WO2005075121A1 - 冷間仕上げ継目無鋼管 - Google Patents
冷間仕上げ継目無鋼管 Download PDFInfo
- Publication number
- WO2005075121A1 WO2005075121A1 PCT/JP2005/001328 JP2005001328W WO2005075121A1 WO 2005075121 A1 WO2005075121 A1 WO 2005075121A1 JP 2005001328 W JP2005001328 W JP 2005001328W WO 2005075121 A1 WO2005075121 A1 WO 2005075121A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- steel pipe
- cold
- residual stress
- mpa
- seamless steel
- Prior art date
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
- C21D9/08—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor for tubular bodies or pipes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D3/00—Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts
- B21D3/02—Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts by rollers
- B21D3/04—Straightening or restoring form of metal rods, metal tubes, metal profiles, or specific articles made therefrom, whether or not in combination with sheet metal parts by rollers arranged on axes skew to the path of the work
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L9/00—Rigid pipes
- F16L9/02—Rigid pipes of metal
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y10—TECHNICAL SUBJECTS COVERED BY FORMER USPC
- Y10T—TECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
- Y10T428/00—Stock material or miscellaneous articles
- Y10T428/12—All metal or with adjacent metals
- Y10T428/12458—All metal or with adjacent metals having composition, density, or hardness gradient
Definitions
- the present invention relates to a cold-finished seamless steel pipe used for bearing parts such as bearing rings of bearings, and more specifically, reduces dimensional deformation due to residual strain generated during turning of the inner and outer surfaces of a steel pipe.
- the present invention relates to a cold-finished seamless steel pipe having excellent roundness and machinability in the final processing of bearing parts.
- seamless steel pipes that require high dimensional accuracy are formed by hot working such as the Mannesmann method or extrusion method, and then subjected to softening treatment such as spheroidizing annealing, and further, die drawing or drawing. Cold working of pilger rolling is performed, and the target outer diameter and wall thickness are accurately finished.
- the cold-finished seamless steel pipe is subjected to a softening treatment such as annealing and the like, and is subjected to a straightening treatment as a refining treatment in order to correct the bending of the steel pipe and to secure a perfect circular shape of the steel pipe cross section. It is inspected as a final steel tube product and then shipped. Straightening performed after cold working is performed to straighten the bow of the steel pipe that occurs after annealing and to correct the elliptical cross section. Generally, a multi-roll straightening machine or a two-roll straightening machine is used. Is used.
- the cold-finished seamless steel pipes that have been shipped are cut into rings, finished to predetermined dimensions by turning or polishing, and are often used as bearing parts for various machines.
- Application examples include bearing rings.
- a seamless steel pipe is annealed at 520-630 ° C in order to remove residual stress generated by straightening after hot pipe forming, and then is subjected to a two-roll air bend.
- a method for manufacturing a hot-finished seamless steel pipe that uses a type straightening machine, performs offset correction of 5 mm or less, and has a crash of 1.5 to 5 mm and has small dimensional deformation during turning. .
- the present invention has been made in view of the above-described conventional problems, and has been made in consideration of the cost of a bearing component.
- the present inventors have studied in detail the deformation that occurs when turning a seamless steel pipe as a bearing part and the deformation that occurs during quenching in order to solve the above problems! As a result, in order to effectively suppress these deformations, we focused on the residual stress generated by straightening after cold working and the particle size of spheroidized carbon that affects the deformation during quenching.
- the machinability of steel pipe can be improved by incorporating some residual stress.
- the cutting process can be advanced by the action of the strain remaining in the steel pipe, and at the same time, the discharge of the formed chips can be promoted. Thereby, the tool life can be extended and the machinability can be improved.
- the present invention has been completed based on the above findings, and includes the following cold-finished seamless steel pipes (1) and (2).
- the average particle size of the spherical carbide in the structure is 0.35 to 0.70 m. Further, it is desirable that the cold-finished seamless steel pipe be subjected to cold working by drawing in order to suppress variation in residual stress in the steel pipe.
- the residual stress generated by the straightening after the cold working is controlled, and if necessary, the spheroidized carbide is formed.
- bearing parts such as bearing rings with little deformation in final processing such as processing and heat treatment.
- FIG. 1 is a diagram showing a configuration of a 2-2-2-1 type opposed roll as a configuration example of a two-roll straightening machine.
