WO2006097505A1 - Arbeitsbühne - Google Patents

Arbeitsbühne Download PDF

Info

Publication number
WO2006097505A1
WO2006097505A1 PCT/EP2006/060785 EP2006060785W WO2006097505A1 WO 2006097505 A1 WO2006097505 A1 WO 2006097505A1 EP 2006060785 W EP2006060785 W EP 2006060785W WO 2006097505 A1 WO2006097505 A1 WO 2006097505A1
Authority
WO
WIPO (PCT)
Prior art keywords
tower
platform
working platform
platform according
support
Prior art date
Application number
PCT/EP2006/060785
Other languages
German (de)
English (en)
French (fr)
Inventor
Aloys Wobben
Original Assignee
Aloys Wobben
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority to EP06725098A priority Critical patent/EP1861564B1/de
Priority to DK06725098.5T priority patent/DK1861564T3/da
Priority to NZ561117A priority patent/NZ561117A/en
Priority to CA2600853A priority patent/CA2600853C/en
Application filed by Aloys Wobben filed Critical Aloys Wobben
Priority to AT06725098T priority patent/ATE468453T1/de
Priority to US11/817,950 priority patent/US20090173577A1/en
Priority to BRPI0608824A priority patent/BRPI0608824B1/pt
Priority to JP2008501314A priority patent/JP4642894B2/ja
Priority to AU2006224584A priority patent/AU2006224584B2/en
Priority to SI200630661T priority patent/SI1861564T1/sl
Priority to DE502006006976T priority patent/DE502006006976D1/de
Priority to PL06725098T priority patent/PL1861564T3/pl
Publication of WO2006097505A1 publication Critical patent/WO2006097505A1/de
Priority to NO20075276A priority patent/NO339741B1/no
Priority to AU2010202780A priority patent/AU2010202780A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/36Scaffolds for particular parts of buildings or buildings of particular shape, e.g. for stairs, cupolas, domes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/04Movable stairways, e.g. of loft ladders which may or may not be concealable or extensible
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables

