WO2011055434A1 - エレベーターの制御装置 - Google Patents

エレベーターの制御装置 Download PDF

Info

Publication number
WO2011055434A1
WO2011055434A1 PCT/JP2009/068846 JP2009068846W WO2011055434A1 WO 2011055434 A1 WO2011055434 A1 WO 2011055434A1 JP 2009068846 W JP2009068846 W JP 2009068846W WO 2011055434 A1 WO2011055434 A1 WO 2011055434A1
Authority
WO
WIPO (PCT)
Prior art keywords
failure
wave
earthquake
elevator
sensor
Prior art date
Application number
PCT/JP2009/068846
Other languages
English (en)
French (fr)
Inventor
功治 山岸
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to CN200980162242.8A priority Critical patent/CN102596782B/zh
Priority to PCT/JP2009/068846 priority patent/WO2011055434A1/ja
Priority to JP2011539220A priority patent/JP5392354B2/ja
Publication of WO2011055434A1 publication Critical patent/WO2011055434A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B5/00Applications of checking, fault-correcting, or safety devices in elevators
    • B66B5/02Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions
    • B66B5/021Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions the abnormal operating conditions being independent of the system
    • B66B5/022Applications of checking, fault-correcting, or safety devices in elevators responsive to abnormal operating conditions the abnormal operating conditions being independent of the system where the abnormal operating condition is caused by a natural event, e.g. earthquake

