WO2014125554A1 - Module unitaire, panneau de sol, procédé de transport et procédé d'installation correspondants - Google Patents

Module unitaire, panneau de sol, procédé de transport et procédé d'installation correspondants Download PDF

Info

Publication number
WO2014125554A1
WO2014125554A1 PCT/JP2013/007663 JP2013007663W WO2014125554A1 WO 2014125554 A1 WO2014125554 A1 WO 2014125554A1 JP 2013007663 W JP2013007663 W JP 2013007663W WO 2014125554 A1 WO2014125554 A1 WO 2014125554A1
Authority
WO
WIPO (PCT)
Prior art keywords
unit room
floor panel
bolt
transporting
installation
Prior art date
Application number
PCT/JP2013/007663
Other languages
English (en)
Japanese (ja)
Inventor
滋明 羽田
嘉幸 山岡
慎一 中杉
正高 秀島
Original Assignee
株式会社Lixil
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Lixil filed Critical 株式会社Lixil
Priority to SG11201504610WA priority Critical patent/SG11201504610WA/en
Publication of WO2014125554A1 publication Critical patent/WO2014125554A1/fr

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/48Special adaptations of floors for incorporating ducts, e.g. for heating or ventilating
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/348Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
    • E04B1/34869Elements for special technical purposes, e.g. with a sanitary equipment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units

