WO2014109079A1 - 複数温度システム - Google Patents

複数温度システム Download PDF

Info

Publication number
WO2014109079A1
WO2014109079A1 PCT/JP2013/063467 JP2013063467W WO2014109079A1 WO 2014109079 A1 WO2014109079 A1 WO 2014109079A1 JP 2013063467 W JP2013063467 W JP 2013063467W WO 2014109079 A1 WO2014109079 A1 WO 2014109079A1
Authority
WO
WIPO (PCT)
Prior art keywords
heat
temperature
heat medium
medium
supplied
Prior art date
Application number
PCT/JP2013/063467
Other languages
English (en)
French (fr)
Inventor
藤塚 正史
和典 土野
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to JP2014556317A priority Critical patent/JP5847337B2/ja
Priority to EP13870571.0A priority patent/EP2947392B1/en
Publication of WO2014109079A1 publication Critical patent/WO2014109079A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • F24D19/1012Arrangement or mounting of control or safety devices for water heating systems for central heating by regulating the speed of a pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D11/00Central heating systems using heat accumulated in storage masses
    • F24D11/002Central heating systems using heat accumulated in storage masses water heating system
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • F24D19/1039Arrangement or mounting of control or safety devices for water heating systems for central heating the system uses a heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/18Hot-water central heating systems using heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2200/00Heat sources or energy sources
    • F24D2200/12Heat pump
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/02Fluid distribution means
    • F24D2220/0207Pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/02Fluid distribution means
    • F24D2220/025Check valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/02Fluid distribution means
    • F24D2220/0271Valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D2220/00Components of central heating installations excluding heat sources
    • F24D2220/08Storage tanks
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2221/00Details or features not otherwise provided for
    • F24F2221/56Cooling being a secondary aspect
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/12Hot water central heating systems using heat pumps
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Definitions

