교량 부모멘트 발생부분의 보강공법 및 그 구조 Download PDFInfo
- Publication number
- KR20030014003A KR20030014003A KR1020010048317A KR20010048317A KR20030014003A KR 20030014003 A KR20030014003 A KR 20030014003A KR 1020010048317 A KR1020010048317 A KR 1020010048317A KR 20010048317 A KR20010048317 A KR 20010048317A KR 20030014003 A KR20030014003 A KR 20030014003A
- Authority
- KR
- South Korea
- Prior art keywords
- concrete
- bridge
- slab
- reinforcing
- fastening member
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
- E01D19/125—Grating or flooring for bridges
Abstract
Description
Claims (5)
- 교량을 연속화하기 위해 교량빔과 교량빔이 위치하는 상판에 소정 넓이와 깊이의 홈을 구비한 후 그 홈에 철근을 방사형태로 배근한 다음 콘크리트를 타설하여 양생시키는 슬래브 공법에 있어서,교량 상판이 연결되는 부분의 슬래브 윗면을 소정 깊이를 갖도록 치핑하는 단계와;치핑된 슬래브에 다수의 앵커홈(6)을 설치하는 단계와;앵커홈(6)이 형성된 슬래브의 표면에 에어콤프레셔를 이용하여 먼지를 제거하는 단계와;먼지가 제거된 앵커홈(6)에 앵커볼트(7)를 설치하고 에폭시를 주입하여 고정하는 단계와;차량 이동방향으로 앵커 볼트(7)에 걸어 철근(8)과 용융점이 낮은 코팅재가 피복된 체결부재(10)를 섞어서 배근하는 단계와;철근(8) 및 체결부재(10)와 교차하는 방향으로 철근(9)을 배근하는 단계와;에어콤프레셔를 이용하여 슬래브 표면의 먼지를 제거하는 단계와;신구콘크리트를 접착하기 위하여 접착제를 치핑된 슬래브(20) 표면에 도포하는 단계와;체결부재(10)에 열을 가할수 있는 소정의 공간부(19)를 두고 콘크리트를 타설하는 단계와;건조된 콘크리트의 양측으로 노출된 체결부재(10)에 전기를 인가시켜 가열시키는 단계와;팽창된 체결부재(10)를 조여 콘크리트에 정착시키는 단계와;전기를 분리시켜 체결부재(10)를 냉각 수축시키는 단계와;공간부(19)에 폴리머 콘크리트나 에폭시계 콘크리트 중 어느 하나가 타설되는 단계로 이루어진 것을 특징으로 하는 교량 부모멘트 발생부분의 보강공법.
- 교량 상판에서 소정의 넓이와 깊이로 치핑된 슬래브에 구비된 앵커홈(6)과,다수의 앵커홈(6)에 삽입된 앵커볼트(7)와;앵커볼트에 걸어서 차량 이동방향으로 배근된 철근(8) 및 용융점이 낮은 코팅재가 피복된 체결부재(10)와;철근(8) 및 체결부재(10)와 교차되게 배근한 횡방향 철근과;신구 콘크리트를 접착하기 위하여 치핑된 슬래브(20) 표면에 도포된 접착제(11)와;콘크리트를 타설하여 건조된 콘크리트(12)와;콘크리트(12)의 가장자리에 폴리머 콘크리트나 에폭시계 콘크리트 중 어느 하나가 타설된 것을 특징으로 하는 교량 부모멘트 발생부분의 보강구조.
- 제2항에 있어서, 상기 체결부재(10)는 소정의 길이를 가지며 체결부재 보다 용융점이 낮은 코팅재가 소정의 두께로 피복된 강봉(14)과;강봉(14)의 양단에 구비된 나사부(15)(16)와;상기 나사부(15)(16)에 결합되는 너트(17)(18)로 구성된 것을 특징으로 하는 교량 부모멘트 발생부분의 보강구조.
- 제2항 또는 제3항에 있어서, 상기 코팅재는 동이나 황동중 어느 하나 인 것을 특징으로 하는 교량 부모멘트 발생부분의 보강구조.
