WO2005118156A1 - 塗装方法 - Google Patents

塗装方法 Download PDF

Info

Publication number
WO2005118156A1
WO2005118156A1 PCT/JP2005/009840 JP2005009840W WO2005118156A1 WO 2005118156 A1 WO2005118156 A1 WO 2005118156A1 JP 2005009840 W JP2005009840 W JP 2005009840W WO 2005118156 A1 WO2005118156 A1 WO 2005118156A1
Authority
WO
WIPO (PCT)
Prior art keywords
coating
sprayer
painting
transport direction
paint
Prior art date
Application number
PCT/JP2005/009840
Other languages
English (en)
French (fr)
Inventor
Yasuyuki Kenmoku
Takehito Katsunuma
Original Assignee
Abb K.K.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abb K.K. filed Critical Abb K.K.
Priority to DE602005026520T priority Critical patent/DE602005026520D1/de
Priority to JP2006514088A priority patent/JP4261580B2/ja
Priority to CA002546852A priority patent/CA2546852A1/en
Priority to US10/581,297 priority patent/US7691450B2/en
Priority to EP05743473A priority patent/EP1754544B1/en
Publication of WO2005118156A1 publication Critical patent/WO2005118156A1/ja

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/04Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
    • B05B13/0463Installation or apparatus for applying liquid or other fluent material to moving work of indefinite length
    • B05B13/0468Installation or apparatus for applying liquid or other fluent material to moving work of indefinite length with reciprocating or oscillating spray heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05DPROCESSES FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05D1/00Processes for applying liquids or other fluent materials
    • B05D1/02Processes for applying liquids or other fluent materials performed by spraying
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B12/00Arrangements for controlling delivery; Arrangements for controlling the spray area
    • B05B12/08Arrangements for controlling delivery; Arrangements for controlling the spray area responsive to condition of liquid or other fluent material to be discharged, of ambient medium or of target ; responsive to condition of spray devices or of supply means, e.g. pipes, pumps or their drive means
    • B05B12/084Arrangements for controlling delivery; Arrangements for controlling the spray area responsive to condition of liquid or other fluent material to be discharged, of ambient medium or of target ; responsive to condition of spray devices or of supply means, e.g. pipes, pumps or their drive means responsive to condition of liquid or other fluent material already sprayed on the target, e.g. coating thickness, weight or pattern
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/04Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation
    • B05B13/0431Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work the spray heads being moved during spraying operation with spray heads moved by robots or articulated arms, e.g. for applying liquid or other fluent material to 3D-surfaces

