先の施設において電力を削減する場合などが想定される。
 スマートメータ情報は、スマートメータ140の識別情報及びスマートメータ140により計測された使用電力のうち、少なくとも一方を含む。スマートメータ140の識別情報は、スマートメータ140が識別できればよく、例えばスマートメータ140の識別子(SM-ID)、またはスマートメータ140のアドレス(IPアドレス等)であってもよい。制御部135は、スマートメータ情報をサーバ(電力供給者サーバ100、アグリゲータサーバ110、または電力管理サーバ120)に通知する。サーバがスマートメータ140に直接アクセスして使用電力を計測する場合、スマートメータ情報としてスマートメータ140の識別情報のみをサーバに送信する。
 また、電力削減要求に応じて需要家施設170の使用電力が削減された場合において、制御部135は、需要家施設170の削減実績電力に応じたインセンティブを取得する制御を行う。
 需要家が電力削減要求に応じる場合、スマートメータ情報をサーバに送信する際に、使用電力の削減予定量を送信してもよい。削減予定量としては、例えば、電力(○○kW)であってもよいし、現在の使用電力に対する削減比率(○○%)であってもよい。なお、削減予定量は、スマートメータ情報をサーバに送信する際に併せて送信することに限定されるものではなく、スマートメータ情報をサーバに送信した後、個別に送信してもよい。
 (1.3 電力管理サーバの構成)
 図3を参照して、第1実施形態に係る電力管理サーバ120について説明する。
 電力管理サーバ120は、受信部121と、通知部123と、制御部122とを有する。受信部121と、通知部123と、制御部122とは、例えば、CPUまたはメモリで構成されている。
 ユーザ端末130が電力供給者サーバ100から電力削減要求メッセージを受信したことに応じて、受信部121は、需要家施設170内のスマートメータ140から取得した需要家施設170の使用電力(スマートメータ情報)をユーザ端末130から受信する。
 また、受信部121は、使用電力と、電力削減要求時間帯における使用電力との差分である削減実績電力を電力供給者サーバ100から取得してもよい。
 通知部123は、使用電力(スマートメータ情報)を電力供給者サーバ100に通知する。
 また、通知部123は、削減実績電力に応じたインセンティブをユーザ端末130に通知してもよい。
 制御部122は、受信部121と、通知部123とを制御する。
 (1.4 電力供給者サーバの構成)
 図4を参照して、第1実施形態に係る電力供給者サーバ100について説明する。
 電力供給者サーバ100は、受信部101と、通知部103と、制御部102とを有する。受信部101と、通知部103と、制御部102とは、例えば、CPUまたはメモリで構成されている。
 通知部103は、電力管理サーバ120を介して、需要家のユーザ端末130に電力削減要求を通知する。
 受信部101は、需要家が電力削減要求に応じる場合において、ユーザ端末130から通知されるスマートメータ情報を、電力管理サーバ120を介して受信する。
 制御部102は、スマートメータ情報を取得し、スマートメータ情報に基づいて、スマートメータ140にアクセスし、需要家施設170の削減実績電力を判断する。
 制御部102は、ユーザ端末130から通知された使用電力(第1使用電力)と、スマートメータ140から取得した使用電力(第2使用電力)とから、削減実績電力を算出する。或いは、制御部102は、スマートメータ140から取得した使用電力のみから削減実績電力を算出してもよい。この場合、制御部102は、ユーザ端末130から使用電力(第1使用電力)を取得しなくてもよい。
 また、電力削減要求に応じて需要家施設170の使用電力が削減された場合において、制御部102は、削減実績電力に応じたインセンティブを需要家に付与するための処理を行う。例えば、制御部102は、インセンティブを需要家に付与するために、削減実績電力を電力管理サーバ120に通知する。
 第1実施形態において、削減実績電力を電力供給者サーバ100が判断する一例を説明するが、削減実績電力をアグリゲータサーバ110が判断してもよい。この場合、上述の電力供給者サーバ100の動作を、電力供給者サーバ100に代えてアグリゲータサーバ110が行ってもよい。
 (1.5 動作例1)
 図5を用いて第1実施形態に係る動作例1を説明する。なお、以下の記載では、アグリゲータサーバ110を省略しているが、電力供給者サーバ100との間で送受信されるメッセージは、アグリゲータサーバ110を介して送受信されてもよい。
 ステップS400において、ユーザ端末130は、電力管理サーバ120に、「電力削減要求メッセージ受信」登録要求を送信する。「電力削減要求メッセージ受信」登録要求とは、ユーザ端末130がユーザ端末130の情報及びスマートメータ140の情報を電力管理サーバ120に登録することを要求することである。ユーザ端末130の情報とは、ユーザ端末130のアドレス、例えば電子メールアドレスなどである。また、スマートメータ140の情報とは、スマートメータ140の識別子であるSM-IDなどである。
 ステップS400において電力管理サーバ120に一度登録しておけば、電力削減要求が送信されてくる。需要家施設の自宅を登録した後、外出先施設を追加で登録してもよい。自宅として需要家施設を登録している状態において、当該需要家施設を対象とした電力削減要求を受信した際に、外出先施設を追加登録してもよい。そのときは、電力削減要求を受信した際に、外出先施設のスマートメータ情報を取得し、取得したスマートメータ情報を電力管理サーバ120に送信する。
 電力管理サーバ120にスマートメータ情報(SM-ID)を一度登録しておけば、電力削減要求を受信した際に、需要家は、スマートメータ情報を送信せずに、何れの施設の使用電力を削減するのか選択するのみでよい。これにより、電力管理サーバ120は、選択された施設に対応付けられたスマートメータ140を特定することができる。
 電力管理サーバ120は、「電力削減要求メッセージ受信」登録要求を受信すると、「電力削減要求メッセージ受信」対象のユーザ端末130として登録する。
 ステップS401において、電力供給者サーバ100は、電力削減要求メッセージを電力管理サーバ120に送信する。電力削減要求メッセージは、電力削減要求時間帯を示す情報を含む。
 ステップS402において、電力供給者サーバ100から電力削減要求メッセージを受信すると、電力管理サーバ120は、登録されているユーザ端末130に、電力削減要求メッセージを送信する。電力削減要求メッセージは、電子メールで送信されてもよい。電力削減要求メッセージを受信したユーザ端末130は、電力削減要求に応じた表示を行う。