Definitions

  • This invention relates to an elevator control device.
  • a failure detection of an earthquake detector is performed using an earthquake detection signal output from the earthquake detector, and an earthquake detector is provided, and an earthquake is detected from the earthquake detector. Based on the operation information, control operation at the time of the earthquake is performed according to the magnitude of the earthquake, and when the magnitude of the earthquake is less than a predetermined magnitude, the reset command of the earthquake detector is output from the earthquake information reset means.
  • a failure detection timer means for setting a time range for detecting a failure of the seismic detector, and a count of the number of times the reset command is output during the set time range.
  • Special low earthquake information failure detection counter means for determining that the seismic detector is in failure when the number of times exceeds a predetermined number of times set in advance.
  • a device configured to perform a predetermined seismic control operation that is performed when the magnitude of the earthquake is greater than or equal to a predetermined magnitude when the failure determination means determines that the earthquake detector is defective. (For example, refer to Patent Document 1).
  • the present invention has been made to solve such a problem.
  • an appropriate measure can be taken according to the importance of the failure, which is unnecessary.
  • An elevator control device that does not cause a decrease in operating efficiency is obtained.
  • the elevator control apparatus includes a P wave detector that detects an earthquake P wave and outputs a P wave detection signal, and an S wave detection that detects an earthquake S wave and outputs an S wave detection signal. And an elevator control means for controlling the elevator to perform a predetermined seismic control operation based on the P-wave detection signal and the S-wave detection signal.
  • FIG. 1 and 2 relate to Embodiment 1 of the present invention.
  • FIG. 1 is a block diagram showing the overall configuration of the elevator control device
  • FIG. 2 is a flowchart showing the operation of the elevator control device.
  • reference numeral 1 is an elevator control means for controlling the overall operation of the elevator. From the beginning of the elevator car operation, various control operations in the event of an earthquake or failure, and the control of alarms in the event of an abnormality, etc. I am in charge.
  • a P wave detector 2 that detects a P wave, which is an initial tremor seismic wave generated by an earthquake, and outputs a P wave detection signal to the elevator control means 1, and is generated by an earthquake.
  • An S wave detector 3 for detecting an S wave that is a main motion seismic wave and outputting an S wave detection signal to the elevator control means 1 is installed.
  • the elevator control means 1 determines that an earthquake of a predetermined magnitude or more has been detected based on the P wave detection signal and the S wave detection signal output from the P wave detector 2 and the S wave detector 3. Controls the elevator to perform a predetermined earthquake control operation.
  • the predetermined earthquake control operation include the following. That is, first, the magnitude of the earthquake is divided into two stages, namely, the extra low earthquake that is the smallest earthquake and the low earthquake that is larger than that. And if the occurrence of an extra low earthquake is detected, after the seismic control operation such as stopping the car at the nearest floor and getting off the passengers on board, If the occurrence of a low earthquake is not detected within the time, it will be judged safe and reset to return to normal operation. On the other hand, when the occurrence of a low earthquake is detected, the operation is suspended after the earthquake-controlled operation in consideration of safety.
  • the P-wave detector 2 detects a failure such as an abnormality in its own power supply or CPU, and outputs a P-wave detector failure signal when a failure is detected.
  • a failure detection for example, a known technique as described in Patent Document 1 described above is used.
  • the S-wave sensor 3 detects a failure such as its own power supply abnormality or CPU abnormality, and outputs a S-wave sensor failure signal when a failure is detected.
  • This failure detection is also similar in that a known technique such as that described in Patent Document 1 described above is used.
  • the P-wave detection failure signal output from the P-wave detector 2 and the S-wave detector failure signal output from the S-wave detector 3 are input to the operation selection means 4 at the time of failure of the earthquake detector.
  • the seismic detector failure operation selecting means 4 determines the importance of the failure state of the seismic detector from the combination of the detected sensor failure signals based on the inputted sensor failure signals, A predetermined earthquake detector failure operation is selected, and an earthquake detector failure operation request is output to the elevator control means 1.
  • the elevator control means 1 controls the elevator in accordance with the earthquake detector failure operation request from the earthquake detector failure operation selection means 4.
  • the elevator control device operates according to a series of flows shown in FIG.
  • the earthquake detector failure operation selection means 4 checks whether or not the S wave detector failure signal from the S wave detector 3 has been detected (step S1). S2). In this confirmation, when it is confirmed that the S-wave detector failure signal from the S-wave detector 3 is detected, the process proceeds to step S3, where the seismic detector failure operation selecting means 4 detects the P-wave detection. A check is made as to whether a P-wave detector failure signal from detector 2 has been detected.
  • step S3 If it is confirmed in step S3 that the P-wave sensor failure signal from the P-wave sensor 2 has been detected, the process proceeds to step S4, where the seismic sensor failure operation selection means 4 is operated. Determines that both the P-wave sensor 2 that senses the initial tremor and the S-wave sensor 3 that senses the main motion are out of order and are of great importance. And an operation request at the time of failure of a seismic sensor of high importance.