- Fig. 2 is a diagram illustrating the procedure for collecting a test piece by the Crampton method, where (a) shows the location where a ring-shaped test piece is sampled from the axial direction of the steel pipe, and (b) and (c) The shape of the test piece before and after slit processing is shown.
- FIG. 3 is a diagram showing a heat pattern of the spherical annealing process employed in Example 2.
- the material steel of the bearing component is not particularly limited in component composition, but it is preferable to use a high carbon chromium bearing steel such as SUJ2 steel specified in JIS G4805. .
- the seamless steel pipe to which the present invention is applied is manufactured into a steel pipe having a predetermined size by a hot pipe manufacturing method such as the Mannesmann rolling method or the Eugene Sejournet extrusion method, and then subjected to spheroidizing annealing for the purpose of softening. Then, cold working such as cold drawing or cold rolling is performed. Further, after finishing to a target size by cold working, softening treatment is performed by annealing or the like, and bending correction is performed by a multi-roll straightener or a two-roll straightener.
- a hot pipe manufacturing method such as the Mannesmann rolling method or the Eugene Sejournet extrusion method
- FIG. 1 is a diagram showing a 2-2-2-1 type opposed roll as a configuration example of a two-roll straightening machine.
- the two-roll straightener shown in FIG. 1 has a structure in which the rolls 2 having mutually inclined axes are rotated in the same direction, and the steel pipe 1 is straightened while being rotated between the two rolls 2.
- the amount of crush (mm) and the amount of offset (mm) are appropriately selected as the straightening conditions.
- the multi-roll straightening machine is not shown in the figure, but has a configuration in which three or more straightening rolls are arranged in a staggered manner, and the straightening of the bent pipe is performed by adjusting only the offset amount (mm). Normally, when straightening is performed by a multi-roll or two-roll straightener, the bending of the product steel pipe is controlled to ImmZ 1000 mm or less.
- the method for measuring the residual stress of the steel pipe specified in the present invention is based on the Crampton method. According to this method, the circumferential residual stress of a thin-walled steel pipe can be accurately measured.
- Fig. 2 is a diagram for explaining a procedure for collecting a test piece by the Crampton method, in which (a) shows a place where a ring-shaped test piece is collected from the axial direction of a steel pipe, and (b) and ( c) shows the shape of the test piece before and after slit processing. Since the end of the straightened steel pipe 1 is easily deformed due to the influence of penetration into the straightening roll, avoid the end and, as shown in Fig. The ring-shaped test piece 1a is continuously cut into 4 to 10 pieces and collected. A slit 3 is formed by aligning the obtained test piece la in the circumferential direction and aligning the same in the axial direction of the steel pipe.
- the outer diameter D and the average thickness t of the test piece la before slitting are measured.
- the outer diameter D 'of the steel pipe of the test piece la at the position crossing the slit processing position by 90 ° was measured, and the residual stress F was calculated by the following equation (1). Is calculated.
- the symbols in the equation are Young's modulus E (MPa) and Poisson's ratio V.
- the measured residual stress F is 30 MPa or more and the variation thereof is 30 MPa or less.
- the reason why the residual stress F inherent in the steel pipe is set to 30 MPa or more is to ensure stable residual strain and ensure machinability as a bearing steel pipe.
- the residual stress F is set to 30 MPa or more, and the machinability is improved by the action of internal strain, and the tool life is extended.
- the average particle size of the spherical carbide in the structure is 0.35 to 0.70 m.
- the average particle size of the spherical carbide is determined as necessary.
- any of drawing and cold rolling can be applied as a cold working method in cold finishing.
- the opening angle of the hole die used is preferably set to 20 to 25 °. This is because when a hole die that also deviates from this opening angle force is used, large variations in residual stress may occur.
- a raw pipe for cold working having an outer diameter of 38 to 110 mm and a wall thickness of 3.1 to 6 mm was formed. Cooled in the air. After performing spheroidizing annealing on each obtained tube, descaling treatment and surface treatment by pickling are performed by a usual method, and then cold drawing is performed according to a processing schedule shown in Table 2 to obtain an outer diameter of 30 mm.
- a cold-finished steel pipe with a thickness of 100 mm and a wall thickness of 2.5-5 mm was manufactured. The processing rate at this time was 25-36%.
- Example 1 After the cold working, soft bending annealing was performed to correct the bending, and then the steel pipe properties were inspected.
- the conditions of the soft annealing were soaking temperature of 680 ° C. and holding time of 20 minutes.
