WO2015068293A1 - 室外機 - Google Patents

室外機 Download PDF

Info

Publication number
WO2015068293A1
WO2015068293A1 PCT/JP2013/080350 JP2013080350W WO2015068293A1 WO 2015068293 A1 WO2015068293 A1 WO 2015068293A1 JP 2013080350 W JP2013080350 W JP 2013080350W WO 2015068293 A1 WO2015068293 A1 WO 2015068293A1
Authority
WO
WIPO (PCT)
Prior art keywords
outdoor unit
snow
refrigerant
unit
control device
Prior art date
Application number
PCT/JP2013/080350
Other languages
English (en)
French (fr)
Inventor
宏満 菊地
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2015546255A priority Critical patent/JP5989260B2/ja
Priority to US14/897,817 priority patent/US20160123607A1/en
Priority to GB1521780.5A priority patent/GB2535831B/en
Priority to PCT/JP2013/080350 priority patent/WO2015068293A1/ja
Publication of WO2015068293A1 publication Critical patent/WO2015068293A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/26Refrigerant piping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/56Casing or covers of separate outdoor units, e.g. fan guards
    • F24F1/58Separate protective covers for outdoor units, e.g. solar guards, snow shields or camouflage
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/06Separate outdoor units, e.g. outdoor unit to be linked to a separate room comprising a compressor and a heat exchanger
    • F24F1/60Arrangement or mounting of the outdoor unit
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/52Weather protecting means, e.g. against wind, rain or snow