  • the elevator control means 1 that has received the operation request at the time of failure of the seismic detector of high importance causes the operation at the time of failure of the earthquake detector of high importance according to the operation request (operation 1). Is controlled. That is, first, in step S5, the elevator control means 1 causes an abnormality of the earthquake detector to the notifying means (not shown) provided in the manager room (monitoring room) in the building or the landing of the elevator. Control to be notified.
  • step S6 the elevator control means 1 immediately cancels all calls already registered for the elevator. Then, the process proceeds to step S7, where the elevator control means 1 causes a car (not shown) to travel to the nearest floor from the current car position, and stops the car when the car arrives at the nearest floor. Control to stop the operation of the elevator.
  • step S3 if it is confirmed in step S3 that the P-wave detector failure signal from the P-wave detector 2 has not been detected, the process proceeds to step S8, and the operation selection at the time of failure of the earthquake detector is selected.
  • the means 4 determines that the P-wave sensor 2 that senses the initial tremor is not faulty, but the S-wave sensor 3 that senses the main motion is faulty and is of importance, and based on this judgment result
  • the operation request at the time of failure of the seismic sensor having the medium importance is output to the elevator control means 1.
  • step S9 the elevator control means 1 that has received the operation request at the time of failure of the seismic detector in the importance level determines the importance according to the operation request. Control of the operation at the time of failure of the earthquake sensor (operation 2) is performed. That is, first, in step S9, the elevator control means 1 causes an abnormality of the earthquake detector to the notifying means (not shown) provided in the manager room (monitoring room) or the elevator landing in the building. Control to be notified.
  • step S10 the elevator control means 1 performs control so as to respond to calls already registered for the elevator. Then, when all of the registered calls have been answered, the process proceeds to step S11, where the car is stopped at the final floor of the call that has been answered last, the door is opened, and then the operation of the elevator is suspended. Control.
  • step S2 if it is confirmed in step S2 that the S-wave detector failure signal from the S-wave detector 3 has not been detected, the process proceeds to step S12, and the seismic detector failure operation selection means 4 is selected. Confirms whether or not a P-wave sensor failure signal from the P-wave sensor 2 is detected. If it is confirmed in step S12 that the P-wave sensor failure signal from the P-wave sensor 2 has been detected, the process proceeds to step S13, and the seismic sensor failure operation selecting means 4 is selected. Determines that the S wave sensor 3 that senses the main motion is not broken, but the P wave sensor 2 that senses the initial tremor is broken and is of low importance, and the elevator control is based on the judgment result. The operation request at the time of failure of the seismic detector with low importance is output to the means 1.
  • step S14 the elevator control means 1 that has received the operation request at the time of failure of the earthquake detector of low importance determines the importance according to the operation request. Control of the operation at the time of failure of the small earthquake sensor (operation 3) is performed. That is, first, in step S14, the elevator control means 1 causes an abnormality of the earthquake detector to the notifying means (not shown) provided in the manager room (monitoring room) in the building or the landing of the elevator. Control to be notified. And it progresses to step S15 and the elevator control means 1 performs control so that normal operation may be continued about the said elevator.
  • step S12 determines that the P-wave sensor failure signal from the P-wave sensor 2 has not been detected.
  • the means 4 determines that neither the P-wave sensor 2 that senses the initial tremor nor the S-wave sensor 3 that senses the main movement has failed, and the failure to the elevator control means 1 based on this determination result. Outputs an operation request when there is no earthquake sensor failure.
  • step S17 the control of the earthquake detector failure operation without failure (operation 4) according to the operation request is performed by the elevator control means 1 that has received the operation request when failure of the earthquake detector without failure. Is done. That is, in step S17, the elevator control means 1 performs control to continue normal operation for the elevator.
  • the operation of the earthquake detector with a low importance is performed. It is conceivable that the operation is the same as the operation at the time of failure of the seismic detector having the importance level (operation 2) or the operation at the time of failure of the seismic detector having the high importance level (operation 1).
  • the P wave sensor and the S wave sensor detect their own faults, they output a P wave sensor fault signal and an S wave sensor fault signal, respectively.
  • the importance of the failure state of the earthquake sensor is determined from the combination of these sensor failure signals, and at the time of a predetermined earthquake sensor failure according to this importance
  • an earthquake detector failure is detected by providing an earthquake detector failure operation selection unit that selects an operation and outputs an earthquake sensor failure operation request to the elevator control unit, the failure detection of the failure is detected. Appropriate measures can be taken according to importance.
  • the present invention relates to a P wave detector that detects an earthquake P wave and outputs a P wave detection signal, an S wave detector that detects an earthquake S wave and outputs an S wave detection signal, and a P wave detection signal. And an elevator control means for controlling the elevator so as to perform a predetermined seismic control operation based on the S-wave detection signal.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

