WO2013145525A1 - エネルギー管理装置、エネルギー管理システム、プログラムを記憶する記憶媒体 - Google Patents

エネルギー管理装置、エネルギー管理システム、プログラムを記憶する記憶媒体 Download PDF

Info

Publication number
WO2013145525A1
WO2013145525A1 PCT/JP2013/000634 JP2013000634W WO2013145525A1 WO 2013145525 A1 WO2013145525 A1 WO 2013145525A1 JP 2013000634 W JP2013000634 W JP 2013000634W WO 2013145525 A1 WO2013145525 A1 WO 2013145525A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
target
individual
overall
branch circuit
Prior art date
Application number
PCT/JP2013/000634
Other languages
English (en)
French (fr)
Inventor
清隆 竹原
Original Assignee
パナソニック株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by パナソニック株式会社 filed Critical パナソニック株式会社
Priority to EP13768295.1A priority Critical patent/EP2833505A4/en
Priority to CN201380017974.4A priority patent/CN104205564A/zh
Publication of WO2013145525A1 publication Critical patent/WO2013145525A1/ja
Priority to US14/497,505 priority patent/US9588159B2/en

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R21/00Arrangements for measuring electric power or power factor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00004Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the power network being locally controlled
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R17/00Measuring arrangements involving comparison with a reference value, e.g. bridge
    • G01R17/02Arrangements in which the value to be measured is automatically compared with a reference value
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05FSYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
    • G05F1/00Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
    • G05F1/66Regulating electric power
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00001Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by the display of information or by user interaction, e.g. supervisory control and data acquisition systems [SCADA] or graphical user interfaces [GUI]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/10The network having a local or delimited stationary reach
    • H02J2310/12The local stationary network supplying a household or a building
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Definitions

