WO2010109888A1 - 充放電制御装置、及び充放電制御方法 - Google Patents

充放電制御装置、及び充放電制御方法 Download PDF

Info

Publication number
WO2010109888A1
WO2010109888A1 PCT/JP2010/002148 JP2010002148W WO2010109888A1 WO 2010109888 A1 WO2010109888 A1 WO 2010109888A1 JP 2010002148 W JP2010002148 W JP 2010002148W WO 2010109888 A1 WO2010109888 A1 WO 2010109888A1
Authority
WO
WIPO (PCT)
Prior art keywords
amount
power
battery
period
expected
Prior art date
Application number
PCT/JP2010/002148
Other languages
English (en)
French (fr)
Inventor
一浩 武藤
英章 松井
博章 村瀬
Original Assignee
株式会社日本総合研究所
伊藤忠商事株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社日本総合研究所, 伊藤忠商事株式会社 filed Critical 株式会社日本総合研究所
Publication of WO2010109888A1 publication Critical patent/WO2010109888A1/ja
Priority to US13/239,402 priority Critical patent/US8803480B2/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L55/00Arrangements for supplying energy stored within a vehicle to a power network, i.e. vehicle-to-grid [V2G] arrangements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/51Photovoltaic means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/50Charging stations characterised by energy-storage or power-generation means
    • B60L53/52Wind-driven generators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/63Monitoring or controlling charging stations in response to network capacity
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/003Load forecast, e.g. methods or systems for forecasting future load demand
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • H02J3/322Arrangements for balancing of the load in a network by storage of energy using batteries with converting means the battery being on-board an electric or hybrid vehicle, e.g. vehicle to grid arrangements [V2G], power aggregation, use of the battery for network load balancing, coordinated or cooperative battery charging
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/126Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving electric vehicles [EV] or hybrid vehicles [HEV], i.e. power aggregation of EV or HEV, vehicle to grid arrangements [V2G]