Definitions

  • the present invention relates to a coating method for coating an object to be coated such as an automobile body, furniture, and an electric appliance using a sprayer.
  • two sprayers are arranged on both the left and right sides of the car body, and the upper surface of the car body is divided into two painting areas, left and right, for painting.
  • the two sprayers reciprocate in the transport direction of the vehicle body (forward and rearward) with respect to, for example, the hood U, (Ponnet) and roof of the white moving vehicle body.
  • the painting area was being painted.
  • the spraying device has a coating surface larger than the reciprocating amplitude (stroke) of the sprayer in the transport direction, so that it can also be painted in the transport direction.
  • stroke reciprocating amplitude
  • An object of the present invention is to increase a coating area per sprayer for an object being transported, thereby improving a coating capability. Provide a coating method that can be applied
  • the present invention includes a transport unit that moves an object to be coated in a constant transport direction, and a plurality of sprayers arranged at intervals in the transport direction of the transport unit.
  • HIJ d Applied to a painting method in which painting areas that are adjacent to each other among multiple painting areas are painted using different sprayers, respectively.
  • each of the sprayers performs painting while reciprocating in a direction substantially parallel to the conveying direction of the object to be coated between the respective coating areas. While each of the sprayers reciprocates in a direction substantially parallel to the conveying direction of the object to be coated, the sprayer is located on the boundary side of the adjacent coating area. The position of the return part of the return movement is sequentially shifted from the front side to the rear side in the transport direction of the object to be coated, and the coating is performed while forming the coating locus of the return part in a stepwise manner.
  • the sprayable area of one sprayer can be substantially expanded.
  • the object to be coated gradually moves from the front position of the sprayer with the transfer of the object, so that as the sprayer reciprocates, the area that can be coated gradually increases after the object to be transferred in the transport direction.
  • the position of the reciprocating fold is changed as in the conventional coating method.
  • the range that can be painted at the beginning of painting and the range that can be painted at the end of painting are limited to the overlapping range, or the range that can be painted by Akatsuki ft machines becomes narrower.
  • the position of the reciprocating turn of the sprayer is sequentially shifted from the front side to the rear side in the conveying direction of the object to be coated.
  • the sprayer reciprocates repeatedly even though it gradually moves away from the sprayer, the reciprocating motion gradually shifts iL toward the rear in the transport direction of the workpiece. Therefore, the range that can be painted at the start of painting and the range that can be painted at the end of painting are not limited to overlapping ranges, and the range that can be painted by the sprayer can be substantially expanded.
  • the folding m The parts can be distributed.
  • the unevenness of the color of the entire painted surface is reduced, for example, as compared with a case where the folded portion is arranged at the same position irf in the reciprocating direction or a case where the folded portion is alternately moved in both the reciprocating directions. Finish quality can be improved.
  • the first parallel moving portion which is the start position of the coating trajectory in each coating area is from the front side to the rear side in the coating material transport direction.
  • the spraying is performed while moving the spraying machine toward the coating area, and the spraying machine is also moved from the front side to the rear side in the transport direction of the object to be coated in the last parallel moving portion which is the end position of the coating trajectory in each of the coating areas. It is preferable to perform painting while moving the paint.
  • the coating is performed such that the parallel moving parts when the sprayer reciprocates are arranged substantially linearly.
  • the present invention at the end of the forward-moving side parallel moving portion and the start of the backward-moving side parallel moving portion when the sprayer reciprocates, from the front to the rear in the transport direction of the article to be coated.
  • the coating may be performed with the position shifted toward the side.
  • the sprayer sprays paint from the sprayer at the parallel moving portion when the sprayer reciprocates, and paints the paint from the sprayer while stopping at the turning portion of the reciprocating motion. May be performed.
  • FIG. 1 is a perspective view showing a coating apparatus used in the coating method according to the first embodiment of the present invention.
  • FIG. 2 is a front view showing the painting trajectory of the rotary atomization type sprayer when painting the panel in Fig. 1.
  • FIG. 3 is a front view showing a state in which the coating area on the upper side in the transport direction of the panel in FIG. 2 is painted.
  • FIG. 4 is a front view following FIG. 3 showing a state in which a painted area on the rear side of the middle part in the transport direction of the panel in FIG. 2 is painted.
  • FIG. 5 shows the part in Figure 2
  • FIG. 6 is a front view following the state 5 in FIG. 2 in which the coating area on the rear end side in the transport direction is coated.
  • Fig. 7 is a front view showing the painting locus of the sprayer when painting the panel using the painting method according to the first comparative example.
  • Fig. 8 is the panel drawing using the painting method according to the second comparative example.
  • Fig. 9 is a front view showing the painting trajectory of the sprayer when painting is performed.
  • Fig. 9 shows the painting trajectory of the rotating sprayer when painting the panel using the painting method according to the second embodiment. It is a front view
  • FIG. 10 is an enlarged front view showing the painting locus of part a in FIG. 9 in an enlarged manner.
  • FIG. 11 is a perspective view showing a coating apparatus used in the coating method according to the third embodiment.
  • FIG. 12 is a front view showing a painting trajectory of a rotary atomization type sprayer when painting the left side surface of a vehicle body using the painting method according to the third embodiment.
  • FIGS. 1 to 6 show a first embodiment of the present invention.
  • a relatively large house a for example, a relatively large house a.
  • a panel constituting the outer surface of an electric appliance or the like is painted by a rotary atomizing sprayer attached to a mouth device will be described.
  • reference numeral 1 denotes a coating apparatus distributed and placed in a coating bush 2.
  • the coating apparatus 1 is generally constituted by a conveyor apparatus 3 described later, a lopot apparatus 6, 7 and a rotary atomizing type sprayer 89, etc.
  • Reference numeral 3 denotes a conveyor provided on the ceiling side in the painting space 2. As shown in FIG. 2 and the like, the conveyor device 3 hangs a panel 11 described later using a nona 3A, and in this state, moves the panel 11 in the direction indicated by the arrow A (left side in FIG. 2). , Rightward) at a predetermined speed 3 ⁇ 4).
  • Reference numeral 4 5 denotes two tracking devices provided in parallel with the conveyor 3. Each tracking device 4
  • Numeral 5 is arranged at an interval between the rear side (upstream side) and the front side (downstream side) of the conveyor device 3 in the transport direction.
  • Each of the tray V king devices 4 and 5 moves a lopot device 67 described later independently at an arbitrary speed in the transport direction or the opposite transport direction. It has become. Therefore b racking device 4
  • Numeral 5 adjusts the moving speed of the mouth bot device 6 7 (sprayer 89) with respect to the panel 11 transported by the conveyor device 3.
  • Reference numerals 6 and 7 denote multi-axis type mouth port devices that constitute the operation device for the sprayer.
  • the hot devices 6 and 7 are respectively mounted on the tracking devices 45 in the middle of the conveyor device 3, and are arranged on the side of the conveyor device 3.
  • the two D-pot devices 6, 7 are It is arranged on the rear side and the front side with an interval in the transport direction of the device 3 (the direction of arrow A), and performs a painting operation by moving a rotary atomizing type atomizer 89 described later. is there.
  • the robot V device 6 includes a base 6A movably provided on the tracking device 4 and a vertical arm 6B rotatably and swingably provided on the base 6A.
  • Mouth potting device 7 is also substantially constituted by base 7A, vertical arm 7B horizontal arm 7C wrist 7D, almost in the same manner as mouth porting device 6.
  • lopot devices 6, 7 support a rotary atomizing type sprayer 89 on the wrists 6D, 7D. Then, the robot device 67 is moved by the conveyor device 3 to the panel 1 described later.
  • Reference numeral 89 denotes a rotary atomizing sprayer attached to the wrists 6 and 7D of two lopot devices 67 respectively.
  • the sprayer 89 has rotary atomizing heads 8A and 9A that are driven to rotate at a high speed at the distal end side.
  • the spray 89 is formed by discharging the paint toward the rotary atomizing head 8A9A, thereby atomizing the paint by the action of the heart force of the rotary atomizing head 8A9A, and distributing the paint forward. Sprays paint on the panel 11
  • the sprayers 8 and 9 are provided with a shaping Xa jet (not shown) located around the outer peripheral side of the rotary atomizing head 8A9 9.
  • Reference numeral 10 denotes a control device connected to the lopot device 67 (sprayer 89).
  • the control device 10 is disposed, for example, in a control room or the like for controlling a coating line.
  • the control device 10 includes a trapping device 45, a ⁇ -lot 67, a sprayer 89,
  • the air control valve is composed of a computer having a program for controlling a paint control valve (neither is shown) or the like.
  • the control device 10 includes the tracking devices 4, 5 and the port. It controls the operation of the notch devices 67 (moving speed of the sprayers 8 and 9), the amount of paint discharged from the sprayers 89 and the pressure of the shaping air.
  • the panel 1 1 indicates a panel to be coated.
  • Numeral 1 is a substantially rectangular plate, for example, an outer panel of steel furniture and electric appliances, which are sequentially conveyed in the direction indicated by the arrow A while being suspended from the conveyor device 3.
  • 1 is a sprayer, for example,
  • the coating area CA a CA c of A a CA d is coated by the sprayer 8 on the rear side in the transport direction, and the coating areas CA b and CA d are coated by the sprayer 9 on the front side in the transport direction. is there. For this reason, the painting area CA a, C Ac to be painted by one sprayer 8 and the painting area C Ab,
  • the coating apparatus 1 according to the first embodiment is configured as described above, the coating method according to the present embodiment will be described with reference to FIGS. 2 to 6 as an example where the panel 11 is coated. Will be explained.
  • the solid line and the dotted line (dashed line) drawn on the painted surface of panel 11 so as to reciprocate in the left and right directions (the direction of arrow A) correspond to the painted surface of panel 11.
  • the painting trajectories Ta, Tb, Tc, Td (moving trajectories) of the sprayers 8, 9 (rotary atomizing heads 8A, 9A) are shown.
  • the solid lines of the coating trajectories Ta, Tb, Tc, and Td represent the parallel moving parts Tal to Ta9, Tbl to Tb9, and Tcl where the sprayers 8 and 9 move in parallel along the left and right directions. Tc9 and Td1 to Td9.
  • the dotted lines of the coating trajectories Ta, Tb, Tc, and Td indicate the turning points Ta0, TbO, TcO, and TdO where the sprayers 8, 9 turn and move. Further, the sprayers 8 and 9 spray the coating material in the parallel moving parts Tal to Ta9, Tbl to Tb9, Tcl to Tc9 and Tdl to Td9, for example, and turn back parts TaO, ⁇ 3 ⁇ 40, ⁇ In cO T dO, the spraying of the material is stopped.
  • the first coating layer ⁇ will be described with reference to FIGS. 2 and 3 .
  • the panel 11 is conveyed using the conveyor device 3.
  • the panel 11 passes near the sprayer 8 located on the upstream side (rear side) in the transport direction.
  • the control device 10 controls the rear robot V-motion device 6 and the sprayer 8 (see FIG. Using the sprayer 8) on the right side of 1), position it on the painted surface of panel 1 1 Start painting for the painting area CA a to be placed.
  • the sprayer 8 moves to the upper left corner of the panel 11 as the start position Tas of the paint trajectory Ta, and starts spraying the paint. .
  • the sprayer 8 forms the spray pattern P and continues to spray the paint, and the upper end of the panel 11 along the first (first) parallel moving portion Ta1. Is moved from the front side in the transport direction to the rear side (reverse direction of the transport direction).
  • the sprayer 8 when the sprayer 8 moves by a predetermined distance in the direction opposite to the transport direction of the panel 11 and reaches the end of the parallel moving portion Tal, the sprayer 8 once sprays the paint. It stops and moves down the panel 11 along the first turnover TaO.
  • the sprayer 8 moves downward with respect to the parallel moving portion Ta1 by a distance smaller than the diameter of the spray panel P, and reaches the end of the turn-back portion TaO. Therefore, the sprayer 8 restarts spraying the paint and moves from the rear side in the transport direction to the front side (forward direction in the transport direction) along the second parallel moving section Ta2.
  • the sprayer 8 When the sprayer 8 reaches the left end of the panel 11 and reaches the end of the parallel moving section Ta2, the sprayer 8 temporarily stops spraying of the paint, and the sprayer 8 stops at the second folded section TaO.
  • the sprayer 8 When the sprayer 8 reaches the left end of the panel 11 and reaches the end of the parallel moving section Ta2, the sprayer 8 temporarily stops spraying of the paint, and the sprayer 8 stops at the second folded section TaO.
  • the third folded portion TaO connecting between the parallel moving portions Ta3 and Ta4 has two coating areas in the same manner as the first folded portion TaO connecting between the parallel moving portions Tal and Ta2. It is located near the boundary between C Aa and C Ab. However, the third folded portion TaO is located behind the first folded portion TaO in the transport direction (the direction of arrow A), and these two folded portions TaO are located in the transport direction. Are separated from each other by the distance dimension ⁇ L
  • the sprayer 8 moves downward with respect to the parallel moving portion Ta3, for example, by the same distance dimension as the first folded portion TaO, and the third folded portion TaO. Reaches the end of the TaO. Therefore, the sprayer 8 restarts the spraying of the paint and moves in the forward direction of the transport direction along the fourth parallel moving section Ta4.
  • the sprayer 8 repeats the subsequent mounting operation in the same manner as the painting operation from the parallel moving part ⁇ a1 to the parallel moving part Ta4. That is, the fifth to ninth parallel moving parts Ta5 to Ta9 move in parallel with the transport direction while spraying the paint, and the fifth to eighth turning parts Ta0 stop the spraying of the paint. To move downward in the direction perpendicular to the transport direction. Like the first and third folded portions TaO, the fifth and seventh folded portions TaO are sequentially located at intervals ⁇ L from the front side to the rear side in the transport direction. Are shifted (see Fig. 2).
  • the sprayer 8 Reaches the end position of Ta.
  • the sprayer 8 temporarily stops spraying the paint, and moves to the next coating area C Ac. It moves toward the start position Tcs of the painting locus Tc to be placed.
  • the sprayer 8 jumps over the coating area CAb adjacent to the coating area CAa and moves toward the coating area CAc located behind the coating area CAb in the transport direction.
  • the second coating process will be described with reference to FIGS. 2 and 4.
  • the panel 11 when the panel 11 is transported using the conveyor device 3, the panel 11
  • the coating area CAc located on the rear side of the intermediate part in the transport direction of the coating surface is located near the sprayer 8 (the right sprayer 8 in FIG. 1) where the coating of the coating area CAa has been completed. .
  • the control device 10 uses the lopot device 6 located on the rear side in the transport direction in the same manner as the coating area CAa, and locates the control device 10 on the rear side of the intermediate portion in the transport direction on the painted surface of the panel 11. Start painting for all painting areas CAc.
  • the sprayer 8 sets the start position T cs of the painting trajectory T c as the start position T cs of the upper side of the panel 11 near the end of the first parallel moving portion T bl in FIG. Move toward the center of the direction to start spraying paint.
  • the sprayer 8 moves the upper end of the panel 11 along the first (first) parallel moving portion Tc1 from the front side to the rear side in the transport direction (in the transport direction) while continuing to spray the paint. And the opposite direction).
  • the sprayer 8 operates the panel 1 for a predetermined distance.
  • the sprayer 8 is disposed near the start end of the parallel moving portion Tdl, so that the spraying of the paint is temporarily stopped, and the sprayer 8 is directed downward to the panel 11 along the first folded portion Tc0.
  • the sprayer 8 When reaching the end m of the first folded portion ⁇ cO, the sprayer 8 resumes spraying the paint, and moves from the rear side in the transport direction to the front side (in the transport direction) along the second translation portion T c 2. The sprayer 8 gradually moves toward the lower side of the panel 11 while repeating forward and backward movements in the transport direction as if moving in the forward direction.
  • Notogi is located on the border side of the painting area C A c C A d
  • the positions of the four folded portions ⁇ cO are sequentially shifted from the front side to the rear side in the transport direction. Further, the four folded portions T cO located on the boundary side of the coating area C Ab C Ac are also sequentially shifted from the side in the transport direction toward.