  • the present invention relates to an energy management apparatus, an energy management system, and a storage medium for storing a program for visualizing electric power used to achieve a reduction target set by an electric power consumer.
  • demand is set to reduce the amount of power used by setting a target value for the amount of power used by consumers and displaying the set target value and the amount of power used by consumers in a comparable manner.
  • Techniques for raising awareness at home have been proposed.
  • a unit period such as one year or one month is divided into periods such as one month or one day, and a target value is set for each divided period.
  • the amount of energy consumed thereafter is predicted from the target value for each divided period.
  • the ratio of the actual value to the target value is calculated as the target ratio for each divided period, and the subsequent energy amount is predicted by using the transition of the target ratio.
  • a cumulative value of the energy amount in the unit period is obtained from the predicted energy amount, and whether or not the target can be achieved is predicted based on the cumulative value.
  • the above-mentioned document does not disclose a technique for setting a target value, and particularly describes how to set each target value when managing the energy amount for each energy management target. Not.
  • the object of the present invention is to display the relationship between the transition of the measured value and the target value for each branch circuit or load device, thereby enabling energy management awareness for consumers, By appropriately assigning the reduction target set for the power consumption of the main circuit to the target value of the power consumption for each branch circuit or load device, it was possible to achieve the reduction target so as not to cause a large excess or deficiency.
  • An energy management apparatus, an energy management system, and a storage medium for storing a program are provided.
  • the energy management device acquires, from the measuring device, a measurement value of the power amount of each branch circuit or load device in the consumer and the power amount of the main circuit from the measuring device, An overall reference value is obtained based on a history of measured values for the power consumption of the main circuit, and an overall setting unit that sets a reduction target for the overall reference value as an overall target value; and the overall setting that is set in the overall setting unit An individual setting unit that sets an individual target value by allocating a target value to the amount of power for each branch circuit or load device to be allocated, and the individual target value and the measurement value acquired by the acquisition unit And a display unit that displays the above on one screen.
  • the overall setting unit includes a period designating unit that designates a target period for setting the overall target value.
  • the individual setting unit is a ratio of a power amount of the main circuit to a total sum of the measured values of the power amount of the branch circuit or the load device that is the assignment target. It is preferable that the individual target value is set by multiplying the amount of power of the branch circuit or the load device to obtain an individual reference value and equally distributing the overall target value to the individual reference value.
  • the individual setting unit obtains an individual reference value before correction based on a history of measured values for the power amount of the branch circuit or the load device, and the branch circuit or the allocation target
  • the ratio of the overall reference value to the sum of the individual reference values before correction in the load device is multiplied by the individual reference value before correction for each branch circuit or the load device to obtain an individual reference value, It is preferable to set the individual target value by evenly distributing the overall target value to a reference value.
  • the energy management device further includes a permission / rejection storage unit that stores permission / rejection information indicating whether or not power reduction is performed for each branch circuit or the load device, and the individual setting unit is written in the permission / rejection storage unit It is preferable to provide a selection unit that allows the user to set the availability information.
  • the individual setting unit arranges the power amount of the branch circuit or the load device in descending order, and the one or more branch circuits or the branch circuit or the load device whose power amount is higher It is preferable to select a load device as the allocation target.
  • a type classification unit that classifies the type of power change using a change pattern of the electric energy of the branch circuit or the load device, and the branch circuit or the type using the type classified by the type classification unit It is preferable to further include a display instruction unit that displays on the display unit advice for reducing the amount of power of the load device.
  • An energy management system includes the measuring device attached to a distribution board installed in a consumer or a load device used by the consumer and measuring the amount of power, and any one of the energy management devices described above. It is characterized by.
  • a storage medium for storing a program according to the present invention includes a computer, an acquisition unit that acquires a measurement value of the power amount of each branch circuit or load device in a consumer and the power amount of the main circuit from the measuring device, and the main circuit
  • An overall setting value for obtaining an overall reference value based on a history of measured values for the amount of electric power and setting a reduction target for the overall reference value as an overall target value; and the overall target value set in the overall setting portion Are allocated to each branch circuit or load device to be allocated, an individual setting unit for setting an individual target value, and the individual target value and the measurement value acquired by the acquisition unit. It is made to function as an energy management apparatus provided with the display part displayed on one screen.
  • the configuration of the present invention it is possible to make consumers aware of energy management by displaying the relationship between the transition of the measured value and the target value for each branch circuit or load device.
  • the reduction target set for the power consumption of the main circuit is appropriately allocated to the target value of the power consumption for each branch circuit or load device, it is possible to achieve the reduction target without causing a large excess or deficiency. There is an advantage of becoming.
  • FIG. 1 It is a block diagram which shows the energy management apparatus which concerns on Embodiment 1.
  • FIG. 2 is a block diagram which shows an example of the energy management system using the energy management apparatus which concerns on Embodiment 1.
  • FIG. It is a block diagram which shows the principal part of the energy management system shown in FIG. It is a figure which shows the example of data of the whole target memory
  • FIG. It is a figure which shows the example of data of the log
  • FIG. It is a figure which shows the example of data of the individual target memory
  • FIG. It is a figure which shows the example of a display in the energy management apparatus which concerns on Embodiment 1.
  • FIG. It is a block diagram which shows the energy management apparatus which concerns on Embodiment 2.
  • FIG. It is a figure which shows the example of the screen which selects the allocation object in the energy management apparatus which concerns on Embodiment 2.
  • FIG. It is a figure which shows the example of data of the availability storage part used for the energy management apparatus which concerns on Embodiment 2.
  • FIG. It is a figure which shows the example of data of the separate target memory
  • FIG. It is a figure which shows the example of grouping of the load equipment in the energy management apparatus which concerns on Embodiment 2.
  • FIG. It is a figure which shows the example of a display when a load apparatus is grouped in the energy management apparatus which concerns on Embodiment 2.
  • FIG. It is a figure which shows the example of a display of the screen which sets the target value in the energy management apparatus which concerns on Embodiment 2.
  • FIG. It is a figure which shows the example of a display of the screen which sets the target value in the energy management apparatus which concerns on Embodiment 2.
  • FIG. It is a figure which shows the example of a display of the screen which sets the target value in the energy management apparatus which concerns on Embodiment 2.
  • FIG. It is a figure which shows the example of a display of the screen which sets the target value in the energy management apparatus which concerns on Embodiment 2.
  • FIG. It is a figure explaining the principle of the energy management apparatus which concerns on Embodiment 3.
  • FIG. It is a figure explaining the principle of the energy management apparatus which concerns on Embodiment 3.
  • FIG. It is a figure explaining the principle of the energy management apparatus which concerns on Embodiment 3.
  • FIG. It is a figure which shows the example of a display which added the advice in the energy management apparatus which concerns on Embodiment 3.
  • FIG. It is a figure which shows the example of a display which added the advice in the energy management apparatus which concerns on Embodiment 3.
  • FIG. It is a figure which shows the example of a display which added the advice in the energy management apparatus which concerns on Embodiment 3.
  • FIG. It is a figure which shows the example of a display which added the advice in the energy management apparatus which concerns on Embodiment 3.
  • FIG. It is
  • Embodiment 1 In the present embodiment described below, an example in which the energy management apparatus is used in a house is taken as an example. However, the energy management apparatus of this embodiment can also be used in buildings such as office buildings and commercial buildings in addition to houses. In any case, if the customer is conscious of reducing the amount of power to be used, the reduction target can be managed by using the energy management device described below.
  • a power line L1 that supplies power from a power supply system 3 of a commercial power source to a distribution board 2 arranged at a consumer, and a plurality of power lines L2 that supply power to a load device 4 in a house, Is connected. It is assumed that the distribution board 2 is connected to the power supply system 3 of the commercial power supply through the power line L1, but the distribution board 2 is connected to a private power generation apparatus such as a solar power generation apparatus or a fuel cell, or a storage battery. A device or the like may be connected.
  • the distribution board 2 includes a main breaker 21 connected to a power line L ⁇ b> 1 that supplies electric power from the power system 3, and a plurality of power supplies connected to the load side of the main breaker 21 via conductors L ⁇ b> 3.
  • the branch breaker 22 is connected to a power line L2 that connects the load device 4.
  • the amount of power passing through the power line L2 and the conductor L3 is measured by the measuring device 5 attached to the distribution board 2.
  • the power line L1 and the conductor L3 correspond to a main circuit, and the power line L2 corresponds to a branch circuit.
  • the measuring device 5 includes a detection unit 51 that detects the outputs of the power sensors C0, C1 to Cn arranged on the power line L2 and the conductor L3, and a plurality of power lines L2 and conductors L3 from the output of the detection unit 51. And an arithmetic unit 50 for determining the amount of power passing through each of the above. Furthermore, the measurement device 5 includes a communication interface unit 52 for notifying other devices of the amount of power obtained by the calculation unit 50.
  • the “communication interface unit” is abbreviated as “communication I / F”.
  • the measuring device 5 measures the amount of power in units of a branch circuit (that is, the power line L2) attached to the distribution board 2 and connected to the branch breaker 22, but the measuring device 5 is connected to the load device 4. May be attached to measure the amount of power for each load device 4. Alternatively, the measuring device 5 may be attached to an outlet (not shown) connected to the power line L2, and the amount of power may be measured in units of outlets.
  • a branch circuit that is, the power line L2
  • the measuring device 5 may be attached to an outlet (not shown) connected to the power line L2, and the amount of power may be measured in units of outlets.
  • the measuring device 5 measures the amount of power that has passed through the main circuit, the amount of power that has passed through each branch circuit, or the amount of power that has been consumed by each load device 4.
  • the amount of power that has passed through the main circuit is referred to as the amount of power of the main circuit
  • the amount of power that has passed through the branch circuit is referred to as the amount of power of the branch circuit
  • the amount of power consumed by the load device 4 is the amount of power of the load device 4 Say.
  • load devices 4 such as air conditioners and IH cookers are often associated with branch circuits on a one-to-one basis. In this case, the power amount of the branch circuit matches the power amount of the load device 4.
  • branch circuit Unless the distinction between the branch circuit and the load device 4 is particularly necessary, only “branch circuit” is described. That is, if there is no need to distinguish between the power amount of the branch circuit and the power amount of the load device 4, it is described as the power amount of the branch circuit.
  • the power sensors C0 and C1 to Cn are used as the power sensors C0 and C1 to Cn.
  • the power sensors C0, C1 to Cn are preferably configured to measure both current and voltage.
  • the detection unit 51 has a function of performing pre-processing such as offset adjustment, noise removal, and amplification of the outputs of the power sensors C0 and C1 to Cn, and AD conversion that converts a signal after the pre-processing into a digital signal.
  • the arithmetic unit 50 includes a device that operates by executing a program, such as a microcomputer, as a main hardware element.
  • the communication I / F 52 preferably performs wireless communication, but may be configured to perform wired communication.