 地震感知器の故障が検出された場合に、その故障の重要度に応じて適切な対応を採ることができ、不必要な運転効率の低下を招来することがないエレベーターの制御装置を提供する。このため、地震のP波及びS波を検知してP波検知信号及びS波検知信号をそれぞれ出力するP波感知器2及びS波感知器3と、これら検知信号に基づいて所定の地震時管制運転を行うよう制御するエレベーター制御手段1と、を有するエレベーターの制御装置において、P波感知器2及びS波感知器3は、自身の故障を検出するとP波感知器故障信号及びS波感知器故障信号をそれぞれ出力し、これらの感知器故障信号の組合せから地震感知器の故障状態の重要度を判定し、この重要度に応じた所定の地震感知器故障時動作を選択して、地震感知器故障時動作要求をエレベーター制御手段1へと出力する地震感知器故障時動作選択手段4を備えた構成とする。

Description

エレベーターの制御装置
 この発明は、エレベーターの制御装置に関するものである。
 従来におけるエレベーターの制御装置においては、地震感知器の故障の検知を、地震感知器から出力される地震検知信号を用いて行うものとして、地震感知器を具備し、前記地震感知器からの地震検知作動情報により、地震規模に応じた地震時管制運転を行い、地震の規模が所定の大きさ以下であった場合には、前記地震感知器のリセット指令が地震情報リセット手段から出力されるエレベーターの運転装置であって、前記地震感知器の故障を検出するための時間範囲を設定する故障検出タイマ手段と、設定された時間範囲中に前記リセット指令が出力された回数をカウントし、カウントされた回数が予め設定された所定の回数以上になったときに、前記地震感知器が故障であると判定する特低地震情報故障検出カウンター手段と、を備え、前記故障判定手段により前記地震感知器が故障であると判定された場合に、地震の規模が所定の大きさ以上である際に行う所定の地震時管制運転を行うように構成されたものが知られている(例えば、特許文献1参照)。
日本特開2003-165679号公報
 しかしながら、特許文献1に示された従来におけるエレベーターの制御装置においては、地震感知器の故障が検知されると、その故障の重要度、すなわち、その故障がどれだけ深刻なものであってエレベーターの運行等に影響を及ぼすのか、によらずに常に地震時管制運転となってエレベーターが休止状態になってしまうため、重要度の高くない故障発生時においても当該エレベーターの設置された建物における縦方向の輸送機能が完全に停止してしまい、運転効率が著しく低下してしまうという課題がある。
 この発明は、このような課題を解決するためになされたもので、地震感知器の故障が検出された場合に、その故障の重要度に応じて適切な対応を採ることができ、不必要な運転効率の低下を招来することがないエレベーターの制御装置を得るものである。
 この発明に係るエレベーターの制御装置に関しては、地震のP波を検知してP波検知信号を出力するP波感知器と、地震のS波を検知してS波検知信号を出力するS波感知器と、前記P波検知信号及び前記S波検知信号に基づいて、所定の地震時管制運転を行うようエレベーターを制御するエレベーター制御手段と、を有するエレベーターの制御装置において、前記P波感知器は、前記P波感知器自身の故障を検出するとP波感知器故障信号を出力し、前記S波感知器は、前記S波感知器自身の故障を検出するとS波感知器故障信号を出力し、前記P波感知器故障信号及び前記S波感知器故障信号に基づいて、これらの感知器故障信号の組合せから地震感知器の故障状態の重要度を判定し、この重要度に応じた所定の地震感知器故障時動作を選択して、地震感知器故障時動作要求を前記エレベーター制御手段へと出力する地震感知器故障時動作選択手段を備えた構成とする。
 この発明に係るエレベーターの制御装置においては、地震感知器の故障が検出された場合に、その故障の重要度に応じて適切な対応を採ることができるという効果を奏する。
この発明の実施の形態1に係るエレベーターの制御装置の全体構成を示すブロック図である。 この発明の実施の形態1に係るエレベーターの制御装置の動作を示すフロー図である。
実施の形態1.
 図1及び図2は、この発明の実施の形態1に係るもので、図1はエレベーターの制御装置の全体構成を示すブロック図、図2はエレベーターの制御装置の動作を示すフロー図である。
 図において1はエレベーターの運転全般を制御するエレベーター制御手段であり、エレベーターの乗りかごの運行は元より、地震時や故障時等における各種管制運転や、異常発生時等における発報等に関する制御を司っている。
 当該エレベーターが設置された建物には地震により発生する初期微動の地震波であるP波を検知してP波検知信号をエレベーター制御手段1へと出力するP波感知器2、及び、地震により発生する主要動の地震波であるS波を検知してS波検知信号をエレベーター制御手段1へと出力するS波感知器3が設置されている。