 ステップS403において、需要家(ユーザ)が電力削減要求を了承する場合、ユーザ端末130は、スマートメータ140に対して使用電力問い合わせを行う。使用電力問い合わせはBルートを用いて行ってもよい。
 ステップS404において、スマートメータ140は、ユーザ端末130に、使用電力問い合わせに対する応答を送信する。応答は、スマートメータ情報を含む。スマートメータ情報は、SM-IDと現在の使用電力(例えばXXXkw)を含む。
 ステップS405において、ユーザ端末130は、電力削減要求に応じることを示す応答(電力削減応答)を電力管理サーバ120に送信する。応答は、スマートメータ情報(SM-IDと使用電力)を含む。
 例えば、ユーザ端末130は、電子メールで受信した電力削減要求メッセージに記載されたURLにアクセスすることにより応答を送信してもよい。或いは、ユーザ端末130は、専用のアプリケーションを用いて応答を送信してもよい。
 ステップS406において、電力管理サーバ120は、ユーザ端末130から受信した応答を、電力供給者サーバ100に送信する。応答は、スマートメータ情報(SM-IDと使用電力)を含む。
 次に、電力削減要求時間帯における動作について説明する。
 ステップS407において、電力供給者サーバ100は、スマートメータ140から使用電力を取得する。使用電力を取得する際にはSM-IDを基にスマートメータ140を特定する。ステップS407での使用電力の取得はAルートを用いて行ってもよい。
 ステップS408において、スマートメータ140は、電力供給者サーバ100に応答を送信する。応答には、SM-IDと、現在の使用電力、つまり電力削減要求時間帯における使用電力(例えばYYYkw)が含まれる。或いは、応答には、過去の一定期間における使用電力の履歴(例えば、30分ごとの使用電力)が含まれてもよい。
 電力供給者サーバ100は、ステップS408で応答を受信すると、削減実績電力を算出する。削減実績電力は、電力削減要求メッセージを受信した際の使用電力と、電力削減要求時間帯における使用電力の差である。図5に示す例では、削減実績電力は、XXX-YYYkwとなる。或いは、電力供給者サーバ100は、過去の一定期間における使用電力の履歴に基づいて、電力削減要求時間帯前の使用電力と電力削減要求時間帯中の使用電力との差を削減実績電力として算出してもよい。
 ステップS409において、電力供給者サーバ100は、電力管理サーバ120に、削減実績電力を通知する。削減実績電力の通知には、SM-IDと削減実績電力(XXX-YYYkw)が含まれる。
 電力管理サーバ120は、電力供給者サーバ100から削減実績電力通知を受けると、削減実績電力に基づいてユーザ端末130に付与するインセンティブを算出する。
 ステップS410において、電力管理サーバ120は、ユーザ端末130にインセンティブを付与する。
 (1.6 動作例2)
 図6を用いて第1実施形態に係る動作例2を説明する。動作例1と共通する部分については説明を省略し、動作例2に特有の動作について説明する。
 動作例2では、ユーザ端末130が、「電力削減要求メッセージ受信」登録を電力供給者サーバ100に行う。
 ステップS500において、ユーザ端末130は、電力管理サーバ120に、「電力削減要求メッセージ受信」登録要求を送信する。「電力削減要求メッセージ受信」登録要求に含める情報は、動作例1と同様である。
 ステップS501において、電力管理サーバ120は、ユーザ端末130から受信した「電力削減要求メッセージ受信」登録要求を電力供給者サーバ100に送信する。
 これにより、電力供給者サーバ100は、電力削減要求メッセージをユーザ端末130に直接送信することが可能となる。
 ステップS502において、電力供給者サーバ100は、電力削減要求メッセージをユーザ端末130に送信する。
 ステップS503とステップS504は、ステップS403とステップS404と同じである。
 ステップS505において、ユーザ端末130は、電力供給者サーバ100に応答を送信する。応答は、スマートメータ140から取得した使用電力(XXXkw)とSMIDを含む。
 ステップS506~ステップS509については、ステップS407~ステップS410と同じである。
 (1.7 ユーザ端末の表示画面)
 図7を用いて、ユーザ端末130の表示画面を説明する。
 図7は、ユーザ端末130が、電力管理サーバ120からインセンティブを付与された際の表示部134の表示画面の一例を示す図である。
 ユーザ端末130が会員として登録している「○○ストア」が、電力管理サーバ120を運営している例を示している。
 ユーザ端末130の画面に削減実績電力(ここでは、削減実績電力量=ZZkwh)と、還元されるポイント(XXXポイント)または商品を購入した場合の割引額が表示される。
 (1.8 第1実施形態のまとめ)
 第1実施形態に係る電力制御方法は、電力供給者サーバ100からの要求に応じて、需要家施設170の使用電力を制御する電力制御方法であって、電力供給者サーバ100が、電力削減要求時間帯を含む電力削減要求メッセージを需要家施設170のユーザ端末130に送信するステップと、ユーザ端末130が、電力削減要求メッセージの受信に応じて、需要家施設170内のスマートメータ140から使用電力を取得し、第1使用電力として、電力供給者サーバ100に通知するステップと、電力供給者サーバ100が、電力削減要求時間帯において、スマートメータ140から使用電力を第2使用電力として取得するステップと、電力供給者サーバ100が、第1使用電力と第2使用電力とから、削減実績電力を算出するステップとを有する。
 第1実施形態に係るユーザ端末130は、電力供給者サーバ100からの要求に応じて、需要家施設170の使用電力を制御する際に用いられる需要家施設170のユーザ端末130であって、電力削減要求時間帯を含む、電力削減要求メッセージを、電力供給者サーバ100から受信する受信部131と、電力削減要求メッセージの受信に応じて、需要家施設170内のスマートメータ140から、使用電力を取得する取得部132と、取得した使用電力を、電力供給者サーバ100に通知する通知部133とを有する。
 また、第1実施形態に係る電力管理サーバ120は、電力供給者サーバ100からの要求に応じて、需要家施設170の使用電力を制御する際に用いられる需要家施設170のユーザ端末130の管理を行う。ユーザ端末130が、電力供給者サーバ100から、電力削減要求時間帯を含む、電力削減要求メッセージを受信したことに応じて、需要家施設170内のスマートメータ140から取得した需要家施設170の使用電力を、ユーザ端末130から受信する受信部121と、使用電力を電力供給者サーバ100に通知する通知部123とを有する。