Definitions

  • the present invention relates to a working platform for use inside a tower-like structure.
  • a work platform is typically attached to a crane and introduced from above into the interior of the tower-like structure.
  • this is only possible as long as the upper end of the tower-like structure is open.
  • a use of a working platform on a crane is no longer possible. For example, since the tower of a wind turbine can reach a height of 100 meters, work inside the tower is not easily possible.
  • a working platform which can be used inside a tower-like structure, such as a tower of a wind turbine.
  • the platform has a scissors-like support structure.
  • a work platform is arranged on this support structure. Therefore, a working platform is provided, which can adapt to different cross sections. This is particularly important in tower-like structures whose cross-sections taper towards the top, so that the available area for a working platform varies accordingly.
  • the invention is based on the idea to provide a scaffold-like framework as a support structure for a working platform, which climbs upwards in the interior of a tower with the construction progress and has a working platform.
  • a work platform or indoor stage is advantageously used in towers, which are made of precast concrete parts.
  • the prefabricated concrete elements used for the erection of a tower have holders on their inner circumference, on which the inner stage or parts of the inner stage can be hung.
  • these holders are arranged at predetermined heights and distances. Holders may either have been pre-installed in the precast concrete parts, or they may be retrofitted.
  • the distributively arranged holders allow the work platform to behave analogously to a mountaineer who, during the ascent, hooks hooks above its position into a mountain wall and then climbs up to these hooks.
  • the holders are preferably mounted in advance, so that a working platform can quickly climb up or down on these holders.
  • an actuating element is arranged around the central support element around which acts on the lower scissor lattice bars resting against the central support element.
  • the actuator By the actuator, the lower scissors lattice bars can be acted upon with a tensile force. This leads to a retraction of the scissor lattice and thus a reduction in the size of the platform, so that it can be moved into a part of the tower with a smaller cross-section.
  • An application of the shear lattice bars with a compressive force leads to an extension of the scissor lattice and thus to an increase in the working platform. If the platform already passes through the entire tower cross-section and is applied to the tower conversion, can be adjusted by the force exerted on the scissor lattice bars compressive force, with which the peripheral edge of the platform rests against the tower wall.
  • FIG. 1 - FIG. 4 each show a cross-section of a tower-like structure during the construction of the building according to the first exemplary embodiment
  • FIG. 5 shows a sectional view of a tower-like building with a working platform therein;
  • FIG. 6 shows a cross-section of a tower-like structure with a corresponding working platform
  • FIG. 7 shows a further cross-section of a tower-type building with a working platform according to the first exemplary embodiment
  • Figure 8 is a simplified representation of a single plate of the work platform.
  • the building under construction 100 preferably a tower of a wind turbine, has two pre-fabricated precast concrete parts 10, 11, which are arranged on top of each other.
  • the working platform 50 is lowered into the interior of the tower-like structure.
  • the work platform 50 essentially consists of - A -
  • Fig. 2 shows a cross section of a tower-like structure with a working platform according to the first embodiment. While in Fig. 1, a situation is shown, in which the working platform is introduced into the interior of the tower-like structure, the situation is shown in Fig. 2, in which the working platform is extended and the tower cross-section completely penetrated. This is essentially achieved by extending the safety lattice-like support arms 5 until they touch the inner wall of the tower-like structure. In the lower part of the platform several Tirac winches 1 are provided. These are preferably attached to an outer end of each Scherengitterarms. On the platform 7, which preferably extends over the entire cross section of the interior of the tower-like structure, people and material and tools may be located. The platform 7 takes over the function of a working platform and the people can perform work steps there to build the tower-like structure.
  • Fig. 3 shows a further cross section of the tower-like structure with a working platform according to the first embodiment. While only two precast concrete parts 10 and 11 are already shown mounted in Figures 1 and 2, Fig. 3 shows the situation in which a further precast concrete part 12 is mounted on the two already assembled precast concrete parts 10 and 11.
  • 3 holders are provided in the inner wall of the concrete precast elements, are attached to which (not shown) ropes. These ropes run through the tirac winches, so that the stage according to the invention can move in the vertical direction along the ropes by suitable control of the tirac winches within the tower.
  • a power supply for the work platform and their Tirac winches can z. B. be provided by a cable from below.
  • Fig. 4 shows a cross section of a tower-like structure with a working platform according to the first embodiment.
  • the platform 50 must be moved upwards to allow work in the upper finished part 12 and / or the installation of the subsequent precast concrete part.
  • one of the workers can climb up to the holder 3 of the inner wall of the third concrete precast element 12 by means of a ladder 15 in order to fix a rope of the Tirac winch 1 there accordingly.
  • a telescopic rod can also be used.
  • the number of holders 3 on the inner wall of the tower-like structure should be at least equal to the number of Tirac winches, so that the ropes of the Tirac winches can be attached thereto accordingly.
