WO2009157342A1 - 電力を電力需要施設に分配する電力制御システム - Google Patents

電力を電力需要施設に分配する電力制御システム Download PDF

Info

Publication number
WO2009157342A1
WO2009157342A1 PCT/JP2009/060915 JP2009060915W WO2009157342A1 WO 2009157342 A1 WO2009157342 A1 WO 2009157342A1 JP 2009060915 W JP2009060915 W JP 2009060915W WO 2009157342 A1 WO2009157342 A1 WO 2009157342A1
Authority
WO
WIPO (PCT)
Prior art keywords
power
value
unit
storage device
facility
Prior art date
Application number
PCT/JP2009/060915
Other languages
English (en)
French (fr)
Inventor
和仁 西村
和夫 山田
Original Assignee
シャープ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by シャープ株式会社 filed Critical シャープ株式会社
Priority to JP2010517916A priority Critical patent/JP5179582B2/ja
Priority to US13/001,500 priority patent/US8578184B2/en
Priority to CN2009801239638A priority patent/CN102067408A/zh
Publication of WO2009157342A1 publication Critical patent/WO2009157342A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means

Definitions

  • the present invention relates to a power control system, and more particularly to a power control system that distributes power supplied from a power system to a plurality of power demand facilities.
  • Patent Document 1 International Publication No. 05/093924 pamphlet
  • Patent Document 2 Japanese Patent Application Laid-Open No. 2002-171444
  • a technique for preventing a reverse power flow in which power flows from a facility that requires power (hereinafter also referred to as a power demand facility) to a power system that supplies power to the power demand facility.
  • a power demand facility is, for example, a house.
  • the electric power system is a system that supplies electric power, for example, in an electric power company.
  • the present invention has been made to solve the above-described problems, and an object of the present invention is to provide a power control system that enables effective use of power while preventing power from flowing to the power system. It is.
  • a power control system includes a plurality of power demand facilities, a first connection unit to which an external power system is connected, and a plurality of power demand facilities.
  • a distribution unit including a second connection unit, and a measurement unit that measures a value of circulating power that is power flowing between the power system and the distribution unit.
  • the distribution unit distributes the power supplied from the power system via the first connection unit to a plurality of power demand facilities.
  • Each of the plurality of power demand facilities includes a power generation device that generates power and outputs the power to the second connection unit, and a power storage device that connects the storage battery and receives the power distributed from the distribution unit.
  • the power storage device performs a charging process for storing the power received by the power storage device in the connected storage battery and a discharging process for outputting at least a part of the power stored from the storage battery to the second connection unit.
  • the power control system further includes a condition detection unit that detects whether or not a condition of (TLP ⁇ K1) is satisfied, and a power control instruction to a plurality of power demand facilities when the condition detection unit detects that the condition is satisfied And a power control unit for transmitting.
  • TLP indicates the value of the distribution power measured by the measurement unit when the value of the distribution power flowing from the power system toward the distribution unit is positive
  • K1 indicates the reverse power flow indicating the distribution power flowing from the distribution unit to the power system. Refers to the threshold for detecting.
  • the power control instruction instructs the power storage device that is performing the discharging process to suppress the amount of power output from the storage battery, and the power storage device that is performing the charging process to the storage battery. Instruct to increase the amount of power stored.
  • the power control system further receives, from each of the plurality of power demand facilities, processing information indicating processing performed by the power storage device of the power demand facility for the storage battery connected to the power storage device.
  • a receiving unit the power control unit transmits a power control instruction to the plurality of power demanding facilities based on the processing information received by the processing information receiving unit.
  • the power storage device receives power distributed from the distribution unit and power output from the power generation devices of a plurality of power demand facilities.
  • the charging process includes a first charging process in which at least a part of the power distributed from the distributing unit is stored in the storage battery, and a second charging process in which at least a part of the power output by the power generation devices of the plurality of power demand facilities is stored in the storage battery. Of at least one of them.
  • the power storage device includes a current capacity value detection unit that detects a value of the current capacity stored in the connected storage battery. Based on the current capacity value detected by the current capacity value detection unit, it is detected whether or not the storage battery can be charged.
  • the power storage device increases the amount of power to be charged in the connected storage battery.
  • each of the plurality of power demanding facilities further includes a distribution unit, an in-facility measurement unit that measures a value of in-facility power that is power flowing between the power storage devices and a direction in which the in-facility power flows, and And an in-facility control unit that performs an internal power control process so that the in-facility power increases when the condition of INP ⁇ L1) is satisfied.
  • INP indicates the value of the in-facility power measured when the direction from the distribution unit to the power storage device is positive
  • L1 indicates the in-facility threshold for detecting the power flowing from the power storage device to the distribution unit. Point to.
  • the in-facility control unit increases the in-facility threshold by a predetermined value when receiving the power control instruction.
  • the internal power control process refers to a process of suppressing the amount of power supplied to the distribution unit by the discharge process when the corresponding power storage device is performing the discharge process.
  • the charging process increases the power to be charged in the corresponding storage battery. Refers to processing.
  • the in-facility threshold indicated by L1 is a value close to zero.
  • the power control unit outputs, to a power storage device performing a discharge process, from a storage battery connected to the power storage device until it is detected that a condition of (TLP ⁇ K1) is satisfied. Control is performed so that the amount of power is suppressed, and the power storage device that performs the charging process is controlled so that the amount of power charged by the storage battery connected to the power storage device increases.
  • the threshold value indicated by K1 is a value close to zero.
  • the power generation device refers to a solar power generation device.
  • a method for controlling a power system includes a distribution unit including a plurality of power demand facilities, a first connection unit to which an external power system is connected, and a second connection unit to which the plurality of power demand facilities are connected, a power system, and a distribution And a measurement unit that measures the value of the distribution power that is the power flowing between the two units.
  • the distribution unit distributes the power supplied from the power system through the first connection unit to a plurality of power demand facilities, and outputs the power supplied through the second connection unit to the power system through the first connection unit. To do.
  • Each of the plurality of power demand facilities includes a power generation device that generates power and outputs the power to the second connection unit, and a power storage device that connects the storage battery and receives the power distributed from the distribution unit or the power output from the power generation device. including.
  • the power storage device performs a charging process for storing the power received by the power storage device in the connected storage battery and a discharging process for outputting the power stored from the storage battery to the second connection unit.
  • the method includes a step of detecting whether or not a condition of (TLP ⁇ K1) is satisfied, and a step of transmitting a power control instruction to a plurality of power demanding facilities when it is detected that the condition is satisfied.
  • TLP indicates the value of the distribution power measured by the measurement unit when the value of the distribution power flowing from the power system toward the distribution unit is positive
  • K1 indicates the reverse power flow indicating the distribution power flowing from the distribution unit to the power system. Refers to the threshold for detecting.
  • the power control instruction instructs the power storage device that is performing the discharging process to suppress the amount of power output from the storage battery, and the power storage device that is performing the charging process to the storage battery. Instruct to increase the amount of power charged.
  • a power control system measures a value of distribution power that is power flowing between a power distribution system and a distribution unit that distributes power supplied from a power system to a plurality of power demand facilities. Including a measurement unit.
  • the measured distribution power is TLP
  • the threshold for detecting reverse power flow is K1
  • the distribution power TLP is large when the condition TLP ⁇ RP0 is satisfied.
  • the power control process is performed as follows. In the power control process, the power storage device that is performing the discharge process is controlled so as to suppress the amount of power supplied to the power system by the discharge process. In addition, the power storage device performing the charging process is controlled so as to increase the power charged in the corresponding storage battery.
  • FIG. 1 is a diagram showing a configuration of a power control system 10000 in the present embodiment.
  • a power system P100 is shown for explanation.
  • the electric power system P100 is a commercial facility such as an electric power company that supplies electric power.
  • the power control system 10000 is a system provided in an apartment house such as an apartment.
  • the power control system 10000 is not limited to this, and may be, for example, a system provided in an apartment house composed of a plurality of detached houses.
  • a power control system 10000 includes a transformer 50, a distribution unit 300, a power measuring device 100, a power control device 200, and a plurality of power demanding facilities 1000.
  • the transformer 50, the distribution unit 300, the power measuring device 100, and the power control device 200 are in the room R100.
  • the room R100 is a room provided in the apartment
  • the power demanding facility 1000 is a house in the apartment.
  • the power system P100 is electrically connected to the transformer 50 through a power line. It is assumed that power system P100 supplies power having a voltage of 6600 V to transformer 50 through a power line.
  • the transformer 50 converts the voltage level (6600V) of the power supplied from the power system P100 into a voltage level (single-phase three-wire system 200V) that can be used in each of the plurality of power demanding facilities 1000.
  • Transformer 50 is electrically connected to distribution unit 300 through power line PL10.
  • the transformer 50 supplies the converted voltage level power (hereinafter also referred to as converted power) to the distribution unit 300 through the power line PL10.
  • the above is the configuration when the power system P100 is 6600V high voltage power, and when the power system P100 is a single-phase three-wire system 200V, the transformer 50 is unnecessary.
  • Distribution unit 300 has a function of distributing power (for example, converted power) flowing through power line PL10 to a plurality of power demanding facilities 1000.
  • the breaker sets the power path to an electrically connected state (hereinafter also referred to as an “on state”) or an electrically disconnected state (hereinafter also referred to as an “off state”). In the present embodiment, it is assumed that the breaker is set to an on state unless otherwise specified.
  • Breaker 310 is electrically connected to transformer 50 through power line PL10.
  • Breaker 310 is electrically connected to node N3 through a power line.
  • Each of the breakers 320 (i) is electrically connected to the node N3 through a power line.
  • Breaker 310 electrically connects transformer 50 and node N3.
  • the converted power supplied from the transformer 50 is supplied to the node N3.
  • power line PL30 (i) is also simply referred to as power line PL30.
  • Each of the breakers 320 electrically connects the node N3 and the corresponding power demand facility 1000.
  • the number of power demanding facilities 1000 may be a value larger than n (natural number).
  • a distribution board for branching may be provided between the breaker in the distribution unit 300 and the corresponding power demand facility 1000.
  • the power measuring apparatus 100 includes a control unit 110 and a communication unit 120.
  • the control unit 110 includes a CPU (Central Processing Unit) 111, a memory 112, and a measurement unit 113 for performing processing on each unit in the power measuring apparatus 100, arithmetic processing, and the like.
  • the CPU 111 instead of the CPU 111, another circuit having an arithmetic function may be used.
  • the measurement unit 113 measures the voltage at the node N3. In the present embodiment, the measured voltage value is assumed to be a positive value unless otherwise specified.
  • Measurement unit 113 has a function of measuring the value of the current flowing through power line PL10.
  • the value of the current measured by measurement unit 113 is , It is assumed to be a positive value.
  • the direction of current flow in power line PL10 is the direction from breaker 310 to transformer 50 (that is, the direction from distribution unit 300 to power system P100)
  • the value of the current measured by measurement unit 113 is Suppose it is negative.
  • the current value measured by measurement unit 113 also indicates the direction of current flow in power line PL10. That is, measurement unit 113 can also measure the direction of current flow in power line PL10.
  • the power is calculated by the product of the current value and the voltage value. Therefore, measurement unit 113 can measure (detect) the value of the power flowing through power line PL10.
  • the power line PL10 The direction in which the power flowing through the power flows in the direction from the power system P100 to the distribution unit 300 is the direction.
  • the value of the measured power is a negative value
  • the direction of the power flowing through power line PL10 is the direction from distribution unit 300 to power system P100. Therefore, measurement unit 113 can measure (detect) the direction of power flowing through power line PL10.
  • the position where the measurement unit 113 measures the voltage and current is a position close to the transformer 50 (high voltage side) and a position close to the distribution unit 300 as long as the voltage and current of the power flowing through the power line PL10 can be measured ( Either of the low pressure side may be used.
  • the measurement unit 113 may be installed anywhere as long as it is closer to the power system P100 than the node N3 in the distribution unit 300.
  • the voltage and current of the power flowing through the power line PL10 are measured at a position close to the distribution unit 300 (low voltage side). It shall be.
  • the communication unit 120 has a function of communicating with the control unit 110 and other devices.
  • the communication unit 120 has a function of performing PLC (Power Line Communications) based on the home plug AV as a communication standard. Since PLC is communication using a power line, it is not necessary to newly install a communication line, and is advantageous in comparison with other communication in terms of cost, communication reliability, and the like.
  • PLC Power Line Communications
  • the communication performed by the communication unit 120 is not limited to the PLC, and may be other communication.
  • the communication performed by the communication unit 120 is, for example, wired communication based on RS (Recommended standard) 485 standard, wired communication based on Ethernet (registered trademark), wireless communication based on IEEE (Institute of Electrical and Electronics Engineers) 802.11g, etc. It may be.
  • the power control apparatus 200 includes a control unit 210 and a communication unit 220.
  • the control unit 210 includes a CPU 211, a memory 212, a condition detection unit 213, and a power control unit 214 for performing processing on each unit in the power control apparatus 200, arithmetic processing, and the like.
  • the condition detection unit 213 detects whether or not a predetermined condition for detecting a reverse power flow described later is satisfied.
  • the power control unit 214 transmits a power control instruction to each of the power demanding facilities 1000. Data stored in the memory 212 will be described later.
  • the processing executed by the CPU 211 may be omitted by incorporating the processing corresponding to the functions of the condition detection unit 213 and the power control unit 214 into the processing.
  • the communication unit 220 has a function of communicating with the control unit 210 and other devices.
  • the communication unit 220 has a function of performing the same communication as the communication unit 120 described above. That is, the communication unit 220 has a function of performing PLC.
  • Communication unit 220 communicates with communication unit 120.
  • the power demand facility 1000 includes a distribution board 400 and an electric load 70R.
  • Distribution board 400 includes breakers 410, 420, 430, and 440.
  • breaker 410 is electrically connected to breaker 320 (1) through power line PL30 (1) (power line PL30).
  • Breaker 410 is electrically connected to node N4 through a power line. Breaker 410 electrically connects breaker 320 (1) and node N4.
  • Breaker 440 is electrically connected to node N4 and electric load 70R through a power line.
  • the electric load 70R is a device that operates by consuming electric power.
  • the electric load 70R is, for example, a refrigerator, an air conditioner, a washing machine, or the like.
  • Breaker 440 electrically connects electrical load 70R and node N4. That is, the distribution board 400 can supply the electric power supplied to the distribution board 400 to the electric load 70R.
  • the power demand facility 1000 further includes a power measuring device 700.
  • the power measuring device 700 includes a control unit 710 and a communication unit 720.
  • the control unit 710 includes a CPU 711, a memory 712, a measurement unit 713, a condition detection unit 714 for detecting a reverse power flow, which will be described later, and a power control unit in order to perform processing, arithmetic processing, and the like on each unit in the power measuring device 700. 715.
  • the power control unit 715 controls charging and discharging by a power storage device 600 described later and power generation by a power generation device 500 described later. Data stored in the memory 712 will be described later.
  • condition detection unit 714 and the power control unit 715 may be omitted by incorporating processing corresponding to the functions of the condition detection unit 714 and the power control unit 715 into the processing executed by the CPU 711.
  • the measurement unit 713 measures the voltage of the node N4 based on the control of the CPU 711. Measuring unit 713 measures (detects) the value of the current flowing through power line PL30 (for example, power line PL30 (1)) between the corresponding breaker (breaker 320 (1)) and breaker 410.
  • power line PL30 for example, power line PL30 (1)
  • the value of the current measured by the measurement unit 713 is assumed to be a positive value.
  • the current value measured by measurement unit 713 is a negative value.
  • the current value measured by the measurement unit 713 also indicates the direction of current flow in the power line PL30. That is, measurement unit 713 can also measure the direction of current flow in power line PL30. The power is calculated by the product of the current value and the voltage value. Therefore, measurement unit 713 can measure (detect) the value of the power flowing through power line PL30.
  • the power line PL30 is obtained when the power value measured by the measurement unit 713 is a positive value.
  • the direction in which the power flowing in the direction flows to the distribution board 400 from the distribution unit 300 is the direction.
  • the value of the power measured by measurement unit 713 is a negative value
  • the direction of the power flowing through power line PL30 is the direction from distribution board 400 toward distribution unit 300 (power system P100). Therefore, measurement unit 713 can measure (detect) the direction in which the power flowing through power line PL30 flows.
  • the position where the measurement unit 713 measures the voltage and current is a position where the total power supplied to the corresponding power demand facility 1000 or the total power supplied from the power demand facility 1000 can be measured, as shown in FIG. It is not limited to the described position.
  • the communication unit 720 has a function of communicating with the control unit 710 and other devices.
  • the communication unit 720 has a function of performing the same communication as the communication unit 120 described above. That is, the communication unit 720 has a function of performing PLC.
  • Communication unit 720 communicates with communication unit 220 in power control device 200 and power storage device 600 described later.
  • the power demand facility 1000 further includes a power generation device 500 and a solar cell BT10.
  • Solar cell BT10 has a function of generating power using sunlight and supplying the generated power to power generation device 500.
  • the solar cell BT10 is obtained by connecting a plurality of solar cells in series so that the supplied voltage is DC (Direct Current) 100V to DC350V. It is assumed that the maximum output power of the solar cell BT10 is 3 kW.
  • the maximum output power of the solar cell BT10 is not limited to 3 kW, but may be another value (for example, any value in the range of 3 to 5 kW).
  • solar cell BT10 is provided on the roof of the apartment.
  • the power generation device 500 has a function of performing a power generation process of converting the DC power obtained by the solar cell BT10 into AC power and supplying the converted power to the distribution board 400, and is solar light linked to the low-voltage system. It is a power conditioner.
  • the power generation device 500 is not limited to a solar power conditioner, and may be a power conditioner that uses power generated by a fuel cell, wind power generation, or the like.
  • the power generation apparatus 500 always performs control (hereinafter also referred to as maximum power follow-up control) such that the maximum power can be acquired from the solar cell BT10.
  • Breaker 420 included in distribution board 400 is electrically connected to node N4 and power generation device 500 through a power line. Breaker 420 electrically connects node N4 and power generation device 500.
  • the power control system 10000 is not limited to the above configuration.
  • the power measurement device 100 and the power control device 200 may be configured as a single device.
  • FIG. 2 is a block diagram showing an internal configuration of the power generation apparatus 500. As shown in FIG. For the sake of explanation, FIG. 2 shows a solar cell BT10, a communication unit 620 described later, and an AC (Alternating Current) 200V voltage source P50.
  • AC Alternating Current
  • power generation device 500 includes a conversion circuit 540.
  • the conversion circuit 540 has a function of converting the DC power obtained by the solar cell BT10 into AC power.
  • the power generation device 500 further includes a control unit 510, a communication unit 520, and a drive circuit 530.
  • the control unit 510 includes a CPU 511, a memory 512, and a signal generation unit 513 in order to perform processing on each unit in the power generation device 500, arithmetic processing, and the like.
  • the signal generator 513 generates and outputs a pulse signal 55S, a pulse width decrease instruction 56S, and a pulse width increase instruction 57S according to the control of the CPU 511.
  • binary high voltage state for example, power supply voltage Vcc
  • low voltage state for example, ground voltage GND
  • the pulse signal is a signal composed of L level and H level voltages.
  • the communication unit 520 has a function of communicating with the control unit 510 and other devices.
  • the communication unit 520 has a function of performing the same communication as that of the communication unit 120 described above.
  • the communication unit 520 communicates with a communication unit 620 described later.
  • the drive circuit 530 Based on the pulse width decrease instruction 56S and the pulse width increase instruction 57S from the signal generation unit 513 of the control unit 510, the drive circuit 530 operates a pulse signal (pulse signals 5AS, 51S, 52S, 53S, 54S) is generated and output. The drive circuit 530 changes the H level width (pulse width) of the output pulse signal based on the pulse width decrease instruction 56S and the pulse width increase instruction 57S.
  • the conversion circuit 540 includes a booster circuit 541, an inverter circuit 542, a filter circuit 543, and a relay circuit 544.
  • the booster circuit 541 is electrically connected to the solar cell BT10.
  • the booster circuit 541 has a function of boosting the voltage level obtained by the solar cell BT10 to about DC380V.
  • the booster circuit 541 supplies the boosted voltage to the inverter circuit 542.
  • Booster circuit 541 includes a reactor L50, a diode D50, a switch circuit G5A, and an electrolytic capacitor C51.
  • the switch circuit G5A can use an IGBT (Insulated Gate Bipolar Transistor) or a MOSFET (Metal Oxide Semiconductor Field Effect Transistor), but here a MOSFET is used.
  • the pulse signal 5AS output from the drive circuit 530 is input to the gate of the MOSFET in the switch circuit G5A.
  • the MOSFET in the switch circuit G5A causes a current to flow between the source and the drain when an H level signal (pulse signal 5AS) is input to the gate.
  • the booster circuit 541 always performs control (hereinafter also referred to as maximum power tracking control) such that the maximum power can be acquired from the solar cell BT10 under the control of the control unit 510 (pulse signal 5AS).
  • the inverter circuit 542 has a function of converting the DC voltage supplied from the booster circuit 541 into an AC voltage.
  • Inverter circuit 542 includes switch circuits G51, G52, G53, and G54.
  • Each of the switch circuits G51, G52, G53, and G54 can use an IGBT or a MOSFET, but here, an IGBT is used.
  • Pulse signals 51S, 52S, 53S, and 54S are input to the gates of the four IGBTs included in the switch circuits G51, G52, G53, and G54, respectively.
  • the IGBT included in each of switch circuits G51, G52, G53, and G54 has a function similar to that of the MOSFET included in switch circuit G5A, and therefore detailed description will not be repeated.
  • the inverter circuit 542 has a function of suppressing the AC voltage to be output by the pulse signals 51S, 52S, 53S, and 54S output from the drive circuit 530.
  • the filter circuit 543 has a function of smoothing and shaping the waveform of the AC voltage generated by the inverter circuit 542.
  • Filter circuit 543 includes reactors L51 and L52 and a capacitor C52.
  • Relay circuit 544 includes relays SW51 and SW52. Each of relays SW51 and SW52 operates in accordance with pulse signal 55S. Specifically, each of the relays SW51 and SW52 electrically connects the filter circuit 543 and the voltage source P50 when the H level pulse signal 55S is input. On the other hand, when the L level pulse signal 55S is input, each of the relays SW51 and SW52 brings the filter circuit 543 and the voltage source P50 into an electrically disconnected state.
  • the voltage source P50 indicates an AC voltage supplied from the power system P100 side to the breaker 420 in FIG.
  • the relay circuit 544 When the relay circuit 544 is ON, the inverter circuit 542 is supplied with a voltage of 200 VAC through the relay circuit 544 and the filter circuit 543, and the inverter circuit 542 passes through the filter circuit 543 and the relay circuit 544 to the breaker 420 side. Output alternating current.
  • the relay circuit 544 is OFF, the inverter circuit 542 stops the output of the alternating current.
  • FIG. 2 shows a state in which two lines are connected to the voltage source P50 in order to simply show the connection state.
  • the voltage source P50 of AC 200V is composed of two AC 100Vs.
  • a voltage source and a single-phase three-wire system 200V composed of three wires can be connected.
  • the conversion circuit 540 is not limited to the above circuit configuration, and may be any configuration that can convert the DC power obtained by the solar cell BT10 into AC power, and is limited to the configuration of FIG. is not.
  • power demand facility 1000 further includes a power storage device 600 and a storage battery BT20.
  • the storage battery BT20 is assumed to be a lithium ion battery.
  • the storage battery BT20 is assumed to be a battery that can be charged with an amount of power of 8 kWh.
  • the maximum output power of the solar cell BT10 is 3 kW.
  • the amount of power allowed to be charged in the storage battery BT20 is also referred to as chargeable power amount. That is, the chargeable power amount of the storage battery BT20 is 8 kWh.
  • the state of the storage battery BT20 when the amount of power stored in the storage battery BT20 is equal to the charge allowable power amount is also referred to as a fully charged state.
  • a state in which no electric power is stored in the storage battery BT20 due to the discharge process is also referred to as a discharge end state.
  • the storage battery BT20 is not limited to a lithium ion battery, and may be any device as long as it can store a large amount of electric energy.
  • the storage battery BT20 may be a secondary battery that converts electrical energy into chemical energy and stores it, such as a lead storage battery, a nickel metal hydride battery, a redox flow battery, or a sodium sulfur battery, or an electric battery such as a lithium ion capacitor. It may be an electric double layer capacitor that stores energy as it is.
  • the storage battery BT20 is obtained by connecting a plurality of storage batteries in series so that the output voltage is 150V to 250V.
  • the power storage device 600 is a storage battery power conditioner having a function of performing a charging process for storing power in the storage battery BT20 and a discharging process for discharging the power stored in the storage battery BT20.
  • power storage device 600 stops the charging process and enters a state in which neither the charging process nor the discharging process is performed.
  • the state of storage battery BT20 becomes a discharge end state due to the discharge process
  • power storage device 600 stops the discharge process and enters a state where neither the charge process nor the discharge process is performed.
  • the power storage device 600 may be a device that does not use a storage battery.
  • power storage device 600 may be a device that stores electrical energy, such as an electric double layer capacitor or a superconducting power storage device.
  • Power storage device 600 may be, for example, a flywheel power storage device that converts electrical energy into mechanical energy and stores the energy.
  • Breaker 430 included in distribution board 400 is electrically connected to node N4 and power storage device 600 through a power line. Breaker 430 electrically connects node N4 and power storage device 600.
  • Power is supplied from the distribution unit 300 to the distribution board 400.
  • the corresponding power storage device 600 is performing a discharge process
  • power is supplied to the distribution board 400 from the corresponding power storage device 600.
  • the corresponding power generation device 500 performs a power generation process
  • power is supplied to the distribution board 400 from the corresponding power generation device 500.
  • the corresponding power storage device 600 performs the discharge process and the corresponding power generation device 500 performs the power generation process
  • the corresponding power storage device 600 and the corresponding power generation device Power is supplied from 500.
  • the corresponding power storage device 600 when power is supplied from distribution unit 300 to distribution board 400 and the corresponding power storage device 600 is performing a charging process, at least part of the power supplied from distribution unit 300 to distribution board 400 is The corresponding storage battery BT20 is charged by the charging process performed by the corresponding power storage device 600.
  • the distribution board 400 when power is supplied to the distribution board 400 from the power storage device 600 performing the discharge process, and the total amount of power supplied to the distribution board 400 is greater than the amount of power consumed by the electrical load 70R, At least a part of the electric power supplied to the distribution board 400 from the power storage device 600 performing the discharging process is sent to the distribution unit 300.
  • distribution board 400 merely connects the devices electrically, and the flow of power is naturally determined by the output state of each device and the magnitude of the electrical load.
  • the power demand facility 1000 connected to the power line PL30 (1) is referred to as a power demand facility A.
  • power demand facility 1000 connected to power line PL30 (n) is referred to as power demand facility B.
  • the power storage device 600 in the power demand facility A is performing the charging process.
  • the power generation device 500 in the power demand facility B performs power generation processing, and the power demand facility B supplies at least a part of the power obtained by the power generation processing to the distribution unit 300.
  • At least a part of the power obtained by the power generation process supplied from the power demand facility B to the distribution unit 300 is distributed by the power storage device 600 in the power demand facility A performing the charging process.