 上述したように、第1実施形態によれば、スマートメータ140から使用電力を取得可能なユーザ端末130を有するユーザが電力削減要求に応じることができる。ここでユーザ端末130とは、スマートメータ140から使用電力を取得できることに加えて、電力削減要求メッセージを受信し、使用電力を電力供給サーバ100等に応答できればよい。ユーザ端末130は、携帯電話またはスマートフォンでもよい。これにより、対象となるユーザ数を増加させることができる。このため、電力削減の効果が大きくなることが期待できる。
 また、携帯電話またはスマートフォンがユーザ端末130の場合、外出先施設でも電力削減要求メッセージを受信できるため、電力削減要求時間帯における使用電力の削減量を増やすことができる。
 使用電力の削減に貢献することによりユーザ端末130にインセンティブが付与されるため、電力削減の効果をさらに大きくすることも期待できる。
 [2.第2実施形態]
 図8及び図9を用いて、第2実施形態に係る電力制御方法を説明する。第1実施形態と共通する部分については説明を省略し、第2実施形態に関する部分を中心に説明する。
 (2.1 システム構成)
 図8を参照して、第2実施形態に係るシステム構成を説明する。
 第2実施形態では、コンビニまたはショッピングモール等の店舗(所定のサービス施設)に店舗端末(インセンティブ付与端末)200を設置する点で、第1実施形態とは異なる。その他の構成については第1実施形態と同様である。
 電力管理サーバ120は、コンビニエンスストア、ショッピングモール等の所定のサービス施設の運営者が運用し、店舗端末200は運営者の施設(店舗)に設置される。また、店舗端末200は、電力管理サーバ120と同一の運営者が運用する。
 電力管理サーバ120は、電力削減要求時間帯において、店舗端末200を介してスマートメータ情報をユーザ端末130から取得し、店舗端末200を介してインセンティブをユーザ端末130(需要家)に付与する。
 店舗端末200は、電力管理サーバ120からユーザ端末130に付与するインセンティブを取得する。また、店舗端末200は、ユーザ端末130の要求に応じて、ユーザ端末130にインセンティブを付与する。店舗端末200は、NFC(Near Field Communication)等の無線通信あるいは有線通信にてユーザ端末130と通信を行う。
 (2.2 動作例)
 図9を用いて第2実施形態に係る動作例を説明する。
 図9のステップS400からステップS408の手順については、図5のステップS400からステップS408の手順と同様である。ユーザ端末130にインセンティブを付与する方法が第1実施形態とは異なる。また、第2実施形態においては、ユーザ端末130は、ステップS405において電力管理サーバ120にスマートメータ情報を通知しなくてもよい。すなわち、ステップS405において、ユーザ端末130は、電力削減要求に応じる旨のみを電力管理サーバ120に通知すればよい。
 第2実施形態では、インセンティブを取得するために、電力削減要求に応じたユーザは、ユーザ端末130を持って店舗端末200が設置されている施設(店舗)を訪問する。
 ステップS600において、電力供給者サーバ100は、削減実績電力通知を電力管理サーバ120に送信する。削減実績電力通知は、SM-IDと削減実績電力(XXX―YYYkw)を含む。
 電力管理サーバ120は、削減実績電力からユーザ端末130(需要家)に付与するインセンティブを算出する。
 ステップS601において、ユーザ端末130は、インセンティブ付与要求を店舗端末200に送信する。インセンティブ付与要求は、スマートメータ情報(SM-ID)を含む。
 ステップS602において、店舗端末200は、電力管理サーバ120に、インセンティブ付与要求を受けたSM-IDに対するインセンティブの問い合わせを行う。
 ステップS603において、インセンティブ付与の問い合わせを受けた電力管理サーバ120は、店舗端末200に対して、インセンティブ問い合わせ応答を送信する。インセンティブ問い合わせ応答にはSM-IDと付与するインセンティブ(例えば、ポイント数)が含まれる。
 ステップS604において、店舗端末200は、ユーザ端末130にポイント数等のインセンティブを付与する。
 なお、図9のステップS400からステップS408の動作を、図6のステップS500からステップS507に入れ替えても同様のインセンティブ付与方法を実現できるのは勿論である。
 (2.3 第2実施形態のまとめ)
 第2実施形態では、店舗端末200を電力管理サーバ120の運営者が運営する所定のサービス施設に設置する。
 電力管理サーバ120の運営者が運営する所定のサービス施設は、コンビニエンスストアまたはショッピングモール等が想定される。
 店舗端末200を所定のサービス施設に設置することにより、ユーザがポイントを取得するために、かかる施設を訪問することになる。電力管理サーバ120の運営者(所定のサービス施設の運営者)にとって集客効果を見込めるというメリットがある。また、需要家に対して電力削減要求を働きかけるインセンティブとなる。
 [3.第3実施形態]
 図10及び図11を用いて、第3実施形態に係る電力制御方法を説明する。第1実施形態及び第2実施形態と共通する部分については説明を省略し、第3実施形態に関する部分を中心に説明する。
 (3.1 システム構成)
 図10を参照して、第3実施形態に係るシステム構成を説明する。
 第3実施形態では、店舗Aに店舗端末200Aが設置され、店舗Bに店舗端末200Bが設置される。電力管理サーバ120A及び店舗端末200Aは、店舗Aの運営者により運用される。電力管理サーバ120B及び店舗端末200Bは、店舗Bの運営者により運用される。
 電力管理サーバ120A及び電力管理サーバ120Bのそれぞれは、電力供給者サーバ100(またはアグリゲータサーバ110)からの電力削減要求メッセージに応じて、ユーザ端末130に電力削減要求メッセージを送信する。
 電力管理サーバ120A及び電力管理サーバ120Bからの電力削減要求にユーザ端末130(需要家)が応じる場合において、電力管理サーバ120Aは、電力管理サーバ120Bとの通信を行うことにより、ユーザ端末130に付与すべきインセンティブを配分する。例えば、電力管理サーバ120Aは、ユーザ端末130(需要家)が店舗ごとに使用した金額または滞在した時間に基づいて、ユーザ端末130(需要家)に付与すべきインセンティブを配分する。
 (3.2 動作例)
 図11を用いて第3実施形態に係る動作例を説明する。