Definitions

  • the present invention relates to an outdoor unit.
  • a refrigerant circuit is configured and a refrigeration cycle is formed.
  • the refrigerant circuit for example, an outdoor unit including a compressor and an outdoor unit side heat exchanger, an indoor unit including an expansion valve, and an indoor unit side heat exchanger are connected by a refrigerant pipe. That is, the refrigerant circuit has a configuration in which an outdoor unit that is a heat source side unit and an indoor unit that is a load side unit are connected by a refrigerant pipe, and the refrigerant circulates.
  • the refrigerant circuit is an indoor unit-side heat exchanger, for example, and evaporates the refrigerant by absorbing heat from the air in the air-conditioning target space that is a heat exchange target.
  • the refrigerant circuit condenses the refrigerant by radiating heat to the air in the air-conditioning target space, which is a heat exchange target, for example, with an indoor heat exchanger. That is, the air conditioner harmonizes the air in the air-conditioning target space by changing the pressure and temperature of the refrigerant flowing through the refrigerant circuit.
  • the outdoor unit is surrounded by a casing, and the outdoor unit side heat exchanger is accommodated in the casing, and an outdoor unit base is provided at the lower part of the outdoor unit side heat exchanger. It has been.
  • the outdoor unit base part has an outdoor unit side heat exchanger mounted thereon.
  • the outdoor unit base is provided with a drain hole.
  • the drain hole discharges drain water generated by the defrosting operation or the like out of the housing.
  • the outdoor unit-side heat exchanger functions as an evaporator. Therefore, if the heating operation is performed when the outside air temperature is low, the drain water or the like staying in the outdoor unit base is frozen and the drain hole is closed. If the drain hole is closed, drain water or the like is not discharged from the outdoor unit base part, and stays in the outdoor unit base part, so that icing further proceeds. As a result, root ice and the like are caused. Since root ice obstructs the flow of air passing through the outdoor unit-side heat exchanger, efficient heat exchange is not performed.
  • electric heaters such as those provided in conventional air conditioners can prevent freezing of water remaining in the outdoor unit base, but there is a large amount of snow and the snow is at the bottom of the outdoor unit base. Even in the area where the electric heater is used, the drain hole of the outdoor unit base is blocked by the snow. Therefore, the drainage performance of the outdoor unit as in the past is reduced.
  • measures against snow accumulation in cold regions include, for example, the provision of a snow cradle to prevent snow from reaching the outdoor unit base, or the operation of an electric heater to collect the drainage accumulated in the outdoor unit base.
  • the snow on the ground was melted by preventing water from icing and installing road heating.
  • the present invention has been made to solve the above-described problems, and provides an outdoor unit that can prevent freezing of water in the outdoor unit base while improving serviceability and realizing low cost. It is intended to provide.
  • An outdoor unit includes a compressor, an indoor unit side heat exchanger, an expansion device, and a first refrigerant circuit formed by connecting an outdoor unit side heat exchanger via a refrigerant pipe.
  • An outdoor unit provided with a part of a refrigerant circuit, the second refrigerant circuit being bypassed by the refrigerant discharged from the compressor and flowing through the first refrigerant circuit, and the refrigerant flowing through the first refrigerant circuit
  • a control device that controls the flow rate and the flow rate of the refrigerant flowing through the second refrigerant circuit; and an outdoor unit base that supports the compressor and the outdoor unit-side heat exchanger, and is provided below the outdoor unit base.
  • a snow heating stand that supports the outdoor unit base, a heating medium flows, and the heating is performed by heat exchange between the heating medium and the refrigerant flowing through the second refrigerant circuit.
  • a unit is provided on the snow cradle. .
  • this invention by providing a load heating unit using a refrigeration cycle to the snow protection stand, it is possible to improve the serviceability and achieve low cost while melting snow accumulated on the snow protection stand. Therefore, this invention has the effect that the freezing of the water in an outdoor unit base part can be prevented, improving serviceability and implement
  • step of describing the program for performing the operation of the embodiment of the present invention is a process performed in time series in the order described, but it is not always necessary to process in time series.
  • the processing executed may be included.
  • each block diagram described in this embodiment may be considered as a hardware block diagram or a software functional block diagram.
  • each block diagram may be realized by hardware such as a circuit device, or may be realized by software executed on an arithmetic device such as a processor (not shown).
  • each block in the block diagram described in the present embodiment only needs to perform its function, and the configuration may not be separated by each block.
  • items not particularly described are the same as those in the first to third embodiments, and the same functions and configurations are described using the same reference numerals.
  • each of Embodiments 1 to 3 may be implemented independently or in combination. In either case, the advantageous effects described below can be obtained.
  • various specific setting examples described in this embodiment are merely examples, and are not particularly limited thereto.
  • FIG. 1 is a diagram showing an example of a schematic configuration of an air conditioning system 1 according to Embodiment 1 of the present invention.
  • the air conditioning system 1 includes an air conditioner 2 and a road heating unit 3.
  • the load heating unit 3 will be described later in detail, it may be a commercially available one and can be attached to the air conditioner 2 as an optional part.
  • the air conditioner 2 includes a main refrigerant circuit 4, a bypass circuit 5, and a heat exchanger 6 for load heating.
  • the main refrigerant circuit 4 includes, for example, a compressor 11, a four-way valve 12, a gas operation valve 13, an indoor unit side heat exchanger 14, an electronic expansion valve 15, a liquid operation valve 16, a flow rate regulator 17, a heat exchanger 18, and an outdoor unit.
  • the machine side heat exchanger 19 and the accumulator 20 are comprised.
  • the bypass circuit 5 includes, for example, a bypass pipe 31, a bypass circuit electromagnetic valve 32, a bypass circuit electronic expansion valve 34, a bypass circuit temperature sensor 35, and the like.
  • the air conditioner 2 includes an outdoor unit 7 and an indoor unit 9.
  • the outdoor unit 7 is provided with a part of the main refrigerant circuit 4 and functions as a heat source unit.
  • the outdoor unit 7 includes, for example, a compressor 11, a four-way valve 12, a gas operation valve 13, a liquid operation valve 16, a flow rate regulator 17, a heat exchanger 18, an outdoor unit side heat exchanger 19, an accumulator 20, and the like. It has been.
  • the outdoor unit side heat exchanger 19 functions as a heat source side heat exchanger.
  • the outdoor unit 7 is provided with a control device 51 as a control function.
  • the control device 51 has a functional configuration realized on, for example, a control board accommodated in an electrical component box of the outdoor unit 7 (not shown). Details of the functional configuration of the control device 51 will be described later with reference to FIG. 3.
  • the control device 51 is mounted on the outdoor unit 7 as a functional configuration for controlling the driving components of the outdoor unit 7 according to various sensing results. It is what is done.
  • the control device 51 is provided with switch means 52 including various switches such as a dip switch and a rotary switch (not shown) as a physical configuration. Such various switches are accommodated in an electrical component box (not shown) as the switch means 52 and used when changing various settings.
  • the outdoor unit 7 is provided with the bypass circuit 5 described above.
  • the detection result of the bypass circuit temperature sensor 35 of the bypass circuit 5 is supplied to the control device 51.
  • the bypass circuit temperature sensor 35 is provided on the outlet side of the load heating heat exchanger 6 and detects the outlet temperature of the load heating heat exchanger 6.
  • the bypass circuit temperature sensor 35 converts such a detection result into a detection signal based on a preset communication protocol, and supplies the detection signal to the control device 51.
  • the indoor unit 9 is provided with another part of the main refrigerant circuit 4 and functions as a load-side unit.
  • the indoor unit 9 is provided with, for example, an indoor unit side heat exchanger 14 and an electronic expansion valve 15. Among these, the indoor unit side heat exchanger 14 functions as a use side heat exchanger.
  • the compressor 11 compresses and discharges the sucked refrigerant.
  • an inverter device (not shown) is provided in the control device 51 described later, and the operation frequency is supplied from the control device 51 to the compressor 11.
  • the control device 51 arbitrarily controls the capacity of the compressor 11, that is, the amount of refrigerant delivered per unit time of the compressor 11 within the range of the specifications of the compressor 11 by arbitrarily changing the operation frequency.
  • the four-way valve 12 switches the refrigerant flow between the cooling operation and the heating operation based on a signal supplied from the control device 51.
  • the gas operation valve 13 controls the amount of refrigerant flowing out of the outdoor unit 7 and the amount of refrigerant flowing into the outdoor unit 7. Specifically, the gas operation valve 13 controls the outflow amount and inflow amount of a gas refrigerant such as a gaseous single-phase refrigerant or a gas-liquid two-phase refrigerant mainly composed of a gaseous refrigerant.
  • the liquid operation valve 16 controls the amount of refrigerant flowing into the outdoor unit 7 and the amount of refrigerant flowing out of the outdoor unit 7. Specifically, the liquid operation valve 16 controls an inflow amount and an outflow amount of a liquid refrigerant such as a liquid single-phase refrigerant or a gas-liquid two-phase refrigerant mainly composed of a liquid refrigerant.
  • the flow rate regulator 17 is provided in the sub refrigerant pipe 23 branched from the main refrigerant pipe 22.
  • the auxiliary refrigerant pipe 23 has, for example, a longitudinal shape having elasticity, one of which is composed of one connection port and the other is composed of two connection ports which are divided into two.
  • One of the auxiliary refrigerant pipes 23 is connected to the main refrigerant pipe 22 on the liquid operation valve 16 side, the first one is connected between the four-way valve 12 and the accumulator 20, and the second is an electronic circuit for bypass circuit. Connected to the downstream side of the expansion valve 34.
  • the flow rate regulator 17 can change an opening degree, and is comprised by the valve which adjusts a flow volume.
  • the heat exchanger 18 exchanges heat between the refrigerant flowing through the main refrigerant pipe 22 and the refrigerant flowing through the sub refrigerant pipe 23.
  • the state of the refrigerant flowing through the sub refrigerant pipe 23 is adjusted by the flow rate regulator 17.
  • the outdoor unit side heat exchanger 19 performs heat exchange between the refrigerant and the air. Specifically, the outdoor unit side heat exchanger 19 exchanges heat between the refrigerant flowing through the main refrigerant pipe 22 and outdoor air sucked from the outdoor unit 7 using a fan of the outdoor unit 7 (not shown). .
  • the outdoor unit side heat exchanger 19 functions as an evaporator during heating operation, for example, and evaporates and evaporates the refrigerant.
  • the outdoor unit side heat exchanger 19 functions as a condenser during cooling operation, for example, and therefore condenses and liquefies the refrigerant.
  • the load heating heat exchanger 6 connects a bypass pipe 31 constituting the bypass circuit 5 and a load heating refrigerant pipe 44 constituting the load heating unit 3.
  • the load heating heat exchanger 6 circulates the refrigerant flowing through the bypass pipe 31 and the load heating refrigerant pipe 44.
  • Heat exchange is performed with a liquid that is a heat medium.
  • an antifreeze liquid is used, so that the liquid flowing through the load heating refrigerant pipe 44 can be prevented from freezing even in a cold region.
  • the heat medium is a heat medium that is frozen in a cold region. As long as it does not, gas may be sufficient.
  • the load heating heat exchanger 6 is provided with, for example, two connection ports for connecting the bypass pipe 31 and two connection ports for connecting the load heating refrigerant pipe 44.
  • Each connection port provided in the heat exchanger 6 for load heating is provided with a member for connecting various pipes.
  • the load heating refrigerant pipe 44 is fixed by a member for connecting various pipes, and the load heating heat exchanger 6 is fixed.
  • each connection port provided in the load heating heat exchanger 6 may be closed with a lid or the like adapted to the shape of each connection port.
  • the members that connect the various pipes are, for example, longitudinal connection pipes composed of two connection ports.
  • Each of the two connection ports is composed of, for example, a covering member that covers the periphery, and dissimilar metals. What is necessary is just to be comprised with the material which can be connected and has high corrosion resistance.
  • the load heating heat exchanger 6 exchanges heat between the refrigerant flowing through the bypass pipe 31 and the antifreeze liquid flowing through the load heating refrigerant pipe 44. Specifically, when the load heating unit 3 becomes necessary during the heating operation, the control device 51 opens the opening degree of the bypass circuit electromagnetic valve 32 of the bypass pipe 31 so that the load heating heat is increased. The exchanger 6 exchanges heat between the refrigerant and the antifreeze liquid.
  • the refrigerant flowing through the bypass pipe 31 is condensed and liquefied, so that it becomes a liquid refrigerant.
  • the accumulator 20 is formed with a configuration for accumulating excess refrigerant, and the accumulator 20 and the bypass pipe 31 are connected. Accordingly, the liquid refrigerant condensed in the load heating heat exchanger 6 flows into the accumulator 20, and the liquid refrigerant is stored in the accumulator 20.
  • the load heating unit 3 includes, for example, a heating member 41 and a pump 42.
  • the heating member 41 is constituted by a heating pipe 43, for example.
  • the heating member 41 is not particularly limited in terms of material, outer shape, cross-sectional shape, and the like, but may be composed of a material having high cold resistance and high durability, for example.
  • the arrangement configuration of the heating pipe 43 is not particularly limited.
  • the heating pipe 43 may be arranged in a meandering shape so that the heat of the heating pipe 43 is easily transmitted around the load heating unit 3.
  • the pump 42 circulates an antifreeze liquid flowing through the heating pipe 43.
  • the pump 42 is controlled by a control device 51 described later.
  • the load heating heat exchanger 6 exchanges heat between the refrigerant and the antifreeze liquid, so that the antifreeze liquid flowing through the load heating refrigerant pipe 44 is heated. Further, since the pump 42 is driven, the antifreeze liquid flowing through the load heating refrigerant pipe 44 circulates in the load heating unit 3. Therefore, since the heated antifreeze liquid passes through the heating pipe 43 by driving the pump 42 and circulates in the load heating unit 3, the heating member 41 can heat the surroundings. That is, the liquid circulating in the load heating unit 3 is a heat medium, and an antifreeze liquid that does not freeze even in a cold region is used. Therefore, the load heating heat exchanger 6 generates a refrigerant and a heat medium. By exchanging heat, the load heating unit 3 can heat the surroundings.
  • the bypass circuit electronic expansion valve 34 is configured to change the opening degree, and adjusts the flow rate of the refrigerant flowing through the bypass pipe 31.
  • the control device 51 obtains the degree of supercooling based on the detection result of the temperature sensor for bypass circuit 35 and the saturation temperature of the high pressure, and according to the obtained degree of supercooling, the electronic expansion valve 34 for the bypass circuit. Adjust the opening.
  • the electromagnetic valve 32 for bypass circuit is a relay that opens and closes the valve, and adjusts whether or not the refrigerant flowing through the bypass pipe 31 is allowed to pass through.
  • the control device 51 obtains a distance ⁇ L between the outdoor unit base 62 described later and the snow 55 based on the detection result of the snowfall sensor 91 described later. Although details of the control will be described later, the control device 51 determines whether or not to shift to the first snow removal mode in which the refrigerant is circulated in the bypass circuit 5 according to the obtained distance ⁇ L.
  • the control device 51 shifts to the first snow removal mode, the refrigerant is circulated through the bypass circuit 5 by opening the bypass circuit solenoid valve 32, and the antifreeze liquid is circulated in the load heating unit 3 by driving the pump 42.
  • the load heating heat exchanger 6 exchanges heat between the refrigerant and the antifreeze liquid.
  • the first snow removal mode is assumed to be an anti-icing process for preventing a state where a drain hole of the outdoor unit base 62, which will be described later, is closed.
  • the indoor unit 9 is provided with another part of the main refrigerant circuit 4. Specifically, the indoor unit 9 is provided with an indoor unit side heat exchanger 14 and an electronic expansion valve 15. Among these, the indoor unit side heat exchanger 14 functions as a use side heat exchanger.
  • the indoor unit side heat exchanger 14 performs heat exchange between the refrigerant and the air. Specifically, the indoor unit side heat exchanger 14 exchanges heat between the refrigerant flowing through the main refrigerant pipe 22 and the indoor air sucked from the indoor unit 9 using a fan of the indoor unit 9 (not shown). .
  • the indoor unit side heat exchanger 14 functions as a condenser during heating operation, for example, so that the refrigerant is condensed and liquefied.
  • the indoor unit-side heat exchanger 14 functions as an evaporator during the cooling operation, and thus evaporates and vaporizes the refrigerant by causing the refrigerant to take heat of the indoor air.
  • the electronic expansion valve 15 is a valve that adjusts the opening.
  • the electronic expansion valve 15 adjusts the pressure of the refrigerant, the flow rate of the refrigerant, and the like of the indoor unit side heat exchanger 14 by controlling the opening of the valve. Therefore, the electronic expansion valve 15 constitutes a decompression unit of the main refrigerant circuit 4. That is, the electronic expansion valve 15 constitutes a pressure adjusting means for the main refrigerant circuit 4.
  • the number of indoor units 9 is one, but the present invention is not particularly limited to this.
  • the air conditioner 2 may be configured by one outdoor unit 7 and a plurality of indoor units 9.
  • the control device 51 controls driving of the compressor 11, the four-way valve 12, the electronic expansion valve 15, the flow rate regulator 17, the bypass circuit solenoid valve 32, the bypass circuit electronic expansion valve 34, and the pump 42. Assume that. In addition to the bypass circuit temperature sensor 35, it is assumed that detection results of various sensors (not shown) are supplied to the control device 51. Further, it is assumed that the heating operation is performed in an environment where the snow 55 does not reach the outdoor unit base 62 described later.
  • the refrigerant supplied by the compressor 11 is compressed and discharged.
  • the refrigerant discharged from the compressor 11 is a high-temperature and high-pressure gas refrigerant.
  • the high-temperature and high-pressure gas refrigerant passes through the four-way valve 12 and the gas operation valve 13, flows out of the outdoor unit 7, and flows into the indoor unit 9.
  • the refrigerant that has flowed into the indoor unit 9 passes through the indoor unit side heat exchanger 14 that functions as a condenser. At this time, in the indoor unit side heat exchanger 14, the refrigerant exchanges heat with indoor air to condense and liquefy, and for example, heat the air in the air-conditioning target space.
  • the air conditioning apparatus 2 can heat the air-conditioning target space.
  • the refrigerant that has passed through the indoor unit side heat exchanger 14 is decompressed, for example, becomes a low-temperature and low-pressure two-phase refrigerant, flows out of the indoor unit 9, and flows into the outdoor unit 7.
  • the low-temperature and low-pressure two-phase refrigerant that has flowed into the outdoor unit 7 passes through the liquid operation valve 16 and flows into the outdoor unit-side heat exchanger 19 that functions as an evaporator.
  • the refrigerant that has passed through the outdoor unit side heat exchanger 19 evaporates and gasifies by exchanging heat with outdoor air, and is further sucked into the compressor 11 via the four-way valve 12 and the accumulator 20.
  • the compressor 11 compresses and discharges the refrigerant again.
  • the processing as described above is performed again, and the refrigerant circulates through the main refrigerant circuit 4.