  • the storage battery BT20 in the power demand facility A may be charged via the unit 300.
  • At least part of the power sent to the power system P100 by the power generation process performed by the power generation apparatus 500 included in the power demand facility B other than the power demand facility A including the power storage apparatus 600 that performs the charging process is used as the power demand facility. It can also be stored in the storage battery BT20 in A.
  • another power demand facility can also effectively use the power supplied from one power demand facility to the distribution unit 300. That is, the plurality of power demanding facilities 1000 can effectively use the power via the distribution unit 300.
  • FIG. 3 is a block diagram showing the internal configuration of the power storage device 600.
  • FIG. 3 shows the storage battery BT20, the communication unit 520 in the power generation device 500, the voltage source P60, and the communication unit 720 in the power measurement device 700 for explanation.
  • power storage device 600 includes a charge / discharge circuit 640.
  • the charge / discharge circuit 640 has a function of performing a charging process for storing electric power in the storage battery BT20 and a discharging process for discharging the electric power stored in the storage battery BT20.
  • the power storage device 600 further includes a control unit 610, a communication unit 620, and a drive circuit 630.
  • the control unit 610 includes a CPU 611, a memory 612, a signal generation unit 613, a measurement unit 614, and a state detection unit 615 in order to perform processing on each unit in the power storage device 600, arithmetic processing, and the like.
  • the signal generation unit 613 generates and outputs a pulse signal 65S, a pulse width decrease instruction 66S, and a pulse width increase instruction 67S based on the control of the CPU 611.
  • Measurement unit 614 measures (detects) the value of the current flowing in the electric wire connecting storage battery BT20 and reactor L60 (described later) in power storage device 600 and the direction in which the current flows, based on the control of CPU 611. Data stored in the memory 612 will be described later.
  • the state detection unit 615 determines whether the charging / discharging circuit 640 is performing a charging process or a discharging process or whether the charging / discharging circuit 640 is performing a charging process or a discharging process. It is always detected whether or not. That is, it is always detected whether the power storage device 600 is performing a charging process or a discharging process, or whether the power storage device 600 is performing neither a charging process nor a discharging process.
  • the communication unit 620 has a function of communicating with the control unit 610 and other devices.
  • the communication unit 620 has a function of performing the same communication as the communication unit 120 described above.
  • Communication unit 620 communicates with communication unit 520 in power generation device 500 and communication unit 720 in power measurement device 700.
  • each of the communication units 120, 220, 520, 620, and 720 shown in FIG. 1, FIG. 2, and FIG. 3 uses the received data as the received data regardless of whether there is an instruction from the corresponding control unit. It has a function to transmit to the destination. That is, each of the communication units 120, 220, 520, 620, and 720 has a function of communicating with an arbitrary communication unit.
  • the communication unit 120 when the communication unit 120 receives data addressed to the power generation device 500 (hereinafter, also referred to as power generation device data) from the control unit 110, the communication unit 120 transmits the power generation device address data to the communication unit 220.
  • the communication unit 220 transmits the received power generation device address data to the communication unit 720.
  • the communication unit 720 transmits the received power generation device address data to the communication unit 620, and the communication unit 620 transmits the received power generation device address data to the communication unit 520 in the power generation device 500.
  • communication unit 720 can communicate with communication unit 620 in power storage device 600, and communication unit 720 can communicate with communication unit 520 in power generation device 500 using communication unit 620 in power storage device 600. . Therefore, communication unit 120 in power measurement device 100 can communicate with communication unit 620 in power storage device 600 using communication unit 220 and communication unit 720. Further, the communication unit 120 in the power measuring device 100 can communicate with the communication unit 520 in the power generation device 500 using the communication unit 220, the communication unit 720, and the communication unit 620.
  • communication unit 220 may be configured to be able to directly communicate with communication unit 520 in power generation device 500 and communication unit 620 in power storage device 600.
  • the drive circuit 630 In response to the pulse width decrease instruction 66S and the pulse width increase instruction 67S from the signal generator 613, the drive circuit 630 operates a pulse signal (pulse signals 6AS, 6BS, 61S, 62S, 63S, 64S) is generated and output.
  • the drive circuit 630 changes the H level width (pulse width) of the output pulse signal based on the pulse width decrease instruction 66S and the pulse width increase instruction 67S.
  • the charge / discharge circuit 640 includes a bidirectional chopper 641, a bidirectional inverter circuit 642, a filter circuit 643, and a relay circuit 644.
  • the bidirectional chopper 641 is electrically connected to the storage battery BT20.
  • the charging / discharging circuit 640 performs a discharging process (hereinafter also referred to as a discharging process)
  • the bidirectional chopper 641 has a function of boosting the voltage level obtained from the storage battery BT20 to about DC 380V. Further, the bidirectional chopper 641 supplies the boosted voltage to the bidirectional inverter circuit 642 when the discharge process is executed.
  • Bidirectional chopper 641 includes a reactor L60, a switch circuit G6A, a switch circuit G6B, and an electrolytic capacitor C61.
  • Each of switch circuit G6A and switch circuit G6B is a MOSFET.
  • the pulse signal 6AS output from the drive circuit 630 is input to the gate of the MOSFET in the switch circuit G6A.
  • the MOSFET in the switch circuit G6A allows a current to flow between the source and the drain when an H level signal (pulse signal 6AS) is input to the gate.
  • the pulse signal 6BS output from the drive circuit 630 is input to the gate of the MOSFET in the switch circuit G6B. Since the MOSFET in switch circuit G6B has the same function as the MOSFET included in switch circuit G6A, detailed description will not be repeated.
  • the bidirectional inverter circuit 642 has a function of converting a DC voltage supplied from the bidirectional chopper 641 into an AC voltage when the discharge process is executed.
  • Bidirectional inverter circuit 642 includes switch circuits G61, G62, G63, and G64.
  • Each of switch circuits G61, G62, G63, and G64 is an IGBT.
  • Pulse signals 61S, 62S, 63S, and 64S are input to the gates of the four IGBTs included in the switch circuits G61, G62, G63, and G64, respectively. Since IGBTs included in each of switch circuits G61, G62, G63, and G64 have the same function as MOSFETs included in switch circuit G6A, detailed description will not be repeated.
  • the filter circuit 643 has a function of smoothing and shaping the waveform of the AC voltage generated by the bidirectional inverter circuit 642 when the discharge process is executed.
  • Filter circuit 643 includes reactors L61 and L62 and a capacitor C62.
  • Relay circuit 644 includes relays SW61 and SW62. Each of relays SW61 and SW62 operates in response to pulse signal 65S. Specifically, each of relays SW61 and SW62 electrically connects filter circuit 643 and voltage source P60 when an H level pulse signal 65S is input. On the other hand, each of relays SW61 and SW62 causes filter circuit 643 and voltage source P60 to be electrically disconnected when L level pulse signal 65S is input.
  • a voltage source P60 indicates an AC voltage supplied from the power system P100 side to the breaker 430 in FIG.
  • the relay circuit 644 When the relay circuit 644 is ON, the voltage of AC200V is supplied to the bidirectional inverter circuit 642 via the relay circuit 644 and the filter circuit 643, and the bidirectional inverter circuit 642 is connected to the filter circuit 643 and the relay to the breaker 420 side.
  • An alternating current is output via the circuit 644.
  • bidirectional inverter circuit 642 stops outputting alternating current.
  • FIG. 3 shows a state in which two lines are connected to the voltage source P60 in order to simply show the connection state, but actually, the voltage source P60 includes two voltage sources, A single-phase three-wire system 200V composed of three wires can be processed.
  • the charging / discharging circuit 640 When the charging / discharging circuit 640 performs a charging process (hereinafter also referred to as a charging process), the AC voltage supplied from the breaker 430 is supplied to the filter circuit 643 via the relay circuit 644.
  • the filter circuit 643 and the bidirectional inverter circuit 642 integrally perform the operation of rectifying and boosting the AC voltage, converting the AC voltage supplied to the filter circuit 643 into a DC voltage of DC 380 V when performing the charging process,
  • the converted DC voltage is supplied to the bidirectional chopper 641.
  • the bidirectional chopper 641 charges the storage battery BT20 by reducing the level of the DC voltage supplied from the bidirectional inverter circuit 642 to a level that can be used by the storage battery BT20 during the charging process.
  • the measurement part 614 of the control part 610 measures the electric current which flows between storage battery BT20 and the reactor L60 as mentioned above.
  • the measurement unit 614 integrates the charging current flowing toward the storage battery BT20 as a positive value when executing the charging process, and integrates the discharging current flowing from the storage battery BT20 toward the reactor L60 as a negative value when executing the discharging process. I will do it.
  • the measurement unit 614 functions as a current capacity value detection unit. That is, by calculating the difference between the accumulated charging current and the accumulated discharging current, the current capacity value CC1 stored in the storage battery BT20 (hereinafter also referred to as a storage current capacity value) CC1 is always detected. And stored in the memory 612.
  • a current capacity value (hereinafter also referred to as a maximum current capacity value) CM1 of the fully charged storage battery BT20 is stored in the memory 612 in advance.
  • the state detection unit 615 always calculates a state of charge (SOC) obtained by multiplying a value obtained by dividing the storage current capacity value by the maximum current capacity value by 100 and stores it in the memory 612.
  • SOC state of charge
  • the state of charge value is a value in the range of 0 to 100, and the unit is expressed in%. For example, when storage current capacity value CC1 and maximum current capacity value CM1 are equal, the charge state value is 100 (%), and the state of storage battery BT20 is a fully charged state. That is, the state of charge value SOC is a value indicating the state of charge of the storage battery BT20.
  • the charging / discharging circuit 640 is not limited to the circuit configuration described above, and can perform a charging process for storing power in the storage battery BT20 and a discharging process for discharging the power stored in the storage battery BT20. Any circuit configuration is possible, and the present invention is not limited to the configuration shown in FIG.
  • power demand facility 1000 in the present embodiment is configured to include both power generation device 500 and power storage device 600.
  • the present invention is not limited to this, and the power demand facility 1000 may include the power generation device 500 without including the power storage device 600.
  • the electric power demand facility 1000 is the structure containing both the electric power generating apparatus 500 and the electrical storage apparatus 600.
  • FIG. This is because, if the power demand facility 1000 does not include the power storage device 600 but includes the power generation device 500, the power demand from the power demand facility 1000 to the distribution unit 300 can be reduced by using the power generated by the power generation device 500. It becomes necessary to suppress the output, and the power that can be generated is discarded. That is, it is not preferable from the viewpoint of efficient use of energy.
  • a process in which the power measurement apparatus 100 measures the value of the power flowing through the power line PL10 will be described.
  • the process performed by the power measurement apparatus 100 in the power measurement process is also referred to as a power measurement process DT.
  • the power measurement process DT is a process performed independently of other processes.
  • the process performed by the power control apparatus 200 in the power measurement process is also referred to as a power measurement process CT.
  • the power measurement process CT is a process performed independently of other processes.
  • FIG. 4 is a flowchart of the power measurement process DT and the power measurement process CT. Referring to FIG. 4, in power measurement process DT, first, the process of step S111 is performed.
  • step S111 measurement unit 113 measures the value of the current flowing through power line PL10 and the value of the voltage at node N3. That is, the value of the power flowing through power line PL10 is measured. Then, the process proceeds to step S112.
  • step S112 the CPU 111 of the control unit 110 detects whether a predetermined time has elapsed by a timer (not shown).
  • the predetermined time is assumed to be 1 second, for example. If YES in step S112, the process proceeds to step S113. On the other hand, if NO at step S112, the process at step S111 is performed again.
  • step S113 the measurement unit 113 transmits the measured power value (hereinafter also referred to as a measured power value) to the power control apparatus 200. Then, the process of step S111 is performed again.
  • a measured power value hereinafter also referred to as a measured power value
  • step S121 power value reception processing is performed.
  • the control unit 210 receives the measured power value.
  • step S121 is repeatedly performed.
  • the CPU 211 obtains the value of power flowing in the power line PL10 (measured power value) every predetermined time. That is, it is assumed that CPU 211 detects the direction in which the power flowing through power line PL10 flows every predetermined time. In the following, the measured power value is stored in the memory 212 and expressed as a power value TLP.
  • a process (hereinafter also referred to as a total power control process) performed by the power control apparatus 200 to prevent power from flowing to the power system P100 will be described.
  • the process performed by the power control apparatus 200 in the total power control process is also referred to as a total power control process CTA.
  • the process performed by each of the plurality of power storage devices 600 included in each of the plurality of power demanding facilities 1000 included in the power control system 10000 in the total power control process is also referred to as a total power control process CP.
  • the process performed by each of the plurality of power measuring devices 700 included in each of the plurality of power demanding facilities 1000 included in the power control system 10000 is also referred to as a total power control process DTA.
  • FIG. 5 is a flowchart of the total power control process CP, the total power control process CTA, and the total power control process DTA. Referring to FIG. 5, in the total power control process CTA, first, the process of step S221 is performed.
  • the condition detection unit 213 detects whether or not the possibility of reverse power flow is high.
  • the reverse power flow is a flow of power from distribution unit 300 (power demand facility 1000) to power system P100.
  • the condition detection unit 213 reads the latest power value TLP currently acquired by the power measurement process CT of FIG. 4 from the memory 212, and the read power value TLP is included in a predetermined range of values. Detect whether to indicate the value to be displayed.
  • the value in the predetermined range is a value in a range where there is a high possibility that the direction in which the power flowing through power line PL10 flows is the direction in which power flows from distribution unit 300 to power system P100. That is, the value in the predetermined range is a value in a range where the possibility of reverse power flow is high. It is assumed that the value in the predetermined range is stored in the memory 212 in advance.
  • the detection result of the condition detection unit 213 indicates that the power value TLP is a negative value, it is detected that a reverse power flow has occurred.
  • the power value TLP indicates that it is a positive value close to 0, it is detected that the possibility of reverse power flow is high.
  • the value in the predetermined range is 1 or more and less than the positive predetermined value K1.
  • the predetermined value K1 is stored in the memory 212 in advance.
  • the predetermined value K1 900 (W).
  • step S221 If it is detected in step S221 that the condition (1 ⁇ TLP ⁇ K1) is satisfied, that is, the possibility of occurrence of reverse power flow is high (YES in step S221), the process proceeds to step S222. If it is not established, that is, it is detected that the possibility of reverse power flow is not high (NO in step S221), the process proceeds to step S225 described later.
  • the power value TLP is assumed to be 300 (W) as an example. In this case, the process proceeds to step S222.
  • step S222 the CPU 211 transmits a processing information request to the plurality of power storage devices 600 included in each power demand facility 1000.
  • the process information request is an instruction for requesting information indicating a process (charging process or discharging process) that the power storage device 600 is currently performing. Then, the process of step S222 ends.
  • step S261 the process of step S261 is performed.
  • step S ⁇ b> 261 the CPU 611 detects whether a processing information request is received from the control unit 210. If it is detected that it has been received (YES in step S261), the process proceeds to step S262, but if it is not received (NO in step S261), the process of step S261 is performed again. Here, assuming that a processing information request has been received, the process proceeds to step S262.
  • step S262 the control unit 610 transmits processing information to the power control apparatus 200.
  • the process information is information indicating a process (charging process or discharging process) currently performed by the corresponding power storage device 600.
  • the transmitted process information indicates a charging process.
  • the process information is processed. Indicates stop. Then, the process of step S261 is performed again.
  • step S223 processing information reception processing is performed.
  • the control unit 210 receives process information.
  • the processing information includes information for identifying the power storage device 600 that has transmitted the processing information.
  • CPU 211 detects that processing information has been received from all power storage devices 600 that have transmitted processing information requests, CPU 211 ends this processing information reception processing, and proceeds to step S224.
  • Control unit 210 can detect the power storage device 600 that is performing the charging process or the discharging process among the plurality of power storage devices 600 included in power control system 10000 by analyzing the received processing information.
  • step S224 power control processing is performed.
  • the power control unit 214 of the control unit 210 sends power control to the power measurement devices 700 included in each of all the power demanding facilities 1000 provided to the own device (power control device 200). Generate and send an indication.
  • the power control instruction is generated based on the analysis result of the received processing information, and transmitted to each power storage device 600 of the power demand facility 1000. Specifically, the power control instruction transmitted to power storage device 600 that is performing the discharge process instructs execution of a process for suppressing the amount of power supplied in the direction to power system P100 by the discharge process. To do. In addition, the power control instruction transmitted to power storage device 600 that is performing the charging process instructs execution of the process for increasing the power charged in the corresponding storage battery BT20 by the charging process.
  • the power control instruction is an instruction for increasing a comparison value L1 used in a process described later performed by the power measurement apparatus 700 by a predetermined value (for example, 5).
  • the comparison value L1 is a value that is referred to for comparison with the value of power flowing through the power line PL30 (in-facility measured power value), and indicates a value close to zero.
  • the process of step S224 is complete
  • each control unit 710 of each of the plurality of power measuring devices 700 included in each of the plurality of power demanding facilities 1000 included in the power control system 10000 stores, in advance, a comparison value L1 used in processing described later in the memory 712. Suppose you are.
  • step S271 the CPU 711 of the control unit 710 detects whether or not a power control instruction has been received. If it is detected that it has been received (YES in step S271), the process proceeds to step S272. If it is detected that no data is received (NO in step S271), the process proceeds to step S273 described later. Here, assuming that a power control instruction has been received, the process proceeds to step S272.
  • step S272 a comparison value increasing process is performed.
  • the CPU 711 increases the comparison value L1 of the memory 712 based on the power control instruction.
  • the initial value of the comparison value L1 is assumed to be 1% of the maximum output of the power generation device 500.
  • the maximum output of the power generation device 500 is 3 kW.
  • the initial value of the comparison value L1 is 30 (W).
  • the power control instruction is an instruction for increasing the comparison value L1 by “5”.
  • the comparison value L1 becomes “35” by the process of step S272. Then, the process proceeds to step S273.
  • step S273 the CPU 711 detects whether or not a later-described decrease instruction for instructing a decrease in the comparison value L1 has been received. If it is detected that it has been received (YES in step S273), the process proceeds to step S274. If it is detected that it is not received (NO in step S273), the process of step S271 is performed again. Here, it is assumed that the process of step S271 is performed again, assuming that the decrease instruction has not been received.
  • step S225 the CPU 211 detects whether or not the possibility of reverse power flow is low. As described above, the reverse power flow is assumed to be a flow of power from the distribution unit 300 (the power demand facility 1000) to the power system P100.
  • step S225 the latest power value TLP currently detected by the condition measurement unit 213 by the power measurement process CT of FIG. 4 is equal to or more than the positive predetermined value K1 (900) described above. Whether or not is detected. That is, it is detected whether or not the detected latest power value TLP (the direction in which the power flowing through power line PL10 flows) is a value that is unlikely to be the direction in which power flows from distribution unit 300 to power system P100.
  • step S225 if it is detected that the condition (TLP ⁇ K1) is satisfied (YES in step S225), the process proceeds to step S226. If it is detected that the condition is not satisfied (NO in step S225), the process is performed again in step S221. Migrate to Here, it is assumed that the latest power value TLP is less than the predetermined value K1, and the process of step S222 is performed again.
  • the comparison value L1 increases by a predetermined value every time the above-described steps S222, S261, S262, S223, S224, S271, and S272 are performed.
  • the processes of steps S222, S261, S262, S223, S224, S271, and S272 are detected when the CPU 211 indicates that the power value TLP acquired by the power measurement process CT of FIG. 4 is equal to or greater than the positive predetermined value K1 described above. It is repeated until it is done.
  • step S225 the process proceeds to step S226.
  • step S226 the CPU 211 transmits a decrease instruction for the comparison value L1 to all the power measurement apparatuses 700 that have transmitted the power control instruction even once.
  • the decrease instruction is an instruction for returning the value of the comparison value L1 that has increased from the initial value to the initial value.
  • the decrease instruction is a smaller value (hereinafter also referred to as a decrease value) than a predetermined value (for example, “5”) obtained by increasing the comparison value L1, for example, every elapse of a predetermined time (for example, 1 second). It is instructed to subtract from the comparison value L1.
  • the decrease value is, for example, “1”.
  • the step width (“1”) for decreasing the comparison value L1 is made smaller than the step width (“5”) for increasing the comparison value L1.
  • the decrease instruction is an instruction for performing control in which reverse flow is unlikely to occur. Then, when the decrease instruction is transmitted, the process of step S226 ends, and the process of step S221 is performed again.
  • step S273 the CPU 711 of the control unit 710 detects whether or not a decrease instruction is received in step S273 as described above. If it is detected that all the power measurement devices 700 to which the decrease instruction has been transmitted have received the decrease instruction (YES in step S273), the process proceeds to step S274.
  • step S274 a reduction process for the comparison value L1 is performed.
  • the CPU 711 of the control unit 710 sets the value of the comparison value L1 that is increasing from the initial value based on the received reduction instruction to the specified decrease value every predetermined time (for example, 1 second). Decrease by (for example, “1”).
  • the decrease instruction is an instruction to decrease by “1” every second. Further, it is assumed that the value of the comparison value L1 is “50” when the decrease instruction is received. In this case, the CPU 711 decreases the value of the comparison value L1 by “1” every 1 second. Then, the process of step S271 is performed again.
  • in-facility power control processing processing for controlling the corresponding power storage device 600 (hereinafter, also referred to as “in-facility power control processing”), which is always performed in the power measurement device 700 of each power demand facility 1000, will be described.
  • the flow of power in the direction from distribution board 400 to distribution unit 300 (power system P100) is also referred to as reverse power flow in the facility.
  • the facility power control process eliminates the reverse power flow in the facility if a reverse power flow occurs in the facility, and if the possibility of a reverse power flow in the facility is high, This is a process for controlling the power storage device 600 so as to reduce it.
  • the in-facility power control process is performed so that the amount of power from the distribution unit 300 toward the distribution board 400 does not exceed the maximum value of the appropriate amount of power consumed in the corresponding power demand facility 1000. It is also a process for controlling.
  • the in-facility power control process is a process performed independently of other processes.
  • FIG. 6 is a flowchart of the in-facility power control process. Referring to FIG. 6, in the facility power control process, first, the process of step S371 is performed.
  • step S371 the measurement unit 713 of the control unit 710 measures the value of the current flowing through the corresponding power line PL30 and the voltage value of the node N4. That is, the value of power flowing through the corresponding power line PL30 (hereinafter also referred to as in-facility power value INP) is measured (detected).
  • the measured in-facility power value INP is stored in the memory 712.
  • the in-facility power value INP is a positive value
  • the direction of the power flowing through the power line PL30 is the direction from the distribution unit 300 toward the corresponding distribution board 400.
  • the in-facility power value INP is a negative value
  • the direction of the power flowing through the power line PL30 is the direction from the corresponding distribution board 400 toward the distribution unit 300 (power system P100).
  • the CPU 711 detects whether or not a reverse power flow in the facility has occurred and whether or not there is a high possibility of the reverse power flow in the facility.
  • the in-facility reverse power flow is assumed to be a flow of power in a direction from the corresponding distribution board 400 to the distribution unit 300 (power system P100).
  • the condition detection unit 714 detects whether or not the in-facility power value INP measured by the measurement unit 713 indicates less than the current comparison value L1.
  • the case where it is detected that the measured in-facility power value INP indicates that it is less than the current comparison value L1 is, for example, from the value of power consumed by the corresponding electric load 70R and the corresponding power storage device 600. This is a case where the value obtained by subtracting the value of the power supplied to the corresponding distribution board 400 from 300 and the power generation device 500 is smaller than the current comparison value L1.
  • the in-facility power value INP indicates a negative value, a reverse power flow in the facility has occurred. If it is detected that the in-facility power value INP indicates a positive value close to 0, there is a high possibility of the occurrence of reverse power flow in the facility. Note that the value of the comparison value L1 varies depending on the processing in steps S272 and S274 of FIG.
  • step S372 if the condition detection unit 714 detects that the condition (INP ⁇ L1) is satisfied (YES in step S372), the process proceeds to step S373, but if it is detected that the condition is not satisfied (NO in step S372). ), The process proceeds to step S381 described later.
  • the current comparison value L1 is “35”.
  • the value of power consumed by the corresponding electric load 70R and the corresponding power storage device 600 is 395W.
  • the value of the power supplied to the corresponding distribution board 400 is assumed to be 400W.
  • the in-facility power value INP is assumed to be ⁇ 5 (W). In this case, it is detected that the condition (INP ⁇ L1) is satisfied (YES in step S372), and the process proceeds to step S373.
  • step S373 the process currently performed by the corresponding power storage device 600 is detected.
  • the CPU 711 transmits a processing information request to the corresponding power storage device 600.
  • the process information request is an instruction for requesting information indicating a process (charging process or discharging process) currently performed by the corresponding power storage device 600.
  • the state detection unit 615 of the control unit 610 of the power storage device 600 that has received the processing information request detects the type of processing currently performed by the power storage device 600 under the control of the control unit 610.
  • the CPU 611 transmits processing information indicating the detection result to the power measurement apparatus 700.
  • the process information is information indicating a process (charging process or discharging process) currently performed by the corresponding power storage device 600.
  • the transmitted processing information indicates a charging process, when performing a discharging process, indicates a discharging process, and when neither charging process nor discharging process is performed, The information indicates processing stop.
  • the CPU 711 of the control unit 710 can detect whether or not the corresponding power storage device 600 is performing processing by receiving the processing information, and is performed when the corresponding power storage device 600 is performing processing. The type of processing that is being performed can be detected. Then, the process proceeds to step S374.
  • step S374 the CPU 711 detects whether or not the corresponding power storage device 600 is performing a discharge process. Specifically, it is detected whether or not the process information received from the corresponding power storage device 600 indicates a discharge process. If it is detected that the discharge process is indicated (YES in step S374), the process proceeds to step S375, but if it is not indicated (NO in step S374), the process proceeds to step S376 described later. Here, assuming that the corresponding power storage device 600 is performing a discharging process, the process proceeds to step S375.
  • step S375 a process for suppressing the power discharged by the discharge process (referred to as a discharge power suppression process) is performed.
  • the power control unit 715 transmits a discharge suppression instruction to the corresponding power storage device 600.
  • the discharge suppression instruction is an instruction for causing the power storage device 600 to execute a process for suppressing the amount of power supplied to the distribution unit 300 (power system P100) by the discharge process.
  • the CPU 611 of the control unit 610 of the power storage device 600 that has received the discharge suppression instruction performs a process for suppressing the amount of power supplied in the direction to the distribution unit 300 (power system P100) by the discharge process.
  • the signal generation unit 613 instructs to reduce the pulse width of the pulse signals (for example, the pulse signals 61S, 62S, 63S, and 64S) output from the drive circuit 630 (hereinafter referred to as “instructions”).
  • Pulse width reduction instruction) 66S is generated and transmitted to the drive circuit 630.
  • the drive circuit 630 that has received the pulse width reduction instruction 66S reduces the pulse width of the pulse signal transmitted to each IGBT.