  • the boundary side of the paint areas CA c and CA d is formed in a step-like manner, and the boundary side of the paint area CA b CA c is also formed in a step-like manner.
  • c has a substantially parallelogram shape as a whole.
  • the third coating process will be described with reference to FIGS. 2 and 5.
  • the panel 11 is moved by the conveyor device 3 using the sprayer on the front side (downstream side) in the transport direction.
  • the control unit 10 uses the robot unit 7 on the front side and the sprayer 9 (the sprayer 9 on the left side in FIG. 1) to control the middle of the painted surface of the panel 11 in the transport direction.
  • Coating on the front side painting area CA b starts.
  • the sprayer 9 moves to the vicinity of the end of the translation part T al as the start position T bs of the painting trajectory T b. Start spraying paint.
  • the sprayer 9 forms the spray pattern P and moves the upper side of the panel 11 along the first parallel moving portion Tb1 in the transport direction while the spraying of the paint is continued. Move from the front side to the rear side (opposite to the transport direction).
  • the parallel moving section TM is arranged substantially linearly with respect to the parallel moving section Tal, and is arranged substantially linearly with respect to the parallel moving section Tel.
  • the sprayer 9 moves the panel 1 by a predetermined distance.
  • sprayer 9 moves downward, for example, by the same distance dimension as first turned-up portion TaO with respect to translation portion TM, and reaches the end of first turned-up portion TbO. Therefore, the sprayer 9 resumes spraying the paint, and moves from the rear side in the transport direction to the front side (forward direction in the transport direction) along the second parallel moving portion Tb2. As described above, the sprayer 9 gradually moves toward the lower side of the panel 11 while repeating reciprocation in the transport direction.
  • the four folded portions T bO are sequentially shifted by the distance dimension ⁇ L from the front side to the rear side in the transport direction.
  • the boundary of the coating area C Ab CA c in the coating trajectory Tb is formed in a step-like shape, and the coating area C The boundary side between A a and CA b is also formed in a step shape.
  • the paint locus Tb has a substantially parallelogram shape as a whole.
  • the parallel moving parts TM to Tb9 are arranged substantially linearly with respect to the parallel moving parts Tal to Ta9, and are arranged substantially linearly with respect to the parallel moving parts Tc1 to Tc9. I have.
  • the sprayer 9 moves in the reverse direction of the transport direction along the last parallel moving portion Tb9 on the lower end side of the panel 11. Then, since the sprayer 9 reaches the end position TM of the coating trajectory Tb, the sprayer 9 temporarily stops spraying the paint and starts the coating trajectory Td located in the next coating area CAd. Move towards position T ds. At this time, the sprayer 9 jumps over the coating area C Ac adjacent to the coating area C Ab and moves toward the coating area C Ad located behind the coating area C Ac in the transport direction.
  • the fourth coating step will be described with reference to FIGS.
  • the coating area CAd located on the rear end side in the transport direction of the coating surface of the panel 11 is coated.
  • the sprayer 9 is located near the sprayer 9 (the sprayer 9 on the left side in FIG. 1) where the coating of the area C Ab has been completed.
  • the control device 10 uses the lopot device 7 and the sprayer 9 located on the front side in the transport direction in the same manner as the coating area C Ab, and uses the lopot device 7 and the sprayer 9 to move the paint surface of the panel 11 to the rear end side in the transport direction. Start painting for the located painting area CA d.
  • the sprayer 9 moves to the vicinity of the end of the first parallel moving portion Tc1 on the upper side of the panel 11 as the start position Tds of the coating trajectory Td, and starts spraying the paint. I do.
  • the sprayer 9 conveys the upper end side of the panel 11 along the first (first) parallel moving portion Td1 while continuing to spray the paint.
  • the sprayer 9 moves the panel 1 for a predetermined distance.
  • the sprayer 9 is disposed on the left end side of the panel 11, so that the spraying of the paint is temporarily stopped and the sprayer 9 is stopped.
  • the sprayer 9 moves, for example,
  • the sprayer 9 When it moves downward by the same distance dimension as the turn-back part T aO of No. 1 and reaches the end of the first turn-around part TdO, the sprayer 9 resumes spraying the paint, and the second parallel moving part T d 2 The sprayer 9 returns to the lower side of the panel 11 while repeating forward and backward movements in the transport direction, as if moving along the transport direction from the rear side to the front side (forward direction in the transport direction).
  • the four folded portions T dO located on the boundary side of the coating areas C Ac and C Ad are sequentially displaced by the distance dimension ⁇ L from the front side to the rear side in the transport direction. (See Figure 2).
  • the boundary of the coating area C Ac C Ad in the coating trajectory T d is formed in a step shape.
  • the parallel moving portions TdlTd9 are arranged substantially linearly with respect to the parallel moving portions Tal to Ta9, TblTb9, and Tc1Tc9.
  • the sprayer 9 moves in the reverse direction of the transport direction along the last parallel moving portion T (19) on the lower end side of the panel 11. Since the end position Tdf of the locus Td is reached, the sprayer 9 stops spraying the paint, and finishes painting the panel 11.
  • the sprayer 9 on the front side (downstream side) in the transport direction starts the spraying operation on the coating area C Ab after the sprayer 8 on the rear side (upstream side) in the transport direction finishes the painting operation in the painting area CA a C Ac.
  • the configuration may be such that the painting operation is started.
  • the painting operation of the painting region C Ab may be started during the painting operation of the painting region C Ac. That is, if the two sprayers 89 do not interfere with each other, the two sprayers 8 and 9 may be configured to perform the painting operation at the same time.
  • the sprayer 89 while the sprayer 89 is reciprocated in a direction substantially parallel to the direction in which the panel 11 is conveyed, the folded portions T aO, T bO, T cO, T Since dO is painted while shifting its position sequentially from the front side to the rear side of panel 11 in the transport direction, compared to the case where the positions of the folded-back portions TaO, TbO, TcO, TdO are fixed.
  • the sprayable area of one sprayer 8, 9 can be substantially expanded.
  • each sprayer 8 in order to fix the positions of the reciprocating folded parts Ta0'TbO 'and TcO ⁇ dO without shifting, the range that can be painted at the start of painting is The range that can be painted at the end of painting is limited to the overlapping range. As a result, each sprayer 8
  • the reciprocating turning portions Ta0, TbO, TcO, and TdO of the sprayers 8, 9 are arranged in the transport direction of the panel 11 in the conveying direction. The position is shifted sequentially from the front side to the rear side. As a result, even if the panel 11 moves away from the sprayers 8 and 9, the range of the reciprocation gradually shifts to the rear side in the transport direction of the panel 11 as the sprayers 8 and 9 reciprocate. Will be done. As a result, the paintable range at the start of painting and the paintable range at the end of painting are not limited to the overlapping range, and the paintable range of the sprayers 8 and 9 can be substantially expanded.
  • each of the sprayers 8, 9 can paint up to a range close to the maximum stroke width Smax, so the coating area per sprayer 8, 9 can be increased to improve the coating handling capability. It can be.
  • the nebulizer 8 necessary for the coating apparatus 1 (the entire coating line) is used. 9 can be reduced, and the traveling distance (moving distance) of the tracking devices 4 and 5 can be reduced.
  • the transport speed of the panel 11 is relatively low, painting can be performed without using the tracking devices 4 and 5.
  • the initial cost such as the equipment cost of the coating apparatus 1 can be reduced, and the size of the coating booth 2 can be reduced, so that the air conditioning of the coating booth 2 and the maintenance of the sprayers 8 and 9 are performed. Costs can also be reduced.
  • the third folded portion TaO located between the parallel moving portions Ta3 and Ta4 of the painting trajectory Ta is the fifth parallel moving portion Ta5 extending beyond the folded portion TaO.
  • the second parallel moving portion Tb2 of the coating locus Tb is also disposed adjacent to the third turnover portion TaO, it is possible to perform coating along the second parallel moving portion Tb2. Then, the spray pattern P at that time overlaps the third turn-back portion Ta0.
  • the folded portions Ta0, TbO, Tc0, and TdO located at the boundaries between the two coating areas C Aa, C Ab, C Ac, and CA d are adjacent to the parallel moving portions T al to T a9, Tbl to Tb9, T el
  • FIG. 7 shows a first comparative example.
  • the folded portions TaO ', TbO', and TcO' ⁇ dO ' are arranged almost one position to the left and right of the panel 11 to paint the locus.
  • the folded portions TaO ', TbO', TcO ', and TdO' are painted areas CAa ',, CA b ', CA c',
  • FIG. 8 shows a second comparative example.
  • T dO is moved alternately in the left and right directions of panel 11 to form the paint trajectory ⁇ ”, Tb ”, Tc”, ⁇ ( ⁇ in a comb-like shape).
  • the folded portions TaO “, TbO", TcO ", and TdO” are formed in two rows at the boundary of the coating area CAa ", CAb", CAc ", CA (T Therefore, as shown by the dashed-dotted lines O 1 and O 2 in Fig. 8, the uneven color area is the boundary between the coating areas CA a ", C Ab ⁇ , CA c" and CA d ⁇ . It is likely to occur over two rows every time.
  • the folded portions TaO, Tb0, TcO, and TdO are distributed and arranged with respect to panel 11. It can reduce the color unevenness of the whole painted surface and improve the quality of the finished paint.
  • the sprayer moves from the front side of the panel 11 in the transport direction to the rear side (the reverse direction of the transport direction). Paint while moving 8 and 9.
  • a comparison is made when the last parallel moving section Ta9 is painted from the rear side in the transport direction to the front side (forward direction in the transport direction).
  • the coating is completed on the front side of the coating area C Aa in the transport direction. Therefore, it is necessary to jump over the painting area C Aa in order to move to the next painting area C Ac.
  • the distance between the end position T af of the paint trajectory Ta and the start position T cs of the paint trajectory T c is increased by the amount of jumping over the coating area C Aa.
  • the first translation In the sections T al T bl, T cl T dl and the last translation section Ta 9 T b9, T c9, T d 9, the transport direction li m?
  • the painting is performed while moving the spraying machine 8 9 in the opposite direction to the distance between the start position T as, T bs, T cs, T ds and the end position T af, T bf T cf, T df.
  • the interruption time of the coating can be shortened.
  • the parallel moving portions T aTa 9 T bl T b9, T c to T c9, and T dl T d 9 of the coating areas CA a, C Ab CA c CA d are adjacent to each other.
  • the parallel moving parts TalTa9, TblTb9, TclTc9, TdlTd9 can be connected continuously in a straight line from the force of painting in Figure 5. Therefore, when the entire painted surface of the panel 11 is a single painted area, the same paint finish quality as that of ⁇ can be obtained.
  • T bl Tb9, T cl T c9 T dl T d9 sprays paint from sprayers 8 and 9 and turns back Ta O TbO T cO and TdO to stop spraying from sprayers 8 and 9
  • the coating film of the folded portions TaO, TbO, TcO, and TdO is thinner than at the opening where paint spraying was continued even at the folded portions TaO, TbO, TcO, and TdO. can do.
  • the thickness of the coating film of the folded portions TaO, TbO, TcO, and TdO should be close to the thickness of the coating film of the parallel moving portions Tal to Ta9, TblTb9TclTc9TdtoTd9.
  • T a9 T b t T b9 T cl T c9, T dl Td9 It prevents color unevenness at the joints of the, and can improve the finish quality of the entire painted surface of the panel 11 consisting of the painting areas CAa, CAb, CAc, and CAd. .
  • FIG. 9 and FIG. 10 show a second embodiment of the present invention.
  • the feature of the present embodiment is that the position of the end of the parallel movement part on the outward path and the start of the parallel movement part on the return path are shifted from the front side toward the rear side in the transport direction.
  • the same components as those in the first embodiment described above are denoted by the same reference numerals, and the description thereof will be omitted.
  • two sets ft67, sprayers 8, 9 and the like which are substantially similar to those of the first embodiment, are used, and the sprayers 8, 9 are reciprocated in the transport direction. While painting, the painted surface of panel 11 is divided into painting areas CA a to CA d and painted.
  • the sprayer 8 located on the rear side in the transport direction paints the painting area C Aa and then paints the painting area C Ac.
  • the sprayer 9 located on the front side in the transport direction paints the painting area C Ad after painting the painting area C Ab.
  • the folded portions Ta0, TbO, TcO, and TdO located on the boundary side of the coating areas CAa to CAd are transported. Painting is performed while shifting the position sequentially from the front side to the rear side in the direction.
  • the end Ef of the parallel moving portion on the outward path side of each of the painting trajectories Ta to Td (for example, after the transfer direction of the parallel moving portion Ta5). End, parallel moving part Tb4 front end in the transport direction, etc.) and start of the parallel moving part on the return path side
  • the coating is performed by shifting the position from the front side to the rear side in the conveying direction. (See Figure 10).
  • the folded portions Ta0TbO and TcOTdO located on the boundary side of the coating area C Aa C Ad are formed obliquely downward while shifting the position in the direction opposite to the transport direction.
  • the second embodiment as described above includes substantially the same operational effects as those of the above-described first embodiment.
  • the paint locus T a in the second embodiment, the paint locus T a
  • the paint is shifted from the front end to the rear end in the transport direction at the end Ef of the parallel movement section on the outward path and the start end Es of the parallel movement section on the return path. For this reason, useless movement of the sprayers 8 and 9, which cancels the transfer of the panel 11, for example, can be eliminated in the reciprocating turn-back portions Ta 0 to T dO of the sprayers 89.
  • the paintable area of 8, 9 can be substantially expanded.
  • FIGS. 11 and 12 show a third embodiment of the present invention.
  • the feature of this embodiment lies in that the body of a vehicle is painted as an object to be coated.
  • the same reference numerals are given to the same components as those in the first embodiment in which BU Ji! I is applied, and the description thereof will be omitted.
  • (First, in the third embodiment, Operating device for sprayer Thus, a total of four mouth pot devices 6 and 7 used in the first embodiment are used, and these robot devices 6 and 7 are provided on both the left and right sides of the body 21 to be coated.
  • the rotary atomizing sprayers 8 and 9 attached to the port devices 6 and 7 respectively move in the transport direction of the vehicle body 21 (the vehicle body 21).
  • the folded portions Ta0 to TdO located on the boundary side of the coating areas CAa to CAd are arranged from the front side to the rear side in the transport direction. Paint while shifting the position.
  • the turn-back portions Ta0 to Td0 of the paint trajectories Ta to Td are, as much as possible, parts of the vehicle body 21 where parts are assembled after painting (for example, the position of a door knob). (The boundary between the door and the door). This reduces the visibility of color shading and enhances the practical quality of the finished paint.
  • the left side of the vehicle body 21 is painted.
  • the same coating method can be applied to the right side of the vehicle body 21, a ponnet, a roof, and the like.
  • the end of the parallel movement section on the outward path and the start of the parallel movement section on the return path are located at substantially the same position in the transport direction. It was decided to arrange and paint.
  • the present invention is not limited to this.
  • the start end of the parallel movement section on the return path is moved to the rear side in the transport direction compared to the end of the parallel movement section on the outward path. It is also possible to adopt a configuration in which the coating is performed by performing the coating.
  • the sprayers 8 and 9 are moved in the opposite direction of the transport direction to perform painting.
  • the sprayer may be used in the forward direction of the transport direction in one or both of the first parallel moving section Tal to Tdl and the last parallel moving section ⁇ a9 to Td9. It is also possible to apply the painting while moving 8,9.
  • the paint trajectories T a to T d are formed from the upper side of the panel 11 and the vehicle body 21 to the lower side. It is also possible to adopt a configuration in which the coating is performed in a state where the coating locus is formed toward.
  • the spraying of the paint is stopped at the folded portions TaO to TdO of the coating trajectories Ta to Td.
  • the spraying of the paint may be continued even at the turning part of the track. In this case 13 ⁇ On the border side between two adjacent coating areas, for example, the turning part of one coating area and the turning part of the other coating area And a predetermined interval is provided between them to prevent the coating film from becoming thick on the boundary side of the coating area.
  • the plate-like panel 11 and the vehicle body 21 of the vehicle are configured to be painted.
  • the painted surface is wide and the painted surface is divided into a plurality of painting regions.
  • the present invention can be applied to the body of a large vehicle such as a bus or a train.
  • the rotary atomizing type sprayers 8 and 9 are used.
  • a spray gun type sprayer may be used. May be used.