  • the amount of power measured by the measuring device 5 is the amount of power in a sampling time (for example, 1 minute), and the measuring device 5 sequentially transmits the amount of power for each sampling time to the energy management device 1 as a measured value.
  • the sampling time described above is an example, and the sampling time is set appropriately.
  • the energy management device 1 includes a controller 11 that communicates with the measurement device 5, and an operation display device 12 that includes a display that displays information obtained by the controller 11 and an operation device that gives instructions to the controller 11. .
  • the operation display device 12 uses a flat panel display such as a liquid crystal display as the display, and uses a mechanical switch such as a push button switch as the operation.
  • the display device and the operation device of the operation display device 12 may be configured by a touch panel, or may be configured by combining a touch panel and a mechanical switch.
  • the operation display device 12 also includes a display unit and a circuit unit for operating the operation unit, and the display unit is configured by the display unit and the circuit unit.
  • the controller 11 includes a communication unit 111 for communicating with other devices.
  • the communication unit 111 includes a communication I / F 1111 as an acquisition unit that acquires measurement values from the measurement device 5 through communication with the measurement device 5, a communication I / F 1112 for communicating with the operation display device 12, and the host device 6. And a communication I / F 1113 for communicating with each other.
  • the communication I / F 1113 communicates with the host device 6 via the communication network NT such as the Internet.
  • the host device 6 is, for example, a computer server, and is operated by a power company that performs dispatch power or a service provider that performs power management on behalf of the power company.
  • the host device 6 has a function of notifying the controller 11 of a power amount reduction target according to the power supply status from the power company.
  • the controller 11 includes a calculation unit 110 and a storage unit 112 in order to manage a reduction target of electric energy in the consumer.
  • the arithmetic unit 110 includes a device that operates by executing a program, such as a microcomputer, as a main hardware element.
  • the controller 11 also includes a real-time clock (RTC) 113 that measures the current date and time.
  • RTC real-time clock
  • the calculation unit 110 sets a reduction target with respect to a reference value (hereinafter referred to as an overall reference value) as an overall target value for the amount of power of the main circuit including the conductor L3 detected by the power sensor C0. 1101.
  • the overall setting unit 1101 includes a target specifying unit 1103 that sets a reduction target, and a period specifying unit 1104 that specifies a target period for executing power reduction.
  • the reduction target is given as a reduction rate with respect to the amount of power that is the overall reference value
  • the overall target value is the amount of power obtained by subtracting the reduction rate from the amount of power that is the overall reference value, but represents the same concept. In the following, they are treated equally.
  • the period specification unit 1104 determines the target period by combining a period selected in units of days from one day, one week, one month, one year, etc., and a time zone in which the reduction target is to be achieved.
  • the determined target period is stored in the overall target storage unit 1121 provided in the storage unit 112.
  • the period designating unit 1104 sets three-stage target periods of short, medium, and long periods in the overall target storage unit 1121.
  • the short term is one day
  • the middle term is one week
  • the long term is two months.
  • the target specifying unit 1103 of the overall setting unit 1101 sets a reduction target (reduction rate in FIG. 4) for each target period.
  • a reduction target reduction rate in FIG. 4
  • the short-term reduction target is 20%
  • the medium-term reduction target is 15%
  • the long-term reduction target is 10%.
  • This reduction target is a reduction rate with respect to an appropriately determined overall reference value, and this overall reference value is obtained in principle from the usage history of electric energy at the consumer.
  • the overall reference value can also be given as a standard value based on the family structure of the customer.
  • the target period and the reduction target stored in the overall target storage unit 1121 by the overall setting unit 1101 are given from the host device 6 through the communication I / F 1113, or in accordance with the operation of the operation display device 12 by the user, the communication I / F 1112. Given through. Therefore, the target period and reduction target are determined by the intention of the user or a request from the electric power company.
  • the storage unit 112 integrates the electric energy for each sampling time acquired from the measuring device 5 and stores the electric energy from the sequential storage unit 1122 for each unit time (for example, 1 hour).
  • the history storage unit 1123 stores a change in electric energy for each unit time.
  • the sequential storage unit 1122 includes a master circuit (simply shown as “main trunk” in FIG. 5) and branch circuits (in FIG. 5, a plurality of branches D1 to Dn) acquired from the measuring device 5 at each sampling time.
  • the electric energy for each (displayed) is integrated and stored.
  • the time amount is not given because the power amount for each sampling time is integrated, but the sequential storage unit 1122 is not the integrated value of the power amount for each sampling time but the power amount acquired for each sampling time. May be stored together with the time stamp.
  • the calculation unit 110 transfers the electric energy stored in the sequential storage unit 1122 to the history storage unit 1123 every hour on the hour measured by the real time clock 113. At this time, the calculation unit 110 stores the time stamp of 1 hour before in the history storage unit 1123 together. In addition, when the calculation unit 110 transfers the power amount from the sequential storage unit 1122 to the history storage unit 1123, the calculation unit 110 resets the power amount stored in the sequential storage unit 1122 to 0.
  • the history storage unit 1123 has one hour for each main circuit (represented simply as a main in FIG. 6) and branch circuits (represented as a plurality of branches D1 to Dn in FIG. 6). Each power amount is stored in association with a time stamp. That is, the history storage unit 1123 stores 24 sets of electric energy per day. The relationship between these times is an example, and the time interval for acquiring the electric energy from the measuring device 5 may not be the sampling time, and the stored value is transferred from the sequential storage unit 1122 to the history storage unit 1123. The time interval may be 15 minutes or 30 minutes instead of 1 hour.
  • the history storage unit 1123 has a storage capacity for storing electric energy for one year or more.
  • the overall setting unit 1101 sets a long-term reduction target when a reduction target is set in the overall target storage unit 1121 in response to a request from the host device 6. In this case, the period, time zone, and reduction rate are given from the host device 6. Therefore, the overall setting unit 1101 stores the period and time zone given from the host device 6 and the reduction rate as a long-term reduction target in the overall target storage unit 1121.
  • the overall standard value for such long-term reduction targets is obtained from the history (actual record) of the measured values for the power consumption of the main circuit in the same period one year ago.
  • the peak value of the measured value in the corresponding period among the measured values of the actual amount of power stored in the history storage unit 1123 is used as the overall reference value.
  • the representative value used for the overall reference value may be an average value in addition to the peak value.
  • the calculation unit 110 includes an individual setting unit 1102 that extracts a required power value from the history storage unit 1123, obtains an individual reference value, and sets an individual target value for each branch circuit.
  • target value is simply referred to as “target value” unless there is a particular need for distinction.
  • the representative value of the electric energy for each branch circuit obtained by the individual setting unit 1102 is not a value generated at the same time on the same month. Therefore, the amount of power obtained by the sum of the representative values for each branch circuit or load device 4 usually does not match the representative value of the power amount of the main circuit in the corresponding period (the overall reference value of the main circuit). Therefore, in order to determine the individual reference value for each branch circuit or load circuit 4 from the actual power amount stored in the history storage unit 1123, it is necessary to correct the actual power amount.
  • the individual setting unit 1102 extracts the required power amount and stores it in the individual target storage unit 1124 provided in the storage unit 112.
  • the individual target storage unit 1124 includes an area for storing the electric energy extracted from the history storage unit 1123 as “an individual reference value before correction” for each branch circuit or load device 4.
  • 7 includes the load device 4 (in FIG. 7, load devices 41 to 46) in some branch circuits (branches D1 to D6) of the plurality of branch circuits (branches D1 to Dn). Is displayed in a one-to-one correspondence.
  • the individual setting unit 1102 corrects the “individual reference value before correction” for each branch circuit stored in the individual target storage unit 1124 and calculates the individual reference value for each branch circuit.
  • the ratio of the overall reference value of the main circuit calculated from the history storage unit 1123 to the sum of the “value” is used. That is, the individual setting unit 1102 uses a value obtained by multiplying this ratio by the “individual reference value before correction” for each branch circuit as the individual reference value for each branch circuit. That is, the individual reference value is obtained by the following equation.
  • the calculation of the following expression is performed at a time interval for transferring the stored value from the sequential storage unit 1122 to the history storage unit 1123.
  • Individual reference value (Individual reference value before correction) x (Overall reference value of main circuit) / (Total of individual reference values before correction)
  • the corrected individual reference value obtained by the individual setting unit 1102 according to the above formula is stored in the individual target storage unit 1124, and the coefficient obtained from the reduction rate stored in the overall target storage unit 1121 is multiplied by this individual reference value.
  • a target value for each branch circuit is calculated.
  • the calculated target value is stored in the individual target storage unit 1124.
  • the individual reference of the individual target storage unit 1124 shown in FIG. 7 For example, if the sum of the “individual reference values before correction” in the individual target storage unit 1124 shown in FIG. 7 is 10 kWh and the overall reference value of the main circuit is 9 kWh, the individual reference of the individual target storage unit 1124 In the value item, a value obtained by multiplying the “individual reference value before correction” by 0.9 is stored. Further, since the long-term reduction rate stored in the overall target storage unit 1121 shown in FIG. 4 is 10%, a value that is 90% with respect to the individual reference value is the target value item of the individual target storage unit 1124. Stored.
  • the individual setting unit 1102 of this embodiment distributes the overall target value set in the overall setting unit 1101 to the amount of power for each branch circuit or load device 4, that is, multiplies the individual reference value by the reduction rate.
  • a target value for each branch circuit or load device 4 is set.
  • the calculation unit 110 displays on the operation display device 12 the target value for each branch circuit stored in the individual target storage unit 1124 and the power amount of the day acquired by the measurement device 5 and stored in the history storage unit 1123.
  • An instruction unit 1105 is provided.
  • the power amount of the day stored in the history storage unit 1123 includes the latest measured value measured by the measuring device 5. Therefore, the measured value is displayed on the screen of the operation display device 12 together with the target value for each branch circuit.
  • Figure 8 shows a display example.
  • the hourly transition of the electric energy for one branch circuit (branch D7) is indicated by a bar graph G1
  • the target value (0.41 kWh) set for this branch circuit is indicated by a horizontal line T1.
  • the horizontal axis represents the time when one day is expressed in 24 hours.
  • the electric energy exceeds the target value between 10 and 11:00. Therefore, there is a possibility that the amount of power at 11-12 o'clock also exceeds the target value.
  • the display instruction unit 1105 highlights and displays the bar representing the amount of power during this period (in the figure, the highlighted display is indicated by a bold line). This display alerts the user to reduce the amount of power used.
  • the storage unit 112 of the controller 11 is provided with an availability storage unit 1125 that stores availability information indicating whether or not to reduce the amount of power for each branch circuit.
  • the configuration of the controller 11 illustrated in FIG. 9 is different from the controller 11 according to the first embodiment illustrated in FIG.
  • the availability information specifies that the corresponding branch circuit is not or cannot be reduced in electric energy.
  • the individual setting unit 1102 of this embodiment includes a selection unit 1106 that allows the user to set the availability information written in the availability storage unit 1125 using the operation display device 12.
  • the selection unit 1106 instructs the display instruction unit 1105 to display on the screen of the operation display device 12 as shown in FIG.
  • the screen shown in FIG. 10 displays selection buttons B1 to B8 for selecting whether or not power reduction is possible for each branch circuit.