  • the discharge power suppression process in step S375 is a process for increasing the in-facility power value INP described above.
  • the discharge power suppression process in step S375 is a process for eliminating the reverse power flow in the facility when the reverse power flow in the facility is generated, and in the case where the possibility of the reverse power flow in the facility is high, This is a process for reducing the possibility of the occurrence of internal reverse power flow. Then, the process of step S371 is performed again.
  • step S374 a process when it is determined as NO in step S374 and the process proceeds to step S376 will be described.
  • step S376 it is detected whether or not power storage device 600 is performing a charging process. Specifically, CPU 711 detects whether or not the processing information received from corresponding power storage device 600 indicates a charging process. If it is detected that the charging process is indicated (YES in step S376), the process proceeds to step S377, but if it is not indicated (NO in step S376), the process proceeds to step S377C described later. Here, assuming that the corresponding power storage device 600 is performing the charging process, the process proceeds to step S377.
  • step S377 a charge state detection process is performed.
  • the CPU 711 of the control unit 710 transmits a charge state information request to the corresponding power storage device 600.
  • the charge state information request is an instruction for requesting charge state information.
  • the charging state information is information indicating the above-described charging state value indicating the charging state of the corresponding storage battery BT20.
  • the state of charge value is also referred to as SOC.
  • the CPU 611 of the power storage device 600 that has received the charge state information request reads the current charge state value SOC from the memory 612, and transmits the charge state information indicating the read charge state value SOC to the power measuring device 700.
  • the CPU 711 of the control unit 710 can detect the charging state of the corresponding storage battery BT20 by receiving the charging state information. Then, the process proceeds to step S378.
  • step S378, the control unit 710 detects whether or not the state of the storage battery BT20 is not close to a fully charged state. Specifically, the CPU 711 of the control unit 710 compares the charge state value SOC indicated by the received charge state information with the comparison value B1 read from the memory 712. Then, based on the comparison result, it is detected whether or not the state of charge SOC is less than the comparison value B1, that is, whether or not the condition (SOC ⁇ B1) is satisfied.
  • the comparison value B1 is a value that is referred to in order to detect whether or not the state of the storage battery BT20 is not close to a fully charged state, and is stored in the memory 712 in advance. When the state of storage battery BT20 is a fully charged state, the charged state value SOC is 100 (%). As an example, assume that the comparison value B1 indicates 98 (%).
  • step S378 If it is detected that the condition of (SOC ⁇ B1) is satisfied (YES in step S378), the process proceeds to step S379A, but if it is not satisfied (NO in step S378), the process proceeds to step S379B described later. Here, it is assumed that the state of charge SOC is less than the comparison value B1, and the process proceeds to step S379A.
  • step S379A charging power increase processing is performed.
  • power control unit 715 transmits a charging power increase instruction to corresponding power storage device 600.
  • the charge power increase instruction is an instruction for causing the corresponding power storage device 600 to execute a process for increasing the power charged in the corresponding storage battery BT20 by the charging process.
  • the control unit 610 of the power storage device 600 that has received the charge power increase instruction performs a process for increasing the power charged in the corresponding storage battery BT20 by the charging process. Specifically, under the control of the CPU 611, the signal generation unit 613 instructs to increase the pulse width of the pulse signals (for example, the pulse signals 61S, 62S, 63S, and 64S) output from the drive circuit 630 (hereinafter, referred to as “instructions”). , Pulse width increase instruction) 67S is generated and transmitted to the drive circuit 630.
  • the drive circuit 630 that has received the pulse width increase instruction 67S increases the pulse width of the pulse signal transmitted to each IGBT based on the pulse width increase instruction 67S.
  • the power charged in the corresponding storage battery BT20 is increased by the charging process performed by the corresponding power storage device 600. Therefore, the power received by power storage device 600 from distribution unit 300 via distribution board 400 increases. That is, the charging power increase process in step S379A is a process for increasing the in-facility power value INP described above.
  • the charging power increase process of step S379A is a process for eliminating the reverse power flow in the facility when the reverse power flow in the facility is generated. If the possibility of the reverse power flow in the facility is high, This is a process for reducing the possibility of the occurrence of internal reverse power flow. Then, the process of step S371 is performed again.
  • step S378 When it is detected that the condition is not satisfied, the state of the storage battery BT20 is a state close to a fully charged state. As described above, when the state of storage battery BT20 becomes a fully charged state, power storage device 600 stops charging processing and does not perform any charging processing or discharging processing.
  • step S379B a charge suppression process is performed.
  • power control unit 715 transmits a charge power suppression instruction to corresponding power storage device 600.
  • the charge power suppression instruction is an instruction for causing the corresponding power storage device 600 to execute a process for suppressing the power charged in the corresponding storage battery BT20 by the charging process.
  • Control unit 610 of power storage device 600 that has received the charging power suppression instruction performs a process for suppressing the power charged in corresponding storage battery BT20 by the charging process. Specifically, under the control of the CPU 611, the signal generation unit 613 instructs to reduce the pulse width of the pulse signals (for example, the pulse signals 61S, 62S, 63S, and 64S) output from the drive circuit 630 (hereinafter referred to as “instructions”). , Pulse width reduction instruction) 66S is generated and transmitted to the drive circuit 630.
  • the drive circuit 630 that has received the pulse width reduction instruction 66S reduces the pulse width of the pulse signal transmitted to each IGBT.
  • the charge suppression process in step S379B is a process for reducing the in-facility power value INP described above.
  • the charge suppression process in step S379B is a process for promoting the reverse flow in the facility when the reverse flow in the facility is generated, and in the case where the possibility of the reverse flow in the facility is high, This is a process for generating the reverse power flow.
  • the process of step S371 is performed again.
  • step S379B is a process for protecting the storage battery BT20 against full charge.
  • the processes for preventing the occurrence of reverse power flow in which power flows to the power system P100 are the total power control process CP, the total power control process CTA, and the total power control process DTA in FIG. A detailed description will be given later of the fact that the reverse power flow that flows through the power system P100 can be prevented by performing the total power control process CP, the total power control process CTA, and the total power control process DTA.
  • step S379B the following power generation suppression process may be performed simultaneously with the above-described charging suppression process.
  • the power control unit 715 transmits a generated power suppression instruction to the corresponding power generation device 500.
  • the generated power suppression instruction is an instruction for executing a power generation suppression process for suppressing the amount of power supplied to the corresponding distribution board 400 by the power generation process performed by the corresponding power generation device 500.
  • the control unit 510 of the power generation apparatus 500 that has received the generated power suppression instruction performs a power generation suppression process for suppressing the amount of power supplied to the corresponding distribution board 400 by the power generation process.
  • the signal generation unit 513 causes an instruction (hereinafter, referred to as “pulse signal 51S, 52S, 53S, 54S”) to reduce the pulse width of the pulse signal output from the drive circuit 530.
  • 56S is generated and transmitted to the drive circuit 530.
  • the drive circuit 530 that has received the pulse width reduction instruction 56S reduces the pulse width of the pulse signal transmitted to each IGBT based on the pulse width reduction instruction 56S. Through the above processing, the amount of power supplied to the corresponding distribution board 400 is suppressed. That is, the power generation suppression process is a process for increasing the in-facility power value INP described above.
  • the power generation suppression process can eliminate the reverse power flow in the facility when the power flow of the power generation apparatus 500 cannot be maximized, but the reverse power flow in the facility is generated. Therefore, in step S379B, it is desirable that the power generation suppression process is performed simultaneously with the above-described charging suppression process.
  • step S376 a process when it is determined NO in step S376 and the process proceeds to step S377C will be described. If NO is determined in step S376, the corresponding power storage device 600 has not performed either the charging process or the discharging process and has stopped the process.
  • step S377C as in step S377, the charge state detection process is performed, and thus detailed description will not be repeated.
  • control unit 710 can receive the charging state information indicating the charging state value SOC and detect the charging state of the corresponding storage battery BT20. Then, the process proceeds to step S378C.
  • step S378C it is detected whether or not the corresponding power storage device 600 can execute the charging process. Specifically, the CPU 711 detects whether or not the received charge state value SOC indicates less than 98. If it is detected that the charging process can be performed (the charging state value SOC indicates less than 98) (YES in step S378C), the process proceeds to step S379C, but the charging process cannot be performed (the charging state value SOC indicates 98 or more). Is detected (NO in step S378C), the process returns to step S371.
  • step S379C a charging process is executed.
  • CPU 711 of control unit 710 transmits a charge execution instruction to corresponding power storage device 600.
  • the charge execution instruction is an instruction for causing the corresponding power storage device 600 to execute a charging process.
  • the control unit 610 of the power storage device 600 that has received the charge execution instruction executes a charging process. Since the charging process has been described above, detailed description will not be repeated. By executing this charging process, the corresponding storage battery BT20 is charged. Accordingly, the power storage device 600 receives power from the distribution unit 300 via the distribution board 400. That is, the charging process executed in step S379C is a process for increasing the in-facility power value INP described above.
  • the charging process in step S379C is a process for eliminating the reverse power flow in the facility when the reverse power flow in the facility is generated. If the possibility of the reverse power flow in the facility is high, the charge in the facility is reversed. This is a process for reducing the possibility of tidal currents. Then, the process of step S371 is performed again.
  • the processing in steps S379A and S379C described above is performed, so that the in-facility power value INP indicates a current comparison value L1 or more.
  • feedback control is performed. That is, in-facility reverse power flow can be prevented from occurring in each of the plurality of power demanding facilities 1000 included in the power control system 10000.
  • step S372 a process when it is detected in step S372 that the condition (INP ⁇ L1) is not satisfied (NO in step S372) and the process proceeds to step S381 will be described.
  • the measured in-facility power value INP indicates a value equal to or greater than the current comparison value L1.
  • the direction of the power flowing through the power line PL30 is the direction from the distribution unit 300 toward the corresponding distribution board 400.
  • the amount of power from the distribution unit 300 toward the corresponding distribution board 400 is also referred to as the consumption direction power amount.
  • step S381 it is detected whether the consumption direction power amount is larger than the appropriate consumption maximum power amount.
  • the appropriate consumption maximum power amount is the maximum value of the appropriate power amount consumed in the corresponding power demand facility 1000. That is, in step S381, it is detected whether the consumption direction power amount exceeds the appropriate consumption maximum power amount.
  • the CPU 711 of the control unit 710 compares the measured in-facility power value INP with the determination value L2 read from the memory 712, and whether or not the condition (INP> L2) is satisfied based on the comparison result. Is detected.
  • the determination value L2 is stored in advance in the memory 712, and is a value that is referred to in order to detect whether or not the consumption direction power amount is larger than the appropriate consumption maximum power amount.
  • the value of the determination value L2 is 50% of the maximum output of the power generation device 500.
  • the determination value L2 indicates 1500 (W). That is, it is assumed that the value of the maximum appropriate power consumption is 1500 (W).
  • step S381 If it is detected that the condition (INP> L2) is satisfied (YES in step S381), the process proceeds to step S382. If it is detected that the condition is not satisfied (NO in step S381), the process in step S371 is performed again. Is done. When the in-facility power value INP is greater than the determination value L2, it is detected that the consumption direction power amount is greater than the appropriate consumption maximum power amount.
  • the consumption direction power amount Is not more than the appropriate consumption maximum power amount, that is, the consumption direction power amount consumed in the corresponding power demand facility 1000 is detected as an appropriate amount.
  • step S382 processing currently performed by the corresponding power storage device 600 is detected. Since it is the same processing as Step S373, detailed explanation is not repeated.
  • the control unit 710 can detect whether or not the corresponding power storage device 600 is processing by receiving the processing information from the corresponding power storage device 600, and the corresponding power storage device 600 performs processing. , It is possible to detect what kind of processing is being performed. Then, the process proceeds to step S383.
  • step S383 it is detected whether or not power storage device 600 is performing a charging process. Specifically, CPU 711 detects whether or not the processing information received from corresponding power storage device 600 indicates a charging process. If it is detected that the charging process is indicated (YES in step S383), the process proceeds to step S384. If it is detected that the charging process is not indicated (NO in step S383), the process proceeds to step S386 described later. Here, assuming that the corresponding power storage device 600 is performing the charging process, the process proceeds to step S384.
  • step S384 the charge suppression process is performed in the same manner as in step S379B, and thus detailed description will not be repeated.
  • the charge suppression process in step S384 is a process for setting the consumption direction power amount to be equal to or less than the appropriate consumption maximum power amount.
  • step S383 a process when it is determined NO in step S383 and the process proceeds to step S386 will be described.
  • step S386 it is detected whether or not the corresponding power storage device 600 is performing a discharge process.
  • the CPU 711 analyzes the processing information received from the corresponding power storage device 600 and detects whether or not the discharge processing is indicated based on the analysis result. If it is detected that the process information indicates a discharge process (YES in step S386), the process proceeds to step S387, but if it is detected that no discharge process is indicated (NO in step S386), the process proceeds to step S387C described later. move on.
  • the process proceeds to step S387.
  • step S387 as in step S377, a charge state detection process is performed, and thus detailed description will not be repeated.
  • the CPU 711 of the control unit 710 can receive the charging state information indicating the charging state value SOC and detect the charging state of the corresponding storage battery BT20. Then, the process proceeds to step S388.
  • step S388 the CPU 711 detects whether or not the state of the corresponding storage battery BT20 is close to the discharge end state based on the state of charge value SOC.
  • the discharge end state is a state in which no electric power is stored in the storage battery BT20.
  • CPU 711 compares charge state value SOC indicated by the received charge state information with comparison value B2 read from memory 712, and based on the comparison result, whether (SOC> B2) is satisfied. Detect whether or not.
  • the comparison value B2 is stored in advance in the memory 712, and is a value that is referred to in order to detect whether or not the state of the storage battery BT20 is not in a state close to the discharge end state.
  • the state of charge value SOC is 0 (%).
  • the comparison value B2 is assumed to indicate 5 (%).
  • step S388 If it is detected that the condition of (SOC> B2) is satisfied (YES in step S388), the process proceeds to step S389A. If it is detected that the condition is not satisfied (NO in step S388), the process is performed in steps described later. Proceed to S389B. Here, it is assumed that the state of charge SOC is larger than the comparison value B2, and the process proceeds to step S389A.
  • step S389A discharge power increase processing is performed.
  • control unit 710 transmits a discharge power increase instruction to corresponding power storage device 600.
  • the discharge power increase instruction is an instruction for causing the corresponding power storage device 600 to execute a process for increasing the power discharged from the corresponding storage battery BT20 by the discharge process.
  • the control unit 610 of the power storage device 600 that has received the discharge power increase instruction performs a process for increasing the power discharged from the corresponding storage battery BT20 by the discharge process. Specifically, under the control of the CPU 611, the signal generation unit 613 instructs to increase the pulse width of the pulse signals (for example, the pulse signals 61S, 62S, 63S, and 64S) output from the drive circuit 630 (hereinafter, referred to as “instructions”). , Pulse width increase instruction) 67S is generated and transmitted to the drive circuit 630.
  • the drive circuit 630 that has received the pulse width increase instruction 67S increases the pulse width of the pulse signal transmitted to each IGBT based on the pulse width increase instruction 67S.
  • the electric power discharged from the corresponding storage battery BT20 is increased by the discharge process performed by the corresponding power storage device 600. Therefore, the power supplied from power storage device 600 to distribution unit 300 (power system P100) via distribution board 400 is increased. That is, the discharge power increasing process in step S389A is a process for making the consumption direction power amount equal to or lower than the appropriate consumption maximum power amount. Then, the process of step S371 is performed again.
  • step S389B a case where it is detected that the condition of (SOC> B2) is not satisfied (NO in step S388) and the process proceeds to step S389B will be described.
  • the state of the corresponding storage battery BT20 is a state close to a discharge end state. As described above, when the state of storage battery BT20 is in a discharge end state, power storage device 600 is in a state in which the discharge process is stopped and neither the charge process nor the discharge process is performed.
  • step S389B similarly to step S375, a discharge power suppression process is performed, and thus detailed description will not be repeated. With this process, the amount of power supplied to the distribution unit 300 (power system P100) due to the discharge process performed by the corresponding power storage device 600 is suppressed. Then, the process of step S371 is performed again.
  • step S386 determines NO in step S386 and the process proceeds to step S387C. If it is determined as NO in step S386, the corresponding power storage device 600 has not performed either the charging process or the discharging process and has stopped the process.
  • step S387C as in step S377, a charge state detection process is performed, and thus detailed description will not be repeated.
  • control unit 710 can receive the charging state information indicating the charging state value SOC and detect the charging state of the corresponding storage battery BT20. Then, the process proceeds to step S388C.
  • step S388C it is detected whether or not the corresponding power storage device 600 can execute the discharge process. Specifically, CPU 711 detects whether or not received charge state value SOC indicates 5 or more. If it is detected that 5 or more is indicated (YES in step S388C), the process proceeds to step S389C. If it is detected that 5 or more is not indicated (NO in step S388C), the process proceeds to step S371 again.
  • step S389C a discharge process is performed.
  • the CPU 711 transmits a discharge process execution instruction to the corresponding power storage device 600.
  • the discharge process execution instruction is an instruction for causing the corresponding power storage device 600 to execute the discharge process.
  • the control unit 610 of the power storage device 600 that has received the discharge process execution instruction executes the discharge process. Since the discharge process has been described above, detailed description will not be repeated. By executing this discharge process, the electric power stored in the corresponding storage battery BT20 is discharged. Therefore, power storage device 600 transmits electric power to distribution unit 300 (power system P100) via distribution board 400. That is, the discharge process executed in step S389C is a process for making the consumption direction power amount equal to or less than the appropriate consumption maximum power amount. Then, the process of step S371 is performed again.
  • the power control system 10000 can prevent power from flowing to the power system P100 by performing the plurality of processes described above.
  • the power measurement process DT and the power measurement process CT of FIG. 4 the total power control process CP, the total power control process CTA and the total power control process DTA of FIG. Assume that power control processing is being performed.
  • the number of power demanding facilities 1000 included in the power control system 10000 is 30.
  • the power demand facility 1000 included in the power control system 10000 is also simply referred to as a power demand facility.
  • the power generation device 500 included in the power demand facility is also simply referred to as a power generation device.
  • the power storage device 600 included in the power demand facility is also simply referred to as a power storage device.
  • the power control device 200 included in the power control system 10000 is also simply referred to as a power control device.
  • each of the 30 power demand facilities perform power generation processing during the daytime when the sunlight is strongest.
  • the value of the power output from each power generation device that performs power generation processing is 3 kW, which is the maximum value.
  • the value of the comparison value L1 stored in the control unit 710 of the power measuring device 700 included in each of the 30 power demand facilities is 30 (W) which is an initial value. It is assumed that the power value TLP acquired by the power control apparatus for the first time by the power measurement process CT in FIG. 4 is 1000 (W), which is a value equal to or greater than the predetermined value K1 (900 (W)). In this case, the power control apparatus repeatedly performs the processes of steps S221 and S225 in FIG.
  • the power demand facility determined as YES in step S372 of the in-facility power control process is a facility in which a reverse flow in the facility is generated or a facility that is highly likely to have a reverse flow in the facility.
  • the power demand facility in a state determined as YES in step S372 of the in-facility power control process is also referred to as a first power demand facility.
  • the power storage device included in each of the 20 first power demand facilities is performing a charging process.
  • the storage battery BT20 included in each of the 20 first power demand facilities is in a state in which power can be charged.
  • the power measuring device 700 included in each of the 20 first power demanding facilities performs the processes of steps S371, S372, S373, S374, S376, S377, S378, and S379A in the in-facility power control process of FIG. Suppose it is repeated. With this process, each of the 20 first power demanding facilities charges the corresponding storage battery BT20 with the power obtained from the corresponding power generation device.
  • the power demand facility determined to be NO in step S372 of the in-facility power control process is a facility with a low possibility of occurrence of reverse flow in the facility.
  • the power demand facility determined to be NO in step S372 of the in-facility power control process is also referred to as a second power demand facility.
  • the power measuring device 700 included in each of the ten second power demanding facilities includes steps S371, S372, S381, S382, S383, S384, S386, S387, S388, in the in-facility power control process of FIG. It is assumed that any one of S389A, S389B, S387C, S388C, and S389C is being performed.
  • the state of the storage battery BT20 included in each of the 10 power demanding facilities among the 20 first power demanding facilities that repeatedly perform the processes of steps S371, S372, S373, S374, S376, S377, S378, and S379A It is assumed that the power measurement device 700 included in each of the ten power demand facilities is in a state close to a fully charged state and performs the process of step S379B instead of step S379A.
  • the power control apparatus performs the processing of steps S222, S223, and S224 in FIG. 5 to give the power control instruction described above to all the power demanding facilities that provided the processing information to the own apparatus (power control apparatus). It transmits to the electric power measurement apparatus 700 contained in each. All of the power demand facilities for which the corresponding power measurement device 700 receives the power control instruction includes ten second power demand facilities.
  • the power measuring apparatus 700 that has received the power control instruction increases the value of the comparison value L1 by a predetermined value (for example, 5). Thereby, the probability that the electric power demand facility which will be in the state determined as YES by step S372 of an in-facility electric power control process among 10 second electric power demand facilities will raise.
  • the second power demand facility that has been determined to be YES in step S372 of the in-facility power control process due to the increase of the comparison value L1 is also referred to as a third power demand facility.
  • the third power demand facility is a power demand facility in which reverse flow in the facility does not occur and the possibility of reverse flow in the facility is low.
  • the power measuring device 700 included in each of the five third power demanding facilities performs the process of step S375 or step S379A in the in-facility power control process of FIG.
  • the third power demand facility in which the corresponding power storage device is performing the discharge process power is supplied in the direction toward the distribution unit 300 (power system P100). The amount is suppressed.
  • the third power demand facility in which the corresponding power storage device performs the charging process among the five third power demand facilities the power charged in the corresponding storage battery BT20 is increased.
  • the power value TLP acquired by the power control apparatus through the power measurement process CT in FIG. 4 increases.
  • the power value TLP becomes a value equal to or greater than the predetermined value K1 (900 (W)), that is, the occurrence of reverse power flow that is the flow of power from the distribution unit 300 (power demand facility 1000) to the power system P100.
  • the power control apparatus performs the process of step S226 in FIG. 5 and transmits a decrease instruction to all the power measurement apparatuses 700 that have transmitted the power control instruction even once.
  • the power measuring apparatus 700 that has received the decrease instruction has a value of the increased comparison value L1 that is smaller than a predetermined value (for example, “5”) (hereinafter also referred to as a decreased value) for a predetermined time (for example, 1 Every time (second), the value is decreased by a decrease value (for example, “1”).
  • a predetermined value for example, “5”
  • a decreased value for example, 1 Every time (second)
  • the value of the comparison value L1 By reducing the value of the comparison value L1 by the above method, it is possible to control the direction in which the power flowing through the power line PL10 flows is less likely to change from the distribution unit 300 to the power system P100.
  • the power value TLP becomes a value equal to or greater than the predetermined value K1
  • the value of the comparison value L1 is decreased by the above method, so that the value of the power value TLP can be prevented from becoming too large. .
  • a plurality of power storage devices included in the power control system 10000 can be subjected to a charging process for suppressing reverse power flow. Therefore, as compared with the case where a single power storage device is used, a plurality of power storage devices are less likely to be unable to be charged because the corresponding storage battery BT20 is in a fully charged state. For this reason, it is possible to perform processing for suppressing reverse power flow with high reliability.
  • the charging power is distributed to a plurality of storage batteries respectively corresponding to the plurality of power storage devices, the charging rate can be suppressed. Therefore, the burden of the storage battery can be reduced and the life of the storage battery can be extended.
  • a process for checking the state of the storage battery BT20 is performed in advance. Thereby, it can prevent charging to storage battery BT20 which is a full charge state, and can ensure safety.
  • power value TLP is a predetermined value K1.
  • the power storage device is controlled so that the reverse power flow in the facility does not occur in each power demand facility. Therefore, it is possible to provide a power control system that does not generate a reverse power flow that is a flow of power from the distribution unit 300 (the power demand facility 1000) to the power system P100.
  • the electric power generating apparatus 500 can utilize the electric power obtained from solar cell BT10 to the maximum. .
  • control is performed so that no reverse power flow from a portion that receives power collectively occurs, and a plurality of power demands
  • the power control device 200 centrally manages and effectively uses the power storage devices included in each facility 1000. As a result, it is possible to provide a power control system that can store surplus power in the power storage device without suppressing the output of the power generation device.
  • the power measuring apparatus 700 that has received the power control instruction increases the value of the comparison value L1 by a predetermined value (for example, 5). Thereby, the second power demand facility in the state determined as NO in step S372 of the in-facility power control process of FIG. 6 becomes the third power in a state determined as YES in step S372 of the in-facility power control process. The probability that a demand facility will occur increases.
  • the power storage device 600 that is performing the discharge process performs a suppression process for suppressing the amount of power supplied to the power system P100 by the discharge process. Can be executed. Further, by increasing the value of comparison value L1, power storage device 600 that is performing the charging process can perform an increasing process for increasing the power charged in corresponding storage battery BT20 by the charging process. .
  • the power storage device 600 included in the power demand facility 1000 that has received the power control instruction performs the discharge process, the probability of performing the suppression process increases.
  • the power storage device 600 included in the power demand facility 1000 that has received the power control instruction is performing the charging process, the probability of performing the increasing process increases.
  • the measurement units 113, 513, 613, 713, the signal generation units 513, 613, and the state detection unit 615 may be configured only by a circuit, or may be configured by a combination of software and a circuit.
  • the present invention is effective in a power control system that distributes power supplied from a power system to a plurality of power demand facilities.
  • PL10 power line BT10 solar cell, BT20 storage battery, P100 power system, 50 transformer, 100 power measuring device, 110, 210, 610, 710 control unit, 200 power control device, 300 distribution unit, 400 distribution board, 500 power generation device , 600 power storage device, 700 power measuring device, 1000 power demand facility, 10000 power control system.