Definitions

  • the present invention relates to a charge / discharge control device for controlling charge / discharge of a battery, and a charge / discharge control method.
  • Patent Document 1 Japanese Patent Application Laid-Open No. 6-38384 Patent Document 2 Japanese Patent Application Laid-Open No. 2008-43170 Patent Document 3 Japanese Patent Application Laid-Open No. 2003-158825 Patent Document 4 Japanese Patent Application Laid-Open No. 2004-291681
  • the electric wire voltage of the electric power system is controlled so as to become a voltage within a certain range, when the electric wire voltage is the upper limit voltage, the surplus power cannot be output to the electric power system.
  • surplus power can be used effectively by supplying power to the battery installed in the electric vehicle, but the battery of the electric vehicle is generally fully charged at night when the power rate is low. Therefore, electric power cannot be supplied to the electric vehicle. Therefore, when surplus power is generated, the surplus power cannot be used effectively, and surplus power must be wasted.
  • the power generation amount is a charge / discharge control device that calculates an expected power generation amount that is a future power generation amount by the power generation unit for each predetermined period.
  • a calculation unit, a power consumption calculation unit that calculates an expected power consumption, which is a power consumption that will be consumed in the future by a power load that consumes the power generated by the power generation unit, and a predicted power generation amount A surplus power period determination unit that determines a surplus power period that is a period that is greater than the power consumption, and surplus power that calculates an expected surplus power that is the power obtained by subtracting the expected power consumption from the expected power generation in the surplus power period
  • the charge / discharge control unit determines the remaining battery amount at the start of the surplus power period as the preset charge amount.
  • the battery may be charged to an amount obtained by subtracting the expected surplus power amount from the amount.
  • the charge / discharge control unit determines the remaining battery amount at the start of the surplus power period as the preset charge amount.
  • the battery may be discharged and supplied to the power load so that the expected surplus power amount is subtracted from the amount.
  • the battery may be mounted on a vehicle driven by the battery.
  • a usage schedule acquisition unit that acquires a vehicle usage schedule and a non-use period determination unit that determines a non-use period of the vehicle from the use schedule may be further provided, and the charge / discharge control unit includes surplus power included in the non-use period Charging / discharging of the battery may be controlled so that the remaining amount of the battery at the start of the period is an amount obtained by subtracting the expected surplus power amount from a preset charge amount.
  • the charge / discharge control unit may control the charge / discharge of the battery so that the remaining amount of the battery at the start of the surplus power period is an amount obtained by subtracting the expected surplus power amount from the full charge amount of the battery.
  • a charge amount calculation unit that calculates a required charge amount that is a charge amount required for using the vehicle based on the use schedule may further be provided, and the charge / discharge control unit may store the remaining battery at the start of the surplus power period.
  • the charging / discharging of the battery may be controlled so that the amount is the amount obtained by subtracting the expected surplus power amount from the required charge amount.
  • FIG. 1 shows an example of a power supply system 100.
  • An example of the charge / discharge control apparatus 300 is shown.
  • An example of the state of the predicted power generation amount, predicted power consumption amount, and predicted surplus power amount on the next day is shown.
  • movement of a charging / discharging control apparatus is shown.
  • FIG. 1 shows an example of the power supply system 100.
  • the power supply system 100 includes a vehicle 200, a charge / discharge control device 300, a power load 400, and a power generation unit 500.
  • the vehicle 200 is equipped with a battery 201.
  • Battery 201 stores electric power for driving vehicle 200.
  • the battery 201 drives the vehicle 200 by supplying electric power to the motor of the vehicle 200.
  • the vehicle 200 includes a usage schedule registration unit that registers the usage schedule of the vehicle 200 input by the user.
  • the use schedule may include information such as the use start time, departure place, and destination of the vehicle 200.
  • the use schedule registration unit may be realized by an information processing device.
  • the power of the power system is supplied to the charge / discharge control device 300.
  • the power load 400 consumes power.
  • the power load 400 consumes the power generated by the power generation unit 500.
  • the power load 400 may consume at least one of the power from the power system and the power of the battery 201 of the vehicle 200.
  • the power load 400 may be, for example, a load of the entire building such as an air conditioner, a heater, and lighting installed in a building such as a house.
  • the power generation unit 500 generates electric power.
  • the power generation unit 500 may be a natural energy generator that converts natural energy such as sunlight and wind into electric power.
  • the power generation unit 500 may be a solar power generator or a wind power generator.
  • the charging / discharging control device 300 controls charging / discharging of the battery 201.
  • the charge / discharge control apparatus 300 charges the battery 201 by supplying power from the power system to the battery 201.
  • the charge / discharge control device 300 charges the battery 201 by supplying the power generated by the power generation unit 500 to the battery 201.
  • the charge / discharge control device 300 supplies power from the power system to the power load 400.
  • the charge / discharge control device 300 supplies the power generated by the power generation unit 500 to the power load 400.
  • the charge / discharge control device 300 discharges the battery 201 and supplies the power of the battery 201 to the power load 400.
  • the charge / discharge control device 300 may be installed in a building such as a house.
  • FIG. 2 shows an example of the charge / discharge control apparatus 300.
  • the charge / discharge control apparatus 300 includes a power generation amount calculation unit 301, a power generation information acquisition unit 302, a power consumption amount calculation unit 303, a usage information acquisition unit 304, a surplus power period determination unit 305, a surplus power amount calculation unit 306, and a charge / discharge control unit. 307, a use schedule acquisition unit 308, a non-use period determination unit 309, and a charge amount calculation unit 310.
  • An information processing apparatus such as a CPU that has read a predetermined program may function as the charge / discharge control apparatus 300. Moreover, you may implement
  • the power generation amount calculation unit 301 calculates an expected power generation amount that is a future power generation amount by the power generation unit 500 for each predetermined period.
  • the power generation amount calculation unit 301 refers to an expected power generation amount generated by the power generation unit 500 from 7:00 to 8:00 on the next day, an expected power generation amount from 8:00 to 9:00, and an expected power generation amount from 9:00 to 10:00.
  • the predicted power generation amount of the next day by the power generation unit 500 may be calculated every hour.
  • the power generation amount calculation unit 301 calculates a future predicted power generation amount using at least one of the weather forecast, the past power generation amount, the power generation amount for each past weather, the solar radiation amount, etc. Good.
  • the power generation amount calculation unit 301 may calculate the predicted power generation amount from the future weather, or may use the past power generation amount as it is as the predicted power generation amount.
  • the power generation amount calculation unit 301 may correct the predicted power generation amount calculated from the future weather using the past power generation amount.
  • the weather includes information indicating the atmospheric state that combines the atmospheric pressure, temperature, humidity, wind direction, wind speed, cloud cover, precipitation, and the like.
  • the power generation information acquisition unit 302 acquires power generation information.
  • the power generation information may be information for predicting the power generation amount of the power generation unit 500.
  • the power generation information acquisition unit 302 may acquire the power generation amount for each predetermined period generated by the past power generation unit 500 as the power generation information.
  • the power generation information acquisition unit 302 may acquire the power generation amount for each predetermined period of the past day of the next day, week, month, or season, the same day, week, month, or season. For example, when the month of the next day is July, the power generation amount for each predetermined period of the past July 1 may be acquired.
  • the power generation information acquisition unit 302 may acquire the power generation amount for each predetermined period of the past day in the same weather and the past of the week or month or season as the next day's weather and week or month or season. . For example, when the next day is July and the next day's weather is sunny, the power generation amount for each predetermined period of the past day when the weather is sunny in July may be acquired.
  • the power generation information acquisition unit 302 uses, as power generation information, the amount of solar radiation for a predetermined period of the past day of the same day, week, month, or season on the same day, week, month, or season. You may get it. For example, when the next day is July, the amount of solar radiation for each predetermined period of July may be acquired. The power generation information acquisition unit 302 may acquire the next day's weather and the amount of solar radiation for each predetermined period of the past day of the week or month or season in the same weather and week or month or season. . For example, when the next day is July and the next day is cloudy, the amount of solar radiation for each predetermined period of the day when the weather is cloudy in July may be acquired.
  • the power generation information acquisition unit 302 may acquire future weather by acquiring a weather forecast via the Internet or the like. Further, the power generation information acquisition unit 302 may acquire a past power generation amount from a database that records the power generation amount for each day, week, month, or season. Moreover, the power generation information acquisition unit 302 may acquire the past power generation amount from a database that records the power generation amount in each weather for each week, month, or season. In addition, the power generation information acquisition unit 302 may acquire the amount of solar radiation from a database that records the amount of solar radiation for each day, week, month, or season. In addition, the power generation information acquisition unit 302 may acquire the amount of solar radiation from a database that records the amount of solar radiation in the weather for each week, month, or season.
  • the power generation amount calculation unit 301 may acquire power generation information from the power generation information acquisition unit 302 and calculate an expected power generation amount for each predetermined period of the next day.
  • the predicted power generation amount may be the power generation amount for each predetermined period of the past day of the month and the same weather and month as the acquired next day.
  • the power generation amount calculation unit 301 calculates an expected power generation amount for each predetermined period.
  • the power generation amount calculation unit 301 outputs the calculated predicted power generation amount for each predetermined period to the surplus power period determination unit 305 and the surplus power amount calculation unit 306.
  • the power consumption calculation unit 303 calculates an expected power consumption, which is the power consumed by the power load 400 in the future, for each predetermined period. For example, the power consumption calculation unit 303 calculates the expected power consumption consumed by the power load 400 from 7:00 to 8:00 on the next day, the predicted power consumption from 8:00 to 9:00, and the prediction from 9:00 to 10:00. As the amount of power consumption, the amount of power consumed by the power load the next day may be calculated every hour.
  • the power consumption calculation unit 303 may calculate the predicted future power consumption using at least one of the weather forecast, the past power consumption, and the power consumption for each past weather. For example, the power consumption calculation unit 303 may calculate the predicted power consumption from the future weather, or the past power consumption may be used as the predicted power consumption.
  • the power consumption calculation unit 303 may correct the predicted power consumption calculated from the future weather using the past power consumption.
  • the usage information acquisition unit 304 acquires usage information of the power load 400.
  • the usage information acquisition unit 304 may acquire the power consumption for each predetermined period of the day consumed by the past power load 400 as the usage information.
  • the usage information acquisition unit 304 may acquire the power consumption for each predetermined period of the past day of the same day, week, month, or season on the next day, week, month, or season. For example, when the month of the next day is July, the power consumption for each predetermined period of the past July 1 may be acquired.
  • the usage information acquisition unit 304 acquires the power consumption for each predetermined period of the past day of the same weather and the past day of the week or month or season, and the weather of the next day and the week or month or season. Good. For example, when the next day is July and the next day's weather is sunny, the power consumption for each predetermined period of the past day when the weather is sunny in July may be acquired.
  • the usage information acquisition unit 304 acquires, as usage information, a power load usage amount for each predetermined period of the same day, week, month, or season on the next day, week, month, or season. It's okay. For example, when the month of the next day is July, the power load usage amount for each predetermined period of July may be acquired.
  • the usage information acquisition unit 304 may acquire the power load usage for a predetermined period of the day of the next day and the same weather and the week, month or season of the week or month or season. Good. For example, when the next day is July and the next day is rainy, the power load consumption for each predetermined period of the day when the weather is rainy in July may be acquired.
  • the usage information acquisition unit 304 may acquire future weather by acquiring a weather forecast via the Internet or the like. Further, the usage information acquisition unit 304 may acquire the past power consumption from a database that records the power consumption for each day, week, month, or season. The usage information acquisition unit 304 may acquire past power consumption from a database that records power consumption in each weather for each week, month, or season. In addition, the usage information acquisition unit 304 may acquire past power load usage from a database that records the power load usage for each day, week, month, or season. In addition, the usage information acquisition unit 304 may acquire past power load usage from a database that records the power load usage in each weather for each month, week, or season.
  • the power consumption calculation unit 303 may acquire the usage information acquired from the usage information acquisition unit 304 and calculate the expected power consumption for each predetermined period of the next day.