  • selection buttons B1 to B8 In the display area of the selection buttons B1 to B8, one of the character strings “can” and “cannot” is displayed.
  • the user can switch the character string from “can” to “cannot” or “cannot” to “can” each time the selection buttons B1 to B8 are pressed.
  • the selection unit 1106 associates the character string displayed in the display area of the selection buttons B1 to B8 with the availability information, and the availability storage unit stores the availability information corresponding to the character string selected on the screen of the operation display device 12. 1125 is written. That is, the availability information for each branch circuit selected by the user is set in the availability storage unit 1125. The availability information written in the availability storage unit 1125 corresponding to the screen shown in FIG. 10 is shown in FIG.
  • the operation display device 12 is a touch panel. Since the operation of the selection buttons B1 to B8 is similar to the operation of the push button switch, the term “pressing” is used, but the display area of the selection buttons B1 to B8 is touched or touched with a fingertip or a pen tip. It means close to the degree.
  • the target value for each branch circuit is set by evenly distributing the overall target value set for the main circuit to all the branch circuits. Since the amount of electric power is not reduced, the entire target value cannot be evenly distributed. Therefore, the target value for each branch circuit is set according to the following procedure.
  • an individual reference value is obtained for each branch circuit.
  • a target value is set as shown in FIG. That is, in the example shown in FIGS. 10 and 11, since it is specified that the two branch circuits (branch D5 and branch D8) do not reduce the amount of power, the target value is an individual reference value for these branch circuits. Is consistent with In addition, the reduction rate of the target value with respect to the individual reference value is greater than the reduction rate set for the main circuit for the other branch circuits.
  • the overall reference value of the main circuit is 9 kWh and the reduction rate, which is the reduction target, is 10%
  • the overall target value of the main circuit is 8.1 kWh.
  • the sum of the “individual reference values before correction” is 10 kWh
  • the total of the “individual reference values before correction” of the branch circuit that cannot be reduced is 2 kWh
  • the remaining 8 kWh is the target value of the main circuit. It will be the amount of power reduced to achieve. Accordingly, the following relationship is established.
  • the branch circuit selected as the power reduction target is referred to as an “allocation target” branch circuit.
  • the overall target value of the main circuit is 8.1 kWh
  • the sum of the individual reference values before correction relating to the branch circuit to be assigned is 8 kWh
  • the sum of the individual reference values before correction relating to the branch circuit not to be assigned Is 2 kWh
  • the present embodiment selects each branch circuit that the user cannot reduce the amount of power, and excludes the selected branch circuit for each branch circuit necessary to achieve the overall target value. Set the target value. Therefore, it is possible to obtain a target value guideline for achieving the overall target value while maintaining the operation of the load device 4 that cannot reduce the amount of power.
  • the information displayed on the operation display device 12 is the same as that in the first embodiment.
  • the user selects whether or not the amount of power can be reduced for each branch circuit, but the user may select a branch circuit that reduces the amount of power. That is, instead of passively selecting a branch circuit that cannot reduce the amount of power, a branch circuit that is intended to reduce the amount of power may be positively selected. For example, if the load device 4 is an air conditioner, a lighting device, an IH cooker, etc., the power consumption is relatively large and the amount of power can be reduced. Therefore, these load devices 4 are connected to reduce the amount of power. The branch circuit may be positively selected.
  • the processing after selection is the same as the operation described above.
  • a target value may be set for each type of the load device 4.
  • 8 circuits are air conditioners
  • 3 circuits are air conditioners
  • 2 circuits are lighting devices
  • 1 circuit is an IH cooker
  • the remaining 2 circuits are others (outlets, etc.).
  • a branch circuit corresponding to an air conditioner, a lighting device, and an IH cooker is selected as a target for reducing the electric energy.
  • a target value obtained by summing the electric energy for each load device 4 is set. In this case, as shown in FIG.
  • the bar graph G2 showing the transition of the measured value obtained by adding up the electric energy of the branch circuit to which the load device 4 of the same type is connected, not the individual branch circuit, shows the target value (4 kWh). It is displayed together with the horizontal line T2 that represents.
  • target management for each type of load device 4 becomes possible. Further, since the screen of the operation display device 12 is configured with the type of the load device 4 as a unit, the number of screens is smaller than when the screen of the operation display device 12 is configured with the branch circuit as a unit. For this reason, the user is not required to select a screen.
  • the target value is managed collectively for each type of the load device 4, but a configuration for managing the target value for each room of the customer can also be adopted.
  • a bar graph indicating the transition of the electric energy for each branch circuit is displayed on the screen of the operation display device 12.
  • a screen for displaying the target value and the individual reference value for each branch circuit side by side may be provided so that all branch circuits can be listed.
  • FIG. 15A shows a display example when the overall target value of the main circuit is evenly distributed to all the branch circuits as in the first embodiment.
  • white bars indicate target values
  • shaded bars indicate individual reference values (actual values one year ago). Note that the target value and the individual reference value may be displayed in different colors.
  • the individual reference values for each branch circuit are arranged in descending order on the screen of the operation display device 12. As a result, it is possible to intuitively understand a branch circuit that needs to increase the amount of power reduction in order to achieve the overall target value.
  • FIG. 15B shows a display example when the branch circuit is selected as not to be assigned as in the second embodiment. That is, by performing an operation of pulling up the bar indicating the target value to the individual reference value from the state displayed as shown in FIG. 15A, the corresponding branch circuit can be excluded from the allocation target. For example, the bar is pulled up to the individual reference value by performing an operation of touching the bar with a fingertip and sliding the touched fingertip upward. In addition, for the branch circuit excluded from the allocation target, a shaded bar is displayed instead of the white bar indicating the target value. Also in this case, the bar indicating that the bar is excluded from the allocation target may be displayed in a color different from the individual reference value.
  • the branch circuit is excluded from the assignment target as described above, the target values of the other branch circuits are recalculated, and the length of the bar representing the target value is changed. This process is performed by the individual setting unit 1102.
  • FIG. 15C shows an example in which the target value is changed to be lowered, and the target value is lowered for the branch circuits of the branch D1 and the branch D3.
  • a bar with cross-hatching is displayed instead of a white bar to indicate that the target value has been changed. Also in this case, it is preferable that the changed target value is displayed in a color different from that of other bars.
  • the target values of the remaining branch circuits (branch D2, branch D4, branch D7, branch D6) are recalculated along with the change of the target value of the branch circuit of branch D1 and branch D3, and the target value is Will rise. However, since these branch circuits are not directly changed by the user, they are displayed as white bars. This processing is also performed by the individual control unit 1102.
  • the individual setting unit 1102 may select one or a plurality of branch circuits from the one with the larger measured power amount as the assignment target branch circuit. In this case, the allocation target is only one or a plurality of branch circuits having a higher power amount in the consumer, and the target value setting operation is facilitated.
  • the user selects a branch circuit to be allocated to reduce the amount of power.
  • the branch circuit to which the load device 4 to be allocated is connected is automatically detected by monitoring the change in the electric energy used in the load device 4 and classifying the type of the load device 4 using the change pattern. A configuration example to be extracted automatically will be described.
  • the calculation unit 110 of the controller 11 includes a type classification unit 1107 (see FIG. 9) that classifies the type of the load device 4 connected to the branch circuit from the change pattern of the electric energy.
  • the display instruction unit 1105 for displaying a bar graph indicating the transition of the power amount on the current day and the target value on the screen of the operation display unit 12 also displays advice for reducing the power amount according to the type of the load device 4.
  • the type classification unit 1107 measures the amount of power every predetermined time for each branch circuit (the time interval at which the stored value is transferred from the sequential storage unit 1122 to the history storage unit 1123), and the change in the amount of power and a threshold value set appropriately.
  • the load device 4 is classified into three types according to the relationship.
  • the type classification unit 1107 sets a threshold value Th (100 Wh in the illustrated example) as appropriate.
  • Th 100 Wh in the illustrated example
  • the load device 4 such as a refrigerator in which power is always consumed
  • the amount of power per predetermined time does not fall below the threshold Th as shown in FIG. 16A.
  • the load device 4 that is turned on several times a day such as an air conditioner or a lighting device, has a relatively high frequency of power consumption per predetermined time as shown in FIG. Some time zones do not exceed.
  • the load device 4 in which the power is turned on for a short time or is not frequently turned on has a very low frequency that the power amount exceeds the threshold Th as shown in FIG. 16C.
  • the load device 4 whose power consumption change pattern is as shown in FIG. 16A is called type 1
  • the load device 4 as shown in FIG. 16B is called type 2
  • the load device 4 as shown in FIG. 16C is called type 3.
  • type 1 the load device 4 as shown in FIG. 16A
  • type 2 the load device 4 as shown in FIG. 16B
  • type 3 the load device 4 as shown in FIG. 16C
  • type 1 the load device 4 as shown in FIG. 16C
  • type 1 the load device 4 as shown in FIG. 16C
  • type 3 the load device 4 as shown in FIG. 16C
  • the threshold Th For example, if the amount of electric power per hour is compared with the threshold Th, type 1, type 2, and type 3 can be classified according to the number of times the amount of electric power exceeds the threshold Th.
  • the number of times that the amount of power exceeds the threshold Th can be classified as 20 types or more as Type 1, 4 times or more and 19 times or less as Type 2, and 3 times or less as Type 3.
  • the branch circuit to which the type 1 load device 4 is connected cannot reduce the amount of power.
  • the branch circuit to which the type 1 load device 4 is connected is excluded from the assignment target as a branch circuit that does not reduce the amount of power.
  • the amount of electric power may be reduced by setting the internal temperature as in the refrigerator, so if the load circuit 4 is a refrigerator, the internal temperature can be increased.
  • the advice indicating that the amount of power can be reduced may be displayed on the screen of the operation display device 12.
  • the branch circuit to which the type 2 or type 3 load device 4 is connected can reduce the amount of power.
  • the user can reduce the amount of power in the target period in which power reduction is performed, or reduce the power amount in the target period by using it outside the target period. It is preferable to give advice. This type of advice is displayed on the screen of the operation display device 12.
  • type 3 load device 4 Since type 3 load device 4 is operated less frequently, type 3 load device 4 is advised to exclude the time zone to be used from the target period. For type 2 load device 4, advice is given to select an operation that shortens the time to use or consumes less power. For example, what is necessary is just to give the advice to the air conditioner which is the load apparatus 4 of type 2 to stop driving
  • the numerical example described above is an example, and is set as appropriate according to the actual use environment.
  • FIGS. 17A to 17C show display examples of the screen of the operation display device 12.
  • FIG. 17A corresponds to a branch circuit to which a load device 4 of type 1 is connected, and shows a bar graph representing the amount of power per hour and a horizontal line T1 representing a target value, and the power amount exceeded the target value.
  • the advice "let's go into energy saving operation mode" is shown.
  • FIG. 17B corresponds to the branch circuit to which the load device 4 of type 2 is connected, and the advice that “continuous use continues. Let's turn off the power” is shown because the electric energy exceeded the target value. Yes.
  • FIG. 17C corresponds to the branch circuit to which the load device 4 of type 3 is connected, and because the amount of electric power exceeded the target value, it is advised that “use outside the energy saving time zone is recommended in the future”. It is shown.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Automation & Control Theory (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Electromagnetism (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Human Computer Interaction (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

