WO2014045313A1 - ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラム - Google Patents

ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラム Download PDF

Info

Publication number
WO2014045313A1
WO2014045313A1 PCT/JP2012/005936 JP2012005936W WO2014045313A1 WO 2014045313 A1 WO2014045313 A1 WO 2014045313A1 JP 2012005936 W JP2012005936 W JP 2012005936W WO 2014045313 A1 WO2014045313 A1 WO 2014045313A1
Authority
WO
WIPO (PCT)
Prior art keywords
station
line
diagram
branch
data
Prior art date
Application number
PCT/JP2012/005936
Other languages
English (en)
French (fr)
Inventor
英樹 久保
Original Assignee
株式会社 東芝
東芝ソリューション株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社 東芝, 東芝ソリューション株式会社 filed Critical 株式会社 東芝
Priority to CA2865773A priority Critical patent/CA2865773C/en
Priority to PCT/JP2012/005936 priority patent/WO2014045313A1/ja
Priority to EP12884869.4A priority patent/EP2899094B1/en
Priority to CN201280070616.5A priority patent/CN104136304B/zh
Publication of WO2014045313A1 publication Critical patent/WO2014045313A1/ja
Priority to US14/469,641 priority patent/US9522689B2/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L99/00Subject matter not provided for in other groups of this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/10Operations, e.g. scheduling or time tables
    • B61L27/12Preparing schedules