  • the brake is released in each case on a winch, so that the rope can be pulled upwards.
  • the rope is fixed again in the winch, so that the stage is also worn by this rope again. Thereafter, the next rope is released and hung in the corresponding upper holder 3, etc.
  • Fig. 5 shows a cross section through a tower-like structure with a working platform according to the first embodiment.
  • the scissors-like support arms 5 of the work platform can be seen.
  • the platform has rollers 16 (here 6 pieces) on the outside of the work platform. The rollers come then with the platform extended in contact with the inner wall of the tower-like structure, so that the work platform 50 can be moved up or down more easily and damage to the tower inner wall and / or platform during movement is avoided.
  • the platform comprises a predetermined number of plates, which is larger by 1 than the number of support arms. All plates are in accordance with the present circular shape. One of these plates encloses a central rod (see reference numeral 60 in Figure 6) to close off the central portion of the platform.
  • the remaining plates are each arranged on a support arm and secured to the outer end of the support arm. Furthermore, these plates are provided with a recess. This recess extends in the radial direction from the center of the plate in a straight line to the outside. In this case, the Auf originallyung on a width which is slightly larger than the diameter of the central rod. In situ, each of these plates is oriented so that its recess faces the central rod.
  • Fig. 6 shows a detailed sectional view of the working platform according to the figures 1-4.
  • the scissors-like support arms 5 are extended on the right side.
  • a larger inner cross section of the tower-like structure can be covered by the platform.
  • Fig. 7 shows a further detailed cross section of the tower-like structure with the working platform according to the first embodiment.
  • the platform is located within a precast concrete part 12 in the upper part of the tower-like structure.
  • the cross section of this finished part is smaller than the cross section of the finished part 10 shown in FIG. 6
  • the scissors-like support arms 5 of the platform adapt to the become smaller cross section, when the platform is moved up by retracting.
  • an indoor platform or platform can be provided, which can climb up or down in the tower itself. For example, it is no longer necessary for a tower of a wind turbine, with a winch from the gondola in the basket up or drive down. Rather, now an indoor platform is provided, which can fully enforce the tower, and which can climb in a simple manner, where work is currently being carried out. Furthermore, it can be adapted to different tower cross-sections by the design of the safety lattice-like support arms 5. Once the platform is no longer needed, it can be retracted by collapsing the lattice-like brackets. Thereafter, the work platform, for example, be removed by a door in the tower of a wind turbine again.
  • the work platform preferably has a central rod 60 and scissor lattice / support arms 5 hinged thereto. On the support arms 5 plates 7 are arranged, which then form the working platform. Below the support arms, the so-called pass winders or Tirac winches 1 are provided. With such tirac or continuous winches, the work platform can climb up or down even on ropes running through the winches.
  • the ropes of the Tirac winches 1 are preferably attached to brackets 3 inside the tower-like structure, so that the Tirac winches on the ropes can run up or down. Preferably, several Tirac winches are provided on the circumference of the work platform.
  • Tirac winches To raise or lower the ropes of Tirac winches must be successively released from the brackets 3 and attached to the next higher or next lower holder, depending on whether the stage is to be raised or lowered.
  • at least five Tirac winches are provided on the circumference of the platform, so that at least five ropes are provided with the corresponding brackets 3.
  • the platforms 7 of the work platform are preferably configured to overlap so that the work platform can accommodate the different cross sections within a tower-like structure.
  • each of the plates attached to a support arm has a recess which is aligned with the central rod and slightly wider than this, a retraction of a support arm with the associated movement of the leads corresponding plate 7 does not lead to a collision of the plate 7 with the central rod. Rather, the recess moves towards the central rod and picks it up.
  • the length of the recess is a measure of how far pushed together the platform or the scissors-like arm can be retracted.
  • FIG. 7 A simplified illustration of a plate 7 is shown in FIG.
  • rollers 6 on the circumference of the working platform 50 are provided so that the working platform rolls on the inside of the tower wall and does not scratch along there.
  • a working platform By means of the work platform which can be adjusted in its cross-section, a working platform can be provided which adapts to the cross-section of a tower-like structure which narrows at the top.
  • the work platform described above proves to be particularly advantageous if a nacelle of a wind turbine is already arranged on the tower of the wind turbine and thus no longer has the opportunity to reach by a crane from above into the interior of the tower of the wind turbine.
  • the collapsible or disassembled working platform can be brought through the door in the lower part of the tower and constructed accordingly so that it can then move up or down along the tower with the help of the holders 3 located in the tower segments.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Wind Motors (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Lubricants (AREA)
  • Glass Compositions (AREA)
  • Low-Molecular Organic Synthesis Reactions Using Catalysts (AREA)
  • Types And Forms Of Lifts (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)
  • Pharmaceuticals Containing Other Organic And Inorganic Compounds (AREA)
  • Support Of Aerials (AREA)
  • Gloves (AREA)
  • Emergency Lowering Means (AREA)
PCT/EP2006/060785 2005-03-16 2006-03-16 Arbeitsbühne WO2006097505A1 (de)