Definitions

  • the present invention relates to a unit room such as a bathroom, a shower room, a toilet room, and a washroom, its floor panel, and its transportation method and installation method.
  • Patent Document 1 discloses a hanging frame that is attached to a floor member of a unit room and arranged above the unit room and the hanging frame. A method is described in which a metal fitting is connected with a connecting material such as a chain, and a suspension frame is lifted by a crane and transported.
  • a level adjustment adjuster bolt is provided to adjust the level after being brought into the construction site.
  • the present invention has an object to provide a unit room and a floor panel that can be easily transported and can be easily adjusted in level after being installed on site, and a transport method and an installation method thereof.
  • a bolt having a locking portion for locking the suspension member is provided at least in the corner portion or in the vicinity thereof.
  • the bolt can be screwed up and down, and can be screwed up to a position protruding downward from the lower surface of the floor panel.
  • An eye bolt is suitable as the bolt.
  • the unit room of the present invention has this floor panel, a wall panel standing on the floor panel, and a ceiling panel provided on the upper side of the wall panel.
  • the unit room transport method of the present invention is a method for transporting the unit room, and the frame body provided with the vertical holes for passing the suspended linear body is circulated around the upper periphery of the unit room. Attaching the unit room to the unit room, engaging the lower end of the linear body inserted through the hole with the engaging part of the bolt, and lifting the unit room via the linear body. And a transporting process.
  • the hole of the frame body is located above the bolt. Moreover, it is preferable that the unit room is lifted and transported by a crane.
  • the unit room installation method of the present invention includes a step of lifting the unit room by this method of transporting the unit room, carrying it into the planned installation part, and then lowering it to the planned installation part, and then turning the bolt to turn the unit room level. Adjusting.
  • the lower end of the linear body is removed from the locking part, and then the bolt is turned to adjust the level of the unit room.
  • the floor panel installation method of the present invention is a method of installing the unit room of the present invention in a planned installation part, wherein a suspension member is engaged with the engagement part of the bolt, There is a method of lifting the floor panel through the member, carrying it into the installation planned part, and then lowering it to the installation planned part, and then adjusting the level of the floor panel by turning the bolt.
  • a bolt having a locking portion is provided so as to be able to be screwed up and down.
  • the lower end of the suspension member can be engaged with the engagement portion, and the unit room or the floor panel can be lifted and conveyed via the suspension member.
  • the frame When transporting the unit room, attach the frame to the unit room so as to go around the upper periphery of the unit room.
  • the suspension member is inserted into a hole in the vertical direction provided in the frame. In this way, the frame body is mounted on the upper part of the unit room, and the suspension member is inserted through the hole of the frame body. This prevents damage to the unit room.
  • the level of the unit room or floor panel is adjusted by carrying this unit room or floor panel into the planned installation part, lowering it to the planned installation part, and then turning the bolt.
  • the bolt has both functions of the hanging metal fitting and the level adjusting member. Therefore, the number of constituent members of the unit room or floor panel is small.
  • the suspension member After lowering the unit room or floor panel to the planned installation part, the suspension member is removed from the locking part, and then the bolt can be easily turned by turning the bolt to adjust the level.
  • FIG. 4 is a sectional view taken along line VI-VI in FIG. 3. It is a perspective view of a floor panel.
  • the floor panel 1 includes a frame 2, a concrete plate 3, and tiles 4 stretched on the upper surface of the concrete plate 3.
  • the frame 2 has a frame-shaped frame body 2a and reinforcing bars (not shown) arranged vertically and horizontally in the frame body 2a.
  • the frame main body 2a has a rectangular shape in plan view, but may be a square or a shape different from these.
  • the frame body 2a is made of iron, but is not limited to this.
  • the concrete plate 3 is formed by placing concrete inside the frame body 2 a, and the reinforcing bars are embedded in the concrete plate 3.
  • a sewage pipe 5 made of a synthetic resin such as vinyl chloride and a drain pan 6 are arranged, and these are integrated with the concrete plate 3.
  • eyebolts 8 are respectively attached to the four corners of the frame body 2a.
  • Bolt insertion holes are provided on the upper surface of the frame body 2a, and nuts 9 arranged coaxially with the bolt insertion holes are fixed to the frame body 2a by welding.
  • An eye bolt 8 is screwed onto the nut 9.
  • a lock nut 10 is screwed onto the eyebolt 8.
  • An opening 11 through which the eyebolt 8 can pass is provided on the bottom surface of the frame main body 2 a vertically below the eyebolt 8.
  • the unit room 20 has wall panels 21, 22, 23, 24 erected on the periphery of the floor panel 1, and a ceiling panel 25 (FIG. 1) so as to straddle the upper ends of the wall panels 21 to 24. It is provided.
  • the wall panel 24 is provided with an entrance door 24a.
  • the unit room 20 is divided into a shower space 27 and a toilet space 28 by a partition 26.
  • a toilet 29 and a basin 30 are installed in the toilet space 28.
  • the wall panels 21 to 24 include a frame 31, a base board 32 attached to the front surface of the frame 31, and a tile 33 attached to the front face of the base board 32 as shown in FIG. Have.
  • corner post 35 is installed in order to connect adjacent wall panels 21 and 22, wall panels 22 and 23, wall panels 23 and 24, and wall panels 24 and 21,
  • the frames 31 of the wall panels 21 to 24 are fastened to the corner posts 35 by screws 36.
  • the eyebolt 8 is disposed inside the corner post 35. For this reason, the exclusive space for arrange
  • the corner post 35 may be an L angle.
  • the frame body 40 used when the unit room 20 is transported has a rectangular frame main body 41, a reinforcing bar 42 of the frame main body 41, and four corner portions of the frame main body 41. It has a hole 43 provided so as to penetrate in the vertical direction and a guide piece 44 projecting downward from the four corners of the frame body 41.
  • the guide piece 44 has an L-shaped horizontal cross section so that it can follow the outer surface of the upper corner of the unit room 20.
  • the guide piece 44 may be configured by a pipe such as a square pipe.
  • a linear body 46 such as a wire or a chain is inserted through each hole 43.
  • a hook 47 as a locking member is withdrawn at the lower end of the linear body 46.
  • the upper ends of the four linear bodies 46 are bundled together.
  • the linear bodies 46, 46 arranged on the diagonal line of the frame body 40 may be continuous.
  • a frame body 40 with a linear body 46 is attached to the upper part of the unit room 20, and each guide piece 44 is attached to the outer side surface of the four corners of the unit room 20.
  • a hook 47 at the lower end of each linear body 46 is hooked on the eyebolt 8.
  • the hook 50 of a crane is hooked on the upper part of the linear body 46, and the unit room 20 is lifted and conveyed. Since the frame body 40 is attached to the unit room 20 and each hole 43 is positioned vertically above each eyebolt 8, the linear body 46 is vertical between the floor panel 1 and the frame body 40. Since each linear body 46 is inserted through the hole 43, even if the unit room 20 shakes or tilts during transportation, the linear body 46 does not hit the unit room 20, and damage to the unit room 20 is prevented. Is done.
  • the unit room 20 After carrying this unit room 20 to the upper part of the planned installation part (in this embodiment, the floor slab 60), the unit room 20 is slowly lowered and lowered onto the floor slab 60. As shown in FIG. 2, it is preferable that an adhesive or mortar 61 is preliminarily placed on the planned landing portion of the bolt 8 on the floor slab 60.
  • the hook 47 is removed from the eyebolt 8
  • the frame body 40 is pulled up by the crane via the linear body 46 and the frame body 40 is carried out from the planned installation portion.
  • the eyebolt 8 is turned, and the eyebolt 8 protrudes downward from the opening 11 as shown in FIG. 3 and is brought into contact with the upper surface of the floor slab 60.
  • the eyebolt 8 is further turned to adjust the level of the unit room 20. In this way, the unit room 20 can be installed on the floor slab 60 and the level can be adjusted.
  • the unit room 20 In order to improve the level adjustment work efficiency of the unit room 20, it is preferable to put a horizontal baseline on the back of the wall panel after the unit room 20 is assembled at the factory. After the unit room 20 is lowered onto the floor slab 60, horizontal level adjustment is performed by combining the ground ink drawn in advance on the site and this horizontal base line. The horizontal level may be adjusted using a level (for example, a laser level) instead of attaching the ink.
  • a level for example, a laser level
  • the unit room 20 is transported and installed, but when the unit room is taken out from the manufacturing factory of the unit room 20, the frame body 40 is attached to the unit room 20 as shown in FIG. It can also be transported.
  • the frame body 40 may be removed from the unit room 20 after being carried out from the factory, or may be left attached to the unit room 20 from the factory to the construction site.
  • the unit room 20 is transported and installed, but only the floor panel 1 is transported, the level is adjusted by lowering it to the planned installation section, and then a wall panel is built on the floor panel 1 to construct the unit room. May be constructed.
  • the hook of the linear body 46 is hung on the eyebolt 8 of the floor panel 1, and the linear body 46 is lifted with a crane and conveyed.
  • the level adjustment method of the floor panel 1 is the same as the procedure shown in FIGS. That is, after the floor panel 1 is lowered onto the floor slab 60, the hook 47 is removed from the eyebolt 8, and then the eyebolt 8 is turned to adjust the level.
  • the above embodiment is an example of the present invention, and the present invention may be other than illustrated.
  • the floor panel 1 and the unit room 20 are for showers and toilets, but may be other unit rooms such as a bathroom unit room.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Epidemiology (AREA)
  • Public Health (AREA)
  • Residential Or Office Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