  • the heating operation is performed in an environment in which the amount of snow is large and the snow 55 reaches the outdoor unit base 62 described later.
  • water generated during the defrosting operation freezes in the outdoor unit base 62 and closes the drain hole of the outdoor unit base 62.
  • the outdoor unit side heat exchanger 19 is frozen, so that the heating performance may be deteriorated.
  • a state is assumed in which the road heating unit 3 is provided on the inner side of a snow protection stand 81 described later.
  • the degree of supercooling is obtained based on the detection result of the temperature sensor 35 for the bypass circuit, and the electronic expansion valve 34 for the bypass circuit is obtained according to the obtained degree of supercooling. Assume a state in which the degree of opening is adjusted. At this time, in order to ensure a stable capacity in the load heating heat exchanger 6, a case is assumed in which, for example, 10 (deg) is set as a target value as the degree of supercooling.
  • the air conditioner 2 opens the bypass circuit solenoid valve 32 and supplies the bypass circuit 5 with the high-temperature and high-pressure refrigerant discharged from the compressor 11.
  • the air conditioning apparatus 2 drives the pump 42 to circulate the antifreeze liquid in the load heating unit 3.
  • the load heating heat exchanger 6 exchanges heat between the antifreeze liquid flowing through the load heating unit 3 and the high-temperature and high-pressure refrigerant discharged from the compressor 11. Therefore, the load heating unit 3 is heated. Therefore, since the load heating unit 3 melts snow below the outdoor unit base 62, the air conditioner 2 can suppress the state where the drain hole is frozen.
  • the main refrigerant circuit 4 corresponds to the first refrigerant circuit in the present invention.
  • the bypass circuit 5 corresponds to the second refrigerant circuit in the present invention.
  • the main refrigerant pipe 22 corresponds to the refrigerant pipe in the present invention.
  • the bypass circuit solenoid valve 32 corresponds to the first solenoid valve in the present invention.
  • the electronic expansion valve 15 corresponds to the expansion device in the present invention. Further, the antifreeze liquid circulating in the load heating unit 3 corresponds to the heat medium in the present invention.
  • circulates the main refrigerant circuit 4 and the bypass circuit 5 is not specifically limited.
  • the refrigerant flowing through the main refrigerant circuit 4 and the bypass circuit 5 may be a single refrigerant such as R22, a non-azeotropic refrigerant mixture such as R407C, or a pseudo-common refrigerant such as R410A. It may be a boiling refrigerant or a natural refrigerant such as CO 2 . That is, various refrigerants can be used as the refrigerant flowing through the main refrigerant circuit 4 and the bypass circuit 5.
  • FIG. 2 is a diagram showing an example of the outer shape of the outdoor unit 7 according to Embodiment 1 of the present invention.
  • the outdoor unit 7 includes, for example, a casing 61, an outdoor unit base 62, a snow hood 63, a wind baffle plate 65, a baffle plate 67, and the like as outer shapes.
  • the housing 61 accommodates a part of the main refrigerant circuit 4.
  • the outdoor unit base 62 is provided, for example, below the housing 61 and supports a part of the main refrigerant circuit 4 housed in the housing 61.
  • the outdoor unit base 62 supports the compressor 11, the outdoor unit side heat exchanger 19, and the like.
  • the outdoor unit base 62 has a drain hole (not shown).
  • the snow hood 63 is provided on the upper side of the housing 61, for example, and houses a fan of the outdoor unit 7 (not shown).
  • the snowproof hood 63 is configured with an air outlet 71. Air blown out as the fan of the outdoor unit 7 (not shown) is blown out from the blowout port 71.
  • the air baffle plate 65 is provided at a position facing a part of the outdoor unit side heat exchanger 19, and a suction port 73 is configured. As the fan of the outdoor unit 7 (not shown) is driven, outdoor air around the outdoor unit 7 is sucked into the outdoor unit 7 from the suction port 73.
  • the air baffle plate 67 is provided at a position facing another part of the outdoor unit side heat exchanger 19, and a suction port 75 is configured. As the fan of the outdoor unit 7 (not shown) is driven, outdoor air around the outdoor unit 7 is sucked into the outdoor unit 7 from the suction port 75.
  • the snow cradle 81 is provided below the outdoor unit 7 as described above. Specifically, since the snow protection stand 81 supports the outdoor unit base 62 by disposing the snow protection stand 81 below the outdoor unit base 62, the snow protection stand 81 supports the outdoor unit 7. Therefore, the snow cradle 81 can support the outdoor unit 7 at a position away from the ground 85.
  • the road heating unit 3 is provided inside the snow proofing frame 81. The load heating unit 3 may be disposed below the snow protection stand 81 and at a position where the load is not stepped on the snow protection stand 81.
  • the snow protection stand 81 includes, for example, a pedestal 82, a foot 83, and a brace 84.
  • the pedestal 82 is opposed to the outdoor unit base 62 and serves as a table that supports the outdoor unit base 62.
  • the foot 83 supports the pedestal 82 from the ground 85, and four legs 83 are provided for the pedestal 82.
  • the brace 84 reinforces the four legs 83.
  • the snow cradle 81 is provided with a snowfall sensor 91.
  • the snowfall sensor 91 is provided at the boundary between the pedestal 82 of the snow protection stand 81 and the outdoor unit base 62.
  • the snowfall sensor 91 detects the snow 55 piled up on the ground 85 and supplies the detection result to the control device 51 described with reference to FIG.
  • the snowfall sensor 91 has detected the snow 55.
  • the present invention is not particularly limited to this.
  • the snowfall sensor 91 may calculate the height of the detected snow 55 from the ground 85 and supply the calculation result to the control device 51.
  • the snowfall sensor 91 should just be comprised with the infrared sensor which detects an obstruction with infrared rays, for example.
  • the snowfall sensor 91 can be realized at low cost.
  • the snowfall sensor 91 may include a plurality of infrared sensors, and the plurality of infrared sensors may be arranged vertically with respect to the ground 85 at regular intervals. In this case, the snowfall sensor 91 can detect the height of the detected snow 55 from the ground 85 in stages.
  • the snowfall sensor 91 may detect the snow 55 by detecting the outside air temperature and moisture.
  • the snowfall sensor 91 detects the snow 55 based on the detection result of the outside air temperature and whether or not moisture has been continuously detected for a preset time, the snowfall sensor 91 is blown by a wind from a tree or the like. Incorrect detection of snow 55 can be prevented.
  • the snowfall sensor 91 supplies the control device 51 with information for adjusting the amount of snow accumulation below the snow protection stand 81.
  • the distance ⁇ L between the lower part of the outdoor unit base 62 and the snow 55 of the snow protection stand 81 is 150 (mm)
  • a drain hole (not shown) is not blocked. Therefore, the distance ⁇ L between the outdoor unit base 62 and the snow 55 on the snow protection stand 81 only needs to be secured by 150 (mm). Therefore, for example, the position where the snowfall sensor 91 is attached to the snow stand 81 may be provided on the foot 83 of the snow stand 81 that is about 150 mm away from the ground 85.
  • the various configurations of the outdoor unit 7, the snow protection stand 81, the snowfall sensor 91, and the like described above are examples, and are not particularly limited thereto.
  • FIG. 3 is a diagram illustrating an example of a functional configuration of the control device 51 according to Embodiment 1 of the present invention.
  • the control device 51 includes, for example, a transmission / reception unit 101, an operation mode determination unit 103, a snow removal mode start determination unit 105, a snow removal mode end determination unit 107, an operation stop determination unit 109, a snow removal condition determination unit 111, An operation mode control unit 113, a snow removal mode control unit 115, a main refrigerant circuit control unit 117, a bypass circuit control unit 121, a load heating unit control unit 123, and the like are included.
  • the transmission / reception unit 101 converts, for example, a signal supplied from the outside into a signal to be processed in the control device 51.
  • the transmission / reception unit 101 converts the signal processed in the control device 51 into a signal supplied to the outside, and then transmits the signal.
  • the operation mode determination unit 103 determines the operation mode of the air conditioner 2.
  • the snow removal mode start determination unit 105 determines whether to start the first snow removal mode.
  • the snow removal mode end determination unit 107 determines whether or not to end the first snow removal mode.
  • the operation stop determination unit 109 determines whether to stop the operation based on a signal supplied from the outside.
  • the snow removal condition determination unit 111 includes, for example, a snow accumulation amount determination unit 131 and a timer unit 133.
  • the snow cover amount determination unit 131 determines the snow cover amount based on the detection result of the snowfall sensor 91.
  • the snow accumulation determination unit 131 obtains a distance ⁇ L between the ground 85 and the surface of the snow 55 as an index corresponding to the snow accumulation. For example, when the installation position of the snowfall sensor 91 is registered in advance and is assumed to be 150 (mm) from the ground 85, if the snowfall sensor 91 detects the snow 55, the distance ⁇ L between the ground 85 and the surface of the snow 55 is , 150 (mm) may be determined.
  • Time measuring unit 133 counts the time that snowfall sensor 91 is detecting, for example. For example, when the snowfall sensor 91 detects a value exceeding 350 (mm) as the distance ⁇ L from the ground 85 to the snow 55, the time measuring unit 133 continuously detects a value exceeding 350 (mm). Count. Note that the determination of the amount of snow as described above is an example, and the present invention is not particularly limited to this.
  • the snow removal condition determination unit 111 determines the start of the first snow removal mode based on the snow accumulation amount based on the detection result of the snowfall sensor 91 and a preset start determination threshold, and determines the determination result as the snow removal mode start determination To the unit 105.
  • the snow removal condition determination unit 111 determines the end of the first snow removal mode based on the amount of snow and the elapsed time based on the detection result of the snowfall sensor 91 and a preset end determination threshold, and the determination result is snowed. This is supplied to the mode end determination unit 107.
  • the operation mode control unit 113 supplies a command corresponding to the determined operation mode to the main refrigerant circuit control unit 117.
  • the snow removal mode control unit 115 issues a command according to the start of the first snow removal mode to the main refrigerant circuit control unit 117, the bypass circuit control unit 121, and the load heating unit control unit. 123 respectively.
  • the snow removal mode control unit 115 issues a command corresponding to the end of the first snow removal mode to the main refrigerant circuit control unit 117, the bypass circuit control unit 121, and the load heating unit control unit. 123 respectively.
  • the main refrigerant circuit control unit 117 includes an electronic expansion valve control unit 141, an electromagnetic valve control unit 143, a compressor control unit 145, a fan control unit 147, and the like, and the flow rate and direction of flow of the refrigerant circulating in the main refrigerant circuit 4 And control the pressure and the like.
  • the electronic expansion valve control unit 141 controls, for example, the opening degree of the electronic expansion valve 15 and the opening degree of the flow rate regulator 17.
  • the electromagnetic valve control unit 143 controls, for example, opening / closing of the gas operation valve 13 and opening / closing of the liquid operation valve 16.
  • the four-way valve control unit 144 controls the switching operation of the four-way valve 12.
  • the compressor control unit 145 controls driving of the compressor 11 according to the operating frequency.
  • the fan control unit 147 controls driving of the fan of the outdoor unit 7 (not shown).
  • the bypass circuit control unit 121 includes a bypass circuit solenoid valve control unit 151, a bypass circuit electronic expansion valve control unit 153, and the like, and controls the flow rate, the flow direction, the pressure, and the like of the refrigerant circulating in the bypass circuit 5.
  • the bypass circuit solenoid valve controller 151 controls the opening and closing of the bypass circuit solenoid valve 32.
  • the bypass circuit electronic expansion valve control unit 153 controls the opening degree of the bypass circuit electronic expansion valve 34.
  • the load heating unit control unit 123 includes a pump control unit 155, and controls the heat medium circulating in the load heating unit 3, for example, the flow rate and flowing direction of the antifreeze liquid.
  • control device 51 including the first snow removal mode
  • FIG. 4 is a flowchart for explaining a control example of the control device 51 according to Embodiment 1 of the present invention.
  • the bypass circuit solenoid valve 32 is closed, the snow protection flag is set to 0, the first distance threshold is set as the start determination threshold, and the second distance is set as the end determination threshold.
  • the threshold is set and the first time threshold is set for the detection duration determination. More specifically, a case is assumed where, for example, 250 (mm) is set as the first distance threshold, 350 (mm) is set as the second distance threshold, and 10 minutes is set as the first time threshold.
  • the various setting examples described above are merely examples, and are not particularly limited thereto.
  • the threshold regarding various distances and the threshold regarding time are examples, and are changed according to the installation environment of the outdoor unit 7, that is, the amount of snow in the area.
  • the threshold value related to various distances may be set shorter than the value assumed above, and the threshold value related to time may be set shorter than the value assumed above.
  • the snow prevention flag is merely used as an index indicating a situation in which a certain transition state is continued in order to count the detection duration time, and is not particularly limited thereto.
  • step S15 to step S21 is the first snow removal mode. That is, it is assumed that the processes in steps S11 to S14 are the first snow removal mode pre-process and the processes in steps S22 to S24 are the first snow removal mode post-process.
  • Step S11 The control device 51 determines the operation mode.
  • Step S12 The control device 51 determines whether or not the heating operation is being performed. When the heating operation is being performed, the control device 51 proceeds to step S13. On the other hand, the control apparatus 51 returns to step S11, when heating operation is not performed.
  • Step S13 The control device 51 acquires the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow cradle 81.
  • Step S14 The control device 51 determines whether or not the distance ⁇ L between the outdoor unit base portion 62 and the snow 55 on the snow protection stand 81 is less than the first distance threshold. When the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow protection stand 81 is less than the first distance threshold, the control device 51 proceeds to step S15. On the other hand, when the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow cradle 81 is not less than the first distance threshold, the control device 51 proceeds to step S11.
  • Step S15 The control device 51 opens the bypass circuit solenoid valve 32.
  • Step S16 The control device 51 acquires the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow cradle 81.
  • Step S17 The control device 51 determines whether or not the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow protection stand 81 is equal to or greater than the second distance threshold. When the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow cradle 81 is not less than the second distance threshold, the control device 51 proceeds to step S18. On the other hand, when the distance ⁇ L between the outdoor unit base portion 62 and the snow 55 of the snow protection stand 81 is not equal to or greater than the second distance threshold, the control device 51 proceeds to step S24.
  • Step S18 The control device 51 sets the snow protection flag to 1.
  • Step S19 The control device 51 counts the detection continuation time during which the state where the snow prevention flag is 1 is continued.
  • Step S20 The control device 51 determines whether or not the detection duration time during which the snowproof flag is 1 has passed the first time threshold. The control device 51 proceeds to step S21 when the detection continuation time in which the snowproof flag is 1 continues for the first time threshold. On the other hand, the control apparatus 51 returns to step S16, when the detection continuation time which has continued the state where the snow prevention flag is 1 does not pass the 1st time threshold value.
  • Step S21 The control device 51 sets the snow prevention flag to 0, and proceeds to step S20.
  • Step S22 The controller 51 closes the bypass circuit solenoid valve 32.
  • Step S23 The control device 51 determines whether or not an operation stop command has arrived. When the operation stop command has arrived, the control device 51 proceeds to step S23. On the other hand, if the operation stop command does not arrive, the control device 51 returns to step S11.
  • Step S24 The control device 51 stops the operation and ends the process.
  • the outdoor unit 7 is provided with the bypass circuit 5 so that the load heating unit 3 using the refrigeration cycle heats the surroundings. Then, the load heating unit 3 is provided on the snow protection stand 81 to heat the periphery of the snow protection stand 81. Therefore, even if the snow 55 starts to accumulate on the snow protection stand 81, the outdoor unit 7 can melt the snow 55 accumulated on the snow protection stand 81 by operating the load heating unit 3.
  • the outdoor unit 7 can discharge the water stored in the outdoor unit base 62 to the outside, the heat exchange efficiency of the outdoor unit side heat exchanger 19 is not lowered and the deterioration of the heating performance can be suppressed. it can. Further, since the refrigerant that flows out of the bypass pipe 31 flows into the accumulator 20, the compressor 11 does not suck in the liquid refrigerant. Therefore, the main refrigerant circuit 4 can improve the reliability of the outdoor unit 7.
  • the height of the snow guard frame 81 may be a design dimension used in normal construction. Therefore, it is not necessary to ensure a sufficient height of the snow protection stand 81, so that the serviceability of the outdoor unit 7 can be improved.
  • the load heating unit 3 may be of any size that can melt the snow 55 that accumulates on the periphery of the snow protection stand 81. Therefore, the load heating unit 3 is constructed at a low cost.
  • a heat pump type refrigeration cycle is used as a heat source for heating the load heating unit 3. Therefore, the load heating unit 3 using the heat pump type refrigeration cycle can have high safety in operation and can be operated with low power consumption. Therefore, the operation cost spent for melting snow using the road heating unit 3 is low. Therefore, the load heating unit 3 can be constructed at a low cost, and the load heating unit 3 can be operated at a low cost.
  • the outdoor unit 7 can melt the snow 55 that has accumulated on the snow protection stand 81 while improving serviceability and realizing low cost. Therefore, the outdoor unit 7 can prevent freezing of water in the outdoor unit base 62 while improving serviceability and realizing low cost. Therefore, the outdoor unit 7 can improve the serviceability and realize low cost, while suppressing root ice and a decrease in air conditioning capability due to freezing of water in the outdoor unit base 62.
  • the main refrigerant formed by connecting the compressor 11, the indoor unit side heat exchanger 14, the electronic expansion valve 15, and the outdoor unit side heat exchanger 19 through the main refrigerant pipe 22.
  • an outdoor unit 7 provided with a part of the main refrigerant circuit 4, a bypass circuit 5 that bypasses the refrigerant discharged from the compressor 11 and flowing through the main refrigerant circuit 4, and the main refrigerant circuit 4
  • an outdoor unit base 62 that supports the compressor 11 and the outdoor unit-side heat exchanger 19, and controls the flow rate of the refrigerant flowing through the bypass circuit 5 and the flow rate of the refrigerant flowing through the bypass circuit 5.
  • a snow guard frame 81 that supports the outdoor unit base unit 62 is provided below the unit 62, and a heat medium flows through the heat medium and heat is exchanged between the heat medium and the refrigerant that flows through the bypass circuit 5 to heat the surroundings.
  • Heating unit 3 The outdoor unit 7 is configured provided snow gantry 81.
  • the outdoor unit 7 can prevent freezing of water in the outdoor unit base 62 while improving serviceability and realizing low cost. Therefore, the outdoor unit 7 can improve the serviceability and realize low cost, while suppressing root ice and a decrease in air conditioning capability due to freezing of water in the outdoor unit base 62.
  • the bypass circuit 5 is connected to the suction side piping of the compressor 11 and the discharge side piping of the compressor 11, respectively, and bypass piping 31 for bypassing the refrigerant and bypass piping. And a bypass circuit solenoid valve 32 that adjusts the flow rate of the refrigerant flowing through 31.