  • the predicted power consumption may be the power consumption amount for each predetermined period of the past day of the month and the same weather and the month of the acquired next day.
  • you may calculate the estimated electric power consumption for every predetermined period from the electric power load usage for every predetermined period of the past day of the same weather and the month of the acquired next day and the month.
  • the power consumption amount calculation unit 303 outputs the calculated predicted power consumption amount to the surplus power period determination unit 305 and the surplus power amount calculation unit 306.
  • the surplus power period determination unit 305 determines a surplus power period, which is a period in which the predicted power generation amount is larger than the predicted power consumption amount, from the predicted power generation amount and the predicted power consumption amount for each predetermined period sent.
  • the surplus power period determination unit 305 outputs the determined surplus power period to the surplus power amount calculation unit 306 and the charge / discharge control unit 307.
  • the surplus power amount calculation unit 306 calculates an expected surplus power amount obtained by subtracting the predicted power consumption from the predicted power generation amount during the surplus power period.
  • the surplus power amount calculation unit 306 outputs the calculated expected surplus power amount to the charge / discharge control unit 307.
  • the usage schedule acquisition unit 308 acquires the usage schedule of the vehicle 200.
  • the usage schedule acquisition unit 308 acquires the usage schedule from the usage schedule registration unit of the vehicle 200.
  • the usage schedule acquisition unit 308 outputs the acquired usage schedule to the non-use period determination unit 309 and the charge amount calculation unit 310.
  • the non-use period determination unit 309 determines the non-use period of the vehicle 200 from the use schedule.
  • the non-use period of the vehicle 200 means a period when the vehicle 200 is not used, for example, a state where the vehicle 200 is at home.
  • the charge / discharge control device 300 is installed, for example, a company, parking, a department store, etc., the vehicle 200 is not used.
  • the non-use period refers to a period during which the charge / discharge control device 300 can charge the battery 201 of the vehicle 200.
  • the period in which charging is possible refers to, for example, a case where the charge / discharge control device 300 can be connected to the vehicle 200 with a charging cable.
  • the nonuse period determination unit 309 outputs the determined nonuse period of the vehicle 200 to the charge / discharge control unit 307.
  • the charge amount calculation unit 310 calculates a required charge amount that is a charge amount required for the next use of the vehicle 200 based on the use schedule of the vehicle 200. Since the use schedule includes the departure place and the destination, the next vehicle 200 is determined from the travel distance from the departure place to the destination, the change in elevation from the departure place to the destination, and the past power consumption data. You may calculate the required amount of charge required for use.
  • the charge amount calculation unit 310 outputs the calculated required charge amount to the charge / discharge control unit 307.
  • the charge / discharge control unit 307 controls charging / discharging of the battery 201 so that the remaining amount of the battery 201 at the start of the expected surplus power period is set to a value obtained by subtracting the expected surplus power amount from a predetermined charge amount. If the amount obtained by subtracting the current remaining amount of the battery 201 from the preset charge amount is larger than the expected surplus power amount, the charge / discharge control unit 307 determines the remaining amount of the battery 201 at the start of the surplus power period in advance. The battery 201 is charged so as to obtain an amount obtained by subtracting the expected surplus power amount from the set charge amount.
  • the charge / discharge control unit 307 determines the remaining amount of the battery 201 at the start of the surplus power period in advance.
  • the battery 201 is discharged and supplied to the power load 400 so as to obtain an amount obtained by subtracting the expected surplus power amount from the set charge amount.
  • the charge / discharge control unit 307 should set the remaining amount of the battery 201 at the start of the surplus power period included in the non-use period of the vehicle 200 to an amount obtained by subtracting the expected surplus power amount from a preset charge amount.
  • the charging / discharging of the battery 201 may be controlled.
  • the preset charge amount may be a full charge amount of the battery 201. That is, the charging / discharging control unit 307 controls the charging / discharging of the battery 201 so that the remaining amount of the battery 201 at the start of the surplus power period is the amount obtained by subtracting the expected surplus power amount from the full charge amount of the battery 201. It's okay.
  • the preset charge amount may be a required charge amount that is a charge amount required for the next use of the vehicle 200. That is, the charging / discharging control unit 307 may control charging / discharging of the battery 201 so that the remaining amount of the battery 201 at the start of the surplus power period becomes an amount obtained by subtracting the expected surplus power amount from the required charge amount.
  • FIG. 3 shows an example of the state of the expected power generation of the next day, the predicted power consumption of the next day, and the expected surplus power.
  • Expected power generation is indicated by a solid line
  • predicted power consumption is indicated by a broken line.
  • the power generation unit 500 gradually generates electric power from before 6:00 in the morning, and reaches the peak of power generation at 12:00. And power generation ends at about 7 o'clock in the evening.
  • the electric power generation amount at the time of using a solar power generator is shown.
  • the power load 400 increases the power consumption from about 5 o'clock in the morning, and reaches the first peak of power consumption around 8:30 in the morning. Then, the second peak of power consumption reaches about 7 o'clock in the evening. Thereafter, the power consumption gradually decreases.
  • the power generation amount calculation unit 301 and the power consumption amount calculation unit 303 calculate the predicted power generation amount and the predicted power consumption amount every predetermined period, for example, every 30 minutes.
  • the period in which the predicted power generation amount is larger than the predicted power consumption is the surplus power period.
  • the power load 400 cannot consume the expected amount of power generation, and is expected to become surplus power.
  • a region indicated by hatching indicates an expected surplus power amount. That is, the area indicated by diagonal lines indicates the expected surplus power amount obtained by subtracting the predicted power consumption amount from the predicted power generation amount during the surplus power period. In this case, it is conceivable to output this expected surplus power to the power system, but it is conceivable that power will be surplus in the home equipped with the power generation unit 500 on the day when the power generation amount is expected to increase.
  • the remaining amount of the battery 201 at the start of the expected surplus power period is set in advance.
  • the battery 201 is charged so that the estimated surplus power amount is subtracted from the charged amount.
  • the battery 201 can be charged with the expected surplus power without wastefully charging the battery 201.
  • the vehicle 200 since the amount of charge set in advance when the expected surplus power is charged in the battery 201, the vehicle 200 will not be hindered for the next use.
  • the remaining amount of the battery 201 at the start of the expected surplus power period is set as the preset charge.
  • the battery 201 is discharged and supplied to the power load 400 so that the amount obtained by subtracting the expected surplus power amount from the amount is discharged.
  • the electric power supplied from the electric power company to the electric power load 400 can be reduced, and the expected surplus electric power can be charged in the battery 201.
  • the vehicle 200 since the amount of charge set in advance when the expected surplus power is charged in the battery 201, the vehicle 200 will not be hindered for the next use.
  • the battery 201 is discharged before the surplus power period and supplied to the power load 400 to The amount of power supplied from the system to the power load 400 can be suppressed.
  • the battery 201 is charged using the power from the power system at night, so that the power charge can be reduced. The battery 201 can be charged.
  • FIG. 4 shows an example of a flowchart of the operation of the charge / discharge control device.
  • the power generation amount calculation unit 301 calculates an expected power generation amount that is the power generation amount of the next day by the power generation unit 500 for each predetermined period.
  • the power consumption calculation unit 303 calculates an expected power consumption, which is the amount of power consumed by the power load 400 on the next day, for each predetermined period.
  • the surplus power period determination unit 305 determines the predicted power generation amount from the predicted power generation amount calculated for each predetermined period and the predicted power consumption amount calculated for each predetermined period. A surplus power period that is greater than the amount is determined.
  • the surplus power amount calculation unit 306 calculates a surplus power amount obtained by subtracting the predicted power consumption amount from the predicted power generation amount in the surplus power period for each predetermined period.
  • step S605 the charge / discharge control unit 307 subtracts the current remaining amount of the battery 201 from the preset charge amount.
  • the preset charge amount may be a full charge amount of the battery 201 or a necessary charge amount necessary for the next use of the vehicle 200. Further, the preset charge amount may be a charge amount designated by the user.
  • step S606 the charge / discharge control unit 307 determines whether or not the subtracted amount is larger than the surplus power amount. When the surplus power period is not within the non-use period, the charge / discharge control unit 307 may end the process as it is because the surplus power cannot be charged in the battery 201.
  • the charge / discharge control unit 307 can only charge the surplus power in the overlapping surplus power period. Since 201 cannot be charged, it may be determined whether the subtracted amount is larger than the expected surplus power amount in the overlapping surplus period.
  • step S607 the charge / discharge control unit 307 determines the remaining charge of the battery 201 at a preset charge at the start of the surplus power period.
  • the battery 201 is charged so as to obtain an amount obtained by subtracting the expected surplus power amount from the amount. Thereby, surplus power can be charged in the battery 201. Further, when the next vehicle 200 is used, the battery 201 can be charged to a predetermined charge amount.
  • step S606 determines whether the subtracted amount is not larger than the expected surplus power amount, that is, it is determined to be smaller. If it is determined in step S606 that the subtracted amount is not larger than the expected surplus power amount, that is, it is determined to be smaller, in step S608, the charge / discharge control unit 307 calculates the expected surplus power amount from the preset charge amount. The battery 201 is discharged to supply power to the power load 400 so as to reduce the amount.
  • the surplus power can be effectively used without wasting the surplus power.
  • the amount of power supplied from the power company can be suppressed, which is economical.
  • the power generation amount calculation unit 301 calculates the predicted power generation amount for the next day as a future power generation amount for the sake of convenience, but it is only necessary to calculate the predicted power generation amount in a certain future period.
  • the power consumption calculation unit 303 calculates the predicted power consumption of the next day as the power consumption consumed by the future power load 400 for the sake of convenience, but if the predicted power consumption for a certain period in the future is calculated, Good.
  • the fixed period in which the power generation amount calculation unit 301 calculates the expected power generation amount and the constant period in which the power consumption amount calculation unit 303 calculates the expected power consumption amount may be the same period.
  • the amount obtained by subtracting the current remaining amount of the battery 201 from the predetermined charge amount is smaller than the surplus power amount, and the amount obtained by subtracting the expected surplus power amount from the preset charge amount is to be obtained. Even if the battery 201 is discharged before the surplus power period, if the power consumption before the surplus power period is large, the power amount from the battery 201 is insufficient, and an insufficient power amount is generated. In this case, power from the power system is required. Therefore, the battery 201 may be charged with the predicted insufficient power amount at night so that the battery 201 can supply the power consumed by the power load 400 before the surplus power period.
  • the remaining amount of the battery 201 at the start of the surplus power period can be set to an amount obtained by subtracting the expected surplus power amount from the preset charge amount, and the power before the surplus power period can be obtained from the power of the battery 201.
  • the power consumption of the load 400 can be supplemented.
  • the charge amount obtained by subtracting the expected surplus power amount from the preset charge amount may be charged in advance at night so as to obtain a charge amount obtained by adding a charge amount corresponding to the power consumption amount predicted to be consumed before the surplus power period.
  • the remaining amount of the battery 201 at the start of the surplus power period can be set to an amount obtained by subtracting the expected surplus power amount from the preset charge amount, and the power before the surplus power period can be obtained from the power of the battery 201.
  • the power consumption of the load 400 can be supplemented.
  • the power generation amount calculation unit 301 may correct the predicted power generation amount according to the day, day of the week, or the like that is the target of calculation of the predicted power generation amount.
  • the power generation amount calculation unit 301 may correct the calculated predicted power generation amount by applying a correction coefficient. When the predicted power generation amount is corrected, the corrected power generation amount becomes the predicted power generation amount.
  • the correction coefficient is preferably a positive number of 1 or less.
  • the power consumption calculation unit 303 may correct the predicted power consumption according to the day, day of the week, and the like that are the calculation target of the predicted power consumption.
  • the power consumption calculation unit 303 may correct the calculated predicted power consumption by applying a correction coefficient.
  • the correction coefficient is preferably 1 or more.
  • the event includes, for example, an event that consumes more power than originally, such as the Koshien final, the Olympics, and the like.
  • the correction coefficient may be a positive number of 1 or less on the day when the power consumption actually consumed is expected to decrease. Thereby, the electric power of the battery 201 can be used effectively.
  • 100 power supply system 200 vehicle, 201 battery, 300 charge / discharge control device, 301 power generation amount calculation unit, 302 power generation information acquisition unit, 303 power consumption amount calculation unit, 304 usage information acquisition unit, 305 surplus power period determination unit, 306 Surplus power amount calculation unit, 307 charge / discharge control unit, 308 use schedule acquisition unit, 309 non-use period determination unit, 310 charge amount calculation unit, 400 power load, 500 power generation unit