 ステップS501において、電力管理サーバ120Aは、電力供給者サーバ100からの電力削減要求メッセージに応じて、ユーザ端末130に電力削減要求メッセージを送信する。電力削減要求メッセージは、電力削減要求時間帯(例えば、本日13:00~15:00)を示す情報を含む。
 ステップS502において、電力管理サーバ120Bは、電力供給者サーバ100からの電力削減要求メッセージに応じて、ユーザ端末130に電力削減要求メッセージを送信する。電力削減要求メッセージは、電力削減要求時間帯(例えば、本日13:00~15:00)を示す情報を含む。
 ユーザ端末130は、複数の電力削減要求に係る表示を行い、複数の電力削減要求に応じるか否かの判断を需要家に促す。ここでは、需要家が複数の電力削減要求に応じると判断し、複数の電力削減要求に応じる旨の操作を需要家がユーザ端末130に対して行ったと仮定して、説明を進める。
 ステップS503において、ユーザ端末130は、電力削減要求に応じる旨の応答Aを電力管理サーバ120Aに送信する。電力削減要求が電子メールにより通知された場合、ユーザ端末130は、電子メールに記載または添付されたURLによりWebブラウザを介して応答Aを行う。或いは、ユーザ端末130は、専用のアプリケーションにより応答Aを行ってもよい。
 ステップS504において、ユーザ端末130は、電力削減要求に応じる旨の応答Bを電力管理サーバ120Bに送信する。ここで、ユーザ端末130は、応答済みの電力管理サーバ120を示す情報を応答Bに含める。すなわち、ユーザ端末130は、電力管理サーバ120Aに応答Aを行っていることを示す情報を応答Bに含める。
 ステップS505において、電力管理サーバ120Bは、ユーザ端末130からの応答Bに基づいて、ユーザ端末130が電力管理サーバ120Aに応答を行っていることを確認し、応答Bがあったことを示す応答通知を電力管理サーバ120Aに送信する。
 一方、ステップS506において、ユーザ端末130は、スマートメータ140に対して使用電力の問い合わせを行う。使用電力の問い合わせはBルートを用いて行ってもよい。
 ステップS507において、スマートメータ140は、ユーザ端末130に、使用電力問い合わせに対する応答を送信する。応答は、スマートメータ情報を含む。スマートメータ情報は、SM-IDと現在の使用電力(例えばXXXkw)を含む。
 以下のステップS508乃至ステップS513の動作は、電力削減要求時間帯において行われる。ここでは、電力削減要求時間帯において、需要家が、需要家施設170における使用電力を削減した後、店舗A、店舗Bの順に訪問する場合を想定する。
 ステップS508において、ユーザ端末130は、店舗Aの店舗端末200Aにアクセスし、インセンティブの取引を行うことを示す電力取引確認メッセージを店舗端末200Aに送信する。電力取引確認メッセージは、スマートメータ情報を含む。ユーザ端末130は、店舗端末200Aにアクセスしたことに応じて、図7に示すような表示画面を表示してもよい。
 ステップS509において、店舗端末200Aは、電力取引確認メッセージを電力管理サーバ120Aに転送する。電力管理サーバ120Aは、電力取引確認メッセージに基づいて、店舗Aにユーザ端末130(需要家)が訪れたことを確認する。
 ステップS510において、電力管理サーバ120Aは、店舗Aにユーザ端末130(需要家)が訪れたことを示す確認通知Aを電力管理サーバ120Bに送信する。電力管理サーバ120Bは、確認通知Aに基づいて、店舗Aにユーザ端末130(需要家)が訪れたことを確認する。
 ステップS511において、ユーザ端末130は、店舗Bの店舗端末200Bにアクセスし、インセンティブの取引を行うことを示す電力取引確認メッセージを店舗端末200Bに送信する。電力取引確認メッセージは、スマートメータ情報を含む。ユーザ端末130は、店舗端末200Bにアクセスしたことに応じて、図7に示すような表示画面を表示してもよい。
 ステップS512において、店舗端末200Bは、電力取引確認メッセージを電力管理サーバ120Bに転送する。電力管理サーバ120Bは、電力取引確認メッセージに基づいて、店舗Bにユーザ端末130(需要家)が訪れたことを確認する。
 ステップS513において、電力管理サーバ120Bは、店舗Bにユーザ端末130(需要家)が訪れたことを示す確認通知Bを電力管理サーバ120Aに送信する。電力管理サーバ120Aは、確認通知Bに基づいて、店舗Bにユーザ端末130(需要家)が訪れたことを確認する。
 電力削減要求時間帯の経過後、ステップS514において、電力管理サーバ120Bは、スマートメータ情報に基づいてスマートメータ140にアクセスする。電力管理サーバ120Bは、スマートメータ140に直接アクセスしてもよい。或いは、電力会社経由(Cルート)でスマートメータ140にアクセスしてもよい。或いは、需要家施設170内のHEMS経由でスマートメータ140にアクセスしてもよい。
 ステップS515において、スマートメータ140は、過去の一定期間における使用電力の履歴(例えば、30分ごとの使用電力)を含む電力値通知を電力管理サーバ120Bに送信する。或いは、スマートメータ140は、電力削減要求時間帯中の使用電力の情報を含む電力値通知を電力管理サーバ120Bに送信する。
 電力管理サーバ120Bは、スマートメータ140から取得した使用電力の履歴に基づいて、電力削減要求時間帯前の使用電力と電力削減要求時間帯中の使用電力との差を削減実績電力として算出する。或いは、電力管理サーバ120Bは、ステップS512で取得した電力削減要求時間帯前の使用電力とステップS515で取得した電力削減要求時間帯中の使用電力との差を削減実績電力として算出してもよい。
 ステップS516において、電力管理サーバ120Bは、電力取引値確認メッセージを電力管理サーバ120Aに送信する。電力取引値確認メッセージは、削減実績電力の情報と、需要家の店舗Bにおける貢献量の情報(貢献量情報B)を含む。貢献量情報Bは、店舗Bで需要家が使用した金額または需要家が店舗Bに滞在した時間である。貢献量情報Bは、店舗Bに需要家が訪問する頻度を含んでもよい。電力管理サーバ120Bは、例えば店舗端末200Bから貢献量情報Bを取得して、貢献量情報Bを電力取引値確認メッセージに含める。
 ステップS517において、電力管理サーバ120Aは、電力取引値確認メッセージを電力管理サーバ120Bに送信する。電力取引値確認メッセージは、需要家の店舗Aにおける貢献量の情報(貢献量情報A)を含む。貢献量情報Aは、店舗Aで需要家が使用した金額または需要家が店舗Aに滞在した時間である。貢献量情報Aは、店舗Aに需要家が訪問する頻度を含んでもよい。電力管理サーバ120Aは、例えば店舗端末200Aから貢献量情報Aを取得して、貢献量情報Aを電力取引値確認メッセージに含める。