- 제2항 또는 제3항에 있어서, 상기 코팅재는 합성수지 인 것을 특징으로 하는 교량 부모멘트 발생부분의 보강구조.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0048317A KR100440621B1 (ko) | 2001-08-10 | 2001-08-10 | 교량 부모멘트 발생부분의 보강공법 및 그 구조 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR10-2001-0048317A KR100440621B1 (ko) | 2001-08-10 | 2001-08-10 | 교량 부모멘트 발생부분의 보강공법 및 그 구조 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20030014003A true KR20030014003A (ko) | 2003-02-15 |
KR100440621B1 KR100440621B1 (ko) | 2004-07-15 |
Family
ID=27718711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR10-2001-0048317A KR100440621B1 (ko) | 2001-08-10 | 2001-08-10 | 교량 부모멘트 발생부분의 보강공법 및 그 구조 |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100440621B1 (ko) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101134537B1 (ko) * | 2011-06-10 | 2012-04-13 | (주)연우지앤비 | 교량슬래브의 균열방지구조 |
CN108755333A (zh) * | 2018-05-24 | 2018-11-06 | 郑州工业应用技术学院 | 一种道路桥梁裂缝修补装置及修补方法 |
KR101934874B1 (ko) * | 2018-03-27 | 2019-03-18 | 주식회사 씨알디 | 초고강도 섬유보강 콘크리트 데크플레이트 및 이를 이용한 시공방법 |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR102585929B1 (ko) * | 2023-06-22 | 2023-10-06 | (주)리빌텍이엔씨 | 교량구조물의 부모멘트를 보강하는 방법 및 장치 |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CS265399B1 (en) * | 1987-09-21 | 1989-10-13 | Jaroslav Cihal | Dilatation bridge closing device and method for producing thereof |
JPH02308051A (ja) * | 1989-05-24 | 1990-12-21 | Chiyoda Koutetsu Kogyo Kk | 樹脂被覆せん断補強鉄筋 |
US5024554A (en) * | 1990-02-22 | 1991-06-18 | Koch Materials Company | Bridge joint construction |
JPH0742751B2 (ja) * | 1990-06-27 | 1995-05-10 | 黒沢建設株式会社 | コンクリート製プレキャスト版及び該プレキャスト版を用いた合成スラブ |
US5649784A (en) * | 1995-06-16 | 1997-07-22 | Pavetech International, Inc. | Expansion joint system and method of making |
KR100237194B1 (ko) * | 1997-02-03 | 2000-01-15 | 이도형 | 에폭시를 연결부에 사용한 조립식 교량 상판 공법 |
JPH10298908A (ja) * | 1997-04-24 | 1998-11-10 | Tonen Corp | 橋梁伸縮連結装置 |
KR100279124B1 (ko) * | 1998-12-30 | 2001-01-15 | 유성용 | 일체식 교대 교량의 변위 허용을 위한 채움 조인트 시공방법 |
KR19990045825A (ko) * | 1999-01-21 | 1999-06-25 | 구민세 | 피.에스.씨교량의성능개선을위한연속화보수공법 |
KR100403076B1 (ko) * | 1999-07-15 | 2003-10-30 | 주식회사 리폼시스템 | 시트부재를 이용한 콘크리트구조물의 보수/보강공법과 그 시트부재 |
JP3586829B2 (ja) * | 1999-12-10 | 2004-11-10 | 真佐子 中村 | 高架橋の目地部の補修施工工法 |
KR20020017114A (ko) * | 2000-08-28 | 2002-03-07 | 김상효 | 가지점과 온도응력을 이용하여 제작된 연속 강합성형교 및그의 시공방법 |
KR100398021B1 (ko) * | 2000-11-15 | 2003-09-19 | 박은진 | 형강이 매설된 프리스트레스트 콘크리트슬래브 및 이를이용한 단. 다경간 교량가설공법 |
KR100395993B1 (ko) * | 2000-11-28 | 2003-08-25 | 김상효 | 온도프리스트레싱을 이용한 교량의 보강공법 |