  • the present invention relates to a multiple temperature system that generates and supplies a heat medium having a plurality of different temperatures for each heat demand section when supplying a heat medium or a cold heat medium from one heat supply section to a plurality of heat demand sections. Is.
  • a pump that circulates hot water in the terminal radiator, a heating device that heats the hot water, and a water amount control valve that does not pass through the heating device are installed, and the high-temperature water heated by the heating device and the water amount adjustment valve have passed.
  • a system configuration is disclosed in which low temperature water is mixed and the temperature is adjusted before being supplied to the terminal radiator. In this system, it is disclosed that the rotation speed of the pump is changed according to the adjustment amount of the water amount control valve (see Patent Document 2).
  • Japanese Patent Laying-Open No. 2005-201618 see, for example, [0022] to [0031], [0038], FIG. 1
  • Japanese Patent Laying-Open No. 2005-156100 see, for example, [0020] to [0032], [0038], FIG. 1 and FIG. 2
  • Patent Document 1 and Patent Document 2 are both mixing ratios of high-temperature water and low-temperature water, which are heat media, by adjusting the opening of a thermal valve (a water amount adjustment valve in Patent Document 2) arranged in series with a pump as a flow passage. Are mixed, and a predetermined temperature is generated and supplied to a floor heating device (terminal radiator in Patent Document 2) which is a heat demand unit. Therefore, it is assumed that the thermal valve (water volume adjustment valve in Patent Document 2) is throttled. If the thermal valve (water volume adjustment valve in Patent Document 2) is throttled, the pressure loss of the entire system increases and the pump power is reduced. There was a problem of increasing.
  • a thermal valve a water amount adjustment valve in Patent Document 2 arranged in series with a pump as a flow passage.
  • the present invention has been made to solve the above-described problems, and realizes a configuration for supplying heat media having a plurality of different temperatures to a plurality of heat demand units in a simple and inexpensive manner and maintaining reliability.
  • Another object of the present invention is to provide a multi-temperature system with high energy saving by suppressing an increase in pressure loss.
  • the multi-temperature system includes a heat supply unit that supplies heat as hot or cold at a first temperature via a heat medium circulating in a circulation path, an on-off valve, and a first indoor air-heat medium heat exchanger.
  • the second heat demand section and the heat supply section are connected by piping so as to be in series, and the second heat demand section is provided on the outlet side of the second indoor air-heat medium heat exchange.
  • a return path for returning the heat medium to the inlet side is formed by branching from the branch path, and the rotation speed is changed on the return path.
  • a desired second temperature which is equipped with a possible return path pump and is lower than the first temperature when the hot heat is supplied from the heat supply unit and higher than the first temperature when the cold heat is supplied.
  • the heat medium is supplied to the inlet side of the second indoor air-heat medium heat exchange, and the flow rate of the heat medium in the return path is changed by changing the rotation speed of the return path pump. By operating, the heat medium supplied to the second heat demand section is controlled to be maintained at the second temperature.
  • the multiple temperature system of the present invention it is possible to easily and inexpensively realize a configuration for supplying a heat medium at different predetermined temperatures to a plurality of heat demand units, and maintain reliability.
  • FIG. 1 is a circuit diagram schematically showing a configuration of a multiple temperature system 100 according to the first embodiment.
  • the multiple temperature system 100 according to the first embodiment includes a heat pump mechanism 200 that is a heat supply unit 400, a first heat demand unit 110, and a second heat demand unit 130.
  • the 1st heat demand part 110 and the 2nd heat demand part 130 are circulating so that the 1st heat demand part 110 and the heat pump mechanism 200 and the 2nd heat demand part 130 and the heat pump mechanism 200 may be in series. Connected by a path 102.
  • the heat pump mechanism 200 includes a compressor 203, a circulation switching valve 204, an outside air heat exchanger 207 including a fan 206, an expansion valve 205, and a heat supply heat exchanger 208, and a heat pump circulation path 202 through which the heat pump heat medium 201 flows.
  • a compressor 203 a compressor 203
  • a circulation switching valve 204 an outside air heat exchanger 207 including a fan 206, an expansion valve 205, and a heat supply heat exchanger 208
  • a heat pump circulation path 202 through which the heat pump heat medium 201 flows.
  • the first circulation pump 103, the circulation switching valve 104, and the heat supply heat exchanger 208 are mounted in series by a circulation path 102 through which the heat medium 101 flows.
  • ⁇ Compressor 203 The compressor 203 sucks the heat pump heat medium 201 and compresses the heat pump heat medium 201 to a high temperature / high pressure state.
  • a heat pump heat medium 201 that can be gas-liquid two-phase within a working temperature and pressure range such as hydrocarbons and carbon dioxide is pumped in a gas phase to increase the temperature and pressure.
  • ⁇ Circulation switching valves 104, 204 The circulation switching valves 104 and 204 switch the flow of the heat medium 101 and the heat pump heat medium 201. It is a four-way valve, and four connection paths A, B, C, and D are connected.
  • the heat medium 101 and the heat pump heat are changed by changing the state in which the connection paths A and B and the connection paths C and D are in circulation and the state in which the connection paths A and C and the connection paths B and D are in circulation.
  • the circulation direction (flow direction) of the medium 201 is changed.
  • the circulation switching valve 204 determines the direction in which the compressor 203 is pumped, that is, the direction in which the heat pump heat medium 201 is circulated in the heat pump circulation path 202, during heating operation (heating the heat medium 101) and during cooling operation (cooling the heat medium 101). Yes) and changed. Note that the circulation direction of the heat pump heat medium 201 is reversed during heating and cooling.
  • the circulation switching valve 104 changes the flow direction of the heat medium 101 to the heat supply heat exchanger 208 during the heating operation (supply the heat medium 101 to the first heat demand section 110 and the second heat demand section 130 as warm heat). It is changed at the time of cooling operation (the heat medium 101 is supplied as cold heat to the first heat demand unit 110 and the second heat demand unit 130).
  • This is a mechanism for efficiently exchanging heat in the heat supply heat exchanger 208 so that the heat pump heat medium 201 and the heat medium 101 always face each other in both the warm and cold supply. Therefore, the supply direction of the heat medium 101 to the first heat demand unit 110 is the same during the heating operation and during the cooling operation.
  • ⁇ Expansion valve 205 The expansion valve 205 expands the heat pump heat medium 201 by reducing the pressure.
  • the high-pressure liquid phase heat pump heat medium 201 is expanded into the gas-liquid mixed phase to lower the temperature and pressure.
  • ⁇ Outside air heat exchange 207 The outside air heat exchanger 207 functions as an evaporator (during heating operation) or a radiator (condenser) (during cooling operation), performs heat exchange between the air supplied from the fan 206 and the heat pump heat medium 201,
  • the heat pump heat medium 201 is vaporized or condensed and liquefied. Heat exchange is performed between the outside air blown by the fan 206 and the heat pump heat medium 201.
  • the heat supply heat exchanger 208 functions as a radiator (condenser) (during heating operation) and an evaporator (during cooling operation), and heat mediums that circulate through two circulation paths (circulation path 102 and heat pump circulation path 202). Heat exchange. That is, heat exchange is performed between the heat pump heat medium 201 that circulates in the heat pump circulation path 202 and the heat medium 101 that is an antifreeze liquid in which glycerin or the like that circulates in the circulation path 102 is mixed with water so as not to solidify to a low temperature. ing. Note that the heat supply heat exchange 208 is configured such that only heat exchange is performed between the heat pump heat medium 201 and the heat medium 101 and they are not mixed.
  • the heat medium 101 may be other than the antifreeze.
  • the heat medium 101 is water or the like, it becomes easy to freeze especially during the cooling operation, and thus more severe temperature management is required.
  • First circulation pump 103 The first circulation pump 103 sucks the heat medium 101 from the first heat demand section 110 and the second heat demand section 130 and pressurizes the heat medium 101 to circulate in the circulation path 102.
  • heat exchange is performed with the outside air supplied from the fan 206, and the heat is absorbed and vaporized (heat is taken from the outside air), and then returns to the compressor 203 via the circulation switching valve 204.
  • the heat medium 101 absorbed by the heat supply heat exchanger 208 is supplied to the first heat demand unit 110 and the second heat demand unit 130 through the circulation path 102.