Landscapes

  • Spray Control Apparatus (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

コンベア装置(3)に沿って2台の噴霧機(8,9)を配置する。コンベア装置(3)で搬送されるパネル(11)の塗装面を4つの塗装領域(CAa~CAd)に区分する。また、各塗装領域(CAa~CAd)に対して噴霧機(8,9)を搬送方向に対して平行に往復動させて塗装する。このとき、塗装領域(CAa~CAd)の境界側では、噴霧機(8,9)の往復動の折返し部(Ta0~Td0)を搬送方向の前側から後側に位置ずれさせ、階段状の塗装軌跡(Ta~Td) を形成する。これにより、噴霧機(8,9)の1台当たりの塗装面積を広げることができる。

Description

塗装方法 技術分野
本発明は、 例えば自動車の車体、 家具、 電化製品等の 被塗物に対して噴霧機を用いて塗装を行う塗装方法に関 する。
背景技術
一般に、 自動車の車体、 家具、 電化製品等の比較的大 書
きな塗装面を有する被塗物に噴霧塗装を行う場合、 被塗 物の塗装面を複数の区画に分けて塗装を行う塗装方法が 知られている (例えば特開 2 0 0 3 — 1 4 4 9 9 0号公 報参照)。
そして のよフな従来技術では 自動車の車体の左 右両側に 2台の噴霧機をそれぞれ配置し、 車体の上面部 を左 , 右の 2 つの塗装領域に区分けして塗装する構成と している の場 α 2 台の噴霧機は 、 例えば白動車車 体のフ Π ン 卜 U ッ ド、 (ポンネッ 卜) よびル フに対し て 車体の搬送方向 (前 , 後方向) に往復動し つ各塗 装領域を塗装していた。
と ろで、 例えば大型の白動車等を塗装する場合には、 搬送方向に対して噴霧機の往復動の振幅 (ス 卜 ク ) よ り も大きな塗 .面を有するから 搬送方向に対しても 複数の塗装領域に区分けして塗装を行う必要がある の場 α 、 例えば車体の搬送速度が遅 比較的単位時間 当たり の塗装面積が小さいときには 、 複数の塗装領域を
1台の讓 を用いて塗装する とが可能となる。 しか し、 車体の搬送速度が速いときには、 単位時間当た り の 塗装面積が大きく なるか ら、 1 台の噴霧機を用いて全て の塗装領域を塗装する こ とがでさな < な 。 しの結果、 噴霧機の台数を増加して、 噴霧機の 1 台当たりの塗装負 担率を低減するか、 または ト ラ ッ千ング装置を用いて噴 霧機を車体に搬送に追従させて涂 ¾可能な範囲を広げて い /し
しかし、 噴霧機の台数の増加ゃ ト ラッキング装置の具 備は、 その導入や設置に伴うィ二シャルコス トが増加す るのに加え、 塗装ブースが大型化する力 ら、 塗装ブース の設備コス 卜や空調等のラン二ング ス ト も上昇する と いう問題があった。 発明の開示
本発明は上述した従来技術の問題に鑑みなされたもの で 、 不発明の目的は、 搬送中の被塗物に対して 、 噴霧機 の 1 台当たり の塗装面積を増加させ 、 塗装対応能力を高 めるこ とができる塗装方法を提供する し と に のる
上述した課題を解決するために、 本発明は、 被塗物を 一定の搬送方向に移動させる搬送手段と、 該搬送手段の 搬送方向に間隔をもって配置された複数の噴霧機とを備 え 、 被塗物の塗装面を複数の塗装領域に区分けし、 HIJ目 d 複数の塗装領域のうち互いに隣合う塗装領域をそれぞれ 異なる噴霧機を用いて塗装を行う涂装方法に適用される
( 1 ) . そして、 本発明が採用する構成の特徴は、 前 記各噴霧機は、 前記各塗装領域間で前記被塗物の搬送方 向とほぼ平行な方向に往復動しつつ塗装を行い、 前記各 噴霧機が前記被塗物の搬送方向とほぼ平行な方向に往復 動する間に、 隣合う塗装領域の境界側に位置する当該往 復動の折返し部を j 己被塗物の搬送方向の前側から後側 に向けて順次位置をずら し 、 当該折返し部の塗装軌跡を 階段状に形成しながら塗装を行う ことにある。
のよう に構成したこ とによ り 、 噴霧機の往復動の折 返し部の位置を搬送方向の前側から後側に向けてずらさ ずに固定した従来技術による塗装方法の場合に比ベて、
1 台の噴霧機の塗装可能な範囲を実質的に広げる とが できる。
即ち 、 被塗物の搬送に伴つて被塗物は噴霧機の正面位 置から次第に ざかるから 、 噴霧機が往復動を重ねるに つれて次第に塗装可能な範囲が被塗物の ち搬送方向の 後側にずれてしまい 塗衣開始時に塗装可能な範囲と塗 装終了時に塗装可能な範囲とが位置ずれしてしま ン のとき 、 従来技術による塗装方法のよう に 往復動の折 返し部の位置をずらさずに固定した 口 には 塗装開始 時に塗装可能な範囲と塗装終了時に塗装可能な範囲とが 重複する範囲に限られるか 、 暁 ft機の塗装可能な範囲 は狭く なる。
れに対し、 本発明では 、 隣合つ塗装領域では噴霧機 の往復動の折返し部を被塗物の搬送方向の前側から後側 に向けて順次その位置をずらす構成としたから、 被塗物 が噴霧機か ら次第に遠ざかつても噴霧機が往復動を重ね るにつれて 、 往復動の申 \ は次第に被塗物の搬送方向の 後側に iL置ずれする ことになる。 従つて 、 塗装開始時に 塗装可能な範囲と塗装終了時に塗装可能な範囲とが重複 する範囲に制限されず 、 噴霧機の塗装可能な範囲を実質 的に広げる こ とができる。 これによ り 、 噴霧機の 1 台当 た り の塗装面積を広げて塗装対応能力を高める ことがで きるから、 塗装ラィ ン全体に対して必要な噴霧機の台数 を減少させる こ とができ、 塗装ライ ンの設備費用 噴霧 機の整 fa費用等を低減する ことができる '
また 、 本発明では、 噴霧機の往復動の折返し部を搬送 方向の前側から後側に順次位置をずら し 、 当該折 し部 の塗装軌跡を階段状に形成しながら塗装を行うから 、 折 mし部を分散して配置する こ とができる 。 この結果 、 例 えば折返し部を往復動方向の同じ位 irf に配置した場合や 折返し部を往復動の両方向に交互に移動させた場 13 に比 ベて、 塗装面全体の色むらを緩和し、 塗装仕上がり ロロ質 を高める ことができる。
また、 本発明では、 前記噴霧機が往復動する ときの平行移動部のつち 刖記各塗装領域の塗装軌跡の 開始位置となる最初の平行移動部では 塗物の搬 方向の前側から後側に向けて噴霧機を移動i させつつ塗装 を行い、 前記各塗装領域の塗装軌跡の終了位置となる最 後の平行移動部でも前記被塗物の搬送方向の前側から後 側に向けて噴霧機を移動させつつ塗 3¾を行う ことが好ま しい。
このよう に構成したこ とによ り、 1 つの塗装領域の塗 装が終了した後に、 次なる塗装領域を塗装するときで 塗装終了後の塗装軌跡の終了位置と塗装開始前の塗 軌 跡の開始位置とを近付ける ことができる。 従って、 塗装 の中断時間を短縮する こ とができ、 1 台の噴霧機で塗装 可能な面積を増加させる ことができる
( 3 ) . また、 本発明では、 前記隣合う塗装領域では、 前記噴霧機が往復動する ときの平行移動部がほぼ直線状 に並ぶように塗装を行う ことが好ましい。
これによ り、 隣合う塗装領域では、 噴霧機が往復動す るときの平行移動部がほぼ直線状に並ぶよう に塗装を行 から、 一方の塗装領域を塗装したときの塗装軌跡と他 の塗装領域を塗装したときの塗装軌跡とを略直線状に 連続させる こ とができる。 このため、 塗装面全体を単一 の塗装領域とした場合と同様の塗装仕上がり品質を得る ことができる。
( 4 ) . また、 本発明では、 前記噴霧機が往復動する ときの往路側の平行移動部の終端と復路側の平行移動部 の始端とでは、 前記被塗物の搬送方向の前側から後側に 向けて位置をずら して塗装を行う構成としてもよい。
これによ り 、 噴霧機の往復動の折返し部において 機の無駄な移動を無くすことができ、 実用上の噴 機の 塗装可能な範囲を効率良く広げる ことができる。
( 5 ) . また、 本発明では、 前記噴霧機が往復 する ときの平行移動部では前記噴霧機から塗料を噴霧し 、 刖 記往復動の折返し部では前記噴霧機からの塗料の 停止しながら塗装を行う構成としてもよい。
れによ り、 折返し部でも塗料の噴霧を継続した場合 に比ベて、 折返し部の塗装膜を薄く する ことがでさる。 この結果、 折返し部の塗装膜の厚さを平行移動部の塗装 膜の厚さに近付ける こ とができるから、 隣合う 2 つの塗 装領域で塗装軌跡を繋ぎ合わせて色むらを防止で 、 2 つの塗装領域からなる塗装面全体の塗装仕上がり品質を 高める ことができる。 図面の簡単な説明
図 1 は、 本発明の第 1 の実施の形態に係る塗装方法に 用いられる塗装装置を示す斜視図である。
図 2 は、 図 1 中のパネルを塗装するときの回転霧化型 噴霧機の塗装軌跡を示す正面図である。 図 3 は、 図 2 中のパネルのう ち搬送方向の刖 顺側の塗 領域を塗装した状 を示す正面図である <
図 4 は 、 図 2 中のパネルのうち搬送方向の中間部後側 の塗壮領域を塗装した状態を示す図 3 に続 <正面図であ る
図 5 は、 図 2 中のパ
の塗装領域を塗装した
図 6 は、 図 2 中の ち搬送方向の後端側の塗 装領域を塗装した状態 5 に続く正面図である。
図 7 は、 第 1 の比較例による塗 方法を用いてパネル を塗装するときの噴霧機の塗お軌跡を示す正面図である 図 8 は、 第 2 の比較例による塗お方法を用いてパネル を塗装するとさの噴霧機の塗装軌跡を示す正面図である 図 9 は、 第 2 の実施の形能による塗装方法を用いてパ ネルを塗装するときの回転 化型噴霧機の塗装軌跡を示 す正面図である
図 1 0 は、 図 9 中の a部の塗装軌跡を拡大して示す拡 大正面図である。
図 1 1 は、 第 3 の実施の形態 係る塗装方法に用い ら れる塗装装置を示す斜視図である。
図 1 2 は、 第 3 の実施の形態による塗装方法を用いて 車体の左側面を塗装する ときの回転霧化型噴霧機の塗装 軌跡を示す正面図である 発明を実施するための最良の形態
以下、 本発明の実施の形態による塗 Ικ方法に いて 添付図面に従 て詳細に説明する
まず、 図 1 ないし図 6 は本発明の第 1 の実施の形態を 示す。 第 1 の実施の形態では、 例えば比較的大きな家 a. 電化製品等の外面を構成するパネルに対し 口 ッ 卜装 置に取付けられた回転霧化型噴霧機によ り塗装を行う場 合を例に挙げて説明する。
図 1 において、 1 は塗装ブ ―ス 2 内に配き又&された塗装 装置を示している。 該塗装 置 1 は 後述のコ ンベァ装 置 3、 ロポッ ト装置 6 , 7 ゝ 回転霧化型噴霧機 8 9等 によって大略構成されている。
3 は塗装プ ―ス 2 内の天井側に設けられたコ ンベァ 置を示している 。 該コ ンベア装置 3 は 、 図 2等に示すよ に、 ノヽンガ 3 Aを用いて後述するパネル 1 1 を吊下げ る と共に、 この状態で パネル 1 1 を矢示 A方向 (図 2 中の左, 右方向 ) に所定の速度を ¾)つて搬送する fcので める。
4 5 は 3 ンベア装置 3 に平行に設けられた 2台の 卜 ラッキング装置を示してレ る。 該各 卜ラッキング装置 4
5 は、 コ ンペァ装置 3 の搬送方向の後側 (上流側) と前 側 (下流側) とに間隔をもって配置され、 コンベァ装置
3 の搬送方向と平行に伸長している そして、 各卜ラ V キング装置 4 , 5 は、 後述のロポッ 卜装置 6 7 を搬送 方向または反搬送方向に任意の速度で独立的に移動させ るよう になつている。 れによ り bラッキング装置 4
5 は、 コ ンペァ装置 3で搬送されるパネル 1 1 に対する 口ボッ ト装置 6 7 (噴霧機 8 9 ) の移動速度を調整 するものである
6 , 7 は噴霧機用動作装置を構成する多軸型の口ポ V 卜装置を示している。 該 Πホッ 卜装置 6 , 7 は コ ンベ ァ装置 3 の途中に位置して ト ラ ッキング装置 4 5上に それぞれ取付けられ、 Π ンベア装置 3 の側方に配設され ている。 また 2 台の Dポッ ト装置 6 , 7 は、 ンべァ 装置 3 の搬送方向 (矢示 A方向) に対して間隔をもつて 後側と前側とにそれぞれ配置され、 後述の回転霧化型噴 霧機 8 9 を移動して塗装作業を実行するものである。
そして、 ロボ V ト装置 6 は、 トラ ッキング装置 4上に 移動可能に設けられた基台 6 Aと、 該基台 6 A上に回転 可能かつ揺動可能に設けられた垂直アーム 6 B と、 該垂 直ァ ム 6 Bの先端に揺動可能に設けられた水平ァ —'ム
6 C と 、 該水平ァ —ム 6 Cの先端に設けられた手首 6 D とにより大略構成されている。 口ポッ 卜装置 7 も、 口ボ ッ 卜装置 6 とほぼ同様に、 基台 7 A、 垂直アーム 7 B 水平ァーム 7 C 手首 7 Dによって大略構成されている。
また 、 ロポッ 卜装置 6 , 7 は、 手首 6 D , 7 Dに回転 霧化型噴霧機 8 9 を支持している。 そして、 ロボッ 卜 装置 6 7 は、 ンベア装置 3 によって後述のパネル 1