Abstract

 電力制御システム(10000)は、電力系統(P100)から供給される電力を複数の電力需要施設(1000)に分配する分配部(300)と、電力系統と、分配部との間に流通電力の値(TLP)を測定する測定部(113)とを含む。電力系統から分配部へ向かって流れる流通電力の値を正としたときに、(TLP<K1:ただしK1は逆潮流を検出するための閾値を指す)の条件が成立したとき電力制御指示が、電力需要施設対し送信される。電力制御指示は、放電処理を行なっている蓄電装置に対しては、電力系統の方向へ流れる電力量を抑制するように指示し、充電処理を行なっている蓄電装置に対しては、対応する蓄電池に充電される電力を増加するように指示する。

Description

電力を電力需要施設に分配する電力制御システム
 本発明は、電力制御システムに関し、特に、電力系統から供給される電力を、複数の電力需要施設に分配する電力制御システムに関する。
 近年、電力を有効に活用する様々な技術が注目されている。たとえば、優先順位が高い電力の供給ラインをできるだけ遮断させないようにするための技術が提案されている(特許文献1:国際公開第05/093924号パンフレット)。また、太陽電池からの発電電力を制限することなく、蓄えられた電力が系統へ流出することを防ぐための技術が提案されている(特許文献2:特開2002-171674号公報)。
 また、電力を必要とする施設(以下、電力需要施設ともいう)から、電力需要施設に電力を供給する電力系統へ電力が流れるという逆潮流を防ぐための技術(以下、第1の先行技術ともいう)が提案されている(特許文献3:特開2004-208426号公報)。電力需要施設は、たとえば、住宅である。電力系統は、たとえば、電力会社における、電力を供給するシステムである。
国際公開第05/093924号パンフレット 特開2002-171674号公報 特開2004-208426号公報
 電力需要施設から、電力系統へ電力が流れるという逆潮流が増加すると、電力系統の配電に係る電圧が上昇するなど、電力系統の設備に悪影響を与える。そのため、逆潮流の防止は、必要不可欠である。
 近年では、電力系統が、複数の電力需要施設(たとえば、住宅)を含む集合住宅へ電力を供給するためのシステムも増えつつある。このようなシステムでは、電力需要施設毎に、電力の使用状況が異なるため、逆潮流を防ぐために、単に、各電力需要施設から、電力系統への電力の流れを防止したのでは、電力を、有効に活用することができない。
 本発明は、上述の問題点を解決するためになされたものであって、その目的は、電力が電力系統へ流れるのを防ぎつつ、電力の有効活用を可能とする電力制御システムを提供することである。
 上記の目的を達成するために、この発明のある局面に従う電力制御システムは、複数の電力需要施設と、外部の電力系統が接続される第1接続部と、複数の電力需要施設が接続される第2接続部とを含む分配部と、電力系統と分配部との間に流れる電力である流通電力の値を測定する測定部とを備える。
 分配部は、第1接続部を介して電力系統から供給される電力を複数の電力需要施設に分配する。
 複数の電力需要施設それぞれは、発電して電力を第2接続部に出力する発電装置と、蓄電池を接続し且つ分配部から分配される電力を受ける蓄電装置とを、含む。
 蓄電装置は、接続される蓄電池に、当該蓄電装置が受ける電力を蓄える充電処理と、当該蓄電池から蓄えられた電力の少なくとも一部を第2接続部に出力する放電処理とを行なう。
 電力制御システムは、さらに、(TLP<K1)の条件が成立するか否かを検出する条件検出部と、条件検出部が条件が成立すると検出したとき、複数の電力需要施設に対し電力制御指示を送信する電力制御部とを、備える。
 TLPは、電力系統から分配部の向きに流れる流通電力の値を正とした場合における測定部が測定する流通電力の値を指し、K1は、分配部から電力系統へ流れる流通電力を指す逆潮流を検出するための閾値を指す。
 電力制御指示は、放電処理を行なっている蓄電装置に対しては、蓄電池から出力される電力量を抑制するように指示し、かつ、充電処理を行なっている蓄電装置に対しては、蓄電池に蓄えられる電力量を増加するように指示する。
 好ましくは、電力制御システムは、さらに、複数の電力需要施設のそれぞれから、当該電力需要施設の蓄電装置が、当該蓄電装置に接続される蓄電池に対して行なう処理を示す処理情報を受信する処理情報受信部を、備える。そして、電力制御部は、処理情報受信部が受信した処理情報に基づき、複数の電力需要施設に対し、電力制御指示を送信する。
 好ましくは、蓄電装置は、分配部から分配される電力、および、複数の電力需要施設の前記発電装置が出力する電力を受ける。充電処理は、分配部から分配される電力の少なくとも一部を蓄電池に蓄える第1充電処理、および、複数の電力需要施設の発電装置が出力する電力の少なくとも一部を蓄電池に蓄える第2充電処理のうちの少なくとも一方を指す。
 好ましくは、蓄電装置は、接続される蓄電池に蓄えられている電流容量の値を検出する電流容量値検出部を、有しする。この電流容量値検出部が検出する電流容量の値に基づき、当該蓄電池を充電することが可能であるか否かを検出する。
 好ましくは、充電することが可能と検出されたとき、蓄電装置は、接続される蓄電池に充電されるべき電力量を増加させる。
 好ましくは、複数の電力需要施設の各々は、さらに、分配部と、蓄電装置との間に流れる電力である施設内電力の値および施設内電力の流れる方向を測定する施設内測定部と、(INP<L1)の条件が成立したとき施設内電力が大きくなるように内部電力制御処理を行なう施設内制御部と、を含む。
 INPは、分配部から蓄電装置へ向かう方向を正としたときに、測定される施設内電力の値を指し、且つL1は、蓄電装置から分配部へ流れる電力を検出するための施設内閾値を指す。施設内制御部は、電力制御指示を受信したとき、施設内閾値を所定値だけ増加させる。
 好ましくは、内部電力制御処理は、対応する蓄電装置が放電処理を行なっている場合は、放電処理による、分配部への電力の供給量を抑制する処理を指す。内部電力制御処理は、対応する蓄電池が充電可能な状態であって、かつ、対応する蓄電装置が充電処理を行なっている場合は、充電処理により、対応する蓄電池に充電されるべき電力を増加する処理を指す。
 好ましくは、L1が指す施設内閾値は、0に近い値である。
 好ましくは、電力制御部は、(TLP≧K1)の条件が成立することが検出されるまで、放電処理を行なっている蓄電装置に対しては、当該蓄電装置に接続される蓄電池から出力される電力量が抑制されるように制御し、かつ、充電処理を行なう蓄電装置に対しては、当該蓄電装置に接続される前記蓄電池が充電する電力量が増加するように制御する。
 好ましくは、K1が指す閾値は、0に近い値である。
 好ましくは、発電装置は、太陽光発電装置を指す。
 この発明の他の局面に従うと、電力システムを制御するための方法が提供される。
 電力システムは、複数の電力需要施設と、外部の電力系統が接続される第1接続部と、複数の電力需要施設が接続される第2接続部とを含む分配部と、電力系統と、分配部との間に流れる電力である流通電力の値を測定する測定部とを備える。
 分配部は、第1接続部を介して電力系統から供給される電力を複数の電力需要施設に分配し、第2接続部を介して与えられる電力を第1接続部を介して電力系統に出力する。
 複数の電力需要施設それぞれは、発電して電力を第2接続部に出力する発電装置と、蓄電池を接続し、且つ分配部から分配される電力または発電装置から出力される電力を受ける蓄電装置とを、含む。
 蓄電装置は、接続される蓄電池に、当該蓄電装置が受ける電力を蓄える充電処理と、当該蓄電池から蓄えられた電力を第2接続部に出力する放電処理とを行なう。
 方法は、(TLP<K1)の条件が成立するか否かを検出するステップと、条件が成立すると検出されたとき、複数の電力需要施設に対し電力制御指示を送信するステップとを、備える。
 TLPは、電力系統から分配部の向きに流れる流通電力の値を正とした場合における測定部が測定する流通電力の値を指し、K1は、分配部から電力系統へ流れる流通電力を指す逆潮流を検出するための閾値を指す。
 電力制御指示は、放電処理を行なっている蓄電装置に対しては、蓄電池から出力される電力量を抑制するように指示し、かつ、充電処理を行なっている蓄電装置に対しては、蓄電池に充電される電力量を増加するように指示する。
 本発明に係る電力制御システムは、電力系統から供給される電力を複数の電力需要施設に分配する分配部と、電力系統と、分配部との間に流れる電力である流通電力の値を測定する測定部とを含む。電力系統から分配部へ向かう方向を正としたときに、測定される流通電力をTLP、逆潮流を検出するための閾値をK1とし、TLP<RP0の条件が成立するときは流通電力TLPが大きくなるように電力制御処理を行なう。電力制御処理では、放電処理を行なっている蓄電装置に対しては、放電処理による、電力系統への方向への電力の供給量を抑制させるように制御する。また、充電処理を行なっている蓄電装置に対しては、対応する蓄電池に充電する電力を増加させるように制御する。
 したがって、電力が電力需要施設から電力系統へ流れる逆潮流の発生を防ぎつつ、電力の有効活用が可能となる。
本実施の形態における電力制御システムの構成を示す図である。 発電装置の内部構成を示すブロック図である。 蓄電装置の内部構成を示すブロック図である。 電力測定処理DTおよび電力測定処理CTのフローチャートである。 総電力制御処理CP、総電力制御処理CTAおよび総電力制御処理DTAのフローチャートである。 施設内電力制御処理のフローチャートである。
 以下、図面を参照しつつ、本発明の実施の形態について説明する。以下の説明では、同一の部品には同一の符号を付してある。それらの名称および機能も同じである。したがって、それらについての詳細な説明は繰り返さない。
 <第1の実施の形態>
 (システムの構成)
 図1は、本実施の形態における電力制御システム10000の構成を示す図である。なお、図1には、説明のために、電力系統P100を示している。電力系統P100は、電力を供給する電力会社等の商用の施設である。電力制御システム10000は、マンション等の集合住宅に設けられるシステムであるとする。なお、これに限定されることなく、電力制御システム10000は、たとえば、複数の一戸建ての家からなる集合住宅に設けられるシステムであってもよい。
 図1を参照して、電力制御システム10000は、変圧器50と、分配部300と、電力計測装置100と、電力制御装置200と、複数の電力需要施設1000とを含む。
 変圧器50、分配部300、電力計測装置100および電力制御装置200は、部屋R100内にあるとする。電力制御システム10000が、マンションに設けられる場合、部屋R100は、マンション内に設けられる部屋であり、電力需要施設1000は、マンション内の住宅である。
 電力系統P100は、電力線により変圧器50と電気的に接続される。電力系統P100は、6600Vの電圧を有する電力を、電力線を介して、変圧器50へ供給するとする。変圧器50は、電力系統P100から供給される電力の電圧レベル(6600V)を、複数の電力需要施設1000の各々で使用可能な電圧レベル(単相3線式200V)に変換する。
 変圧器50は、電力線PL10により分配部300と電気的に接続される。変圧器50は、変換した電圧レベルの電力(以下、変換済電力ともいう)を、電力線PL10を介して、分配部300へ供給する。
 上記は、電力系統P100が6600Vの高圧電力の場合の構成であり、電力系統P100が単相3線式200Vの場合は、変圧器50は不要である。
 分配部300は、電力線PL10に流れる電力(たとえば、変換済電力)を、複数の電力需要施設1000へ分配する機能を有する。分配部300は、ブレーカー310と、ブレーカー320(i)(ただし、i=1,2,3,・・・,n(nは自然数))とを含む。本実施の形態において、ブレーカーは、電力の経路を、電気的に接続した状態(以下、オン状態ともいう)または電気的に遮断した状態(以下、オフ状態ともいう)に設定する。本実施の形態では、特に記載がない限り、ブレーカーは、オン状態に設定されているとする。ブレーカー310は、電力線PL10により、変圧器50と電気的に接続される。また、ブレーカー310は、電力線により、ノードN3と電気的に接続される。ブレーカー320(i)それぞれは、電力線により、ノードN3と電気的に接続される。
 ブレーカー310は、変圧器50と、ノードN3とを電気的に接続する。この場合、変圧器50から供給される変換済電力は、ノードN3へ供給される。本実施の形態において、電力需要施設1000の数は、n(自然数)であるとする。したがって、ブレーカー320(i)は、それぞれ、電力線PL30(i)(ただし、i=1,2,3,・・・,n(nは自然数))それぞれにより、複数の電力需要施設1000と電気的に接続されるとする。以下においては、電力線PL30(i)それぞれを、単に、電力線PL30ともいう。
 ブレーカー320の各々は、ノードN3と、対応する電力需要施設1000とを電気的に接続する。なお、電力需要施設1000の数は、n(自然数)より大きい値であってもよい。この場合、分配部300内のブレーカーと、対応する電力需要施設1000との間に分岐用の分電盤を設けてもよい。
 電力計測装置100は、制御部110と、通信部120とを含む。
 制御部110は、電力計測装置100内の各部に対する処理や、演算処理等を行なうためにCPU(Central Processing Unit)111、メモリ112および測定部113を有する。なお、CPU111に代替して、演算機能を有するその他の回路であってもよい。CPU111の制御に基づき測定部113は、ノードN3の電圧を測定する。なお、本実施の形態では、測定される電圧の値は、特に記載がない限り、正の値であるとする。また、測定部113は、電力線PL10に流れる電流の値を測定する機能を有する。
 ここで、電力線PL10における電流の流れる方向が、変圧器50からブレーカー310へ向かう方向(すなわち、電力系統P100から分配部300へ向かう方向)である場合、測定部113により測定される電流の値は、正の値であるとする。一方、電力線PL10における電流の流れる方向が、ブレーカー310から変圧器50へ向かう方向(すなわち、分配部300から電力系統P100へ向かう方向)である場合、測定部113により測定される電流の値は、負の値であるとする。
 すなわち、測定部113が測定した電流値は、電力線PL10における電流の流れる方向も示す。すなわち、測定部113は、電力線PL10における電流の流れる方向も測定することができる。なお、電力は、電流値と、電圧値の積により算出される。したがって、測定部113は、電力線PL10に流れる電力の値を測定(検出)することが可能となる。
 また、電力は、電流値と、電圧値の積により算出されるので、電圧値は正の値であるとすると、測定部113により測定される電力の値が正の値である場合、電力線PL10に流れる電力の流れる方向は、電力系統P100から分配部300へ向かう方向となる。一方、測定される電力の値が負の値である場合、電力線PL10に流れる電力の流れる方向は、分配部300から電力系統P100へ向かう方向となる。したがって、測定部113は、電力線PL10に流れる電力の流れる方向を測定(検出)することが可能となる。
 なお、測定部113が電圧および電流を測定する位置は、電力線PL10に流れる電力の電圧および電流を測定できる位置であれば、変圧器50に近い位置(高圧側)および分配部300に近い位置(低圧側)のどちらであってもよい。または、測定部113は、分配部300内のノードN3よりも電力系統P100側であれば、どこに設置されてもよい。本実施の形態では、低圧電力の方が電圧検出素子の耐圧が不要であり低コストで構成できるため、分配部300に近い位置(低圧側)で、電力線PL10に流れる電力の電圧および電流を測定するものとする。
 通信部120は、制御部110および他の装置と通信する機能を有する。通信部120は、通信規格としてのホームプラグAVに基づいて、PLC(Power Line Communications:電力線搬送通信)を行なう機能を有する。PLCは、電力線を利用する通信であるため、通信線を新たに敷設する必要がなく、コストの点、通信の信頼性の点等で、他の通信に比べ有利である。
 なお、通信部120が行なう通信は、PLCに限定されることなく、他の通信であってもよい。通信部120が行なう通信は、たとえば、RS(Recommended standard)485の規格に基づく有線通信、Ethernet(登録商標)に基づく有線通信、IEEE(Institute Of Electrical and Electronics Engineers)802.11gに基づく無線通信等であってもよい。
 電力制御装置200は、制御部210と、通信部220とを含む。制御部210は、電力制御装置200内の各部に対する処理や、演算処理等を行なうためにCPU211、メモリ212、条件検出部213および電力制御部214を有する。条件検出部213は、後述の逆潮流を検出するための所定条件が成立するか否かを検出する。電力制御部214は、電力需要施設1000のそれぞれに、電力制御指示を送信する。メモリ212に格納されるデータについては後述する。
 CPU211が実行する処理に、条件検出部213と電力制御部214の機能に相当する処理を組込むことによって、条件検出部213と電力制御部214を省略してもよい。
 通信部220は、制御部210および他の装置と通信する機能を有する。通信部220は、前述の通信部120と同じ通信を行なう機能を有する。すなわち、通信部220は、PLCを行なう機能を有する。通信部220は、通信部120と通信を行なう。
 電力需要施設1000は、分電盤400と、電気負荷70Rとを含む。
 分電盤400は、ブレーカー410,420,430,440を含む。ここで、電力需要施設1000は、ブレーカー320(1)と電気的に接続されるものとする。この場合、ブレーカー410は、電力線PL30(1)(電力線PL30)により、ブレーカー320(1)と電気的に接続される。また、ブレーカー410は、電力線により、ノードN4と電気的に接続される。ブレーカー410は、ブレーカー320(1)とノードN4とを電気的に接続する。
 ブレーカー440は、電力線により、ノードN4および電気負荷70Rと電気的に接続される。電気負荷70Rは、電力を消費することにより動作する装置である。電気負荷70Rは、たとえば、冷蔵庫、エア・コンディショナ、洗濯機等である。ブレーカー440は、電気負荷70Rと、ノードN4とを電気的に接続する。すなわち、分電盤400は、当該分電盤400に供給される電力を、電気負荷70Rへ供給することができる。
 電力需要施設1000は、さらに、電力計測装置700を含む。電力計測装置700は、制御部710と、通信部720とを含む。
 制御部710は、電力計測装置700内の各部に対する処理や、演算処理等を行なうためにCPU711、メモリ712、測定部713、後述の逆潮流の検出をするための条件検出部714および電力制御部715を有する。電力制御部715は、後述の蓄電装置600による充電と放電ならびに後述の発電装置500による発電を制御する。メモリ712に格納されるデータについては後述する。
 CPU711が実行する処理に、条件検出部714と電力制御部715の機能に相当する処理を組込むことによって、条件検出部714と電力制御部715を省略してもよい。
 測定部713は、CPU711の制御に基づきノードN4の電圧を測定する。測定部713は、対応するブレーカー(ブレーカー320(1))と、ブレーカー410との間の電力線PL30(たとえば、電力線PL30(1))に流れる電流の値を測定(検出)する。
 ここで、電力線PL30における電流の流れる方向が、分配部300から分電盤400へ向かう方向である場合、測定部713により測定される電流の値は、正の値であるとする。一方、電力線PL30における電流の流れる方向が、分電盤400から分配部300(電力系統P100)へ向かう方向である場合、測定部713により測定される電流の値は、負の値であるとする。
 すなわち、測定部713が測定した電流値は、電力線PL30における電流の流れる方向も示す。すなわち、測定部713は、電力線PL30における電流の流れる方向も測定することができる。なお、電力は、電流値と、電圧値の積により算出される。したがって、測定部713は、電力線PL30に流れる電力の値を測定(検出)することが可能となる。
 また、電力は、電流値と、電圧値の積により算出されるので、電圧値は正の値であるとすると、測定部713により測定される電力の値が正の値である場合、電力線PL30に流れる電力の流れる方向は、分配部300から分電盤400へ向かう方向となる。一方、測定部713により測定される電力の値が負の値である場合、電力線PL30に流れる電力の流れる方向は、分電盤400から分配部300(電力系統P100)へ向かう方向となる。したがって、測定部713は、電力線PL30に流れる電力の流れる方向を測定(検出)することが可能となる。
 なお、測定部713が電圧および電流を測定する位置は、対応する電力需要施設1000に供給される総電力、または電力需要施設1000から供給される総電力を測定できる位置であれば、図1に記載の位置に限定されない。
 通信部720は、制御部710および他の装置と通信する機能を有する。通信部720は、前述の通信部120と同じ通信を行なう機能を有する。すなわち、通信部720は、PLCを行なう機能を有する。通信部720は、電力制御装置200内の通信部220および後述する蓄電装置600と通信を行なう。
 電力需要施設1000は、さらに、発電装置500と、太陽電池BT10とを含む。
 太陽電池BT10は、太陽光を利用して発電し、発電した電力を、発電装置500へ供給する機能を有する。太陽電池BT10は、供給する電圧が、DC(Direct Current)100V~DC350Vになるように、複数の太陽電池が直列に接続されたものである。太陽電池BT10の最大出力電力は、3kWであるとする。
 なお、太陽電池BT10の最大出力電力は、3kWに限定されることなく、他の値(たとえば、3~5kWの範囲のいずれかの値)であってもよい。電力制御システム10000が、マンションに設けられる場合、太陽電池BT10は、マンションの屋上に設けられる。
 発電装置500は、太陽電池BT10が得た直流電力を交流電力に変換して、変換した電力を、分電盤400へ供給する発電処理を行なう機能を有し、低圧系統と連系する太陽光パワーコンディショナである。なお、発電装置500は、太陽光パワーコンディショナに限定されることなく、たとえば、燃料電池や風力発電等が発電する電力を利用するパワーコンディショナであってもよい。発電装置500は、常に、太陽電池BT10から最大の電力を取得できるような制御(以下、最大電力追従制御ともいう)を行なっている。
 分電盤400に含まれるブレーカー420は、電力線により、ノードN4および発電装置500と電気的に接続される。ブレーカー420は、ノードN4と発電装置500とを電気的に接続する。
 なお、電力制御システム10000は、上記構成に限定されることはない。たとえば、電力計測装置100および電力制御装置200は、1つの装置で構成されてもよい。
 図2は、発電装置500の内部構成を示すブロック図である。図2には、説明のため、太陽電池BT10と、後述する通信部620と、AC(Alternating Current)200Vの電圧源P50とを示している。
 図2を参照して、発電装置500は、変換回路540を含む。変換回路540は、太陽電池BT10が得た直流電力を交流電力に変換する機能を有する。
 発電装置500は、さらに、制御部510と、通信部520と、ドライブ回路530とを含む。
 制御部510は、発電装置500内の各部に対する処理や、演算処理等を行なうためにCPU511、メモリ512および信号生成部513を有する。信号生成部513は、CPU511の制御に従いパルス信号55Sおよびパルス幅減少指示56Sならびにパルス幅増加指示57Sを生成し出力する。
 以下においては、信号およびデータ等の2値的な高電圧状態(たとえば、電源電圧Vcc)および低電圧状態(たとえば、接地電圧GND)を、それぞれ、Hレベル(“1”)およびLレベル(“0”)とも称する。パルス信号は、LレベルおよびHレベルの電圧からなる信号である。
 通信部520は、制御部510および他の装置と通信する機能を有する。通信部520は、前述した通信部120と同じ通信を行なう機能を有する。通信部520は、後述する通信部620と通信を行なう。