  • the high-temperature and high-pressure gas phase heat pump heat medium 201 flows from the compressor 203 to the heat supply heat exchanger 208, but when the heat medium 101 is cooled (cooling operation).
  • the first heat demand section 110 is mounted with a fan coil (room air-heat medium heat exchange) 111 and a radiator (room air-heat medium heat exchange) 121 connected in parallel. Further, an open / close valve 112 is mounted in series with the fan coil 111 between the circulation path 102 and the fan coil 111, and the open / close valve 122 is disposed between the circulation path 102 and the radiator 121. 121 connected in series.
  • the fan coil 111 functions as a radiator (during heating operation) and a heat absorber (during cooling operation), performs heat exchange between the indoor air supplied from the fan and the heat medium 101, and heats or cools the indoor air. To do. Heat exchange is performed between the room air and the heat medium 101 by forced convection by a fan.
  • ⁇ RADIATOR 121 ⁇ The radiator 121 functions as a radiator, heats the room air by exchanging heat between the room air and the heat medium 101. Heat exchange is performed between the indoor air and the heat medium 101 by natural convection.
  • the radiator 121 is described as an example of the indoor air-heat medium heat exchange, but a heat exchanger having a function as a heat absorber (during cooling operation) may be used.
  • Open / close valves 112, 122 The on-off valves 112 and 122 are for switching whether the heat medium 101 is completely flowed or stopped. Generally, a ball valve is used as the on-off valve, so that pressure loss when flowing can be minimized.
  • the on-off valve is manually opened and closed to switch the flow of the heat medium 101 to the fan coil 111 and the radiator 121.
  • the on-off valve 112 may not be provided. In that case, it is only impossible to stop the flow of the heat medium 101 to the fan coil 111.
  • the on-off valve 122 may not be provided. In that case, it is only impossible to stop the flow of the heat medium 101 to the radiator 121.
  • Second heat demand section 130 In the second heat demand section 130, the on-off valve 132, the second check valve 135, and the floor heating device 131 (indoor air-heat medium heat exchange) are connected in series by a branch flow path 152 branched from the circulation path 102. Has been installed.
  • a second circulation pump (return path pump) 143 and a first check valve 145 are mounted in series by a return path 142.
  • the return path 142 joins between the second check valve 135 of the branch flow path 152 and the floor heating device 131 to return a part of the heat medium 101 from the outlet Y side of the floor heating device 131 to the inlet X side. It is a flow path.
  • the floor heating device 131 heats the room air by exchanging heat between the room air and the heat medium 101.
  • the floor heating apparatus 131 according to the first embodiment can have a cooling function by supplying the heat medium 101 cooled by the heat supply heat exchange 208.
  • the cooling function to secure a drainage path so that condensed water from the air does not accumulate on the floor, or suppress the temperature difference between the heat medium 101 flowing through the floor heating device 131 and the air, It is desirable to prevent the generation of condensed water as much as possible.
  • the on-off valve 132 is for switching whether the heat medium 101 is made to flow or stop, like the on-off valves 112 and 122.
  • the flow of the heat medium 101 to the floor heating device 131 is switched by manually opening and closing.
  • the first check valve 145 and the second check valve 135 allow the flow of the heat medium 101 only in one direction (the direction of the arrow) and suppress the flow in the reverse direction (the reverse direction of the arrow). .
  • the first check valve 145 allows only a flow from the outlet Y side of the floor heating device 131 toward the inlet X side in the return path 142.
  • the second check valve 135 allows only the flow from the inlet X side to the outlet Y side of the floor heating device 131 in the branch flow path 152.
  • the second circulation pump 143 sucks the heat medium 101 from the outlet Y side of the floor heating device 131, energizes the heat medium 101, and circulates it to the inlet X side of the floor heating device 131.
  • the temperature of the heat medium 101 after the heat exchange is changed by adjusting the temperature of the heat pump heat medium 201 by changing the rotation speed of the compressor 203 and adjusting the amount of heat exchanged by the heat supply heat exchanger 208. it can be controlled to 1 temperature T 1.
  • the heat medium 101 at the first temperature T 1 (for example, 40 ° C.) from the branch flow path 152 and the low temperature (for example, 25 ° C.) after heat is radiated by the floor heating device 131 from the return path 142.
  • the heated heat medium 101 joins at the entrance X of the floor heating device 131 and is then supplied to the floor heating device 131.
  • the rotational speed of the second circulation pump 143 mounted on the return path 142 is supplied to the floor heating device 131 only by changing the temperature of the joined heat medium 101 while detecting the temperature of the heat medium 101 with a temperature sensor (not shown).
  • the heated heat medium 101 can be controlled to the second temperature T 2 (for example, 30 ° C.) and supplied to the floor heating device 131 while maintaining the temperature.
  • the flow rate of the heat medium 101 at 40 ° C. is approximately 1 with the flow rate of the heat medium 101 at 25 ° C. being 2 (the flow rate twice as high as that of the heat medium 101 at 40 ° C.).
  • 3 can be supplied to the floor heating device 131 (3 times the flow rate of the heat medium 101 at 40 ° C.).
  • the flow rate of the heat medium 101 that can be supplied to the floor heating device 131 is 2 due to pressure loss
  • the flow rate of the heat medium 101 at 40 ° C. is 2/3 and the flow rate of the heat medium 101 at 25 ° C. is 4 / 3 and the heat medium 101 having a flow rate of 2 at 30 ° C. is supplied to the floor heating device 131.
  • the second circulation pump 143 is not operated and the flow rate of the heat medium 101 in the return path 142 is 0, and the flow rate of the heat medium 101 supplied to the floor heating device 131 is 1 as compared with the case where the flow rate is 1.
  • the flow rate of the heating medium 101 increases from 1 to 2, and the pressure loss increases.
  • the pressure loss of the entire flow channel 152 does not change greatly.
  • the flow rate of the return path 142 is changed from 0 to 4/3, and accordingly, the flow rate supplied at 40 ° C. is reduced from 1 to 2/3.
  • An operation similar to the conventional one of adjusting the temperature can be realized without controlling the supply amount with the adjusting valve.
  • the temperature of the heat medium 101 supplied to the floor heating device 131 after the merging is changed by adjusting the merging ratio between the branch flow path 152 and the return path 142 before the merging only by the rotational speed of the second circulation pump 143. , Can be controlled to any temperature between them. Also, if the on-off valve 132 is closed, the heat medium 101 of the first temperature T 1 of the floor heating device 131 is not supplied, try to keep down the number of revolutions of the second circulation pump 143 to the second temperature T 2 Although a, the heat from the heat pump mechanism 200 (heat supply unit 400) not supplied, not completely maintained in the second temperature T 2, the second circulation pump 143 after will be stopped automatically.
  • the rotational speed of the second circulation pump 143 mounted on the return path 142 is adjusted so that the combined heat medium 101 has a second temperature T higher than the first temperature T 1 (for example, 15 ° C.). 2 (for example, 20 ° C.) while being supplied to the floor heating device 131.
  • the plurality of temperature system 100 is configured as described above, an actuator for controlling the first temperature T 1 of the second temperature T 2 is only need the second circulation pump 143, for parts and temperature control The number of input / output points can be minimized, and the configuration can be simple and inexpensive.
  • the supply of the heat medium 101 to the inlet X side of the floor heating device 131 and the suction from the outlet Y side of the floor heating device 131 are simultaneously performed by the second circulation pump 143 mounted on the return path 142. Therefore, increase / decrease in pressure loss of the diversion channel 152 having the inlet X and the outlet Y of the floor heating device 131 is suppressed, and the flow rate and power of the heat medium 101 circulated between the heat supply unit 400 and the second heat demand unit 130. Fluctuations can be minimized.
  • the heat medium 101 can be circulated with less energy.
  • the second heat demand The minimum reliability of supplying heat to the unit 130 can be maintained. In this case, it can not control by the rotational speed to the second temperature T 2 of the second circulation pump 143, to adjust the amount of heat that is thermally exchanged by changing the rotational speed of the compressor 203 by heat supply heat exchange 208 , control of the first temperature T 1 of the can. Therefore, the case of failure the second circulation pump 143, if to control urgently to lower the first temperature T 1, it is possible to suppress the temperature in the floor heating device 131, can be avoided burns, etc. is there.
  • the first check valve 145 is mounted on the return path 142, the backflow from the inlet X side to the outlet Y side of the floor heating device 131 in the return path 142 can be suppressed when the second circulation pump 143 is stopped.