  • the snow protection stand 81 includes a snowfall sensor 91 that detects snow 55 that has accumulated on the periphery of the snow protection stand 81, and the control device 51 is detected by the outdoor unit base 62 and the snowfall sensor 91.
  • the road heating unit 3 is operated by controlling the solenoid valve 32 for the bypass circuit according to the distance ⁇ L from the snow 55.
  • the load heating unit 3 is provided inside or below the snow protection stand 81.
  • the heat medium is composed of an antifreeze liquid.
  • the outdoor unit 7 can prevent water icing in the outdoor unit base 62 while significantly improving serviceability and realizing low cost.
  • Embodiment 2 The difference from the first embodiment is that an electromagnetic valve 36 for gas refrigerant is provided between the discharge side of the compressor 11 and the gas operation valve 13 so that the refrigerant is not supplied to the indoor unit-side heat exchanger 14. Thus, snow can be removed even during the heating stop period.
  • FIG. 5 is a diagram illustrating an example of a schematic configuration of the air-conditioning system 1 according to Embodiment 2 of the present invention.
  • a gas refrigerant solenoid valve 36 is provided between the four-way valve 12 and the gas operation valve 13. That is, in the heating operation, when the four-way valve 12 is switched and the discharge side of the compressor 11 and the indoor unit side heat exchanger 14 are connected, as described above, the compressor 11 A gas refrigerant solenoid valve 36 is provided between the discharge side and the gas operation valve 13.
  • the gas refrigerant solenoid valve 36 corresponds to the second solenoid valve in the present invention.
  • the gas refrigerant solenoid valve 36 By providing the gas refrigerant solenoid valve 36, it is possible to control whether or not the gas refrigerant flows into the indoor unit side heat exchanger 14. That is, the gas refrigerant solenoid valve 36 can control the inflow of the gas refrigerant into the indoor unit 9.
  • the heating stop time is long.
  • the load heating unit 3 does not operate during the heating operation stop period. Therefore, the snow 55 may reach the lower part of the outdoor unit base 62. Furthermore, if the state where the snow 55 reaches the lower part of the outdoor unit base 62 continues for a long time, the drain hole provided in the outdoor unit base 62 may be blocked. For example, in the case of shifting to 21:00, the heating operation is stopped, and when the scheduled operation for restarting the heating operation from 7 o'clock the next day is performed, the heating operation stop period continues from 21:00 the previous day to 7 o'clock the next day. The road heating unit 3 does not operate. Under such circumstances, it is assumed that the snow 55 that accumulates on the ground 85 may reach the lower part of the outdoor unit base 62 in an area with a large amount of snow.
  • control device 51 activates the gas refrigerant solenoid valve 36 when the certain condition is satisfied, and executes control in which the refrigerant is not supplied to the indoor unit side heat exchanger 14.
  • FIG. 6 is a diagram illustrating an example of a functional configuration of the control device 51 according to the second embodiment of the present invention.
  • the transmission / reception unit 101, the snow removal mode start determination unit 105, the snow removal mode end determination unit 107, the snow removal condition determination unit 111, the operation mode control unit 113, the snow removal mode control unit 115, the main refrigerant circuit control unit 117, A bypass circuit control unit 121 and a load heating unit control unit 123 are configured. That is, compared to the case of the first embodiment described with reference to FIG. 3, the operation mode determination unit 103 and the operation stop determination unit 109 do not exist in FIG. 6 that describes the second embodiment. .
  • the transmission / reception unit 101, the snow removal mode start determination unit 105, the snow removal mode end determination unit 107, the operation mode control unit 113, the snow removal mode control unit 115, and a bypass circuit Since the control unit 121 and the load heating unit control unit 123 are the same as those in FIG. 3 described in the first embodiment, their descriptions are omitted.
  • the snow amount determination unit 131 is the same as the functional configuration shown in FIG.
  • the time measuring unit 133 uses a stop time, an elapsed time, a detection duration, and various threshold values for counting.
  • the setting determination unit 135 determines whether or not the second snow removal mode is set.
  • the second snow removal mode is set by, for example, a dip switch or a rotary switch provided in the outdoor unit 7.
  • the gas refrigerant solenoid valve control unit 149 is a newly added functional configuration.
  • the gas refrigerant solenoid valve controller 149 controls opening and closing of the gas refrigerant solenoid valve 36.
  • the operation stop state is set by the stop flag, and the time threshold for continuing the operation stop state is set by the second time threshold value.
  • the first start threshold is set to continue the state for a predetermined time
  • the first distance threshold is set in the same manner as described above
  • the second start occurs when the distance ⁇ L satisfies the condition of less than the first distance threshold.
  • a state in which the second snow removal mode is set is set with the threshold value, and the third start threshold value is set.
  • the second time threshold for example, a continuous time T1 is set.
  • the continuous time T2 is set as the third time threshold.
  • the second distance threshold and the detection duration are set in the same manner as described above, and the case where the detection duration has passed the first time threshold is the first end threshold.
  • a case where the elapsed time is equal to or greater than the third time threshold is set as the second end threshold.
  • the elapsed time here is an elapsed time from the start of control by the control device 51 to the present, and a third time threshold is set to, for example, the continuous time T2 as a threshold for determining it. ing.
  • 0 is set as a default value for each of the first start threshold, the second start threshold, and the third start threshold.
  • Each of the first end threshold and the second end threshold is set to 0 as a default value.
  • the continuous time T1 and the continuous time T2 are set to values according to the surrounding environment in which the outdoor unit 7 is provided.
  • the heating prohibition flag set in the second snow removal mode process and reset in the second snow removal mode post-process process indicates a state in which the heating operation is prohibited in the second snow removal mode, It is not particularly limited to this.
  • the second snow removal mode and the heating operation may be operations that are exclusively controlled.
  • the snow prevention flag is not particularly limited because it is merely used for counting the detection duration time and is only used as an index indicating a situation where the transition state continues.
  • the various setting examples described above are merely examples, and are not particularly limited thereto.
  • the threshold regarding various distances and the threshold regarding time are examples, and are changed according to the installation environment of the outdoor unit 7, that is, the amount of snow in the area.
  • step S44 to step S58 is the second snow removal mode processing. Further, the processing from step S31 to step S43 is second snow removal mode pre-processing. It is assumed that the processing from step S59 to step S61 is the second snow removal mode post-processing.
  • FIG. 7 is a flowchart for explaining a control example of the control device 51 according to Embodiment 2 of the present invention. It is assumed that the heating operation is prohibited while the heating prohibition flag is set to 1.
  • Step S31 The control device 51 initializes various flags.
  • Step S32 The control device 51 determines whether or not the operation is stopped. When the operation is stopped, the control device 51 proceeds to step S33. On the other hand, when the operation is not stopped, the control device 51 returns to step S32.
  • Step S33 The control device 51 sets the stop flag to 1.
  • Step S34 The control device 51 counts the stop time in which the stop flag is kept at 1.
  • Step S35 The control device 51 determines whether or not the stop time has passed the second time threshold. When the stop time has exceeded the second time threshold, the control device 51 proceeds to step S36. On the other hand, the control apparatus 51 returns to step S34, when stop time does not pass the 2nd time threshold value.
  • Step S36 The control device 51 sets the first start threshold value to 1.
  • Step S37 The control device 51 acquires the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow cradle 81.
  • Step S38 The control device 51 determines whether or not the distance ⁇ L is less than the first distance threshold. If the distance ⁇ L is less than the first distance threshold, the control device 51 proceeds to step S39. On the other hand, if the distance ⁇ L is not less than the first distance threshold, the control device 51 proceeds to step S32.
  • Step S39 The control device 51 sets the second start threshold value to 1.
  • Step S40 The control device 51 determines whether or not the second snow removal mode is set. When the second snow removal mode is set, the control device 51 proceeds to step S41. On the other hand, the control apparatus 51 returns to step S32, when the 2nd snow removal mode is not set.
  • Step S41 The control device 51 sets the third start threshold value to 1.
  • Step S42 The control device 51 performs an AND operation on the first start threshold, the second start threshold, and the third start threshold.
  • Step S43 The control device 51 determines whether or not the execution result of the AND operation is 1. When the execution result of the AND operation is 1, the control device 51 proceeds to step S44. On the other hand, if the execution result of the AND operation is not 1, the control device 51 returns to step S32.
  • Step S44 The control device 51 closes the gas refrigerant solenoid valve 36.
  • Step S45 The control device 51 opens the bypass circuit solenoid valve 32.
  • Step S46 The control device 51 sets the heating prohibition flag of the indoor unit side heat exchanger 14 to 1. That is, the control device 51 sets the heating prohibition state of the indoor unit side heat exchanger 14.
  • Step S47 The control device 51 counts the elapsed time after starting the control.
  • Step S48 The control device 51 acquires the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow cradle 81.
  • Step S49 The control device 51 determines whether or not the distance ⁇ L is greater than or equal to the second distance threshold. If the distance ⁇ L is greater than or equal to the second distance threshold, the control device 51 proceeds to step S50. On the other hand, if the distance ⁇ L is not greater than or equal to the second distance threshold, the control device 51 proceeds to step S58.
  • Step S50 The control device 51 sets the snow protection flag to 1.
  • Step S51 The control device 51 counts the detection continuation time during which the snowproof flag continues to be 1.
  • Step S52 The control device 51 determines whether or not the detection duration has exceeded the first time threshold. When the detection duration time has exceeded the first time threshold, the control device 51 proceeds to step S53. On the other hand, the control apparatus 51 returns to step S51, when detection continuation time does not pass the 1st time threshold value.
  • Step S53 The control device 51 sets the first end threshold value to 1.
  • Step S54 The control device 51 determines whether or not the elapsed time is equal to or greater than a third time threshold value. If the elapsed time is greater than or equal to the third time threshold, the control device 51 proceeds to step S55. On the other hand, if the elapsed time is not greater than or equal to the third time threshold, the control device 51 proceeds to step S56.
  • Step S55 The control device 51 sets the second end threshold value to 1.
  • Step S56 The control device 51 performs an OR operation between the first end threshold and the second end threshold.
  • Step S57 The control device 51 determines whether or not the execution result of the OR operation is 1. If the execution result of the OR operation is 1, the control device 51 proceeds to step S59. On the other hand, if the execution result of the OR operation is not 1, the control device 51 returns to step S48.
  • Step S58 The control device 51 sets the snow protection flag to 0 and returns to step S48.
  • Step S59 The control device 51 opens the gas refrigerant solenoid valve 36.
  • Step S60 The controller 51 closes the bypass circuit solenoid valve 32.
  • Step S61 The control device 51 sets the heating prohibition flag of the indoor unit side heat exchanger 14 to 0, and ends the process. That is, the control device 51 cancels the heating prohibited state of the indoor unit side heat exchanger 14.
  • the outdoor unit 7 can melt the snow 55 accumulated below the outdoor unit base 62, and as a result, can perform snow removal. Therefore, the outdoor unit 7 can remove the snow 55 that has accumulated on the lower part of the snow cradle 81 even when the heating operation is stopped.
  • the control device 51 is configured to close the gas refrigerant solenoid valve 36 and open the bypass circuit solenoid valve 32 when the heating operation is stopped.
  • the outdoor unit 7 can perform snow removal even during the heating stop period.
  • Embodiment 3 FIG. The difference from Embodiment 1 and Embodiment 2 is that the operating frequency of the compressor 11 is made higher than that of a normal one during snow removal.
  • FIG. 8 is a diagram illustrating an example of a functional configuration of the control device 51 according to Embodiment 3 of the present invention.
  • the difference from the first embodiment and the second embodiment is that the set value of the rapid snow removal operation frequency is supplied to the compressor control unit 145.
  • the operation frequency for quick snow removal can be set by a dip switch or the like provided in an electric box (not shown) of the outdoor unit 7.
  • As the operation frequency for quick snow removal for example, a value with a higher operation frequency is set as compared with the operation frequency during normal operation.
  • the rapid snow removal operation frequency can be set when the second snow removal mode is set.
  • FIG. 9 is a flowchart for explaining a control example of the control device 51 according to Embodiment 3 of the present invention.
  • the difference from the second embodiment is that a process that has not been performed during the second snow removal mode process is added, which is a technique for controlling the compressor 11 at the rapid snow removal operation frequency. It is assumed that the heating operation is prohibited while the heating prohibition flag is set to 1.
  • step S84 to step S99 is the third snow removal mode processing. Further, the processing of step S71 to step S83 is second snow removal mode pre-processing. It is assumed that the processes in steps S100 to S103 are second snow removal mode post-process processes.
  • Step S71 The control device 51 initializes various flags.
  • Step S72 The control device 51 determines whether or not the operation is stopped. When the operation is stopped, the control device 51 proceeds to step S73. On the other hand, when the operation is not stopped, the control device 51 returns to step S72.
  • Step S73 The control device 51 sets the stop flag to 1.
  • Step S74 The control device 51 counts the stop time in which the stop flag is kept at 1.
  • Step S75 The control device 51 determines whether or not the stop time has passed the second time threshold. When the stop time has exceeded the second time threshold, the control device 51 proceeds to step S76. On the other hand, the control apparatus 51 returns to step S74, when stop time does not pass the 2nd time threshold value.
  • Step S76 The control device 51 sets the first start threshold value to 1.
  • Step S77 The control device 51 acquires the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow cradle 81.
  • Step S78 The control device 51 determines whether or not the distance ⁇ L is less than the first distance threshold. If the distance ⁇ L is less than the first distance threshold, the control device 51 proceeds to step S79. On the other hand, if the distance ⁇ L is not less than the first distance threshold, the control device 51 proceeds to step S72.
  • Step S79 The control device 51 sets the second start threshold value to 1.
  • Step S80 The control device 51 determines whether or not the second snow removal mode is set. When the second snow removal mode is set, the control device 51 proceeds to step S81. On the other hand, when the second snow removal mode is not set, the control device 51 returns to step S72.
  • Step S81 The control device 51 sets the third start threshold value to 1.
  • Step S82 The control device 51 performs an AND operation on the first start threshold, the second start threshold, and the third start threshold.
  • Step S83 The control device 51 determines whether or not the execution result of the AND operation is 1. If the execution result of the AND operation is 1, the control device 51 proceeds to step S84. On the other hand, when the execution result of the AND operation is not 1, the control device 51 returns to step S72.
  • Step S84 The control device 51 closes the gas refrigerant solenoid valve 36.
  • Step S85 The control device 51 opens the bypass circuit solenoid valve 32.
  • Step S86 The control device 51 controls the compressor 11 at the rapid snow removal operation frequency.
  • Step S87 The control device 51 sets the heating prohibition flag of the indoor unit side heat exchanger 14 to 1. That is, the control device 51 sets the heating prohibition state of the indoor unit side heat exchanger 14.
  • Step S88 The control device 51 counts the elapsed time after starting the control.
  • Step S89 The control device 51 acquires the distance ⁇ L between the outdoor unit base 62 and the snow 55 of the snow cradle 81.
  • Step S90 The control device 51 determines whether or not the distance ⁇ L is greater than or equal to the second distance threshold. If the distance ⁇ L is greater than or equal to the second distance threshold, the control device 51 proceeds to step S91. On the other hand, if the distance ⁇ L is not equal to or greater than the second distance threshold, the control device 51 proceeds to step S99.
  • Step S91 The control device 51 sets the snow protection flag to 1.
  • Step S92 The control device 51 counts the detection continuation time during which the snowproof flag continues to be 1.
  • Step S93 The control device 51 determines whether or not the detection duration has exceeded the first time threshold. When the detection continuation time has passed the first time threshold, the control device 51 proceeds to step S94. On the other hand, the control apparatus 51 returns to step S92, when the detection continuation time does not pass the 1st time threshold value.
  • Step S94 The control device 51 sets the first end threshold value to 1.
  • Step S95 The control device 51 determines whether or not the elapsed time is equal to or greater than a third time threshold value. If the elapsed time is greater than or equal to the third time threshold, the control device 51 proceeds to step S96. On the other hand, if the elapsed time is not greater than or equal to the third time threshold, the control device 51 proceeds to step S97.
  • Step S96 The control device 51 sets the second end threshold value to 1.
  • Step S97 The control device 51 performs an OR operation between the first end threshold and the second end threshold.
  • Step S98 The control device 51 determines whether or not the execution result of the OR operation is 1. When the execution result of the OR operation is 1, the control device 51 proceeds to step S100. On the other hand, if the execution result of the OR operation is not 1, the control device 51 returns to step S89.
  • Step S99 The control device 51 sets the snow prevention flag to 0 and returns to step S89.
  • Step S100 The control device 51 opens the gas refrigerant solenoid valve 36.
  • Step S101 The controller 51 closes the bypass circuit solenoid valve 32.
  • Step S102 The control device 51 returns the operating frequency of the compressor 11 to a normal one.
  • Step S103 The control device 51 sets the heating prohibition flag of the indoor unit side heat exchanger 14 to 0, and ends the process. That is, the control device 51 cancels the heating prohibited state of the indoor unit side heat exchanger 14.
  • the outdoor unit 7 drives the operation frequency of the compressor 11 at a high snow removal operation frequency higher than that of a normal one during snow removal. be able to. Therefore, since the outdoor unit 7 drives the compressor 11 at an operation frequency according to the installation environment, the heat exchange amount of the load heating heat exchanger 6 can be increased according to the amount of snowfall. Therefore, the outdoor unit 7 can increase the heating amount per unit time of the load heating unit 3. Therefore, by changing the setting according to the amount of snowfall, the outdoor unit 7 can shorten the snow removal time or increase the snow removal amount per unit time.
  • the switch unit 52 is further provided, and the control device 51 increases the operation frequency of the compressor 11 according to the setting content of the switch unit 52 when the heating operation is stopped.
  • the outdoor unit 7 can shorten the snow removal time or increase the snow removal amount per unit time.
  • Embodiments 1 to 3 the outdoor unit 7 of the air conditioner 2 has been described.
  • a system in which the outdoor unit-side heat exchanger 19 functions as an evaporator is a hot water supply system or the like.
  • the techniques described in Embodiments 1 to 3 can be applied to other refrigeration systems driven by a heat pump system.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)
  • Other Air-Conditioning Systems (AREA)