 電力管理サーバ120Bは、貢献量情報A及び貢献量情報Bに基づいて、需要家に付与すべきインセンティブを配分する。例えば、貢献量情報A及び貢献量情報Bの比に応じて削減実績電力を分割し、店舗Aの貢献による削減実績電力A及び店舗Bの貢献による削減実績電力Bを導出する。需要家の視点からは、削減実績電力に応じたインセンティブが、店舗Aに対応するインセンティブ及び店舗Bに対応するインセンティブに分割されることになる。インセンティブは例えばポイントなどで付与される。
 ステップS518において、電力管理サーバ120Bは、電力取引値応答メッセージを電力管理サーバ120Aに送信する。電力取引値応答メッセージは、店舗Aの貢献による削減実績電力Aを含む。電力取引値応答メッセージは、店舗Bの貢献による削減実績電力Bを含んでもよい。
 ステップS519において、電力管理サーバ120Aは、店舗Aの貢献による削減実績電力Aに基づいて、需要家に対するインセンティブを決定する。
 ステップS520において、電力管理サーバ120Bは、店舗Bの貢献による削減実績電力Bに基づいて、需要家に対するインセンティブを決定する。
 第3実施形態では、2つの電力管理サーバ120からの電力取引要求メッセージをユーザ端末130が受信する一例を説明したが、3つ以上の電力管理サーバ120からの電力取引要求メッセージをユーザ端末130が受信してもよい。
 (3.3 第3実施形態のまとめ)
 第3実施形態では、電力管理サーバ120A及び電力管理サーバ120Bからの電力削減要求にユーザ端末130(需要家)が応じる場合において、電力管理サーバ120Aは、電力管理サーバ120Bとの通信を行うことにより、ユーザ端末130(需要家)に付与すべきインセンティブを配分する。これにより、複数の電力削減要求に需要家が応じる場合であっても、需要家に対して適切にインセンティブを付与することができる。
 [4.その他の実施形態]
 上述の実施形態では、電力供給者が設置する電力供給者サーバ100から電力削減要求メッセージを送信する形態について説明したが、電力削減要求メッセージの送信元はアグリゲータが設置するアグリゲータサーバ110でもよい。
 電力削減要求メッセージを受信した電力管理サーバ120がユーザ端末130に電力削減要求メッセージを送信するタイミングまたは回数については、電力管理サーバ120で適宜調整できることに留意すべきである。電力管理サーバ120は、最も効果的に電力削減を行えるタイミングまたは回数でユーザ端末130に電力削減要求メッセージを送信する。
 また、電力管理サーバ120の運営者と、インセンティブ付与端末200の運用者とが異なる場合でも本発明を実現できることは勿論である。
 上述の実施形態に係る動作をユーザ端末130に実行させるためのプログラム(アプリケーション)が提供されてもよい。
 上述の実施形態では、電力供給者サーバ100からスマートメータ140に対してAルートを介して需要家施設170の使用電力を取得したが、これに限られず、アグリゲータサーバ110(または、電力管理サーバ120)を介するCルートを用いて需要家施設170の使用電力を取得してもよい。またAルートおよびCルートの両方を用いて需要家施設170の使用電力を取得してもよい。
 ここで、需要家施設170の使用電力としては、電力削減要求時間帯前の使用電力及び電力削減要求時間帯中の使用電力が考えられる。これらの使用電力の双方がAルートで取得されてもよく、これらの使用電力の双方がCルートで取得されてもよい。或いは、これらの使用電力の一方がAルートで取得され、これらの使用電力の他方がCルートで取得されてもよい。使用電力の取得ルートは特に限定されるものではないが、上述の実施形態では、電力削減要求時間帯前の使用電力がCルートで取得され、電力削減要求時間帯前の使用電力がAルートで取得されるケースが例示されている。
 上述の実施形態では、スマートメータ情報は、スマートメータ140の識別情報及びスマートメータ140により計測された使用電力のうち、少なくとも一方を含む。例えば、サーバ(電力供給者サーバ100または電力管理サーバ120)がスマートメータ140にアクセスする機能を有する場合には、スマートメータ情報がスマートメータ140の識別情報を含んでいれば、サーバは、スマートメータ140にアクセスすることによって、スマートメータ140により計測された使用電力を取得することができる。このようなケースでは、スマートメータ情報は、スマートメータ140により計測された使用電力を含まずに、スマートメータ140の識別情報を含んでいてもよい。一方で、サーバ(電力供給者サーバ100または電力管理サーバ120)がスマートメータ140にアクセスする機能を有していない場合には、スマートメータ情報がスマートメータ140の識別情報を含んでいても、サーバは、スマートメータ140にアクセスすることができない。このようなケースでは、スマートメータ情報は、スマートメータ140の識別情報を含まずに、スマートメータ140により計測された使用電力を含んでいてもよい。ここで、スマートメータ140により計測された使用電力は、力削減要求時間帯前の使用電力であってもよく、電力削減要求時間帯中の使用電力であってもよい。
 実施形態では、使用電力及び削減実績電力の単位としてkWを用いているが、使用電力及び削減実績電力の単位としてkWhを用いてもよい。すなわち、使用電力及び削減実績電力を使用電力量及び削減実績電力量と読み替えてもよい。
 実施形態では特に触れていないが、ユーザ端末130が行う各処理をコンピュータに実行させるプログラムが提供されてもよい。また、プログラムは、コンピュータ読取り可能媒体に記録されていてもよい。コンピュータ読取り可能媒体を用いれば、コンピュータにプログラムをインストールすることが可能である。ここで、プログラムが記録されたコンピュータ読取り可能媒体は、非一過性の記録媒体であってもよい。非一過性の記録媒体は、特に限定されるものではないが、例えば、CD-ROMやDVD-ROM等の記録媒体であってもよい。
 或いは、ユーザ端末130が行う各処理を実行するためのプログラムを記憶するメモリ及びメモリに記憶されたプログラムを実行するプロセッサによって構成されるチップが提供されてもよい。
 なお、日本国特許出願第2014-261801号(2014年12月25日出願)及び日本国特許出願第2015-089854号(2015年4月24日出願)の全内容が、参照により、本願に組み込まれている。
 実施形態によれば、電力供給者からの電力制御に関する要求に応じて適切に使用電力を制御することを可能とするサーバ、ユーザ端末、及びプログラムを提供することができる。