 需要家に対してエネルギー管理の意識付けを行うことを可能にし、かつ大きな過不足が生じないように削減目標を達成させることを可能にする。コントローラは、需要家における分岐回路ごとの電力量と主幹回路の電力量との計測値を通信インターフェイス部を通して計測装置から取得する。演算部は、主幹回路の電力量についての計測値の履歴をもとに全体基準値を求め、全体基準値に対する削減目標を全体目標値として設定する全体設定部と、全体目標値を割当対象である分岐回路ごとの通過電力に配分することにより個別目標値を設定する個別設定部とを備える。表示指示部は、通信インターフェイス部を通して計測装置から取得した計測値と、個別目標値とを、通信インターフェイス部を通して操作表示装置の画面に表示させる。

Description

エネルギー管理装置、エネルギー管理システム、プログラムを記憶する記憶媒体
 本発明は、電力の需要家において設定された削減目標を達成するために使用している電力を可視化するエネルギー管理装置、エネルギー管理システム、プログラムを記憶する記憶媒体に関するものである。
 従来から、需要家において使用する電力量に目標値を設定し、設定された目標値と需要家が使用した電力量とを比較可能に表示することによって、使用する電力量を削減するように需要家に意識付けを行う技術が提案されている。
 たとえば、日本国特許公開2005-234746号公報には、1年間や1ヶ月間のような単位期間を、1ヶ月や1日のような期間に分割し、分割した期間ごとに目標値を設定し、分割した期間ごとの目標値から以後に消費されるエネルギー量を予測することが記載されている。具体的には、分割された期間ごとに目標値に対する実績値の比率が目標比率として算出され、目標比率の推移が用いられることにより以後のエネルギー量が予測されている。さらに、予測されたエネルギー量から単位期間におけるエネルギー量の累積値が求められ、この累積値に基づいて目標達成の可否が予測されている。
 上記文献には、エネルギー管理対象ごとに電力量のデータを収集してもよい旨の記載があり、エネルギー量を分電盤の分岐前の1系統のみで行う場合だけではなく、エネルギー管理対象ごとに個別に行う場合も示唆されている。
 ところで、上記文献には、目標値を設定する技術は示されておらず、とくに、エネルギー管理対象ごとにエネルギー量を管理する場合に、それぞれの目標値をどのように設定するかについては記載されていない。
 最近では、電力会社などからの要請により電力量の削減目標が設定される場合があり、また、需要家自身が電力量の削減目標を設定する場合もある。このような削減目標は、商用電源の電源系統から購入する電力量について定められるから、削減目標を達成するために、需要家において、個々の分岐回路ないし個々の負荷機器で使用する電力量の目標値を設定することには困難が伴う。すなわち、分岐回路あるいは負荷機器ごとに電力量を削減するための目標値を設定することは、需要家にとっては大きな負担である。
 また、需要家全体の電力量について削減目標を管理するだけでは、削減目標の範囲内で分岐回路や負荷機器ごとに使用可能になる電力量がわからないから、使用する電力量に過不足が生じやすくなる。その結果、削減目標が10%であるにもかかわらず、5%になったり、20%になったりするという問題が生じる。
 そこで、本発明の目的は、分岐回路あるいは負荷機器ごとに計測値の推移と目標値との関係を表示することにより、需要家に対してエネルギー管理の意識付けを行うことを可能にし、しかも、主幹回路の電力量について設定された削減目標を、分岐回路あるいは負荷機器ごとに電力量の目標値に適切に割り振ることによって、大きな過不足が生じないように削減目標を達成させることを可能にしたエネルギー管理装置、エネルギー管理システム、プログラムを記憶する記憶媒体を提供することにある。
 本発明に係るエネルギー管理装置は、上記目的を達成するために、需要家における分岐回路または負荷機器ごとの電力量と主幹回路の電力量との計測値を計測装置から取得する取得部と、前記主幹回路の電力量についての計測値の履歴をもとに全体基準値を求め、前記全体基準値に対する削減目標を全体目標値として設定する全体設定部と、前記全体設定部に設定された前記全体目標値を、割当対象である前記分岐回路または前記負荷機器ごとの電力量に配分することにより、個別目標値を設定する個別設定部と、前記個別目標値と前記取得部が取得した前記計測値とを1つの画面上に表示する表示部とを備えることを特徴とする。
 このエネルギー管理装置において、前記全体設定部は、前記全体目標値を設定する対象期間を指定する期間指定部を備えることが好ましい。
 このエネルギー管理装置において、前記個別設定部は、前記割当対象である前記分岐回路または前記負荷機器の電力量の前記計測値の総和に対する前記主幹回路の電力量の比率を、前記割当対象である前記分岐回路または前記負荷機器の電力量に乗じて、個別基準値を求め、前記個別基準値に前記全体目標値を均等に分配することにより、前記個別目標値を設定することが好ましい。
 このエネルギー管理装置において、前記個別設定部は、前記分岐回路または前記負荷機器の電力量についての計測値の履歴をもとに補正前の個別基準値を求め、前記割当対象である前記分岐回路または前記負荷機器における前記補正前の個別基準値の総和に対する前記全体基準値の比率を、前記分岐回路または前記負荷機器ごとの前記補正前の個別基準値に乗じて、個別基準値を求め、前記個別基準値に前記全体目標値を均等に分配することにより、前記個別目標値を設定することが好ましい。
 このエネルギー管理装置において、前記分岐回路または前記負荷機器ごとに電力削減を実施するか否かを示す可否情報を格納する可否記憶部をさらに備え、前記個別設定部は、前記可否記憶部に書き込まれる前記可否情報を利用者に設定させる選択部を備えることが好ましい。
 このエネルギー管理装置において、前記個別設定部は、前記分岐回路または前記負荷機器の電力量を降順に並べ、前記分岐回路または前記負荷機器の電力量が上位である1乃至複数の前記分岐回路または前記負荷機器を前記割当対象として選択することが好ましい。
 このエネルギー管理装置において、前記分岐回路または前記負荷機器の電力量の変化パターンを用いて電力変化の種類を分類する種類分類部と、前記種類分類部が分類した種類を用いて前記分岐回路または前記負荷機器の電力量を削減するための助言を前記表示部に表示させる表示指示部とをさらに備えることが好ましい。
 本発明に係るエネルギー管理システムは、需要家に設置された分電盤または需要家が使用する負荷機器に付設され電力量を計測する前記計測装置と、上記いずれかのエネルギー管理装置とを備えることを特徴とする。
 本発明に係るプログラムを記憶する記憶媒体は、コンピュータを、需要家における分岐回路または負荷機器ごとの電力量と主幹回路の電力量との計測値を計測装置から取得する取得部と、前記主幹回路の電力量についての計測値の履歴をもとに全体基準値を求め、前記全体基準値に対する削減目標を全体目標値として設定する全体設定部と、前記全体設定部に設定された前記全体目標値を、割当対象である前記分岐回路または前記負荷機器ごとの電力量に配分することにより、個別目標値を設定する個別設定部と、前記個別目標値と前記取得部が取得した前記計測値とを1つの画面上に表示する表示部とを備えるエネルギー管理装置として機能させるものである。
 本発明の構成によれば、分岐回路あるいは負荷機器ごとに計測値の推移と目標値との関係を表示することにより、需要家に対してエネルギー管理の意識付けを行うことが可能になる。しかも、主幹回路の電力量について設定された削減目標を、分岐回路あるいは負荷機器ごとに電力量の目標値に適切に割り振るので、大きな過不足が生じないように削減目標を達成させることが可能になるという利点がある。
 本発明の好ましい実施形態をさらに詳細に記述する。本発明の他の特徴および利点は、以下の詳細な記述および添付図面に関連して一層良く理解されるものである。
実施形態1に係るエネルギー管理装置を示すブロック図である。 実施形態1に係るエネルギー管理装置を用いたエネルギー管理システムの一例を示す構成図である。 図2に示したエネルギー管理システムの要部を示す構成図である。 実施形態1に係るエネルギー管理装置に用いる全体目標記憶部のデータ例を示す図である。 実施形態1に係るエネルギー管理装置に用いる逐次記憶部のデータ例を示す図である。 実施形態1に係るエネルギー管理装置に用いる履歴記憶部のデータ例を示す図である。 実施形態1に係るエネルギー管理装置に用いる個別目標記憶部のデータ例を示す図である。 実施形態1に係るエネルギー管理装置における表示例を示す図である。 実施形態2に係るエネルギー管理装置を示すブロック図である。 実施形態2に係るエネルギー管理装置において割当対象を選択する画面の例を示す図である。 実施形態2に係るエネルギー管理装置に用いる可否記憶部のデータ例を示す図である。 実施形態2に係るエネルギー管理装置に用いる個別目標記憶部のデータ例を示す図である。 実施形態2に係るエネルギー管理装置における負荷機器のグループ化の例を示す図である。 実施形態2に係るエネルギー管理装置において負荷機器をグループ化した場合の表示例を示す図である。 実施形態2に係るエネルギー管理装置における目標値を設定する画面の表示例を示す図である。 実施形態2に係るエネルギー管理装置における目標値を設定する画面の表示例を示す図である。 実施形態2に係るエネルギー管理装置における目標値を設定する画面の表示例を示す図である。 実施形態3に係るエネルギー管理装置の原理を説明する図である。 実施形態3に係るエネルギー管理装置の原理を説明する図である。 実施形態3に係るエネルギー管理装置の原理を説明する図である。 実施形態3に係るエネルギー管理装置において助言を付記した表示例を示す図である。 実施形態3に係るエネルギー管理装置において助言を付記した表示例を示す図である。 実施形態3に係るエネルギー管理装置において助言を付記した表示例を示す図である。
 (実施形態1)
 以下に説明する本実施形態では、エネルギー管理装置を住宅で用いる場合を例とする。ただし、本実施形態のエネルギー管理装置は、住宅以外に事務所ビルや商業ビルなどの建物において用いることも可能である。いずれにしても、使用する電力量を削減することに意識を持つ需要家であれば以下に説明するエネルギー管理装置を用いて削減目標を管理できる。
 図2に示すように、需要家に配置される分電盤2に、商用電源の電源系統3から電力を供給する電力線L1と、宅内の負荷機器4に電力を供給する複数本の電力線L2とが接続される。なお、分電盤2は電力線L1を通して商用電源の電源系統3に接続されていることを前提にしているが、分電盤2に太陽光発電装置や燃料電池のような自家発電装置、あるいは蓄電装置などが接続されていてもよい。
 図3に示すように、分電盤2は、電力系統3からの電力を供給する電力線L1に接続された主幹ブレーカ21と、主幹ブレーカ21の負荷側に導電体L3を介して接続された複数個の分岐ブレーカ22とを備える。分岐ブレーカ22には負荷機器4を接続する電力線L2が接続される。電力線L2および導電体L3を通過する電力量は、分電盤2に付設された計測装置5により計測される。電力線L1および導電体L3は主幹回路に相当し、電力線L2は分岐回路に相当する。
 計測装置5は、電力線L2および導電体L3にそれぞれ配置された電力センサC0,C1~Cnの出力を検出する検出部51と、検出部51の出力から、複数本の電力線L2と導電体L3とのそれぞれを通過する電力量を求める演算部50とを備える。さらに、計測装置5は、演算部50が求めた電力量を他装置に通知するための通信インターフェイス部52を備える。以下、「通信インターフェイス部」を「通信I/F」と略称する。
 図示例では、計測装置5は、分電盤2に付設され分岐ブレーカ22に接続された分岐回路(つまり、電力線L2)を単位として電力量を計測しているが、負荷機器4に計測装置5を付設して負荷機器4ごとの電力量を計測してもよい。また、電力線L2に接続されるコンセント(図示せず)に計測装置5を付設し、コンセントを単位として電力量を計測してもよい。
 計測装置5は、主幹回路を通過した電力量と、分岐回路ごとの通過した電力量または負荷機器4ごとの消費した電力量を計測する。以下では、主幹回路を通過した電力量を主幹回路の電力量と言い、分岐回路を通過した電力量を分岐回路の電力量と言い、負荷機器4が消費した電力量を負荷機器4の電力量と言う。また、エアコンやIH調理器のような負荷機器4は、分岐回路に一対一に対応付けられることが多く、この場合、分岐回路の電力量は負荷機器4の電力量と一致するから、以下では、分岐回路と負荷機器4との区別がとくに必要でなければ「分岐回路」のみ記載する。すなわち、分岐回路の電力量と負荷機器4の電力量との区別の必要がなければ、分岐回路の電力量として記載する。
 図示例では、電力量を簡易に計測するために、電力センサC0,C1~Cnとして変流器からなる電流センサが用いられている。ただし、計測精度を高めるには、電力センサC0,C1~Cnは、電流と電圧との両方を計測する構成が好ましい。検出部51は、電力センサC0,C1~Cnの出力のオフセット調整、ノイズ除去、増幅などの前置処理と、前置処理後の信号をデジタル信号に変換するAD変換とを行う機能を有する。演算部50は、マイコンのようにプログラムを実行することにより動作するデバイスを主なハードウェア要素として構成される。通信I/F52は、無線通信を行うことが好ましいが、有線通信を行う構成であってもよい。計測装置5が計測する電力量はサンプリング時間(たとえば、1分間)における電力量であり、計測装置5は、サンプリング時間ごとの電力量を計測値としてエネルギー管理装置1に逐次伝送する。なお、上記したサンプリング時間は一例であり、サンプリング時間は適宜に設定される。