Abstract

 圧縮機11、室内機側熱交換器14、電子膨張弁15、及び室外機側熱交換器19が主冷媒配管22を介して接続されて形成される主冷媒回路4のうち、主冷媒回路4の一部が設けられた室外機7であって、圧縮機11から吐出され、主冷媒回路4を流通する冷媒を迂回させるバイパス回路5と、主冷媒回路4を流通する冷媒の流量及びバイパス海路5を流通する冷媒の流量を制御する制御装置51と、圧縮機11及び室外機側熱交換器19を支える室外機ベース部62と、を備え、室外機ベース部62の下方に、室外機ベース部62を支える防雪架台81が設けられ、熱媒体が流通し、熱媒体と、バイパス回路5を流通する冷媒と、を熱交換させることで周囲を加熱するロードヒーティングユニット3が防雪架台81に設けられた。

Description

室外機
 本発明は、室外機に関する。
 空気調和装置は、例えば、ヒートポンプ方式で構成されている場合、冷媒回路が構成されており、冷凍サイクルが形成される。冷媒回路は、例えば、圧縮機と、室外機側熱交換器と、を含む室外機と、膨張弁と、室内機側熱交換器と、を含む室内機とが冷媒配管で接続されている。つまり、冷媒回路は、熱源側ユニットである室外機と、負荷側ユニットである室内機とが冷媒配管で接続され、冷媒が循環する構成である。
 冷媒回路は、例えば、室内機側熱交換器で、熱交換対象である空調対象空間の空気から吸熱することで、冷媒を蒸発させている。また、冷媒回路は、例えば、室内側熱交換器で、熱交換対象である空調対象空間の空気へ放熱することで、冷媒を凝縮させている。つまり、空気調和装置は、冷媒回路を流通する冷媒の圧力及び温度等を変化させることで、空調対象空間の空気を調和している。
 ここで、室外機は、周囲が筐体で囲まれているものであって、筐体内に室外機側熱交換器が収容され、室外機側熱交換器の下部には室外機ベース部が設けられている。室外機ベース部は、室外機側熱交換器を載置している。室外機ベース部は、ドレン穴が設けられている。
 ドレン穴は、霜取り動作等で発生したドレン水等を筐体外に排出する、例えば、空気調和装置が暖房運転を行う場合、室外機側熱交換器が蒸発器として機能する。よって、外気温度が低い場合に暖房運転が行われれば、室外機ベース部に滞留したドレン水等が氷結し、ドレン穴が塞がれる。ドレン穴が塞がれれば、ドレン水等は、室外機ベース部から排出されず、室外機ベース部に滞留し続けるため、さらに氷結が進む。この結果、根氷等が引き起こされる。根氷は、室外機側熱交換器を通過する空気の流れを邪魔するため、効率的な熱交換が行われない。
 そこで、従来技術の一つとして、ドレン穴の周辺に電気ヒーターが設置されている空気調和装置があった。電気ヒーターは、通電することで加熱され、室外機ベース部にある氷を溶かす。つまり、従来の空気調和装置のうち、電気ヒーターを通電させることで、室外機ベース部に滞留する水の氷結を防止しているものがあった(例えば、特許文献1参照)。
 しかし、従来の空気調和装置に設けられているような電気ヒーターは、室外機ベース部に滞留している水の氷結を防止することはできるが、積雪量が多く、雪が室外機ベース部の下部まで到達する地域では、電気ヒーターを使用した場合であっても、雪の影響で室外機ベース部のドレン穴が塞がる。よって、従来のような室外機は、排水性が低下する。
 そこで、室外機の下方に防雪架台を設けることで、雪を室外機ベース部に到達させない高さを確保する必要がある。
 なお、寒冷地で積雪量の多い地域では、一般的には、ロードヒーティングが雪を溶かすために利用されている(例えば、特許文献2参照)。
特許第3882910号公報(段落[0012]) 特許第4517556号公報(段落[0022])
 上記で述べたように、寒冷地の積雪対策は、例えば、防雪架台を設けることで室外機ベース部に雪を到達させないようにしたり、電気ヒーターを運用することで室外機ベース部に滞留したドレン水等を氷結させないようにしたり、ロードヒーティングを配設することで、地面に積もった雪を溶かしたりしていた。
 しかし、電気ヒーターが室外機ベース部に滞留したドレン水等の氷結を防止することができたとしても、雪が室外機ベースに到達した場合、電気ヒーターは雪の影響に起因するドレン穴の塞がりを抑制することができなかった。よって、雪が室外機ベースの下部に到達しないだけの十分な高さを防雪架台で確保させる必要があった。
 防雪架台の高さを十分に確保させる場合、積雪量の多い地域では、例えば、5(m)以上の積雪が想定されるため、それを超える高さが要求される。よって、防雪架台の高さを十分に確保させた場合、室外機が高所に配置されるため、サービス性は低下する。よって、防雪架台で室外機ベース部への雪の影響を回避させる場合、サービス性を向上させることはできなかった。
 また、仮に、防雪架台を設け、電気ヒーターを室外機の下方に設けた場合、電気ヒーターでは運用上の安全面を考慮する要求が増すことで、運用コストがかかった。
 また、ロードヒーティングを室外機周囲の地面全体に設けることで、地面に積雪した雪を溶かす場合、配設コストがかかった。
 つまり、サービス性を向上させ、低コストを実現しつつ、室外機ベース部における水の氷結を防止することができないという問題点があった。
 本発明は、上記のような問題点を解決するためになされたもので、サービス性を向上させ、低コストを実現しつつ、室外機ベース部における水の氷結を防止することができる室外機を提供することを目的とするものである。
 本発明に係る室外機は、圧縮機、室内機側熱交換器、膨張装置、及び室外機側熱交換器が冷媒配管を介して接続されて形成される第1冷媒回路のうち、該第1冷媒回路の一部が設けられた室外機であって、前記圧縮機から吐出され、前記第1冷媒回路を流通する冷媒を迂回させる第2冷媒回路と、前記第1冷媒回路を流通する冷媒の流量及び前記第2冷媒回路を流通する冷媒の流量を制御する制御装置と、前記圧縮機及び前記室外機側熱交換器を支える室外機ベース部と、を備え、前記室外機ベース部の下方に、該室外機ベース部を支える防雪架台が設けられ、熱媒体が流通し、該熱媒体と、前記第2冷媒回路を流通する前記冷媒と、を熱交換させることで周囲を加熱するロードヒーティングユニットが前記防雪架台に設けられたものである。
 本発明は、冷凍サイクルを利用したロードヒーティングユニットを防雪架台に設けることで、サービス性を向上させ、低コストを実現しつつ、防雪架台に積雪した雪を溶かすことができる。よって、本発明は、サービス性を向上させ、低コストを実現しつつ、室外機ベース部における水の氷結を防止することができるという効果を有する。
本発明の実施の形態1における空調システム1の概略構成の一例を示す図である。 本発明の実施の形態1における室外機7の外形の一例を示す図である。 本発明の実施の形態1における制御装置51の機能構成の一例を示す図である。 本発明の実施の形態1における制御装置51の制御例を説明するフローチャートである。 本発明の実施の形態2における空調システム1の概略構成の一例を示す図である。 本発明の実施の形態2における制御装置51の機能構成の一例を示す図である。 本発明の実施の形態2における制御装置51の制御例を説明するフローチャートである。 本発明の実施の形態3における制御装置51の機能構成の一例を示す図である。 本発明の実施の形態3における制御装置51の制御例を説明するフローチャートである。
 以下、本発明の実施の形態について、図面を用いて詳細に説明する。なお、本発明の実施の形態の動作を行うプログラムを記述するステップは、記載された順序に沿って時系列に行われる処理であるが、必ずしも時系列に処理されなくても、並列的又は個別に実行される処理をも含んでもよい。
 また、本実施の形態で説明される各機能をハードウェアで実現するか、ソフトウェアで実現するかは問わない。つまり、本実施の形態で説明される各ブロック図は、ハードウェアのブロック図と考えても、ソフトウェアの機能ブロック図と考えてもよい。例えば、各ブロック図は、回路デバイス等のハードウェアで実現されてもよく、図示しないプロセッサ等の演算装置上で実行されるソフトウェアで実現されてもよい。
 また、本実施の形態で説明されるブロック図の各ブロックは、その機能が実施されればよく、それらの各ブロックで構成が分離されなくてもよい。なお、本実施の形態1~3のそれぞれにおいて、特に記述しない項目については実施の形態1~3と同様とし、同一の機能及び構成については同一の符号を用いて述べることとする。また、本実施の形態1~3のそれぞれは、単独で実施されてもよく、組み合わされて実施されてもよい。いずれの場合においても、下記で説明する有利な効果を奏することとなる。また、本実施の形態で説明する各種具体的な設定例は一例を示すだけであり、特にこれらに限定されない。
実施の形態1.
(実施の形態1の構成)
 図1は、本発明の実施の形態1における空調システム1の概略構成の一例を示す図である。図1に示すように、空調システム1は、空気調和装置2と、ロードヒーティングユニット3と、を備えている。ロードヒーティングユニット3は、詳細については後述するが、市販のものであればよく、オプション部品として、空気調和装置2に取り付けることができる構成となっている。
 空気調和装置2は、主冷媒回路4と、バイパス回路5と、ロードヒーティング用熱交換器6と、を備えている。主冷媒回路4は、例えば、圧縮機11、四方弁12、ガス操作弁13、室内機側熱交換器14、電子膨張弁15、液操作弁16、流量調整器17、熱交換器18、室外機側熱交換器19、及びアキュムレーター20等で構成されている。バイパス回路5は、例えば、バイパス配管31、バイパス回路用電磁弁32、バイパス回路用電子膨張弁34、及びバイパス回路用温度センサー35等で構成されている。
 次に、空気調和装置2の具体的な構成について説明する。空気調和装置2は、室外機7と、室内機9と、を備えている。このうち、室外機7は、主冷媒回路4の一部が設けられ、熱源側ユニットとして機能する。室外機7は、例えば、圧縮機11、四方弁12、ガス操作弁13、液操作弁16、流量調整器17、熱交換器18、室外機側熱交換器19、及びアキュムレーター20等が設けられている。このうち、室外機側熱交換器19は、熱源側熱交換器として機能する。
 室外機7は、制御機能として、制御装置51が設けられている。制御装置51は、例えば、図示しない室外機7の電気品箱に収容される制御基板上で実現される機能構成である。制御装置51の機能構成の詳細については図3を用いて後述するが、要するに、制御装置51は、各種センシング結果に応じて、室外機7の駆動部品を制御する機能構成として室外機7に実装されるものである。また、制御装置51は、物理的構成としては、図示しないディップスイッチ及びロータリースイッチ等の各種スイッチを含むスイッチ手段52が設けられている。そのような各種スイッチは、スイッチ手段52として、図示しない電気品箱内部に収容され、各種設定を変更するときに使用される。
 室外機7は、上記で説明したバイパス回路5が設けられている。バイパス回路5のバイパス回路用温度センサー35の検知結果は、制御装置51に供給される。例えば、バイパス回路用温度センサー35は、ロードヒーティング用熱交換器6の出口側に設けられ、ロードヒーティング用熱交換器6の出口温度を検知する。バイパス回路用温度センサー35は、そのような検知結果を予め設定された通信プロトコルに基づいて検知信号に変換し、そのような検知信号を制御装置51に供給する。一方、室内機9は、主冷媒回路4の別の一部が設けられ、負荷側ユニットとして機能する。室内機9は、例えば、室内機側熱交換器14及び電子膨張弁15等が設けられている。このうち、室内機側熱交換器14が利用側熱交換器として機能する。
 次に、上記の構成を前提として、空気調和装置2のさらに具体的な構成について説明する。まず、室外機7の具体的な各種構成について説明する。圧縮機11は、吸入した冷媒を圧縮して吐出する。例えば、図示しないインバータ装置が後述する制御装置51に設けられ、制御装置51から運転周波数が圧縮機11に供給される。制御装置51は、運転周波数を任意に変化させることで、圧縮機11の容量、つまり、圧縮機11の単位時間当たりの冷媒の送出量を圧縮機11の仕様の範囲内で任意に制御する。
 四方弁12は、制御装置51から供給される信号に基づいて、冷房運転時と、暖房運転時と、で冷媒の流れを切り換える。ガス操作弁13は、室外機7から流出する冷媒の流出量と、室外機7に流入する冷媒の流入量とを制御する。具体的には、ガス操作弁13は、ガス状の単相冷媒又はガス状の冷媒を主成分とする気液二相冷媒といったようなガス冷媒の流出量及び流入量を制御する。液操作弁16は、室外機7に流入する冷媒の流入量と、室外機7から流出する冷媒の流出量とを制御する。具体的には、液操作弁16は、液状の単相冷媒又は液状の冷媒を主成分とする気液二相冷媒といったような液冷媒の流入量及び流出量を制御する。
 流量調整器17は、主冷媒配管22から分岐した副冷媒配管23に設けられる。副冷媒配管23は、例えば、弾性を有する長手形状であって、一方が1つの接続口で構成され、他方が2又に分かれた2つの接続口で構成される。副冷媒配管23は、一方が液操作弁16側の主冷媒配管22に接続され、他方のうち、1つめが四方弁12とアキュムレーター20との間に接続され、2つめがバイパス回路用電子膨張弁34の下流側に接続される。流量調整器17は、開度を変更することができ、流量を調整する弁で構成される。熱交換器18は、主冷媒配管22を流通する冷媒と、副冷媒配管23を流通する冷媒と、で熱交換させる。副冷媒配管23を流通する冷媒の状態は、流量調整器17で調整される。
 室外機側熱交換器19は、冷媒と、空気との熱交換を行う。具体的には、室外機側熱交換器19は、主冷媒配管22を流通する冷媒と、図示しない室外機7のファンを用いて室外機7から吸い込まれた室外の空気と、を熱交換させる。室外機側熱交換器19は、例えば、暖房運転時に蒸発器として機能するため、冷媒を蒸発させて気化させる。室外機側熱交換器19は、例えば、冷房運転時に凝縮器として機能するため、冷媒を凝縮させて液化させる。
 ロードヒーティング用熱交換器6は、バイパス回路5を構成するバイパス配管31と、ロードヒーティングユニット3を構成するロードヒーティング用冷媒配管44と、を接続する。ロードヒーティング用熱交換器6は、バイパス配管31と、ロードヒーティング用冷媒配管44と、が接続されている場合、バイパス配管31を流通する冷媒と、ロードヒーティング用冷媒配管44を流通する熱媒体である液体と、を熱交換させる。ロードヒーティング用冷媒配管44を流通する液体には、例えば、不凍液が用いられることで、寒冷地であっても、ロードヒーティング用冷媒配管44を流通する液体の凍結を防ぐことができる。
 なお、上記の説明では、ロードヒーティング用冷媒配管44を流通する熱媒体の一例として液体の不凍液が用いられる一例について説明したが、特にこれに限定されず、熱媒体であり、寒冷地で凍結しないものであれば、気体であってもよい。
 ロードヒーティング用熱交換器6は、例えば、バイパス配管31を接続する2つの接続口と、ロードヒーティング用冷媒配管44とを接続する2つの接続口とが設けられている。ロードヒーティング用熱交換器6に設けられているそれぞれの接続口は、各種配管を接続する部材が設けられる。例えば、ロードヒーティング用熱交換器6にロードヒーティングユニット3をオプションで取り付ける場合には、各種配管を接続する部材でロードヒーティング用冷媒配管44を固定させ、ロードヒーティング用熱交換器6にロードヒーティングユニット3をオプションで取り付けない場合には、ロードヒーティング用熱交換器6に設けられているそれぞれの接続口をそれぞれの接続口の形状に合わせた蓋等で閉じればよい。
 各種配管を接続する部材は、例えば、2つの接続口から構成される長手方向の接続管であって、2つの接続口のそれぞれは、例えば、周囲を被覆する被覆部材で構成され、異種金属を接続することができ、耐食性の高い素材で構成されればよい。
 ロードヒーティング用熱交換器6は、上記で説明したように、バイパス配管31を流通する冷媒と、ロードヒーティング用冷媒配管44を流通する不凍液と、を熱交換させる。具体的には、暖房運転時にロードヒーティングユニット3が必要になった場合、制御装置51は、バイパス配管31のバイパス回路用電磁弁32の開度を開とすることで、ロードヒーティング用熱交換器6で、冷媒と、不凍液と、を熱交換させる。
 この結果、バイパス配管31を流通する冷媒は凝縮して液化するため、液冷媒となる。アキュムレーター20は余剰冷媒を溜める構成で形成され、アキュムレーター20と、バイパス配管31とは接続されている。よって、ロードヒーティング用熱交換器6で凝縮された液冷媒はアキュムレーター20に流れ込み、アキュムレーター20で液冷媒が貯留される。
 ロードヒーティングユニット3は、例えば、ヒーティング部材41と、ポンプ42と、で構成されている。ヒーティング部材41は、例えば、ヒーティングパイプ43で構成されている。ヒーティング部材41として、素材、外形形状、及び断面形状等は特に限定されないが、例えば、耐寒性及び耐久性の高いもので構成されればよい。ヒーティングパイプ43の配置構成は、特に限定されないが、ロードヒーティングユニット3の周囲にヒーティングパイプ43の熱を伝達されやすくするため、例えば、蛇行形状に配置されればよい。ポンプ42は、例えば、ヒーティングパイプ43を流通する不凍液を循環させる。ポンプ42は、後述する制御装置51が駆動を制御する。
 また、上記で説明したように、ロードヒーティング用熱交換器6は、冷媒と、不凍液と、を熱交換させるため、ロードヒーティング用冷媒配管44を流通する不凍液は加熱される。また、ポンプ42が駆動されるため、ロードヒーティング用冷媒配管44を流通する不凍液は、ロードヒーティングユニット3内を循環する。よって、加熱された不凍液が、ポンプ42の駆動でヒーティングパイプ43を通過し、ロードヒーティングユニット3内を循環するため、ヒーティング部材41は周囲を加熱することができる。つまり、ロードヒーティングユニット3内を循環する液体は、熱媒体であり、寒冷地であっても凍結しない不凍液が使用されているため、ロードヒーティング用熱交換器6で冷媒と熱媒体とが熱交換することで、ロードヒーティングユニット3は周囲を加熱することができる。
 次に、バイパス回路5について具体的に説明する。バイパス回路用電子膨張弁34は、開度を変更する構成であって、バイパス配管31を流通する冷媒の流量を調整する。制御装置51は、バイパス回路用温度センサー35の検知結果と、高圧圧力の飽和温度と、に基づいて、過冷却度を求め、求めた過冷却度に応じて、バイパス回路用電子膨張弁34の開度を調整する。
 バイパス回路用電磁弁32は、弁の開閉動作をするリレーであって、バイパス配管31を流通する冷媒を通過させるか否かを調整する。制御装置51は、後述する降雪センサー91の検知結果に基づいて、後述する室外機ベース部62と、雪55との間の距離ΔLを求める。制御の詳細については後述するが、制御装置51は、求めた距離ΔLに応じて、バイパス回路5に冷媒を循環させる第1除雪モードに移行させるか否かを判定する。制御装置51は、第1除雪モードに移行した場合、バイパス回路用電磁弁32を開くことでバイパス回路5に冷媒を流通させ、ポンプ42を駆動させることでロードヒーティングユニット3内に不凍液を循環させる。
 よって、上記で説明したように、ロードヒーティング用熱交換器6は、冷媒と、不凍液と、を熱交換させる。なお、第1除雪モードは、後述する室外機ベース部62のドレン穴が塞がれる状態を防止する氷結防止処理と想定する。
 次に、室内機9の具体的な構成について説明する。室内機9は、主冷媒回路4のうち、別の一部が設けられている。具体的には、室内機9は、室内機側熱交換器14と、電子膨張弁15とが設けられている。このうち、室内機側熱交換器14は、利用側熱交換器として機能する。
 室内機側熱交換器14は、冷媒と、空気との熱交換を行う。具体的には、室内機側熱交換器14は、主冷媒配管22を流通する冷媒と、図示しない室内機9のファンを用いて室内機9から吸い込まれた室内の空気と、を熱交換させる。室内機側熱交換器14は、例えば、暖房運転時に凝縮器として機能するため、冷媒を凝縮させて液化させる。室内機側熱交換器14は、例えば、冷房運転時に蒸発器として機能するため、冷媒に室内の空気の熱を奪わせることで、蒸発させて気化させる。
 電子膨張弁15は、開度を調整する弁で構成される。電子膨張弁15は、弁の開度を制御することで、室内機側熱交換器14の冷媒の圧力及び冷媒の流量等を調整する。よって、電子膨張弁15は、主冷媒回路4の減圧手段を構成する。つまり、電子膨張弁15は、主冷媒回路4の圧力調整手段を構成する。なお、上記の説明では、室内機9が一台である場合を想定したが、特にこれに限定されない。例えば、1台の室外機7と、複数台の室内機9とで、空気調和装置2が構成されてもよい。
 次に、空気調和装置2の暖房運転時、主冷媒回路4で形成される冷凍サイクルについて冷媒の流れに基づいて説明する。ここで、制御装置51が、圧縮機11、四方弁12、電子膨張弁15、流量調整器17、バイパス回路用電磁弁32、バイパス回路用電子膨張弁34、及びポンプ42のそれぞれの駆動を制御すると想定する。また、制御装置51には、バイパス回路用温度センサー35の他にも、図示しない各種センサーの検知結果が供給されると想定する。また、後述する室外機ベース部62まで雪55が到達しないような環境で暖房運転が行われる場合を想定する。
 室外機7では、圧縮機11が供給された冷媒を圧縮して吐出する。圧縮機11から吐出される冷媒は、高温高圧のガス冷媒である。高温高圧のガス冷媒は、四方弁12及びガス操作弁13を通過し、室外機7から流出して室内機9に流入する。室内機9に流入した冷媒は、凝縮器として機能する室内機側熱交換器14を通過する。このとき、室内機側熱交換器14では、冷媒が室内の空気と熱交換することで、凝縮して液化すると共に、例えば、空調対象空間の空気を加熱する。よって、空気調和装置2は、空調対象空間の暖房を行うことができる。次いで、室内機側熱交換器14を通過した冷媒は減圧され、例えば、低温低圧の二相冷媒となり、室内機9から流出して室外機7に流入する。