Definitions

  • the present embodiment relates to a diagram creation device, a diagram creation method, and a diagram display program.
  • a railway operating company inputs data such as the departure and arrival times at each station of a train and the distance (km distance) between adjacent stations on a diagram creation device, and then creates this diagram data as an operation diagram.
  • diagram is displayed on the screen to manage train operation.
  • the diagram is represented in a graph form in which the distance from the first station (reference station) is plotted on the vertical axis, the time is plotted on the horizontal axis, and the names of traveling stations are arranged on the vertical axis in consideration of the distance between stations.
  • One train is represented by a single line on the diagram.
  • the down train goes down and the up train goes to the right.
  • Draw a rising line The slope of the line represents the speed of the train. The faster the train, the larger the slope of the line, and the horizontal line (slope 0) represents that the vehicle is stopped.
  • a device when creating an operation diagram in a railway network having a line section where there are many branches, a device has been devised to draw it so that it can be put on one screen including the branch line section.
  • railway management separates the lower (infrastructure) management and upper (operation / operation) organizations and separates the lower and upper accounts.
  • railway management separates the lower (infrastructure) management and upper (operation / operation) organizations and separates the lower and upper accounts.
  • in Germany there are cases where not only the upper and lower parts are separated but also open access is introduced and there are a plurality of upper organizations. From this mechanism, the entry of new operating companies is permitted, and the track can be used freely.
  • European railways unlike mass transport between large cities in Japan, operate trains by freely selecting routes on tracks stretched around like a mesh for the purpose of transport between regional bases. There is a high need to do it.
  • the block diagram which shows the example of whole structure of the diamond production apparatus which concerns on one Embodiment of this invention.
  • the figure which shows the hardware structural example of the diamond production apparatus shown in FIG. The route map which shows the railroad network used as the creation object of a diagram data in the diagram creation apparatus shown in FIG.
  • the figure which shows the specific example of the diagram which a conventional diamond creation apparatus produces and displays about the route shown in FIG.
  • the flowchart which shows the specific example of the diagram creation process in the diagram creation apparatus shown in FIG.
  • the flowchart which shows the specific example of the line section switching process in the diagram production apparatus shown in FIG.
  • the figure explaining the method of the line section switching process in the diagram production apparatus shown in FIG. The figure explaining the method of the line section switching process in the diagram production apparatus shown in FIG.
  • FIG. 15 is a diagram showing a specific example of a diagram created and displayed by the diagram creation device shown in FIG. 1 for the railway network shown in FIG.
  • a diagram creation device includes a database, a processing device, and a display device.
  • the database includes a line master that stores the name of a line within a railway network including a plurality of lines and a line code for identifying the line as line data, and a reference code in the same line together with the line code.
  • Station order master code that stores the station order code indicating the order of the station, the station name, and the relationship of the kilometer distance from the reference station as station order data;
  • a branch master that stores the relationship of the line code as branch data.
  • the processing device reads line segment data, station order data, and branch data from the database, and creates a diagram that displays station lines and diagrams associated with station names on a two-dimensional plane composed of a time axis and a distance axis.
  • the display device displays a diagram generated by the processing device.
  • the processing device includes means for displaying in a diagram a station line in which the line name, the station name of each station included in the line area, and the distance from the reference point of each station are displayed in parallel in the time axis.
  • means for displaying in the diagram the branch button associated with the other branch line in the vicinity of the station line corresponding to the branch station belonging to the other line section The station order data and branch data are read based on the branch line code of the branch destination, and a part of the station line related to the line area displayed in the diagram is a branch station belonging to another line area starting from the branch station And means for switching to a subsequent station line for display.
  • the diagram creation apparatus displays a diagram with high visibility and operability, and can easily create an operation diagram in a railway network in which many branches exist.
  • FIG. 1 is a block diagram illustrating an example of the overall configuration of a diagram creating apparatus 1 according to an embodiment.
  • the diagram creation apparatus 1 includes a line section master 101, a station order master 102, a branch master 103, a diagram data storage section 104, a line section determination section 105, a station order data reading section 106, and branch data reading.
  • the computer includes a unit 107, a diagram display processing unit 108, a line section switching unit 109, and a diagram data creating unit 110.
  • the line ward master 101 is a table that stores, as line ward data, the relationship between the line ward names (route names) in the railway network including a plurality of line wards and the line ward codes that identify them. Table 1 below shows a specific example of the line zone master 101.
  • the station order master 102 stores the relationship between the line code, the station order code indicating the order from the reference station in the same line, the station name, and the distance from the reference station (the station order code 1 or the cumulative distance from a certain reference). It is a table memorize
  • the branch master 103 is a table that stores, as branch data, a relationship between a line code, a station order code, and a branch destination line code related to branch stations belonging to a plurality of line sections. Table 3 below shows a specific example of the branch master 103.
  • station order code ascending side bottom of the diagram
  • station order code descending side This means that it is placed on the upper side of the diagram.
  • branch destination line direction is 1
  • the station order code is in the ascending order station
  • -1 is that the station order code is in the descending direction station.
  • the line section determination unit 105 is a program that refers to the line section master 101 and determines a line section code related to a target line section that is a target of display / creation of a diagram showing the relationship between kilometers and time.
  • the line code determination method includes a method of reading data of the line master 101 and allowing the user to select from a list displayed on the screen, or a method of directly inputting the line code.
  • the station sequence data reading unit 106 is a program that reads station sequence data from the station sequence master 102 using the line segment code determined by the line segment determining unit 105 as a key.
  • the branch data reading unit 107 is a program for reading branch data from the branch master 103 using the line section code and the station order code included in the station order data read by the station order data reading unit 106 as keys.
  • the diagram display processing unit 108 draws a station line representing the kilometer of the station included in the target line section based on the station order data, displays the station name corresponding to the station line, and displays the station name based on the branch data. It is a program for displaying a diagram creation screen including a diagram diagram in which a branch button in which a branch destination line code and a branch line line direction are associated is provided in the vicinity of a station line related to a branch station in the figure. Further, the diagram display processing unit 108 arranges the branch buttons with respect to the station line of the branch station included in the branch data (display order from the station line to the other line area) and from the branch station in the other line area to the adjacent station. Based on the direction flag (branch line direction), the arrangement of the branch button and the station order code associated with the branch button are determined, and a diagram is created and displayed.
  • the line section switching unit 109 selects a part of the station line related to the target line section in the diagram based on the branch destination section code as the starting point for the branch station.
  • This is a program for switching and displaying the station lines after the branch station belonging to the line section. Specifically, the branch destination line code, station order code and branch destination line direction associated with the branch button when creating the diagram are output to the diagram display processing unit 108, and the master data is reloaded. Switch the line section.
  • the diagram data creation unit 110 analyzes the coordinates of the diagram drawn with continuous lines in the diagram diagram on the diagram creation screen, and the train line code, departure station, arrival station, departure time and It is a program for creating diagram data indicating the relationship between arrival times. Further, when the diagram based on the created diagram data is changed on the diagram creation screen, the diagram data creation unit 110 creates new diagram data based on the modified diagram and updates the diagram data storage unit 104. .
  • FIG. 2 is a diagram illustrating a hardware configuration example of a computer applied to the diagram creating apparatus illustrated in FIG.
  • the diagram creation device includes a CPU (Central Processing Unit) 401, a ROM (Read Only Memory) 402, a RAM (Random Access Memory) 403, an input / output interface 404, a system bus 405, an input device 406, It comprises a display device 407, an auxiliary storage device 408, and a communication device 409.
  • a CPU Central Processing Unit
  • ROM Read Only Memory
  • RAM Random Access Memory
  • the CPU 401 is a processing device that executes various arithmetic processes using programs, data, and the like stored in the ROM 402 and the RAM 403.
  • the ROM 402 is a read-only storage device that stores basic programs and environment files for causing the computer to function.
  • the RAM 403 is a storage device that stores programs executed by the CPU 401 and data necessary for the execution of each program, and can be read and written at high speed.
  • the input / output interface 404 is a device and a program that mediate connection between various hardware and the system bus 405.
  • a system bus 405 is an information transmission path shared by the CPU 401, ROM 402, RAM 403, and input / output interface 404.
  • the input / output interface 404 is connected to hardware such as an input device 406, a display device 407, an auxiliary storage device 408, and a communication device 409.
  • the input device 406 is a device that processes input from the user, and is, for example, a keyboard or a mouse.
  • the display device 407 is a device that displays a calculation result, a creation screen, and the like to the user, and is, for example, a CRT, a liquid crystal display, a plasma display, or the like.
  • the auxiliary storage device 408 is a large-capacity storage device for accumulating a program for creating traveling performance data and data, and is, for example, a hard disk device.
  • FIG. 3 is a route diagram showing a railway network that is a target of creation of diagram data in the diagram creation device shown in FIG.
  • this railway network three lines of an ⁇ line area, a ⁇ line area, and a ⁇ line area branch from the B station.
  • FIG. 4 is a diagram showing a specific example of a diagram that the conventional diagram creation device creates and displays for the route shown in FIG.
  • different line segments are often combined and described in one sheet on a diagram. This is an idea to indicate the branch line section in one figure.
  • a diagram drawing of each train on the diagram
  • this diagram diagram representation the drawing and operation of the branch portion will be complicated.
  • the diagram creating apparatus 1 can draw a diagram extending over a plurality of line sections with continuous lines.
  • the diagram creation process and the line segment switching process in the diagram creation apparatus 1 will be described in detail.
  • FIG. 5 is a flowchart showing a specific example of the diagram creation process in the diagram creation apparatus shown in FIG.
  • the line segment determination unit 105 refers to the line segment master 101 and determines a line segment code related to a target line segment that is a target of display / creation of a diagram showing the relationship between kilometer and time.
  • the station order data reading unit 106 reads station order data from the station order master 102 using the line section code determined by the line section determination unit 105 as a key.
  • the station order data reading unit 106 determines whether there is unprocessed station order data for the target line section. If it is determined that there is unprocessed station order data (S503: Yes), the process proceeds to S504. On the other hand, when it is determined that there is no unprocessed station order data (S503: No), the process proceeds to S511.
  • the branch data reading unit 107 reads the branch data from the branch master 103 using the line section code and the station order code included in the station order data read by the station order data reading unit 106 as keys. At this time, branch data is read in ascending order of display designation order (display order from the station line to the other line section) of the branch master 103 corresponding to the station order code.
  • the diagram display processing unit 108 determines whether or not branch data exists. If it is determined that branch data exists (S505: Yes), the process proceeds to S506. On the other hand, when it is determined that there is no branch data (S505: No), the process returns to S502.
  • the diagram display processing unit 108 determines whether or not a branch check box has not been created. If it is determined that the branch check box has not been created (S506: Yes), a branch check box is created (S507). On the other hand, if it is determined that the branch check box has been created (S506: No), the process proceeds to S508.
  • the diagram display processing unit 108 determines whether or not the display order on the other line section is a positive value. Here, when it determines with a positive value (S508: Yes), it progresses to S509. On the other hand, when it determines with a negative value (S508: No), it progresses to S510. In S509, the diagram display processing unit 108 creates a branch button below the branch station.
  • the diagram display processing unit 108 creates a branch button above the branch station.
  • the diamond display processing unit 108 reads the registered diamond data from the diamond data storage unit 104 and develops it on the memory.
  • the diagram display processing unit 108 draws and displays a diagram.
  • FIG. 6 is a flowchart showing a specific example of the line segment switching process in the diagram creating apparatus 1 shown in FIG. 7 to 12 are diagrams showing specific examples of the line section switching process.
  • the diagram display processing unit 108 determines whether the branch check box displayed on the diagram creation screen is ON.
  • ON / OFF of the branch check box is a switch for determining whether or not to display a branch button when there is a branch around the station line of the branch station. If it is determined that the branch check box is ON (S601: Yes), the process proceeds to S602. On the other hand, if it is determined that the branch check box is OFF (S601: No), the process proceeds to S603.
  • the diagram display processing unit 108 displays a branch button near the station line of the branch station on the diagram creation screen. Assuming that the branch check box is initially OFF, the diagram drawing area when the ⁇ line section is displayed is as shown in FIG. When the branch check box displayed between the station name and the kilometer is turned ON, a branch button is displayed around the ⁇ line B station where the branch exists as shown in FIG.
  • a branch button is displayed based on the branch master 103 shown in Table 3 above, and when the display order to other line sections is a negative value, branch to the station code descending side (upper diagram) When a button is arranged and the display order to other line sections is a positive value, a branch button is arranged on the station code ascending order side (lower side of the diagram).
  • the line section switching unit 109 determines whether or not the branch button is pressed in the diagram creation screen. If it is determined that the branch button has been pressed (S603: Yes), the process proceeds to S604. On the other hand, when it is determined that the branch button is not pressed (S601: No), the process proceeds to S605.
  • the line section switching unit 109 outputs the branch destination line code, the station order code, and the branch destination line direction associated with the pressed branch button to the diagram display processing unit 108. Accordingly, the diagram display processing unit 108 reads the master data from the station order master 102 and the branch master 103 again using the station order code and the branch destination line code as keys.
  • the master data reading process is the same as that in the flowchart of FIG. 5 described above, but the station order master data read from the station order master 102 is sufficient only from the branch station to the branch destination line direction.
  • the diagram display processing unit 108 switches a part of the diagram display area related to the target line section in the diagram to the diagram display area related to another line section from the branch station as a starting point based on the branch destination line section code.
  • To display For example, as shown in FIG. 9, in the state in which the ⁇ line section is displayed, three branch buttons at station B appear. Then, when you click the branch button for “ ⁇ line district Z station direction” on the station order code ascending side (bottom of the screen), as shown in FIG. Switch to ⁇ -ray section. Moreover, the branch button is recreated about the ⁇ -ray by reading the branch master 103 again as the ⁇ -line B station. In addition, as shown in FIG.
  • the diagram display processing unit 108 determines whether the branch check box displayed on the diagram creation screen is OFF. If it is determined that the branch check box is OFF, the process proceeds to S607. On the other hand, if it is determined that the branch check box is ON, the process proceeds to S608.
  • the diagram display processing unit 108 returns the branch button displayed near the station line of the branch station on the diagram creation screen to non-display.
  • the diagram display processing unit 108 determines whether or not the line section on which the train travels has been determined based on the presence or absence of a line section switching request.
  • the process proceeds to S609.
  • the process returns to S601.
  • step S ⁇ b> 609 the diagram display processing unit 108 accepts input from the user for the line segments displayed on the diagram, and draws a diagram.
  • step S610 the diagram display processing unit 108 determines whether drawing of a diagram is completed on the diagram creation screen. For example, it is determined based on whether or not a completion button (not shown) is pressed. If it is determined that the drawing of the diagram is completed, the process proceeds to S611. On the other hand, if it is determined that it is not completed, the process returns to S609.
  • the diagram data creation unit 110 analyzes the coordinates of the diagram drawn by continuous lines in the diagram diagram of the diagram creation screen, and the train line code, departure station, arrival station, The diagram data indicating the relationship between the departure time and the arrival time is created and registered in the diagram data storage unit 104.
  • the diagram data is updated. For example, as in the example shown in FIG. 4, if there is a train that goes from the ⁇ line X station to the ⁇ line Z station via the B station, it becomes a diagram diagram as shown in FIG. A simple drawing that doesn't feel a branch can be realized.
  • a branch button (branch line section display button) is prepared at a station where a branch line section exists, and the station display unit is pressed by pressing the branch button. Buttons with branch line names appear on the up and down sides respectively. Then, when a button with a branch line section name is pressed, the display is switched to a line section that is newly selected from there.
  • the diagram itself can be handled as one continuous line centered at a branch station, and can be drawn with a simple diagram theory that draws a line between conventional stations.
  • a simple diagram theory that draws a line between conventional stations.
  • FIG. 14 is a route diagram showing a railway network that is a target of creation of a diagram in the diagram creation device shown in FIG.
  • FIG. 15 is a diagram showing a specific example of a diagram displayed on the railway network shown in FIG. 14 by a conventional diagram creation device.
  • FIG. 14 consider the case of creating a train diagram that travels like a thick line in the railway network as shown in FIG.
  • all routes will be posted on the same screen and paper, or a route will be decided to some extent and only the narrowed routes will be displayed to create a diagram. .
  • this drawing rule when a route is freely selected and a route is set, the continuity of the diagram is lost as shown in FIG. 15, resulting in a screen with poor visibility and operability.
  • FIG. 16 is a diagram showing a specific example of a diagram displayed on the railway network shown in FIG. 14 by the diagram creating device shown in FIG. For example, assuming that the H line is displayed at the start, even if the complicated route shown by the thick line in FIG. Thus, it is possible to realize a diagram drawing by a continuous line having higher visibility than that of FIG.
  • the program for executing the process of the present embodiment and the data related thereto may be provided by a computer-readable storage medium.
  • these storage media are CD-ROM (Compact Disk Read Only Memory), flexible disk (FD), CD-R (Compact Disk Recordable), DVD (Digital Versatile Disk), and the like.
  • a program for executing the process of the present embodiment and data related thereto may be stored in a computer downloaded via a network, for example, the Internet or Ethernet. Furthermore, it may be provided in a downloadable state on a computer or the like on those networks. Furthermore, the program that executes the process of the present embodiment and the data related thereto may be provided in a state that can be downloaded to different locations on the cloud. The related data may be provided by being stored in advance in a ROM or a flash memory in the apparatus.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