- a 2-2-2-1 opposed-type roll straightening machine was used, and the amount of crush and the amount of offset were adjusted for each test tube. Table 3 shows the straightening setup.
- Table 3 shows the maximum value, the minimum value of the residual stress F, the variation that is the difference between the maximum value and the minimum value, and the average particle size of the spherical carbide.
- the steel pipe cut into a ring shape was subjected to 0.2-0.3mm internal and external cutting, and the roundness was measured. After that, it was heated at 830 ° C for 30 minutes to perform oil quenching, and the roundness was measured. The roundness was measured by the maximum outer diameter minus the minimum outer diameter (mm).
- FIG. 3 is a diagram showing a heat pattern of the spherical annealing process employed in Example 2.
- the spheroidizing annealing pattern is as follows: After heating and holding at 780-820 ° C, the first spheroidizing process of cooling at a rate of 50-200 ° C Zhr to a temperature lower than Ar is performed, and then the temperature exceeds Ac and Ac + 40 ° C After heating to the following temperature, it is repeated at least 50 times at a temperature of 50-200 ° C Zhr to a temperature of not more than Ar.
- a raw tube for cold working having an outer diameter of 95mm and a wall thickness of 6mm was made using a Mannes mandrel mill, and after the hot pipe making, it was allowed to cool in the atmosphere. After subjecting each of the obtained tubes to spherical annealing with a controlled pattern, descaling treatment and surface treatment by pickling are performed in the usual manner, and then cold drawing is performed with a kanemper degree of 25%. A cold-finished steel pipe with an outer diameter of 85 mm and a wall thickness of 5 mm was finished. As in the case of Example 1, a taper die and a cylindrical plug were used, and the die opening angle was 25 °.
- the conditions of the soft annealing were soaking temperature of 680 ° C and holding time of 20 minutes.
- the residual stress F and the spheroidized carbide were obtained under the same conditions as in Example 1.
- the average particle size was measured.
- the steel pipe cut into a ring was machined 0.2-0.3 mm inside and outside, and the roundness was measured. Then, heat at 830 ° C for 30 minutes to perform oil quenching, and measure roundness. Specified.
- Table 4 shows the drawing processing schedule, straightening setup, and the measurement results of the residual stress F, the average particle diameter of the spheroidized carbide, and the roundness.
- the residual stress generated by the straightening after the cold working is controlled, and the residual stress F measured by the Crampton method is 30 MPa or more, and Variation should be 30MPa or less.
- the average particle size of the spheroidized carbide precise roundness and precision can be improved in the final machining of bearing parts, where dimensional deformation due to residual strain generated during turning of the inner and outer surfaces of the steel pipe is small. Excellent machinability can be ensured. This not only contributes to cost reduction of bearing parts, but also provides bearing parts with high dimensional accuracy and little deformation in final machining such as turning and heat treatment. Widely applicable as steel pipe.
Abstract
Description
Claims
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP05709491A EP1712306B1 (en) | 2004-02-05 | 2005-01-31 | Cold-finished seamless steel pipe |