1 が塗装 に搬送されてく る と、 垂直アーム 6 B 7
B 水平アーム 6 C , 7 C等を揺動させ、 最大ス ト U ク幅 S maxの範囲内で噴霧機 8 , 9 をパネル 1 1 に沿つ て搬送方向とほぼ平行に往復動させるものである
8 9 は 2 台のロポッ 卜装置 6 7 の手首 6 , 7 D にそれぞれ取付けられた回転霧化 噴霧機を示 ている。 該噴霧機 8 9 は、 先端側に高速で回転駆動さ る回転 霧化頭 8 A , 9 Aを有している。 そして、 噴霧 8 9 は、 塗料を回転霧化頭 8 A 9 Aに向け吐出す ことに よ り、 該回転霧化頭 8 A 9 Aの 心力の作用 より塗 料を微粒化し、 前方に配 されたパネル 1 1 に けて塗 料を噴霧するものである
また、 噴霧機 8 , 9 には 、 回転霧化頭 8 A 9 Αの外 周側の周囲に位置してシェ ピング Xァ噴出 Ρ (図示せ ず) が設けられている。 のシェ ―ピングェァ噴出口は、 回転霧化頭 8 A 9 A力 ら噴霧された噴霧塗料を取囲む よ 5 に後 カゝらシエ ーピングェァを吹付ける そして、 シエ ーピングェァは、 回転霧化頭 8 A , 9 Aから噴霧さ れた噴霧塗料が 心力によ り径方向に広がろ う とするの を抑え 所望の 寸法をもつた円形.状の噴霧 夕 ン P
(スプレーパ夕 ン) に整形するものである ,
1 0 はロポッ 卜装置 6 7 (噴霧機 8 9 ) に接続し て設けられた制御装置を示している。 該制御装置 1 0 は 例えば塗装ライ ンを制御する制御室等に配設されている し し し 制御装置 1 0 は、 卜ラ ッ千ング装置 4 5 π ッ 卜 6 7 、 噴霧機 8 9 、 エア制御弁 塗料制 御弁 (いずれも図示せず) 等の制御を行う プ Πグラムを もった ンピュ 夕等によ り構成されている そして、 制御装置 1 0 は 卜 ラツキング装置 4 , 5 および口不ッ ト装置 6 7 の動作 (噴霧機 8 , 9 の移動速度)、 噴霧 機 8 9 の塗料の吐出量、 シェ ピングエアの噴出圧力 等を制御している。
1 1 は被塗物となるパネルを示している。 該パネル 1
1 は、 例えばスチール製の家具 電化製品の外面板等を なす略四角形状の板体で、 コ ンベァ装置 3 に吊下げられ た状態で順次矢示 A方向に搬送される よ / 、 パネル 1
1 は、 搬送方向 (矢示 A方向) に対して例えば噴霧機 8
9 の最大ス ト ローク幅 S maxよ り も大きな長さ寸法 L 1を 有している (図 2参照) ( , そして、 パネル 1 1 の塗装面 は 、 例えば搬送方向の前側から後側に向けて 4つの塗装 領域 C A a C A dとに区分けされている。 各塗装領域 C
A a C A dのうち塗装領域 C A a C A cは 搬送方向後 側の噴霧機 8 によって塗装され、 塗装領域 C A b , C A d は 、 搬送方向前側の噴霧機 9 によって塗装されるもので ある。 このため、 一方の噴霧機 8が塗装する塗装領域 C A a, C Acと他方の噴霧機 9 が塗装する塗装領域 C Ab,
C A dとは、 搬送方向に向けて交互に並んで配置されて いる。
第 1 の実施の形態による塗装装置 1 は前述のよう に構 成されるが、 本実施の形態による塗装方法について、 パ ネル 1 1 を塗装する場合を例に挙げ、 図 2ないし図 6 を 参照して説明する。
なお、 図 2ないし図 6 において、 パネル 1 1 の塗装面 に左, 右方向 (矢示 A方向) に往復動するよう に描かれ た実線と点線 (破線) は、 パネル 1 1 の塗装面に対する 噴霧機 8 , 9 (回転霧化頭 8 A, 9 A) の塗装軌跡 T a, Tb, T c, T d (移動軌跡) を示している。 また、 塗装 軌跡 T a, T b, T c, Tdの実線は、 噴霧機 8, 9が左, 右方向に沿って平行に移動する平行移動部 T al〜 T a9, Tbl〜 Tb9, T cl〜 T c9, T d 1〜 T d9を示している。 塗 装軌跡 T a, T b, T c, T dの点線は、 噴霧機 8 , 9が折 返して移動する折返し部 T a0, T bO, T cO, TdOを示し ている。 さ らに、 噴霧機 8, 9 は、 例えば平行移動部 T al〜 T a9, Tbl〜 Tb9, T cl~ T c9, Tdl〜 Td9では塗 料を噴霧し 、 折返し部 T aO , Τ ¾0 , τ cO T dOでは 料 の噴霧を停止する構成とな ている。
まず 、 第 1 の塗装ェ ¾εに いて図 2 、 図 3 を用いて説 明する しの第 1 の塗装ェ程では 、 パネル 1 1がコ ンベ ァ装置 3 を用いて搬送されて <ると、 該パネル 1 1 は 、 搬送方向の上流側 (後側) に位置する噴霧機 8の近傍を 通過する このとさ、 制御 置 1 0 は 、 後側のロボ V 卜 装置 6 よび噴霧機 8 (図 1 中の右側の噴霧機 8 ) を用 いて、 パネル 1 1 の塗装面の Όち搬送方向の最前側に位 置する塗装領域 C A aに対する塗装を開始する。 このと さ 、 噴霧機 8 は、 図 3 に示すよう に、 塗装軌跡 T aの開 始位置 T a sと してパネル 1 1 のうち左上側の角隅に移動 して 、 塗料の噴霧を開始する。 これによ り 、 噴霧機 8 は 噴霧パターン Pを形成すると共に、 塗料の噴霧を継続し た状 、で第 1 の (最初の) 平行移動部 T a 1に沿ってパネ ル 1 1 の上端側を搬送方向の前側から後側 (搬送方向の 逆方向 ) に向けて移動する。
次に 、 噴霧機 8 が予め決められた距離だけパネル 1 1 の搬送方向の逆方向に平行移動して平行移動部 T alの終 端に到達する と、 噴霧機 8 は、 塗料の噴霧を一旦停止し 第 1 の折返し部 T aOに沿ってパネル 1 1 の下方向に向け て移動する。
そして、 噴霧機 8 は、 平行移動部 T a 1に対して噴霧パ 夕 ―ン Pの直径寸法よ り も小さい距離寸法だけ下方向に 移動し 、 折返し部 T aOの終端に到達する。 そこで、 噴霧 機 8 は 、 塗料の噴霧を再開して第 2 の平行移動部 T a2に 沿つて搬送方向の後側から前側 (搬送方向の順方向) に 向けて移動する。
そして、 噴霧機 8がパネル 1 1 の左端側に位置して平 行移動部 T a2の終端に到達する と、 噴霧機 8 は、 塗料の 噴霧を一旦停止し、 第 2 の折返し部 T aOに沿ってパネル
1 1 の下方向に向けて移動する。
次に 、 噴霧機 8 が第 2 の折返し部 T aOの終端に到達す ると 、 噴霧機 8 は、 塗料の噴霧を再開し、 第 3 の平行移 動部 T a3に沿って搬送方向の逆方向に向けて移動する。 そして 、 平行移動部 T a3の終端に到達する と、 噴霧機 8 は 、 第 1 の折返し部 T aOと同様に、 塗料の噴霧を一旦停 止して 、 第 3 の折返し部 T aOに沿ってパネル 1 1 の下方 向に向けて移動する。
このとき、 平行移動部 T a3, T a4間を接続する第 3 の 折返し部 T aOは、 平行移動部 T al, T a2間を接続する第 1 の折返し部 T aOと同様に 2つの塗装領域 C Aa, C Ab の境界付近に配置されている。 しかし、 第 3 の折返し部 T aOは、 第 1 の折返し部 T aOよ り も搬送方向 (矢示 A方 向) の後側に位置して、 これら 2 つの折返し部 TaOは搬 送方向に対して間隔寸法△ Lだけ互いに離間 している
(図 2参照)。
そして、 第 1 の折返し部 T aOと同様に、 噴霧機 8 は、 平行移動部 T a3に対して例えば第 1 の折返し部 T aOと同 じ距離寸法だけ下方向に移動し、 第 3 の折 し部 T aOの 終端に到達する。 そこで、 噴霧機 8 は 、 塗料の噴霧を再 開して第 4の平行移動部 T a4に沿 て搬送方向の順方向 に向けて移動する。
このよう に、 噴霧機 8 は 、 平行移動部 τ a 1から平行移 動部 Ta4までの塗装動作と同様に 、 以降の 装動作を繰 返す。 即ち、 第 5 〜第 9 の平行移動部 T a5 〜 T a9では 、 塗料の噴霧を行いつつ搬送方向と平行に移動し、 第 5 〜 第 8 の折返し部 T a0では、 塗料の噴霧を停止して搬送方 向と直交した下方向に移動する。 のとさ 、 第 5、 第 7 の折返し部 T aOは、 第 1 、 第 3 の折 し部 T aOと同様に、 搬送方向の前側から後側に向けて間隔寸法 Δ L をち て 順次位置がずれている (図 2参照)。
そして、 図 3 に示すよう に、 噴霧機 8 がパネル 1 1 の 下端側で最後の平行移動部 T a9に沿って搬送方向の逆方 向に移動する と、 噴霧機 8 は、 塗装軌跡 T aの終了位置 T a Πこ到達する。 この終了位置 T a ίでは、 噴霧機 8 は、 塗料の噴霧を一旦停止し、 次なる塗装領域 C Ac内に位 置する塗装軌跡 T cの開始位置 T c sに向けて移動する。 このとき、 噴霧機 8 は、 塗装領域 C A aと隣合う塗装領 域 C A bを飛び越して、 塗装領域 C A bよ り も搬送方向の 後側に位置する塗装領域 C A cに向けて移動する。
次に 、 第 2 の塗装工程について、 図 2 、 図 4 を用いて 明する この第 2 の塗装工程では、 パネル 1 1 がコ ン ベァ装置 3 を用いて搬送される と、 パネル 1 1 の塗装面 のう ち搬送方向の中間部後側に位置する塗装領域 C A c が 、 塗装領域 C A aの塗装が終了した噴霧機 8 (図 1 中 の右側の噴霧機 8 ) の近傍に配置される。
このため 、 制御装置 1 0 は、 塗装領域 C A aと同様に 搬送方向の後側に位置するロポッ ト装置 6 を用いて 、 パ ネル 1 1 の塗装面のうち搬送方向の中間部後側に位置す る塗装領域 C A cに対する塗装を開始する。 このとさ、 噴霧機 8 は 、 塗装軌跡 T cの開始位置 T c sと して、 パネ ル 1 1 の上側うち第 1 の平行移動部 T b lの終端近傍とな る図 3 中の左, 右方向の中央側に移動して、 塗料の噴霧 を開始する 。 そして、 噴霧機 8 は、 塗料の噴霧を継続し た状態で第 1 の (最初の) 平行移動部 T c 1に沿ってパネ ル 1 1 の上端側を搬送方向の前側から後側 (搬送方向と 逆方向) に向けて移動する。
次に 、 噴霧機 8 は、 予め決め られた距離だけパネル 1
1 の搬送方向の逆方向に平行移動して平行移動部 T c 1の 終端に到達する 。 そこで、 噴霧機 8 は、 平行移動部 T d l の始端近傍に配置されるから、 塗料の噴霧を一旦停止し て、 第 1 の折返し部 T c 0に沿ってパネル 1 1 の下方向に 向けて移動する
そして 、 噴霧機 8 が平行移動部 T c 1に対して例えば第
1 の折 し部 τ a0と同じ距離寸法だけ下方向に移動して 第 1 の折返し部 τ cOの終 mに到達する と、 噴霧機 8 は 塗料の噴霧を再開し、 第 2 の平行移動部 T c 2に沿つて搬 送方向の後側から前側 (搬送方向の順方向) に向けて移 動する のよう に、 噴霧機 8 は、 搬送方向に対する往 復動を繰返しながらパネル 1 1 の下側に向けて徐々に移 動する 。
のとぎ 、 塗装領域 C A c C A dの境界側に位置する
4回の折返し部 τ cOは、 搬送方向の前側から後側に向け て順次位置がずれる。 また 、 塗装領域 C Ab C A cの 界側に位置する 4回の折返し部 T cOも、 搬送方向の刖側 から に向けて順次位 がずれている。 これによ り 塗装軌跡 T cのう ち塗装領域 C A c , C A dの境界側は階 段状に形成される と共に、 塗装領域 C A b C A cの境界 側も階段状に形成され、 塗装軌跡 T cは全体と して略平 行四辺形状をなしている。
そして 図 4 に示すよう に、 噴霧機 8 がパネル 1 1 の 下端側で最後の平行移動部 T c9に沿って搬送方向の逆方 向に移動する と 、 噴霧機 8 は、 塗装軌跡 T cの終了位置
T cfに到達する 。 そこで、 噴霧機 8 は、 塗料の噴霧を停 止して パネル 1 1 に対する塗装を終了する。
次に 第 3 の塗装工程に いて、 図 2 、 図 5 を用いて 説明する この第 3 の塗装工程では、 パネル 1 1 がコ ン ベア装置 3 を用いて搬送方向前側 (下流側) の噴霧機 9 の近傍に移動すると、 制御装置 1 0 は、 前側のロボッ ト 装置 7 および噴霧機 9 (図 1 中の左側の噴霧機 9 ) を用 いて、 パネル 1 1 の塗装面のうち搬送方向の中間部前側 の塗装領域 C A bに対する塗装を開始する。 このとき、 噴霧機 9 は 、 図 2 、 図 5 に示すよう に、 塗装軌跡 T bの 開始位置 T bsとして平行移動部 T alの終端近傍に移動し て 塗料の噴霧を開始する。 これによ り 、 噴霧機 9 は 噴霧パ夕 —ン Pを形成すると共に 、 塗料の噴霧を継続し た状態で第 1 の平行移動部 T b 1に沿つてパネル 1 1 の上 側を搬送方向の前側から後側 (搬送方向の逆方向) に 向けて移動する 。 このとき、 平行移動部 TMは、 平行移 動部 T alに対して略直線状に配置される と共に、 平行移 動部 Telに対して略直線状に配置されている。