 エレベーター制御手段1は、これらP波感知器2及びS波感知器3から出力されるP波検知信号及びS波検知信号に基づいて、所定の規模以上の地震が検知されたと判断される場合には、所定の地震時管制運転を行うよう当該エレベーターを制御する。
 この所定の地震時管制運転の具体的な例としては、次のようなものがある。
 すなわち、まず、地震の規模を一番規模の小さな地震である特低地震とそれ以上の規模の地震である低地震の二段階に分ける。そして、特低地震の発生が検知された場合には、乗りかごを最寄階に停止させて乗車中の乗客を降車させた後戸開待機させる等の地震時管制運転を行った後、所定時間以内に低地震の発生が検知されなければ、安全と判断してリセットされて平常運転に復帰させる。一方、低地震の発生が検知された場合には、安全を考慮し地震時管制運転を行った後、運転を休止させる。
 また、P波感知器2は、自身の電源異常やCPU異常等の故障の検出を行い、故障が検出されるとP波感知器故障信号を出力する。この故障検出は、例えば前述した特許文献1に記載されているような公知の技術が用いられる。
 そして、S波感知器3もP波感知器2と同様に、自身の電源異常やCPU異常等の故障の検出を行い、故障が検出されるとS波感知器故障信号を出力する。この故障検出は、例えば前述した特許文献1に記載されているような公知の技術が用いられる点も同様である。
 P波感知器2から出力されたP波感知故障信号、及び、S波感知器3から出力されたS波感知器故障信号は、地震感知器故障時動作選択手段4へと入力される。
 この地震感知器故障時動作選択手段4は、これら入力された感知器故障信号に基づいて、検出した感知器故障信号の組合せから地震感知器の故障状態の重要度を判定し、この重要度に応じた所定の地震感知器故障時動作を選択して、地震感知器故障時動作要求をエレベーター制御手段1へと出力する。
 そして、エレベーター制御手段1は、この地震感知器故障時動作選択手段4からの地震感知器故障時動作要求に従って、当該エレベーターの制御を行う。
 この実施の形態にあっては、エレベーター制御装置は図2に示す一連のフローに従って動作する。
 まず、当該エレベーターの通常動作時において(ステップS1)、地震感知器故障時動作選択手段4は、S波感知器3からのS波感知器故障信号が検出されたか否かについて確認を行う(ステップS2)。この確認において、S波感知器3からのS波感知器故障信号が検出されたことが確認された場合には、ステップS3へと進み、地震感知器故障時動作選択手段4は、P波感知器2からのP波感知器故障信号が検出されたか否かについて確認を行う。
 このステップS3の確認において、P波感知器2からのP波感知器故障信号が検出されたことが確認された場合には、ステップS4へと移行して、地震感知器故障時動作選択手段4は、初期微動を感知するP波感知器2及び主要動を感知するS波感知器3の両方が故障しており重要度大であると判定し、この判定結果に基づいてエレベーター制御手段1へと重要度大の地震感知器故障時動作要求を出力する。
 続くステップS5からステップS7においては、この重要度大の地震感知器故障時動作要求を受けたエレベーター制御手段1により、この動作要求に応じた重要度大の地震感知器故障時動作(動作1)の制御が行われる。
 すなわち、まず、ステップS5において、エレベーター制御手段1は、当該建物内の管理人室(監視室)や当該エレベーターの乗場等に設けられた図示しない発報手段に対し、地震感知器の異常発生を発報するよう制御を行う。
 次に、ステップS6において、エレベーター制御手段1は、当該エレベーターについて既に登録されている呼びの全てを即座にキャンセルする。
 そして、ステップS7へと進み、エレベーター制御手段1は、図示しない乗りかごを、現在のかご位置からの最寄階へと走行させて、乗りかごがこの最寄階に到着すると乗りかごを停止させて戸開待機させ、その後、当該エレベーターの運転を休止させるよう制御する。
 一方、ステップS3の確認において、P波感知器2からのP波感知器故障信号が検出されていないことが確認された場合には、ステップS8へと移行して、地震感知器故障時動作選択手段4は、初期微動を感知するP波感知器2は故障していないが主要動を感知するS波感知器3が故障しており重要度中であると判定し、この判定結果に基づいてエレベーター制御手段1へと重要度中の地震感知器故障時動作要求を出力する。
 そして、ステップS9へと移行し、このステップS9からステップS11の一連の工程においては、この重要度中の地震感知器故障時動作要求を受けたエレベーター制御手段1により、この動作要求に応じた重要度中の地震感知器故障時動作(動作2)の制御が行われる。