L'invention concerne un module unitaire et un panneau de sol qui sont faciles à transporter et dans lesquels le réglage de niveau peut être effectué facilement après l'installation sur le site d'installation ; et un procédé de transport et un procédé d'installation correspondants. Un corps de cadre (40) est monté sur la partie supérieure du module unitaire (20). Des pièces de guidage (44) sont chacune agencées le long de la surface extérieure des quatre parties de coin respectives du module unitaire (20). Des crochets (47) installés chacun sur l'extrémité inférieure de corps linéaires respectifs (46) sont accrochés à des boulons à œil respectifs (8). Un crochet (50) de grue est accroché sur la partie supérieure de chacun des corps linéaires (46), et le module unitaire (20) est soulevé et transporté. Après transport du module unitaire au-dessus d'une dalle de sol (60), il est abaissé sur ladite dalle de sol (60). Après dégagement des crochets (47) des boulons à œil respectifs (8), le niveau du module unitaire (20) est réglé par rotation des boulons à œil (8) afin de faire saillie vers le bas.
PCT/JP2013/007663 2013-02-14 2013-12-27 Module unitaire, panneau de sol, procédé de transport et procédé d'installation correspondants WO2014125554A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SG11201504610WA SG11201504610WA (en) 2013-02-14 2013-12-27 Unit room, floor panel, method for transporting same, and method for installing same

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013-026877 2013-02-14
JP2013026877A JP6102306B2 (ja) 2013-02-14 2013-02-14 ユニットルームの運搬方法及び設置方法

Publications (1)

Publication Number Publication Date
WO2014125554A1 true WO2014125554A1 (fr) 2014-08-21

Family

ID=51353590

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/007663 WO2014125554A1 (fr) 2013-02-14 2013-12-27 Module unitaire, panneau de sol, procédé de transport et procédé d'installation correspondants

Country Status (3)

Country Link
JP (1) JP6102306B2 (fr)
SG (1) SG11201504610WA (fr)
WO (1) WO2014125554A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016120779A1 (de) * 2016-10-31 2018-05-03 Harald Sauer Raummodul für ein Gebäude
WO2019185450A1 (fr) * 2018-03-28 2019-10-03 Werk Eins Gmbh Procédé de fabrication d'une unité sanitaire