次に、 噴霧機 9 は、 予め決められた距離だけパネル 1
1 の搬送方向の逆方向に平行移動して平行移動部 T Mの 終端に到達する 。 そこで、 噴霧機 9 は、 平行移動部 T cl の始端近傍に配置されるから、 塗料の噴霧を一旦停止し て 第 1 の折返し部 T bOに沿ってパネル 1 1 の下方向に 向けて移動する
そして 、 噴霧機 9 は、 平行移動部 T Mに対して例えば 第 1 の折返し部 T aOと同じ距離寸法だけ下方向に移動し て第 1 の折返し部 TbOの終端に到達する。 そこで、 噴霧 機 9 は、 塗料の噴霧を再開し、 第 2 の平行移動部 Tb2に 沿って搬送方向の後側から前側 (搬送方向の順方向) に 向けて移動する。 このよう に、 噴霧機 9 は、 搬送方向に 対する往復動を繰返しながらパネル 1 1 の下側に向けて 徐々に移動する。
のとき、 塗装領域 C A b, C A cの境界側に位置する
4回の折返し部 T bOは 、 搬送方向の前側から後側に向け て間隔寸法 Δ Lだけ順次位置がずれる よ / 塗装領域
C A a, C A bの境界側に位置する 4回の折返し部 T b0¾ 搬送方向の前側から後側に向けて間隔寸法 Δ Lだけ順次 位置がずれている (図 2参照)。
これによ り、 塗装軌跡 Tbのうち塗装領域 C Ab C A cの境界側は、 階段状に形成される と共に、 塗装領域 C A a, C A bの境界側も、 階段状に形成される。 そして、 塗装軌跡 Tbは、 全体と して略平行四辺形状をなしてい る。 また、 平行移動部 TM〜 Tb9は、 平行移動部 T al〜 T a9に対して略直線状に配置される と共に、 平行移動部 T c 1〜 T c 9に対して略直線状に配置されている。
そして、 図 5 に示すよう に、 噴霧機 9は、 パネル 1 1 の下端側で最後の平行移動部 T b9に沿って搬送方向の逆 方向に移動する。 そこで、 噴霧機 9が塗装軌跡 T bの終 了位置 TMに到達するから、 噴霧機 9 は、 塗料の噴霧を 一旦停止して、 次なる塗装領域 C Ad内に位置する塗装 軌跡 T dの開始位置 T dsに向けて移動する。 このとき、 噴霧機 9は、 塗装領域 C Abと隣合う塗装領域 C Acを飛 び越して、 塗装領域 C Acよ り も搬送方向の後側に位置 する塗装領域 C Adに向けて移動する。
次に、 第 4の塗装工程について、 図 2、 図 6 を用いて 説明する。 この第 4の塗装工程では、 パネル 1 1がコ ン ベア装置 3 を用いて搬送される と、 パネル 1 1 の塗装面 のう ち搬送方向の後端側に位置する塗装領域 C A dが、 塗装領域 C Abの塗装が終了した噴霧機 9 (図 1 中の左 側の噴霧機 9 ) の近傍に配置される。
このため、 制御装置 1 0 は、 塗装領域 C Abと同様に 搬送方向の前側に位置するロポッ ト装置 7および噴霧機 9 を用いて、 パネル 1 1 の塗装面のうち搬送方向の後端 側に位置する塗装領域 C A dに対する塗装を開始する。 このとき、 噴霧機 9 は、 塗装軌跡 T dの開始位置 T dsと して、 パネル 1 1 の上側うち第 1 の平行移動部 T c 1の終 端近傍に移動して、 塗料の噴霧を開始する。 そして、 噴 霧機 9 は、 塗料の噴霧を継続した状態で第 1 の (最初 の) 平行移動部 T d 1に沿ってパネル 1 1 の上端側を搬送 05009840
方向の前側から後側 (搬送方向と逆方向) に向けて移動 する。 のとき、 平行移動部 Tdlは、 平行移動部 T al
T bl, T clに対して略直線状に配置されている。
次に 噴霧機 9は、 予め決め られた距離だけパネル 1
1 の搬送方向の逆方向に平行移動して平行移動部 T dlの 終端に到達する。 そこで、 噴霧機 9 は、 パネル 1 1 の左 端側に配置されるから、 塗料の噴霧を一旦停止して 第
1 の折 し部 T dOに沿ってパネル 1 1 の下方向に向けて 移動する
そして 噴霧機 9が平行移動部 T dlに対して例えば第
1 の折返し部 T aOと同じ距離寸法だけ下方向に移動して 第 1 の折返し部 TdOの終端に到達すると、 噴霧機 9 は 塗料の噴霧を再開し、 第 2の平行移動部 T d 2に沿つて搬 送方向の後側から前側 (搬送方向の順方向) に向けて移 動する のよう に、 噴霧機 9 は、 搬送方向に対する往 復動を 返しながらパネル 1 1 の下側に向けて徐々 に移 動する のとき、 塗装領域 C Ac, C Adの境界側に位 置する 4回の折返し部 T dOは、 搬送方向の前側から後側 に向けて間隔寸法 Δ Lだけ順次位置がずれている (図 2 参照)。
これによ り、 塗装軌跡 T dのうち塗装領域 C Ac C A dの境界側は、 階段状に形成されている。 また、 平行移 動部 T dl T d9は、 平行移動部 T al~ T a9, Tbl Tb9, T c 1 T c 9に対して略直線状に配置されている。
最終的に、 図 6 に示すよう に、 噴霧機 9は、 パネル 1 1 の下端側で最後の平行移動部 T (19に沿って搬送方向の 逆方向に移動する。 そこで、 噴霧機 9が塗装軌跡 T dの 終了位置 T dfに到達するから、 噴霧機 9 は、 塗料の噴霧 を停止して、 パネル 1 1 に対する塗装を終了する。 なお、 搬送方向前側 (下流側) の噴霧機 9 は、 搬送方 向後側 (上流側) の噴霧機 8が塗装領域 C A a C Acの 塗装作業を終了した後に、 塗装領域 C Abの塗装作業を 開始する構成と してもよ く 、 例えば塗装領域 C Acの塗 装作業の途中に、 塗装領域 C Abの塗装作業を開始する 構成としてもよい。 即ち、 2台の噴霧機 8 9が干渉し ない状 であれば、 2台の噴霧機 8 , 9 が同時に塗装作 業を行う構成としてもよい。
か <して、 第 1 の実施の形態によれば、 噴霧機 8 9 をパネル 1 1 の搬送方向とほぼ平行な方向に往復動させ る間に 折返し部 T aO, T bO, T cO, T dOをパネル 1 1 の搬送方向の前側から後側に向けて順次位置をずら しつ つ塗装を行うから、 折返し部 T aO, T bO, T cO, T dOの 位置を固定した場合に比べて、 1 台の噴霧機 8 , 9 の塗 可能な範囲を実質的に広げることができる。
即ち、 パネル 1 1 の搬送に伴ってパネル 1 1 は噴霧機 8 , 9 の正面位置から次第に遠ざかるから、 噴霧機 8 , 9 が往復動を重ねるにつれて次第に塗装可能な範囲がパ ネル 1 1 のうち搬送方向の後側にずれてしまう。 従って、 各塗装領域 C A a C A dの塗装開始時に塗装可能な範囲 と塗装終了時に塗装可能な範囲とが位置ずれしてしまう 。 そ で、 図 7 のよう に、 折返し部の位置をずらさない 場合について比較してみる。 図 7 に示す第 1 の比較例の よう に 、 往復動の折返し部 T a0' T bO ' , T cO τ dO の位置をずらさずに固定するためには、 塗装開始時 に塗 可能な範囲と塗装終了時に塗装可能な範囲とが重 複する範囲に限られる。 この 果 、 それぞれの噴霧機 8
9 で塗装可能な範囲は最大ス ト ローク幅 S maxよ り も狭 い範囲に限定され、 噴霧機 8 , 9 の塗装可能な範囲は狭 く なる。
これに対し、 本実施の形態では、 隣合う塗装領域 C A a〜 C Adでは噴霧機 8, 9 の往復動の折返し部 T a0, T bO, T cO, T dOをパネル 1 1 の搬送方向の前側から後側 に向けて順次その位置をずらす構成としている。 これに よ り、 パネル 1 1 が噴霧機 8 , 9 から次第に遠ざかって も噴霧機 8, 9 が往復動を重ねるにつれて、 往復動の範 囲は次第にパネル 1 1 の搬送方向の後側に位置ずれする ことになる。 この結果、 塗装開始時に塗装可能な範囲と 塗装終了時に塗装可能な範囲とが重複する範囲に制限さ れず、 噴.霧機 8, 9 の塗装可能な範囲を実質的に広げる ことができる。
このため、 それぞれの噴霧機 8 , 9 は最大ス トローク 幅 S maxに近い範囲まで塗装可能となるか ら、 噴霧機 8 , 9 の 1 台当た り の塗装面積を広げて塗装対応能力を高め る ことができる。 これによ り、 例えばパネル 1 1 の搬送 速度が上昇して単位時間当たり の塗装面積が増加した場 合であっても、 塗装装置 1 (塗装ライ ン全体) に対して 必要な噴霧機 8, 9 の台数を減少させる こ とができる と 共に、 トラッキング装置 4 , 5 の走行距離 (移動距離) を短縮する ことができる。
また、 パネル 1 1 の搬送速度が比較的遅い場合には、 トラッキング装置 4, 5 を用いないで塗装する こ とがで きる。 この結果、 塗装装置 1 の設備費用等のイニシャル コス トを低減できるのに加え、 塗装ブース 2 を小型化す る ことができるから、 塗装ブース 2 の空調、 噴霧機 8 , 9 の整備等に伴う ランニングコス ト も低減する こ とがで きる。
また、 噴霧機 8 , 9 の往復動の折返し部 T a0, T bO, T cO t T dOを搬送方向と逆向きの一定方向に順次位置を ずら し 、 当該折返し部 T aO, T b0, T cO, T dOの塗装軌 跡 T a, T b, T c, T dを階段状に形成している。 このた め 、 例えば塗装軌跡 T aのう ち平行移動部 T a3, T a4間 に位置する第 3の折返し部 T aOは、 該折返し部 T aOを越 えて延びる第 5の平行移動部 T a5に隣接して配置される のとき、 平行移動部 T a5に沿って塗装を行う と、 その とさの噴霧パターン Pが第 3 の折返し部 T a0にも重なり o
また 、 塗装軌跡 Tbのう ち第 2 の平行移動部 T b2も、 第 3 の折返し部 T aOに隣接して配置されるから、 第 2 の 平行移動部 Tb2に沿って塗装を行う ときにも、 そのとき の噴霧パターン Pが第 3の折返し部 T a0に重なり合う。
様に、 2つの塗装領域 C Aa, C Ab, C Ac, C A d の 界部分に位置する折返し部 T a0, TbO, Tc0, T dO は 、 隣接する平行移動部 T al〜 T a9, Tbl〜Tb9, T el
T c9 , T dl〜T d9を塗装する ときの噴霧パターン Pが 重なるから、 平行移動部 T al〜T a9, TM〜Tb9, T el τ c9 , T dl〜T d9の塗装を行う ときに、 この塗装に伴 う噴霧パターン Pを折返し部 T a0, TbO, TcO, TdOに 重ね合わせることができる。
この結果、 折返し部 T a0, T b0ラ T cO , TdOに対する 噴霧パターン Pの塗り重ね回数 、 塗お膜の厚さ等を他の 部位 (平行移動部 T al~ T a9 T bl 〜 T b9, T cl〜 T c9
Tdl〜T d9) に近付ける ことがでさ 、 折返し部 T aO, T b0, T cO, TdOの色むらを緩和して塗装仕上がり性を向 上する ことができる。
そこで、 この塗装仕上がり性について 、 本実施の形態 の場合と図 7、 図 8 に示す第 1 第 2の比較例の場合と を比較する。
まず、 図 7 は第 1 の比較例を示している 。 この第 1 の 比較例の場合 、 例えば折返し部 T aO' , T bO' , T cO ' τ dO' をパネル 1 1 の左, 右方向に対してほほ 1司し 1 置 に配置して塗装軌跡 T a' , T b' , T c ' , T d' を形成 している しの場合では、 折返し部 T aO' , T bO' , T cO ' , T dO' が塗装領域 C A a ' , , C A b ' , C A c ' ,
C A d' の境界部分に 1 列状に並んで集中的に配置され る。 このため、 図 7 中に一点鎖線〇で示すよう に、 色む ら部分が、 塗装領域 C A a' , C A b ' , C A c ' , C A d ' の境界毎に 1 列に亘つて生じる傾向がある。
一方 、 図 8 は第 2 の比較例を示している。 この第 2 の 比較例の場合 、 例えば折返し部 T a0〃 , T b0〃 Τ cO
T dO" をパネル 1 1 の左, 右方向に対して交互に移動さ せて塗装軌跡 Τ Ά" , T b" , T c" , Τ (Γ を櫛歯状 (ン グザグ状) に形成している。 この場合では、 折返し部 T aO" , T bO" , T cO" , T dO" が塗装領域 C A a" , C A b" , C A c " , C A (T の境界部分に 2 列状に並んで 配置される。 このため、 図 8 中に一点鎖線 O 1, O 2で示 すように、 色むら部分が、 塗装領域 C A a" , C Ab〃 , C A c" , C A d〃 の境界毎に 2列に亘つて生じ易い。