Priority Applications (14)

Application Number Priority Date Filing Date Title
US11/817,950 US20090173577A1 (en) 2005-03-16 2006-03-16 Working platform
NZ561117A NZ561117A (en) 2005-03-16 2006-03-16 Working platform for interior of tower such as wind power tower, with scissors carrier structure and overlapping plates
CA2600853A CA2600853C (en) 2005-03-16 2006-03-16 Working platform
JP2008501314A JP4642894B2 (ja) 2005-03-16 2006-03-16 作業足場
AT06725098T ATE468453T1 (de) 2005-03-16 2006-03-16 Arbeitsbühne
DK06725098.5T DK1861564T3 (da) 2005-03-16 2006-03-16 Arbejdsplatform
BRPI0608824A BRPI0608824B1 (pt) 2005-03-16 2006-03-16 conjunto de plataforma de trabalho
EP06725098A EP1861564B1 (de) 2005-03-16 2006-03-16 Arbeitsbühne
AU2006224584A AU2006224584B2 (en) 2005-03-16 2006-03-16 Working platform
SI200630661T SI1861564T1 (sl) 2005-03-16 2006-03-16 Delovni oder
DE502006006976T DE502006006976D1 (de) 2005-03-16 2006-03-16 Arbeitsbühne
PL06725098T PL1861564T3 (pl) 2005-03-16 2006-03-16 Pomost roboczy
NO20075276A NO339741B1 (no) 2005-03-16 2007-10-15 Arbeidsplattformsammenstilling til bruk ved oppsetting av en tårnliknende bygning.
AU2010202780A AU2010202780A1 (en) 2005-03-16 2010-07-01 Working platform

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102005012497A DE102005012497A1 (de) 2005-03-16 2005-03-16 Arbeitsbühne
DE102005012497.6 2005-03-16

Publications (1)

Publication Number Publication Date
WO2006097505A1 true WO2006097505A1 (de) 2006-09-21

Family

ID=36764517

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2006/060785 WO2006097505A1 (de) 2005-03-16 2006-03-16 Arbeitsbühne

Country Status (19)

Country Link
US (1) US20090173577A1 (pt)
EP (1) EP1861564B1 (pt)
JP (1) JP4642894B2 (pt)
KR (2) KR20100021534A (pt)
CN (1) CN100535361C (pt)
AT (1) ATE468453T1 (pt)
AU (2) AU2006224584B2 (pt)
BR (1) BRPI0608824B1 (pt)
CA (1) CA2600853C (pt)
CY (1) CY1110120T1 (pt)
DE (2) DE102005012497A1 (pt)
DK (1) DK1861564T3 (pt)
ES (1) ES2343368T3 (pt)
NO (1) NO339741B1 (pt)
NZ (1) NZ561117A (pt)
PL (1) PL1861564T3 (pt)
PT (1) PT1861564E (pt)
SI (1) SI1861564T1 (pt)
WO (1) WO2006097505A1 (pt)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20210122563A1 (en) * 2018-04-02 2021-04-29 PLANT BASE Co., Ltd. Method for discharging granular powder brought into fixed state inside hollow structure