KR100388848B1 (ko) * | 2001-05-02 | 2003-06-25 | 김연호 | 프리스트레스를 도입한 보의 조합을 통한 연속합성보구조물 및 시공방법 |
-
2001
- 2001-08-10 KR KR10-2001-0048317A patent/KR100440621B1/ko active IP Right Grant
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101134537B1 (ko) * | 2011-06-10 | 2012-04-13 | (주)연우지앤비 | 교량슬래브의 균열방지구조 |
KR101934874B1 (ko) * | 2018-03-27 | 2019-03-18 | 주식회사 씨알디 | 초고강도 섬유보강 콘크리트 데크플레이트 및 이를 이용한 시공방법 |
CN108755333A (zh) * | 2018-05-24 | 2018-11-06 | 郑州工业应用技术学院 | 一种道路桥梁裂缝修补装置及修补方法 |
CN108755333B (zh) * | 2018-05-24 | 2020-11-13 | 郑州工业应用技术学院 | 一种道路桥梁裂缝修补装置及修补方法 |
Also Published As
Publication number | Publication date |
---|---|
KR100440621B1 (ko) | 2004-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100837608B1 (ko) | 교각 코핑상면에 블럭아웃을 실시하여 매립한 중공형 철제파이프와 일체로 형성하여 지지력을 갖는 고장력 강봉과조립식 철제 브라켓을 이용한 교량 슬라브 인상공법 | |
KR102009134B1 (ko) | 장경간 거더교의 시공방법 | |
JP3867149B2 (ja) | 橋梁の鋼床版構造および鋼床版補強工法 | |
WO2010021428A1 (en) | Opening steel composite girder and method for manufacturing the same | |
KR100622935B1 (ko) | 수평 증축 접합구조 및 이를 이용한 접합공법 | |
US6149067A (en) | Precast reinforced concrete railway crossing slab | |
KR100440621B1 (ko) | 교량 부모멘트 발생부분의 보강공법 및 그 구조 | |
JP4137287B2 (ja) | 高耐久性構造埋設型枠工法 | |
JP2005090115A (ja) | 小梁による既設床版の補強工法 | |
JP2528432B2 (ja) | 中空pc鋼棒を使用したコンクリ―ト構造物の補強方法 | |
JPH04285247A (ja) | プレストレス導入部材およびプレストレス導入方法 | |
KR100949584B1 (ko) | 교량의 상부구조물용 프리캐스트 콘크리트 부재 및 이를이용한 시공방법 | |
KR20000007940A (ko) | 교량상부구조의 연속화공법 | |
JPH08218326A (ja) | 高架橋床板の補強方法 | |
JP2007169950A (ja) | 橋梁用伸縮体とそれを用いた橋梁伸縮構造 | |
JP7186670B2 (ja) | コンクリート床版の補修方法 | |
KR100440802B1 (ko) | 온도프리스트레싱 보강재 접합방식을 이용한 교량의보강공법 | |
KR200268159Y1 (ko) | 콘크리트 구조물 보강용 외부강선 정착장치 | |
KR200241299Y1 (ko) | 콘크리트구조물의 외부강선 보강용 정착장치 | |
JP2001164504A (ja) | 高架橋の目地部の補修施工工法 | |
JP2528435B2 (ja) | 平行に架設した桁材を有する構造物におけるプレストレス導入補強構造 | |
CN113789732A (zh) | 空心板梁抗剪加固方法及空心板梁抗剪加固装置 | |
JP2002332645A (ja) | 地上走行クレ−ンレ−ルの基礎構造および基礎の敷設方法 | |
KR100435099B1 (ko) | 부모멘트로 손상된 교량 상판 패널보강공법 | |
KR100414261B1 (ko) | 콘크리트구조물의 외부강선 보강공법 및 정착장치 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130628 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20140707 Year of fee payment: 11 |
|
FPAY | Annual fee payment |
Payment date: 20150706 Year of fee payment: 12 |
|
FPAY | Annual fee payment |
Payment date: 20160704 Year of fee payment: 13 |
|
FPAY | Annual fee payment |
Payment date: 20170703 Year of fee payment: 14 |
|
FPAY | Annual fee payment |
Payment date: 20180704 Year of fee payment: 15 |
|
FPAY | Annual fee payment |
Payment date: 20190703 Year of fee payment: 16 |