これに対し、 第 1 の実施の形態では、 塗装軌跡 T a,
T b, T c, T dを階段状に形成したか ら、 折返し部 T aO,
T bO, T cO, T dOの位置を一定方向にずらすことがでぎ る し の結果 、 折返し部 T aO, T b0, T cO, T dOをパネ ル 1 1 に対して分散して配置する ことができ、 塗装面全 体の色むらを緩和し、 塗装仕上がり品質を高める ことが でさる。
また、 塗装軌跡 T a, T b, T c, T dの開始位置 T as T bs, T cs, T dsとなる最初の平行移動部 T al, TM T el, T d 1では、 パネル 1 1 の搬送方向の前側から後側 (搬送方向の逆方向) に向けて噴霧機 8 , 9 を移動させ つつ塗装を行う。 一方、 終了位置 T af, Tbf, T cf, T df となる最後の平行移動部 T a9 Tb9, T c9, Td9でも、 パネル 1 1 の搬送方向の前側から後側 (搬送方向の逆方 向) に向けて噴霧機 8 9 を移動させつつ塗装を行う構 成としている。 このため、 例えば塗装領域 C Aaの塗装 が終了した後に、 次なる塗装領域 C Acを塗装する とき でも 塗装終了後の塗装軌跡 T aの終了位置 T af と塗装 開始刖の塗装軌跡 T cの開始位置 T c sとを近付ける こ と がで含る
で、 例えば最後の平行移動部 T a9を搬送方向の後 側から前側 (搬送方向の順方向) に塗装した場合につい て比較する 。 この場合には、 塗装領域 C Aaのう ち搬送 方向の前側で塗装が終了する ことになる。 このため、 次 なる塗装領域 C Acに移動するために塗装領域 C Aaを飛 び越える必要がある。 この結果、 塗装領域 C Aaを飛び 越える分だけ塗装軌跡 T aの終了位置 T af と塗装軌跡 T c の開始位置 T c sとの距離が離れる ことになる。
一方、 最初の平行移動部 Telを搬送方向の順方向に塗 装した場合について比較する。 この場合には、 塗装領域 C Aaから塗装領域 C Acに移動するために塗装領域 C A cを飛び越える必要がある。 このため、 この場合にも、 塗装領域 C Acを飛び越える分だけ塗装軌跡 T aの終了位 置 T aiと塗装軌跡 T cの開始位置 T csとの距離が離れる ことになり、 塗装の中断時間が長く な り、 塗装効率が低 下する。
これに対し、 第 1 の実施の形態では、 最初の平行移動 部 T al T bl, T cl T dlと最後の平行移動部 T a9 T b9, T c9 , T d 9とでは、 いずれもパネル 1 1 の搬送方向 li m?
の逆方向に向けて噴霧機 8 9 を移動させつつ塗装を行 ラカゝら、 開始位置 T as, T bs, T cs, T dsと終了位置 T af , T bf T cf , T df との距離を短縮する とがでさる この結果 、 塗装の中断時間を短縮する ことができるから、
1 台の噴霧機 8 , 9で塗装可能な面積を増加させる と ができ、 塗装効率を高める ことができる ,
また、 本実施の形態では 、 互いに隣合 Ό塗装領域 C A a, C Ab C A c C A dの平行移動部 T al T a9 T bl T b9 , T cト T c9 , T dl T d 9がほぼ直線状に並ぶよ
5に塗装を行う力 ら 平行移動部 T al T a9, T bl T b9, T cl T c9 T dl T d9を直線状に繋げて連続させ る ことができる。 このため 、 パネル 1 1 の塗装面全体を 単一の塗装領域と した場 α と同様の塗装仕上がり 品質を とができる。
さ ら に、 本実施の形態では、 平行移動部 T al T a9
T bl Tb9, T cl T c9 T dl T d9では噴霧機 8 , 9 から塗料を噴霧し、 折返し部 T aO TbO T cO, TdOで は噴霧機 8 , 9からの 料の噴霧を停止する構成と して いる このため、 折返し部 T aO, T bO, T cO, T dOでも 塗料の噴霧を継続した場口に比べて、 折返し部 T aO, T bO, T cO, T dOの塗装膜を薄くする こ とができる。 この 結果 折返し部 TaO , T bO TcO, T dOの塗装膜の厚さ を平行移動部 T al~ T a9 , T bl T b9 T cl T c9 T dト T d9の塗装膜の厚さ に近付ける ことができる。 これ によ り 、 隣合う塗装領域 C A a, C Ab, C A c C A dで は塗装軌跡 T a, T b T c, T dのうち平行移動部 T al
T a9 T b卜 T b9 T cl T c9, T dl Td9を繋ぎ合わ せる こ とができ、 の繋ぎ合わせ部分で色むらを防止で さ、 塗装領域 C A a, C A b, C A c, C A dからなるパネ ル 1 1 の塗装面全体の塗装仕上がり品質を高める ことが できる。
次に、 図 9お び図 1 0 は本発明の第 2 の実施の形態
¾示している 本実施の形態の特徴は、 往路側の平行移 動部の終端と復路側の平行移動部の始端とでは 、 搬送方 向の前側カゝら後側に向けて位置をずら して塗装を行う こ とにめる なお 、 本実施の形態では 、 前述した第 1 の実 施の形態と同一の構成要素に同一の符号を付し 、 その説 明を省略するものとする。
そして、 第 2 の実施の形態では 、 第 1 の実施の形態と ほぼ同様な 2 台の ッ ト装 ft 6 7 、 噴霧機 8 , 9等 が用いられ、 噴霧機 8, 9 を搬送方向に往復動させなが らパネル 1 1 の塗装面を塗装領域 C A a〜 C A dに区分け して塗装する
また、 第 1 の実施の形態と同様に 、 搬送方向の後側に 位置する噴霧機 8 は、 塗装領域 C A aを塗装した後に、 塗装領域 C A cの塗装を行う。 一方、 搬送方向の前側に 位置する噴霧機 9 は、 塗装領域 C A bを塗装した後に、 塗装領域 C Adの塗装を行う ものである。
そして、 第 2 の実施の形態でも、 第 1 の実施の形態と 同様に、 塗装領域 C A a〜 C A dの境界側に位置する折返 し部 T a0, T bO, T cO, T dOは、 搬送方向の前側から後 側に向けて順次位置をずら して塗装を行っている。
しかし、 第 2 の実施の形態では、 第 1 の実施の形態と 異なり、 各塗装軌跡 T a〜 T dの往路側の平行移動部の終 端 E f (例えば平行移動部 T a5の搬送方向後端、 平行移 動部 T b4の搬送方向前端等) と復路側の平行移動部の始 端 E s (例えば平行移動部 T a6の搬送方向後端、 平行移 動部 Tb5の搬送方向前端等) とでは、 搬送方向の前側か ら後側に向けて位置をずら して塗装を行っている (図 1 0参照)。 これによ り 、 塗装領域 C Aa C Adの境界側 に位置する折返し部 T a0 TbO, T cO TdOは、 搬送方 向の逆方向に位置をずら しつつ斜め下方向に向けて形成 されている
かく して、 のよ な第 2 の実施の形態でも、 前述し た第 1 の実施の形態とほぼ同様の作用効果を得る こ とが で含る。 特に 第 2 の実施の形態では、 塗装軌跡 T a
T dのうち往路側の平行移動部の終端 E f と復路側の平行 移動部の始端 E sとでは搬送方向の前側か ら後側に向け て位置をずら して塗装する。 このため、 噴霧機 8 9 の 往復動の折返し部 T a0~ T dOにおいて例えばパネル 1 1 の搬送を打ち消すような噴霧機 8 , 9 の無駄な移動を くすこ とができ、 実用上の噴霧機 8 , 9 の塗装可能な範 囲を実質的に広げることができる。
また、 往路側と復路側とで平行移動部 T al T a9, τ
M T b9 T cl T c9 T dl T d9の端部 (始端 E s 終端 E f) の位置がずれるから、 平行移動部 T al~ T a9 Tbl Tb9 T cl~ T c9 Tdl Td9の端部で色むらが 生じるのを緩和する ことができ、 塗装仕上がり品質を高 めることがでさる。
次に 、 図 1 1 および図 1 2 は本発明の第 3の実施の形 を示し、 本実施の形態の特徵は、 被塗物として庙動車 の車体の塗装を行ったことにある。 なお、 本実施の形態 では、 BU Ji!iした第 1 の実施の形態と同一の構成要素に同 の符号を付し、 その説明を省略するものとする( まず 、 第 3 の実施の形態では、 噴霧機用動作装置と し て第 1 の実施の形態で使用 した口ポッ ト装置 6, 7が合 計 4台用いられ、 これらのロボッ ト装置 6 , 7 は、 被塗 物となる車体 2 1 の左, 右両側に 2台ずつ配置されてい る そして、 各口ポッ ト装置 6, 7 に取り付けられた回 転霧化型噴霧機 8, 9 は車体 2 1 の搬送方向 (車体 2 1
の刖 , 後方向) に往復動する構成としている。
こ こで、 例えば車体 2 1 の左側に配置した 2台のロボ ッ ト装置 6, 7が車体 2 1 の左側面を塗装するときには、 塗装面となる車体 2 1 の左側面を 4個の塗装領域 C Aa 〜 C A dに区分けする。 そして、 搬送方向の後側に位置 する口ポッ ト装置 6 (噴霧機 8 ) は、 第 1 の実施の形態 と同様に、 塗装領域 C Aaを塗装した後に、 塗装領域 C Acを塗装する。 一方、 搬送方向の前側に位置する ロボ ッ ト装置 7 (噴霧機 9 ) は、 塗装領域 C A bを塗装した 後に、 塗装領域 C Adを塗装するものである。
そして、 第 3の実施の形態でも、 第 1 の実施の形態と 同様に、 塗装領域 C A a~ C A dの境界側に位置する折返 し部 T a0~ T dOは、 搬送方向の前側から後側に位置をず ら しつつ塗装を行う。 また、 塗装軌跡 T a〜 T dの折返し 部 T a0〜 Td0は、 できるだけ車体 2 1 のうち塗装後に部 品が組みつけられる箇所 (例えばドアノ ブの位置) ゃ異 なる部品の境界部分 (例えばフェンダと ドアとの境界部 分) のよう に色むらが目立たない位置に配置している。 これによ り、 色むらの視認性を緩和し、 実用上の塗装仕 上がり品質を高めている。
かく して、 このよう に構成された第 3 の実施の形態で も、 前述した第 1 の実施の形態とほぼ同様の作用効果を 得る ことができる。
なお、 第 3 の実施の形態では、 車体 2 1 の左側面の塗 装方法についてのみ説明したが、 車体 2 1 の右側面、 ポ ンネッ ト、 ルーフ等にも同様の塗装方法が適用可能であ る。
また 、 第 3 の実施の形態では、 第 1 の実施の形態と同 様に 、 往路側の平行移動部の終端と復路側の平行移動部 の始顺とを搬送方向に対してほぼ同じ位置に配置して塗 装を行う ちのと した。 しかし、 本発明はこれに限らず、 例えば第 2 の実施の形態のよう に、 往路側の平行移動部 の終顺に比ベて復路側の平行移動部の始端を搬送方向の 後側に移動して塗装を行う構成と してもよい。
また 、 刖記第 1 , 第 2 の実施の形態では、 開始位置 T
&S〜 T dsとなる最初の平行移動部 T al〜 T dlと終了位置
T af ~ T d f となる最後の平行移動部 T a9〜 T d9では、 い ずれ 搬送方向の逆方向に向けて噴霧機 8 , 9 を移動さ せつ 塗装を行う構成とした。 しかし、 本発明はこれに 限らず 、 取初の平行移動部 T al〜 T dlと最後の平行移動 部 τ a9 〜 T d9とのうちいずれか一方または両方で搬送方 向の順方向に噴霧機 8, 9 を移動させた状態で塗装を行 う構成としてもよい。
また 、 刖記各実施の形態では、 塗装軌跡 T a〜 T dはパ ネル 1 1 、 車体 2 1 の上側から下側に向けて形成する も のとしたが 、 例えばパネル等の下側から上側に向けて塗 装軌跡を形成した状態で塗装を行う構成としてもよい。
また 、 HU記各実施の形態では、 塗装軌跡 T a〜 T dのう ち折返し部 T aO 〜 T dOでは塗料の噴霧を停止する構成と した o しかし、 本発明はこれに限らず、 例えば塗装軌跡 の折返し部でも塗料の噴霧を継続する構成としてもよレ この場 13 ゝ 隣合う 2つの塗装領域の境界側では、 例えば 一方の塗装領域の折返し部と他方の塗装領域の折返し部 との間に所定の間隔を設け、 塗装領域の境界側で塗装膜 が厚く なるのを防ぐ構成とするものである。
また、 前記各実施の形態では、 板状のパネル 1 1 、 自 動車の車体 2 1 を塗装する構成としたが、 塗装面が広く て塗装面を複数の塗装領域に区分するものであればよく 、 例えばバス、 列車等の大型車両の車体等にも適用可能で ある。
さ らに、 前記各実施の形態では、 回転霧化型噴霧機 8, 9 を用いる構成と したが、 スプレーガン型の噴霧機を用 いてもよく 、 静電塗装に限らず、 他の塗装装置を用いて もよい。