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021157570A1 (fr) * 2020-02-03 2021-08-12 ホアビン・コンストラクション・グループ・ジョイント・ストック・カンパニー Structure avec pièce équipée d'un appareil utilisant de l'eau
KR102583751B1 (ko) * 2021-11-24 2023-09-27 삼성물산 (주) 완성형 화장실용 고정 구조

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09302965A (ja) * 1996-05-17 1997-11-25 Inax Corp ユニットルーム及びその搬入方法
JP2004060244A (ja) * 2002-07-29 2004-02-26 Sanki Eng Co Ltd 高剛性床の設置構造およびその設置方法
JP2008038336A (ja) * 2006-08-01 2008-02-21 Sumitomo Forestry Co Ltd 土間コンクリート構造
JP2013014976A (ja) * 2011-07-06 2013-01-24 Mitsubishi Electric Corp 吊上げ式パッケージハウス

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2738254B2 (ja) * 1993-01-27 1998-04-08 株式会社イナックス ユニットルームの搬入方法
JP3635273B2 (ja) * 2002-08-21 2005-04-06 積水ハウス株式会社 仮設トイレ囲い

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09302965A (ja) * 1996-05-17 1997-11-25 Inax Corp ユニットルーム及びその搬入方法
JP2004060244A (ja) * 2002-07-29 2004-02-26 Sanki Eng Co Ltd 高剛性床の設置構造およびその設置方法
JP2008038336A (ja) * 2006-08-01 2008-02-21 Sumitomo Forestry Co Ltd 土間コンクリート構造
JP2013014976A (ja) * 2011-07-06 2013-01-24 Mitsubishi Electric Corp 吊上げ式パッケージハウス

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102016120779A1 (de) * 2016-10-31 2018-05-03 Harald Sauer Raummodul für ein Gebäude
WO2019185450A1 (fr) * 2018-03-28 2019-10-03 Werk Eins Gmbh Procédé de fabrication d'une unité sanitaire

Also Published As

Publication number Publication date
JP6102306B2 (ja) 2017-03-29
JP2014156703A (ja) 2014-08-28
SG11201504610WA (en) 2015-08-28

Similar Documents

Publication Publication Date Title
KR20130045711A (ko) 실내장식용 커튼월 시공장치
WO2014125554A1 (fr) Module unitaire, panneau de sol, procédé de transport et procédé d'installation correspondants
WO2015025565A1 (fr) Bâtiment de grande hauteur et son procédé d'entretien
KR200425807Y1 (ko) 인양형 갱폼
JP2017214739A (ja) 建物ユニットの製造方法
WO2014125553A1 (fr) Panneau de sol et son procédé de fabrication
KR101794530B1 (ko) 건물외벽의 패널 시공구조 및 패널 시공방법
JP2587052Y2 (ja) プレファブ式建築物の吊り構造
JP2015007364A (ja) 高層の建築物、及びそのメンテナンス方法
JP2556943B2 (ja) ユニット及びパネルの組み合わせ工法
JP2004052455A (ja) 外部足場装置及び外部足場装置の施工方法
JP2004346601A (ja) ユニットパネル用の吊具およびユニットパネル工法
JP3060862B2 (ja) 衛生設備室用モジュール
JP3961116B2 (ja) 鉄骨造りの建物における床構造
JPH0539675A (ja) プレフアブトイレの施工方法
JP6541107B2 (ja) 建物ユニット及びその設置方法
JPH07268950A (ja) 屋上バルコニーユニットと吊金具
JP3062810B2 (ja) 建物における水回りユニットの組付方法およびその水回りユニット
JPH082267Y2 (ja) 軽量気泡コンクリートパネル
JP2001227094A (ja) 鉄骨ビルの階床構造
JPS5938846Y2 (ja) 建築用ユニツトの吊り上げ治具
JP2529445B2 (ja) ユニット住宅におけるバスユニットの施工方法
JP2002146900A (ja) バルコニーユニットとその設置方法
KR200459936Y1 (ko) 연속 사용이 가능한 천정거푸집 장치
JP2008285832A (ja) アンカー金具及び軽量気泡コンクリートパネル並びに軽量気泡コンクリートパネルの吊り上げ方法及び軽量気泡コンクリートパネルの取付方法。

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13875135

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: IDP00201503191

Country of ref document: ID

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 13875135

Country of ref document: EP

Kind code of ref document: A1