 ドライブ回路530は、制御部510の信号生成部513からのパルス幅減少指示56Sならびにパルス幅増加指示57Sに基づき、変換回路540を動作させるためのパルス信号(パルス信号5AS,51S,52S,53S,54S)を生成し出力する。ドライブ回路530は、パルス幅減少指示56Sならびにパルス幅増加指示57Sに基づき、出力するパルス信号のHレベルの幅(パルス幅)を変化させる。
 変換回路540は、昇圧回路541と、インバータ回路542と、フィルタ回路543と、リレー回路544とを含む。
 昇圧回路541は、太陽電池BT10と電気的に接続される。昇圧回路541は、太陽電池BT10が得た電圧のレベルを、DC380V程度まで昇圧させる機能を有する。また、昇圧回路541は、昇圧させた電圧を、インバータ回路542へ供給する。
 昇圧回路541は、リアクトルL50と、ダイオードD50と、スイッチ回路G5Aと、電解コンデンサC51とを含む。スイッチ回路G5Aは、IGBT(Insulated Gate Bipolar Transistor)やMOSFET(Metal Oxide Semiconductor Field Effect Transistor)を利用することができるが、ここではMOSFETを使用するものとする。
 スイッチ回路G5A内のMOSFETのゲートには、ドライブ回路530から出力されるパルス信号5ASが入力される。スイッチ回路G5A内のMOSFETは、ゲートにHレベルの信号(パルス信号5AS)が入力された場合、ソース-ドレイン間に電流を流す。
 昇圧回路541は、制御部510の制御(パルス信号5AS)により、常に、太陽電池BT10から最大の電力を取得できるような制御(以下、最大電力追従制御ともいう)を行なっている。
 インバータ回路542は、昇圧回路541から供給される直流電圧を交流電圧に変換する機能を有する。インバータ回路542は、スイッチ回路G51,G52,G53,G54を含む。スイッチ回路G51,G52,G53,G54の各々は、IGBTやMOSFETを利用することができるが、ここではIGBTを使用するものとする。スイッチ回路G51,G52,G53,G54にそれぞれ含まれる4つのIGBTのゲートには、それぞれ、パルス信号51S,52S,53S,54Sが入力される。スイッチ回路G51,G52,G53,G54の各々に含まれるIGBTは、スイッチ回路G5Aに含まれるMOSFETと同様な機能を有するので詳細な説明は繰り返さない。
 インバータ回路542は、ドライブ回路530から出力される、パルス信号51S,52S,53S,54Sにより、出力する交流電圧を抑制する機能を有する。
 フィルタ回路543は、インバータ回路542により生成された交流電圧の波形を、平滑化して整形する機能を有する。フィルタ回路543は、リアクトルL51,L52と、コンデンサC52とを含む。
 リレー回路544は、リレーSW51,SW52を含む。リレーSW51,SW52の各々は、パルス信号55Sに応じて動作する。具体的には、リレーSW51,SW52の各々は、Hレベルのパルス信号55Sが入力された場合、フィルタ回路543と、電圧源P50とを電気的に接続する。一方、リレーSW51,SW52の各々は、Lレベルのパルス信号55Sが入力された場合、フィルタ回路543と、電圧源P50とを電気的に非接続な状態にする。
 電圧源P50は、図1のブレーカー420に電力系統P100側から供給される交流電圧を示す。リレー回路544がONの場合は、インバータ回路542にはリレー回路544とフィルタ回路543を介してAC200Vの電圧が供給され、インバータ回路542はブレーカー420側に対してフィルタ回路543とリレー回路544を介して交流電流を出力する。リレー回路544がOFFの場合は、インバータ回路542は交流電流の出力を停止する。
 なお、図2では、接続状態を簡単に示すために、電圧源P50に2本の線が接続されている状態を示しているが、実際には、AC200Vの電圧源P50は、2つのAC100Vの電圧源と、3本の線から構成される単相3線式200Vが接続可能な構成を有する。
 また、変換回路540は、上記回路構成に限定されることなく、太陽電池BT10が得た直流電力を交流電力に変換することが可能な構成であればよく、図2の構成に限定されるものではない。
 再び、図1を参照して、電力需要施設1000は、さらに、蓄電装置600と、蓄電池BT20とを含む。蓄電池BT20は、リチウムイオン電池であるとする。蓄電池BT20は、8kWhの電力量を充電可能な電池であるとする。なお、前述したように、太陽電池BT10の最大出力電力は、3kWであるとする。
 以下においては、蓄電池BT20に充電が許容される電力量を、充電許容電力量ともいう。すなわち、蓄電池BT20の充電許容電力量は、8kWhである。また、以下においては、蓄電池BT20に蓄えられた電力量が充電許容電力量と等しい場合における蓄電池BT20の状態を、満充電状態ともいう。また、以下においては、放電処理が行なわれることにより、蓄電池BT20に電力が蓄えられてない状態を、放電終止状態ともいう。
 なお、蓄電池BT20は、リチウムイオン電池に限定されることなく、大容量の電気エネルギーを蓄える装置であればどのようなものであってもよい。蓄電池BT20は、たとえば、鉛蓄電池、ニッケル水素電池、レドックスフロー電池、ナトリウム硫黄電池などの、電気エネルギーを化学エネルギーに変換して蓄える二次電池であってもよいし、リチウムイオンキャパシタのように電気エネルギーのまま蓄える電気二重層キャパシタであってもよい。蓄電池BT20は、出力電圧が、150V~250Vになるように、複数の蓄電池が直列に接続されたものである。
 蓄電装置600は、電力を、蓄電池BT20に蓄えるための充電処理と、蓄電池BT20に蓄えられた電力を放電させるための放電処理とを行なう機能を有する蓄電池用パワーコンディショナである。なお、充電処理により、蓄電池BT20の状態が、満充電状態になった場合、蓄電装置600は、充電処理を停止し、充電処理および放電処理のいずれも行なわない状態になる。また、放電処理により、蓄電池BT20の状態が、放電終止状態になった場合、蓄電装置600は、放電処理を停止し、充電処理および放電処理のいずれも行なわない状態になる。
 なお、蓄電装置600は、蓄電池を利用しない装置であってもよい。この場合、蓄電装置600は、電気二重層キャパシタや超電導電力貯蔵装置等の電気エネルギーとして蓄える装置であってもよい。また、蓄電装置600は、たとえば、電気エネルギーを力学エネルギーに変換して蓄えるフライホイール電力貯蔵装置であってもよい。
 分電盤400に含まれるブレーカー430は、電力線により、ノードN4および蓄電装置600と電気的に接続される。ブレーカー430は、ノードN4と蓄電装置600とを電気的に接続する。
 分電盤400には、分配部300から電力が供給される。また、分電盤400には、対応する蓄電装置600が放電処理を行なっている場合、当該対応する蓄電装置600から電力が供給される。また、分電盤400には、対応する発電装置500が発電処理を行なっている場合、当該対応する発電装置500から電力が供給される。また、分電盤400には、対応する蓄電装置600が放電処理を行なっており、かつ、対応する発電装置500が発電処理を行なっている場合、当該対応する蓄電装置600および当該対応する発電装置500から電力が供給される。
 また、分配部300から分電盤400に電力が供給されており、対応する蓄電装置600が充電処理を行なっている場合、分配部300から分電盤400に供給される電力の少なくとも一部は、対応する蓄電装置600が行なう充電処理により、対応する蓄電池BT20に充電される。
 また、放電処理を行なっている蓄電装置600から分電盤400に電力が供給されており、分電盤400に供給される総電力量が、電気負荷70Rで消費される電力量より大きい場合、放電処理を行なっている蓄電装置600から分電盤400に供給される電力の少なくとも一部は、分配部300へ送られる。
 なお、分電盤400は、各装置間を電気的に接続するだけのものであり、電力の流れは、各装置の出力状態や電気負荷の大きさによって自然に決まるものである。
 ここで、電力線PL30(1)と接続される電力需要施設1000を、電力需要施設Aとよぶものとする。また、電力線PL30(n)と接続される電力需要施設1000を、電力需要施設Bとよぶものとする。また、電力需要施設A内の蓄電装置600が充電処理を行なっているとする。また、電力需要施設B内の発電装置500が発電処理を行なっており、電力需要施設Bが、当該発電処理により得られた電力の少なくとも一部を、分配部300へ供給しているとする。
 この場合、電力需要施設Bが分配部300へ供給している当該発電処理により得られた電力の少なくとも一部は、電力需要施設A内の蓄電装置600が充電処理を行なっていることにより、分配部300を介して、電力需要施設A内の蓄電池BT20に充電される場合もある。
 すなわち、充電処理を行なう蓄電装置600を含む電力需要施設A以外の電力需要施設Bが含む発電装置500が行なう発電処理により電力系統P100への方向に送られる電力の少なくとも一部を、電力需要施設A内の蓄電池BT20に蓄えることもできる。
 すなわち、ある電力需要施設が分配部300へ供給している電力を、他の電力需要施設が有効利用することもできる。すなわち、複数の電力需要施設1000は、分配部300を介して、電力の有効利用を行なうことができる。
 図3は、蓄電装置600の内部構成を示すブロック図である。図3には、説明のため、蓄電池BT20と、発電装置500内の通信部520と、電圧源P60と電力計測装置700内の通信部720とを示している。
 図3を参照して、蓄電装置600は、充放電回路640を含む。充放電回路640は、電力を、蓄電池BT20に蓄えるための充電処理と、蓄電池BT20に蓄えられた電力を放電させるための放電処理とを行なう機能を有する。
 蓄電装置600は、さらに、制御部610と、通信部620と、ドライブ回路630とを含む。
 制御部610は、蓄電装置600内の各部に対する処理や、演算処理等を行なうためにCPU611、メモリ612、信号生成部613、測定部614および状態検出部615を有する。信号生成部613はCPU611の制御に基づきパルス信号65Sとパルス幅減少指示66Sならびにパルス幅増加指示67Sを生成し出力する。また、測定部614はCPU611の制御に基づき、蓄電池BT20と、蓄電装置600内の後述するリアクトルL60とを接続する電線に流れる電流の値および電流の流れる方向を測定(検出)する。メモリ612に格納されるデータについては後述する。
 また、状態検出部615は、測定部614の検出結果に基づき、充放電回路640が充電処理および放電処理のいずれの処理をおこなっているか、または、充放電回路640が充電処理および放電処理のいずれもおこなっていないかを常に検知している。すなわち、蓄電装置600が充電処理および放電処理のいずれの処理をおこなっているか、または、蓄電装置600が充電処理および放電処理のいずれもおこなっていないかを常に検知している。
 通信部620は、制御部610および他の装置と通信する機能を有する。通信部620は、前述した通信部120と同じ通信を行なう機能を有する。通信部620は、発電装置500内の通信部520および電力計測装置700内の通信部720と通信を行なう。
 なお、図1、図2、図3に示される通信部120,220,520,620,720の各々は、対応する制御部からの指示の有無に関わらず、受信したデータを、受信したデータの宛先へ送信する機能を有する。すなわち、通信部120,220,520,620,720の各々は、任意の通信部と通信する機能を有する。
 たとえば、通信部120が、制御部110から発電装置500宛のデータ(以下、発電装置宛データともいう)を受信した場合、通信部120は、発電装置宛データを、通信部220へ送信し、通信部220は、受信した発電装置宛データを、通信部720へ送信する。通信部720は、受信した発電装置宛データを、通信部620へ送信し、通信部620は、受信した発電装置宛データを、発電装置500内の通信部520へ送信する。
 また、たとえば、通信部720は、蓄電装置600内の通信部620と通信し、通信部720は、蓄電装置600内の通信部620を利用して、発電装置500内の通信部520と通信できる。したがって、電力計測装置100内の通信部120は、通信部220および通信部720を利用して、蓄電装置600内の通信部620と通信できる。また、電力計測装置100内の通信部120は、通信部220、通信部720および通信部620を利用して、発電装置500内の通信部520と通信できる。
 なお、通信部120,220,520,620,720の各々の通信形態は、図1、図2、図3に示した形態に限定されない。たとえば、通信部220が、発電装置500内の通信部520および蓄電装置600内の通信部620と直接通信可能なように構成されてもよい。
 ドライブ回路630は、信号生成部613からのパルス幅減少指示66Sならびにパルス幅増加指示67Sに応じて、充放電回路640を動作させるためのパルス信号(パルス信号6AS,6BS,61S,62S,63S,64S)を生成し出力する。ドライブ回路630は、パルス幅減少指示66Sならびにパルス幅増加指示67Sに基づき、出力するパルス信号のHレベルの幅(パルス幅)を変化させる。
 充放電回路640は、双方向チョッパ641と、双方向インバータ回路642と、フィルタ回路643と、リレー回路644とを含む。
 双方向チョッパ641は、蓄電池BT20と電気的に接続される。充放電回路640が放電処理を行なう時(以下、放電処理実行時ともいう)、双方向チョッパ641は、蓄電池BT20から得た電圧のレベルを、DC380V程度まで昇圧させる機能を有する。また、双方向チョッパ641は、放電処理実行時において、昇圧させた電圧を、双方向インバータ回路642へ供給する。
 双方向チョッパ641は、リアクトルL60と、スイッチ回路G6Aと、スイッチ回路G6Bと、電解コンデンサC61とを含む。スイッチ回路G6Aおよびスイッチ回路G6Bの各々は、MOSFETである。
 スイッチ回路G6A内のMOSFETのゲートには、ドライブ回路630から出力されるパルス信号6ASが入力される。スイッチ回路G6A内のMOSFETは、ゲートにHレベルの信号(パルス信号6AS)が入力された場合、ソース-ドレイン間に電流を流す。スイッチ回路G6B内のMOSFETのゲートには、ドライブ回路630から出力されるパルス信号6BSが入力される。スイッチ回路G6B内のMOSFETは、スイッチ回路G6Aに含まれるMOSFETと同様な機能を有するので詳細な説明は繰り返さない。
 双方向インバータ回路642は、放電処理実行時において、双方向チョッパ641から供給される直流電圧を交流電圧に変換する機能を有する。双方向インバータ回路642は、スイッチ回路G61,G62,G63,G64を含む。スイッチ回路G61,G62,G63,G64の各々は、IGBTである。スイッチ回路G61,G62,G63,G64にそれぞれ含まれる4つのIGBTのゲートには、それぞれ、パルス信号61S,62S,63S,64Sが入力される。スイッチ回路G61,G62,G63,G64の各々に含まれるIGBTは、スイッチ回路G6Aに含まれるMOSFETと同様な機能を有するので詳細な説明は繰り返さない。
 フィルタ回路643は、放電処理実行時において、双方向インバータ回路642により生成された交流電圧の波形を、平滑化して整形する機能を有する。フィルタ回路643は、リアクトルL61,L62と、コンデンサC62とを含む。
 リレー回路644は、リレーSW61,SW62を含む。リレーSW61,SW62の各々は、パルス信号65Sに応じて動作する。具体的には、リレーSW61,SW62の各々は、Hレベルのパルス信号65Sが入力された場合、フィルタ回路643と、電圧源P60とを電気的に接続する。一方、リレーSW61,SW62の各々は、Lレベルのパルス信号65Sが入力された場合、フィルタ回路643と、電圧源P60とを電気的に非接続な状態にする。
 電圧源P60は、図1のブレーカー430に電力系統P100側から供給される交流電圧を示す。リレー回路644がONの場合は、双方向インバータ回路642にはリレー回路644とフィルタ回路643を介してAC200Vの電圧が供給され、双方向インバータ回路642はブレーカー420側に対してフィルタ回路643とリレー回路644を介して交流電流を出力する。リレー回路644がOFFの場合は、双方向インバータ回路642は交流電流の出力を停止する。
 なお、図3では、接続状態を簡単に示すために、電圧源P60に2本の線が接続されている状態を示しているが、実際には、電圧源P60は、2つの電圧源と、3本の線から構成される単相3線式200Vが処理可能な構成を有する。
 充放電回路640が充電処理を行なう時(以下、充電処理実行時ともいう)、ブレーカー430から供給される交流電圧が、リレー回路644を介して、フィルタ回路643に供給される。フィルタ回路643と双方向インバータ回路642は一体となって交流電圧の整流および昇圧の動作を行い、充電処理実行時において、フィルタ回路643に供給される交流電圧を、DC380Vの直流電圧に変換し、変換した直流電圧を、双方向チョッパ641へ供給する。双方向チョッパ641は、充電処理実行時において、双方向インバータ回路642から供給された直流電圧のレベルを、蓄電池BT20で使用可能なレベルに低下させて、蓄電池BT20を充電する。
 なお、制御部610の測定部614は、前述したように、蓄電池BT20と、リアクトルL60との間に流れる電流を測定する。測定部614は、充電処理実行時には、蓄電池BT20に向かって流れる充電電流を正の値として積算していき、放電処理実行時には、蓄電池BT20からリアクトルL60に向かって流れる放電電流を負の値として積算していく。測定部614は電流容量値検出部として機能する。つまり、積算された充電電流と、積算された放電電流との差を算出することにより、現時点で蓄電池BT20に蓄えられている電流容量の値(以下、蓄電流容量値ともいう)CC1を常に検出し、メモリ612に格納する。
 また、満充電状態の蓄電池BT20が有する電流容量の値(以下、最大電流容量値ともいう)CM1を予めメモリ612に記憶しているとする。そして、状態検出部615は、蓄電流容量値を、最大電流容量値で除算した値に、100を乗算することにより求まる充電状態値(SOC;State Of Charge)を、常に算出してメモリ612に格納する。充電状態値は、0~100の範囲の値であり、単位は、%で表される。たとえば、蓄電流容量値CC1と、最大電流容量値CM1とが等しい場合、充電状態値は、100(%)となり、蓄電池BT20の状態は、満充電状態である。すなわち、充電状態値SOCは、蓄電池BT20の充電状態を示す値である。
 また、充放電回路640は、上記回路構成に限定されることなく、電力を、蓄電池BT20に蓄えるための充電処理と、蓄電池BT20に蓄えられた電力を放電させるための放電処理とを行なうことが可能な回路構成であればよく、図3の構成に限定されない。
 再び、図1を参照して、本実施の形態における電力需要施設1000は、発電装置500および蓄電装置600の両方を含む構成とした。しかしながら、これに限定されることなく、電力需要施設1000は、蓄電装置600を含まず、発電装置500を含む構成であってもよい。
 なお、各電力需要施設1000から、分配部300に向かう電力をなるべく抑制するには、電力需要施設1000は、発電装置500および蓄電装置600の両方を含む構成であることが好ましい。なぜならば、電力需要施設1000が、蓄電装置600を含まず、発電装置500を含む構成である場合、電力需要施設1000から分配部300に向かう電力を抑制するには、発電装置500が得る電力の出力を抑える必要が生じ、本来発電できる電力を捨てることになる。すなわち、エネルギーの効率利用の観点から好ましくないからである。
 (電力制御方法)
 次に、電力が電力系統P100へ流れるのを防ぐために、電力制御システム10000において行なわれる処理について説明する。
 まず、電力計測装置100が、電力線PL10に流れる電力の値を測定する処理(以下、電力測定処理ともいう)について説明する。以下においては、電力測定処理において、電力計測装置100が行なう処理を、電力測定処理DTともいう。電力測定処理DTは、他の処理とは独立して行なわれる処理である。また、以下においては、電力測定処理において、電力制御装置200が行なう処理を、電力測定処理CTともいう。電力測定処理CTは、他の処理とは独立して行なわれる処理である。
 図4は、電力測定処理DTおよび電力測定処理CTのフローチャートである。図4を参照して、電力測定処理DTでは、まず、ステップS111の処理が行なわれる。
 ステップS111では、測定部113が、電力線PL10に流れる電流の値およびノードN3の電圧の値を測定する。すなわち、電力線PL10に流れる電力の値を測定する。そして、ステップS112に進む。
 ステップS112では、制御部110のCPU111が、図示しないタイマによって所定時間経過したか否かを検出する。所定時間は、たとえば、1秒であるとする。ステップS112において、YESならば、ステップS113に進む。一方、ステップS112において、NOならば、再度、ステップS111の処理が行なわれる。
 ステップS113では、測定部113が、測定した電力の値(以下、測定電力値ともいう)を、電力制御装置200へ送信する。そして、再度、ステップS111の処理が行なわれる。
 電力測定処理CTでは、まず、ステップS121の処理が行なわれる。
 ステップS121では、電力値受信処理が行なわれる。電力値受信処理では、制御部210が、測定電力値を受信する。なお、電力測定処理CTでは、ステップS121の処理が繰り返し行なわれる。
 以上の処理が行なわれることにより、所定時間経過毎に、CPU211は、電力線PL10に流れる電力の値(測定電力値)を取得する。すなわち、CPU211は、所定時間経過毎に、電力線PL10に流れる電力の流れる方向を、検知しているとする。以下においては、測定電力値はメモリ212に格納されて、電力値TLPと表す。
 ここで、電力制御システム10000に含まれる複数の電力需要施設1000の一部から、分配部300の方向へ向かって電力が流れているとする。
 次に、電力制御装置200が、電力が電力系統P100へ流れるのを防ぐために行なう処理(以下、総電力制御処理ともいう)について説明する。以下においては、総電力制御処理において、電力制御装置200が行なう処理を、総電力制御処理CTAともいう。
 また、以下においては、総電力制御処理において、電力制御システム10000に含まれる複数の電力需要施設1000にそれぞれ含まれる複数の蓄電装置600の各々が行なう処理を、総電力制御処理CPともいう。また、以下においては、総電力制御処理において、電力制御システム10000に含まれる複数の電力需要施設1000にそれぞれ含まれる複数の電力計測装置700の各々が行なう処理を、総電力制御処理DTAともいう。
 図5は、総電力制御処理CP、総電力制御処理CTAおよび総電力制御処理DTAのフローチャートである。図5を参照して、総電力制御処理CTAでは、まず、ステップS221の処理が行なわれる。
 ステップS221では、条件検出部213により、逆潮流の発生の可能性が高いか否かが検出される。ここで、逆潮流は、分配部300(電力需要施設1000)から、電力系統P100への電力の流れであるとする。具体的には、条件検出部213が、現時点において、図4の電力測定処理CTにより取得している最新の電力値TLPをメモリ212から読出し、読出した電力値TLPが、所定範囲の値に含まれる値を指示するか否かを検出する。ここで、所定範囲の値は、電力線PL10に流れる電力の流れる方向が、分配部300から電力系統P100へ流れる方向となる可能性が高い範囲の値であるとする。すなわち、所定範囲の値は、逆潮流の発生の可能性が高い範囲の値である。所定範囲の値は、予めメモリ212に格納されていると想定する。
 条件検出部213の検出の結果が、電力値TLPが、負の値であると指示する場合は、逆潮流が発生していることが検出される。電力値TLPが、0に近い正の値であると指示する場合は、逆潮流の発生の可能性が高いことが検出される。所定範囲の値は、一例として、1以上且つ正の所定値K1未満の値であるとする。ここで、所定値K1は、予めメモリ212に格納されている。
 ここで、電力制御システム10000の電力の最大出力値の1%が、所定値K1の値であるとする。また、電力制御システム10000の電力の最大出力値は、90kWとする。この場合、所定値K1は、900(W)となる。