  • the temperature supplied to the floor heating device 131 is still low (eg, when the second circulation pump 143 does not move as a result of the control because the temperature is low), such as immediately after the start of the multiple temperature system 100, it is not supplied to the floor heating device 131.
  • the flow of the heat medium 101 returning to the heat supply unit 400 can be suppressed, and the time during which the floor heating device 131 is warmed can be shortened.
  • the second check valve 135 that suppresses the back flow of the heat medium 101 is mounted on the branch flow path 152, the back flow from the outlet Y side of the floor heating device 131 to the inlet X side in the split flow path 152 can be suppressed. Therefore, even if the flow rate and pressure balance of the entire heat demand unit such as load fluctuations are lost, or the flow rate of the second circulation pump 143 varies greatly, the flow rate and temperature of the heat medium 101 to the first heat demand unit 110 Variation can be suppressed. Furthermore, since the on-off valve 132 is mounted, when the heat supply to the second heat demand unit 130 is not required, the supply of the heat medium 101 to the second heat demand unit 130 can be stopped by manually closing.
  • the on-off valve 132 that is manually opened and closed is used.
  • the electromagnetic valve or the like is used to determine whether the second heat demand section 130 is necessary or not (know beforehand if the second heat demand section 130 is not used). And the like may be automatically opened and closed.
  • the on-off valves 112 and 122 may be automatically opened and closed depending on whether the first heat demand unit 110 is necessary or unnecessary.
  • the on-off valve 132 and the second check valve 135 are mounted on the inlet X side of the floor heating device 131 in the branch flow path 152, but may be mounted on the outlet Y side of the floor heating device 131.
  • the first check valve 145 is mounted on the outlet side of the second circulation pump 143 in the return path 142, but may be mounted on the inlet side.
  • the first check valve 145, the second check valve 135, and the on-off valve 132 are provided, but some or all of them may not be provided. If they are not provided, the effect of being provided is naturally not obtained, but other effects are obtained in the same manner.
  • Embodiment 1 although the structure provided with the fan coil 111 and the radiator 121 as the 1st heat demand part 110 and the structure provided with the floor heating apparatus 131 as the 2nd heat demand part 130, respectively, the 1st heat demand was shown.
  • the fan coil 111, the radiator 121, and the floor heating device 131 may be included in any of the unit 110 and the second heat demand unit 130. Moreover, it is not limited to the fan coil 111, the radiator 121, and the floor heating apparatus 131, The other thing which has the function similar to them, ie, the function to perform heat exchange between indoor air and the heat medium 101, is carried out. You may comprise. In addition, you may apply said modification as needed in the following embodiment.
  • FIG. FIG. 2 is a circuit diagram schematically showing a configuration of a multiple temperature system 100A according to Embodiment 2 of the present invention.
  • the heat supply unit 400 is the heat pump mechanism 200, but in the second embodiment, the heat supply unit 400 ⁇ / b> A is the heat storage tank 210 including the electric heater 211. Therefore, in the multiple temperature system 100A, it is premised only on the heating operation in which the heat is supplied to the first heat demand unit 110 and the second heat demand unit 130.
  • Heating medium 101 is heated by the electric heater 211 to a first temperature T 1 of the heat storage tank 210 is stored.
  • the heat medium 101 is supplied from the inlet side of the heat storage tank 210 to the first heat demand section 110 and the second heat demand section 130 through the circulation path 102 by the first circulation pump (circulation path pump) 103. Thereafter, the heat medium 101 is returned from the first heat demand unit 110 and the second heat demand unit 130 to the inlet side of the heat storage tank 210.
  • the structure of the 1st heat demand part 110 and the 2nd heat demand part 130 is the same as that of Embodiment 1, and there exists the same effect.
  • a bypass passage 212 is formed to branch from the flow path on the inlet side of the heat storage tank 210 and flow the heat medium 101 to the outlet side without passing through the heat storage tank 210.
  • the bypass passage 212 is equipped with a bypass pump having a variable speed, or a control valve that can change the flow rate of the heat medium 101 to the bypass passage 212 and the heat storage tank 210.
  • the heat medium 101 is stored in the heat storage tank 210 at a temperature higher than the first temperature T1, and the heat medium 101 from the heat storage tank 210 and the heat medium 101 from the bypass 212 are adjusted and controlled. Then, after the temperature is lowered to the first temperature T1, it can be supplied to the first heat demand section 110 and the second heat demand section 130. As a result, the amount of heat that can be stored in the heat storage tank 210 can be increased or the volume of the heat storage tank 210 can be reduced as much as the temperature rises.
  • FIG. 3 is a circuit diagram schematically showing a configuration of a multiple temperature system 100B according to Embodiment 3 of the present invention.
  • a description will be given focusing on differences from the first or second embodiment.
  • the open / close valve 132 is mounted on the branch flow path 152 at a position before the heat medium 101 from the return path 142 is merged.
  • the on / off valve 132 is merged.
  • On-off valves 132A and 132B are mounted at a later position. Further, the on-off valve 132A and the floor heating device 131A are connected in series, the on-off valve 132B and the floor heating device 131B are connected in series, and the branch flow path 152 is branched so that they are connected in parallel. . In such a configuration, by adjusting the rotational speed of the second circulation pump 143 can supply floor heating device 131A and the heat medium 101 both to the second temperature T 2 of 131B. That is, the heat medium 101 having the same temperature can be simultaneously supplied to the floor heating devices 131A and 131B.
  • the on-off valve 132A may not be provided. In that case, the supply of the heat medium 101 to the floor heating device 131A cannot be stopped. Similarly, the on-off valve 132B may not be provided. In that case, the supply of the heat medium 101 to the floor heating device 131B cannot be stopped.
  • FIG. 4 is a circuit diagram schematically showing a configuration of a multiple temperature system 100C according to Embodiment 4 of the present invention.
  • the floor heating device 131 heat medium 101 of the second temperature T 2 which is one temperature (Embodiment 3 in the floor heating device 131A and 131B of the embodiment) to the supply It had been.
  • the second temperature T 2A temperature supplied to the floor heating device 131A
  • T 2B floor heating
  • the open / close valve 132A, the second check valve 135A, and the floor heating device 131A are mounted in series by a branch flow path 152A in which the return path 142A branches and joins in the middle, and the open / close valve 132B, The second check valve 135B and the floor heating device 131B are mounted in series by a branch flow path 152B in which the return path 142B is branched and joined in the middle.
  • the diversion channels 152A and 152B are branched from the circulation path 102 so as to be parallel to each other.
  • the position of the second check valve 135 mounted on the branch flow path 152 on the inlet X side of the floor heating device 131 is on the outlet Y side of the floor heating devices 131A and 131B.
  • Second check valves 135A and 135B are mounted on the branch flow paths 152A and 152B after branching to the return paths 142A and 142B, respectively.
  • the rotation speed of the second circulation pump 143A on the return path 142A corresponding to the floor heating apparatus 131A and the rotation speed of the second circulation pump 143B on the return path 142B corresponding to the floor heating apparatus 131B are set.
  • the heat medium 101 supplied to the floor heating devices 131A and 131B can be controlled to the two different temperatures T 2A and T 2B .
  • Other operations are the same as those in the first to third embodiments, and the same effects are obtained.
  • Embodiment 4 Modification of Embodiment 3 or 4
  • two floor heating devices 131A and 131B are provided as the second heat demand section 130B or 130C, but may be three or more. Even in that case, the same effects can be obtained.
  • 100 multiple temperature system 100A multiple temperature system, 100B multiple temperature system, 100C multiple temperature system, 101 heat medium, 102 circulation path, 103 first circulation pump, 104 circulation switching valve, 110 first heat demand section, 111 fan coil ( 1st indoor heat exchanger), 112 open / close valve, 121 radiator (first indoor air-heat medium heat exchange), 122 open / close valve, 130 second heat demand section, 130B second heat demand section, 130C second heat demand section , 131 Floor heating device (second indoor air-heat medium heat exchange), 131A Floor heating device (room air-heat medium heat exchange), 131B Floor heating device (room air-heat medium heat exchange), 132 Open / close valve, 132A On-off valve, 132B on-off valve, 135 second check valve, 135A second check valve, 135B second check valve, 142 , 142A return path, 142B return path, 143 second circulation pump, 143A second circulation pump, 143B second circulation pump, 145 first check valve, 145A first check valve,