視認性および操作性の高いダイヤ図を表示し、分岐が多数存在する鉄道網における運行ダイヤグラムの作成を容易にする。 本発明の一実施形態に係るダイヤ作成装置は、データベース、処理装置および表示装置を備える。処理装置は、時間軸に平行に、線区名、線区に含まれる各駅の駅名、各駅の基準点からの距離程が表示された駅線をダイヤ図内に表示する手段と、各駅の内、他の線区に属する分岐駅に対応した駅線の近傍に、分岐先の他の線区が対応付けられた分岐ボタンをダイヤ図内に表示する手段と、分岐ボタンが押下された場合に、分岐先の線区コードに基づいて駅順データおよび分岐データを読込み、ダイヤ図内に表示している線区に係る駅線の一部を分岐駅を起点として他の線区に属する分岐駅以降の駅線に切り替えて表示する手段と、を有する。

Description

ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラム 関連出願の引用

 本出願の関連出願は、2011年3月24日に出願した日本国特許出願第2011-065749号であり、その関連出願の内容全体を引用によりここに包含する。
 本実施形態は、ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラムに関する。
 一般に、鉄道の運行会社は、列車の各駅における発着時刻、隣接駅間の距離程(キロ程)等のデータをダイヤ作成装置上で入力してダイヤデータを作成した後、このダイヤデータを運行ダイヤグラム(以下、「ダイヤ図」という。)として画面上に表示することで、列車の運行を管理している。例えば、ダイヤ図は、始発駅(基準駅)からのキロ程を縦軸、時刻を横軸にとり、駅間距離を考慮して走行駅名を縦軸上に配置したグラフ状で表される。そして、一つの列車はダイヤ図上で一本の線(ダイヤスジ)で表現される。仮に、下り列車の始発駅を一番上に配置し、ここを原点としてキロ程を下向き、時間を右向きに増加するように座標軸を配置すると、下り列車は右肩下がり、反対に上り列車は右肩上がりの折れ線を描く。線の傾きは列車の速度を表し、速い列車ほど線の傾きは大きくなり、水平線(傾き0)は停車していることを表す。 
 また、分岐が多数存在する線区を持つ鉄道網における運行ダイヤグラムを作成するときには、分岐先の線区も含め、1画面に入れるように描画する工夫がなされている。
 下記文献は、上述した技術に関連しており、ここに内容全体を引用によりここに包含する。
特許第3544328号公報
 しかしながら、上述のダイヤ図表記法は、鉄道運行会社独自のものであり、分岐が多数存在する線区を持つ鉄道の運行ダイヤグラムを作成するときには、スジ描画操作も単純に線を結ぶだけでなく、ある区間を飛ばしたりするなど複雑なものとなってしまう。
 また、新線ができた場合や、他社路線との乗り入れが実現した場合には、新しい線区への乗り入れに対する検討を開始しなければならないが、先の複雑な表記法のため、ダイヤ図の配置から見直すことになってしまう。これは紙上でのダイヤ図記述方式を踏襲しているためであるが、コンピュータ化されたダイアグラムシステムでも新しいダイヤ表記・作成手法は発案されていない。
 更に、一般のダイヤ表記・作成手法では、海外の鉄道事情を考慮し、ダイヤを作成することは極めて困難である。例えば、ヨーロッパでは、鉄道の経営は、下部(インフラ)の管理と上部(運行・運営)を行う組織を分離し、下部と上部の会計を独立させている。特にドイツの場合は、上部と下部を分離するだけでなく、オープンアクセスを導入して複数の上部組織が存在するケースまである。この仕組みから、新たな運行会社の参入まで認められ、線路を自由に使用できる状況になっている。また、ヨーロッパの鉄道では、日本の大都市間の大量輸送とは異なり、地域拠点間の輸送を目的として、網の目のように張り巡らされた線路上を自由に経路選択して列車を運行したいというニーズも高い。このため、線路という1つの資源を複数の運行会社で有効に活用し、複雑になりがちな運行経路の選択および管理をシンプルに行えることがダイヤシステムには求められている。しかし、従来のダイヤ表記・作成手法は、日本のように決められた路線を繰り返し走行する場合を対象としているため適していない。
本発明の一実施形態に係るダイヤ作成装置の全体構成例を示すブロック図。 図1に示すダイヤ作成装置のハードウェア構成例を示す図。 図1に示すダイヤ作成装置においてダイヤデータの作成対象となる鉄道網を示す路線図。 従来のダイヤ作成装置が図3に示す路線について作成・表示するダイヤ図の具体例を示す図。 図1に示すダイヤ作成装置におけるダイヤ図作成処理の具体例を示すフローチャート。 図1に示すダイヤ作成装置における線区切替処理の具体例を示すフローチャート。 図1に示すダイヤ作成装置における線区切替処理の方法を説明する図。 図1に示すダイヤ作成装置における線区切替処理の方法を説明する図。 図1に示すダイヤ作成装置における線区切替処理の方法を説明する図。 図1に示すダイヤ作成装置における線区切替処理の方法を説明する図。 図1に示すダイヤ作成装置における線区切替処理の方法を説明する図。 図1に示すダイヤ作成装置における線区切替処理の方法を説明する図。 図1に示すダイヤ作成装置においてダイヤ図上で描かれたダイヤスジの具体例を示す図。 図1に示すダイヤ作成装置においてダイヤ図の作成対象となる他の鉄道網を示す路線図。 図14に示す鉄道網について従来のダイヤ作成装置が作成・表示するダイヤ図の具体例を示す図。 図14に示す鉄道網について図1に示すダイヤ作成装置が作成・表示するダイヤ図の具体例を示す図。
 一実施形態に係るダイヤ作成装置は、データベース、処理装置および表示装置を備える。
 データベースは、複数の線区を含む鉄道網内の線区の名称およびこれを識別する線区コードを線区データとして記憶する線区マスタと、線区コードと共に、同一線区内における基準駅からの順序を示す駅順コード、駅名および基準駅からのキロ程の関係を駅順データとして記憶する駅順マスタと、複数の線区に属する分岐駅に係る線区コード、駅順コードおよび分岐先線区コードの関係を分岐データとして記憶する分岐マスタと、を有する。
 処理装置は、データベースから線区データ、駅順データおよび分岐データを読込み、時間軸と距離軸からなる二次元平面に、駅名に対応付けられた駅線およびダイヤスジを表示するダイヤ図を作成する。表示装置は、処理装置で作成されたダイヤ図を表示する。
 処理装置は、時間軸に平行に、線区名、線区に含まれる各駅の駅名、各駅の基準点からの距離程が表示された駅線をダイヤ図内に表示する手段と、各駅の内、他の線区に属する分岐駅に対応した駅線の近傍に、分岐先の他の線区が対応付けられた分岐ボタンをダイヤ図内に表示する手段と、分岐ボタンが押下された場合に、分岐先の線区コードに基づいて駅順データおよび分岐データを読込み、ダイヤ図内に表示している線区に係る駅線の一部を分岐駅を起点として他の線区に属する分岐駅以降の駅線に切り替えて表示する手段と、を有することを特徴とする。
 一実施形態に係るダイヤ作成装置は、視認性および操作性の高いダイヤ図を表示し、分岐が多数存在する鉄道網における運行ダイヤグラムの作成を容易に行える。
 以下、本実施形態について図面を用いて詳細に説明する。 
 図1は、一実施形態に係るダイヤ作成装置1の全体構成例を示すブロック図である。同図に示されるように、ダイヤ作成装置1は、線区マスタ101、駅順マスタ102、分岐マスタ103、ダイヤデータ記憶部104、線区決定部105、駅順データ読込部106、分岐データ読込部107、ダイヤ表示処理部108、線区切替部109およびダイヤデータ作成部110を備えるコンピュータである。
 線区マスタ101は、複数の線区を含む鉄道網内の線区の名称(路線名)およびこれを識別する線区コードの関係を線区データとして記憶するテーブルである。下記の表1は、線区マスタ101の具体例を示す。
Figure JPOXMLDOC01-appb-T000001
 駅順マスタ102は、線区コード、同一線区内における基準駅からの順序を示す駅順コード、駅名および基準駅からのキロ程(駅順コード1またはある基準からの累計距離)の関係を駅順データとして記憶するテーブルである。下記の表2は、駅順マスタ102の具体例を示しており、駅順コードが線区ごとに始発駅から昇順に付けられている。
Figure JPOXMLDOC01-appb-T000002
 分岐マスタ103は、複数の線区に属する分岐駅に係る線区コード、駅順コードおよび分岐先線区コードの関係を分岐データとして記憶するテーブルである。下記の表3は、分岐マスタ103の具体例を示す。
Figure JPOXMLDOC01-appb-T000003