 エネルギー管理装置1は、計測装置5との間で通信を行うコントローラ11と、コントローラ11で得られる情報を表示する表示器およびコントローラ11に指示を与える操作器を備えた操作表示装置12とを備える。操作表示装置12は、表示器に液晶表示器のようなフラットパネルディスプレイを用い、操作器に押釦スイッチのような機械式のスイッチを用いる。操作表示装置12の表示器および操作器は、タッチパネルで構成したり、タッチパネルと機械式のスイッチとを組み合わせて構成してもよい。また、操作表示装置12は、表示器および操作器を動作させるための回路部も備えており、表示器と回路部とにより表示部が構成される。
 コントローラ11は、図1に示すように、他装置と通信するための通信部111を備える。通信部111は、計測装置5との通信により計測装置5から計測値を取得する取得部としての通信I/F1111と、操作表示装置12と通信するための通信I/F1112と、上位装置6との間で通信するための通信I/F1113とを含む。通信I/F1113は、インターネットのような通信網NTを介して上位装置6と通信する。上位装置6は、たとえばコンピュータサーバであって、発送電を行う電力会社あるいは電力会社に代わって電力管理を行うサービス事業者が運営する。上位装置6は、電力会社からの電力の供給状況などに応じた電力量の削減目標をコントローラ11に通知する機能を有する。
 コントローラ11は、需要家における電力量の削減目標を管理するために、演算部110および記憶部112を備える。演算部110は、マイコンのようにプログラムを実行することによって動作するデバイスを主なハードウェア要素として構成される。コントローラ11は、現在日時を計時するリアルタイムクロック(RTC)113も備える。
 演算部110は、電力センサC0により検出された導電体L3を含む主幹回路の電力量について、基準値(以下、これを全体基準値と称する)に対する削減目標を全体目標値として設定する全体設定部1101を備える。全体設定部1101は、削減目標を設定する目標指定部1103と、電力削減を実行する対象期間を指定する期間指定部1104とを備える。ここに、削減目標は、全体基準値である電力量に対する削減率として与えられ、全体目標値は全体基準値である電力量から削減率分を減じた電力量であるが、同じ概念を表しているので以下では同等に扱う。
 期間指定部1104は、1日間、1週間、1ヶ月間、1年間などから日単位で選択される期間と、削減目標を達成しようとする時間帯との組合せにより対象期間を定める。定めた対象期間は、記憶部112に設けられた全体目標記憶部1121に格納される。期間指定部1104は、たとえば、図4に示す例のように、短期、中期、長期の3段階の対象期間を全体目標記憶部1121に設定する。図示例では、短期を1日間、中期を1週間、長期を2ヶ月間としている。すなわち、短期は「8月3日」において「13:00~16:00」を対象期間とし、中期は「8月1日~8月7日」において「9:00~21:00」を対象期間とし、長期は「7月1日~9月30日」において「9:00~21:00」を対象期間としている。
 全体設定部1101の目標指定部1103は、対象期間ごとに削減目標(図4では、削減率)を設定する。図4に示す例では、短期の削減目標を20%とし、中期の削減目標を15%とし、長期の削減目標を10%としている。この削減目標は、適宜に定めた全体基準値に対する削減率であって、この全体基準値は、原則として需要家における電力量の使用履歴から求められる。なお、全体基準値は、需要家の家族構成などに基づく標準値として与えることも可能である。
 全体設定部1101が全体目標記憶部1121に格納する対象期間および削減目標は、上位装置6から通信I/F1113を通して与えられるか、または利用者による操作表示装置12の操作に伴って通信I/F1112を通して与えられる。したがって、対象期間および削減目標は、利用者の意思または電力会社などからの要請によって定められる。
 ところで、記憶部112は、計測装置5から取得したサンプリング時間ごとの電力量を積算して格納する逐次記憶部1122と、単位時間(たとえば、1時間)ごとに逐次記憶部1122から電力量の積算値が転送される履歴記憶部1123とを備える。履歴記憶部1123には、単位時間ごとの電力量の推移が記憶される。
 逐次記憶部1122は、図5に示すように、計測装置5からサンプリング時間ごとに取得した主幹回路(図5では単に主幹と表示される)および分岐回路(図5では複数の分岐D1~Dnと表示される)ごとの電力量をそれぞれ積算して記憶する。図示例は、サンプリング時間ごとの電力量を積算しているからタイムスタンプは付与していないが、逐次記憶部1122は、サンプリング時間ごとの電力量の積算値ではなくサンプリング時間ごとに取得した電力量をタイムスタンプとともに記憶するようにしてもよい。
 逐次記憶部1122に格納された電力量は、リアルタイムクロック113により計時される正時毎に、演算部110が履歴記憶部1123に転送する。このとき、演算部110は、1時間前の正時のタイムスタンプを併せて履歴記憶部1123に格納する。また、演算部110は、逐次記憶部1122から履歴記憶部1123に電力量を転送すると、逐次記憶部1122に記憶された電力量を0にリセットする。
 したがって、履歴記憶部1123は、図6に示すように、主幹回路(図6では単に主幹と表示される)および分岐回路(図6では複数の分岐D1~Dnと表示される)ごとの1時間毎の電力量がタイムスタンプに対応付けて格納される。すなわち、履歴記憶部1123は、1日当たり24組の電力量を記憶する。なお、これらの時間の関係は一例であって、計測装置5から電力量を取得する時間間隔はサンプリング時間でなくてもよく、また、逐次記憶部1122から履歴記憶部1123に記憶値を転送する時間間隔も1時間ではなく15分や30分などであってもよい。
 履歴記憶部1123は、1年間以上の電力量を記憶する記憶容量を有している。全体設定部1101は、上位装置6からの要請により削減目標を全体目標記憶部1121に設定する場合、長期の削減目標を定める。この場合、期間および時間帯と削減率とは上位装置6から与えられる。したがって、全体設定部1101は、上位装置6から与えられた期間および時間帯と削減率とを、全体目標記憶部1121に長期の削減目標として格納する。
 このような長期の削減目標に関する全体基準値は、1年前の同時期における主幹回路の電力量についての計測値の履歴(実績)から求められる。ここで、長期の削減目標は期間が数十日に及び、また時間帯も数時間に及ぶから、履歴記憶部1123に格納された実績の電力量の計測値うち該当期間における計測値のピーク値のような代表値が全体基準値に用いられる。全体基準値に用いる代表値は、ピーク値以外にも平均値などであってもよい。
 本実施形態は、分岐回路または負荷機器4ごとに削減目標(個別目標値)を設定することを目的にしているから、分岐回路または負荷機器4ごとの電力量についての計測値の履歴うち該当期間に計測された計測値のピーク値や平均値から分岐回路または負荷機器4ごとに基準値(以下、これを個別基準値と称する)を定め、この個別基準値に対して個別目標値を設定する必要がある。そのため、演算部110は、履歴記憶部1123から所要の電力値を抽出し、個別基準値を求め、分岐回路ごとに個別目標値を設定する個別設定部1102を備える。以下、とくに区別の必要がない場合、個別目標値を、単に「目標値」と記載する。
 ところで、個別設定部1102が求めた分岐回路ごとの電力量の代表値は、同月日の同時刻に生じた値ではない。したがって、分岐回路または負荷機器4ごとの代表値の合計により得られる電力量は、通常は、該当する期間の主幹回路の電力量の代表値(主幹回路の全体基準値)とは一致しない。そのため、履歴記憶部1123に格納された実績の電力量から分岐回路または負荷回路4ごとの個別基準値を定めるには、実績の電力量に対する補正が必要である。
 さらに具体的に説明する。個別設定部1102は、所要の電力量を抽出すると、記憶部112に設けられた個別目標記憶部1124に格納する。個別目標記憶部1124は、図7に示すように、履歴記憶部1123から抽出した電力量を「補正前の個別基準値」として、分岐回路または負荷機器4ごとに格納する領域を備える。なお、図7に示す個別目標記憶部1124は、複数の分岐回路(分岐D1~Dn)のうちの一部の分岐回路(分岐D1~D6)に負荷機器4(図7では負荷機器41~46と表示される)を一対一に対応付けた例を示している。
 個別設定部1102は、個別目標記憶部1124に格納された分岐回路ごとの「補正前の個別基準値」を補正して分岐回路ごとの個別基準値を算出するために、「補正前の個別基準値」の総和に対する履歴記憶部1123から求めた主幹回路の全体基準値の比率を用いる。すなわち、個別設定部1102は、この比率を分岐回路ごとの「補正前の個別基準値」に乗じた値を、分岐回路ごとの個別基準値に用いる。すなわち、下式により個別基準値が求められる。下式の演算は、逐次記憶部1122から履歴記憶部1123に記憶値を転送する時間間隔で行われる。
個別基準値=(補正前の個別基準値)×(主幹回路の全体基準値)/(補正前の個別基準値の総和)
 個別設定部1102が上式によって求めた補正後の個別基準値は、個別目標記憶部1124に格納され、全体目標記憶部1121に格納された削減率から得られる係数を、この個別基準値に乗じることによって、分岐回路ごとの目標値が算出される。算出された目標値は、個別目標記憶部1124に格納される。
 たとえば、図7に示す個別目標記憶部1124において「補正前の個別基準値」の総和が10kWhであって、主幹回路の全体基準値が9kWhであるとすれば、個別目標記憶部1124の個別基準値の項目には、「補正前の個別基準値」を0.9倍した値が格納される。また、図4に示す全体目標記憶部1121に格納された長期の削減率は10%であるから、個別基準値に対して90%となる値が、個別目標記憶部1124の目標値の項目に格納される。
 このように、本実施形態の個別設定部1102は、全体設定部1101に設定された全体目標値を分岐回路または負荷機器4ごとの電力量に配分する、すなわち、削減率を個別基準値に乗じることによって分岐回路または負荷機器4ごとの目標値を設定する。
 演算部110は、個別目標記憶部1124に格納された分岐回路ごとの目標値と、計測装置5が取得し履歴記憶部1123に記憶された当日の電力量とを操作表示装置12に表示させる表示指示部1105を備える。履歴記憶部1123に記憶された当日の電力量は、計測装置5が計測した最新の計測値を含んでいる。そのため、操作表示装置12の画面に分岐回路ごとの目標値とともに計測値が表示されることになる。
 図8に表示例を示す。図示例では、1つの分岐回路(分岐D7)について電力量の1時間ごとの推移がバーグラフG1によって示され、この分岐回路について設定された目標値(0.41kWh)が横線T1で示されている。図8において横軸は1日を24時間で表したときの時刻である。図示例では、10~11時の間に電力量が目標値を超えている。したがって、11~12時の電力量も目標値を超える可能性がある。そのため、表示指示部1105は、この期間の電力量を表すバーを強調して表示している(図では強調表示を太線で示している)。この表示により、利用者は使用する電力量を削減するように注意が喚起される。
 なお、上述した例では、長期の削減率が一定(10%)である場合を示したが、対象期間が重複する場合は、該当する区分の中で最大の削減率を採用することが好ましい。
 (実施形態2)
 本実施形態は、図9に示すように、コントローラ11の記憶部112に、分岐回路ごとに電力量の削減を実施するか否かを示す可否情報を格納する可否記憶部1125が設けられている。図9に示すコントローラ11の構成は、図1に示した実施形態1のコントローラ11とは、可否記憶部1125の有無が相違する。たとえば、分岐回路に接続されている負荷機器4が、電子レンジや炊飯器である場合、この分岐回路に接続された負荷機器4の電力量を削減することは困難である。そこで、可否情報によって、該当する分岐回路については電力量の削減を行わない、あるいは行えないことを指定する。このように可否情報で分岐回路ごとに電力量を削減するか否かを指定することにより、電力量の削減が可能な分岐回路についてのみ、主幹回路について設定した全体目標値に対応する電力量の削減状態を監視することが可能になる。
 また、本実施形態の個別設定部1102は、操作表示装置12を用いて可否記憶部1125に書き込まれる可否情報を利用者に設定させる選択部1106を備える。選択部1106は、表示指示部1105に対して、操作表示装置12の画面に、図10のような表示を行わせるように指示する。
 図10に示す画面は、電力削減の可否を選択するための選択釦B1~B8を分岐回路ごとに表示している。選択釦B1~B8の表示領域には、「できる」と「できない」とのいずれかの文字列が表示される。利用者は、この画面が表示されているとき、選択釦B1~B8の押下毎に、文字列を「できる」から「できない」、または「できない」から「できる」に切り替えることができる。
 選択部1106は、選択釦B1~B8の表示領域に表示されている文字列を可否情報に対応付けており、操作表示装置12の画面で選択された文字列に対応する可否情報を可否記憶部1125に書き込む。すなわち、可否記憶部1125には、利用者が選択した分岐回路ごとの可否情報が設定されることになる。図10に示す画面に対応して可否記憶部1125に書き込まれた可否情報を図11に示す。