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080302605A1 (en) * 2007-06-08 2008-12-11 Andre St-Germain Size adjustable platform for scaffolding
WO2009056898A1 (es) 2007-11-02 2009-05-07 Alejandro Cortina-Cordero Torre de concreto postensado para generadores eolicos
CA2729081A1 (en) * 2008-06-23 2009-12-30 Thomas Hedegaard Platform, in particular interior platform for tubular tower
KR101038226B1 (ko) * 2008-10-24 2011-06-01 (주)유진기업 원자로의 철근콘크리트방벽 보강용 강선케이블 설치를 위한작업대 및 이를 이용한 강선케이블의 설치공법
DK2478171T3 (en) 2009-09-15 2018-12-10 Vestervangen Holding Odense Aps PIPULAR BUILDING STRUCTURE WITH HINGING CONNECTED PLATFORM SEGMENT
CN103264772A (zh) * 2011-11-16 2013-08-28 北京晟航国瑞科技有限公司 一种用于运送旅客的客梯车
CN103061992B (zh) * 2012-12-13 2014-11-19 北京金风科创风电设备有限公司 操作平台
DE102013011489B4 (de) * 2013-07-09 2021-09-16 Liebherr-Werk Ehingen Gmbh Turmdrehkran
PL3034870T3 (pl) * 2014-12-15 2022-10-31 Nordex Energy Spain, S.A. Turbina wiatrowa z betonową wieżą i sposób montażu turbiny wiatrowej z betonową wieżą
EP3095750B1 (en) * 2015-05-19 2018-07-11 Anco Maritime Activities Ltd. Method for inspecting an inside room of a ship and/or performing works therein
DE102016109818A1 (de) * 2016-05-27 2017-11-30 Wobben Properties Gmbh Steigvorrichtung zur Ausführung einer Bewegung relativ zu einem Turm und Verfahren zur Herstellung eines Turms
EP3379079B1 (de) 2017-03-23 2019-10-16 Nordex Energy GmbH Einrichtung zur montage und wartung eines turms für eine windenergieanlage und verwendung derselben
DE102017116873A1 (de) 2017-07-26 2019-01-31 Wobben Properties Gmbh Windenergieanlagen-Stahlturmringsegment und Verfahren
DE102017116872A1 (de) 2017-07-26 2019-01-31 Wobben Properties Gmbh Windenergieanlagen-Stahlturmabschnitt für einen Windenergieanlagen-Turm und Verfahren zur Herstellung
EP3444471B1 (de) 2017-08-18 2020-04-29 Nordex Energy GmbH Wartungsplattform, sowie anordnung zur wartung von einbauten in einem turm einer windenergieanlage und verfahren zur montage einer wartungsplattform
DE102017128143B3 (de) 2017-11-28 2019-01-10 Nordex Energy Gmbh Wartungsplattform zur Wartung von Einbauten in einem Turm für eine Windenergieanlage und Anordnung einer Wartungsplattform
CN115233961A (zh) * 2022-06-13 2022-10-25 上海建工一建集团有限公司 一种核心筒空中变形的施工安全防护平台结构及方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE366C (de) * 1877-07-02 GROSMANN in Düsseldorf Rettungsapparat bei Feuersgefahr und Observationsthurm, basirend auf der Nürnberger Scheere
US3080941A (en) * 1961-01-27 1963-03-12 Standard Oil Co Collapsible scaffold
JPS52136412A (en) * 1976-05-12 1977-11-15 Kawasaki Heavy Ind Ltd Work scaffold of spherical tank
US4095670A (en) * 1976-06-09 1978-06-20 Raise Contracting, Limited Foldable platform for raise drilling
AT373018B (de) * 1981-06-30 1983-12-12 Patenver Ag Geruest
EP0638371A1 (en) * 1993-08-10 1995-02-15 Tric Holdings Limited Method of servicing interior of large container and service apparatus