Claims (14)

  1.  需要家のユーザ端末に電力削減要求を通知する通知部と、
     前記需要家が前記電力削減要求に応じる場合において、前記ユーザ端末から通知されるスマートメータ情報を取得する制御部と、を備え、
     前記スマートメータ情報は、電力削減の対象とする需要家施設のスマートメータに関する情報であり、
     前記制御部は、前記スマートメータ情報に基づいて、前記需要家施設の削減実績電力を判断することを特徴とするサーバ。
  2.  前記制御部は、前記スマートメータ情報に基づいて、前記スマートメータにアクセスし、前記削減実績電力を判断することを特徴とする請求項1に記載のサーバ。
  3.  前記スマートメータ情報は、前記スマートメータの識別情報及び前記スマートメータにより計測された使用電力のうち、少なくとも一方を含むことを特徴とする請求項1または請求項2に記載のサーバ。
  4.  前記電力削減要求に応じて前記需要家施設の使用電力が削減された場合において、前記制御部は、前記削減実績電力に応じたインセンティブを前記需要家に付与するための処理を行うことを特徴とする請求項1乃至請求項3のいずれかに記載のサーバ。
  5.  前記制御部は、前記電力削減要求により電力削減が要求された時間帯において、所定のサービス施設の端末装置を介して前記スマートメータ情報を前記ユーザ端末から取得することを特徴とする請求項1乃至請求項4のいずれかに記載のサーバ。
  6.  前記端末装置を介して前記インセンティブを前記需要家に付与するための処理を行うことを特徴とする請求項3を引用する請求項5に記載のサーバ。
  7.  自サーバを含む複数のサーバからの電力削減要求に前記需要家が応じる場合において、前記制御部は、前記複数のサーバに含まれる他のサーバとの通信を行うことにより、前記需要家に付与すべき前記インセンティブを前記複数のサーバ間で配分することを特徴とする請求項4に記載のサーバ。
  8.  前記複数のサーバは、複数のサービス施設と関連付けられており、
     前記制御部は、前記需要家がサービス施設ごとに使用した金額または滞在した時間に基づいて、前記需要家に付与すべき前記インセンティブを前記複数のサーバ間で配分することを特徴とする請求項7に記載のサーバ。
  9.  前記制御部は、前記電力削減要求を前記需要家に送信する際に、使用電力の削減を希望する施設に関する情報を含むことを特徴とする請求項1乃至請求項8のいずれかに記載のサーバ。
  10.  需要家のユーザ端末であって、
     前記需要家がサーバからの電力削減要求に応じる場合において、電力削減の対象とする需要家施設のスマートメータに関するスマートメータ情報を取得する制御部を備え、
     前記制御部は、前記スマートメータ情報を前記サーバに通知することを特徴とするユーザ端末。
  11.  前記スマートメータ情報は、前記スマートメータの識別情報及び前記スマートメータにより計測された使用電力のうち、少なくとも一方を含むことを特徴とする請求項10に記載のユーザ端末。
  12.  前記電力削減要求に応じて前記需要家施設の使用電力が削減された場合において、前記制御部は、前記需要家施設の削減実績電力に応じたインセンティブを取得することを特徴とする請求項10または請求項11に記載のユーザ端末。
  13.  前記制御部は、前記電力削減要求により電力削減が要求された時間帯において、所定のサービス施設の端末装置を介して前記スマートメータ情報を前記サーバに通知し、前記端末装置を介して前記インセンティブを前記サーバから取得することを特徴とする請求項12に記載のユーザ端末。
  14.  需要家のユーザ端末に、
     前記需要家がサーバからの電力削減要求に応じる場合において、電力削減の対象とする需要家施設のスマートメータに関するスマートメータ情報を取得する手順と、
     前記スマートメータ情報を前記サーバに通知する手順と、
    を実行させることを特徴とするプログラム。
PCT/JP2015/085634 2014-12-25 2015-12-21 サーバ、ユーザ端末、及びプログラム WO2016104402A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2016566333A JP6343030B2 (ja) 2014-12-25 2015-12-21 サーバ、ユーザ端末、及びプログラム
US15/537,554 US10365623B2 (en) 2014-12-25 2015-12-21 Server, user terminal, and program
EP15872970.7A EP3240140A4 (en) 2014-12-25 2015-12-21 Server, user terminal, and program