 なお、図示例は、操作表示装置12がタッチパネルである場合を想定している。選択釦B1~B8の操作は、押釦スイッチの操作と類似しているので、「押下」という用語を用いているが、選択釦B1~B8の表示領域に指先やペン先などで触れるか、触れる程度に近づけることを意味している。
 実施形態1は、主幹回路について設定した全体目標値を、すべての分岐回路に均等に分配することにより分岐回路ごとの目標値を設定しているが、本実施形態は、一部の分岐回路では電力量を削減しないから、全体目標値を均等に分配することはできない。そのため、以下の手順で分岐回路ごとの目標値を設定する。
 いま、実施形態1と同様に、分岐回路ごとに個別基準値が求められているものとする。図10、図11に示した例では、たとえば、図12に示すように目標値が設定される。すなわち、図10、図11に示した例では、2つの分岐回路(分岐D5と分岐D8)は電力量を削減しないことが指定されているから、これらの分岐回路について、目標値は個別基準値と一致している。また、他の分岐回路について、個別基準値に対する目標値の削減率が、主幹回路に対して設定した削減率よりも大きくなっている。
 実施形態1と同様に、主幹回路の全体基準値を9kWhとし、削減目標である削減率を10%とすると、主幹回路の全体目標値は8.1kWhになる。分岐回路について、「補正前の個別基準値」の総和は10kWhであり、そのうち削減できない分岐回路の「補正前の個別基準値」の合計は2kWhであるから、残りの8kWhが主幹回路の目標値を達成するために削減される電力量になる。したがって、下式の関係が成立する。以下では、電力量の削減対象に選ばれた分岐回路を「割当対象」の分岐回路という。
(主幹回路の全体目標値)=(割当対象の分岐回路に関する補正前の個別基準値の総和)×α+(割当対象以外の分岐回路に関する補正前の個別基準値の総和)
したがって、係数αは、下式で求められる。
α={(主幹回路の全体目標値)-(割当対象以外の分岐回路に関する補正前の個別基準値の総和)}/(割当対象の分岐回路に関する補正前の個別基準値の総和)
 この係数αを上式から求め、割当対象の分岐回路ごとの補正前の個別基準値に乗じることによって、割当対象である分岐回路ごとの目標値が算出される。図12に示す例では、主幹回路の全体目標値が8.1kWh、割当対象の分岐回路に関する補正前の個別基準値の総和が8kWh、割当対象外の分岐回路に関する補正前の個別基準値の総和が2kWhであるから、係数αは、α=(8.1-2)/8=0.7625になる。この係数αを、割当対象の分岐回路ごとの補正前の個別基準値にそれぞれ乗じることにより、割当対象の分岐回路ごとに目標値が得られる。つまり、図12に示す例では、割当対象の分岐回路に関する補正前の個別基準値に、0.7625を乗じることによって、割当対象の分岐回路ごとの目標値が求められる。なお、図12において、小数点以下3桁目を四捨五入している。図12の分岐回路ごとの目標値の合計は8.09になり、主幹回路の全体目標値を満足している。
 以上のように、本実施形態は、利用者自身が電力量を削減することができない分岐回路を選択し、選択された分岐回路を除外して全体目標値を達成するために必要な分岐回路ごとの目標値を設定する。したがって、電力量を削減することができない負荷機器4の動作を維持しながらも、全体目標値を達成するための目標値の目安を得ることができる。操作表示装置12に表示される情報は実施形態1と同様である。
 上述した例では、分岐回路ごとに電力量の削減の可否を利用者が選択しているが、電力量を削減する分岐回路を利用者が選択するようにしてもよい。すなわち、電力量の削減が不可能な分岐回路を消極的に選択するのではなく、電力量の削減を行おうとする分岐回路を積極的に選択するようにしてもよい。たとえば、負荷機器4がエアコン、照明機器、IH調理器などは、消費電力が比較的大きく、かつ電力量の削減が可能であるから、電力量を削減するためにこれらの負荷機器4を接続した分岐回路を積極的に選択するようにしてもよい。選択後の処理は、上述した動作と同様である。
 ところで、上述のように電力量を削減しようとする負荷機器4が接続されている分岐回路を積極的に選択する場合、負荷機器4の種類ごとにまとめて目標値を設定してもよい。いま、図13に示すように、8回路の分岐回路について、3回路がエアコン、2回路が照明機器、1回路がIH調理器、残りの2回路がその他(コンセントなど)である場合を想定する。図13に示す例では、エアコン、照明機器、IH調理器に対応する分岐回路が、電力量を削減する対象として選択されている。また、負荷機器4ごとに電力量を合計した目標値が設定される。この場合、図14に示すように、個々の分岐回路ではなく、同種の負荷機器4が接続された分岐回路の電力量を合算した計測値の推移を示すバーグラフG2が目標値(4kWh)を表す横線T2と併せて表示される。
 図14に示す例のように、同じ負荷機器4について需要家全体で合算した電力量を管理することによって、負荷機器4の種類ごとの目標管理が可能になる。また、負荷機器4の種類を単位として操作表示装置12の画面を構成するから、分岐回路を単位として操作表示装置12の画面を構成する場合よりも画面数が少なくなる。そのため、利用者にとっても画面を選択する手間が少なくなる。なお、上述した例では負荷機器4の種類ごとにまとめて目標値を管理しているが、需要家の部屋ごとの目標値を管理する構成を採用することも可能である。
 上述した動作では、操作表示装置12の画面に、分岐回路ごとの電力量の推移を示すバーグラフが表示されている。これに対して、図15A~15Cに示すように、すべての分岐回路について一覧できるように、分岐回路ごとの目標値と個別基準値とを並べて表示する画面を設けてもよい。
 図15Aは、実施形態1のように、主幹回路の全体目標値を、すべての分岐回路に均等に分配した場合の表示例を示している。図において白抜きのバーが目標値を示し、斜線付きのバーが個別基準値(1年前の実績値)を示している。なお、目標値と個別基準値とは異なる色で表示してもよい。また、操作表示装置12の画面には、分岐回路ごとの個別基準値が降順に並べられる。このことにより、全体目標値の達成のために電力量の削減量を大きくする必要がある分岐回路が直観的にわかる。
 図15Bは、実施形態2のように、分岐回路を割当対象外として選択する場合の表示例を示している。すなわち、図15Aのように表示された状態から、目標値を示しているバーを個別基準値まで引き上げる操作を行うことにより、該当する分岐回路を割当対象外にすることが可能になっている。たとえば、バーに指先で触れ、触れた指先を上方にスライドさせる操作を行うことにより、バーが個別基準値まで引き上げられる。また、割当対象から除外された分岐回路は、目標値を示す白抜きのバーに代わって斜線付きのバーが表示される。この場合も、割当対象から除外されたことを示すバーは、個別基準値とは異なる色で表示してもよい。上述のようにして分岐回路が割当対象から除外されると、他の分岐回路の目標値が再計算され、目標値を表すバーの長さが変更される。この処理は、個別設定部1102により行われる。
 図15Bに示した例のように、一部の分岐回路を割当対象から除外した場合、残りのすべての分岐回路について目標値が一律に引き下げられることになる。しかしながら、分岐回路ごとに目標値の変更には難易がある。そのため、目標値を個別基準値まで引き上げる変更だけではなく、目標値を引き下げる変更も可能にしてある。図15Cは、目標値を引き下げるように変更した場合の例であって、分岐D1、分岐D3の分岐回路について目標値を引き下げている。
 図示例では、目標値が変更されたことを示すために、白抜きのバーに代わってクロスハッチング付きのバーが表示されている。この場合も、変更された目標値は、他のバーとは異なる色で表示されることが好ましい。また、分岐D1、分岐D3の分岐回路の目標値が変更されたことに伴って、残りの分岐回路(分岐D2、分岐D4、分岐D7、分岐D6)の目標値が再計算され、目標値が上昇することになる。ただし、これらの分岐回路は、利用者が直接変更していないから、白抜きのバーのままで表示される。この処理も個別制御部1102が行う。
 図15Cに示す例のように、計測値である電力量が多いほうの複数の分岐回路について、目標値を引き下げると、主幹回路の全体目標値を達成しやすくなる。すなわち、通過する電力量の小さい分岐回路において目標値を引き下げたとしても、主幹回路の電力量の削減率に反映される割合が小さいが、通過する電力量の大きい分岐回路において目標値を引き下げることにより、主幹回路の電力量の削減率に対する貢献度が高くなる。したがって、個別設定部1102は、計測された電力量が大きいほうから1乃至複数の分岐回路を、割当対象の分岐回路として選択してもよい。この場合、割当対象は、需要家において電力量が上位である1乃至複数の分岐回路のみになり、目標値の設定作業が容易になる。
 他の構成および動作は実施形態1と同様であるから説明を省略する。
 (実施形態3)
 実施形態2は、電力量の削減を行う割当対象の分岐回路を利用者が選別している。本実施形態は、負荷機器4で使用した電力量の変化を監視し、変化パターンを用いて負荷機器4の種類を分類することによって、割当対象の負荷機器4が接続されている分岐回路を自動的に抽出する構成例について説明する。
 具体的には、コントローラ11の演算部110に、電力量の変化パターンから分岐回路に接続された負荷機器4の種類を分類する種類分類部1107(図9参照)を備える。操作表示部12の画面に当日の電力量の推移を示すバーグラフおよび目標値を表示させる表示指示部1105は、負荷機器4の種類に応じて電力量を削減するための助言も併せて表示させる。種類分類部1107は、分岐回路ごとに所定時間毎(逐次記憶部1122から履歴記憶部1123に記憶値を転送する時間間隔)の電力量を計測し、この電力量の変化と適宜に設定した閾値との関係によって負荷機器4を3種類に分類する。
 種類分類部1107は、たとえば、図16A~16Cに示すように、適宜に閾値Th(図示例は100Wh)を設定する。電力が常時消費される冷蔵庫のような負荷機器4は、図16Aのように、所定時間毎の電力量が閾値Thを下回ることがない。また、エアコンや照明機器のように1日に電源が数回投入される負荷機器4は、図16Bのように、所定時間毎の電力量が比較的高い頻度で閾値Thを超えるが、閾値Thを超えない時間帯も生じる。さらに、電源が投入される時間が短いか投入される頻度が少ない負荷機器4は、図16Cのように、電力量が閾値Thを超える頻度が非常に少なくなる。
 したがって、所定時間毎の電力量が1日に閾値Thを超える回数を複数段階に分けることによって、分岐回路に接続されている負荷機器4の種類をおおまかに分類することが可能になる。以下では、電力量の変化パターンが、図16Aのようになる負荷機器4をタイプ1、図16Bのようになる負荷機器4をタイプ2、図16Cのようになる負荷機器4をタイプ3と呼ぶ。たとえば、1時間ごとの電力量を閾値Thと比較すれば、電力量が閾値Thを超える回数によってタイプ1、タイプ2、タイプ3の分類が可能になる。たとえば、電力量が閾値Thを超える回数が、20回以上をタイプ1、4回以上19回以下をタイプ2、3回以下をタイプ3などと分類できる。
 この場合、タイプ1の負荷機器4が接続された分岐回路は電力量を削減できないと判断される。タイプ1の負荷機器4が接続されている分岐回路は、電力量の削減を行わない分岐回路として割当対象から除外される。ただし、タイプ1の負荷機器4であっても冷蔵庫のように庫内温度の設定などによって電力量を削減できる場合もあるから、負荷回路4が冷蔵庫であれば、庫内温度を高くすることにより、電力量の削減が可能である旨の助言を、操作表示装置12の画面に表示してもよい。
 また、タイプ2またはタイプ3の負荷機器4が接続されている分岐回路は電力量を削減できると判断される。ただし、電力量が閾値Thを超える回数に応じて、電力削減を実行する対象期間で電力量を削減するか、対象期間外で使用することにより対象期間における電力量を削減するように、利用者に助言を与えることが好ましい。この種の助言は、操作表示装置12の画面に表示される。
 タイプ3の負荷機器4は運転の頻度が少ないから、タイプ3の負荷機器4については、使用する時間帯を対象期間から除外するように助言を与える。また、タイプ2の負荷機器4については、使用する時間を短くしたり、消費する電力量が少なくなる動作を選択するように助言を与える。たとえば、タイプ2の負荷機器4であるエアコンに対しては、一定時間の運転後に運転を停止させるように助言を与えればよい。なお、上述した数値例は一例であって、実際の使用環境に応じて適宜に設定される。
 図17A~17Cに操作表示装置12の画面の表示例を示す。図17Aはタイプ1の負荷機器4が接続された分岐回路に対応し、1時間ごとの電力量を表すバーグラフと目標値を表す横線T1とが示され、電力量が目標値を超えたことにより、「省エネ運転モードにしましょう」という助言が示されている。図17Bはタイプ2の負荷機器4が接続された分岐回路に対応し、電力量が目標値を超えたことにより、「継続使用が続いています。電源を切りましょう」という助言が示されている。さらに、図17Cはタイプ3の負荷機器4が接続された分岐回路に対応し、電力量が目標値を超えたことにより、「今後は省エネ時間帯以外での使用をお勧めします」という助言が示されている。
 他の構成および動作は実施形態1または実施形態2と同様であるから説明を省略する。
 本発明を幾つかの好ましい実施形態について記述したが、この発明の本来の精神および範囲、即ち請求の範囲を逸脱することなく、当業者によって様々な修正および変形が可能である。