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1213043A (en) * 1917-01-16 George Washington Walker Scaffold.
US159571A (en) * 1875-02-09 Improvement in fire-escapes
US686458A (en) * 1901-05-31 1901-11-12 Henry Winthrop Gray Fire-escape.
US737377A (en) * 1903-06-22 1903-08-25 John E England Adjustable scaffold.
US818304A (en) * 1905-06-02 1906-04-17 Robert Fleming Aerial ladder.
US1092096A (en) * 1911-10-06 1914-03-31 Horn G Donigan Extensible tower.
US1090856A (en) * 1913-04-17 1914-03-24 Gustave Johnson Hanging scaffold.
US1284699A (en) * 1918-02-26 1918-11-12 Olof F Johnson Silo-scaffold.
US1652403A (en) * 1926-12-13 1927-12-13 Nat Conveyor Company Building derrick for bunkers
US1708113A (en) * 1927-06-29 1929-04-09 Alvah K Allen Collapsible tower
AT203033B (de) * 1957-07-09 1959-04-25 Voest Ag Hängegerüst zur Ausmauerung von Konvertern
US3289788A (en) * 1964-12-31 1966-12-06 Goodrich Gulf Chem Inc Folding scaffold with central support
US3910379A (en) * 1973-11-30 1975-10-07 Robert E Miller System for construction of monolithic concrete tanks and silos
JPS5414657Y2 (pt) * 1975-09-30 1979-06-16
JPS52151224A (en) * 1977-06-22 1977-12-15 Ishikawajima Harima Heavy Ind Liftable scaffold device
JPS57180763A (en) * 1981-04-30 1982-11-06 Nippon Kokan Kk Scafford for constructing tower tanks
JPS6110668A (ja) * 1984-06-22 1986-01-18 大成建設株式会社 昇降式伸縮作業足場
FR2647770B1 (fr) * 1989-06-05 1991-09-06 Polytec Dispositif de deplacement curviligne d'un objet au contact d'une surface notamment convexe
DE19909440C1 (de) 1999-03-04 2000-03-16 Gregor Marc Roman Johannsen Anordnung zur Befestigung von Regalböden
DE10311674B4 (de) * 2003-03-11 2007-02-01 aeroconcept Ingenieurgesellschaft für Luftfahrttechnik und Faserverbundtechnologie mbH Wartungsplattform
US7690317B2 (en) * 2003-03-19 2010-04-06 Herman Miller, Inc. Computer workstation with moveable monitor support

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE366C (de) * 1877-07-02 GROSMANN in Düsseldorf Rettungsapparat bei Feuersgefahr und Observationsthurm, basirend auf der Nürnberger Scheere
US3080941A (en) * 1961-01-27 1963-03-12 Standard Oil Co Collapsible scaffold
JPS52136412A (en) * 1976-05-12 1977-11-15 Kawasaki Heavy Ind Ltd Work scaffold of spherical tank
US4095670A (en) * 1976-06-09 1978-06-20 Raise Contracting, Limited Foldable platform for raise drilling
AT373018B (de) * 1981-06-30 1983-12-12 Patenver Ag Geruest
EP0638371A1 (en) * 1993-08-10 1995-02-15 Tric Holdings Limited Method of servicing interior of large container and service apparatus

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 002, no. 021 (M - 007) 10 February 1978 (1978-02-10) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20210122563A1 (en) * 2018-04-02 2021-04-29 PLANT BASE Co., Ltd. Method for discharging granular powder brought into fixed state inside hollow structure
US11524838B2 (en) * 2018-04-02 2022-12-13 PLANT BASE Co., Ltd. Method for discharging granular powder brought into fixed state inside hollow structure

Also Published As

Publication number Publication date
BRPI0608824B1 (pt) 2017-03-14
EP1861564A1 (de) 2007-12-05
CN100535361C (zh) 2009-09-02
ATE468453T1 (de) 2010-06-15
NO20075276L (no) 2007-10-15
DE102005012497A1 (de) 2006-09-21
NZ561117A (en) 2011-02-25
CA2600853A1 (en) 2006-09-21
CA2600853C (en) 2011-07-05
DE502006006976D1 (de) 2010-07-01
CY1110120T1 (el) 2015-01-14
PL1861564T3 (pl) 2010-11-30
ES2343368T3 (es) 2010-07-29
JP4642894B2 (ja) 2011-03-02
KR20100021534A (ko) 2010-02-24
DK1861564T3 (da) 2010-08-09
KR20070112238A (ko) 2007-11-22
PT1861564E (pt) 2010-06-28
BRPI0608824A2 (pt) 2011-03-15
US20090173577A1 (en) 2009-07-09
CN101137806A (zh) 2008-03-05
SI1861564T1 (sl) 2010-06-30
EP1861564B1 (de) 2010-05-19
NO339741B1 (no) 2017-01-30
KR101009519B1 (ko) 2011-01-18
AU2006224584B2 (en) 2010-04-01
AU2006224584A1 (en) 2006-09-21
JP2008533334A (ja) 2008-08-21
AU2010202780A1 (en) 2010-07-22