Abstract

 第2熱需要部130は、第2室内空気-熱媒体熱交131の出口Y側の熱媒体101を入口X側に戻す戻し路142を、分流路152から分岐させて形成し、戻し路142上に回転数の変更が可能な戻し路用ポンプ143を搭載し、熱供給部400から温熱が供給される時は第1温度より低く、冷熱が供給される時は第1温度より高い、所望の第2温度の熱媒体101が、第2室内空気-熱媒体熱交131の入口X側へ供給されるようにされており、戻し路用ポンプ143の回転数の変更により戻し路142の熱媒体101の流量を操作することによって、第2熱需要部130へ供給される熱媒体101を第2温度へ維持するように制御するものである。

Description

複数温度システム
 本発明は、1つの熱供給部から複数の熱需要部へ温熱又は冷熱の熱媒体を供給する際に、熱需要部毎に異なる複数の温度の熱媒体を生成し、供給する複数温度システムに関するものである。
 従来、ポンプによって床暖房装置の出口側から入口側へ循環する低温水と、熱源から床暖房装置へ供給される高温水と、を混合し、温度を調節してから床暖房装置へ供給するシステム構成が開示されている。また、このシステムでは複数ある床暖房装置の内いずれかが未使用のときは、それぞれの床暖房装置への循環水の流通路に搭載した比例制御弁を操作するとともに、ポンプの流量を低下させることによってポンプ動力を削減することが開示されている(特許文献1参照)。
 また、端末放熱器に温水を循環させるポンプと、温水を加熱する加熱装置と、加熱装置を通らない水量制御弁とを搭載し、加熱装置で加熱された高温水と、水量調節弁を通過した低温水と、を混合し、温度を調整してから端末放熱器へ供給するシステム構成が開示されている。また、このシステムでは水量制御弁の調整量に応じてポンプの回転数を変更することが開示されている(特許文献2参照)。
特開2005-201618号公報(例えば、[0022]~[0031]、[0038]、図1参照) 特開2005-156100号公報(例えば、[0020]~[0032]、[0038]、図1、図2参照)
 特許文献1と特許文献2は、ともに流通路としてポンプと直列に配置された熱動弁(特許文献2では水量調整弁)の開度調節によって熱媒体である高温水と低温水との混合比を変更して混合し、所定温度を作って熱需要部である床暖房装置(特許文献2では端末放熱器)へ供給するというものである。そのため、熱動弁(特許文献2では水量調整弁)を絞ることが前提であり、熱動弁(特許文献2では水量調整弁)を絞るとシステム全体の圧力損失が増加し、ポンプの動力が増加するという課題があった。また、その圧力損失増加を避けるために、比例制御弁(特許文献2では水量制御弁)の開度に連動してポンプの回転数を変更する必要がある。そのため、操作対象のアクチュエータが多く、制御ロジックが煩雑になるという課題があった。また、操作対象のアクチュエータが多いと高コストとなる上、故障の可能性が高くなり、信頼性の点で課題があった。
 本発明は、以上のような課題を解決するためになされたもので、複数の熱需要部へ異なる複数の温度の熱媒体を供給する構成を、簡単かつ安価に実現し、信頼性を維持し、また、圧力損失の増加を抑制して省エネ性の高い複数温度システムを提供することを目的としている。
 本発明に係る複数温度システムは、循環路を循環する熱媒体を介して第1温度の温熱又は冷熱として熱を供給する熱供給部と、開閉弁、及び、第1室内空気-熱媒体熱交が直列に配管接続された、前記熱媒体を介して熱が供給される第1熱需要部と、前記循環路から分岐した分流路上に第2室内空気-熱媒体熱交が搭載された、前記熱媒体を介して熱が供給される第2熱需要部と、を有し、前記第1熱需要部と前記第2熱需要部とは並列に、前記第1熱需要部と前記熱供給部、及び前記第2熱需要部と前記熱供給部とは直列となるように前記循環路によって配管接続され、前記第2熱需要部は、前記第2室内空気-熱媒体熱交の出口側の前記熱媒体を入口側に戻す戻し路を、前記分流路から分岐させて形成し、前記戻し路上に回転数の変更が可能な戻し路用ポンプを搭載し、前記熱供給部から前記温熱が供給される時は前記第1温度より低く、前記冷熱が供給される時は前記第1温度より高い、所望の第2温度の前記熱媒体が、前記第2室内空気-熱媒体熱交の入口側へ供給されるようにされており、前記戻し路用ポンプの回転数の変更により前記戻し路の前記熱媒体の流量を操作することによって、前記第2熱需要部へ供給される前記熱媒体を前記第2温度へ維持するように制御するものである。
 本発明に係る複数温度システムによれば、複数の熱需要部へ異なる所定温度で熱媒体を供給する構成を、簡単かつ安価に実現し、信頼性を維持することができる。
本発明の実施の形態1に係る複数温度システムの構成を概略的に示す回路図である。 本発明の実施の形態2に係る複数温度システムの構成を概略的に示す回路図である。 本発明の実施の形態3に係る複数温度システムの構成を概略的に示す回路図である。 本発明の実施の形態4に係る複数温度システムの構成を概略的に示す回路図である。
 以下、本発明の実施の形態を図面に基づいて説明する。
実施の形態1.
 図1は、本実施の形態1に係る複数温度システム100の構成を概略的に示す回路図である。
 本実施の形態1に係る複数温度システム100は、熱供給部400であるヒートポンプ機構200と、第1熱需要部110と、第2熱需要部130と、から構成されている。そして、第1熱需要部110と第2熱需要部130とは並列に、第1熱需要部110とヒートポンプ機構200、及び第2熱需要部130とヒートポンプ機構200とは直列となるように循環路102によって接続されている。
{ヒートポンプ機構200の構成}
 ヒートポンプ機構200は、圧縮機203と、循環切替弁204と、ファン206を備えた外気熱交207と、膨張弁205と、熱供給熱交208とが、ヒートポンプ熱媒体201が流れるヒートポンプ循環路202によって直列に接続されて搭載されている。また、第1循環ポンプ103と、循環切替弁104と、熱供給熱交208とが、熱媒体101が流れる循環路102によって直列に接続されて搭載されている。
{圧縮機203}
 圧縮機203は、ヒートポンプ熱媒体201を吸入し、そのヒートポンプ熱媒体201を圧縮して高温・高圧の状態にするものである。例えば、炭化水素系や二酸化炭素など使用温度圧力範囲内で気液2相化可能なヒートポンプ熱媒体201を、気相の状態で圧送して高温高圧化している。
{循環切替弁104、204}
 循環切替弁104、204は、熱媒体101、ヒートポンプ熱媒体201の流れを切り替えるものである。4方弁であり、4つの接続路A、B、C、Dが接続されている。接続路AとB、及び接続路CとDが流通している状態と、接続路AとC、及び接続路BとDが流通している状態とを変更することによって熱媒体101、ヒートポンプ熱媒体201の循環方向(流動方向)を変更している。
 循環切替弁204は、圧縮機203の圧送方向、すなわちヒートポンプ循環路202でのヒートポンプ熱媒体201の循環方向を、暖房運転時(熱媒体101を加熱する)と冷房運転時(熱媒体101を冷却する)とで変更している。なお、暖房時と冷房時ではヒートポンプ熱媒体201の循環方向は逆となる。
 循環切替弁104は、熱供給熱交208への熱媒体101の流動方向を、暖房運転時(第1熱需要部110及び第2熱需要部130へ熱媒体101を温熱として供給する)と、冷房運転時(第1熱需要部110及び第2熱需要部130へ熱媒体101を冷熱として供給する)とで変更している。これは、熱供給熱交208では、温熱供給時にも冷熱供給時にもヒートポンプ熱媒体201と熱媒体101とが常に対向流となるようにして効率よく熱交換するための機構である。そのため、第1熱需要部110への熱媒体101の供給方向は、暖房運転時も冷房運転時も同じとなる。
{膨張弁205}
 膨張弁205は、ヒートポンプ熱媒体201を減圧して膨張させるものである。高圧の液相のヒートポンプ熱媒体201を気液混合相へ膨張させて低温低圧化している。
{外気熱交207}
 外気熱交207は、蒸発器(暖房運転時)や放熱器(凝縮器)(冷房運転時)として機能し、ファン206から供給される空気とヒートポンプ熱媒体201との間で熱交換を行い、ヒートポンプ熱媒体201を蒸発ガス化又は凝縮液化するものである。ファン206で送風された外気とヒートポンプ熱媒体201との間で熱交換を行っている。
{熱供給熱交208}
 熱供給熱交208は、放熱器(凝縮器)(暖房運転時)や蒸発器(冷房運転時)として機能し、2つの循環路(循環路102及びヒートポンプ循環路202)を循環する熱媒体同士で熱交換を行うものである。すなわち、ヒートポンプ循環路202を循環するヒートポンプ熱媒体201と、循環路102を循環するグリセリン等を水に混ぜて低温まで凝固しないようにした不凍液である熱媒体101と、の間で熱交換を行っている。なお、熱供給熱交208は、ヒートポンプ熱媒体201と熱媒体101との間で熱交換するだけで、それらは混合されない構成である。なお、熱媒体101は不凍液ではなく別のものでもよい。例えば熱媒体101が水である場合などには、特に冷房運転時に凍結しやすくなるので、より厳しい温度管理が必要となる。
{第1循環ポンプ103}
 第1循環ポンプ103は、第1熱需要部110及び第2熱需要部130からの熱媒体101を吸入し、その熱媒体101を加圧して循環路102内を循環させるものである。
 {ヒートポンプ機構200内の動作}
 以下、(熱媒体101を加熱する)暖房運転時におけるヒートポンプ機構200内の動作を説明する。
 圧縮機203で高温高圧にされた気相のヒートポンプ熱媒体201は、圧縮機203から吐出され、循環切替弁204を経由し、熱供給熱交208に流入する。そこで熱媒体101との間で熱交換を行い、放熱して液化された(熱媒体101に熱を奪われた)後、膨張弁205で減圧されて低温低圧の気液混合相となり、外気熱交207に流入する。そこでファン206から供給される外気との間で熱交換を行い、吸熱して気化された(外気から熱を奪った)後、循環切替弁204を経由して圧縮機203へ戻る。