 ここでは、駅線からの他線区への表示順が正の値の場合は、駅順コード昇順側(ダイヤ図下側)に配置すること、負の値の場合は、駅順コード降順側(ダイヤ図上側)に配置することを表す。また、分岐先線区方向が1の場合は、駅順コード昇順方向の駅へ、-1の場合は、駅順コード降順方向の駅へ分岐することを表す。
 線区決定部105は、線区マスタ101を参照し、キロ程と時刻の関係を示すダイヤ図の表示・作成の対象となる対象線区に係る線区コードを決定するプログラムである。尚、線区コードの決定方法としては、線区マスタ101のデータを読み込み、画面に表示させた一覧の中からユーザに選択させる方法や、線区コードを直接入力する方法が挙げられる。
 駅順データ読込部106は、線区決定部105において決定された線区コードをキーとして駅順マスタ102から駅順データを読込むプログラムである。 
 分岐データ読込部107は、駅順データ読込部106において読込まれた駅順データに含まれる線区コードおよび駅順コードをキーとして分岐マスタ103から分岐データを読込むプログラムである。
 ダイヤ表示処理部108は、駅順データに基づいて対象線区に含まれる駅のキロ程を表す駅線を描画し、この駅線に対応して駅名を表示すると共に、分岐データに基づいてダイヤ図内の分岐駅に係る駅線の近傍に分岐先線区コードおよび分岐線線区方向を関連付けた分岐ボタンを付したダイヤ図を含むダイヤ作成画面を表示するプログラムである。 
 また、ダイヤ表示処理部108は、分岐データに含まれる分岐駅の駅線に対する分岐ボタンの配置順(駅線からの他線区への表示順)および他の線区における分岐駅から隣接駅への方向フラグ(分岐線線区方向)に基づいて分岐ボタンの配置および分岐ボタンに対応付けられる駅順コードを決定してダイヤ図を作成し、表示する。
 線区切替部109は、ダイヤ作成画面において分岐ボタンが押下された場合に、分岐先線区コードに基づいてダイヤ図内の対象線区に係る駅線の一部を、分岐駅を起点として他の線区に属する分岐駅以降の駅線に切り替えて表示するプログラムである。具体的には、ダイヤ図の作成時に分岐ボタンに関連付けされている分岐先線区コード、駅順コードおよび分岐先線区方向をダイヤ表示処理部108へ出力して、マスタデータの再読込みを行わせることで線区切替を行う。
 ダイヤデータ作成部110は、ダイヤ作成画面においてダイヤ図内に連続した線で描画されたダイヤスジの座標を解析し、列車が走行する線区に係る線区コード、出発駅、到着駅、出発時刻および到着時刻の関係を示すダイヤデータを作成するプログラムである。 
 また、ダイヤデータ作成部110は、ダイヤ作成画面において作成済みのダイヤデータに基づくダイヤスジが変更された場合、変更後のダイヤスジに基づいて新たなダイヤデータを作成してダイヤデータ記憶部104を更新する。
 図2は、図1に示すダイヤ作成装置に適用されるコンピュータのハードウェア構成例を示す図である。同図に示されるように、ダイヤ作成装置は、CPU(Central Processing Unit)401、ROM(Read Only Memory)402、RAM(Random Access Memory)403、入出力インターフェース404、システムバス405、入力装置406、表示装置407、補助記憶装置408および通信装置409から構成される。
 CPU401は、ROM402やRAM403に格納されたプログラムやデータなどを用いて各種の演算処理を実行する処理装置である。ROM402は、コンピュータを機能させるための基本プログラムや環境ファイルなどを記憶する読み取り専用の記憶装置である。RAM403は、CPU401が実行するプログラムおよび各プログラムの実行に必要なデータを記憶する記憶装置であり、高速な読み出しと書き込みが可能である。入出力インターフェース404は、各種のハードウェアとシステムバス405との接続を仲介する装置およびプログラムである。システムバス405は、CPU401、ROM402、RAM403および入出力インターフェース404で共有される情報伝達路である。 
 また、入出力インターフェース404には、入力装置406、表示装置407、補助記憶装置408、および通信装置409などのハードウェアが接続されている。入力装置406は、ユーザからの入力を処理する装置であり、例えばキーボードやマウスなどである。表示装置407は、ユーザに対して演算結果や作成画面などを表示する装置であり、例えばCRT、液晶ディスプレイ、プラズマディスプレイなどである。補助記憶装置408は、走行実績データの作成プログラムやデータを蓄積する大容量の記憶装置であり、例えばハードディスク装置などである。
 図3は、図1に示すダイヤ作成装置においてダイヤデータの作成対象となる鉄道網を示す路線図である。この鉄道網では、B駅を中心として、α線区、β線区、γ線区の三つの路線が分岐している。また、図4は、従来のダイヤ作成装置が図3に示す路線について作成・表示するダイヤ図の具体例を示す図である。同図に示されるように、多くの事例ではダイヤ図上に異なる線区を、組み合わせて1枚の中で表記されることが多い。これは分岐線区をひとつの図の中で表記しようとする工夫である。 
 しかし、コンピュータ上で、このダイヤ図表現でダイヤスジ(ダイヤ上での列車1本1本の描画のこと)を描くと、分岐の部分の描画、オペレーションとも複雑なものになる。また鉄道会社の路線ごとの事情に影響され、鉄道会社を問わない統一的なシステムを実現することが大変難しい。
 例えば、β線区X駅からB駅を経由してγ線区Z駅に行く列車があるとすると、図4のダイヤ図のダイヤスジになる。B駅より下側の、α線区、β線区を飛ばすよう(点線で結ばれている部分)にダイヤスジを描画しなければならない。また、点線で結ぶためには、リンク情報を別途入力しなければならない。 
 これに対して、本発明の一実施形態に係るダイヤ作成装置1は、複数の線区に跨ったダイヤスジを連続した線で描くことができる。以下、ダイヤ作成装置1におけるダイヤ図作成処理および線区切替処理を詳細に説明する。
 図5は、図1に示すダイヤ作成装置におけるダイヤ図作成処理の具体例を示すフローチャートである。 
 S501において、線区決定部105は、線区マスタ101を参照し、キロ程と時刻の関係を示すダイヤ図の表示・作成の対象となる対象線区に係る線区コードを決定する。 
 S502において、駅順データ読込部106は、線区決定部105において決定された線区コードをキーとして駅順マスタ102から駅順データを読込む。
 S503において、駅順データ読込部106は、対象線区について未処理の駅順データが有るか否かを判定する。ここで、未処理の駅順データ有りと判定された場合(S503:Yes)は、S504へ進む。これに対し、未処理の駅順データ無しと判定された場合(S503:No)は、S511へ進む。
 S504において、分岐データ読込部107は、駅順データ読込部106において読込まれた駅順データに含まれる線区コードおよび駅順コードをキーとして分岐マスタ103から分岐データを読込む。この際、駅順コードに対応する分岐マスタ103の表示指定順(駅線からの他線区への表示順)の小さい順に分岐データを読み込む。
 S505において、ダイヤ表示処理部108は、分岐データが存在するか否かを判定する。ここで、分岐データが存在すると判定した場合(S505:Yes)は、S506へ進む。これに対し、分岐データは存在しないと判定された場合(S505:No)は、S502へ戻る。
 S506において、ダイヤ表示処理部108は、分岐チェックボックスが未作成か否かを判定する。ここで、分岐チェックボックスが未作成と判定された場合(S506:Yes)は、分岐チェックボックスを作成する(S507)。これに対し、分岐チェックボックスは作成済みと判定した場合(S506:No)は、S508へ進む。
 S508において、ダイヤ表示処理部108は、他線区への表示順が正の値か否かを判定する。ここで、正の値と判定された場合(S508:Yes)は、S509へ進む。これに対し、負の値と判定された場合(S508:No)は、S510へ進む。 
 S509において、ダイヤ表示処理部108は、分岐駅の下側に分岐ボタンを作成する。
 S510において、ダイヤ表示処理部108は、分岐駅の上側に分岐ボタンを作成する。 
 S511において、ダイヤ表示処理部108は、ダイヤデータ記憶部104から登録済みのダイヤデータを読み込み、メモリ上に展開する。 
 S512において、ダイヤ表示処理部108は、ダイヤを描画・表示する。
 図6は、図1に示すダイヤ作成装置1における線区切替処理の具体例を示すフローチャートである。また、図7乃至図12は、線区切替処理の具体例を示す図である。 