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

 発電部による将来の発電量である予想発電量を予め定められた期間毎に算出する発電量算出部と、発電部によって発電された電力を消費する電力負荷が将来消費する電力量である予想消費電力量を予め定められた期間毎に算出する消費電力量算出部と、予想発電量が予想消費電力量より大きくなる期間である余剰電力期間を判断する余剰電力期間判断部と、余剰電力期間における予想発電量から予想消費電力量を差し引いた電力量である予想余剰電力量を算出する余剰電力量算出部と、余剰電力期間の開始時の電池の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池の充放電を制御する充放電制御部とを備える。

Description

充放電制御装置、及び充放電制御方法
 本発明は、電池の充放電を制御する充放電制御装置、及び充放電制御方法に関する。
 従来、翌日の太陽電池の発電量が翌日の消費電力より小さい場合は、不足分の電力を電池に充電して、翌日の太陽電池の発電量が翌日の消費電力より大きい場合は、電池を充電しない技術が知られている。また、家庭等に太陽電池を設置させて、太陽電池で発電された電力量を家庭等に設けられた負荷に供給することで、電力を節約することが知られている。電力系統の電力は、電線を介してそれぞれの家庭に供給される。また、太陽電池が発電した電力量が、負荷が消費する消費電力より多い場合は、余った余剰電力を電力系統に出力する技術も知られている。
 特許文献1 特開平6-38384号公報
 特許文献2 特開2008-43170号公報
 特許文献3 特開2003-158825号公報
 特許文献4 特開2004-291681号公報
 ここで、電力系統の電線電圧は、一定の範囲の電圧となるように制御されているので、電線電圧が上限電圧の場合は、余った余剰電力を電力系統に出力することはできない。太陽の日射量が多い日は、各家庭で余剰電力が発生し易く、各家庭が余剰電力を電力系統の電線に出力しようとすると、膨大な電力が電線に出力されて、電線電圧が上限値に達してしまい、余剰電力を電力系統に出力できない家庭も多数発生する。このような場合は、電気自動車に搭載している電池に電力を供給することで、余剰電力を有効に使えるが、一般的に電力料金が安い夜間に電気自動車の電池をフルに充電してしまうので、電気自動車に電力を供給することができない。したがって、余剰電力が発生した場合は、該余剰電力を有効に使用することができず、余剰電力を無駄にしなければならない。
 上記課題を解決するために、本発明の第1の態様においては、充放電制御装置であって、発電部による将来の発電量である予想発電量を予め定められた期間毎に算出する発電量算出部と、発電部によって発電された電力を消費する電力負荷が将来消費する電力量である予想消費電力量を予め定められた期間毎に算出する消費電力量算出部と、予想発電量が予想消費電力量より大きくなる期間である余剰電力期間を判断する余剰電力期間判断部と、余剰電力期間における予想発電量から予想消費電力量を差し引いた電力量である予想余剰電力量を算出する余剰電力量算出部と、余剰電力期間の開始時の電池の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池の充放電を制御する充放電制御部とを備える。
 充放電制御部は、予め設定された充電量から現在の電池の残量を差し引いた量が予想余剰電力量より大きい場合、余剰電力期間の開始時の電池の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池を充電してもよい。
 充放電制御部は、予め設定された充電量から現在の電池の残量を差し引いた量が予想余剰電力量より小さい場合、余剰電力期間の開始時の電池の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池を放電させて電力負荷に供給してもよい。
 電池は、電池で駆動される車両に搭載されてよい。
 車両の使用スケジュールを取得する使用スケジュール取得部と、使用スケジュールから車両の不使用期間を判断する不使用期間判断部とをさらに備えてよく、充放電制御部は、不使用期間に含まれる余剰電力期間の開始時の電池の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池の充放電を制御してよい。
 充放電制御部は、余剰電力期間の開始時の電池の残量を、電池の満充電量から予想余剰電力量を差し引いた量にすべく、電池の充放電を制御してよい。
 使用スケジュールに基づいて、車両の使用に必要とされる充電量である必要充電量を算出する充電量算出部をさらに備えてよく、充放電制御部は、余剰電力期間の開始時の電池の残量を、必要充電量から予想余剰電力量を差し引いた量にすべく、電池の充放電を制御してよい。
 なお、上記の発明の概要は、本発明の必要な特徴の全てを列挙したものではない。また、これらの特徴群のサブコンビネーションもまた、発明となりうる。
電力供給システム100の一例を示す。 充放電制御装置300の一例を示す。 翌日の予想発電量、予想消費電力量、及び予想余剰電力量の様子の一例を示す。 充放電制御装置の動作のフローチャートの一例を示す。
 以下、発明の実施の形態を通じて本発明を説明するが、以下の実施形態は請求の範囲にかかる発明を限定するものではない。また、実施形態の中で説明されている特徴の組み合わせの全てが発明の解決手段に必須であるとは限らない。
 図1は、電力供給システム100の一例を示す。電力供給システム100は、車両200、充放電制御装置300、電力負荷400、及び発電部500を有する。車両200は、電池201を搭載する。電池201は、車両200を駆動させる電力を蓄電する。電池201は、車両200のモータに電力を供給することで、車両200を駆動させる。車両200は、ユーザによって入力された車両200の使用スケジュールを登録する使用スケジュール登録部を有する。使用スケジュールは、車両200の使用開始時刻、出発地、及び目的地等の情報を含んでよい。使用スケジュール登録部は、情報処理装置によって実現してよい。
 電力系統の電力は、充放電制御装置300に供給される。電力負荷400は、電力を消費する。電力負荷400は、発電部500によって発電された電力を消費する。また、電力負荷400は、電力系統からの電力、車両200の電池201の電力の少なくとも1つを消費してよい。電力負荷400は、例えば、家等の建物に設置されたエアコン、ヒータ、及び照明等の建物全体の負荷であってよい。発電部500は、電力を発電する。発電部500は、太陽光、風等の自然エネルギーを電力に変換する自然エネルギー発電機であってよい。発電部500は、太陽光発電機であってもよく、風力発電機であってもよい。
 充放電制御装置300は、電池201の充放電を制御する。充放電制御装置300は、電力系統からの電力を電池201に供給して電池201を充電する。また、充放電制御装置300は、発電部500が発電した電力を電池201に供給して電池201を充電する。また、充放電制御装置300は、電力系統からの電力を電力負荷400に供給する。また、充放電制御装置300は、発電部500が発電した電力を電力負荷400に供給する。また、充放電制御装置300は、電池201を放電させて、電池201の電力を電力負荷400に供給する。充放電制御装置300は、家等の建物に設置されてよい。
 図2は、充放電制御装置300の一例を示す。充放電制御装置300は、発電量算出部301、発電情報取得部302、消費電力量算出部303、使用情報取得部304、余剰電力期間判断部305、余剰電力量算出部306、充放電制御部307、使用スケジュール取得部308、不使用期間判断部309、及び充電量算出部310を備える。所定のプログラムを読み込んだCPU等の情報処理装置が充放電制御装置300として機能してよい。また、充放電制御装置300の各部を、情報処理装置によって実現してもよい。
 発電量算出部301は、発電部500による将来の発電量である予想発電量を予め定められた期間毎に算出する。例えば、発電量算出部301は、翌日の7時から8時までの発電部500が発電する予想発電量、8時から9時までの予想発電量、9時から10時までの予想発電量という具合に、発電部500による翌日の予想発電量を1時間毎に算出してよい。発電量算出部301は、天気予報、過去の発電量、過去の天気毎の発電量、太陽の日射量等、天気毎の日射量の少なくとも1つを用いて将来の予想発電量を算出してよい。例えば、発電量算出部301は、将来の天気から予想発電量を算出してもよく、過去の発電量をそのまま予想発電量としてもよい。また、発電量算出部301は、過去の発電量を用いて、将来の天気から算出した予想発電量を補正してよもよい。天気は、気圧・気温・湿度・風向・風速・雲量・降水量などを総合した大気の状態を示す情報を含む。
 発電情報取得部302は、発電情報を取得する。発電情報は、発電部500の発電量を予測するための情報であってよい。発電情報取得部302は、発電情報として、過去の発電部500が発電した予め定められた期間毎の発電量を取得してよい。発電情報取得部302は、翌日の日にち、週、月、又は季節と、同じ日にち、週、月、又は季節の過去の1日の予め定められた期間毎の発電量を取得してよい。例えば、翌日の月が7月の場合は、過去の7月の1日の予め定められた期間毎の発電量を取得してよい。発電情報取得部302は、翌日の天気、及び、週又は月又は季節と、同じ天気、及び、週又は月又は季節の過去の1日の予め定められた期間毎の発電量を取得してよい。例えば、翌日の月が7月で、翌日の天気が晴れの場合は、7月で天気が晴れのときの過去の1日の予め定められた期間毎の発電量を取得してよい。