 一方、熱供給熱交208で吸熱した熱媒体101は、循環路102を通って第1熱需要部110及び第2熱需要部130へ供給される。
 なお、熱媒体101を加熱する際(暖房運転時)は、圧縮機203から熱供給熱交208へ高温高圧の気相のヒートポンプ熱媒体201が流れるが、熱媒体101を冷却する際(冷房運転時)は、膨張弁205から熱供給熱交208へ低温低圧の気液混合相のヒートポンプ熱媒体201が流れる。
{第1熱需要部110の構成}
 第1熱需要部110は、ファンコイル(室内空気-熱媒体熱交)111とラジエター(室内空気-熱媒体熱交)121とが並列に接続されて搭載されている。また、循環路102とファンコイル111との間には、開閉弁112がファンコイル111と直列に接続されて搭載されており、循環路102とラジエター121との間には、開閉弁122がラジエター121と直列に接続されて搭載されている。
{ファンコイル111}
 ファンコイル111は、放熱器(暖房運転時)や吸熱器(冷房運転時)として機能し、ファンから供給される室内空気と熱媒体101との間で熱交換を行い、室内空気を暖房又は冷房するものである。ファンによる強制対流によって室内空気と熱媒体101との間で熱交換を行っている。
{ラジエター121}
 ラジエター121は、放熱器として機能し、室内空気と熱媒体101との間で熱交換を行い、室内空気を暖房するものである。自然対流によって室内空気と熱媒体101との間で熱交換を行っている。なお、ここでは室内空気-熱媒体熱交の一例としてラジエター121を挙げて説明しているが、吸熱器(冷房運転時)としての機能を有する熱交換器を利用してもよい。
{開閉弁112、122}
 開閉弁112、122は、熱媒体101を完全に流動させるか完全に停止させるかを切り替えるためのものである。開閉弁には一般的にボール弁を使うことで、流動させたときの圧損を最小限にすることができる。また開閉弁は、手動で開閉し、ファンコイル111及びラジエター121への熱媒体101の流動を切り替えている。なお、開閉弁112は備えられていなくてもよい。その場合は、ファンコイル111への熱媒体101の流動を停止できなくなるだけである。また、開閉弁122も同様に備えられていなくてもよい。その場合は、ラジエター121への熱媒体101の流動を停止できなくなるだけである。
{第2熱需要部130の構成}
 第2熱需要部130は、開閉弁132と、第2逆止弁135と、床暖房装置131(室内空気-熱媒体熱交)とが、循環路102から分岐した分流路152によって直列に接続されて搭載されている。
 また、第2循環ポンプ(戻し路用ポンプ)143と、第1逆止弁145とが、戻し路142によって直列に接続されて搭載されている。戻し路142は、分流路152の第2逆止弁135と床暖房装置131との間へ合流し、床暖房装置131の出口Y側から入口X側へ熱媒体101の一部を戻すための流路である。
{床暖房装置131}
 床暖房装置131は、ファンコイル111やラジエター121と同様に、室内空気と熱媒体101との間で熱交換を行い、室内空気を暖房するものである。なお、本実施の形態1に係る床暖房装置131は、熱供給熱交208で冷却された熱媒体101を供給するようにすれば冷房機能とすることも可能である。ただし、冷房機能で使用する場合、空気中からの凝縮水が床に溜まらないように排水路を確保したり、あるいは、床暖房装置131を流れる熱媒体101と空気との温度差を抑制し、極力凝縮水が発生しないようしたりすることが望ましい。
{開閉弁132}
 開閉弁132は、開閉弁112、122と同様に、熱媒体101を流動させるか停止させるかを切り替えるためのものである。手動で開閉し、床暖房装置131への熱媒体101の流動を切り替えている。
{第1逆止弁145、第2逆止弁135}
 第1逆止弁145及び第2逆止弁135は、熱媒体101の流れを一方向のみ(矢印の方向)に許容し、逆方向(矢印の逆方向)への流動を抑制するものである。
 第1逆止弁145は、戻し路142において、床暖房装置131の出口Y側から入口X側へ向かう流れのみを許容する。
 第2逆止弁135は、分流路152において、床暖房装置131の入口X側から出口Y側へ向かう流れのみを許容する。
{第2循環ポンプ143}
 第2循環ポンプ143は、床暖房装置131の出口Y側からの熱媒体101を吸入し、その熱媒体101を加勢して床暖房装置131の入口X側へ循環させるものである。
{複数温度システム100の動作}
 以下、暖房運転時における複数温度システム100の動作を説明する。
 ヒートポンプ機構200内の熱供給熱交208で吸熱し、第1温度T(例えば40℃)となった熱媒体101は、その後、循環路102を通って第1熱需要部110、及び第2熱需要部130へ供給される。
 なお、圧縮機203の回転数を変更してヒートポンプ熱媒体201の温度を調整し、熱供給熱交208で熱交換される熱量を調整することで、熱交換後の熱媒体101の温度を第1温度Tに制御することができる。
 床暖房装置131へは、分流路152からの第1温度T(例えば40℃)の熱媒体101と、戻し路142からの床暖房装置131で放熱した後の低温(例えば25℃)となった熱媒体101とが、床暖房装置131の入口Xで合流後、床暖房装置131へ供給される。このとき、戻し路142に搭載された第2循環ポンプ143の回転数を、合流後の熱媒体101の温度を図示省略の温度センサー等で検知しながら変更するだけで、床暖房装置131へ供給される熱媒体101を第2温度T(例えば30℃)へ制御し、その温度を維持しながら床暖房装置131へ供給できる。
 上記温度では概ね、40℃の熱媒体101の流量が1に対して25℃の熱媒体101の流量が2(40℃の熱媒体101の2倍の流量)を合流して、30℃で流量が3(40℃の熱媒体101の3倍の流量)の熱媒体101を床暖房装置131へ供給できる。なお、例えば圧力損失の関係で、床暖房装置131へ供給できる熱媒体101の流量が2となる場合、40℃の熱媒体101の流量が2/3と25℃の熱媒体101の流量が4/3とが合流して、30℃で流量が2の熱媒体101が床暖房装置131へ供給されることになる。このとき、第2循環ポンプ143を動作せず戻し路142の熱媒体101の流量が0で、床暖房装置131へ供給する熱媒体101の流量が1の場合に比べて床暖房装置131を通過する熱媒体101の流量は1から2へ増加し、圧力損失が増える。しかし、戻し路142が合流するまでの分流路152は、熱媒体101の流量が1から2/3に減って圧力損失が減るため、分流路152全体の圧力損失は大きく変化しないことになる。
 上記を別の見方をすると、戻し路142の流量が0から4/3となることで、それに応じて40℃で供給される流量が1から2/3に減ることとなり、従来技術のように供給量を調節弁で制御することなく、温度を調節するという従来と同様な動作を実現できることとなる。またさらに別の見方をすると、このことは、床暖房装置131を通過する流量を一定にしながらも、供給する温度を変えることができることを意味する。そのため、従来技術では調節弁制御のため、床暖房装置131を通過する流量が変化することとなり、流量が少なくなると、腐食が進んだり、不純物が堆積したりする不具合が起きやすかったが、このようにすることで、そのような不具合が抑制される。
 なお、合流後に床暖房装置131へ供給される熱媒体101の温度は、合流前の分流路152と戻し路142との合流比を第2循環ポンプ143の回転数だけを調節して変えることによって、それらの間の任意の温度へ制御することができる。
 また、開閉弁132が閉じられた場合、床暖房装置131へ第1温度Tの熱媒体101が供給されなくなるので、第2循環ポンプ143の回転数を下げて第2温度Tへ維持しようとするが、ヒートポンプ機構200(熱供給部400)から熱が供給されていないので、第2温度Tへ維持しきれず、後に第2循環ポンプ143は自動で停止することになる。
 冷房時も同様に、戻し路142に搭載された第2循環ポンプ143の回転数だけを調節して合流後の熱媒体101を、第1温度T(例えば15℃)より高い第2温度T(例えば20℃)へ維持しながら床暖房装置131へ供給できる。
 以上のように複数温度システム100は構成されているので、第1温度Tから第2温度Tへ制御するためのアクチュエータは第2循環ポンプ143だけで済み、部品点数及び温度制御のための入出力点数を最小限にでき、簡単かつ安価に構成することができる。
 また、戻し路142に搭載された第2循環ポンプ143によって、熱媒体101の床暖房装置131の入口X側への供給と床暖房装置131の出口Y側からの吸入とが同時に行われる。そのため、床暖房装置131の入口X及び出口Yがある分流路152の圧力損失の増減は抑制され、熱供給部400と第2熱需要部130との間で循環する熱媒体101の流量及び動力の変動を最小限にできる。その結果、第1熱需要部110及び第2熱需要部130へ供給されるそれぞれの熱媒体101の流量及び熱量の変動が抑制されるため、第1温度T及び第2温度Tの変動も抑制され、流量/熱量/温度変動による制御性や快適性の低下を抑制できる。
 また、分流路152の圧力損失の増減を抑制できるため、少ないエネルギーで熱媒体101を循環させることができる。さらに、第2循環ポンプ143が故障しても第2温度Tへ制御できなくなるだけで熱供給部400から第2熱需要部130への熱媒体101の供給は継続できるため、第2熱需要部130へ熱供給するという最低限の信頼性を維持できる。このとき、第2循環ポンプ143の回転数による第2温度Tへの制御はできないが、圧縮機203の回転数を変更して熱供給熱交208で熱交換される熱量を調整することで、第1温度Tへの制御はできる。そのため、第2循環ポンプ143が故障した場合は、緊急的により低い第1温度Tへ制御するようにすれば、床暖房装置131での温度を抑制でき、火傷などを回避することは可能である。
 また、戻し路142上に第1逆止弁145を搭載したので、第2循環ポンプ143停止時に戻し路142における床暖房装置131の入口X側から出口Y側への逆流を抑制できる、そのため、複数温度システム100起動直後など、床暖房装置131へ供給される温度がまだ低い時(温度が低いため制御の結果、第2循環ポンプ143は動かない時)に、床暖房装置131へ供給されずに熱供給部400へ戻る熱媒体101の流動を抑制でき、床暖房装置131が暖まる時間を早めることができる。