 S601において、ダイヤ表示処理部108は、ダイヤ作成画面上に表示されている分岐チェックボックスがONとなっているか否かを判定する。分岐チェックボックスのON/OFFは、分岐駅の駅線の周囲に分岐がある場合に、分岐ボタン表示するか否かを決めるスイッチである。ここで、分岐チェックボックスがONとなっていると判定された場合(S601:Yes)はS602へ進む。これに対し、分岐チェックボックスがOFFとなっていると判定された場合(S601:No)はS603へ進む。
 S602において、ダイヤ表示処理部108は、ダイヤ作成画面において分岐駅の駅線近傍に分岐ボタンを表示する。最初に分岐チェックボックスがOFFの状態であるとすると、α線区を表示したときのダイヤ描画領域は図7のような状態になる。そして、駅名とキロ程の間に表示されている分岐チェックボックスをONにすると、図8のように分岐があるα線B駅の周囲に分岐ボタンが表示される。ここでは、上記の表3に示される分岐マスタ103に基づいて分岐ボタンが表示されており、他線区への表示順が負の値のときは、駅コード降順側(ダイヤ図上側)に分岐ボタンが配置され、他線区への表示順が正の値のときは、駅コード昇順側に(ダイヤ図下側)に分岐ボタンが配置されている。
 S603において、線区切替部109は、ダイヤ作成画面内で分岐ボタンが押下されたか否かを判定する。ここで、分岐ボタンが押下されたと判定された場合(S603:Yes)は、S604へ進む。これに対し、分岐ボタンの押下はないと判定された場合(S601:No)は、S605へ進む。
 S604において、線区切替部109は、押下された分岐ボタンに対応付けされた分岐先線区コード、駅順コードおよび分岐先線区方向をダイヤ表示処理部108へ出力する。これに伴い、ダイヤ表示処理部108は、駅順コードと分岐先線区コードをキーとして駅順マスタ102および分岐マスタ103からマスタデータを再度読込む。マスタデータの読込む処理は上記図5のフローチャートと同様であるが、駅順マスタ102から再度読込む駅順マスタデータは分岐駅から分岐先線区方向についてのみで十分である。
 S605において、ダイヤ表示処理部108は、分岐先線区コードに基づいてダイヤ図内の対象線区に係るダイヤ表示領域の一部を他の線区に係るダイヤ表示領域に分岐駅を起点として切り替えて表示する。 
 例えば、図9に示すように、α線区が表示されている状態では、B駅の分岐ボタンが3つ出現している。そして、駅順コード昇順側(画面下側)の「γ線区Z駅方面」の分岐ボタンをクリックすると、図10に示すように、B駅より駅順コード昇順側(画面下側)が、γ線区に切り替わる。また、γ線区B駅として、分岐マスタ103を再度読込むことで、γ線について分岐ボタンが再作成されている。また、図11に示すように、B駅の分岐ボタンが3つ出現している状態で、駅順コード降順側(画面上側)の「β線区X駅方面」の分岐ボタンをクリックすると、図12に示すようにB駅より駅順コード降順側(画面上側)がβ線区に切り替わる。
 S606において、ダイヤ表示処理部108は、ダイヤ作成画面上に表示されている分岐チェックボックスがOFFとなっているか否かを判定する。ここで、分岐チェックボックスがOFFとなっていると判定された場合はS607へ進む。これに対し、分岐チェックボックスがONとなっていると判定された場合はS608へ進む。
 S607において、ダイヤ表示処理部108は、ダイヤ作成画面において分岐駅の駅線近傍に表示されている分岐ボタンを非表示に戻す。 
 S608において、ダイヤ表示処理部108は、列車が走行する線区が確定したか否かを線区切替要求の有無に基づいて判定する。ここで、線区が確定したと判定された場合は、S609へ進む。これに対し、線区が確定していないと判定された場合は、S601へ戻る。
 S609において、ダイヤ表示処理部108は、ダイヤ図上に表示されている線区についてユーザからの入力を受付け、ダイヤスジの描画を行う。 
 S610において、ダイヤ表示処理部108は、ダイヤ作成画面においてダイヤスジの描画が完了したか否かを判定する。例えば、完了ボタン(図示省略する)の押下有無などに基づいて判定するものとする。ここで、ダイヤスジの描画が完了したと判定された場合は、S611へ進む。これに対して、未完了と判定された場合は、S609へ戻る。
 S611において、ダイヤデータ作成部110は、ダイヤ作成画面のダイヤ図内に連続した線で描画されたダイヤスジの座標を解析し、列車が走行する線区に係る線区コード、出発駅、到着駅、出発時刻および到着時刻の関係を示すダイヤデータを作成し、ダイヤデータ記憶部104へ登録する。尚、登録済みのダイヤデータに係るダイヤスジを変更していた場合には、ダイヤデータの更新を行う。例えば、図4に示した事例と同様に、β線区X駅からB駅を経由してγ線区Z駅に行く列車があるとすると、図13に示すようなダイヤ図のダイヤスジになり、分岐を感じさせないシンプルな描画を実現できる。
 このように、本実施形態に係るダイヤ作成装置1によれば、分岐線区が存在する駅に分岐ボタン(分岐線区表示ボタン)を用意し、分岐ボタンを押下することで、駅表示部の上り方、下り方にそれぞれ分岐線区名が書かれたボタンが出現する。そして、分岐線区名が書かれたボタンを押下すると、そこから以遠が新たに選択された線区に表示が切り替わる。この表現を用いることによって、分岐があっても単純な直線路線のようにダイヤ図を表現でき、その上でのダイヤスジ描画、オペレーションも簡単な操作によって実現できる。
 また、既に分岐・乗り入れをしている路線だけでなく、乗り入れできない構造になっていて、今後乗り入れを検討している線区であっても、マスタデータの修正だけで乗り入れの検討も可能である。
 また、ダイヤの描画自体を、分岐駅を中心に連続した1つの線区のように取り扱うことができ、従来からの駅間で線を引くという、単純なダイアグラム理論で描画することができる。特に、網の目のように張り巡らされた路線の上で、列車ダイヤを作成する際に、分岐を切替えて1本の路線のように表現することで、スジの連続性が失われて断続的な描画となることはなく、連続した視認性の高いダイヤスジの表示を実現できる。
 以下、従来のダイヤスジの表示との違いを補足して説明する。図14は、図1に示すダイヤ作成装置においてダイヤ図の作成対象となる鉄道網を示す路線図である。ここでは、網の目のように張り巡らされた5つの路線が存在している。また、図15は、従来のダイヤ作成装置が図14に示す鉄道網について表示するダイヤ図の具体例を示す図である。ここで、図14のような鉄道網内を太線のように走行させる列車のダイヤを作成する場合を考える。従来からの日本の描画・表現方法であれば、同一の画面、紙面上にすべての経路を掲載しておくか、ある程度ルートを決め、絞り込んだ路線のみを表示してダイヤを作成することになる。しかし、この描画ルールでは、路線を自由に選択して経路を設定しようとすると、図15に示すようにダイヤスジの連続性が失われ、視認性および操作性の悪い画面になってしまう。
 これに対し、図16は、図1に示すダイヤ作成装置が図14に示す鉄道網について表示するダイヤ図の具体例を示す図である。例えば、スタート時はH線が表示されているとして、分岐ボタンを次々と切り替えていくことにより、図14の太線で示される複雑な経路であっても、図16のような駅順のダイヤ図を表現でき、図15と比較して視認性の高い連続線によるダイヤスジ描画を実現することができる。
 以上、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら新規な実施形態は、その他の様々な形態で実施することが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれるとともに、特許請求の範囲に記載された発明とその均等の範囲に含まれる。
 なお、本実施例のプロセスを実行させるプログラムやそれに関連するデータは、コンピュータに読み取り可能な記憶媒体によって提供されてもよい。例えば、それら記憶媒体は、CD-ROM (Compact Disk Read Only Memory), フレキシブルディスク (FD), CD-R (Compact Disk Recordable), DVD (Digital Versatile Disk)などである。
 また、本実施例のプロセスを実行させるプログラムやそれに関連するデータは、ネットワーク、例えばインターネットやイーサーネットなどを介してダウンロードしたコンピュータに記憶されてもよい。さらに、それらのネットワーク上において、コンピュータ等にダウンロード可能な状態で提供されてもよい。さらに、本実施例のプロセスを実行させるプログラムやそれに関連したデータは、クラウド上にあるそれぞれ別々の場所にダウンロード可能な状態で提供されてもよい
 また、本実施例のプロセスを実行させるプログラムやそれに関連するデータは、予め、装置内のROMやフラッシュメモリー等に記憶されて提供されてもよい。