 また、発電情報取得部302は、発電情報として、翌日の日にち、週、月、又は季節と、同じ日にち、週、月、又は季節の過去の1日の予め定められた期間毎の日射量を取得してよい。例えば、翌日の月が7月の場合は、7月の1日の予め定められた期間毎の日射量を取得してよい。発電情報取得部302は、翌日の天気、及び、週又は月又は季節と、同じ天気、及び、週又は月又は季節の過去の1日の予め定められた期間毎の日射量を取得してよい。例えば、翌日の月が7月で、翌日の天気が曇りの場合は、7月で天気が曇りのときの1日の予め定められた期間毎の日射量を取得してよい。発電情報取得部302は、インターネット等を介して、天気予報を取得することで将来の天気を取得してよい。また、発電情報取得部302は、日、週、月、又は季節毎の発電量を記録したデータベースから過去の発電量を取得してよい。また、発電情報取得部302は、週、月、又は季節毎のそれぞれの天気における発電量を記録したデータベースから過去の発電量を取得してよい。また、発電情報取得部302は、日、週、月、又は季節毎の太陽の日射量を記録したデータベースから日射量を取得してよい。また、発電情報取得部302は、週、月、又は季節毎のそれぞれの天気における太陽の日射量を記録したデータベースから日射量を取得してよい。
 発電量算出部301は、発電情報取得部302から発電情報を取得して翌日の予め定められた期間毎の予想発電量を算出してよい。例えば、取得した翌日の天気及び月と同じ天気及び月の過去の1日の予め定められた期間毎の発電量を予想発電量としてよい。また、取得した翌日の天気及び日射量から1日の予め定められた期間毎の予想発電量を算出してよい。また、取得した翌日の天気及び月と同じ天気及び月の過去の発電量を用いて、翌日の天気及び日射量から算出した予想発電量を補正してよい。発電量算出部301は、予め定められた期間毎の予想発電量を算出する。発電量算出部301は、算出した予め定められた期間毎の予想発電量を余剰電力期間判断部305及び余剰電力量算出部306に出力する。
 消費電力量算出部303は、電力負荷400が将来消費する電力量である予想消費電力量を予め定められた期間毎に算出する。例えば、消費電力量算出部303は、翌日の7時から8時までの電力負荷400が消費する予想消費電力量、8時から9時までの予想消費電力量、9時から10時までの予想消費電力量という具合に、電力負荷が翌日消費する消費電力量を1時間毎に算出してよい。消費電力量算出部303は、天気予報、過去の消費電力量、過去の天気毎の消費電力量の少なくとも1つを用いて将来の予想消費電力量を算出してよい。例えば、消費電力量算出部303は、将来の天気から予想消費電力量を算出してもよく、過去の消費電力量をそのまま予想消費電力量としてもよい。また、消費電力量算出部303は、過去の消費電力量を用いて、将来の天気から算出した予想消費電力量を補正してもよい。
 使用情報取得部304は、電力負荷400の使用情報を取得する。使用情報取得部304は、使用情報として、過去の電力負荷400が消費した1日の予め定められた期間毎の消費電力量を取得してよい。使用情報取得部304は、翌日の日にち、週、月、又は季節と、同じ日にち、週、月、又は季節の過去の1日の予め定められた期間毎の消費電力量を取得してよい。例えば、翌日の月が7月の場合は、過去の7月の1日の予め定められた期間毎の消費電力量を取得してよい。使用情報取得部304は、翌日の天気、及び、週又は月又は季節と、同じ天気、及び、週又は月又は季節の過去の1日の予め定められた期間毎の消費電力量を取得してよい。例えば、翌日の月が7月で、翌日の天気が晴れの場合は、7月で天気が晴れのときの過去の1日の予め定められた期間毎の消費電力量を取得してよい。
 使用情報取得部304は、使用情報として、翌日の日にち、週、月、又は季節と、同じ日にち、週、月、又は季節の1日の予め定められた期間毎の電力負荷使用量を取得してよい。例えば、翌日の月が7月の場合は、7月の1日の予め定められた期間毎の電力負荷使用量を取得してよい。使用情報取得部304は、翌日の天気、及び、週又は月又は季節と、同じ天気、及び、週又は月又は季節の1日の予め定められた期間毎の電力負荷使用量を取得してもよい。例えば、翌日の月が7月で、翌日の天気が雨の場合は、7月で天気が雨のときの1日の予め定められた期間毎の電力負荷消費量を取得してよい。使用情報取得部304は、インターネット等を介して、天気予報を取得することで将来の天気を取得してよい。また、使用情報取得部304は、日、週、月、又は季節毎の消費電力量を記録したデータベースから過去の消費電力量を取得してよい。使用情報取得部304は、週、月、又は季節毎のそれぞれの天気における消費電力量を記録したデータベースから過去の消費電力量を取得してよい。また、使用情報取得部304は、日、週、月、又は季節毎の電力負荷使用量を記録したデータベースから過去の電力負荷使用量を取得してよい。また、使用情報取得部304は、月、週、又は季節毎のそれぞれの天気における電力負荷使用量を記録したデータベースから過去の電力負荷使用量を取得してよい。
 消費電力量算出部303は、使用情報取得部304から取得した使用情報を取得して翌日の予め定められた期間毎の予想消費電力量を算出してよい。例えば、取得した翌日の天気及び月と同じ天気及び月の過去の1日の予め定められた期間毎の消費電力量を予想消費電力量としてよい。また、取得した翌日の天気及び月と同じ天気及び月の過去の1日の予め定められた期間毎の電力負荷使用量から予め定められた期間毎の予想消費電力量を算出してよい。消費電力量算出部303は、算出した予想消費電力量を余剰電力期間判断部305及び余剰電力量算出部306に出力する。
 余剰電力期間判断部305は、送られてきた予め定められた期間毎の予想発電量及び予想消費電力量から、予想発電量が予想消費電力量より大きくなる期間である余剰電力期間を判断する。余剰電力期間判断部305は、判断した余剰電力期間を余剰電力量算出部306及び充放電制御部307に出力する。余剰電力量算出部306は、余剰電力期間における予想発電量から予想消費電力を差し引いた予想余剰電力量を算出する。余剰電力量算出部306は、算出した予想余剰電力量を充放電制御部307に出力する。
 使用スケジュール取得部308は、車両200の使用スケジュールを取得する。使用スケジュール取得部308は、車両200の使用スケジュール登録部から使用スケジュールを取得する。使用スケジュール取得部308は、取得した使用スケジュールを不使用期間判断部309及び充電量算出部310に出力する。不使用期間判断部309は、使用スケジュールから車両200の不使用期間を判断する。車両200の不使用期間とは、車両200を使用していない期間のことをいい、たとえば、自宅に車両200がある状態のことをいう。ここで、車両200を充放電制御装置300が設置された建物以外の場所、例えば、会社、パーキング、デパート等に駐車している場合は、車両200は使用されていない状態であるが、これらの場合は不使用期間に含まれない。不使用期間とは、充放電制御装置300が車両200の電池201を充電可能な期間のことをいう。充電可能な期間とは、例えば、充放電制御装置300が車両200と充電ケーブルで接続できる場合等をいう。不使用期間判断部309は、判断した車両200の不使用期間を充放電制御部307に出力する。
 充電量算出部310は、車両200の使用スケジュールに基づいて、車両200の次回の使用に必要とされる充電量である必要充電量を算出する。使用スケジュールには、出発地及び目的地が含まれているので、出発地から目的地までの走行距離、出発地から目的地までの標高の変化、過去の消費電力データとから次回の車両200の使用に必要な必要充電量を算出してよい。充電量算出部310は、算出した必要充電量を充放電制御部307に出力する。
 充放電制御部307は、予想余剰電力期間の開始時の電池201の残量を、予め定められた充電量から予想余剰電力量を差し引いた量にすべく、電池201の充放電を制御する。充放電制御部307は、予め設定された充電量から現在の電池201の残量を差し引いた量が予想余剰電力量より大きい場合は、余剰電力期間の開始時の電池201の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池201を充電する。充放電制御部307は、予め設定された充電量から現在の電池201の残量を差し引いた量が予想余剰電力量より小さい場合は、余剰電力期間の開始時の電池201の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池201を放電させて電力負荷400に供給する。
 また、充放電制御部307は、車両200の不使用期間に含まれる余剰電力期間の開始時の電池201の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池201の充放電を制御してよい。また、予め設定された充電量とは、電池201の満充電量であってよい。つまり、充放電制御部307は、余剰電力期間の開始時の電池201の残量を、電池201の満充電量から予想余剰電力量を差し引いた量にすべく、電池201の充放電を制御してよい。また、予め設定された充電量とは、車両200の次回の使用に必要とされる充電量である必要充電量であってもよい。つまり、充放電制御部307は、余剰電力期間の開始時の電池201の残量を、必要充電量から予想余剰電力量を差し引いた量にすべく、電池201の充放電を制御してよい。
 図3は、翌日の予想発電量、翌日の予想消費電力量、及び予想余剰電力量の様子の一例を示す。予想発電量は実線で、予想消費電力量は破線で示す。発電部500は、朝の6時前から徐々に電力を発電していき、12時に発電のピークを迎える。そして、夜の7時ぐらいに発電を終了する。図3では、太陽光発電機を用いた場合の発電量を示している。また、電力負荷400は、朝の5時ぐらいから消費する電力が増えていき、朝の8時30分当たりで消費電力の第1のピークを迎える。そして、夜の7時ぐらいに消費電力の第2のピークを迎える。その後、徐々に消費電力が少なくなる。発電量算出部301及び消費電力量算出部303は、予め定められた期間毎に、たとえば、30分毎に、その予想発電量及び予想消費電力量を算出する。
 また、予想発電量が予想消費電力量より大きくなる期間が余剰電力期間となる。この余剰電力期間においては、電力負荷400が予想発電量を消費することができず、余剰電力になると予想される。斜線で示している領域は、予想余剰電力量を示している。つまり、斜線で示している領域は、余剰電力期間における予想発電量から予想消費電力量を差し引いた予想余剰電力量を示している。この場合、この予想余剰電力を電力系統に出力することも考えられるが、発電量が大きくなると予想される日は、発電部500を備えている家庭では電力が余ってしまうことが考えられる。