Claims (9)

  1.  需要家における分岐回路または負荷機器ごとの電力量と主幹回路の電力量との計測値を計測装置から取得する取得部と、
     前記主幹回路の電力量についての計測値の履歴をもとに全体基準値を求め、前記全体基準値に対する削減目標を全体目標値として設定する全体設定部と、
     前記全体設定部に設定された前記全体目標値を、割当対象である前記分岐回路または前記負荷機器ごとの電力量に配分することにより、個別目標値を設定する個別設定部と、
     前記個別目標値と前記取得部が取得した前記計測値とを1つの画面上に表示する表示部とを備える
     ことを特徴とするエネルギー管理装置。
  2.  前記全体設定部は、
     前記全体目標値を設定する対象期間を指定する期間指定部を備える
     ことを特徴とする請求項1記載のエネルギー管理装置。
  3.  前記個別設定部は、
     前記割当対象である前記分岐回路または前記負荷機器の電力量の前記計測値の総和に対する前記主幹回路の電力量の比率を、前記割当対象である前記分岐回路または前記負荷機器の電力量に乗じて、個別基準値を求め、
     前記個別基準値に前記全体目標値を均等に分配することにより、前記個別目標値を設定する
     ことを特徴とする請求項1又は2記載のエネルギー管理装置。
  4.  前記個別設定部は、
     前記分岐回路または前記負荷機器の電力量についての計測値の履歴をもとに補正前の個別基準値を求め、
     前記割当対象である前記分岐回路または前記負荷機器における前記補正前の個別基準値の総和に対する前記全体基準値の比率を、前記分岐回路または前記負荷機器ごとの前記補正前の個別基準値に乗じて、個別基準値を求め、
     前記個別基準値に前記全体目標値を均等に分配することにより、前記個別目標値を設定する
     ことを特徴とする請求項1又は2記載のエネルギー管理装置。
  5.  前記分岐回路または前記負荷機器ごとに電力削減を実施するか否かを示す可否情報を格納する可否記憶部をさらに備え、
     前記個別設定部は、前記可否記憶部に書き込まれる前記可否情報を利用者に設定させる選択部を備える
     ことを特徴とする請求項1~4のいずれか1項に記載のエネルギー管理装置。
  6.  前記個別設定部は、
     前記分岐回路または前記負荷機器の電力量を降順に並べ、前記分岐回路または前記負荷機器の電力量が上位である1乃至複数の前記分岐回路または前記負荷機器を前記割当対象として選択する
     ことを特徴とする請求項1~4のいずれか1項に記載のエネルギー管理装置。
  7.  前記分岐回路または前記負荷機器の電力量の変化パターンを用いて電力変化の種類を分類する種類分類部と、
     前記種類分類部が分類した種類を用いて前記分岐回路または前記負荷機器の電力量を削減するための助言を前記表示部に表示させる表示指示部とをさらに備える
     ことを特徴とする請求項1~4のいずれか1項に記載のエネルギー管理装置。
  8.  需要家に設置された分電盤または需要家が使用する負荷機器に付設され電力量を計測する前記計測装置と、
     請求項1~7のいずれか1項に記載のエネルギー管理装置とを備える
     ことを特徴とするエネルギー管理システム。
  9.  コンピュータを、
     需要家における分岐回路または負荷機器ごとの電力量と主幹回路の電力量との計測値を計測装置から取得する取得部と、
     前記主幹回路の電力量についての計測値の履歴をもとに全体基準値を求め、前記全体基準値に対する削減目標を全体目標値として設定する全体設定部と、
     前記全体設定部に設定された前記全体目標値を、割当対象である前記分岐回路または前記負荷機器ごとの電力量に配分することにより、個別目標値を設定する個別設定部と、
     前記個別目標値と前記取得部が取得した前記計測値とを1つの画面上に表示する表示部と
     を備えるエネルギー管理装置として機能させるプログラムを記憶した記憶媒体。
PCT/JP2013/000634 2012-03-30 2013-02-06 エネルギー管理装置、エネルギー管理システム、プログラムを記憶する記憶媒体 WO2013145525A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP13768295.1A EP2833505A4 (en) 2012-03-30 2013-02-06 ENERGY MANAGEMENT DEVICE, POWER MANAGEMENT SYSTEM, AND STORAGE MEDIUM FOR STORING A PROGRAM
CN201380017974.4A CN104205564A (zh) 2012-03-30 2013-02-06 能量管理设备、能量管理系统和存储有程序的存储介质
US14/497,505 US9588159B2 (en) 2012-03-30 2014-09-26 Energy management apparatus, system, method, and storage medium storing program

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2012-080773 2012-03-30
JP2012080773A JP5991611B2 (ja) 2012-03-30 2012-03-30 エネルギー管理装置、エネルギー管理システム、プログラム

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US14/497,505 Continuation US9588159B2 (en) 2012-03-30 2014-09-26 Energy management apparatus, system, method, and storage medium storing program

Publications (1)

Publication Number Publication Date
WO2013145525A1 true WO2013145525A1 (ja) 2013-10-03

Family

ID=49258852

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2013/000634 WO2013145525A1 (ja) 2012-03-30 2013-02-06 エネルギー管理装置、エネルギー管理システム、プログラムを記憶する記憶媒体

Country Status (5)

Country Link
US (1) US9588159B2 (ja)
EP (1) EP2833505A4 (ja)
JP (1) JP5991611B2 (ja)
CN (1) CN104205564A (ja)
WO (1) WO2013145525A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015075438A (ja) * 2013-10-10 2015-04-20 パナソニックIpマネジメント株式会社 電力表示装置

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016006577A (ja) * 2014-06-20 2016-01-14 キヤノンマーケティングジャパン株式会社 情報処理装置、その制御方法、及びプログラム、並びに、情報処理システム、その制御方法、及びプログラム
JP2017038452A (ja) * 2015-08-07 2017-02-16 パナソニックIpマネジメント株式会社 制御方法、制御装置、および、プログラム
CN105929342A (zh) * 2016-05-09 2016-09-07 湖北日海通讯技术有限公司 一种电源分配柜
JP6689395B2 (ja) * 2016-10-11 2020-04-28 三菱電機株式会社 制御装置、電力管理システム、電力管理方法及びプログラム
US20230148149A1 (en) * 2021-11-08 2023-05-11 Johnson Controls Tyco IP Holdings LLP Building automation system with resource consumption tracking features

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002051463A (ja) * 2000-08-01 2002-02-15 Hitachi Ltd 電力負荷制御システム
JP2005234746A (ja) 2004-02-18 2005-09-02 Matsushita Electric Ind Co Ltd エネルギ管理システム
WO2011030200A1 (ja) * 2009-09-09 2011-03-17 パナソニック電工株式会社 電力制御システム

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2784354B2 (ja) 1995-08-09 1998-08-06 株式会社電興社 節約料金表示装置
JP4228539B2 (ja) 2000-12-28 2009-02-25 三菱電機株式会社 省エネルギー効果演算システム、その演算方法
JP2003088004A (ja) 2001-07-02 2003-03-20 Matsushita Electric Ind Co Ltd 電力管理装置
JP2007097310A (ja) * 2005-09-29 2007-04-12 Sanyo Electric Co Ltd 系統連係システム
JP5127479B2 (ja) * 2008-01-29 2013-01-23 株式会社東芝 行動改善支援装置及び行動改善支援方法
US8001403B2 (en) * 2008-03-14 2011-08-16 Microsoft Corporation Data center power management utilizing a power policy and a load factor
CN101346028B (zh) * 2008-08-28 2011-12-21 上海电机成套联合有限公司 智能节电最优控制方法
JP2011142753A (ja) 2010-01-07 2011-07-21 Panasonic Corp 家電機器制御装置及び家電機器制御システム
JP5455709B2 (ja) * 2010-02-26 2014-03-26 キヤノン株式会社 管理装置、その制御方法、及びプログラム
JP5520118B2 (ja) * 2010-04-02 2014-06-11 パナソニック株式会社 機器制御システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002051463A (ja) * 2000-08-01 2002-02-15 Hitachi Ltd 電力負荷制御システム
JP2005234746A (ja) 2004-02-18 2005-09-02 Matsushita Electric Ind Co Ltd エネルギ管理システム
WO2011030200A1 (ja) * 2009-09-09 2011-03-17 パナソニック電工株式会社 電力制御システム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP2833505A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015075438A (ja) * 2013-10-10 2015-04-20 パナソニックIpマネジメント株式会社 電力表示装置

Also Published As

Publication number Publication date
EP2833505A4 (en) 2015-11-11
JP5991611B2 (ja) 2016-09-14
US9588159B2 (en) 2017-03-07
US20150008900A1 (en) 2015-01-08
JP2013211998A (ja) 2013-10-10
CN104205564A (zh) 2014-12-10
EP2833505A1 (en) 2015-02-04

Similar Documents

Publication Publication Date Title
WO2013145525A1 (ja) エネルギー管理装置、エネルギー管理システム、プログラムを記憶する記憶媒体
JP4648482B1 (ja) 分析装置及び計測管理システム
US9766679B2 (en) Power monitoring device and power monitoring system
JP5887549B2 (ja) エネルギー管理装置、エネルギー管理方法、プログラム
WO2015087470A1 (ja) 需要予測装置、プログラム
WO2015046320A1 (ja) ホームエネルギーマネージメントシステム及びホームエネルギーマネージメント方法
WO2016084313A1 (ja) 電力需要調整システム、需要調整装置、グループ生成装置及びグループ生成方法
JP7038314B2 (ja) 表示制御方法、表示制御プログラム、及び表示制御システム
WO2013161154A1 (ja) エネルギー管理装置、エネルギー管理システム、プログラム
JP2017116129A (ja) 情報提示システム、及び、プログラム
JP2009112075A (ja) 電力管理システム
WO2015115137A1 (ja) 監視装置、監視システム、監視方法、補正情報作成装置、補正情報作成方法及びプログラム
AU2016324351B2 (en) Power analyser and method for the use thereof
JP2019049404A (ja) 計画生成装置、計画生成方法、空調システムおよびプログラム
JP5106961B2 (ja) エネルギー消費削減支援装置
KR20150096833A (ko) 양방향 조율 및 순차보상 기반 최대수요전력관리 방법 및 시스템
JP2018036934A (ja) 電力使用量または消費電流による居住者の生活状態・活動推定システムおよび方法
JP5992678B2 (ja) 電力監視システム
WO2016186069A1 (ja) インセンティブ予測量提示装置
JP2015102526A (ja) 電力推定装置及び電力推定方法
JP7054829B2 (ja) 表示方法、プログラム、及び表示システム
JP6722060B2 (ja) プロセッサ、電力管理装置、およびemsサーバ
US9506959B2 (en) Operation support system and recording medium
JP6343263B2 (ja) 太陽光発電システム
JP5139394B2 (ja) エネルギー管理システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 13768295

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2013768295

Country of ref document: EP

NENP Non-entry into the national phase

Ref country code: DE

NENP Non-entry into the national phase

Ref country code: DE