 すなわち、まず、ステップS9において、エレベーター制御手段1は、当該建物内の管理人室(監視室)や当該エレベーターの乗場等に設けられた図示しない発報手段に対し、地震感知器の異常発生を発報するよう制御を行う。
 次に、ステップS10において、エレベーター制御手段1は、当該エレベーターについて既に登録されている呼びに対して応答するよう制御を行う。
 そして、登録済みの呼びの全てに応答し終わるとステップS11へと進み、この最後に応答した呼びの終着階において乗りかごを停止させて戸開待機させ、その後、当該エレベーターの運転を休止させるよう制御する。
 一方、ステップS2の確認において、S波感知器3からのS波感知器故障信号が検出されていないことが確認された場合には、ステップS12へと進み、地震感知器故障時動作選択手段4は、P波感知器2からのP波感知器故障信号が検出されたか否かについて確認を行う。
 このステップS12の確認において、P波感知器2からのP波感知器故障信号が検出されたことが確認された場合には、ステップS13へと移行して、地震感知器故障時動作選択手段4は、主要動を感知するS波感知器3は故障していないが初期微動を感知するP波感知器2が故障しており重要度小であると判定し、この判定結果に基づいてエレベーター制御手段1へと重要度小の地震感知器故障時動作要求を出力する。
 そして、ステップS14へと移行し、このステップS14からステップS15の一連の工程においては、この重要度小の地震感知器故障時動作要求を受けたエレベーター制御手段1により、この動作要求に応じた重要度小の地震感知器故障時動作(動作3)の制御が行われる。
 すなわち、まず、ステップS14において、エレベーター制御手段1は、当該建物内の管理人室(監視室)や当該エレベーターの乗場等に設けられた図示しない発報手段に対し、地震感知器の異常発生を発報するよう制御を行う。
 そして、ステップS15へと進み、エレベーター制御手段1は、当該エレベーターについて通常運転を継続するよう制御を行う。
 一方、ステップS12の確認において、P波感知器2からのP波感知器故障信号が検出されていないことが確認された場合には、ステップS16へと移行して、地震感知器故障時動作選択手段4は、初期微動を感知するP波感知器2及び主要動を感知するS波感知器3のいずれもが故障していないと判定し、この判定結果に基づいてエレベーター制御手段1へと故障なしの地震感知器故障時動作要求を出力する。
 そして、ステップS17へと移行し、この故障なしの地震感知器故障時動作要求を受けたエレベーター制御手段1により、この動作要求に応じた故障なしの地震感知器故障時動作(動作4)の制御が行われる。すなわち、ステップS17において、エレベーター制御手段1は、当該エレベーターについて通常運転を継続するよう制御を行う。
 なお、ここでは、P波感知器2及びS波感知器3それぞれの故障状態の組合せに応じて4種類の地震感知器故障時動作を行うようにしたが、この地震感知器故障時動作の種類をさらに減少させて、構成の簡潔化を図るとともに、より安全側にたった地震感知器故障時動作を選択するようにしてもよい。
 この場合、例えば、初期微動を感知するP波感知器2は故障していないが主要動を感知するS波感知器3が故障している場合の重要度中の地震感知器故障時動作(動作2)を重要度大の地震感知器故障時動作(動作1)と同様のものとすることが考えられる。
 また、主要動を感知するS波感知器3は故障していないが初期微動を感知するP波感知器2が故障している場合の重要度小の地震感知器故障時動作(動作3)を重要度中の地震感知器故障時動作(動作2)や重要度大の地震感知器故障時動作(動作1)と同様のものとすることが考えられる。
 以上のように構成されたエレベーターの制御装置においては、P波感知器及びS波感知器は自身の故障を検出するとP波感知器故障信号及びS波感知器故障信号をそれぞれ出力し、P波感知器故障信号及びS波感知器故障信号に基づいて、これらの感知器故障信号の組合せから地震感知器の故障状態の重要度を判定し、この重要度に応じた所定の地震感知器故障時動作を選択して、地震感知器故障時動作要求をエレベーター制御手段へと出力する地震感知器故障時動作選択手段を備えたことにより、地震感知器の故障が検出された場合に、その故障の重要度に応じて適切な対応を採ることができる。
 この発明は、地震のP波を検知してP波検知信号を出力するP波感知器と、地震のS波を検知してS波検知信号を出力するS波感知器と、P波検知信号及びS波検知信号に基づいて、所定の地震時管制運転を行うようエレベーターを制御するエレベーター制御手段と、を有するエレベーターの制御装置に利用できる。
  1  エレベーター制御手段
  2  P波感知器
  3  S波感知器
  4  地震感知器故障時動作選択手段