 室外機7に流入した低温低圧の二相冷媒は、液操作弁16を通過し、蒸発器として機能する室外機側熱交換器19に流入する。室外機側熱交換器19を通過した冷媒は、室外の空気と熱交換することで蒸発してガス化し、さらに、四方弁12及びアキュムレーター20を介して、圧縮機11に吸入される。次いで、圧縮機11は、再び冷媒を圧縮して吐出する。この結果、上記で説明したような処理が再び行われ、冷媒は、主冷媒回路4を循環する。
 上記で説明したような基本的な暖房運転では、バイパス配管31に冷媒を供給してバイパス回路5に冷媒を流通させる必要がないため、バイパス回路用電磁弁32は閉じた状態を維持している。
 一方、例えば、積雪量が多く、後述する室外機ベース部62まで雪55が到達するような環境で暖房運転が行われる場合を想定する。このような想定の場合、霜取り運転時に発生した水が室外機ベース部62で氷結し、室外機ベース部62のドレン穴を塞ぐ。さらに、そのような状況下では、室外機側熱交換器19は凍結するため、暖房性能が低下する恐れがある。また、後述する防雪架台81の内側にロードヒーティングユニット3が設けられている状態を想定する。また、ロードヒーティング用熱交換器6の能力を確保するため、バイパス回路用温度センサー35の検知結果に基づいて過冷却度を求め、求めた過冷却度に応じてバイパス回路用電子膨張弁34の開度が調整される状態を想定する。このとき、ロードヒーティング用熱交換器6で安定した能力を確保するために、過冷却度として、例えば、10(deg)が目標値に設定された場合を想定する。
 まず、空気調和装置2は、バイパス回路用電磁弁32を開き、圧縮機11から吐出される高温高圧の冷媒をバイパス回路5に供給する。次に、空気調和装置2は、ポンプ42を駆動させることで、ロードヒーティングユニット3内の不凍液を循環させる。次いで、ロードヒーティング用熱交換器6は、ロードヒーティングユニット3を流通する不凍液と、圧縮機11から吐出された高温高圧の冷媒と、を熱交換させる。よって、ロードヒーティングユニット3が加熱される。したがって、ロードヒーティングユニット3が室外機ベース部62の下方を融雪するため、空気調和装置2はドレン穴が凍結する状態を抑制することができる。
 なお、主冷媒回路4は、本発明における第1冷媒回路に相当する。また、バイパス回路5は、本発明における第2冷媒回路に相当する。また、主冷媒配管22は、本発明における冷媒配管に相当する。また、バイパス回路用電磁弁32は、本発明における第1電磁弁に相当する。また、電子膨張弁15は、本発明における膨張装置に相当する。また、ロードヒーティングユニット3内を循環する不凍液は、本発明における熱媒体に相当する。
 なお、主冷媒回路4及びバイパス回路5を流通する冷媒は特に限定されない。例えば、主冷媒回路4及びバイパス回路5を流通する冷媒は、R22のような単一冷媒であってもよく、R407Cのような非共沸混合冷媒であってもよく、R410Aのような疑似共沸冷媒であってもよく、COのような自然冷媒であってもよい。つまり、主冷媒回路4及びバイパス回路5を流通する冷媒には、各種冷媒を用いることができる。
 次に、室外機7と、ロードヒーティングユニット3との配置構成について図2を用いて説明する。図2は、本発明の実施の形態1における室外機7の外形の一例を示す図である。図2に示すように、室外機7は、外形形状として、例えば、筐体61、室外機ベース部62、防雪フード63、風そらせ板65、及び風そらせ板67等で構成される。筐体61は、上記で説明したように、主冷媒回路4の一部が収納されている。室外機ベース部62は、例えば、筐体61の下側に設けられ、筐体61に収納されている主冷媒回路4の一部を支える。具体的には、室外機ベース部62は、圧縮機11及び室外機側熱交換器19等を支える。室外機ベース部62は、図示しないドレン穴が構成されている。
 防雪フード63は、例えば、筐体61の上側に設けられ、図示しない室外機7のファンを収納する。防雪フード63は、吹出口71が構成される。図示しない室外機7のファンの駆動に伴って吹き出された空気は、吹出口71から吹き出される。風そらせ板65は、室外機側熱交換器19の一部と対向する位置に設けられ、吸込口73が構成される。図示しない室外機7のファンの駆動に伴い、吸込口73から室外機7の周囲の室外の空気が室外機7に吸い込まれる。風そらせ板67は、室外機側熱交換器19の別の一部と対向する位置に設けられ、吸込口75が構成される。図示しない室外機7のファンの駆動に伴い、吸込口75から室外機7の周囲の室外の空気が室外機7に吸い込まれる。
 上記で説明したような室外機7の下方には、防雪架台81が設けられる。具体的には、室外機ベース部62の下方に防雪架台81が配設されることで、防雪架台81が室外機ベース部62を支えるため、防雪架台81は、室外機7を支える。よって、防雪架台81は、室外機7を地面85から離した位置で支えることができる。防雪架台81の内側には、ロードヒーティングユニット3が設けられる。なお、ロードヒーティングユニット3は、防雪架台81の下方であって、防雪架台81に踏まれない位置に配置させることもできる。
 防雪架台81は、例えば、台座82、足部83、及び筋交い84で構成される。台座82は、室外機ベース部62と対向し、室外機ベース部62を支える台となる。足部83は、例えば、台座82を地面85から支え、台座82に対して4本設けられている。筋交い84は、4つの足部83を補強している。
 防雪架台81には、降雪センサー91が設けられる。例えば、降雪センサー91は、防雪架台81の台座82と、室外機ベース部62との境目に設けられる。降雪センサー91は、地面85に積もっている雪55を検知し、検知結果を図1で説明した制御装置51に供給する。なお、防雪架台81の地面85からの高さと、降雪センサー91が取り付けられた地面85からの高さと、が制御装置51に設定されている場合には、降雪センサー91は、雪55を検知したことだけを制御装置51に供給すればよいが、特にこれに限定されない。例えば、降雪センサー91は、雪55を検知したときに、検知した雪55の地面85からの高さを演算し、その演算結果を制御装置51に供給してもよい。
 なお、降雪センサー91は、例えば、赤外線で障害物を検知する赤外線センサーで構成されればよい。この場合、降雪センサー91は、低コストで実現できる。また、降雪センサー91は、複数の赤外線センサーを備え、そのような複数の赤外線センサーを一定間隔で地面85に対して縦に配置して構成されたものであってもよい。この場合、降雪センサー91は、検知した雪55の地面85からの高さを段階的に検知することができる。また、降雪センサー91は、外気温度と、水分とを検知することで、雪55を検出してもよい。この場合、降雪センサー91は、外気温度の検知結果と、予め設定された時間だけ連続して水分を検知したか否かと、に基づいて、雪55を検出するため、樹木等から風で飛ばされた雪55の誤検知を防ぐことができる。
 つまり、降雪センサー91は、防雪架台81の下方の積雪量を調整するための情報を制御装置51に供給する。例えば、一般的には、室外機ベース部62の下部と、防雪架台81の雪55との距離ΔLは、150(mm)あれば、図示しないドレン穴が塞がることがない。そこで、室外機ベース部62と、防雪架台81にある雪55との距離ΔLは、150(mm)分だけ確保されればよい。そこで、例えば、降雪センサー91を防雪架台81に取り付ける位置は、地面85から150(mm)ほど離れた防雪架台81の足部83に設ければよい。なお、上記で説明したような室外機7、防雪架台81、及び降雪センサー91等の各種構成は一例であって、特にこれらに限定されない。
 次に、上記で概要について説明した制御装置51の詳細について図3を用いて説明する。図3は、本発明の実施の形態1における制御装置51の機能構成の一例を示す図である。図3に示すように、制御装置51は、例えば、送受信部101、運転モード判定部103、除雪モード開始判定部105、除雪モード終了判定部107、運転停止判定部109、除雪条件判定部111、運転モード制御部113、除雪モード制御部115、主冷媒回路制御部117、バイパス回路制御部121、及びロードヒーティングユニット制御部123等で構成される。
 送受信部101は、例えば、外部から供給される信号を受信後、制御装置51内で処理する信号に変換する。送受信部101は、例えば、制御装置51内で処理した信号を外部へ供給する信号に変換後、送信する。運転モード判定部103は、空気調和装置2の運転モードを判定する。除雪モード開始判定部105は、第1除雪モードを開始するか否かを判定する。除雪モード終了判定部107は、第1除雪モードを終了するか否かを判定する。運転停止判定部109は、外部から供給される信号に基づいて、運転を停止させるか否かを判定する。
 除雪条件判定部111は、例えば、積雪量判定部131及び計時部133で構成される。積雪量判定部131は、降雪センサー91の検知結果に基づいて、積雪量を判定する。積雪量判定部131は、積雪量に対応する指標として、地面85と、雪55の表面との距離ΔLを求める。例えば、降雪センサー91の設置位置が予め登録され、地面85から150(mm)と想定される場合、降雪センサー91が雪55を検知すれば、地面85と、雪55の表面との距離ΔLは、150(mm)に到達したと判定してもよい。
 計時部133は、例えば、降雪センサー91が検知している時間をカウントする。例えば、計時部133は、降雪センサー91が地面85から雪55までの距離ΔLとして350(mm)を超える値を検知した場合、350(mm)を超える値を継続して検知している時間をカウントする。なお、上記で説明した積雪量の判定は一例であって、特にこれに限定されない。
 除雪条件判定部111は、降雪センサー91の検知結果と、予め設定された開始判定閾値と、に基づいて、第1除雪モードの開始を積雪量に基づいて判定し、判定結果を除雪モード開始判定部105に供給する。除雪条件判定部111は、降雪センサー91の検知結果と、予め設定された終了判定閾値と、に基づいて、第1除雪モードの終了を積雪量及び経過時間に基づいて判定し、判定結果を除雪モード終了判定部107に供給する。
 運転モード制御部113は、判定された運転モードに応じた指令を主冷媒回路制御部117に供給する。除雪モード制御部115は、第1除雪モードの開始が判定された場合、第1除雪モードの開始に応じた指令を主冷媒回路制御部117、バイパス回路制御部121、及びロードヒーティングユニット制御部123にそれぞれ供給する。除雪モード制御部115は、第1除雪モードの終了が判定された場合、第1除雪モードの終了に応じた指令を主冷媒回路制御部117、バイパス回路制御部121、及びロードヒーティングユニット制御部123にそれぞれ供給する。
 主冷媒回路制御部117は、電子膨張弁制御部141、電磁弁制御部143、圧縮機制御部145、及びファン制御部147等で構成され、主冷媒回路4を循環する冷媒の流量、流れる向き、及び圧力等を制御する。電子膨張弁制御部141は、例えば、電子膨張弁15の開度及び流量調整器17の開度を制御する。電磁弁制御部143は、例えば、ガス操作弁13の開閉及び液操作弁16の開閉を制御する。四方弁制御部144は、四方弁12の切換動作を制御する。圧縮機制御部145は、運転周波数に応じて圧縮機11の駆動を制御する。ファン制御部147は、図示しない室外機7のファンの駆動を制御する。
 バイパス回路制御部121は、バイパス回路用電磁弁制御部151及びバイパス回路用電子膨張弁制御部153等で構成され、バイパス回路5を循環する冷媒の流量、流れる向き、及び圧力等を制御する。バイパス回路用電磁弁制御部151は、バイパス回路用電磁弁32の開閉を制御する。バイパス回路用電子膨張弁制御部153は、バイパス回路用電子膨張弁34の開度を制御する。ロードヒーティングユニット制御部123は、ポンプ制御部155で構成され、ロードヒーティングユニット3内を循環する熱媒体、例えば、不凍液の流量及び流れる向き等を制御する。
 なお、上記で説明した機能構成は一例であって、特にこれらに限定されず、上記で説明したような機能が実行される構成であればよい。次に、第1除雪モードを含む制御装置51の動作例について図4を用いて説明する。
(実施の形態1の動作)
 図4は、本発明の実施の形態1における制御装置51の制御例を説明するフローチャートである。図4においては、デフォルト設定として、バイパス回路用電磁弁32が閉じた状態であって、防雪フラグが0に設定され、開始判定閾値として第1距離閾値が設定され、終了判定閾値として第2距離閾値が設定され、検知継続時間の判定に第1時間閾値が設定されている場合を想定する。さらに具体的には、第1距離閾値として例えば250(mm)が設定され、第2距離閾値として例えば350(mm)が設定され、第1時間閾値として10分が設定された場合を想定する。
 なお、上記で説明した各種設定例は一例であって、特にこれらに限定されない。例えば、各種距離に関する閾値及び時間に関する閾値は一例であって、室外機7の設置環境、すなわち、その地域の積雪量に応じて変更される。
 例えば、上記で想定した場合と比べ、単位時間当たりの積雪量が多い地域に室外機7を設ける場合、早く雪55が積もる。よって、各種距離に関する閾値を上記で想定した値と比べて短く設定し、時間に関する閾値を上記で想定した値と比べて短く設定してもよい。また、例えば、防雪フラグは、単に検知継続時間を数えるためにある遷移状態が継続している状況を示す指標として利用しているだけであって、特にこれに限定されない。
 また、ステップS15~ステップS21の処理は、第1除雪モードであると想定する。すなわち、ステップS11~ステップS14の処理は、第1除雪モード前工程処理であって、ステップS22~ステップS24の処理は、第1除雪モード後工程処理であると想定する。
(第1除雪モード前工程処理)
(ステップS11)
 制御装置51は、運転モードを判定する。
(ステップS12)
 制御装置51は、暖房運転が行われているか否かを判定する。制御装置51は、暖房運転が行われている場合、ステップS13に進む。一方、制御装置51は、暖房運転が行われていない場合、ステップS11に戻る。
(ステップS13)
 制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLを取得する。
(ステップS14)
 制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLが第1距離閾値未満であるか否かを判定する。制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLが第1距離閾値未満である場合、ステップS15に進む。一方、制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLが第1距離閾値未満でない場合、ステップS11に進む。
(第1除雪モード処理)
(ステップS15)
 制御装置51は、バイパス回路用電磁弁32を開く。
(ステップS16)
 制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLを取得する。
(ステップS17)
 制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLが第2距離閾値以上であるか否かを判定する。制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLが第2距離閾値以上である場合、ステップS18に進む。一方、制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLが第2距離閾値以上でない場合、ステップS24に進む。
(ステップS18)
 制御装置51は、防雪フラグを1に設定する。
(ステップS19)
 制御装置51は、防雪フラグが1である状態を継続している検知継続時間をカウントする。
(ステップS20)
 制御装置51は、防雪フラグが1である状態を継続している検知継続時間が第1時間閾値を経過したか否かを判定する。制御装置51は、防雪フラグが1である状態を継続している検知継続時間が第1時間閾値を経過した場合、ステップS21に進む。一方、制御装置51は、防雪フラグが1である状態を継続している検知継続時間が第1時間閾値を経過しない場合、ステップS16に戻る。
(ステップS21)
 制御装置51は、防雪フラグを0に設定し、ステップS20に移行する。
(第1除雪モード後工程処理)
(ステップS22)
 制御装置51は、バイパス回路用電磁弁32を閉じる。
(ステップS23)
 制御装置51は、運転停止指令が到来したか否かを判定する。制御装置51は、運転停止指令が到来した場合、ステップS23に進む。一方、制御装置51は、運転停止指令が到来しない場合、ステップS11に戻る。
(ステップS24)
 制御装置51は、運転を停止し、処理を終了する。
(実施の形態1の効果)
 以上の結果、室外機7は、バイパス回路5を設けることで、冷凍サイクルを利用したロードヒーティングユニット3が周囲を加熱する。そして、ロードヒーティングユニット3が防雪架台81に設けられることで、防雪架台81の周辺を加熱する。よって、防雪架台81に雪55が積もり始めたとしても、室外機7はロードヒーティングユニット3を作動させることで、防雪架台81に積もった雪55を溶かすことができる。
 よって、外気温度が低く、積雪量の多い環境下に室外機7が設置されたとしても、暖房運転の霜取り時に発生した水が氷結しないため、室外機ベース部62のドレン穴を塞ぐことがない。よって、室外機7は、室外機ベース部62に貯留する水を外部に排出することができるため、室外機側熱交換器19の熱交換効率を下げず、暖房性能の低下を抑制することができる。さらに、バイパス配管31を流出した冷媒がアキュムレーター20に流れる回路構成であるため、圧縮機11が液状の冷媒を吸入することがない。よって、主冷媒回路4は、室外機7の信頼性を高めることができる。
 また、室外機7が設けられる地域で想定される最高積雪量を超えるまで防雪架台81を高くする必要がないため、防雪架台81の高さは、通常の施工で用いられる設計寸法でよい。したがって、防雪架台81の高さを十分に確保する必要がなくなるため、室外機7のサービス性を向上させることができる。
 また、ロードヒーティングユニット3は、防雪架台81の周辺に積雪される雪55を溶かすことができるサイズであればよい。よって、ロードヒーティングユニット3は、低コストで施工される。また、ロードヒーティングユニット3を加熱する熱源にはヒートポンプ式の冷凍サイクルが利用されている。よって、ヒートポンプ式の冷凍サイクルを利用するロードヒーティングユニット3は、運用上、安全性を高くすることができ、また、低消費電力で作動させることができる。よって、ロードヒーティングユニット3を用いた融雪に費やされる運用コストは低コストで済む。したがって、ロードヒーティングユニット3を低コストで施工させることができ、ロードヒーティングユニット3を低コストで運用させることができる。
 よって、室外機7は、サービス性を向上させ、低コストを実現しつつ、防雪架台81に積雪した雪55を溶かすことができる。よって、室外機7は、サービス性を向上させ、低コストを実現しつつ、室外機ベース部62における水の氷結を防止することができる。したがって、室外機7は、サービス性を向上させ、低コストを実現しつつ、室外機ベース部62における水の氷結に起因する根氷及び空調能力低下を抑制することができる。
 以上、本実施の形態1において、圧縮機11、室内機側熱交換器14、電子膨張弁15、及び室外機側熱交換器19が主冷媒配管22を介して接続されて形成される主冷媒回路4のうち、主冷媒回路4の一部が設けられた室外機7であって、圧縮機11から吐出され、主冷媒回路4を流通する冷媒を迂回させるバイパス回路5と、主冷媒回路4を流通する冷媒の流量及びバイパス回路5を流通する冷媒の流量を制御する制御装置51と、圧縮機11及び室外機側熱交換器19を支える室外機ベース部62と、を備え、室外機ベース部62の下方に、室外機ベース部62を支える防雪架台81が設けられ、熱媒体が流通し、熱媒体と、バイパス回路5を流通する冷媒と、を熱交換させることで周囲を加熱するロードヒーティングユニット3が防雪架台81に設けられた室外機7が構成される。
 上記構成で、室外機7は、サービス性を向上させ、低コストを実現しつつ、室外機ベース部62における水の氷結を防止することができる。したがって、室外機7は、サービス性を向上させ、低コストを実現しつつ、室外機ベース部62における水の氷結に起因する根氷及び空調能力低下を抑制することができる。
 また、本実施の形態1において、バイパス回路5は、圧縮機11の吸入側の配管と、圧縮機11の吐出側の配管と、にそれぞれ接続され、冷媒を迂回させるバイパス配管31と、バイパス配管31を流れる冷媒の流量を調整するバイパス回路用電磁弁32と、を備えたものである。
 また、本実施の形態1において、防雪架台81は、防雪架台81の周囲に積雪した雪55を検知する降雪センサー91を備え、制御装置51は、室外機ベース部62と、降雪センサー91で検知した雪55と、の距離ΔLに応じて、バイパス回路用電磁弁32を制御することで、ロードヒーティングユニット3を作動させる。
 また、本実施の形態1において、ロードヒーティングユニット3は、防雪架台81の内側又は下方に設けられたものである。
 また、本実施の形態1において、熱媒体は、不凍液で構成されるものである。
 上記構成で、室外機7は、特に顕著に、サービス性を向上させ、低コストを実現しつつ、室外機ベース部62における水の氷結を防止することができる。
実施の形態2.