 したがって、発電部500を備えているすべての家庭が余剰電力を電力系統の電線に出力しようとすると、電線に出力される電力量が膨大になるので、電線の電圧が上限値に達してしまい電力系統に電力を出力できない家庭も多数出てくる。したがって、この予想余剰電力を車両200の電池201に充電できれば、発電した電力を無駄にすることなく、有効に使える。したがって、予想余剰電力量を電池201に充電できる容量を確保するために、電池201の充放電を制御する。
 具体的には、予め設定された充電量から現在の電池201の残量を差し引いた量が予想余剰電力量より大きい場合は、予想余剰電力期間の開始時の電池201の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池201を充電する。これにより、無駄に電池201を充電することがなく、予想余剰電力を電池201に充電することができる。また、予想余剰電力を電池201に充電したときに予め設定された充電量となるので、車両200の次回の使用の支障をきたさない。また、予め設定された充電量から現在の電池201の残量を差し引いた量が予想余剰電力量より小さい場合は、予想余剰電力期間の開始時の電池201の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池201を放電させて電力負荷400に供給する。これにより、電力会社から電力負荷400に供給させる電力を低減させることができ、予想余剰電力を電池201に充電することができる。また、予想余剰電力を電池201に充電したときに予め設定された充電量となるので、車両200の次回の使用の支障をきたさない。
 また、余剰電力期間前は、発電部500の予想発電量より、電力負荷400の予想消費電力量が大きいので、電力系統からの電力を電力負荷400に供給する必要がある。しかし、予め設定された充電量から現在の電池残量を差し引いた量が、予想余剰電力量より大きい場合は、余剰電力期間前に電池201を放電させて電力負荷400に供給することで、電力系統から電力負荷400に供給させる電力量を抑えることができる。また、予め設定され充電量から現在の電池残量を差し引いた量が、予想余剰電力量より小さい場合は、夜間に電力系統からの電力を用いて電池201を充電することで、安い電力料金で電池201を充電させることができる。
 図4は、充放電制御装置の動作のフローチャートの一例を示す。ステップS601で、発電量算出部301は、発電部500による翌日の発電量である予想発電量を予め定められた期間毎に算出する。ステップS602で、消費電力量算出部303は、電力負荷400が翌日に消費する電力量である予想消費電力量を予め定められた期間毎に算出する。ステップS603で、余剰電力期間判断部305は、予め定められた期間毎に算出された予想発電量と予め定められた期間毎に算出された予想消費電力量とから、予想発電量が予想消費電力量より大きくなる余剰電力期間を判断する。ステップS604で、余剰電力量算出部306は、予め定められた期間毎に余剰電力期間における予想発電量から予想消費電力量を差し引いた余剰電力量を算出する。
 ステップS605で、充放電制御部307は、予め設定された充電量から現在の電池201の残量を差し引く。予め設定された充電量は、電池201の満充電量であってもよく、車両200の次の使用に必要な必要充電量であってよい。また、予め設定された充電量は、ユーザが指定した充電量であってもよい。ステップS606で、充放電制御部307は、差し引いた量が、余剰電力量より大きいか否かを判断する。なお、充放電制御部307は、余剰電力期間が不使用期間内にない場合は、余剰電力を電池201に充電することができないので、そのまま処理を終了してよい。また、充放電制御部307は、余剰電力期間が不使用期間内に完全に含まれずに、余剰電力期間と不使用期間とが一部重複する場合は、重複する余剰電力期間における余剰電力しか電池201に充電することができないので、差し引いた量が当該重複する余剰期間における予想余剰電力量より大きいか否かを判断してよい。
 ステップS606で、差し引いた量が予想余剰電力量より大きいと判断された場合は、ステップS607で、充放電制御部307は、余剰電力期間の開始時に電池201の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池201を充電する。これにより、余剰電力を電池201に充電することができる。また、次の車両200の使用時には、予め定められた充電量に電池201を充電することができる。一方、ステップS606で、差し引いた量が予想余剰電力量より大きくない、つまり小さいと判断された場合は、ステップS608で、充放電制御部307は、予め設定された充電量から予想余剰電力量を差し引いた量にすべく、電池201を放電させて電力負荷400に電力を供給する。
 このように、余剰電力を無駄にすることがなく、余剰電力を有効に使用することができる。また、余剰電力を有効に使用するので、電力会社から供給される電力量を抑えることができ経済的になる。なお、発電量算出部301は、将来の発電量として、便宜上、翌日の予想発電量を算出したが、将来の一定の期間における予想発電量を算出すればよい。また、消費電力量算出部303は、将来の電力負荷400が消費する消費電力量として、便宜上、翌日の予想消費電力量を算出したが、将来の一定の期間における予想消費電力量を算出すればよい。また、発電量算出部301が予想発電量を算出する一定の期間と、消費電力量算出部303が予想消費電力量を算出する一定の期間は、同一の期間であってよい。
 また、予め定められた充電量から現在の電池201の残量を差し引いた量が、余剰電力量より小さいと判断して、予め設定された充電量から予想余剰電力量を差し引いた量にすべく電池201を余剰電力期間前に放電させても、余剰電力期間前の消費電力量が大きい場合は、電池201からの電力量では足りなくなり不足電力量が発生する。この場合は、電力系統からの電力を必要とする。したがって、余剰電力期間前に電力負荷400が使用する消費電力を電池201が供給できるように、予め夜間に当該予測される不足電力量を電池201に充電してもよい。これにより、余剰電力期間の開始時の電池201の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすることができるとともに、電池201の電力で余剰電力期間前の電力負荷400の消費電力を補うことができる。
 また、予め定められた充電量から現在の電池201の残量を差し引いた量が、余剰電力量より大きいと判断された場合は、予め設定された充電量から予想余剰電力量を差し引いた充電量に、余剰電力期間前に消費されると予測される消費電力量分の充電量を加えた充電量となるように予め夜間に電池201を充電してよい。これにより、余剰電力期間の開始時の電池201の残量を、予め設定された充電量から予想余剰電力量を差し引いた量にすることができるとともに、電池201の電力で余剰電力期間前の電力負荷400の消費電力を補うことができる。
 なお、予想発電量より実際に発電された発電量が少ない場合には、得られると思っていた余剰電力量が得られなくなり、電池201を満充電することができなくなる。したがって、発電量算出部301は、予想発電量の算出対象となる日、曜日等に応じて、予想発電量を補正してよい。発電量算出部301は、算出した予想発電量に補正係数をかけて補正してよい。予想発電量を補正した場合は、補正後の発電量が予想発電量となる。補正係数は、1以下の正数であることが好ましい。予想発電量を少なめにすることで、実際に発電された発電量が補正前の予想発電量より少ない場合であっても対応することができる。
 また、予想消費電力より実際に消費された消費電力量が多い場合は、得られると思っていた余剰電力量が得られなくなり、電池201を満充電することができなくなる。したがって、消費電力量算出部303は、予想消費電力量の算出対象となる日、曜日等に応じて、予想消費電力量を補正してよい。消費電力量算出部303は、算出した予想消費電力量に補正係数をかけて補正してよい。予想消費電力量を補正した場合は、補正後の電力量が予想消費電力量となる。補正係数は1以上の値であることが好ましい。予想消費電力量を多めにすることで、実際に消費された消費電力量が補正前の予想消費電力量より多い場合であっても対応することができる。消費電力量算出部303は、イベントがある日は補正係数を大きくしてよい。イベントとは、例えば、甲子園の決勝戦、オリンピック等の本来より消費する電力量が多くなると思われるものを含む。逆に、実際に消費する消費電力量が少なくなる見込みがある日は、補正係数を1以下の正数にしてもよい。これにより、電池201の電力を有効に使用することができる。
 以上、本発明を実施の形態を用いて説明したが、本発明の技術的範囲は上記実施の形態に記載の範囲には限定されない。上記実施の形態に、多様な変更または改良を加えることが可能であることが当業者に明らかである。その様な変更または改良を加えた形態も本発明の技術的範囲に含まれ得ることが、請求の範囲の記載から明らかである。
 請求の範囲、明細書、および図面中において示した装置、システム、プログラム、および方法における動作、手順、ステップ、および段階等の各処理の実行順序は、特段「より前に」、「先立って」等と明示しておらず、また、前の処理の出力を後の処理で用いるのでない限り、任意の順序で実現しうることに留意すべきである。請求の範囲、明細書、および図面中の動作フローに関して、便宜上「まず、」、「次に、」等を用いて説明したとしても、この順で実施することが必須であることを意味するものではない。
100 電力供給システム、200 車両、201 電池、300 充放電制御装置、301 発電量算出部、302 発電情報取得部、303 消費電力量算出部、304 使用情報取得部、305 余剰電力期間判断部、306 余剰電力量算出部、307 充放電制御部、308 使用スケジュール取得部、309 不使用期間判断部、310 充電量算出部、400 電力負荷、500 発電部