BRPI0507469-0A BRPI0507469A (pt) | 2004-02-05 | 2005-01-31 | tubos de aço sem costura acabados a frio |
AT05709491T ATE526095T1 (de) | 2004-02-05 | 2005-01-31 | Kalt bearbeitetes nahtloses stahlrohr |
JP2005517663A JP4453657B2 (ja) | 2004-02-05 | 2005-01-31 | 冷間仕上げ継目無鋼管 |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2004-029520 | 2004-02-05 | ||
JP2004029520 | 2004-02-05 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2005075121A1 true WO2005075121A1 (ja) | 2005-08-18 |
Family
ID=34835954
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2005/001328 WO2005075121A1 (ja) | 2004-02-05 | 2005-01-31 | 冷間仕上げ継目無鋼管 |
Country Status (9)
Country | Link |
---|---|
US (1) | US7371293B2 (ja) |
EP (1) | EP1712306B1 (ja) |
JP (1) | JP4453657B2 (ja) |
KR (1) | KR100835056B1 (ja) |
CN (1) | CN100460100C (ja) |
AR (1) | AR048214A1 (ja) |
AT (1) | ATE526095T1 (ja) |
BR (1) | BRPI0507469A (ja) |
WO (1) | WO2005075121A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5621012B1 (ja) * | 2013-05-22 | 2014-11-05 | 陳邱生 | ベルジャー式球化アニーリング連続熱処理炉の構造 |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008173643A (ja) * | 2007-01-16 | 2008-07-31 | Sumitomo Metal Ind Ltd | 二相ステンレス鋼管の製造方法、矯正方法および強度調整方法、ならびに、二相ステンレス鋼管の矯正機の操業方法 |
EP2145705B1 (en) | 2007-03-14 | 2016-08-24 | Shinko Metal Products Co., Ltd. | Seamless steel pipe and hollow spring utilizing the seamless steel pipe |
CN101827665B (zh) * | 2007-10-17 | 2012-07-04 | 住友金属工业株式会社 | 内表面带筋钢管的制造方法以及内表面带筋钢管 |
CN102844128B (zh) * | 2010-03-29 | 2015-03-25 | 新日铁住金株式会社 | 管的矫正方法和矫正用辊 |
CA2802171C (en) * | 2010-06-28 | 2015-11-24 | Nippon Steel & Sumitomo Metal Corporation | Heat transfer tube for steam generator and method for producing the same |
CN102154599B (zh) * | 2011-03-17 | 2012-10-10 | 北京科技大学 | 一种白铜合金管材短流程高效生产方法 |
CN102494195A (zh) * | 2011-12-15 | 2012-06-13 | 武汉钢铁(集团)公司 | 一种钢结构管道及其制备和评价的方法 |
JP5304915B2 (ja) | 2012-03-09 | 2013-10-02 | 新日鐵住金株式会社 | 金属管の製造方法及び製造設備 |
DE102012108643A1 (de) * | 2012-09-14 | 2014-03-20 | Sandvik Materials Technology Deutschland Gmbh | Pilgerwalzstraße |
TWI571607B (zh) * | 2013-04-18 | 2017-02-21 | qiu-sheng Chen | The structure of the continuous heat treatment furnace for bell - type ball annealing |
CN103231215A (zh) * | 2013-05-07 | 2013-08-07 | 莱芜钢铁集团有限公司 | 一种连铸设备中的回转轴及其制作方法 |
EP3088553A4 (en) * | 2014-02-04 | 2017-08-23 | Nippon Steel & Sumitomo Metal Corporation | Steel pipe |
CN104551226A (zh) * | 2014-12-26 | 2015-04-29 | 内蒙古包钢钢联股份有限公司 | 一种测试无缝管轴向残余应力的切割方法 |
CN104568232A (zh) * | 2014-12-26 | 2015-04-29 | 内蒙古包钢钢联股份有限公司 | 一种棒材纵向残余应力检测方法 |
CN109425655B (zh) * | 2017-08-24 | 2021-11-02 | 重庆钢铁研究所有限公司 | 一种金属管渐进式进料精矫方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10137850A (ja) * | 1996-11-08 | 1998-05-26 | Sanyo Special Steel Co Ltd | 継目無鋼管の低残留歪み矯正方法 |
JP2001329316A (ja) * | 2000-05-22 | 2001-11-27 | Sanyo Special Steel Co Ltd | 残留応力の少ない継目無鋼管の製造方法 |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH04371521A (ja) * | 1991-06-18 | 1992-12-24 | Sumitomo Metal Ind Ltd | 軸受用鋼管の製造方法 |
JPH10140238A (ja) * | 1996-11-12 | 1998-05-26 | Sumitomo Metal Ind Ltd | 高強度高靭性エアーバッグ用鋼管の製造方法 |
CN2384699Y (zh) * | 1999-07-16 | 2000-06-28 | 浙江健力钢管有限公司 | 冷拔(冷轧)轴承钢无缝钢管 |
JP2001269713A (ja) * | 2000-03-27 | 2001-10-02 | Nisshin Steel Co Ltd | ステンレス鋼溶接管及びその製造方法 |
JP4067768B2 (ja) * | 2001-01-10 | 2008-03-26 | 山陽特殊製鋼株式会社 | 継目無鋼管の2ロールにおける低残留歪矯正方法 |
-
2005
- 2005-01-07 AR ARP050100054A patent/AR048214A1/es active IP Right Grant
- 2005-01-24 US US11/039,954 patent/US7371293B2/en active Active
- 2005-01-31 AT AT05709491T patent/ATE526095T1/de not_active IP Right Cessation