Claims (9)

  1.  地震のP波を検知してP波検知信号を出力するP波感知器と、地震のS波を検知してS波検知信号を出力するS波感知器と、前記P波検知信号及び前記S波検知信号に基づいて、所定の地震時管制運転を行うようエレベーターを制御するエレベーター制御手段と、を有するエレベーターの制御装置において、
     前記P波感知器は、前記P波感知器自身の故障を検出するとP波感知器故障信号を出力し、
     前記S波感知器は、前記S波感知器自身の故障を検出するとS波感知器故障信号を出力し、
     前記P波感知器故障信号及び前記S波感知器故障信号に基づいて、これらの感知器故障信号の組合せから地震感知器の故障状態の重要度を判定し、この重要度に応じた所定の地震感知器故障時動作を選択して、地震感知器故障時動作要求を前記エレベーター制御手段へと出力する地震感知器故障時動作選択手段を備えたことを特徴とするエレベーターの制御装置。
  2.  前記地震感知器故障時動作選択手段は、前記P波感知器故障信号及び前記S波感知器故障信号の両方を検出した場合は、地震感知器の故障状態は重要度大であると判定し、重要度大に対応する所定の地震感知器故障時動作を選択して前記地震感知器故障時動作要求を出力することを特徴とする請求項1に記載のエレベーターの制御装置。
  3.  前記重要度大に対応する所定の地震感知器故障時動作は、当該エレベーターの監視を行う監視室に発報し、当該エレベーターに対し既に登録済みである呼びの全てを即座にキャンセルし、乗りかごを最寄階に停止させて当該エレベーターを休止する動作であることを特徴とする請求項2に記載のエレベーターの制御装置。
  4.  前記地震感知器故障時動作選択手段は、前記P波感知器故障信号を検出せず、かつ、前記S波感知器故障信号を検出した場合は、地震感知器の故障状態は重要度中であると判定し、重要度中に対応する所定の地震感知器故障時動作を選択して前記地震感知器故障時動作要求を出力することを特徴とする請求項1から請求項3のいずれかに記載のエレベーターの制御装置。
  5.  前記重要度中に対応する所定の地震感知器故障時動作は、当該エレベーターの監視を行う監視室に発報し、当該エレベーターに対し既に登録済みである呼びに対応した後、乗りかごを停止させて当該エレベーターを休止する動作であることを特徴とする請求項4に記載のエレベーターの制御装置。
  6.  前記重要度中に対応する所定の地震感知器故障時動作は、前記重要度大に対応する所定の地震感知器故障時動作と、同一の動作であることを特徴とする請求項4に記載のエレベーターの制御装置。
  7.  前記地震感知器故障時動作選択手段は、前記P波感知器故障信号を検出し、かつ、前記S波感知器故障信号を検出しない場合は、地震感知器の故障状態は重要度小であると判定し、重要度小に対応する所定の地震感知器故障時動作を選択して前記地震感知器故障時動作要求を出力することを特徴とする請求項1から請求項6のいずれかに記載のエレベーターの制御装置。
  8.  前記重要度小に対応する所定の地震感知器故障時動作は、当該エレベーターの監視を行う監視室に発報する動作であることを特徴とする請求項7に記載のエレベーターの制御装置。
  9.  前記重要度小に対応する所定の地震感知器故障時動作は、前記重要度大に対応する所定の地震感知器故障時動作又は前記重要度中に対応する所定の地震感知器故障時動作と、同一の動作であることを特徴とする請求項7に記載のエレベーターの制御装置。
PCT/JP2009/068846 2009-11-04 2009-11-04 エレベーターの制御装置 WO2011055434A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN200980162242.8A CN102596782B (zh) 2009-11-04 2009-11-04 电梯控制装置
PCT/JP2009/068846 WO2011055434A1 (ja) 2009-11-04 2009-11-04 エレベーターの制御装置
JP2011539220A JP5392354B2 (ja) 2009-11-04 2009-11-04 エレベーターの制御装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2009/068846 WO2011055434A1 (ja) 2009-11-04 2009-11-04 エレベーターの制御装置

Publications (1)

Publication Number Publication Date
WO2011055434A1 true WO2011055434A1 (ja) 2011-05-12

Family

ID=43969679

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/068846 WO2011055434A1 (ja) 2009-11-04 2009-11-04 エレベーターの制御装置

Country Status (3)