 また、分流路152上に熱媒体101の逆流を抑制する第2逆止弁135を搭載したので、分流路152における床暖房装置131の出口Y側から入口X側への逆流を抑制できる。そのため、負荷変動など熱需要部全体の流量や圧力バランスが崩れたり、第2循環ポンプ143の流量が大きく変動したりしても、第1熱需要部110への熱媒体101の流量及び温度の変動を抑制できる。
 さらに、開閉弁132を搭載したので、第2熱需要部130への熱供給不要時には、手動で閉じることで、第2熱需要部130への熱媒体101の供給を停止できる。
実施の形態1の変形例.
 実施の形態1では、手動で開閉する開閉弁132としたが、電磁弁などを使って、第2熱需要部130が必要か不要か(第2熱需要部130を使わないと事前にわかっている場合など)によって自動で開閉するようにしてもよい。また、開閉弁112及び122についても同様に、第1熱需要部110が必要か不要かによって自動で開閉するようにしてもよい。
 実施の形態1では、開閉弁132及び第2逆止弁135は分流路152における床暖房装置131の入口X側に搭載したが、床暖房装置131の出口Y側に搭載してもよい。
 実施の形態1では、第1逆止弁145は戻し路142における第2循環ポンプ143の出口側に搭載したが、入口側に搭載してもよい。
 実施の形態1では、第1逆止弁145、第2逆止弁135、及び開閉弁132を設けたが、それらは一部又は全部が設けられていなくともよい。それらが設けられていない場合、設けられていることによる効果は当然得られなくなるが、その他の効果は同様に得られる。
 実施の形態1では、第1熱需要部110としてファンコイル111及びラジエター121を備えた構成を、第2熱需要部130として床暖房装置131を備えた構成をそれぞれ示したが、第1熱需要部110及び第2熱需要部130のどちらにファンコイル111、ラジエター121、床暖房装置131が含まれていてもよい。また、ファンコイル111、ラジエター121、及び床暖房装置131に限定されるものでなく、それらと同様の機能、つまり室内空気と熱媒体101との間で熱交換を行う機能、を有する他のものを含んで構成してもよい。
 なお、上記の変形例は、以下の実施の形態において必要に応じて適用してもよい。
実施の形態2.
 図2は、本発明の実施の形態2に係る複数温度システム100Aの構成を概略的に示す回路図である。
 以下、実施の形態1と異なる点を中心に説明する。
 実施の形態1では、熱供給部400はヒートポンプ機構200であったが、実施の形態2では、熱供給部400Aは電気ヒーター211を備えた蓄熱タンク210である。そのため、複数温度システム100Aでは、第1熱需要部110及び第2熱需要部130へ温熱を供給する、暖房運転のみを前提としている。
 蓄熱タンク210内には電気ヒーター211によって第1温度Tまで加熱された熱媒体101が蓄えられている。その熱媒体101は蓄熱タンク210の入口側から第1循環ポンプ(循環路用ポンプ)103によって、循環路102を通って第1熱需要部110及び第2熱需要部130へ供給される。その後、熱媒体101は第1熱需要部110及び第2熱需要部130から蓄熱タンク210の入口側へ戻される。なお、第1熱需要部110及び第2熱需要部130の構成は実施の形態1と同様であり、同様の効果を奏する。
実施の形態2の変形例.
 蓄熱タンク210の入口側の流路から分岐させ、蓄熱タンク210を通らずにその出口側へ熱媒体101を流動させるバイパス路212を形成する。そのバイパス路212に、回転数可変のバイパスポンプ、又はバイパス路212と蓄熱タンク210への熱媒体101の流量を変更できるような調節弁を搭載する。そうすることにより、蓄熱タンク210に蓄えられる熱媒体101の温度は第1温度Tでなくても、第1温度Tの熱媒体101を第1熱需要部110及び第2熱需要部130へ供給することができる。つまり、蓄熱タンク210に第1温度T1より高い温度で熱媒体101を蓄えておき、蓄熱タンク210からの熱媒体101と、バイパス路212からの熱媒体101とを混合比を調整し制御することで低温化し、第1温度T1にした後で第1熱需要部110及び第2熱需要部130へ供給することができる。その結果、高温となった分だけ蓄熱タンク210に蓄熱できる蓄熱量を増大できる、あるいは蓄熱タンク210の容積を小さくできる。
実施の形態3.
 図3は、本発明の実施の形態3に係る複数温度システム100Bの構成を概略的に示す回路図である。
 以下、実施の形態1又は2と異なる点を中心に説明する。
 実施の形態1又は2では、第2熱需要部130として、床暖房装置131だけであったが、本実施の形態3では、第2熱需要部130Bとして、床暖房装置131A及び131Bを備えている。また、実施の形態1及び2では、開閉弁132は分流路152上の、戻し路142からの熱媒体101が合流する前の位置に搭載されていたが、本実施の形態3では、合流した後の位置に開閉弁132A及び132Bを搭載している。また、開閉弁132Aと床暖房装置131Aとを直列に接続し、開閉弁132Bと床暖房装置131Bとを直列に接続し、それらが並列に接続されるように、分流路152を分岐させている。
 このように構成した場合、第2循環ポンプ143の回転数を調節することで、床暖房装置131A及び131Bの両方へ第2温度Tの熱媒体101を供給できる。つまり、床暖房装置131A及び131Bに対して、同時に同じ温度の熱媒体101を供給できる。
 また、開閉弁132A及び132Bのいずれか一方を閉じた場合、開いている方の開閉弁(132A又は132B)に直列に接続された床暖房装置(131A又は131B)へ第2温度Tの熱媒体101を供給できる。
 なお、開閉弁132A及び132Bの両方を閉じた場合、実施の形態1又は2において、開閉弁132を閉じた場合と同様である。その他の作用については、実施の形態1又は2と同様であり、同様な効果を奏する。
 また、開閉弁132Aは、備えられていなくてもよい。その場合は、床暖房装置131Aへの熱媒体101の供給を停止できなくなるだけである。また、開閉弁132Bも同様に、備えられていなくてもよい。その場合は、床暖房装置131Bへの熱媒体101の供給を停止できなくなるだけである。
実施の形態4.
 図4は、本発明の実施の形態4に係る複数温度システム100Cの構成を概略的に示す回路図である。
 以下、実施の形態1~3と異なる点を中心に説明する。
 実施の形態1~3では、第2熱需要部130において、床暖房装置131(実施の形態3では床暖房装置131A及び131B)に1つの温度である第2温度Tの熱媒体101が供給されていた。しかし、実施の形態4では、第2熱需要部130Cにおいて、床暖房装置131A及び131Bに異なる2つの温度である第2温度T2A(床暖房装置131Aへ供給する温度)及びT2B(床暖房装置131Bへ供給する温度)の熱媒体101が供給される。
 そのため、開閉弁132Aと、第2逆止弁135Aと、床暖房装置131Aとが、戻し路142Aが途中で分岐合流した分流路152Aによって直列に接続されて搭載されており、開閉弁132Bと、第2逆止弁135Bと、床暖房装置131Bとが、戻し路142Bが途中で分岐合流した分流路152Bによって直列に接続されて搭載されている。そして、分流路152Aと152Bとは、お互いに並列となるように循環路102から分岐して形成されている。
 なお、実施の形態1~3では、床暖房装置131の入口X側の分流路152上に搭載されていた第2逆止弁135の位置は、床暖房装置131A、131Bの出口Y側で、戻し路142A、142Bへ分岐後の分流路152A、152B上に第2逆止弁135A、135Bがそれぞれ搭載されている。
 このように構成した場合、床暖房装置131Aに対応した戻し路142A上の第2循環ポンプ143Aの回転数、及び床暖房装置131Bに対応した戻し路142B上の第2循環ポンプ143Bの回転数を個別に調節することで、床暖房装置131A及び131Bへ供給する熱媒体101を、それぞれ異なる2つの温度である第2温度T2A及びT2Bへ制御することができる。その他の作用については、実施の形態1~3と同様であり、同様な効果を奏する。
実施の形態3又は4の変形例.
 実施の形態4では、第2熱需要部130B又は130Cとして、2つの床暖房装置131A及び131Bを備えたが、3つ以上であってもよい。その場合においてもそれぞれ同様な効果を奏する。
 100 複数温度システム、100A 複数温度システム、100B 複数温度システム、100C 複数温度システム、101 熱媒体、102 循環路、103 第1循環ポンプ、104 循環切替弁、110 第1熱需要部、111 ファンコイル(第1室内熱交換器)、112 開閉弁、121 ラジエター(第1室内空気-熱媒体熱交)、122 開閉弁、130 第2熱需要部、130B 第2熱需要部、130C 第2熱需要部、131 床暖房装置(第2室内空気-熱媒体熱交)、131A 床暖房装置(室内空気-熱媒体熱交)、131B 床暖房装置(室内空気-熱媒体熱交)、132 開閉弁、132A 開閉弁、132B 開閉弁、135 第2逆止弁、135A 第2逆止弁、135B 第2逆止弁、142 戻し路、142A 戻し路、142B 戻し路、143 第2循環ポンプ、143A 第2循環ポンプ、143B 第2循環ポンプ、145 第1逆止弁、145A 第1逆止弁、145B 第1逆止弁、152 分流路、152A 分流路、152B 分流路、200 ヒートポンプ機構(熱供給部)、201 ヒートポンプ熱媒体、202 ヒートポンプ循環路、203 圧縮機、204 循環切替弁、205 膨張弁、206 ファン、207 外気熱交、208 熱供給熱交、210 蓄熱タンク、211 電気ヒーター、212 バイパス路、400 熱供給部、400A 熱供給部、A 接続路、B 接続路、C 接続路、D 接続路、X (床暖房装置の)入口、Y (床暖房装置の)出口。