 実施の形態1との相違点は、圧縮機11の吐出側と、ガス操作弁13との間に、ガス冷媒用電磁弁36が設けられ、室内機側熱交換器14に冷媒を供給させないことで、暖房停止期間中であっても、除雪を行うことができる点にある。
(実施の形態2の構成)
 図5は、本発明の実施の形態2における空調システム1の概略構成の一例を示す図である。図5に示すように、四方弁12と、ガス操作弁13との間には、ガス冷媒用電磁弁36が設けられている。つまり、暖房運転時、四方弁12が切り換えられ、圧縮機11の吐出側と、室内機側熱交換器14とが接続される状態となった場合、上記で説明したように、圧縮機11の吐出側と、ガス操作弁13との間に、ガス冷媒用電磁弁36が設けられる状態になる。
 なお、ガス冷媒用電磁弁36は、本発明における第2電磁弁に相当する。
 ガス冷媒用電磁弁36が設けられることで、室内機側熱交換器14にガス冷媒を流入させるか否かを制御することができる。つまり、ガス冷媒用電磁弁36は、室内機9へのガス冷媒の流入を制御することができる。
 例えば、暖房停止時間が長くなる場合を想定する。この場合、暖房運転停止期間中、ロードヒーティングユニット3は作動しない。よって、室外機ベース部62下部まで雪55が到達する恐れがある。さらに、室外機ベース部62下部まで雪55が到達する状況が長時間継続すれば、室外機ベース部62に設けられたドレン穴が塞がる恐れもある。例えば、21時移行は暖房運転を停止し、翌日の7時から暖房運転を再開するスケジュール運転を行っていた場合、暖房運転停止期間が前日21時から翌日7時まで続くため、合計10時間にわたって、ロードヒーティングユニット3が作動しない。このような状況下では、積雪量の多い地域では、地面85に積もる雪55が室外機ベース部62下部まで到達する恐れがあると想定される。
 そこで、制御装置51は、暖房運転停止後、ある一定の条件を満たした場合、ガス冷媒用電磁弁36を作動させ、室内機側熱交換器14に冷媒が供給されない制御を実行する。次に、上記で説明した動作をする機能構成の一例について図6を用いて説明する。
 図6は、本発明の実施の形態2における制御装置51の機能構成の一例を示す図である。図6に示すように、送受信部101、除雪モード開始判定部105、除雪モード終了判定部107、除雪条件判定部111、運転モード制御部113、除雪モード制御部115、主冷媒回路制御部117、バイパス回路制御部121、及びロードヒーティングユニット制御部123で構成されている。つまり、図3を用いて説明した実施の形態1の場合と比べ、実施の形態2を説明する図6においては、運転モード判定部103及び運転停止判定部109が存在しない機能構成となっている。
 また、実施の形態2を説明する図6に示す機能構成のうち、送受信部101、除雪モード開始判定部105、除雪モード終了判定部107、運転モード制御部113、除雪モード制御部115、バイパス回路制御部121、及びロードヒーティングユニット制御部123については実施の形態1で説明した図3と同様であるため、それらの説明については省略する。
 除雪条件判定部111の構成のうち、積雪量判定部131は図3に示す機能構成と同様であるため、その説明については省略する。除雪条件判定部111の構成のうち、計時部133は、停止時間、経過時間、検知継続時間、及び各種閾値がカウントに使用される。設定判定部135は、第2除雪モードが設定されているか否かを判定する。第2除雪モードは、例えば、室外機7に設けられているディップスイッチ又はロータリースイッチ等で設定される。主冷媒回路制御部117の構成のうち、ガス冷媒用電磁弁制御部149は、新たに追加された機能構成である。ガス冷媒用電磁弁制御部149は、ガス冷媒用電磁弁36の開閉を制御する。
 次に、第2除雪モードの動作について図7を用いて説明する。なお、想定される設定として、第2除雪モード前工程処理には、運転停止の状態が停止フラグで設定され、運転停止の状態を継続させる時間の閾値が第2時間閾値で設定され、運転停止の状態を予め定めた時間だけ継続させたことが第1開始閾値で設定され、第1距離閾値は上記と同様に設定され、距離ΔLが第1距離閾値未満の条件を満たす場合が第2開始閾値で設定され、第2除雪モードが設定されている状態が第3開始閾値で設定されている。また、第2時間閾値は、例えば、連続時間T1が設定されている。また、第3時間閾値は、例えば、連続時間T2が設定されている。
 また、想定される設定として、第2除雪モード処理には、第2距離閾値及び検知継続時間は上記と同様に設定され、検知継続時間が第1時間閾値を経過した場合が第1終了閾値で設定され、経過時間が第3時間閾値以上である場合が第2終了閾値で設定されている。また、例えば、ここでいう経過時間とは、制御装置51が制御を開始してから現在までの経過時間であり、それを判定する閾値として第3時間閾値が、例えば、連続時間T2に設定されている。
 なお、第1開始閾値、第2開始閾値、及び第3開始閾値のそれぞれは、デフォルト値として0が設定されている。また、第1終了閾値及び第2終了閾値のそれぞれは、デフォルト値として0が設定されている。また、連続時間T1及び連続時間T2は、室外機7が設けられる周囲環境に応じた値がそれぞれ設定されている。
 なお、第2除雪モード処理で設定され、第2除雪モード後工程処理で再設定される暖房禁止フラグは、第2除雪モード時は、暖房運転を禁止している状態を示すものであって、特にこれに限定されない。要するに、第2除雪モードと、暖房運転とは、排他制御される動作であればよい。また、例えば、防雪フラグは、単に検知継続時間を数えるためであって、遷移状態が継続している状況を示す指標として利用されるだけであるため、特にこれに限定されない。
 なお、上記で説明した各種設定例は一例であって、特にこれらに限定されない。例えば、各種距離に関する閾値及び時間に関する閾値は一例であって、室外機7の設置環境、すなわち、その地域の積雪量に応じて変更される。
 なお、ステップS44~ステップS58の処理は、第2除雪モード処理であると想定する。また、ステップS31~ステップS43の処理は、第2除雪モード前工程処理であって。ステップS59~ステップS61の処理は、第2除雪モード後工程処理であると想定する。
(実施の形態2の動作)
 図7は、本発明の実施の形態2における制御装置51の制御例を説明するフローチャートである。なお、暖房禁止フラグに1が設定されている間、暖房運転が禁止されると想定する。
(第2除雪モード前工程処理)
(ステップS31)
 制御装置51は、各種フラグを初期化する。
(ステップS32)
 制御装置51は、運転が停止しているか否かを判定する。制御装置51は、運転が停止している場合、ステップS33に進む。一方、制御装置51は、運転が停止していない場合、ステップS32に戻る。
(ステップS33)
 制御装置51は、停止フラグを1に設定する。
(ステップS34)
 制御装置51は、停止フラグが1の状態を保持している停止時間をカウントする。
(ステップS35)
 制御装置51は、停止時間が第2時間閾値を経過したか否かを判定する。制御装置51は、停止時間が第2時間閾値を経過した場合、ステップS36に進む。一方、制御装置51は、停止時間が第2時間閾値を経過しない場合、ステップS34に戻る。
(ステップS36)
 制御装置51は、第1開始閾値を1に設定する。
(ステップS37)
 制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLを取得する。
(ステップS38)
 制御装置51は、距離ΔLが第1距離閾値未満であるか否かを判定する。制御装置51は、距離ΔLが第1距離閾値未満である場合、ステップS39に進む。一方、制御装置51は、距離ΔLが第1距離閾値未満でない場合、ステップS32に進む。
(ステップS39)
 制御装置51は、第2開始閾値を1に設定する。
(ステップS40)
 制御装置51は、第2除雪モードが設定されているか否かを判定する。制御装置51は、第2除雪モードが設定されている場合、ステップS41に進む。一方、制御装置51は、第2除雪モードが設定されていない場合、ステップS32に戻る。
(ステップS41)
 制御装置51は、第3開始閾値を1に設定する。
(ステップS42)
 制御装置51は、第1開始閾値と第2開始閾値と第3開始閾値とのAND演算を実行する。
(ステップS43)
 制御装置51は、AND演算の実行結果が1であるか否かを判定する。制御装置51は、AND演算の実行結果が1である場合、ステップS44に進む。一方、制御装置51は、AND演算の実行結果が1でない場合、ステップS32に戻る。
(第2除雪モード処理)
(ステップS44)
 制御装置51は、ガス冷媒用電磁弁36を閉じる。
(ステップS45)
 制御装置51は、バイパス回路用電磁弁32を開く。
(ステップS46)
 制御装置51は、室内機側熱交換器14の暖房禁止フラグを1に設定する。つまり、制御装置51は、室内機側熱交換器14の暖房禁止状態を設定する。
(ステップS47)
 制御装置51は、制御を開始後の経過時間をカウントする。
(ステップS48)
 制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLを取得する。
(ステップS49)
 制御装置51は、距離ΔLが第2距離閾値以上であるか否かを判定する。制御装置51は、距離ΔLが第2距離閾値以上である場合、ステップS50に進む。一方、制御装置51は、距離ΔLが第2距離閾値以上でない場合、ステップS58に進む。
(ステップS50)
 制御装置51は、防雪フラグを1に設定する。
(ステップS51)
 制御装置51は、防雪フラグが1の状態を継続している検知継続時間をカウントする。
(ステップS52)
 制御装置51は、検知継続時間が第1時間閾値を経過したか否かを判定する。制御装置51は、検知継続時間が第1時間閾値を経過した場合、ステップS53に進む。一方、制御装置51は、検知継続時間が第1時間閾値を経過しない場合、ステップS51に戻る。
(ステップS53)
 制御装置51は、第1終了閾値を1に設定する。
(ステップS54)
 制御装置51は、経過時間が第3時間閾値以上であるか否かを判定する。制御装置51は、経過時間が第3時間閾値以上である場合、ステップS55に進む。一方、制御装置51は、経過時間が第3時間閾値以上でない場合、ステップS56に進む。
(ステップS55)
 制御装置51は、第2終了閾値を1に設定する。
(ステップS56)
 制御装置51は、第1終了閾値と第2終了閾値とのOR演算を実行する。
(ステップS57)
 制御装置51は、OR演算の実行結果が1であるか否かを判定する。制御装置51は、OR演算の実行結果が1である場合、ステップS59に進む。一方、制御装置51は、OR演算の実行結果が1でない場合、ステップS48に戻る。
(ステップS58)
 制御装置51は、防雪フラグを0に設定し、ステップS48に戻る。
(第2除雪モード後工程処理)
(ステップS59)
 制御装置51は、ガス冷媒用電磁弁36を開く。
(ステップS60)
 制御装置51は、バイパス回路用電磁弁32を閉じる。
(ステップS61)
 制御装置51は、室内機側熱交換器14の暖房禁止フラグを0に設定し、処理を終了する。つまり、制御装置51は、室内機側熱交換器14の暖房禁止状態を解除する。
(実施の形態2の効果)
 以上の結果、室外機7は、第2除雪モードに遷移している状態では、暖房運転に遷移しないため、室内機側熱交換器14に高温高圧のガス冷媒が供給されず、圧縮機11から吐出された高温高圧のガス冷媒をバイパス回路5に供給することができる。よって、室外機7は、暖房運転停止中であっても、ロードヒーティング用熱交換器6で冷媒と熱媒体とを熱交換させることができるため、ロードヒーティングユニット3を加熱させることができる。
 よって、室外機7は、室外機ベース部62の下方に積もっている雪55の融雪を行うことができるため、結果として、除雪を行うことができる。したがって、室外機7は、暖房運転停止中であっても、防雪架台81下部に降り積もる雪55を除去することができる。
 以上、本実施の形態2において、室内機側熱交換器14と、圧縮機11の吐出側と、の間に設けられ、室内機側熱交換器14へ供給する冷媒の流量を調整するガス冷媒用電磁弁36と、をさらに備え、制御装置51は、暖房運転が停止した場合、ガス冷媒用電磁弁36を閉じ、バイパス回路用電磁弁32を開くものである。
 上記構成で、室外機7は、暖房停止期間中であっても、除雪を行うことができる。
実施の形態3.
 実施の形態1及び実施の形態2との相違点は、除雪時に、圧縮機11の運転周波数を通常のものと比べて高くする点にある。
(実施の形態3の構成)
 図8は、本発明の実施の形態3における制御装置51の機能構成の一例を示す図である。実施の形態1及び実施の形態2との相違点は、圧縮機制御部145に急速除雪用運転周波数の設定値が供給される点にある。急速除雪用運転周波数は、室外機7の図示しない電気品箱等に設けられているディップスイッチ等で設定することができる。急速除雪用運転周波数は、例えば、通常の動作時の運転周波数と比べて、運転周波数が高い値が設定される。なお、急速除雪用運転周波数は、第2除雪モードが設定されている場合に設定することができる構成となっている。
(実施の形態3の動作)
 図9は、本発明の実施の形態3における制御装置51の制御例を説明するフローチャートである。なお、実施の形態2との相違点は、第2除雪モード処理中にはなかった処理が追加された点であり、それは、急速除雪用運転周波数で圧縮機11を制御する技術である。なお、暖房禁止フラグに1が設定されている間、暖房運転が禁止されると想定する。
 なお、ステップS84~ステップS99の処理は、第3除雪モード処理であると想定する。また、ステップS71~ステップS83の処理は、第2除雪モード前工程処理であって。ステップS100~ステップS103の処理は、第2除雪モード後工程処理であると想定する。
(第3除雪モード前工程処理)
(ステップS71)
 制御装置51は、各種フラグを初期化する。
(ステップS72)
 制御装置51は、運転が停止しているか否かを判定する。制御装置51は、運転が停止している場合、ステップS73に進む。一方、制御装置51は、運転が停止していない場合、ステップS72に戻る。
(ステップS73)
 制御装置51は、停止フラグを1に設定する。
(ステップS74)
 制御装置51は、停止フラグが1の状態を保持している停止時間をカウントする。
(ステップS75)
 制御装置51は、停止時間が第2時間閾値を経過したか否かを判定する。制御装置51は、停止時間が第2時間閾値を経過した場合、ステップS76に進む。一方、制御装置51は、停止時間が第2時間閾値を経過しない場合、ステップS74に戻る。
(ステップS76)
 制御装置51は、第1開始閾値を1に設定する。
(ステップS77)
 制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLを取得する。
(ステップS78)
 制御装置51は、距離ΔLが第1距離閾値未満であるか否かを判定する。制御装置51は、距離ΔLが第1距離閾値未満である場合、ステップS79に進む。一方、制御装置51は、距離ΔLが第1距離閾値未満でない場合、ステップS72に進む。
(ステップS79)
 制御装置51は、第2開始閾値を1に設定する。
(ステップS80)
 制御装置51は、第2除雪モードが設定されているか否かを判定する。制御装置51は、第2除雪モードが設定されている場合、ステップS81に進む。一方、制御装置51は、第2除雪モードが設定されていない場合、ステップS72に戻る。
(ステップS81)
 制御装置51は、第3開始閾値を1に設定する。
(ステップS82)
 制御装置51は、第1開始閾値と第2開始閾値と第3開始閾値とのAND演算を実行する。
(ステップS83)
 制御装置51は、AND演算の実行結果が1であるか否かを判定する。制御装置51は、AND演算の実行結果が1である場合、ステップS84に進む。一方、制御装置51は、AND演算の実行結果が1でない場合、ステップS72に戻る。
(第3除雪モード処理)
(ステップS84)
 制御装置51は、ガス冷媒用電磁弁36を閉じる。
(ステップS85)
 制御装置51は、バイパス回路用電磁弁32を開く。
(ステップS86)
 制御装置51は、急速除雪用運転周波数で圧縮機11を制御する。
(ステップS87)
 制御装置51は、室内機側熱交換器14の暖房禁止フラグを1に設定する。つまり、制御装置51は、室内機側熱交換器14の暖房禁止状態を設定する。
(ステップS88)
 制御装置51は、制御を開始後の経過時間をカウントする。
(ステップS89)
 制御装置51は、室外機ベース部62と防雪架台81の雪55との間の距離ΔLを取得する。
(ステップS90)
 制御装置51は、距離ΔLが第2距離閾値以上であるか否かを判定する。制御装置51は、距離ΔLが第2距離閾値以上である場合、ステップS91に進む。一方、制御装置51は、距離ΔLが第2距離閾値以上でない場合、ステップS99に進む。
(ステップS91)
 制御装置51は、防雪フラグを1に設定する。
(ステップS92)
 制御装置51は、防雪フラグが1の状態を継続している検知継続時間をカウントする。
(ステップS93)
 制御装置51は、検知継続時間が第1時間閾値を経過したか否かを判定する。制御装置51は、検知継続時間が第1時間閾値を経過した場合、ステップS94に進む。一方、制御装置51は、検知継続時間が第1時間閾値を経過しない場合、ステップS92に戻る。
(ステップS94)
 制御装置51は、第1終了閾値を1に設定する。
(ステップS95)
 制御装置51は、経過時間が第3時間閾値以上であるか否かを判定する。制御装置51は、経過時間が第3時間閾値以上である場合、ステップS96に進む。一方、制御装置51は、経過時間が第3時間閾値以上でない場合、ステップS97に進む。
(ステップS96)
 制御装置51は、第2終了閾値を1に設定する。
(ステップS97)
 制御装置51は、第1終了閾値と第2終了閾値とのOR演算を実行する。
(ステップS98)
 制御装置51は、OR演算の実行結果が1であるか否かを判定する。制御装置51は、OR演算の実行結果が1である場合、ステップS100に進む。一方、制御装置51は、OR演算の実行結果が1でない場合、ステップS89に戻る。
(ステップS99)
 制御装置51は、防雪フラグを0に設定し、ステップS89に戻る。
(第3除雪モード後工程処理)
(ステップS100)
 制御装置51は、ガス冷媒用電磁弁36を開く。
(ステップS101)
 制御装置51は、バイパス回路用電磁弁32を閉じる。
(ステップS102)
 制御装置51は、圧縮機11の運転周波数を通常のものに戻す。
(ステップS103)
 制御装置51は、室内機側熱交換器14の暖房禁止フラグを0に設定し、処理を終了する。つまり、制御装置51は、室内機側熱交換器14の暖房禁止状態を解除する。
(実施の形態3の効果)
 以上の結果、圧縮機11の運転周波数が設置環境に応じて変えられるため、室外機7は、除雪時に、圧縮機11の運転周波数を通常のものと比べて高い急速除雪用運転周波数で駆動させることができる。よって、室外機7は、設置環境に応じた運転周波数で圧縮機11を駆動させるため、降雪量に応じてロードヒーティング用熱交換器6の熱交換量を増大させることができる。よって、室外機7は、ロードヒーティングユニット3の単位時間当たりの加熱量を増大させることができる。したがって、降雪量に応じた設定変更が行われることで、室外機7は、除雪時間を短縮させたり、単位時間当たりの除雪量を増大させたりすることができる。
 以上、本実施の形態3において、スイッチ手段52をさらに備え、制御装置51は、暖房運転が停止した場合、スイッチ手段52の設定内容に応じて、圧縮機11の運転周波数を上げるものである。
 上記構成で、室外機7は、除雪時間を短縮させたり、単位時間当たりの除雪量を増大させたりすることができる。
 以上、実施の形態1~実施の形態3においては、空気調和装置2の室外機7について説明したが、例えば、室外機側熱交換器19が蒸発器として機能するシステムとして、給湯システム等のように、ヒートポンプ方式で駆動する他の冷凍システムであっても、実施の形態1~実施の形態3で説明される技術を適用することができる。
 1 空調システム、2 空気調和装置、3 ロードヒーティングユニット、4 主冷媒回路、5 バイパス回路、6 ロードヒーティング用熱交換器、7 室外機、9 室内機、11 圧縮機、12 四方弁、13 ガス操作弁、14 室内機側熱交換器、15 電子膨張弁、16 液操作弁、17 流量調整器、18 熱交換器、19 室外機側熱交換器、20 アキュムレーター、22 主冷媒配管、23 副冷媒配管、31 バイパス配管、32 バイパス回路用電磁弁、34 バイパス回路用電子膨張弁、35 バイパス回路用温度センサー、36 ガス冷媒用電磁弁、41 ヒーティング部材、42 ポンプ、43 ヒーティングパイプ、44 ロードヒーティング用冷媒配管、51 制御装置、52 スイッチ手段、55 雪、61 筐体、62 室外機ベース部、63 防雪フード、65、67 風そらせ板、71 吹出口、73、75 吸込口、81 防雪架台、82 台座、83 足部、84 筋交い、85 地面、91 降雪センサー、101 送受信部、103 運転モード判定部、105 除雪モード開始判定部、107 除雪モード終了判定部、109 運転停止判定部、111 除雪条件判定部、113 運転モード制御部、115 除雪モード制御部、117 冷媒回路制御部、121 バイパス回路制御部、123 ロードヒーティングユニット制御部、131 積雪量判定部、133 計時部、135 設定判定部、141 電子膨張弁制御部、143 電磁弁制御部、144 四方弁制御部、145 圧縮機制御部、147 ファン制御部、149 ガス冷媒用電磁弁制御部、151 バイパス回路用電磁弁制御部、153 バイパス回路用電子膨張弁、155 ポンプ制御部。