1…ダイヤ作成装置
101…線区マスタ
102…駅順マスタ
103…分岐マスタ
104…ダイヤデータ記憶部
105…線区決定部
106…駅順データ読込部
107…分岐データ読込部
108…ダイヤ表示処理部
109…線区切替部
110…ダイヤデータ作成部
401…CPU
402…ROM
403…RAM
404…入出力インターフェース
405…システムバス
406…入力装置
407…表示装置
408…補助記憶装置
409…通信装置

Claims (12)

  1.  複数の線区を含む鉄道網内の前記線区の名称およびこれを識別する線区コードを線区データとして記憶する線区マスタと、前記線区コードと共に、同一線区内における基準駅からの順序を示す駅順コード、駅名および前記基準駅からのキロ程の関係を駅順データとして記憶する駅順マスタと、複数の前記線区に属する分岐駅に係る前記線区コード、前記駅順コードおよび分岐先線区コードの関係を分岐データとして記憶する分岐マスタと、を有するデータベースと、
     前記データベースから前記線区データ、前記駅順データおよび前記分岐データを読込み、時間軸と距離軸からなる二次元平面に、前記駅名に対応付けられた駅線およびダイヤスジを表示するダイヤ図を作成する処理装置と、
     前記作成された前記ダイヤ図を表示する表示装置と、
     を備え、
     前記処理装置は、
     前記時間軸に平行に、前記線区名、前記線区に含まれる各駅の前記駅名、前記各駅の基準点からの前記距離程が表示された前記駅線を前記ダイヤ図内に表示する手段と、
     前記各駅の内、他の線区に属する分岐駅に対応した前記駅線の近傍に、分岐先の前記他の線区が対応付けられた分岐ボタンを前記ダイヤ図内に表示する手段と、
     前記分岐ボタンが押下された場合に、前記分岐先の前記線区コードに基づいて前記駅順データおよび前記分岐データを読込み、前記ダイヤ図内に表示している線区に係る前記駅線の一部を前記分岐駅を起点として前記他の線区に属する前記分岐駅以降の前記駅線に切り替えて表示する手段と、
    を有することを特徴とするダイヤ作成装置。

  2.  複数の線区を含む鉄道網内の前記線区の名称およびこれを識別する線区コードを線区データ、前記線区コードと共に、同一線区内における基準駅からの順序を示す駅順コード、駅名および前記基準駅からのキロ程の関係を駅順データ、および前記駅順コードおよび分岐先線区コードの関係を分岐データを読込み、時間軸と距離軸からなる二次元平面に、前記駅名に対応付けられた駅線およびダイヤスジを表示するダイヤ図を作成する処理装置と、
     前記作成された前記ダイヤ図を表示する表示装置と、
     を備え、
     前記処理装置は、
     前記時間軸に平行に、前記線区名、前記線区に含まれる各駅の前記駅名、前記各駅の基準点からの前記距離程が表示された前記駅線を前記ダイヤ図内に表示する手段と、
     前記各駅の内、他の線区に属する分岐駅に対応した前記駅線の近傍に、分岐先の前記他の線区が対応付けられた分岐ボタンを前記ダイヤ図内に表示する手段と、
    を有することを特徴とするダイヤ作成装置。