Country Link
JP (1) JP5392354B2 (ja)
CN (1) CN102596782B (ja)
WO (1) WO2011055434A1 (ja)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014240315A (ja) * 2013-06-11 2014-12-25 株式会社日立ビルシステム 昇降機の遠隔監視システム
ES2527364A1 (es) * 2014-06-19 2015-01-22 Aplicaciones Electromecánicas Gervall S.A. Aparato y procedimiento de seguridad para ascensores
JP2015124017A (ja) * 2013-12-25 2015-07-06 株式会社日立ビルシステム 昇降機の遠隔監視システム
JP7374642B2 (ja) 2018-07-27 2023-11-07 オーチス エレベータ カンパニー エレベータ安全システム

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103680072A (zh) * 2013-12-17 2014-03-26 广东省特种设备检测研究院 一种用于电梯的地震预警装置及预警方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5661286A (en) * 1979-10-19 1981-05-26 Mitsubishi Electric Corp Driving gear for elevator in case of earthquake
JP2000335844A (ja) * 1999-05-27 2000-12-05 Toshiba Corp エレベータ制御システム
JP2003165679A (ja) * 2001-11-29 2003-06-10 Mitsubishi Electric Corp エレベーターの運転装置

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003321171A (ja) * 2002-05-07 2003-11-11 Kajima Corp エレベータの地震管制および運転復旧システム
JP2007246183A (ja) * 2006-03-13 2007-09-27 Toshiba Elevator Co Ltd エレベータの運転制御装置
JP4910578B2 (ja) * 2006-09-06 2012-04-04 三菱電機株式会社 エレベータの地震時管制運転装置
JP2009046273A (ja) * 2007-08-22 2009-03-05 Fujitec Co Ltd エレベータの地震管制運転システム

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5661286A (en) * 1979-10-19 1981-05-26 Mitsubishi Electric Corp Driving gear for elevator in case of earthquake
JP2000335844A (ja) * 1999-05-27 2000-12-05 Toshiba Corp エレベータ制御システム
JP2003165679A (ja) * 2001-11-29 2003-06-10 Mitsubishi Electric Corp エレベーターの運転装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014240315A (ja) * 2013-06-11 2014-12-25 株式会社日立ビルシステム 昇降機の遠隔監視システム
JP2015124017A (ja) * 2013-12-25 2015-07-06 株式会社日立ビルシステム 昇降機の遠隔監視システム
ES2527364A1 (es) * 2014-06-19 2015-01-22 Aplicaciones Electromecánicas Gervall S.A. Aparato y procedimiento de seguridad para ascensores
JP7374642B2 (ja) 2018-07-27 2023-11-07 オーチス エレベータ カンパニー エレベータ安全システム

Also Published As

Publication number Publication date
JP5392354B2 (ja) 2014-01-22
JPWO2011055434A1 (ja) 2013-03-21
CN102596782B (zh) 2014-03-12
CN102596782A (zh) 2012-07-18

Similar Documents

Publication Publication Date Title
JP6263552B2 (ja) エレベータの安全システム
US20090133963A1 (en) Elevator control apparatus and control method
JP5602613B2 (ja) エレベータ装置
JP7374642B2 (ja) エレベータ安全システム
JP5392354B2 (ja) エレベーターの制御装置
KR101545797B1 (ko) 엘리베이터의 안전 제어 장치
JP2005500965A (ja) エレベータシステムのドアの領域に不良がある場合の状況依存反応
WO2007083383A1 (ja) エレベータ制御システム
JP5624845B2 (ja) 電子安全エレベータ
CN101910041B (zh) 电梯装置
US20210261383A1 (en) Elevator monitoring system
JP5399879B2 (ja) エレベータ制御装置
JP4750570B2 (ja) エレベーターの管制運転装置及び管制運転方法
JP2011046494A (ja) エレベータ制御装置
JP4872361B2 (ja) エレベータの異常検出装置
JP2017226507A (ja) エレベーター
WO2011161790A1 (ja) エレベーターの制御システム
JP2008114930A (ja) エレベータの制御装置
JP2010222139A (ja) エレベータの運転装置
WO2015151256A1 (ja) エレベータの制御装置
JP5035773B2 (ja) エレベータの制御装置
JP2015059014A (ja) エレベータの制御システム
JP5935433B2 (ja) エレベータの火災時運転システム
JP6256286B2 (ja) エレベータ装置
JP2011098812A (ja) エレベータの地震復旧診断運転装置

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980162242.8

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09851087

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2011539220

Country of ref document: JP

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 09851087

Country of ref document: EP

Kind code of ref document: A1