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2014261801 2014-12-25
JP2014-261801 2014-12-25
JP2015089854 2015-04-24
JP2015-089854 2015-04-24

Publications (1)

Publication Number Publication Date
WO2016104402A1 true WO2016104402A1 (ja) 2016-06-30

Family

ID=56150421

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2015/085634 WO2016104402A1 (ja) 2014-12-25 2015-12-21 サーバ、ユーザ端末、及びプログラム

Country Status (4)

Country Link
US (1) US10365623B2 (ja)
EP (1) EP3240140A4 (ja)
JP (1) JP6343030B2 (ja)
WO (1) WO2016104402A1 (ja)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018036696A (ja) * 2016-08-29 2018-03-08 京セラ株式会社 電力料金管理方法、ユーザ端末及び電力料金管理システム
JP6343372B1 (ja) * 2017-06-09 2018-06-13 九電みらいエナジー株式会社 デマンドレスポンスシステム
WO2020241246A1 (ja) * 2019-05-24 2020-12-03 パナソニックIpマネジメント株式会社 管理システムおよび管理方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160143456A (ko) * 2015-06-05 2016-12-14 주식회사 인코어드 테크놀로지스 전력 관리 기능을 갖는 시스템 및 사용자 단말기, 및 이것의 전력 관리 방법
US20190157866A1 (en) * 2016-07-27 2019-05-23 Kyocera Corporation Power management apparatus, power management method, and power management system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013094687A1 (ja) * 2011-12-22 2013-06-27 大和ハウス工業株式会社 エネルギー管理システム及び管理装置
WO2013114601A1 (ja) * 2012-02-02 2013-08-08 株式会社日立製作所 電力需要調整システム及び電力需要調整方法
JP2014060887A (ja) * 2012-09-19 2014-04-03 Sharp Corp 節電要請発生装置
JP2014191579A (ja) * 2013-03-27 2014-10-06 Japan Research Institute Ltd 節電行動誘発システム及びその方法
JP2014229000A (ja) * 2013-05-21 2014-12-08 株式会社Nttファシリティーズ 節電支援システム、節電支援装置、及び節電支援方法