 ステップS221において、(1≦TLP<K1)の条件が成立する、すなわち逆潮流の発生の可能性が高いと検出されると(ステップS221でYES)、処理はステップS222に進むが、当該条件が成立しない、すなわち逆潮流の発生の可能性が高くはないと検出されると(ステップS221でNO)、処理は、後述するステップS225に進む。ここでは、電力値TLPが、一例として、300(W)であるとする。この場合、処理はステップS222に進む。
 ステップS222では、CPU211が、処理情報要求を、電力需要施設1000それぞれ含まれる複数の蓄電装置600へ送信する。処理情報要求は、蓄電装置600が現在行なっている処理(充電処理または放電処理)を示す情報を要求するための指示である。そして、ステップS222の処理は終了する。
 総電力制御処理CPでは、まず、ステップS261の処理が行なわれる。
 ステップS261では、CPU611が、制御部210から処理情報要求を受信したか否かを検出する。受信したと検出すると(ステップS261でYES)、処理はステップS262に進むが、受信しないと検出すると(ステップS261でNO)、再度、ステップS261の処理が行なわれる。ここでは、処理情報要求を受信したとして、ステップS262に進む。
 ステップS262では、制御部610が、処理情報を、電力制御装置200へ送信する。処理情報は、対応する蓄電装置600が現在行なっている処理(充電処理または放電処理)を示す情報である。蓄電装置600が充電処理を行なっている場合、送信される処理情報は充電処理を示し、放電処理を行なっている場合は放電処理を示し、充電処理および放電処理のいずれも行なっていない場合は処理停止を示す。そして、再度、ステップS261の処理が行なわれる。
 総電力制御処理CTAでは、ステップS222の処理の後、ステップS223に進む。
 ステップS223では、処理情報受信処理が行なわれる。処理情報受信処理では、制御部210が、処理情報を受信する。処理情報には、当該処理情報を送信した蓄電装置600を識別する情報が含まれる。CPU211は、処理情報要求を送信した全ての蓄電装置600から、処理情報を受信したと検出すると、この処理情報受信処理を終了し、ステップS224に進む。制御部210は、受信した処理情報を解析することにより、電力制御システム10000に含まれる複数の蓄電装置600のうち、充電処理または放電処理を行なっている蓄電装置600を検出することができる。
 ステップS224では、電力制御処理が行なわれる。電力制御処理では、制御部210の電力制御部214が、処理情報を、自装置(電力制御装置200)に提供した全ての電力需要施設1000の各々に含まれる電力計測装置700宛てに、電力制御指示を生成して送信する。
 電力制御指示は、受信した処理情報の解析結果に基づき生成されて、電力需要施設1000の蓄電装置600それぞれに宛てて送信される。具体的には、放電処理を行なっている蓄電装置600宛てに送信される電力制御指示は、放電処理による、電力系統P100への方向への電力の供給量を抑制させるための処理の実行を指示する。また、充電処理を行なっている蓄電装置600宛てに送信される電力制御指示は、充電処理により、対応する蓄電池BT20に充電する電力を増加させるための処理の実行を指示する。
 具体的には、電力制御指示は、電力計測装置700が行なう後述する処理において使用される比較値L1を、所定値(たとえば、5)だけ増加させるための指示である。比較値L1は、電力線PL30に流れる電力の値(施設内測定電力値)と比較するために参照される値であって、ゼロに近い値を指す。そして、ステップS224の処理は終了する。
 総電力制御処理DTAでは、まず、ステップS271の処理が行なわれる。ここで、電力制御システム10000に含まれる複数の電力需要施設1000にそれぞれ含まれる複数の電力計測装置700の各々の制御部710は、予め、後述する処理において使用する比較値L1をメモリ712に記憶しているとする。
 ステップS271では、制御部710のCPU711が、電力制御指示を受信したか否かを検出する。受信したと検出すると(ステップS271でYES)、処理はステップS272に移行する。受信しないと検出すると(ステップS271でNO)、処理は後述するステップS273に進む。ここでは、電力制御指示を受信したとして、処理はステップS272に進む。
 ステップS272では、比較値増加処理が行なわれる。比較値増加処理では、CPU711が、電力制御指示に基づいて、メモリ712の比較値L1を増加させる。ここで、比較値L1の初期値は、発電装置500の最大出力の1%の値であるとする。ここで、発電装置500の最大出力は、3kWであるとする。この場合、比較値L1の初期値は、30(W)となる。また、電力制御指示は、比較値L1を、“5”増加させるための指示であるとする。この場合、ステップS272の処理により、比較値L1は、“35”となる。そして、処理はステップS273に進む。
 ステップS273では、CPU711が、比較値L1の減少を指示する後述の減少指示を受信したか否かを検出する。受信したと検出すると(ステップS273でYES)、処理はステップS274に進む。受信しないと検出すると(ステップS273でNO)、再度、ステップS271の処理が行なわれる。ここでは、減少指示を受信してないとして、再度、ステップS271の処理が行なわれるとする。
 総電力制御処理CTAでは、ステップS224の処理の後、ステップS225に進む。
 ステップS225では、CPU211は、逆潮流の発生の可能性が低いか否かを検出する。逆潮流は、前述したように、分配部300(電力需要施設1000)から、電力系統P100への電力の流れであるとする。
 具体的には、ステップS225では、条件検出部213が、現時点において、図4の電力測定処理CTにより検出している最新の電力値TLPが、前述した正の所定値K1(900)以上であるか否かを検出する。すなわち、検出した最新の電力値TLPが(電力線PL10に流れる電力の流れる方向が)、分配部300から電力系統P100へ流れる方向となる可能性が低い値であるか否かを検出する。
 つまり、(TLP≧K1)の条件が成立すると検出すると(ステップS225でYES)、処理はステップS226に進むが、当該条件は成立しないと検出すると(ステップS225でNO)、処理は再度、ステップS221に移行する。ここでは、最新の電力値TLPが、所定値K1未満であるとして、再度、ステップS222の処理が行なわれるとする。
 そして、再度、前述した、ステップS222,S261,S262,S223,S224,S271,S272の処理が行なわれる毎に、比較値L1が、所定値ずつ増加する。ステップS222,S261,S262,S223,S224,S271,S272の処理は、CPU211が、図4の電力測定処理CTにより取得している電力値TLPが、前述した正の所定値K1以上を指示すると検出されるまで繰り返し行なわれる。
 そして、比較値L1が、たとえば、50(W)になったときに、CPU211が、電力測定処理CTにより取得する電力値TLPが、前述した正の所定値K1(900)以上を指示すると検出したとする。この場合、逆潮流の発生の可能性が低くなったことになる。この場合、ステップS225において、YESと検出され、処理はステップS226に進む。
 ステップS226では、CPU211が、一度でも、電力制御指示を送信したことのある全ての電力計測装置700へ、比較値L1についての減少指示を送信する。減少指示は、初期値より増加している比較値L1の値を、初期値に戻すための指示である。なお、減少指示は、比較値L1を増加させた所定値(たとえば、“5”)より、小さい値(以下、減少値ともいう)を、たとえば、所定時間(たとえば、1秒)経過毎に、比較値L1から減じることを指示する。ここでは、減少値は、たとえば、“1”である。
 すなわち、減少指示では、比較値L1を増加させるステップ幅(“5”)より、比較値L1を減少させるステップ幅(“1”)を小さくしている。そのため、減少指示は、逆潮流が発生しにくい制御を行なわせるための指示である。そして、減少指示が送信されると、ステップS226の処理は終了し、再度、ステップS221の処理が行なわれる。
 総電力制御処理DTAでは、制御部710のCPU711は、ステップS273において、前述したように、減少指示を受信したか否かを検出する。減少指示が送信された全ての電力計測装置700の各々において、減少指示を受信したと検出されると(ステップS273でYES)、処理はステップS274に進む。
 ステップS274では、比較値L1についての減少処理が行なわれる。減少処理では、制御部710のCPU711が、受信した減少指示に基づいて、初期値より増加している比較値L1の値を、所定時間(たとえば、1秒)経過毎に、指示された減少値(たとえば、“1”)ずつ減少させる。
 ここで、減少指示が、1秒経過毎に、“1”ずつ減少させる指示であるとする。また、減少指示を受信した時点で、比較値L1の値は“50”であるとする。この場合、CPU711は、比較値L1の値を、1秒経過毎に、“1”ずつ減少させる。そして、再度、ステップS271の処理が行なわれる。
 次に、電力需要施設1000それぞれの電力計測装置700において常に行なわれている、対応する蓄電装置600を制御するための処理(以下、施設内電力制御処理ともいう)について説明する。以下においては、分電盤400から分配部300(電力系統P100)への方向への電力の流れを、施設内逆潮流ともいう。
 施設内電力制御処理は、施設内逆潮流が発生している場合は、施設内逆潮流をなくし、施設内逆潮流の発生の可能性が高い場合は、施設内逆潮流の発生の可能性を低減させるように、蓄電装置600を制御するための処理である。また、施設内電力制御処理は、分配部300から、分電盤400へ向かう電力量が、対応する電力需要施設1000において消費される適切な電力量の最大値を超えないように、蓄電装置600を制御するための処理でもある。施設内電力制御処理は、他の処理とは独立して行なわれる処理である。
 図6は、施設内電力制御処理のフローチャートである。図6を参照して、施設内電力制御処理では、まず、ステップS371の処理が行なわれる。
 ステップS371では、制御部710の測定部713が、対応する電力線PL30に流れる電流の値およびノードN4の電圧の値を測定する。すなわち、対応する電力線PL30に流れる電力の値(以下、施設内電力値INPともいう)を測定(検出)する。測定した施設内電力値INPはメモリ712に格納される。
 ここで、施設内電力値INPが正の値である場合、電力線PL30に流れる電力の流れる方向は、分配部300から対応する分電盤400へ向かう方向であるとする。一方、施設内電力値INPが負の値である場合、電力線PL30に流れる電力の流れる方向は、対応する分電盤400から分配部300(電力系統P100)へ向かう方向であるとする。
 次の、ステップS372では、CPU711は施設内逆潮流が発生しているか否かと、施設内逆潮流の発生の可能性が高いか否かとを検出する。ここで、施設内逆潮流は、対応する分電盤400から分配部300(電力系統P100)への方向への電力の流れであるとする。
 具体的には、条件検出部714は、測定部713が測定した施設内電力値INPが、現時点の比較値L1の値未満を指示するか否かを検出する。測定した施設内電力値INPが、現時点の比較値L1の値未満を指示すると検出する場合とは、たとえば、対応する電気負荷70Rおよび対応する蓄電装置600により消費される電力の値から、分配部300および発電装置500から対応する分電盤400に供給されている電力の値を引いた値が、現時点の比較値L1より小さい場合である。
 施設内電力値INPが、負の値を指示すると検出した場合は、施設内逆潮流が発生していることになる。施設内電力値INPが、0に近い正の値を指示すると検出した場合は、施設内逆潮流の発生の可能性が高いことになる。なお、比較値L1の値は、前述した図5のステップS272,S274の処理等により変化する。
 ステップS372において、条件検出部714が、(INP<L1)の条件が成立すると検出すると(ステップS372でYES)、処理はステップS373に進むが、当該条件が成立しないと検出すると(ステップS372でNO)、処理は後述するステップS381に進む。ここで、現時点の比較値L1の値は、“35”であるとする。また、対応する電気負荷70Rおよび対応する蓄電装置600により消費される電力の値は、395Wであるとする。また、対応する分電盤400に供給されている電力の値は、400Wであるとする。この場合、施設内電力値INPは、-5(W)であるとする。この場合、(INP<L1)の条件は成立すると検出されて(ステップS372でYES)、処理は、ステップS373に進む。
 ステップS373では、対応する蓄電装置600が現在行っている処理を検出する。検出のために、CPU711は、処理情報要求を、対応する蓄電装置600へ送信する。処理情報要求は、対応する蓄電装置600が現在行なっている処理(充電処理または放電処理)を示す情報を要求するための指示である。
 処理情報要求を受信した、蓄電装置600の制御部610の状態検出部615は、制御部610の制御の下に蓄電装置600が現在行う処理の種類を検出する。CPU611は、検出結果を指す処理情報を、電力計測装置700へ送信する。処理情報は、対応する蓄電装置600が現在行なっている処理(充電処理または放電処理)を示す情報である。蓄電装置600が充電処理を行なっている場合、送信される処理情報は充電処理を示し、放電処理を行なっている場合、放電処理を示し、充電処理および放電処理のいずれも行なっていない場合、処理情報は、処理停止を示す。
 制御部710のCPU711は、処理情報を受信することにより、対応する蓄電装置600が処理を行なっているか否かを検出することができ、対応する蓄電装置600が処理を行なっている場合、行なわれている処理の種類を検出することができる。そして、処理はステップS374に進む。
 ステップS374では、CPU711は、対応する蓄電装置600が放電処理を行なっているか否かを検出する。具体的には、対応する蓄電装置600から受信した処理情報が放電処理を示すか否かを検出する。放電処理を示すと検出すると(ステップS374でYES)、処理はステップS375に進むが、示さないと検出すると(ステップS374でNO)、処理は後述するステップS376に進む。ここでは、対応する蓄電装置600が放電処理を行なっているとして、処理はステップS375に進む。
 ステップS375では、放電処理により放電される電力を抑制するための処理(放電電力抑制処理という)が行なわれる。放電電力抑制処理では、電力制御部715は、放電抑制指示を、対応する蓄電装置600へ送信する。放電抑制指示は、蓄電装置600に、放電処理による、分配部300(電力系統P100)への方向への電力の供給量を抑制させるための処理を実行させるための指示である。
 放電抑制指示を受信した、蓄電装置600の制御部610のCPU611は、放電処理による、分配部300(電力系統P100)への方向への電力の供給量を抑制させるための処理を行なう。具体的には、CPU611の制御の下に、信号生成部613は、ドライブ回路630が出力するパルス信号(たとえば、パルス信号61S,62S,63S,64S)のパルス幅を小さくさせるための指示(以下、パルス幅減少指示)66Sを生成し、当該ドライブ回路630へ送信する。
 パルス幅減少指示66Sを受信したドライブ回路630は、各IGBTに送信するパルス信号のパルス幅を小さくする。以上の処理により、対応する蓄電装置600が行なう放電処理による、分配部300(電力系統P100)への方向への電力の供給量が抑制される。すなわち、ステップS375の放電電力抑制処理は、前述した施設内電力値INPを大きくするための処理である。
 すなわち、ステップS375の放電電力抑制処理は、施設内逆潮流が発生している場合は、施設内逆潮流をなくすための処理であり、施設内逆潮流の発生の可能性が高い場合は、施設内逆潮流の発生の可能性を低減させるための処理である。そして、再度、ステップS371の処理が行なわれる。
 次に、ステップS374において、NOと判定され、ステップS376に進む場合の処理について説明する。
 ステップS376では、蓄電装置600が充電処理を行なっているか否かが検出される。具体的には、CPU711が、対応する蓄電装置600から受信した処理情報が充電処理を示すか否かを検出する。充電処理を示すと検出すると(ステップS376でYES)、処理はステップS377に進むが、示さないと検出すると(ステップS376でNO)、処理は後述するステップS377Cに進む。ここでは、対応する蓄電装置600が充電処理を行なっているとして、処理はステップS377に進む。
 ステップS377では、充電状態検知処理が行なわれる。充電状態検知処理では、制御部710のCPU711が、充電状態情報要求を、対応する蓄電装置600へ送信する。充電状態情報要求は、充電状態情報を要求するための指示である。充電状態情報は、対応する蓄電池BT20の充電状態を示す前述した充電状態値を示す情報である。以下においては、充電状態値を、SOCともいう。
 充電状態情報要求を受信した、蓄電装置600のCPU611は、現時点の充電状態値SOCをメモリ612から読出し、読出した充電状態値SOCを示す充電状態情報を、電力計測装置700へ送信する。制御部710のCPU711は、充電状態情報を受信することにより、対応する蓄電池BT20の充電状態を検知することができる。そして、処理はステップS378に進む。
 ステップS378では、制御部710が、蓄電池BT20の状態が、満充電状態に近い状態でないか否かを検出する。具体的には、制御部710のCPU711が、受信した充電状態情報が示す充電状態値SOCと、メモリ712から読出した比較値B1とを比較しする。そして、比較結果に基づき、充電状態値SOCが比較値B1未満であるか否かを、すなわち(SOC<B1)の条件が成立するか否かを検出する。比較値B1は、蓄電池BT20の状態が、満充電状態に近い状態でないか否かを検出するために参照される値であって、予めメモリ712に格納されている。蓄電池BT20の状態が、満充電状態である場合、充電状態値SOCは100(%)である。比較値B1は、一例として、98(%)を指示すると想定する。
 (SOC<B1)の条件が成立すると検出すると(ステップS378でYES)、処理はステップS379Aに進むが、成立しないと検出すると(ステップS378でNO)、処理は、後述するステップS379Bに進む。ここでは、充電状態値SOCが、比較値B1未満であるとして、処理はステップS379Aに進むとする。
 ステップS379Aでは、充電電力増加処理が行なわれる。充電電力増加処理では、電力制御部715が、充電電力増加指示を、対応する蓄電装置600へ送信する。充電電力増加指示は、対応する蓄電装置600に、充電処理により、対応する蓄電池BT20に充電する電力を増加させるための処理を実行させるための指示である。
 充電電力増加指示を受信した、蓄電装置600の制御部610は、充電処理により、対応する蓄電池BT20に充電する電力を増加させるための処理を行なう。具体的には、CPU611の制御の下に、信号生成部613は、ドライブ回路630が出力するパルス信号(たとえば、パルス信号61S,62S,63S,64S)のパルス幅を大きくさせるための指示(以下、パルス幅増加指示)67Sを生成し、当該ドライブ回路630へ送信する。
 パルス幅増加指示67Sを受信したドライブ回路630は、パルス幅増加指示67Sに基づき各IGBTに送信するパルス信号のパルス幅を大きくする。以上の処理により、対応する蓄電装置600が行なう充電処理により、対応する蓄電池BT20に充電する電力が増加される。したがって、蓄電装置600が、分配部300から分電盤400を介して、受け取る電力が増加する。すなわち、ステップS379Aの充電電力増加処理は、前述した施設内電力値INPを大きくするための処理である。
 すなわち、ステップS379Aの充電電力増加処理は、施設内逆潮流が発生している場合は、施設内逆潮流をなくすための処理であり、施設内逆潮流の発生の可能性が高い場合は、施設内逆潮流の発生の可能性を低減させるための処理である。そして、再度、ステップS371の処理が行なわれる。
 次に、ステップS378で(SOC<B1)の条件が成立しないと検出されて、ステップS379Bの処理が実行される場合について説明する。当該条件が成立しないと検出される場合は、蓄電池BT20の状態が、満充電状態に近い状態である場合である。なお、前述したように、蓄電池BT20の状態が、満充電状態になった場合、蓄電装置600は、充電処理を停止し、充電処理および放電処理のいずれも行なっていない状態になる。
 ステップS379Bでは、充電抑制処理が行なわれる。充電抑制処理では、電力制御部715が、充電電力抑制指示を、対応する蓄電装置600へ送信する。充電電力抑制指示は、対応する蓄電装置600に、充電処理により、対応する蓄電池BT20に充電する電力を抑制させるための処理を実行させるための指示である。
 充電電力抑制指示を受信した、蓄電装置600の制御部610は、充電処理により、対応する蓄電池BT20に充電する電力を抑制させるための処理を行なう。具体的には、CPU611の制御の下に、信号生成部613は、ドライブ回路630が出力するパルス信号(たとえば、パルス信号61S,62S,63S,64S)のパルス幅を小さくさせるための指示(以下、パルス幅減少指示)66Sを生成し、当該ドライブ回路630へ送信する。
 パルス幅減少指示66Sを受信したドライブ回路630は、各IGBTに送信するパルス信号のパルス幅を小さくする。以上の処理により、対応する蓄電装置600が行なう充電処理により、対応する蓄電池BT20に充電する電力が抑制される。したがって、蓄電装置600が、分配部300から分電盤400を介して、受け取る電力が抑制される。すなわち、ステップS379Bの充電抑制処理は、前述した施設内電力値INPを小さくするための処理である。
 すなわち、ステップS379Bの充電抑制処理は、施設内逆潮流が発生している場合は、施設内逆潮流を促進するための処理であり、施設内逆潮流の発生の可能性が高い場合は、施設内逆潮流を発生させるための処理である。充電抑制処理が終了すると、再度、ステップS371の処理が行なわれる。
 ステップS379Bの処理は、満充電に対する蓄電池BT20の保護を行なうための処理である。
 なお、本発明の構成では、電力制御システム10000に含まれる複数の電力需要施設1000のうちの一部の電力需要施設1000において施設内逆潮流が発生し、分配部300へ電力が流れても、施設内逆潮流が発生してない他の電力需要施設1000が分配部300に供給される電力量より多くの電力量を消費すれば、電力系統P100へ電力が流れる逆潮流は発生しない。
 本発明において、電力系統P100へ電力が流れる逆潮流の発生を防ぐための処理は、図5の総電力制御処理CP、総電力制御処理CTAおよび総電力制御処理DTAである。なお、総電力制御処理CP、総電力制御処理CTAおよび総電力制御処理DTAが行なわれることにより、電力系統P100へ電力が流れる逆潮流の発生を防ぐことができることの詳細な説明は後述する。
 なお、ステップS379Bでは、前述した充電抑制処理と同時に、以下の発電抑制処理が行なわれてもよい。
 発電抑制処理では、電力制御部715が、発電電力抑制指示を、対応する発電装置500へ送信する。発電電力抑制指示は、対応する発電装置500が行なう発電処理により、対応する分電盤400へ供給する、電力の供給量を抑制させるための発電抑制処理を実行させるための指示である。
 発電電力抑制指示を受信した、発電装置500の制御部510は、発電処理により、対応する分電盤400へ供給する、電力の供給量を抑制させるための発電抑制処理を行なう。具体的には、CPU511の制御の下に信号生成部513は、ドライブ回路530が出力するパルス信号(たとえば、パルス信号51S,52S,53S,54S)のパルス幅を小さくさせるための指示(以下、パルス幅減少指示)56Sを生成し、当該ドライブ回路530へ送信する。
 パルス幅減少指示56Sを受信したドライブ回路530は、パルス幅減少指示56Sに基づき各IGBTに送信するパルス信号のパルス幅を小さくする。以上の処理により、対応する分電盤400へ供給する、電力の供給量が抑制される。すなわち、発電抑制処理は、前述した施設内電力値INPを大きくするための処理である。
 したがって、発電抑制処理は、発電装置500が、太陽電池BT10から得た電力を最大限に利用できなくなるものの、施設内逆潮流が発生している場合は、施設内逆潮流をなくすことができる。そのため、ステップS379Bでは、前述した充電抑制処理と同時に、発電抑制処理が行なわれることが望ましい。
 次に、ステップS376において、NOと判定され、ステップS377Cに進む場合の処理について説明する。ステップS376において、NOと判定される場合は、対応する蓄電装置600が、充電処理および放電処理のいずれも行なってなく、処理を停止している場合である。