Claims

S冃 求 の 範 囲
1 . 被塗物を一定の搬送方向に移動させる搬送手段と 該搬送手段の搬送方向に間隔をもつて配置された複数 の噴霧機とを備え 、
被塗物の塗装面を複数の塗装領域に区分けし、
刖 eti te数の塗装領域のうち互いに隣合う塗装領域をそ れぞれ異なる噴霧機を用いて塗装を行う塗装方法におい て、
前記各噴霧機は、 前記各塗装領域間で前記被塗物の搬 送方向とほぼ平行な方向に往復動しつつ塗装を行い、
前記各噴霧機が前記被塗物の搬送方向とほぼ平行な方 向に往復動する間に、 隣合う塗装領域の境界側に位置す る当該往復動の折返し部を刖 Bid被塗物の搬送方向の前側 から後側に向けて順次位置をずら し 、 当該折返し部の塗 装軌跡を階段状に形成しながら塗装を行う こ とを特徴と する塗装方法。
2 . 前記噴霧機が往復動する とさの平行移動部のうち、 广- 刖記各塗装領域の塗装軌跡の開始位置となる最初の平行 移動部では前記被塗物の搬送方向の前側から後側に向け て噴霧機を移動させつつ塗装を行い、 mi s己各塗装領域の 塗装軌跡の終了位置となる最後の平行移動部でも 記被 塗物の搬送方向の前側から後側に向けて噴霧機を移動さ せつつ塗装を行う ことを特徴とす 求項 1 に記 の塗 装方法。
3 . 前記隣合う塗装領域では、 前記噴霧機が往復動す るときの平行移動部がほぼ直線状に並ぶように塗装を行 う ことを特徴とする請求項 1 に記載の塗装方法。
4 . 前記噴霧機が往復動するときの往路側の平行移動 部の終端と復路側の平行移動部の始端とでは、 前記被塗 物の搬送方向の前側から後側に向けて位置をずら して塗 装を行う ことを特徴とする請求項 1 に記載の塗装方法。
5 . 前記噴霧機が往復動する ときの平行移動部では前 記噴霧機から塗料を噴霧し、 前記往復動の折返し部では 前記噴霧機からの塗料の噴霧を停止しながら塗装を行う こ とを特徴とする請求項 1 に記載の塗装方法。
PCT/JP2005/009840 2004-06-01 2005-05-24 塗装方法 WO2005118156A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DE602005026520T DE602005026520D1 (de) 2004-06-01 2005-05-24 Malverfahren
JP2006514088A JP4261580B2 (ja) 2004-06-01 2005-05-24 塗装方法
CA002546852A CA2546852A1 (en) 2004-06-01 2005-05-24 Painting method
US10/581,297 US7691450B2 (en) 2004-06-01 2005-05-24 Painting method
EP05743473A EP1754544B1 (en) 2004-06-01 2005-05-24 Painting method

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2004-163602 2004-06-01
JP2004163602 2004-06-01

Publications (1)

Publication Number Publication Date
WO2005118156A1 true WO2005118156A1 (ja) 2005-12-15

Family

ID=35462770

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2005/009840 WO2005118156A1 (ja) 2004-06-01 2005-05-24 塗装方法

Country Status (7)

Country Link
US (1) US7691450B2 (ja)
EP (1) EP1754544B1 (ja)
JP (1) JP4261580B2 (ja)
CN (1) CN100548507C (ja)
CA (1) CA2546852A1 (ja)
DE (1) DE602005026520D1 (ja)
WO (1) WO2005118156A1 (ja)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8800745B2 (en) * 2008-05-09 2014-08-12 Caterpillar Inc. Modular manufacturing line including work tool having work tool spray nozzle and method of operation therefor
CN101387866B (zh) * 2008-09-08 2010-06-16 长江润发机械股份有限公司 清洗机自动节气系统
JP5143078B2 (ja) * 2009-04-24 2013-02-13 マツダ株式会社 複層塗膜形成方法
JP5922346B2 (ja) * 2011-06-22 2016-05-24 旭化成ホームズ株式会社 塗装方法
DE102013006868B4 (de) 2013-04-19 2016-06-23 Dürr Systems GmbH Lackierverfahren und Lackieranlage zum Lackieren eines Bauteils mit einer Charakterkante
DE102015015090A1 (de) * 2015-11-20 2017-05-24 Dürr Systems Ag Beschichtungsverfahren und entsprechende Beschichtungsanlage
CN106238285B (zh) * 2016-08-25 2019-12-27 中国电子科技集团公司第十研究所 散热齿类零件表面的复合涂漆方法
US10661307B2 (en) 2017-03-03 2020-05-26 Honda Motor Co., Ltd. Method and system for use in applying a coating material to a vehicle
DE102019111760A1 (de) * 2019-05-07 2020-11-12 Dürr Systems Ag Beschichtungsverfahren und entsprechende Beschichtungsanlage
CN110449328A (zh) * 2019-07-02 2019-11-15 佛山汉龙智能科技有限公司 一种用于汽车修补的机器人喷漆工艺
CN116532334A (zh) * 2023-04-14 2023-08-04 联德(广州)机械有限公司 铝型材喷涂工艺及喷涂生产线

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06262564A (ja) * 1993-03-15 1994-09-20 Toyota Motor Corp 塗装ロボットの教示方法
JPH08224539A (ja) * 1995-02-20 1996-09-03 Chugoku Marine Paints Ltd 一次防錆塗料塗膜が形成された大型構造物用鋼板および大型構造物用鋼板の一次防錆塗料の塗装方法
JPH0952067A (ja) * 1995-08-15 1997-02-25 Abb Ind Kk 車体の自動塗装方法
JP2003144990A (ja) * 2001-11-15 2003-05-20 Mazda Motor Corp 複数塗装機による塗装方法及びその装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004033640B4 (de) * 2003-07-18 2012-03-29 Abb As Farbauftragssystem

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06262564A (ja) * 1993-03-15 1994-09-20 Toyota Motor Corp 塗装ロボットの教示方法
JPH08224539A (ja) * 1995-02-20 1996-09-03 Chugoku Marine Paints Ltd 一次防錆塗料塗膜が形成された大型構造物用鋼板および大型構造物用鋼板の一次防錆塗料の塗装方法
JPH0952067A (ja) * 1995-08-15 1997-02-25 Abb Ind Kk 車体の自動塗装方法
JP2003144990A (ja) * 2001-11-15 2003-05-20 Mazda Motor Corp 複数塗装機による塗装方法及びその装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP1754544A4 *

Also Published As

Publication number Publication date
EP1754544A4 (en) 2008-11-19
US7691450B2 (en) 2010-04-06
CN100548507C (zh) 2009-10-14
EP1754544B1 (en) 2011-02-23
EP1754544A1 (en) 2007-02-21
DE602005026520D1 (de) 2011-04-07
JP4261580B2 (ja) 2009-04-30
JPWO2005118156A1 (ja) 2008-04-03
CA2546852A1 (en) 2005-12-15
CN1905953A (zh) 2007-01-31
US20070134430A1 (en) 2007-06-14

Similar Documents

Publication Publication Date Title
WO2005118156A1 (ja) 塗装方法
JP4291367B2 (ja) 塗装方法
CA2373804C (en) A method for coating a work object in two tones
CN104602825B (zh) 涂装方法
JP2007514532A (ja) スプレー塗装装置
JPH04100565A (ja) レシプロ塗装方法
JP5799888B2 (ja) ロボット塗装システム及びこれを用いた塗装方法
JP3313949B2 (ja) 車体の自動塗装方法
JP6580170B2 (ja) 管外面の塗装装置および塗装方法
JP4180955B2 (ja) 塗装方法
KR100754915B1 (ko) 도장 방법
JPH04100564A (ja) メタリック塗料の塗装方法
KR100754916B1 (ko) 도장 방법
US6703079B2 (en) Method for painting with a bell applicator
JPH0326380A (ja) 超厚膜塗装鋼板の製造方法
JP3796925B2 (ja) 自動車ボディの塗装方法
JP2001198502A (ja) 塗装装置およびこの塗装装置を用いた塗装方法
JP2001162211A (ja) 塗装方法
JPH02109B2 (ja)
JP2019198869A (ja) 管外面の塗装装置および塗装方法
JPH04166252A (ja) メタリック塗装方法
JP2000185250A (ja) 建材スプレー塗装方法

Legal Events

Date Code Title Description
WWE Wipo information: entry into national phase

Ref document number: 200580001852.1

Country of ref document: CN

AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KM KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NG NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SM SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2006514088

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 2546852

Country of ref document: CA

WWE Wipo information: entry into national phase

Ref document number: 2007134430

Country of ref document: US

Ref document number: 10581297

Country of ref document: US

WWE Wipo information: entry into national phase

Ref document number: 2005743473

Country of ref document: EP

WWE Wipo information: entry into national phase

Ref document number: 1020067016871

Country of ref document: KR

NENP Non-entry into the national phase

Ref country code: DE

WWW Wipo information: withdrawn in national office

Ref document number: DE

WWP Wipo information: published in national office

Ref document number: 2005743473

Country of ref document: EP

WWP Wipo information: published in national office

Ref document number: 10581297

Country of ref document: US