Similar Documents

Publication Publication Date Title
EP1861564B1 (de) Arbeitsbühne
EP3016901B1 (de) Turmdrehkran und verfahren zur montage eines windturbinen-rotorblattes
EP2803616B1 (de) Arbeitsbühnenvorrichtung zum Arbeiten in verändlicher Höhe und Verfahren dafür
EP1929107B1 (de) Schutz- und zugangsvorrichtung
EP2072812A2 (de) Verfahren und Einrichtung zur Handhabung einer Rotornabe einer Windenergieanlage
EP1857670A1 (de) Verfahren und Vorrichtung zum Errichten eines aus einzelnen Turmsegmenten zusammengesetzten Turms einer Windenergieanlage
DE2823525B1 (de) Verfahren zum Errichten einer Windenergieanlage
WO2015039876A1 (de) Vorrichtung und verfahren zur handhabung, montage oder demontage von komponenten einer windkraftanlage
EP2723670B1 (de) Lasthandhabungsvorrichtung zum anheben und verfahren zur montage von rotorblättern einer windenergieanlage
EP3379079B1 (de) Einrichtung zur montage und wartung eines turms für eine windenergieanlage und verwendung derselben
WO2015090282A1 (de) Halte-, hebe- und sicherungsvorrichtung zur anbringung an hohen, turmartigen bauwerken
EP3047083B1 (de) Variables schutzdach
DE102010060639A1 (de) Arbeitsbühnenanlage
EP3464754B1 (de) Steigvorrichtung zur ausführung einer bewegung relativ zu einem turm und verfahren zur herstellung eines turms
AT506952B1 (de) Instandhaltungssystem
DE10308239A1 (de) Verfahren und Vorrichtung zur Errichtung einer Windenergieanlage
DE102013202235B4 (de) Kran mit einer Ausrüstung für den Abbau eines Auslegers des Krans in der Höhe
WO2021028441A1 (de) Montagetraverse und verfahren zum einziehen von kabelförmigen elementen, insbesondere von spanngliedern, entlang eines turms einer windenergieanlage
DE4445165C2 (de) Verfahren und Stockbaum zum Errichten von Gittermasten
WO2005045160A1 (de) Deckentisch einer betonschalung und vorrichtung zum versetzen des deckentischs
DE102010060294A1 (de) Arbeitsbühne
DE10164514C1 (de) Hebevorrichtung zur Erhöhung von Freileitungsmasten
DE102015004392A1 (de) Personenhebevorrichtung für Windenergieanlagentürme
EP3877311A1 (de) Hebezeugbefestigung und hebezeug für windkraftturbinen
DE1559019B1 (de) Kletterschalung zum Betonieren von insbesondere turmartigen Bauwerken

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application
DPE1 Request for preliminary examination filed after expiration of 19th month from priority date (pct application filed from 20040101)
WWE Wipo information: entry into national phase

Ref document number: 2006224584

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 2600853

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 561117

Country of ref document: NZ

WWE Wipo information: entry into national phase

Ref document number: 200680008101.7

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 2008501314

Country of ref document: JP

Ref document number: 3465/KOLNP/2007

Country of ref document: IN

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2006224584

Country of ref document: AU

Date of ref document: 20060316

Kind code of ref document: A

WWP Wipo information: published in national office

Ref document number: 2006224584

Country of ref document: AU

WWE Wipo information: entry into national phase

Ref document number: 1020077022700

Country of ref document: KR

NENP Non-entry into the national phase

Ref country code: RU

WWE Wipo information: entry into national phase

Ref document number: 2006725098

Country of ref document: EP

WWW Wipo information: withdrawn in national office

Ref document number: RU

WWP Wipo information: published in national office

Ref document number: 2006725098

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 11817950

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 1020107001946

Country of ref document: KR

ENP Entry into the national phase

Ref document number: PI0608824

Country of ref document: BR

Kind code of ref document: A2

Effective date: 20070905