 ステップS377Cでは、ステップS377と同様に、充電状態検知処理が行なわれるので詳細な説明は繰り返さない。この処理により、制御部710は、充電状態値SOCを示す充電状態情報を受信し、対応する蓄電池BT20の充電状態を検知することができる。そして、ステップS378Cに進む。
 ステップS378Cでは、対応する蓄電装置600が、充電処理を実行可能であるか否かが検出される。具体的には、CPU711が、受信した充電状態値SOCが、98未満を指すか否かを検出する。充電処理実行可能(充電状態値SOCが98未満を指す)と検出すると(ステップS378CでYES)、処理は、ステップS379Cに進むが、充電処理実行不可能(充電状態値SOCが98以上を指す)と検出すると(ステップS378CでNO)、処理は、ステップS371に戻る。
 ステップS379Cでは、充電処理が実行される。制御部710のCPU711は、充電実行指示を、対応する蓄電装置600へ送信する。充電実行指示は、対応する蓄電装置600に充電処理を実行させるための指示である。
 充電実行指示を受信した、蓄電装置600の制御部610は、充電処理を実行する。なお、充電処理については、前述したので、詳細な説明は繰り返さない。この充電処理が実行されることにより、対応する蓄電池BT20に充電が行なわれる。したがって、蓄電装置600は、分配部300から分電盤400を介して、電力を受け取るようになる。すなわち、ステップS379Cで実行される充電処理は、前述した施設内電力値INPを大きくするための処理である。
 すなわち、ステップS379Cの充電処理は、施設内逆潮流が発生している場合は、施設内逆潮流をなくすための処理であり、施設内逆潮流の発生の可能性が高い場合は、施設内逆潮流の発生の可能性を低減させるための処理である。そして、再度、ステップS371の処理が行なわれる。
 施設内電力値INPが、現時点の比較値L1の値未満を指示する場合は、前述したステップS379A,S379Cの処理が行なわれることにより、施設内電力値INPが現時点の比較値L1以上を指示するようにフィードバック制御が行なわれる。すなわち、電力制御システム10000に含まれる複数の電力需要施設1000の各々において、施設内逆潮流が生じないようにすることができる。
 次に、ステップS372において(INP<L1)の条件が成立しないと検出されて(ステップS372でNO)、ステップS381へ進む場合の処理について説明する。ステップS372において(INP<L1)の条件が成立しないと検出される場合は、測定した施設内電力値INPが、現時点の比較値L1の値以上を指す場合である。この場合、施設内逆潮流は発生しておらず、電力線PL30に流れる電力の流れる方向は、分配部300から対応する分電盤400へ向かう方向である。以下においては、分配部300から、対応する分電盤400へ向かう電力量を、消費方向電力量ともいう。
 ステップS381では、消費方向電力量が消費適切最大電力量より大きいか否かが検出される。ここで、消費適切最大電力量は、対応する電力需要施設1000において消費される適切な電力量の最大値であるとする。すなわち、ステップS381では、消費方向電力量が、消費適切最大電力量を超えているか否かが検出される。
 具体的には、制御部710のCPU711が、測定した施設内電力値INPと、メモリ712から読出した判定値L2を比較し、比較結果に基づき(INP>L2)の条件が成立するか否かを検出する。判定値L2は、予めメモリ712に格納されており、消費方向電力量が消費適切最大電力量より大きいか否かを検出するために参照される値である。
 ここで、判定値L2の値は、発電装置500の最大出力の50%の値であるとする。ここで、前述したように、発電装置500の最大出力は、3kWであるとするから、判定値L2の値は、1500(W)を指示することになる。すなわち、消費適切最大電力量の値は、1500(W)であるとする。
 (INP>L2)の条件が成立すると検出されると(ステップS381でYES)、処理はステップS382に進み、条件が成立しないと検出されると(ステップS381でNO)、再度、ステップS371の処理が行なわれる。施設内電力値INPが、判定値L2より大きい場合、消費方向電力量が消費適切最大電力量より大きいと検出される。一方、施設内電力値INPが、判定値L2以下である場合、すなわち、施設内電力値INPが、現時点の比較値L1の値以上で、かつ、判定値L2以下である場合、消費方向電力量が消費適切最大電力量以下、すなわち、対応する電力需要施設1000内で消費される消費方向電力量が適切な量であると検出される。
 ステップS382では、対応の蓄電装置600が現在行っている処理が検知される。ステップS373と同様の処理であるので、詳細な説明は繰り返さない。この処理により、制御部710は、対応する蓄電装置600から処理情報を受信することにより、対応する蓄電装置600が処理を行なっているか否かを検知することができ、対応する蓄電装置600が処理を行なっている場合、行なわれている処理の種類が何であるか検知することができる。そして、処理はステップS383に進む。
 ステップS383では、蓄電装置600が充電処理を行なっているか否かが検出される。具体的には、CPU711は、対応する蓄電装置600から受信した処理情報が充電処理を示すか否かを検出する。充電処理を示すと検出すると(ステップS383でYES)、処理はステップS384に進むが、充電処理を示さないと検出すると(ステップS383でNO)、処理は、後述するステップS386に進む。ここでは、対応する蓄電装置600が充電処理を行なっているとして、処理はステップS384に進む。
 ステップS384では、ステップS379Bと同様に充電抑制処理が行なわれるので詳細な説明は繰り返さない。この処理により、対応する蓄電装置600が行なう充電処理により、対応する蓄電池BT20に充電する電力が抑制される。したがって、蓄電装置600が、分配部300から分電盤400を介して、受け取る電力が抑制される。すなわち、ステップS384の充電抑制処理は、消費方向電力量を消費適切最大電力量以下にするための処理である。充電抑制処理が終了すると、再度、ステップS371の処理が行なわれる。
 次に、ステップS383において、NOと判定され、ステップS386に進む場合の処理について説明する。
 ステップS386では、対応する蓄電装置600が放電処理を行なっているか否かが検出される。具体的には、CPU711が、対応する蓄電装置600から受信した処理情報を解析し、解析結果に基づき放電処理を示すか否かを検出する。処理情報は放電処理を指すと検出すると(ステップS386でYES)、処理は、ステップS387に進むが、放電処理を指さないと検出すると(ステップS386でNO)、処理は、後述するステップS387Cに進む。ここでは、対応する蓄電装置600が放電処理を行なっているとして、処理はステップS387に進む。
 ステップS387では、ステップS377と同様に、充電状態検知処理が行なわれるので詳細な説明は繰り返さない。この処理により、制御部710のCPU711は、充電状態値SOCを示す充電状態情報を受信し、対応する蓄電池BT20の充電状態を検知することができる。そして、処理はステップS388に進む。
 ステップS388では、CPU711は、充電状態値SOCに基づき対応する蓄電池BT20の状態が、放電終止状態に近い状態でないか否かを検出する。放電終止状態は、前述したように、蓄電池BT20に電力が蓄えられてない状態である。
 具体的には、CPU711は、受信した充電状態情報が示す充電状態値SOCと、メモリ712から読出した比較値B2とを比較し、比較結果に基づき、(SOC>B2)の条件が成立するか否かを検出する。比較値B2は、予めメモリ712に格納されており、蓄電池BT20の状態が、放電終止状態に近い状態でないか否かを検出するために参照される値である。蓄電池BT20の状態が、放電終止状態である場合、充電状態値SOCは0(%)である。比較値B2は、一例として、5(%)を指すと想定する。
 (SOC>B2)の条件が成立すると検出されると(ステップS388でYES)、処理は、ステップS389Aに進むが、成立しないと検出されると(ステップS388でNO)、処理は、後述するステップS389Bに進む。ここでは、充電状態値SOCが、比較値B2より大きいとして、処理はステップS389Aに進むとする。
 ステップS389Aでは、放電電力増加処理が行なわれる。放電電力増加処理では、制御部710が、放電電力増加指示を、対応する蓄電装置600へ送信する。放電電力増加指示は、対応する蓄電装置600に、放電処理により、対応する蓄電池BT20から放電する電力を増加させるための処理を実行させるための指示である。
 放電電力増加指示を受信した、蓄電装置600の制御部610は、放電処理により、対応する蓄電池BT20から放電する電力を増加させるための処理を行なう。具体的には、CPU611の制御の下に、信号生成部613は、ドライブ回路630が出力するパルス信号(たとえば、パルス信号61S,62S,63S,64S)のパルス幅を大きくさせるための指示(以下、パルス幅増加指示)67Sを生成し、当該ドライブ回路630へ送信する。
 パルス幅増加指示67Sを受信したドライブ回路630は、パルス幅増加指示67Sに基づき各IGBTに送信するパルス信号のパルス幅を大きくする。以上の処理により、対応する蓄電装置600が行なう放電処理により、対応する蓄電池BT20が放電する電力が増加される。したがって、蓄電装置600が、分電盤400を介して、分配部300(電力系統P100)への方向へ供給する電力が増加される。すなわち、ステップS389Aの放電電力増加処理は、消費方向電力量を消費適切最大電力量以下にするための処理である。そして、再度、ステップS371の処理が行なわれる。
 次に、(SOC>B2)の条件が成立しないと検出されて(ステップS388でNO)、処理がステップS389Bに進む場合について説明する。当該条件が成立しないと検出される場合は、対応する蓄電池BT20の状態が、放電終止状態に近い状態である場合である。なお、前述したように、蓄電池BT20の状態が、放電終止状態になった場合、蓄電装置600は、放電処理を停止し、充電処理および放電処理のいずれも行なっていない状態になる。
 ステップS389Bでは、ステップS375と同様に、放電電力抑制処理が行なわれるので詳細な説明は繰り返さない。この処理により、対応する蓄電装置600が行なう放電処理による、分配部300(電力系統P100)への方向への、電力の供給量が抑制される。そして、再度、ステップS371の処理が行なわれる。
 次に、ステップS386において、NOと判定され、ステップS387Cに進む場合の処理について説明する。ステップS386において、NOと判定される場合は、対応する蓄電装置600が、充電処理および放電処理のいずれも行なってなく、処理を停止している場合である。
 ステップS387Cでは、ステップS377と同様に、充電状態検知処理が行なわれるので詳細な説明は繰り返さない。この処理により、制御部710は、充電状態値SOCを示す充電状態情報を受信し、対応する蓄電池BT20の充電状態を検知することができる。そして、ステップS388Cに進む。
 ステップS388Cでは、対応する蓄電装置600が、放電処理を実行可能であるか否かが検出される。具体的には、CPU711は、受信した充電状態値SOCが、5以上を示すか否かを検出する。5以上を示すと検出すると(ステップS388CでYES)、処理はステップS389Cに進むが、5以上を示さないと検出すると(ステップS388CでNO)、処理は再度、ステップS371に移行する。
 ステップS389Cでは、放電処理が実行される。放電処理を実行するために、CPU711は、放電処理実行指示を、対応する蓄電装置600へ送信する。放電処理実行指示は、対応する蓄電装置600に放電処理を実行させるための指示である。
 放電処理実行指示を受信した、蓄電装置600の制御部610は、放電処理を実行する。なお、放電処理については、前述したので、詳細な説明は繰り返さない。この放電処理を実行することにより、対応する蓄電池BT20に蓄えられた電力が放電される。したがって、蓄電装置600が、分電盤400を介して、分配部300(電力系統P100)への方向へ電力を送信する。すなわち、ステップS389Cで実行される放電処理は、消費方向電力量を消費適切最大電力量以下にするための処理である。そして、再度、ステップS371の処理が行なわれる。
 次に、前述した複数の処理が行なわれることにより、電力制御システム10000において、電力が電力系統P100へ流れるのを防ぐことができることを、具体例により検証する。
 なお、電力制御システム10000では、前述した、図4の電力測定処理DTおよび電力測定処理CT、図5の総電力制御処理CP、総電力制御処理CTAおよび総電力制御処理DTA、図6の施設内電力制御処理が行なわれているとする。
 ここで、電力制御システム10000に含まれる電力需要施設1000の数は、30戸であるとする。以下においては、電力制御システム10000に含まれる電力需要施設1000を、単に、電力需要施設ともいう。また、電力需要施設に含まれる発電装置500を、単に、発電装置ともいう。また、電力需要施設に含まれる蓄電装置600を、単に、蓄電装置ともいう。また、電力制御システム10000に含まれる電力制御装置200を、単に、電力制御装置ともいう。
 また、陽射しが最も強い昼間に、30戸の電力需要施設の各々が含む発電装置は、発電処理を行なっているとする。この場合、発電処理を行なう各発電装置が出力する電力の値は、最大値である3kWであるとする。
 また、30戸の電力需要施設の各々が含む電力計測装置700の制御部710が記憶している比較値L1の値は、初期値である30(W)であるとする。なお、電力制御装置が、図4の電力測定処理CTにより、始めて取得した電力値TLPは、所定値K1(900(W))以上の値である、1000(W)であるとする。この場合、電力制御装置では、図5のステップS221,S225の処理を繰り返し行なう。
 また、30戸の電力需要施設のうち、20戸の電力需要施設は、図6の施設内電力制御処理のステップS372でYESと判定される状態であるとする。施設内電力制御処理のステップS372でYESと判定される状態の電力需要施設は、施設内逆潮流が発生している施設または施設内逆潮流の発生の可能性が高い施設である。
 以下においては、施設内電力制御処理のステップS372でYESと判定される状態の電力需要施設を、第1電力需要施設ともいう。また、20戸の第1電力需要施設の各々が含む蓄電装置は、充電処理を行なっているとする。また、20戸の第1電力需要施設の各々が含む蓄電池BT20は、電力を充電可能な状態であるとする。
 この場合、20戸の第1電力需要施設の各々が含む電力計測装置700は、図6の施設内電力制御処理において、ステップS371,S372,S373,S374、S376,S377,S378,S379Aの処理を繰り返し行なうとする。この処理により、20戸の第1電力需要施設の各々は、対応する発電装置から得た電力を、対応する蓄電池BT20に充電する。
 なお、30戸の電力需要施設のうち、20戸の第1電力需要施設以外の10戸の電力需要施設は、図6の施設内電力制御処理のステップS372でNOと判定される状態であるとする。施設内電力制御処理のステップS372でNOと判定される状態の電力需要施設は、施設内逆潮流の発生の可能性が低い施設である。
 以下においては、施設内電力制御処理のステップS372でNOと判定される状態の電力需要施設を、第2電力需要施設ともいう。
 この場合、10戸の第2電力需要施設の各々が含む電力計測装置700は、図6の施設内電力制御処理において、ステップS371、S372,S381,S382,S383,S384,S386,S387,S388,S389A,S389B,S387C,S388C,S389Cのいずれかの処理を行なっているとする。
 なお、ステップS371,S372,S373,S374、S376,S377,S378,S379Aの処理を繰り返し行なう20戸の第1電力需要施設のうち、10戸の電力需要施設の各々が含む蓄電池BT20の状態が、満充電状態に近い状態になり、当該10戸の電力需要施設の各々が含む電力計測装置700が、ステップS379Aの代わりに、ステップS379Bの処理を行なうようになったとする。
 これにより、対応する電力計測装置700が、ステップS379Bの処理を行なう10戸の電力需要施設で、施設内逆潮流が発生したとする。
 そして、この状態で、電力制御装置が図4の電力測定処理CTにより取得した電力値TLPが、所定値K1(900(W))未満の値である、700(W)になったとする。この場合、電力線PL10に流れる電力の流れる方向が、分配部300から電力系統P100へ流れる方向となる逆潮流の発生の可能性が高くなる。この場合、30戸の電力需要施設のうち、対応する電力計測装置700が、ステップS379Bの処理を行なっていない電力需要施設は、20戸であるとする。
 この場合、電力制御装置は、図5のステップS222,S223,S224の処理を行なうことにより、前述した電力制御指示を、処理情報を自装置(電力制御装置)に提供した全ての電力需要施設の各々に含まれる電力計測装置700へ送信する。対応する電力計測装置700が、電力制御指示を受信する全ての電力需要施設には、10戸の第2電力需要施設も含まれる。
 電力制御指示を受信した電力計測装置700は、比較値L1の値を、所定値(たとえば、5)だけ増加させる。これにより、10戸の第2電力需要施設のうち、施設内電力制御処理のステップS372でYESと判定される状態になった電力需要施設が発生する確率が上昇する。以下においては、比較値L1の値の増加により、施設内電力制御処理のステップS372でYESと判定される状態になった第2電力需要施設を、第3電力需要施設ともいう。第3電力需要施設は、施設内逆潮流が発生しておらず、かつ、施設内逆潮流の発生の可能性が低い電力需要施設である。
 ここで、比較値L1の値の増加により、10戸の第2電力需要施設のうち、5戸の第2電力需要施設が、第3電力需要施設になったとする。
 この場合、5戸の第3電力需要施設の各々が含む電力計測装置700は、図6の施設内電力制御処理において、ステップS375またはステップS379Aの処理を行なう。これにより、5戸の第3電力需要施設のうち、対応する蓄電装置が、放電処理を行なっている第3電力需要施設では、分配部300(電力系統P100)への方向への、電力の供給量が抑制される。また、5戸の第3電力需要施設のうち、対応する蓄電装置が、充電処理を行なっている第3電力需要施設では、対応する蓄電池BT20に充電する電力が増加される。
 したがって、電力制御装置が図4の電力測定処理CTにより取得する電力値TLPが上昇する。そして、電力値TLPが、所定値K1(900(W))以上の値になると、すなわち、分配部300(電力需要施設1000)から、電力系統P100への電力の流れである逆潮流の発生の可能性が低くなると、電力制御装置は、図5のステップS226の処理を行ない、減少指示を、一度でも、電力制御指示を送信したことのある全ての電力計測装置700へ送信する。
 減少指示を受信した電力計測装置700は、増加された比較値L1の値が、所定値(たとえば、“5”)より、小さい値(以下、減少値ともいう)で、所定時間(たとえば、1秒)経過毎に、減少値(たとえば、“1”)ずつ減少させる。
 上記方法により比較値L1の値を減少させることにより、電力線PL10に流れる電力の流れる方向が、分配部300から電力系統P100へ流れる方向に転じにくくなるよう制御することができる。また、電力値TLPが、所定値K1以上の値になった場合に、上記方法により比較値L1の値が減少されることにより、電力値TLPの値が大きくなりすぎないようにすることができる。
 以上の処理が行なわれることにより、分配部300(電力需要施設1000)から、電力系統P100への電力の流れである逆潮流の発生を防止することができる。すなわち、電力系統P100の配電電圧の上昇を防ぐことができ、電力系統P100に悪影響を与えないようにすることができる。
 また、本実施の形態では、電力制御システム10000に含まれる複数の蓄電装置に、逆潮流抑制のための充電処理を行なわせることもできる。そのため、一台の蓄電装置を利用する場合と比べて、複数の蓄電装置が、対応する蓄電池BT20の状態が満充電状態となり、充電処理ができなくなる可能性が少なくなる。そのため、信頼性が高い逆潮流抑制の処理を行うことができる。また、複数の蓄電装置にそれぞれ対応する複数の蓄電池に、充電電力が分散するため、充電レートを抑制することができる。そのため、蓄電池の負担を減らし蓄電池の長寿命化を図ることができる。
 また、本実施の形態では、蓄電池BT20に電力を充電させる場合、事前に、蓄電池BT20の状態を調べる処理を行なう。これにより、満充電状態である蓄電池BT20に充電させることを防ぐことができ、安全性を確保することができる。
 また、本実施の形態では、分配部300(電力需要施設1000)から、電力系統P100への電力の流れである逆潮流の発生の可能性が低い場合、すなわち、電力値TLPが、所定値K1以上である場合は、各電力需要施設において、施設内逆潮流の発生が生じないように、蓄電装置が制御される。そのため、分配部300(電力需要施設1000)から、電力系統P100への電力の流れである逆潮流が発生しない電力制御システムを提供できる。
 また、本実施の形態では、発電装置500が行なう発電処理により出力される電力量を抑制する処理はしないので、発電装置500が、太陽電池BT10から得た電力を最大限に利用することができる。
 また、本実施の形態では、複数の電力需要施設1000を含む電力制御システム10000において、一括して電力を受電する部分からの逆潮流が発生しないような制御が行なわれ、かつ、複数の電力需要施設1000の各々が含む蓄電装置を、電力制御装置200が集中管理して有効利用する。その結果、発電装置の出力を抑制することなく、蓄電装置に余剰電力を蓄電することができる電力制御システムを提供することができる。
 以上により、本発明においては、電力が電力系統P100へ流れるのを防ぎつつ、電力の有効活用を可能とすることができるという効果を奏する。
 ここで、電力制御指示が、全ての電力需要施設1000の各々に含まれる電力計測装置700へ送信されることにより生じる現象を説明する。
 電力制御指示を受信した電力計測装置700は、比較値L1の値を、所定値(たとえば、5)だけ増加させる。これにより、図6の施設内電力制御処理のステップS372でNOと判定される状態の第2電力需要施設が、施設内電力制御処理のステップS372でYESと判定される状態になった第3電力需要施設が発生する確率が上昇する。対応する蓄電装置が充電処理または放電処理を行なっている複数の第3電力需要施設の各々が含む電力計測装置700は、図6の施設内電力制御処理において、ステップS375またはステップS379Aの処理を行なう。
 したがって、比較値L1の値が増加されることにより、放電処理を行なっている蓄電装置600に、放電処理による、電力系統P100への方向への、電力の供給量を抑制させるための抑制処理を実行させることができる。また、比較値L1の値が増加されることにより、充電処理を行なっている蓄電装置600に、充電処理により、対応する蓄電池BT20に充電する電力を増加させるための増加処理を実行させることができる。
 したがって、電力制御指示を受信した電力需要施設1000が有する蓄電装置600が、放電処理を行なっている場合抑制処理を行なう確率が上昇する。また、電力制御指示を受信した電力需要施設1000が有する蓄電装置600が、充電処理を行なっている場合増加処理を行なう確率が上昇する。
 なお、測定部113,513,613,713、信号生成部513,613、状態検知部615は、回路のみにより構成されてもよく、または、ソフトウェアと回路の組合せにより構成されてもよい。
 このように、今回開示した上記実施の形態はすべての点で例示であって、制限的なものではない。本発明の技術的範囲は請求の範囲によって画定され、また請求の範囲の記載と均等の意味および範囲内でのすべての変更を含むものである。
 本発明は、電力系統から供給される電力を、複数の電力需要施設に分配する電力制御システムにおいて有効である。
 PL10 電力線、BT10 太陽電池、BT20 蓄電池、P100 電力系統、50 変圧器、100 電力計測装置、110,210,610,710 制御部、200 電力制御装置、300 分配部、400 分電盤、500 発電装置、600 蓄電装置、700 電力計測装置、1000 電力需要施設、10000 電力制御システム。