Claims (8)

  1.  発電部による将来の発電量である予想発電量を予め定められた期間毎に算出する発電量算出部と、
     前記発電部によって発電された電力を消費する電力負荷が将来消費する電力量である予想消費電力量を前記予め定められた期間毎に算出する消費電力量算出部と、
     前記予想発電量が前記予想消費電力量より大きくなる期間である余剰電力期間を判断する余剰電力期間判断部と、
     前記余剰電力期間における前記予想発電量から前記予想消費電力量を差し引いた電力量である予想余剰電力量を算出する余剰電力量算出部と、
     前記余剰電力期間の開始時の電池の残量を、予め設定された充電量から前記予想余剰電力量を差し引いた量にすべく、前記電池の充放電を制御する充放電制御部と
    を備える充放電制御装置。
  2.  前記充放電制御部は、前記予め設定された充電量から現在の前記電池の残量を差し引いた量が前記予想余剰電力量より大きい場合、前記余剰電力期間の開始時の前記電池の残量を、前記予め設定された充電量から前記予想余剰電力量を差し引いた量にすべく、前記電池を充電する
    請求項1に記載の充放電制御装置。
  3.  前記充放電制御部は、前記予め設定された充電量から現在の前記電池の残量を差し引いた量が前記予想余剰電力量より小さい場合、前記余剰電力期間の開始時の前記電池の残量を、前記予め設定された充電量から前記予想余剰電力量を差し引いた量にすべく、前記電池を放電させて前記電力負荷に供給する
    請求項1または2に記載の充放電制御装置。
  4.  前記電池は、前記電池で駆動される車両に搭載されている
    請求項1から3のいずれかに記載の充放電制御装置。
  5.  前記車両の使用スケジュールを取得する使用スケジュール取得部と、
     前記使用スケジュールから前記車両の不使用期間を判断する不使用期間判断部と
    をさらに備え、
     前記充放電制御部は、前記不使用期間に含まれる前記余剰電力期間の開始時の前記電池の残量を、前記予め設定された充電量から前記予想余剰電力量を差し引いた量にすべく、前記電池の充放電を制御する
    請求項4に記載の充放電制御装置。
  6.  前記充放電制御部は、前記余剰電力期間の開始時の前記電池の残量を、前記電池の満充電量から前記予想余剰電力量を差し引いた量にすべく、前記電池の充放電を制御する
    請求項1から5のいずれかに記載の充放電制御装置。
  7.  前記使用スケジュールに基づいて、前記車両の使用に必要とされる充電量である必要充電量を算出する充電量算出部
    をさらに備え、
     前記充放電制御部は、前記余剰電力期間の開始時の前記電池の残量を、前記必要充電量から前記予想余剰電力量を差し引いた量にすべく、前記電池の充放電を制御する
    請求項5に記載の充放電制御装置。
  8.  発電部による将来の発電量である予想発電量を予め定められた期間毎に算出する発電量算出段階と、
     前記発電部によって発電された電力を消費する電力負荷が将来消費する電力量である予想消費電力量を前記予め定められた期間毎に算出する消費電力量算出段階と、
     前記予想発電量が前記予想消費電力量より大きくなる期間である余剰電力期間を判断する余剰電力期間判断段階と、
     前記余剰電力期間における前記予想発電量から前記予想消費電力量を差し引いた電力量である予想余剰電力量を算出する余剰電力量算出段階と、
     前記余剰電力期間の開始時の電池の残量を、予め設定された充電量から前記予想余剰電力量を差し引いた量にすべく、前記電池の充放電を制御する充放電制御段階と
    を備える充放電制御方法。
PCT/JP2010/002148 2009-03-27 2010-03-25 充放電制御装置、及び充放電制御方法 WO2010109888A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US13/239,402 US8803480B2 (en) 2009-03-27 2011-09-22 Charge/discharge control apparatus and charge/discharge control method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009080597A JP5430994B2 (ja) 2009-03-27 2009-03-27 充放電制御装置、及び充放電制御方法
JP2009-080597 2009-03-27

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US13/239,402 Continuation US8803480B2 (en) 2009-03-27 2011-09-22 Charge/discharge control apparatus and charge/discharge control method

Publications (1)

Publication Number Publication Date
WO2010109888A1 true WO2010109888A1 (ja) 2010-09-30

Family

ID=42780584

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2010/002148 WO2010109888A1 (ja) 2009-03-27 2010-03-25 充放電制御装置、及び充放電制御方法

Country Status (3)

Country Link
US (1) US8803480B2 (ja)
JP (1) JP5430994B2 (ja)
WO (1) WO2010109888A1 (ja)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012175722A (ja) * 2011-02-17 2012-09-10 Panasonic Corp 充放電制御装置
JP2015109791A (ja) * 2013-11-15 2015-06-11 本田技研工業株式会社 車両と電力系統間の制御
CN105122580A (zh) * 2013-03-11 2015-12-02 株式会社东芝 充电时间调整装置、充电系统、充电时间调整程序
EP2775586A4 (en) * 2011-11-01 2016-04-13 Nec Corp CHARGING CONTROL DEVICE, CELL MANAGEMENT DEVICE, CHARGING CONTROL METHOD AND RECORDING MEDIUM
CN110797928A (zh) * 2018-08-02 2020-02-14 郑州宇通客车股份有限公司 一种充电站负载均衡管理方法及装置
CN112373348A (zh) * 2020-12-04 2021-02-19 江苏科技大学 一种无人自助式海上充电方法及其充电系统