  3.  複数の線区を含む鉄道網内の前記線区の名称およびこれを識別する線区コードを線区データとして記憶する線区マスタと、
     前記線区コードと共に、同一線区内における基準駅からの順序を示す駅順コード、駅名および前記基準駅からのキロ程の関係を駅順データとして記憶する駅順マスタと、
     複数の前記線区に属する分岐駅に係る前記線区コード、前記駅順コードおよび分岐先線区コードの関係を分岐データとして記憶する分岐マスタと、
     前記線区マスタを参照し、前記キロ程と時刻の関係を示すダイヤ図の表示および作成の対象となる対象線区に係る前記線区コードを決定する線区決定部と、
     前記決定された線区コードをキーとして前記駅順マスタから前記駅順データを読込む駅順データ読込部と、
     前記読込まれた前記駅順データに含まれる前記線区コードおよび前記駅順コードをキーとして前記分岐マスタから前記分岐データを読込む分岐データ読込部と、
     前記駅順データに基づいて前記対象線区に含まれる駅の前記キロ程を表す駅線を描画し、この駅線に対応して前記駅名を表示すると共に、前記分岐先線区コードを関連付けた分岐ボタンを付した前記ダイヤ図を含むダイヤ作成画面を表示するダイヤ表示処理部と、
     前記分岐ボタンが押下された場合に、前記分岐先線区コードに基づいて前記ダイヤ図内の前記対象線区に係る前記駅線の一部を前記分岐駅を起点として前記他の線区に属する前記分岐駅以降の前記駅線に切り替えて表示する線区切替部と、
     前記ダイヤ作成画面において前記ダイヤ図内に連続した線で描画されたダイヤスジの座標を解析し、前記列車が走行する線区に係る前記線区コード、出発駅、到着駅、出発時刻および到着時刻の関係を示すダイヤデータを作成するダイヤデータ作成部と、
    を備えることを特徴とするダイヤ作成装置。
  4.  作成済みの前記ダイヤデータを記憶するダイヤデータ記憶部を更に備え、
     前記ダイヤ表示処理部は、前記ダイヤ作成画面に表示されている線区に係る前記線区コードに基づいて前記ダイヤデータ記憶部から前記ダイヤデータを読込み、前記ダイヤ図内に前記ダイヤデータに基づく前記ダイヤスジを表示し、かつ、
     前記ダイヤデータ作成部は、前記ダイヤ作成画面において前記ダイヤデータに基づく前記ダイヤスジが変更された場合、変更後のダイヤスジに基づいて新たなダイヤデータを作成して前記ダイヤデータ記憶部を更新することを特徴とする請求項3記載のダイヤ作成装置。

  5.  複数の線区からなる鉄道網内の前記線区の名称およびこれを識別する線区コードを線区データとして記憶する線区マスタを参照し、前記キロ程と時刻の関係を示すダイヤ図の表示および作成の対象となる対象線区に係る前記線区コードを決定する線区決定ステップと、
     前記線区コード、同一線区内における基準駅からの順序を示す駅順コード、駅名および前記基準駅からのキロ程の関係を駅順データとして記憶する駅順マスタから、前記線区決定ステップで決定された線区コードをキーとして前記駅順データを読込む駅順データ読込ステップと、
     複数の前記線区に属する分岐駅に係る前記線区コード、前記駅順コードおよび分岐先線区コードの関係を分岐データとして記憶する分岐マスタから、前記駅順データ読込ステップで読込まれた前記駅順データに含まれる前記線区コードおよび前記駅順コードをキーとして前記分岐データを読込む分岐データ読込ステップと、
     前記駅順データに基づいて前記対象線区に含まれる駅の前記キロ程を表す駅線を描画し、この駅線に対応して前記駅名を表示すると共に、前記分岐先線区コードを関連付けた分岐ボタンを付した前記ダイヤ図を含むダイヤ作成画面を表示するダイヤ作成画面表示ステップと、
     前記分岐ボタンが押下された場合に、前記分岐先線区コードに基づいて前記ダイヤ図内の前記対象線区に係る前記駅線の一部を前記分岐駅を起点として前記他の線区に属する前記分岐駅以降の前記駅線に切り替えて表示する線区切替ステップと、
     前記ダイヤ作成画面において前記ダイヤ図内に連続した線で描画されたダイヤスジの座標を解析し、前記列車が走行する線区に係る前記線区コード、出発駅、到着駅、出発時刻および到着時刻の関係を示すダイヤデータを作成するダイヤデータ作成ステップと、
    を有することを特徴とするダイヤ作成方法。

  6.  鉄道網内の複数の線区の名称および前記名称を識別する線区コードを、キロ程と時刻の関係を示すダイヤ図の表示対象とするために、決定する線区決定機能と、
     前記線区決定機能で決定された線区コードに対応した同一線区内における、基準駅からの順序を示す駅順コード、駅名および前記基準駅からのキロ程の関係を読込む駅順データ読込機能と、
     前記線区コードと前記駅順コードに対応し、分岐駅であることと、分岐先の線区を示す分岐先線区コードを読込む分岐データ読込機能と、
     前記線区コード、前記駅順コード、前記駅名と前記基準駅からのキロ程の関係に基づいて、前記対象線区に含まれる駅の前記キロ程を表す駅線を描画し、この駅線に対応して前記駅名を表示すると共に、前記分岐先線区コードを関連付けた分岐表示指示部を付した前記ダイヤ図を含むダイヤ作成画面を表示する表示機能と、
    を有することを特徴とする、記憶媒体に記憶可能で、コンピュータに実行させることができるダイヤ表示プログラム。
  7.  前記分岐表示指示部が分岐ボタンであり、前記分岐ボタンを、前記分岐駅の駅名近傍に表示したことを特徴とする請求項6記載のダイヤ表示プログラム。
  8.  前記分岐ボタンにより押下された場合に、前記分岐先線区コードに基づいて前記ダイヤ図内の前記対象線区に係る前記駅線の一部を前記分岐駅を起点として他の線区に属する前記分岐駅以降の前記駅線に切り替えて表示する線区切替機能を、
    さらに有することを特徴とする請求項7記載のダイヤ表示プログラム。
  9.  前記ダイヤ作成画面において前記ダイヤ図内に連続した線で描画されたダイヤスジの座標を解析し、前記列車が走行する線区に係る前記線区コード、出発駅、到着駅、出発時刻および到着時刻の関係を示すダイヤデータを作成するダイヤデータ作成機能を、
    さらに有することを特徴とする請求項8記載のダイヤ表示プログラム。
  10.  作成済みの前記ダイヤデータを記憶するダイヤデータ記憶機能を更に備え、
     前記表示機能は、前記ダイヤ作成画面に表示されている線区に係る前記線区コードに基づいて前記ダイヤデータ記憶機能に記憶された前記ダイヤデータを読込み、前記ダイヤ図内に前記ダイヤデータに基づく前記ダイヤスジを表示し、かつ、
     前記ダイヤデータ作成機能は、前記ダイヤ作成画面において前記ダイヤデータに基づく前記ダイヤスジが変更された場合、変更後のダイヤスジに基づいて新たなダイヤデータを作成して、前記ダイヤデータ記憶機能により記憶された前記ダイヤデータを更新することを特徴とする請求項9記載のダイヤ表示プログラム。
  11.  前記線区決定機能は、さらに、前記線区の名称および前記線区コードを線区データとして記憶する線区マスタを参照し、前記キロ程と時刻の関係を示すダイヤ図の表示対象となる対象線区に係る前記線区コードを決定し、
     前記駅順データ読込機能は、さらに、前記線区コード、前記駅順コード、前記駅名および前記基準駅からのキロ程の前記関係を駅順データとして記憶する駅順マスタから、前記線区決定機能で決定された線区コードをキーとして前記駅順データを読込み、
     前記分岐データ読込機能は、さらに、
     複数の前記線区に属する分岐駅に係る前記線区コード、前記駅順コードおよび前記分岐先線区コードの関係を分岐データとして記憶する分岐マスタから、前記駅順データ読込機能で読込まれた前記駅順データに含まれる前記線区コードおよび前記駅順コードをキーとして前記分岐データを読込むこと
    を特徴とする請求項6記載のダイヤ表示プログラム。
  12.  前記分岐データ読込機能は、さらに、分岐先の線区が、基準駅からの順序が昇順か、降順か示す分岐先線区方向を読込み、
     前記表示機能は、昇順の場合、前記分岐駅の下側に前記分岐ボタンを配置し、降順の場合、前記分岐駅の上側に前記分岐ボタンを配置すること
    を特徴とする請求項7記載のダイヤ表示プログラム。
PCT/JP2012/005936 2012-09-18 2012-09-18 ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラム WO2014045313A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
CA2865773A CA2865773C (en) 2012-09-18 2012-09-18 Diagram creating device, diagram creating method, and diagram display program
PCT/JP2012/005936 WO2014045313A1 (ja) 2012-09-18 2012-09-18 ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラム
EP12884869.4A EP2899094B1 (en) 2012-09-18 2012-09-18 Timetable creation device and timetable creation method
CN201280070616.5A CN104136304B (zh) 2012-09-18 2012-09-18 运行图制作装置及运行图制作方法
US14/469,641 US9522689B2 (en) 2012-09-18 2014-08-27 Diagram creating device, diagram creating method, and diagram display program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2012/005936 WO2014045313A1 (ja) 2012-09-18 2012-09-18 ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/469,641 Continuation US9522689B2 (en) 2012-09-18 2014-08-27 Diagram creating device, diagram creating method, and diagram display program