Claims (7)

  1.  圧縮機、室内機側熱交換器、膨張装置、及び室外機側熱交換器が冷媒配管を介して接続されて形成される第1冷媒回路のうち、該第1冷媒回路の一部が設けられた室外機であって、
     前記圧縮機から吐出され、前記第1冷媒回路を流通する冷媒を迂回させる第2冷媒回路と、
     前記第1冷媒回路を流通する冷媒の流量及び前記第2冷媒回路を流通する冷媒の流量を制御する制御装置と、
     前記圧縮機及び前記室外機側熱交換器を支える室外機ベース部と、
    を備え、
     前記室外機ベース部の下方に、該室外機ベース部を支える防雪架台が設けられ、
     熱媒体が流通し、該熱媒体と、前記第2冷媒回路を流通する前記冷媒と、を熱交換させることで周囲を加熱するロードヒーティングユニットが前記防雪架台に設けられた
    ことを特徴とする室外機。
  2.  前記第2冷媒回路は、
     前記圧縮機の吸入側の配管と、前記圧縮機の吐出側の配管と、にそれぞれ接続され、前記冷媒を迂回させるバイパス配管と、
     前記バイパス配管を流れる前記冷媒の流量を調整する第1電磁弁と、
    を備えた
    ことを特徴とする請求項1に記載の室外機。
  3.  前記防雪架台は、
     当該防雪架台の周囲に積雪した雪を検知する降雪センサーを備え、
     前記制御装置は、
     前記室外機ベース部と、前記降雪センサーで検知した前記雪と、の距離に応じて、前記第1電磁弁を制御することで、前記ロードヒーティングユニットを作動させる
    ことを特徴とする請求項2に記載の室外機。
  4.  前記室内機側熱交換器と、前記圧縮機の吐出側と、の間に設けられ、前記室内機側熱交換器へ供給する前記冷媒の流量を調整する第2電磁弁と、
    をさらに備え、
     前記制御装置は、
     暖房運転が停止した場合、前記第2電磁弁を閉じ、前記第1電磁弁を開く
    ことを特徴とする請求項3に記載の室外機。
  5.  スイッチ手段をさらに備え、
     前記制御装置は、
     前記暖房運転が停止した場合、前記スイッチ手段の設定内容に応じて、前記圧縮機の運転周波数を上げる
    ことを特徴とする請求項4に記載の室外機。
  6.  前記ロードヒーティングユニットは、
     前記防雪架台の内側又は下方に設けられた
    ことを特徴とする請求項1~5の何れか一項に記載の室外機。
  7.  前記熱媒体は、不凍液で構成される
    ことを特徴とする請求項1~6の何れか一項に記載の室外機。
PCT/JP2013/080350 2013-11-08 2013-11-08 室外機 WO2015068293A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2015546255A JP5989260B2 (ja) 2013-11-08 2013-11-08 室外機
US14/897,817 US20160123607A1 (en) 2013-11-08 2013-11-08 Outdoor unit
GB1521780.5A GB2535831B (en) 2013-11-08 2013-11-08 Air-conditioning outdoor unit with snow protection
PCT/JP2013/080350 WO2015068293A1 (ja) 2013-11-08 2013-11-08 室外機

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2013/080350 WO2015068293A1 (ja) 2013-11-08 2013-11-08 室外機

Publications (1)

Publication Number Publication Date
WO2015068293A1 true WO2015068293A1 (ja) 2015-05-14

Family

ID=53041094

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/080350 WO2015068293A1 (ja) 2013-11-08 2013-11-08 室外機

Country Status (4)

Country Link
US (1) US20160123607A1 (ja)
JP (1) JP5989260B2 (ja)
GB (1) GB2535831B (ja)
WO (1) WO2015068293A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113639436A (zh) * 2021-08-02 2021-11-12 海尔(深圳)研发有限责任公司 用于调节空调室外机换热量的方法及装置、空调室外机

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017077647A1 (ja) * 2015-11-06 2017-05-11 三菱電機株式会社 室外機及びそれを用いた空気調和装置
JP2018179418A (ja) * 2017-04-14 2018-11-15 日立ジョンソンコントロールズ空調株式会社 室外ユニット、及び、当該室外ユニットを有する空気調和機

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS587254Y2 (ja) * 1978-12-08 1983-02-08 三菱電機株式会社 空気熱源ヒ−トポンプ式空気調和装置
JPH0322073U (ja) * 1989-07-13 1991-03-06
JPH03113249A (ja) * 1989-09-26 1991-05-14 Tohoku Electric Power Co Inc 冷暖房融雪装置
JPH0410496Y2 (ja) * 1986-10-27 1992-03-16
JP2001355880A (ja) * 2000-06-13 2001-12-26 Daikin Ind Ltd 防雪フードおよびこれを備えた室外機
JP2006125806A (ja) * 2004-11-01 2006-05-18 Sanki Eng Co Ltd 空調設備、外調機の据付施工方法および空調設備の製造方法
JP2008002695A (ja) * 2006-06-20 2008-01-10 Daikin Ind Ltd ヒートポンプ装置
JP2010065889A (ja) * 2008-09-09 2010-03-25 Hiroshi Ito 空気調和機の室外機用架台

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS587254A (ja) * 1981-07-03 1983-01-17 東洋紡績株式会社 抗血液凝固性を有する選択性分離膜およびその製造方法
JPH0322073A (ja) * 1989-06-19 1991-01-30 Matsushita Graphic Commun Syst Inc データ転送制御装置
JPH0410496A (ja) * 1990-04-26 1992-01-14 Nec San-Ei Instr Co Ltd 電気部品取付構造
JPH04117326U (ja) * 1991-04-05 1992-10-21 株式会社竹中工務店 屋外機の防雪構造
JP2000082695A (ja) * 1998-05-14 2000-03-21 Sony Corp プラズマエッチング法及び半導体装置
JP2003075018A (ja) * 2001-08-31 2003-03-12 Mitsubishi Heavy Ind Ltd ガスヒートポンプ式空気調和装置
JP3722109B2 (ja) * 2002-07-05 2005-11-30 ダイキン工業株式会社 空気調和装置の室外ユニット
AU2005268223B2 (en) * 2004-08-02 2008-05-29 Daikin Industries, Ltd. Refrigerating apparatus
US7633398B2 (en) * 2005-11-19 2009-12-15 Noonan Technologies, Llc Apparatus and method for measuring precipitation
JP4229188B2 (ja) * 2007-01-23 2009-02-25 ダイキン工業株式会社 空気調和装置
US20100131106A1 (en) * 2008-10-30 2010-05-27 Malee Kriangkanont Method for efficient operation of cooling system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS587254Y2 (ja) * 1978-12-08 1983-02-08 三菱電機株式会社 空気熱源ヒ−トポンプ式空気調和装置
JPH0410496Y2 (ja) * 1986-10-27 1992-03-16
JPH0322073U (ja) * 1989-07-13 1991-03-06
JPH03113249A (ja) * 1989-09-26 1991-05-14 Tohoku Electric Power Co Inc 冷暖房融雪装置
JP2001355880A (ja) * 2000-06-13 2001-12-26 Daikin Ind Ltd 防雪フードおよびこれを備えた室外機
JP2006125806A (ja) * 2004-11-01 2006-05-18 Sanki Eng Co Ltd 空調設備、外調機の据付施工方法および空調設備の製造方法
JP2008002695A (ja) * 2006-06-20 2008-01-10 Daikin Ind Ltd ヒートポンプ装置
JP2010065889A (ja) * 2008-09-09 2010-03-25 Hiroshi Ito 空気調和機の室外機用架台

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113639436A (zh) * 2021-08-02 2021-11-12 海尔(深圳)研发有限责任公司 用于调节空调室外机换热量的方法及装置、空调室外机
CN113639436B (zh) * 2021-08-02 2022-12-23 海尔(深圳)研发有限责任公司 用于调节空调室外机换热量的方法及装置、空调室外机

Also Published As

Publication number Publication date
US20160123607A1 (en) 2016-05-05
GB201521780D0 (en) 2016-01-27
GB2535831A (en) 2016-08-31
GB2535831B (en) 2020-02-19
JPWO2015068293A1 (ja) 2017-03-09
JP5989260B2 (ja) 2016-09-07

Similar Documents

Publication Publication Date Title
JP6569536B2 (ja) 空気調和装置
JP5238001B2 (ja) 冷凍サイクル装置
JP6468300B2 (ja) 空気調和装置
JP7082098B2 (ja) 熱源ユニット及び冷凍装置
US20110314852A1 (en) Air conditioner
JP6834561B2 (ja) 空気調和装置
JP5989260B2 (ja) 室外機
JP6716960B2 (ja) 空気調和装置
KR102638181B1 (ko) 공기조화기의 제어방법
JP6272481B2 (ja) 空気調和装置
JP7356506B2 (ja) 空気調和機
KR20110029447A (ko) 공기 조화기 및 그 제어 방법
JP6350338B2 (ja) 空気調和装置
JP5313774B2 (ja) 空気調和機
JP2018087675A (ja) 冷凍装置
JP6930127B2 (ja) 空気調和装置
JP6881538B2 (ja) 冷凍装置
KR20090021593A (ko) 난방능력이 향상된 멀티형 공기조화기
JP2006275449A (ja) 蓄熱式空調装置
JP6881503B2 (ja) 空調システム
JP6805887B2 (ja) 空気調和装置
JP2010112611A (ja) 空気調和装置
JP6849037B1 (ja) 熱源ユニット、冷凍等装置、及び過冷却ユニット
KR101488903B1 (ko) 축열장치 및 그 운전방법
JP6057512B2 (ja) クランクケースヒータを備えた空気調和機

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13896872

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2015546255

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 201521780

Country of ref document: GB

Kind code of ref document: A

Free format text: PCT FILING DATE = 20131108

WWE Wipo information: entry into national phase

Ref document number: 14897817

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13896872

Country of ref document: EP

Kind code of ref document: A1