- 2005-01-31 WO PCT/JP2005/001328 patent/WO2005075121A1/ja active Application Filing
- 2005-01-31 EP EP05709491A patent/EP1712306B1/en active Active
- 2005-01-31 JP JP2005517663A patent/JP4453657B2/ja active Active
- 2005-01-31 KR KR1020067015560A patent/KR100835056B1/ko active IP Right Grant
- 2005-01-31 BR BRPI0507469-0A patent/BRPI0507469A/pt not_active Application Discontinuation
- 2005-01-31 CN CNB2005800039890A patent/CN100460100C/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10137850A (ja) * | 1996-11-08 | 1998-05-26 | Sanyo Special Steel Co Ltd | 継目無鋼管の低残留歪み矯正方法 |
JP2001329316A (ja) * | 2000-05-22 | 2001-11-27 | Sanyo Special Steel Co Ltd | 残留応力の少ない継目無鋼管の製造方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5621012B1 (ja) * | 2013-05-22 | 2014-11-05 | 陳邱生 | ベルジャー式球化アニーリング連続熱処理炉の構造 |
Also Published As
Publication number | Publication date |
---|---|
CN100460100C (zh) | 2009-02-11 |
KR20060127118A (ko) | 2006-12-11 |
JP4453657B2 (ja) | 2010-04-21 |
EP1712306A1 (en) | 2006-10-18 |
US7371293B2 (en) | 2008-05-13 |
ATE526095T1 (de) | 2011-10-15 |
KR100835056B1 (ko) | 2008-06-03 |
EP1712306B1 (en) | 2011-09-28 |
US20050191509A1 (en) | 2005-09-01 |
AR048214A1 (es) | 2006-04-12 |
JPWO2005075121A1 (ja) | 2007-10-11 |
EP1712306A4 (en) | 2008-11-12 |
BRPI0507469A (pt) | 2007-07-10 |
CN1913985A (zh) | 2007-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2005075121A1 (ja) | 冷間仕上げ継目無鋼管 | |
US7201812B2 (en) | Method for manufacturing seamless steel tube | |
US7393420B2 (en) | Steel tube for bearing element parts and method of manufacturing as well as machining the same | |
CN107931331B (zh) | 一种高精度二辊冷轧无缝钢管的生产方法 | |
EP2140950B1 (en) | Method for manufacturing a cold-finished seamless steel pipe for integrally molded drive shaft | |
EP1595609B1 (en) | Seamless steel tube for drive shaft and method of manufacturing the same | |
CN110052792B (zh) | 一种液压缸用缸筒的制造方法 | |
US20230151474A1 (en) | Metal rings formed from beryllium-copper alloys | |
CN113600637A (zh) | 一种无缝钢管及其制备方法 | |
US8065901B2 (en) | Mandrel bar for high-alloy rolling, method for surface treating a mandrel bar, method for producing mandrel bar, and method for operating seamless pipe mill | |
CN112238143B (zh) | 基于锻造辊的热管辊及其制造方法 | |
JPH04172113A (ja) | 冷間管圧延機用孔型ロール及びその製造方法 | |
JPH11257357A (ja) | 転がり軸受の軌道輪 | |
JP5020689B2 (ja) | 切削性に優れた機械構造用鋼管 | |
JPH11347673A (ja) | 転がり軸受及びその製造方法 | |
JPH03285041A (ja) | 冷間転造に適した軸受レース用鋼管 | |
WO1999066092A1 (fr) | Materiau pour coussinet destine a un profilage par laminage a froid et son element de profilage | |
JPH0810826A (ja) | 軸受用合金鋼冷間引抜加工線材の製造方法 | |
JPH09276907A (ja) | オーステナイト系ステンレス継目無鋼管の製造方法 | |
JP2001137913A (ja) | 高炭素継目無鋼管の製造方法 | |
JP2002086210A (ja) | 引抜き加工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A1 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A1 Designated state(s): GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 2005517663 Country of ref document: JP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1020067015560 Country of ref document: KR |
|
WWE | Wipo information: entry into national phase |
Ref document number: 200580003989.0 Country of ref document: CN |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2005709491 Country of ref document: EP |
|
WWP | Wipo information: published in national office |
Ref document number: 2005709491 Country of ref document: EP |
|
WWP | Wipo information: published in national office |
Ref document number: 1020067015560 Country of ref document: KR |
|
ENP | Entry into the national phase |
Ref document number: PI0507469 Country of ref document: BR |