Claims (12)

  1.  電力制御システム(10000)であって、
     複数の電力需要施設(1000)と、
     外部の電力系統(P100)が接続される第1接続部(310)と、前記複数の電力需要施設が接続される第2接続部(320(i))とを含む分配部(300)と、
     前記電力系統と、前記分配部との間に流れる電力である流通電力の値を測定する測定部(113)とを備え、
     前記分配部は、前記第1接続部を介して前記電力系統から供給される電力を前記複数の電力需要施設に分配し、
     前記複数の電力需要施設それぞれは、
      発電して電力を前記第2接続部に出力する発電装置(500)と、
      蓄電池(BT20)が接続され、且つ前記分配部から分配される電力を受ける蓄電装置(600)とを、含み、
      前記蓄電装置は、接続される前記蓄電池に、当該蓄電装置が受ける電力を蓄える充電処理と、当該蓄電池から蓄えられた電力の少なくとも一部を前記第2接続部に出力する放電処理とを行ない、
     前記電力制御システムは、さらに、
      (TLP<K1)の条件が成立するか否かを検出する条件検出部(213)と、
      前記条件検出部が前記条件が成立すると検出したとき、前記複数の電力需要施設に対し電力制御指示を送信する電力制御部(214)とを、備え、
      前記TLPは、前記電力系統から前記分配部の向きに流れる前記流通電力の値を正とした場合における前記測定部が測定する前記流通電力の値を指し、前記K1は、前記分配部から前記電力系統へ流れる前記流通電力を指す逆潮流を検出するための閾値を指し、
      前記電力制御指示は、前記放電処理を行なっている前記蓄電装置に対しては、前記蓄電池から出力される電力量を抑制するように指示し、かつ、前記充電処理を行なっている前記蓄電装置に対しては、前記蓄電池に蓄えられる電力量を増加するように指示する、電力制御システム。
  2.  前記電力制御システムは、さらに、
     前記複数の電力需要施設のそれぞれから、当該電力需要施設の前記蓄電装置が、当該蓄電装置に接続される前記蓄電池に対して行なう処理を示す処理情報を受信する処理情報受信部を、備え、
     前記電力制御部は、前記処理情報受信部が受信した前記処理情報に基づき、前記複数の電力需要施設に対し、前記電力制御指示を送信する、請求の範囲第1項に記載の電力制御システム。
  3.  前記蓄電装置は、前記分配部から分配される電力、および、前記複数の電力需要施設の前記発電装置が出力する電力を受け、
     前記充電処理は、前記分配部から分配される電力の少なくとも一部を前記蓄電池に蓄える第1充電処理、および、前記複数の電力需要施設の前記発電装置が出力する電力の少なくとも一部を前記蓄電池に蓄える第2充電処理のうちの少なくとも一方を指す、請求の範囲第1項に記載の電力制御システム。
  4.  前記蓄電装置は、
     接続される前記蓄電池に蓄えられている電流容量の値を検出する電流容量値検出部(614)を、有し、
     前記電流容量値検出部が検出する前記電流容量の値に基づき、当該蓄電池を充電することが可能であるか否かを検出する、請求の範囲第1項に記載の電力制御システム。
  5.  前記充電することが可能と検出されたとき、前記蓄電装置は、接続される前記蓄電池に充電されるべき電力量を増加させる、請求の範囲第4項に記載の電力制御システム。
  6.  前記複数の電力需要施設の各々は、さらに、
      前記分配部と、前記蓄電装置との間に流れる電力である施設内電力の値および前記施設内電力の流れる方向を測定する施設内測定部(713)と、
      (INP<L1)の条件が成立したとき前記施設内電力が大きくなるように内部電力制御処理を行なう施設内制御部(715)と、を含み、
     前記INPは、前記分配部から前記蓄電装置へ向かう方向を正としたときに、測定される前記施設内電力の値を指し、且つ前記L1は、前記蓄電装置から前記分配部へ流れる電力を検出するための施設内閾値を指し、
     前記施設内制御部は、前記電力制御指示を受信したとき、前記施設内閾値を所定値だけ増加させる、請求の範囲第1項に記載の電力制御システム。
  7.  前記内部電力制御処理は、対応する前記蓄電装置が前記放電処理を行なっている場合は、前記放電処理による、前記分配部への電力の供給量を抑制する処理を指し、
     前記内部電力制御処理は、対応する前記蓄電池が充電可能な状態であって、かつ、前記対応する蓄電装置が前記充電処理を行なっている場合は、前記充電処理により、前記対応する蓄電池に充電されるべき電力を増加する処理を指す、請求の範囲第6項に記載の電力制御システム。
  8.  前記L1が指す前記施設内閾値は、0に近い値である、請求の範囲第6項に記載の電力制御システム。
  9.  前記電力制御部は、
     (TLP≧K1)の条件が成立することが検出されるまで、前記放電処理を行なっている前記蓄電装置に対しては、当該蓄電装置に接続される前記蓄電池から出力される電力量が抑制されるように制御し、かつ、前記充電処理を行なう前記蓄電装置に対しては、当該蓄電装置に接続される前記蓄電池が充電する電力量が増加するように制御する、請求の範囲第1項に記載の電力制御システム。
  10.  前記K1が指す前記閾値は、0に近い値である、請求の範囲第1項に記載の電力制御システム。
  11.  前記発電装置は、太陽光発電装置を指す、請求の範囲第1項に記載の電力制御システム。
  12.  電力システム(10000)を制御するための方法であって、
     前記電力システムは、
     複数の電力需要施設(1000)と、
     外部の電力系統(P100)が接続される第1接続部(310)と、前記複数の電力需要施設が接続される第2接続部(320(i))とを含む分配部(300)と、
     前記電力系統と、前記分配部との間に流れる電力である流通電力の値を測定する測定部(113)とを備え、
     前記分配部は、前記第1接続部を介して前記電力系統から供給される電力を前記複数の電力需要施設に分配し、前記第2接続部を介して与えられる電力を前記第1接続部を介して前記電力系統に出力し、
     前記複数の電力需要施設それぞれは、
      発電して電力を前記第2接続部に出力する発電装置(500)と、
      蓄電池(BT20)が接続され、且つ前記分配部から分配される電力または前記発電装置から出力される電力を受ける蓄電装置(600)とを、含み、
      前記蓄電装置は、接続される前記蓄電池に、当該蓄電装置が受ける電力を蓄える充電処理と、当該蓄電池から蓄えられた電力を前記第2接続部に出力する放電処理とを行ない、
     前記方法は、
     (TLP<K1)の条件が成立するか否かを検出するステップと、
     前記条件が成立すると検出されたとき、前記複数の電力需要施設に対し電力制御指示を送信するステップとを、備え、
      前記TLPは、前記電力系統から前記分配部の向きに流れる前記流通電力の値を正とした場合における前記測定部が測定する前記流通電力の値を指し、前記K1は、前記分配部から前記電力系統へ流れる前記流通電力を指す逆潮流を検出するための閾値を指し、
      前記電力制御指示は、前記放電処理を行なっている前記蓄電装置に対しては、前記蓄電池から出力される電力量を抑制するように指示し、かつ、前記充電処理を行なっている前記蓄電装置に対しては、前記蓄電池に充電される電力量を増加するように指示する、電力システムを制御するための方法。
PCT/JP2009/060915 2008-06-27 2009-06-16 電力を電力需要施設に分配する電力制御システム WO2009157342A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2010517916A JP5179582B2 (ja) 2008-06-27 2009-06-16 電力を電力需要施設に分配する電力制御システム
US13/001,500 US8578184B2 (en) 2008-06-27 2009-06-16 Power control system for distributing power to power demanding facility
CN2009801239638A CN102067408A (zh) 2008-06-27 2009-06-16 向电力需求设施分配电力的电力控制系统

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2008168532 2008-06-27
JP2008-168532 2008-06-27

Publications (1)

Publication Number Publication Date
WO2009157342A1 true WO2009157342A1 (ja) 2009-12-30

Family

ID=41444410

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2009/060915 WO2009157342A1 (ja) 2008-06-27 2009-06-16 電力を電力需要施設に分配する電力制御システム

Country Status (4)

Country Link
US (1) US8578184B2 (ja)
JP (1) JP5179582B2 (ja)
CN (1) CN102067408A (ja)
WO (1) WO2009157342A1 (ja)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012034438A (ja) * 2010-07-28 2012-02-16 Chugoku Electric Power Co Inc:The 充電制御装置、充電制御方法
JP2012044733A (ja) * 2010-08-12 2012-03-01 Daiwa House Industry Co Ltd 太陽光発電電力を利用した蓄電池システム
JP2012120284A (ja) * 2010-11-30 2012-06-21 Kyocera Corp 複数の分散電源の出力制御システムおよび複数の分散電源の出力制御方法
JP2012151923A (ja) * 2011-01-17 2012-08-09 Nichicon Corp 電力変換装置
CN102709961A (zh) * 2011-03-28 2012-10-03 株式会社东芝 充电/放电确定装置和方法
CN102738832A (zh) * 2011-03-31 2012-10-17 株式会社神户制钢所 具备发电系统的局部电力系统的控制方法及局部电力系统
WO2012144044A1 (ja) * 2011-04-21 2012-10-26 株式会社日立製作所 電力管理システム及び方法
JP2013143814A (ja) * 2012-01-10 2013-07-22 Ntt Facilities Inc 電力供給システム、電力供給制御装置、電力供給方法及びプログラム
JP2013143816A (ja) * 2012-01-10 2013-07-22 Ntt Facilities Inc 電力供給システム、電力供給制御装置、電力供給方法及びプログラム
KR20140023125A (ko) * 2012-08-17 2014-02-26 엘지전자 주식회사 에너지 저장장치, 전력 관리 장치, 이동 단말기 및 그 동작방법
WO2015029431A1 (ja) * 2013-08-30 2015-03-05 京セラ株式会社 分散電源システム、パワーコンディショナ
JP2015050835A (ja) * 2013-08-30 2015-03-16 京セラ株式会社 分散電源システム、パワーコンディショナ
JP2017085797A (ja) * 2015-10-28 2017-05-18 京セラ株式会社 電力制御装置、電力管理システムおよび電力管理方法
KR20190046733A (ko) * 2019-04-25 2019-05-07 엘지전자 주식회사 에너지 저장장치, 및 전력 관리 장치

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5427762B2 (ja) * 2010-12-16 2014-02-26 株式会社日立製作所 電力変換装置、電力変換装置の制御装置及び電力変換装置の制御方法
JP2012252580A (ja) * 2011-06-03 2012-12-20 Sony Corp 電力制御装置、電力管理装置および電力管理システム
US8610306B2 (en) * 2011-07-29 2013-12-17 General Electric Company Power plant control system and method for influencing high voltage characteristics
US20130154368A1 (en) * 2011-12-16 2013-06-20 Chung-Shan Institute of Science and Technology Armaments, Bureau, Ministry of Natonal Defense Converter-based Power Supply System for Reducing a Contract Capacity
CN103185846B (zh) * 2011-12-31 2016-01-06 阳光电源股份有限公司 一种逆流检测方法、防逆流控制方法、装置及防逆流系统
DE102012224015A1 (de) 2012-12-20 2014-06-26 BSH Bosch und Siemens Hausgeräte GmbH Wasserführendes Haushaltsgerät mit einem elektrischen Energiespeicher, System und Verfahren zum Betreiben eines Haushaltsgeräts
JP6424452B2 (ja) * 2014-04-07 2018-11-21 株式会社デンソー 電力変換装置
DE102014216291A1 (de) * 2014-08-15 2016-02-18 TRUMPF Hüttinger GmbH + Co. KG Verfahren zum Betrieb eines bidirektional betreibbaren Wechselrichters und Batteriemanagementsystem
US10581246B2 (en) * 2015-09-03 2020-03-03 Kabushiki Kaisha Toshiba Voltage-fluctuation suppression device and method
WO2017149618A1 (ja) * 2016-02-29 2017-09-08 日本電気株式会社 制御装置、発電制御装置、制御方法、システム、及び、プログラム
WO2017163625A1 (ja) * 2016-03-25 2017-09-28 シャープ株式会社 発電システム、パワーコンディショナ、電力制御装置、電力制御方法及び電力制御プログラム
CN108886255B (zh) * 2016-03-29 2021-11-23 京瓷株式会社 电力管理装置、电力管理系统以及电力管理方法
CN109861386A (zh) * 2018-12-12 2019-06-07 珠海格力电器股份有限公司 一种电量监控方法、装置、存储介质及终端
KR102280972B1 (ko) * 2019-11-12 2021-07-23 주식회사 릴테크 스마트 고소설치기기 승강장치 및 그 제어 방법
US11429167B2 (en) * 2020-07-17 2022-08-30 Lenovo (Singapore) Pte. Ltd. Techniques to decommission battery based on user command

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07231570A (ja) * 1994-02-10 1995-08-29 Osaka Gas Co Ltd 発電システム
JP2002010500A (ja) * 2000-06-15 2002-01-11 Toshiba Eng Co Ltd 電力需要供給制御システム
JP2003116225A (ja) * 2001-10-09 2003-04-18 Hitachi Ltd 分散電源システム
JP2007028735A (ja) * 2005-07-13 2007-02-01 Toshiba Corp 分散電源システム及び方法
JP2007330002A (ja) * 2006-06-06 2007-12-20 Ntt Facilities Inc マイクログリッドの電力監視計測制御システム、その電力監視計測制御方法及びその電力監視計測制御プログラム

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3634731B2 (ja) * 2000-09-21 2005-03-30 シャープ株式会社 太陽光発電管理システム、そのシステムに用いられる太陽光発電管理サーバおよび太陽光発電装置
JP4765162B2 (ja) 2000-12-04 2011-09-07 株式会社Gsユアサ 電力貯蔵型太陽光発電システム
JP3726265B2 (ja) 2002-12-25 2005-12-14 中国電力株式会社 直流連系による家庭用分散型電源装置及びその制御方法
CN1934761A (zh) 2004-03-25 2007-03-21 Ipps株式会社 多个电力需求者集合区域的电力系统
JP4584920B2 (ja) 2004-04-28 2010-11-24 シャープ株式会社 発電設備管理システム
US8310094B2 (en) * 2006-01-27 2012-11-13 Sharp Kabushiki Kaisha Power supply system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07231570A (ja) * 1994-02-10 1995-08-29 Osaka Gas Co Ltd 発電システム
JP2002010500A (ja) * 2000-06-15 2002-01-11 Toshiba Eng Co Ltd 電力需要供給制御システム
JP2003116225A (ja) * 2001-10-09 2003-04-18 Hitachi Ltd 分散電源システム
JP2007028735A (ja) * 2005-07-13 2007-02-01 Toshiba Corp 分散電源システム及び方法
JP2007330002A (ja) * 2006-06-06 2007-12-20 Ntt Facilities Inc マイクログリッドの電力監視計測制御システム、その電力監視計測制御方法及びその電力監視計測制御プログラム

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012034438A (ja) * 2010-07-28 2012-02-16 Chugoku Electric Power Co Inc:The 充電制御装置、充電制御方法
JP2012044733A (ja) * 2010-08-12 2012-03-01 Daiwa House Industry Co Ltd 太陽光発電電力を利用した蓄電池システム
JP2012120284A (ja) * 2010-11-30 2012-06-21 Kyocera Corp 複数の分散電源の出力制御システムおよび複数の分散電源の出力制御方法
JP2012151923A (ja) * 2011-01-17 2012-08-09 Nichicon Corp 電力変換装置
US8901876B2 (en) 2011-03-28 2014-12-02 Kabushiki Kaisha Toshiba Charge/discharge determining apparatus and computer-readable medium
CN102709961A (zh) * 2011-03-28 2012-10-03 株式会社东芝 充电/放电确定装置和方法
CN102738832A (zh) * 2011-03-31 2012-10-17 株式会社神户制钢所 具备发电系统的局部电力系统的控制方法及局部电力系统
WO2012144044A1 (ja) * 2011-04-21 2012-10-26 株式会社日立製作所 電力管理システム及び方法
JP2013143816A (ja) * 2012-01-10 2013-07-22 Ntt Facilities Inc 電力供給システム、電力供給制御装置、電力供給方法及びプログラム
JP2013143814A (ja) * 2012-01-10 2013-07-22 Ntt Facilities Inc 電力供給システム、電力供給制御装置、電力供給方法及びプログラム
US9490635B2 (en) 2012-08-17 2016-11-08 Lg Electronics Inc. Energy storage device, power management device, mobile terminal and method for operating the same
KR20140023125A (ko) * 2012-08-17 2014-02-26 엘지전자 주식회사 에너지 저장장치, 전력 관리 장치, 이동 단말기 및 그 동작방법
US10170916B2 (en) 2012-08-17 2019-01-01 Lg Electronics Inc. Energy storage device, power management device, mobile terminal and method for operating the same
WO2015029431A1 (ja) * 2013-08-30 2015-03-05 京セラ株式会社 分散電源システム、パワーコンディショナ
JP2015050835A (ja) * 2013-08-30 2015-03-16 京セラ株式会社 分散電源システム、パワーコンディショナ
JPWO2015029431A1 (ja) * 2013-08-30 2017-03-02 京セラ株式会社 分散電源システム、パワーコンディショナ
US10079491B2 (en) 2013-08-30 2018-09-18 Kyocera Corporation Dispersed power supply system and power conditioner
JP2017085797A (ja) * 2015-10-28 2017-05-18 京セラ株式会社 電力制御装置、電力管理システムおよび電力管理方法
KR20190046733A (ko) * 2019-04-25 2019-05-07 엘지전자 주식회사 에너지 저장장치, 및 전력 관리 장치
KR102117596B1 (ko) * 2019-04-25 2020-06-01 엘지전자 주식회사 에너지 저장장치, 및 전력 관리 장치

Also Published As

Publication number Publication date
US8578184B2 (en) 2013-11-05
CN102067408A (zh) 2011-05-18
JP5179582B2 (ja) 2013-04-10
US20110107123A1 (en) 2011-05-05
JPWO2009157342A1 (ja) 2011-12-08

Similar Documents

Publication Publication Date Title
JP5179582B2 (ja) 電力を電力需要施設に分配する電力制御システム
JP5663645B2 (ja) 制御装置及び制御方法
JP5485857B2 (ja) 電力管理システム
WO2022222529A1 (zh) 光储离网系统控制方法、装置、控制器及存储介质
US20170187190A1 (en) Distributed power supply system, power converter device, and method of controlling power factor
CN107980194A (zh) 冗余住宅电源
US20150025702A1 (en) Energy management system
JP5373528B2 (ja) 配電装置
JP5993082B1 (ja) 分散型電源システム、電力変換装置及び力率制御方法
JP5377435B2 (ja) 充電制御装置、充電制御方法
KR102257906B1 (ko) 에너지 저장 시스템
JP6722295B2 (ja) 電力変換システム、電力供給システムおよび電力変換装置
US20190103756A1 (en) Power storage system, apparatus and method for controlling charge and discharge, and program
JP6050914B1 (ja) 分散型電源システム及び電力変換装置
KR102591100B1 (ko) 분산형 직류 나노 그리드에서 에너지 흐름 제어 및 전압 유지 방법
US20230369861A1 (en) Storage system configured for use with an energy management system
US20240039296A1 (en) Portable energy system with ac input
US20240039321A1 (en) Portable energy system with two-stage power saving feature
JP6787473B1 (ja) 分散型電源システム
JP7412877B2 (ja) 蓄電システム及び蓄電池の充電方法
US11205911B2 (en) Energy storage system
JP2019030162A (ja) 分散型電源システム
JP6569977B2 (ja) 系統電圧管理システム
CN106099966B (zh) 一种分布式电网调峰配电系统
JP2023135057A (ja) 電力融通方法、コンピュータプログラム、充放電装置及び電力融通システム

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200980123963.8

Country of ref document: CN

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 09770052

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2010517916

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 13001500

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 465/CHENP/2011

Country of ref document: IN

122 Ep: pct application non-entry in european phase

Ref document number: 09770052

Country of ref document: EP

Kind code of ref document: A1