Publications (1)

Publication Number Publication Date
WO2014045313A1 true WO2014045313A1 (ja) 2014-03-27

Family

ID=50340676

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/005936 WO2014045313A1 (ja) 2012-09-18 2012-09-18 ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラム

Country Status (5)

Country Link
US (1) US9522689B2 (ja)
EP (1) EP2899094B1 (ja)
CN (1) CN104136304B (ja)
CA (1) CA2865773C (ja)
WO (1) WO2014045313A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105528435A (zh) * 2015-12-20 2016-04-27 河南思维自动化设备股份有限公司 交路车站防重叠绘制方法

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SG11201610454PA (en) * 2014-06-25 2017-02-27 Mitsubishi Electric Corp Device for creating construction gauge measurement diagram, device for creating construction gauge measurement diagram data, method for creating construction gauge measurement diagram, construction gauge measurement diagram, and construction gauge measurement diagram data
CN105383522B (zh) * 2015-12-09 2017-08-08 湖南中车时代通信信号有限公司 一种导航式列车运行径路图的制作方法和系统
CN106697002B (zh) * 2016-12-29 2019-05-17 卡斯柯信号有限公司 一种互联互通线路运行图的分布式编制方法
JP7169251B2 (ja) * 2019-06-14 2022-11-10 株式会社東芝 情報処理装置、情報処理方法及びコンピュータプログラム
CN110920697B (zh) * 2019-12-09 2022-02-15 交控科技股份有限公司 Ats站场图自动生成方法及装置
CN112406968B (zh) * 2020-10-28 2022-12-16 交控科技股份有限公司 列车计划运行图生成方法、装置与电子设备

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11310132A (ja) * 1998-04-30 1999-11-09 Hitachi Ltd 乗務員運用計画作成方法及び乗務員運用計画作成システム
JP2001180493A (ja) * 1999-12-24 2001-07-03 Hitachi Ltd 列車ダイヤ表示装置
JP2001278052A (ja) * 2000-03-31 2001-10-10 Kawasaki Heavy Ind Ltd 列車の計画ダイヤ作成方法及び作成支援装置
JP3544328B2 (ja) 1999-12-20 2004-07-21 三菱電機株式会社 ダイヤ図作成方法および装置
JP2006130981A (ja) * 2004-11-02 2006-05-25 Mitsubishi Electric Corp 輸送情報表示システム
JP2012201153A (ja) * 2011-03-24 2012-10-22 Toshiba Corp ダイヤ作成装置およびダイヤ作成方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7092894B1 (en) * 1994-09-01 2006-08-15 Harris Corporation Cost reactive scheduler and method
AUPS241002A0 (en) * 2002-05-20 2002-06-13 Tmg International Holdings Pty Limited Scheduling method and system for rail networks
US8538611B2 (en) * 2003-01-06 2013-09-17 General Electric Company Multi-level railway operations optimization system and method
BRPI0917242B1 (pt) * 2008-08-26 2019-12-10 Hitachi Ltd sistema e método de suporte de arranjo de operação
JP5183535B2 (ja) * 2009-03-16 2013-04-17 株式会社日立製作所 データ入力支援装置及びデータ入力支援方法
CN101853440A (zh) * 2010-05-11 2010-10-06 北京交通大学 列车运行计划自动编制的实现方法及其系统
CN102194162A (zh) * 2011-03-25 2011-09-21 上海磁浮交通发展有限公司 一种实现自动编制磁浮列车运行图的方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11310132A (ja) * 1998-04-30 1999-11-09 Hitachi Ltd 乗務員運用計画作成方法及び乗務員運用計画作成システム
JP3544328B2 (ja) 1999-12-20 2004-07-21 三菱電機株式会社 ダイヤ図作成方法および装置
JP2001180493A (ja) * 1999-12-24 2001-07-03 Hitachi Ltd 列車ダイヤ表示装置
JP2001278052A (ja) * 2000-03-31 2001-10-10 Kawasaki Heavy Ind Ltd 列車の計画ダイヤ作成方法及び作成支援装置
JP2006130981A (ja) * 2004-11-02 2006-05-25 Mitsubishi Electric Corp 輸送情報表示システム
JP2012201153A (ja) * 2011-03-24 2012-10-22 Toshiba Corp ダイヤ作成装置およびダイヤ作成方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105528435A (zh) * 2015-12-20 2016-04-27 河南思维自动化设备股份有限公司 交路车站防重叠绘制方法

Also Published As

Publication number Publication date
EP2899094A4 (en) 2016-08-03
CN104136304A (zh) 2014-11-05
CA2865773C (en) 2017-05-30
EP2899094B1 (en) 2018-11-07
CN104136304B (zh) 2016-03-23
CA2865773A1 (en) 2014-03-27
US20140365048A1 (en) 2014-12-11
US9522689B2 (en) 2016-12-20
EP2899094A1 (en) 2015-07-29

Similar Documents

Publication Publication Date Title
WO2014045313A1 (ja) ダイヤ作成装置、ダイヤ作成方法およびダイヤ表示プログラム
JP5671117B2 (ja) 運転整理支援システムおよびその方法
JP5185408B2 (ja) ダイヤ作成装置およびダイヤ作成方法
JP6995338B2 (ja) 情報処理システム、情報処理プログラム、情報処理装置および情報処理方法
WO2017046933A1 (ja) 運転整理支援装置およびシステム
JP2013190928A (ja) 地図上移動計画作成システム
JP5355338B2 (ja) 車群協調シミュレーション方法及び装置
JP5197790B2 (ja) 運転曲線作成装置および運転曲線作成方法
JP6184748B2 (ja) 地図上区間指定システム
JP2013134392A (ja) 通称データを生成するための装置及び方法、並びに通称データを生成するためのコンピュータプログラム及び該コンピュータプログラムを記録した記録媒体
JP2007045216A (ja) 車両・乗務員運用復旧装置
JP2017037552A (ja) 経路グラフ生成方法、装置、及びプログラム
JP6194392B2 (ja) 時刻表表示システムおよび時刻表表示プログラム
JP4536388B2 (ja) クライアント装置
JP2010188750A (ja) 運転整理支援システム
JP2019027863A (ja) 経路決定方法、情報処理装置、車載機器及びプログラム
JP2017204088A (ja) インデックス情報生成装置、列車運行出力装置、インデックス情報の生産方法及びプログラム
JP5303216B2 (ja) 経路検索サーバおよび経路検索プログラム
JP7388915B2 (ja) 運転整理支援装置および運転整理支援方法
JP2008224426A (ja) 交通ネットワークデータ作成装置および交通ネットワークデータを用いた経路探索システムならびに経路探索サーバ
WO2024106090A1 (ja) データ表示装置、データ表示方法、および鉄道業務システム
JP5007205B2 (ja) 情報処理装置、情報処理方法及びプログラム
CN116775746A (zh) 基于铁路枢纽的可视化方法、装置、设备及存储介质
JP6760725B2 (ja) 車両運用業務支援システム
JP6297317B2 (ja) 情報処理システム、情報処理方法、情報処理装置、端末装置、サーバ、および情報処理プログラム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 201280070616.5

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12884869

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2865773

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2012884869

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: JP