Claims (9)

  1.  循環路を循環する熱媒体を介して第1温度の温熱又は冷熱として熱を供給する熱供給部と、
     開閉弁、及び、第1室内空気-熱媒体熱交が直列に配管接続された、前記熱媒体を介して熱が供給される第1熱需要部と、
     前記循環路から分岐した分流路上に第2室内空気-熱媒体熱交が搭載された、前記熱媒体を介して熱が供給される第2熱需要部と、を有し、
     前記第1熱需要部と前記第2熱需要部とは並列に、前記第1熱需要部と前記熱供給部、及び前記第2熱需要部と前記熱供給部とは直列となるように前記循環路によって配管接続され、
     前記第2熱需要部は、
     前記第2室内空気-熱媒体熱交の出口側の前記熱媒体を入口側に戻す戻し路を、前記分流路から分岐させて形成し、前記戻し路上に回転数の変更が可能な戻し路用ポンプを搭載し、
     前記熱供給部から前記温熱が供給される時は前記第1温度より低く、前記冷熱が供給される時は前記第1温度より高い、所望の第2温度の前記熱媒体が、前記第2室内空気-熱媒体熱交の入口側へ供給されるようにされており、
     前記戻し路用ポンプの回転数の変更により前記戻し路の前記熱媒体の流量を操作することによって、前記第2熱需要部へ供給される前記熱媒体を前記第2温度へ維持するように制御する
     ことを特徴とする複数温度システム。
  2.  前記戻し路上に、第1逆止弁を搭載した
     ことを特徴とする請求項1に記載の複数温度システム。
  3.  前記分流路上に、第2逆止弁を搭載した
     ことを特徴とする請求項1又は2に記載の複数温度システム。
  4.  前記分流路上に、開閉弁を搭載した
     ことを特徴とする請求項1~3のいずれかに記載の複数温度システム。
  5.  前記熱供給部は、
     圧縮機、外気熱交、膨張弁、及び、熱供給熱交が冷凍サイクルを構成するように配管接続され、かつ、循環路用ポンプ、及び、前記熱供給熱交が前記循環路の中に直列に配管接続されている
     ことを特徴とする請求項1~4のいずれかに記載の複数温度システム。
  6.  前記熱供給部は、
     循環路用ポンプ、及び、電気ヒーターを備えた蓄熱タンクが直列に配管接続されている
     ことを特徴とする請求項1~4のいずれかに記載の複数温度システム。
  7.  前記熱供給部は、前記蓄熱タンクの入口側から分岐させ、前記蓄熱タンクを通らずに該蓄熱タンクの出口側へ前記熱媒体を流動させるバイパス路を形成する
     ことを特徴とする請求項6に記載の複数温度システム。
  8.  前記第2熱需要部は、
     前記分流路を少なくとも2つ以上に分岐させ、前記第2室内空気-熱媒体熱交が少なくとも2つ以上並列に搭載され、
     前記分流路は、
     前記戻し路を合流させた位置よりも前記第2室内空気-熱媒体熱交の入口側で分岐させた
     ことを特徴とする請求項1~7のいずれかに記載の複数温度システム。
  9.  前記第2熱需要部は、
     前記分流路を少なくとも2つ以上有し、
     前記分流路は、
     互いに並列となるように前記循環路から分岐している
     ことを特徴とする請求項1~7のいずれかに記載の複数温度システム。
PCT/JP2013/063467 2013-01-10 2013-05-14 複数温度システム WO2014109079A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2014556317A JP5847337B2 (ja) 2013-01-10 2013-05-14 複数温度システム
EP13870571.0A EP2947392B1 (en) 2013-01-10 2013-05-14 Multiple temperature system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2013002996 2013-01-10
JP2013-002996 2013-01-10

Publications (1)

Publication Number Publication Date
WO2014109079A1 true WO2014109079A1 (ja) 2014-07-17

Family

ID=51166746

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/063467 WO2014109079A1 (ja) 2013-01-10 2013-05-14 複数温度システム

Country Status (3)

Country Link
EP (1) EP2947392B1 (ja)
JP (1) JP5847337B2 (ja)
WO (1) WO2014109079A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3098523A1 (en) * 2015-05-22 2016-11-30 Daikin Industries, Limited Fluid-type temperature-regulating unit

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6317318A (ja) * 1986-07-10 1988-01-25 Matsushita Electric Ind Co Ltd 温水暖房装置
JPH05180450A (ja) * 1991-12-27 1993-07-23 Mitsubishi Electric Corp 温水循環式床暖房装置
JPH0688626A (ja) * 1992-09-08 1994-03-29 Daiwa House Ind Co Ltd 低温水床暖房配管システム
JPH08261486A (ja) * 1995-03-27 1996-10-11 Matsushita Electric Works Ltd 蓄熱温水床暖房設備
JPH09318083A (ja) * 1996-05-31 1997-12-12 Sanyo Electric Co Ltd 温水循環装置
JP2005156100A (ja) 2003-11-28 2005-06-16 Matsushita Electric Ind Co Ltd 温水暖房装置
JP2005201618A (ja) 2003-12-16 2005-07-28 Noritz Corp 温水暖房システム
JP2012013358A (ja) * 2010-07-02 2012-01-19 Panasonic Corp ヒートポンプ式冷温水冷房暖房装置

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3724661A1 (de) * 1987-07-25 1989-02-02 Manfred Klenke Vorrichtung zur beimischregelung in warmwasserheizungsanlagen
JP4239963B2 (ja) * 2004-07-23 2009-03-18 株式会社ノーリツ 温水暖房システム
JP4685553B2 (ja) * 2005-08-30 2011-05-18 株式会社長府製作所 コージェネレーションシステム

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6317318A (ja) * 1986-07-10 1988-01-25 Matsushita Electric Ind Co Ltd 温水暖房装置
JPH05180450A (ja) * 1991-12-27 1993-07-23 Mitsubishi Electric Corp 温水循環式床暖房装置
JPH0688626A (ja) * 1992-09-08 1994-03-29 Daiwa House Ind Co Ltd 低温水床暖房配管システム
JPH08261486A (ja) * 1995-03-27 1996-10-11 Matsushita Electric Works Ltd 蓄熱温水床暖房設備
JPH09318083A (ja) * 1996-05-31 1997-12-12 Sanyo Electric Co Ltd 温水循環装置
JP2005156100A (ja) 2003-11-28 2005-06-16 Matsushita Electric Ind Co Ltd 温水暖房装置
JP2005201618A (ja) 2003-12-16 2005-07-28 Noritz Corp 温水暖房システム
JP2012013358A (ja) * 2010-07-02 2012-01-19 Panasonic Corp ヒートポンプ式冷温水冷房暖房装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2947392A4

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3098523A1 (en) * 2015-05-22 2016-11-30 Daikin Industries, Limited Fluid-type temperature-regulating unit

Also Published As

Publication number Publication date
JPWO2014109079A1 (ja) 2017-01-19
EP2947392A4 (en) 2016-10-26
EP2947392A1 (en) 2015-11-25
EP2947392B1 (en) 2019-06-26
JP5847337B2 (ja) 2016-01-20

Similar Documents

Publication Publication Date Title
JP5174950B2 (ja) 温度調整装置、流体供給システム、暖房システム、温度調整装置の取付方法及び流体供給方法
KR102487265B1 (ko) 히트 펌프 시스템
WO2010119642A1 (ja) ヒートポンプ式暖房装置
US8800319B2 (en) Refrigerating cycle device used in an air conditioning apparatus, a refrigerating device and the like
EP3098541B1 (en) Co2 water heater
KR20120091772A (ko) 전기자동차용 공조장치
JP2013036648A (ja) 蓄熱給湯装置及び蓄熱給湯方法
JP5847337B2 (ja) 複数温度システム
KR102657255B1 (ko) 차량용 히트 펌프 시스템
KR101674302B1 (ko) 항온시스템의 냉동기
JP2009168403A (ja) チラー装置
US11353234B2 (en) Air conditioning system
JP2013190906A (ja) 自動販売機
JP2012167838A (ja) 温水暖房装置
JP4871800B2 (ja) チラー装置
JP2017198414A (ja) 給湯空調システム
KR101016717B1 (ko) 3중 효용의 히트펌프 시스템
JP6858869B2 (ja) 温度調整装置、中継装置、負荷装置、および冷凍サイクル装置
JP6476445B2 (ja) 温度調整装置
KR100860047B1 (ko) 히트펌프를 이용하여 물을 가열 및 냉각하는 장치 및 방법
JP6663740B2 (ja) 熱利用システム
JP2015068577A (ja) ヒートポンプ装置および給湯暖房装置
JP2014134321A (ja) 複合型空調システム
JP2005201618A (ja) 温水暖房システム
KR20120093668A (ko) 차량용 히트 펌프 시스템

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13870571

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2014556317

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2013870571

Country of ref document: EP