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5319644B2 (ja) * 2010-11-01 2013-10-16 三菱電機株式会社 エネルギー管理システム及びプログラム
JP5818499B2 (ja) * 2010-11-10 2015-11-18 三菱重工業株式会社 蓄電池運用制御装置及び蓄電池運用制御方法ならびにそのプログラム
JP5652196B2 (ja) * 2010-12-27 2015-01-14 株式会社ノーリツ パワーコンディショナ
KR101203842B1 (ko) 2010-12-28 2012-11-21 엘지전자 주식회사 에너지 관리장치의 제어방법
JP2012191700A (ja) * 2011-03-09 2012-10-04 Sumitomo Forestry Co Ltd 蓄電池利用システム
JP5353957B2 (ja) * 2011-06-14 2013-11-27 株式会社デンソー 電力供給システム
JP5967516B2 (ja) 2011-11-22 2016-08-10 パナソニックIpマネジメント株式会社 電力管理装置、電力管理プログラム、及び、電力分配システム
CN102545711B (zh) * 2012-02-17 2015-06-24 振发能源集团有限公司 一种新型的离网/并网一体化太阳能发电系统与控制方法
JP5703248B2 (ja) * 2012-03-07 2015-04-15 株式会社東芝 充放電管理装置及び充放電管理方法
JP2013192351A (ja) * 2012-03-13 2013-09-26 Omron Corp 電力調整装置、電力調整方法、プログラム、および電力システム
JP6053303B2 (ja) * 2012-03-30 2016-12-27 三菱重工業株式会社 電力管理装置、電力管理方法及びプログラム
JP5999576B2 (ja) 2012-04-11 2016-09-28 株式会社Ihi 家屋用電力供給システム、家屋及び電気自動車
JP6000007B2 (ja) * 2012-07-20 2016-09-28 三菱重工業株式会社 充電制御装置、電気自動車充電システム、及び電気自動車充電方法
JP5882156B2 (ja) * 2012-07-23 2016-03-09 株式会社デンソー 電力制御装置
JP2014113006A (ja) * 2012-12-05 2014-06-19 Panasonic Corp 充放電管理装置、パワーコンディショナ、蓄電装置、プログラム
JP6053711B2 (ja) * 2014-02-27 2016-12-27 三菱重工業株式会社 充電設備管理装置、充電設備管理方法、およびプログラム
JP2015171189A (ja) * 2014-03-05 2015-09-28 清水建設株式会社 充放電管理装置、充放電管理方法及びプログラム
WO2015159388A1 (ja) * 2014-04-16 2015-10-22 三菱電機株式会社 制御装置、制御システム、制御方法及びプログラム
KR20160143178A (ko) * 2015-06-04 2016-12-14 삼성전자주식회사 의료 영상 처리 장치 및 의료 영상 처리 방법
CN107710542B (zh) * 2015-06-22 2020-10-30 三菱电机株式会社 蓄电池控制装置、蓄电池充放电系统、太阳能发电系统以及蓄电池控制方法
JP6705652B2 (ja) * 2016-01-14 2020-06-03 積水化学工業株式会社 蓄電池制御方法
CN108521236A (zh) * 2018-04-19 2018-09-11 佛山市小沙江科技有限公司 一种新能源自供电系统
JP7142291B2 (ja) * 2018-10-04 2022-09-27 パナソニックIpマネジメント株式会社 充電方法、及び、充電システム
DE102019112228A1 (de) * 2019-05-10 2020-11-12 Bayerische Motoren Werke Aktiengesellschaft Vorrichtung, Verfahren und Kabel zum Einspeisen elektrischer Energie in ein Energienetz auf Basis eines mobilen Energiespeichers
JP7071321B2 (ja) * 2019-10-25 2022-05-18 本田技研工業株式会社 管理装置、管理方法、及びプログラム
CN112874380B (zh) * 2021-01-18 2022-09-16 浙江零跑科技股份有限公司 一种新能源汽车有序充电方法及计算机可读存储介质
GB2613367B (en) * 2021-12-01 2024-04-24 Myenergi Ltd A method of charging an auxiliary battery

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002233054A (ja) * 2001-02-05 2002-08-16 Japan Storage Battery Co Ltd 電力貯蔵装置および充電制御方法
JP2002315193A (ja) * 2001-04-10 2002-10-25 Mitsubishi Heavy Ind Ltd 電力制御システム
JP2007312597A (ja) * 2002-07-11 2007-11-29 Toyota Motor Corp 自家用エネルギ生成システム
JP2009232670A (ja) * 2008-02-29 2009-10-08 Osaka Gas Co Ltd エネルギ供給システム
JP2010041883A (ja) * 2008-08-07 2010-02-18 Panasonic Corp 蓄電システム

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2680965B2 (ja) 1992-02-25 1997-11-19 レーム プロパティズ ビーブイ エネルギ制御装置
JP2003158825A (ja) 2001-09-04 2003-05-30 Hitachi Ltd 自然エネルギー利用発電装置と電力貯蔵用二次電池とのハイブリッドシステム及びその利用方法
JP4320776B2 (ja) 2003-03-25 2009-08-26 マツダ株式会社 車両の電力制御装置
US6914411B2 (en) * 2003-05-19 2005-07-05 Ihs Imonitoring Inc. Power supply and method for controlling it
JP3917573B2 (ja) * 2003-09-10 2007-05-23 株式会社日立製作所 蓄電システム
WO2005108784A1 (ja) * 2004-05-07 2005-11-17 Mitsubishi Denki Kabushiki Kaisha 風力発電評価システム、風力発電機のための予測制御サービスシステム
JP2008043170A (ja) 2006-08-10 2008-02-21 Nippon Telegr & Teleph Corp <Ntt> 電力供給システム、需用家群設備、およびその監視制御方法
JP5095495B2 (ja) * 2008-05-20 2012-12-12 日本電信電話株式会社 電力システムおよびその制御方法
AU2008365735B2 (en) * 2008-12-26 2014-08-14 Japan Wind Development Co., Ltd. Wind-driven electricity generation system of type having storage battery, and device for controlling charge and discharge of storage battery

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002233054A (ja) * 2001-02-05 2002-08-16 Japan Storage Battery Co Ltd 電力貯蔵装置および充電制御方法
JP2002315193A (ja) * 2001-04-10 2002-10-25 Mitsubishi Heavy Ind Ltd 電力制御システム
JP2007312597A (ja) * 2002-07-11 2007-11-29 Toyota Motor Corp 自家用エネルギ生成システム
JP2009232670A (ja) * 2008-02-29 2009-10-08 Osaka Gas Co Ltd エネルギ供給システム
JP2010041883A (ja) * 2008-08-07 2010-02-18 Panasonic Corp 蓄電システム

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012175722A (ja) * 2011-02-17 2012-09-10 Panasonic Corp 充放電制御装置
EP2775586A4 (en) * 2011-11-01 2016-04-13 Nec Corp CHARGING CONTROL DEVICE, CELL MANAGEMENT DEVICE, CHARGING CONTROL METHOD AND RECORDING MEDIUM
US9682633B2 (en) 2011-11-01 2017-06-20 Nec Corporation Charge control device, battery management device, charge control method, and record medium
CN105122580A (zh) * 2013-03-11 2015-12-02 株式会社东芝 充电时间调整装置、充电系统、充电时间调整程序
US10003209B2 (en) 2013-03-11 2018-06-19 Kabushiki Kaisha Toshiba Charge period adjusting apparatus, charge system, and charge period adjusting program
JP2015109791A (ja) * 2013-11-15 2015-06-11 本田技研工業株式会社 車両と電力系統間の制御
CN110797928A (zh) * 2018-08-02 2020-02-14 郑州宇通客车股份有限公司 一种充电站负载均衡管理方法及装置
CN112373348A (zh) * 2020-12-04 2021-02-19 江苏科技大学 一种无人自助式海上充电方法及其充电系统
CN112373348B (zh) * 2020-12-04 2022-04-15 江苏科技大学 一种无人自助式海上充电方法及其充电系统

Also Published As

Publication number Publication date
US20120007563A1 (en) 2012-01-12
JP2010233408A (ja) 2010-10-14
US8803480B2 (en) 2014-08-12
JP5430994B2 (ja) 2014-03-05

Similar Documents

Publication Publication Date Title
JP5430994B2 (ja) 充放電制御装置、及び充放電制御方法
US10193343B2 (en) Method for managing power of energy storage system connected with renewable energy
JP3740099B2 (ja) 電力ネットワーク管理システムおよび電力ネットワーク管理方法
JP5095495B2 (ja) 電力システムおよびその制御方法
JP5877479B2 (ja) 電力管理システム、電力管理方法、プログラム
US9331512B2 (en) Power control device and power control method for measuring open-circuit voltage of battery
US9944194B1 (en) Smarter charging of plug-in vehicles
US10374433B2 (en) Power supply system
CN106532764B (zh) 一种就地消纳光伏发电的电动汽车充电负荷调控方法
CN110112783B (zh) 光伏蓄电池微电网调度控制方法
JP5369885B2 (ja) 電力供給システムおよびその制御方法
EP2602902B1 (en) Power supplying system
JP2013031283A (ja) デマンド制御装置
EP3010107A1 (en) State of charge management in battery systems
US9172247B2 (en) Power supply system with controlled power storage
JP2010268576A (ja) 電力供給配分制御装置
JP2014155286A (ja) 設備運転計画決定方法
Hafiz et al. Energy storage management strategy based on dynamic programming and optimal sizing of PV panel-storage capacity for a residential system
JP2018038238A (ja) 電力制御システムおよび電力制御方法
US9876350B2 (en) Power supply system
JP6753469B2 (ja) 蓄電装置及び電源システム
JP5992748B2 (ja) 太陽光発電システム及び電力供給システム
JP5969365B2 (ja) 電力制御システム
JP7252116B2 (ja) 再生可能エネルギー発電システム
JP2013042575A (ja) 発電量予測装置、サーバ、および発電システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 10755690

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 10755690

Country of ref document: EP

Kind code of ref document: A1