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8700187B2 (en) * 2007-08-28 2014-04-15 Consert Inc. Method and apparatus for actively managing consumption of electric power supplied by one or more electric utilities
US8706650B2 (en) * 2009-01-14 2014-04-22 Integral Analytics, Inc. Optimization of microgrid energy use and distribution
US20110202467A1 (en) * 2010-01-19 2011-08-18 Hilber Del A Automated load control and dispatch system and method
JP5016704B2 (ja) * 2010-05-31 2012-09-05 株式会社エナリス 電力需要管理装置、および電力需要管理システム
US8825215B2 (en) * 2010-11-17 2014-09-02 General Electric Company Power consumption compliance monitoring system and method
JP6236587B2 (ja) * 2011-09-16 2017-11-29 オートグリッド インコーポレイテッド デマンドレスポンス及び分散エネルギーリソースを最適化及び管理するシステム及び方法
JP5622714B2 (ja) * 2011-12-27 2014-11-12 株式会社東芝 情報処理装置および電力利用調整システム
JP2013161144A (ja) 2012-02-02 2013-08-19 Hitachi Ltd 電力需給の統合計画システム
JP5905324B2 (ja) 2012-04-25 2016-04-20 京セラ株式会社 電力管理装置、表示装置、表示方法、および画像作成プログラム
KR20140079274A (ko) * 2012-12-18 2014-06-26 삼성전자주식회사 홈 네트워크 시스템에서 에너지 소비를 관리하는 방법 및 장치
US9563218B2 (en) * 2013-03-15 2017-02-07 Dominion Resources, Inc. Electric power system control with measurement of energy demand and energy efficiency using t-distributions

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013094687A1 (ja) * 2011-12-22 2013-06-27 大和ハウス工業株式会社 エネルギー管理システム及び管理装置
WO2013114601A1 (ja) * 2012-02-02 2013-08-08 株式会社日立製作所 電力需要調整システム及び電力需要調整方法
JP2014060887A (ja) * 2012-09-19 2014-04-03 Sharp Corp 節電要請発生装置
JP2014191579A (ja) * 2013-03-27 2014-10-06 Japan Research Institute Ltd 節電行動誘発システム及びその方法
JP2014229000A (ja) * 2013-05-21 2014-12-08 株式会社Nttファシリティーズ 節電支援システム、節電支援装置、及び節電支援方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3240140A4 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018036696A (ja) * 2016-08-29 2018-03-08 京セラ株式会社 電力料金管理方法、ユーザ端末及び電力料金管理システム
JP2021061022A (ja) * 2016-08-29 2021-04-15 京セラ株式会社 電力管理方法及び管理装置
JP7038789B2 (ja) 2016-08-29 2022-03-18 京セラ株式会社 電力管理方法及び管理装置
JP6343372B1 (ja) * 2017-06-09 2018-06-13 九電みらいエナジー株式会社 デマンドレスポンスシステム
JP2018207759A (ja) * 2017-06-09 2018-12-27 九電みらいエナジー株式会社 デマンドレスポンスシステム
WO2020241246A1 (ja) * 2019-05-24 2020-12-03 パナソニックIpマネジメント株式会社 管理システムおよび管理方法

Also Published As

Publication number Publication date
US20170343973A1 (en) 2017-11-30
EP3240140A1 (en) 2017-11-01
EP3240140A4 (en) 2018-05-23
JPWO2016104402A1 (ja) 2017-09-21
US10365623B2 (en) 2019-07-30
JP6343030B2 (ja) 2018-06-13

Similar Documents

Publication Publication Date Title
JP6343030B2 (ja) サーバ、ユーザ端末、及びプログラム
JP6170729B2 (ja) 節電支援システム、節電支援装置、及び節電支援方法
KR20130038102A (ko) 휴대용 기기를 이용하여 음식 배달 업체에 대한 검색, 주문, 결제 및 위치 추적 방법
JP5470102B2 (ja) 携帯端末、車載端末、スタンプカード管理方法、およびスタンプカード管理プログラム
JP2014157498A (ja) 情報提供システム、情報提供装置、買い物用プログラムおよび情報提供方法
JP2012003428A (ja) 電子クーポン配布装置,電子クーポン配布システム及び方法
JP2013235511A (ja) 予約処理装置、予約処理方法および予約処理プログラム
JP5683727B2 (ja) ビル電力管理装置、ビル電力管理システム、テナント電力管理システム、ビル電力管理方法、及びプログラム
JP5289342B2 (ja) 通信システム、接続提供端末、接続利用端末、サーバ、通信方法およびプログラム
KR20150070481A (ko) 마케팅 시스템 및 이를 이용한 마케팅 방법
KR20160057958A (ko) 사용자 맞춤 서비스 제공 방법 및 장치
JP2013214195A (ja) ビジネス支援システム
JP5131879B1 (ja) ネットワークを介して携帯端末にダウンロードされ、その携帯端末によって実行されるコンピュータプログラム
JP5807398B2 (ja) 携帯端末、ポイント交換システム、ポイント交換方法およびポイント交換プログラム
US10002380B2 (en) Beacon service method and device
JP2016099801A (ja) クーポン配信システム及びクーポン配信プログラム
JP5601798B2 (ja) 位置管理サーバ、位置管理システム、および位置管理方法
JP6920648B2 (ja) 施設運営支援システム
US20160225009A1 (en) Permitting a business with physical locations to connect with their customers on their mobile devices (retap)
TWI485643B (zh) 具即時與區域性特徵的訂房系統與方法
WO2015145926A1 (ja) 電力供給システム、制御装置、電力受給装置、端末装置、電力制御方法及び非一時的なコンピュータ可読媒体
KR101948532B1 (ko) 쿠폰 통합 관리 시스템 및 쿠폰 통합 관리 방법
KR20140108473A (ko) 모바일 스탬프 제공 방법 및 서버
JP2015114992A (ja) 省電力支援装置、省電力支援方法および省電力支援プログラム
JP6724794B2 (ja) 情報処理装置、情報処理方法、およびプログラム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 15872970

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2016566333

Country of ref document: JP

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 15537554

Country of ref document: US

REEP Request for entry into the european phase

Ref document number: 2015872970

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE