JPS60135165A - 分散型スケジュール方法 - Google Patents
分散型スケジュール方法Info
- Publication number
- JPS60135165A JPS60135165A JP58243865A JP24386583A JPS60135165A JP S60135165 A JPS60135165 A JP S60135165A JP 58243865 A JP58243865 A JP 58243865A JP 24386583 A JP24386583 A JP 24386583A JP S60135165 A JPS60135165 A JP S60135165A
- Authority
- JP
- Japan
- Prior art keywords
- work
- instruction device
- station
- work instruction
- speed monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi-Process Working Machines And Systems (AREA)
- General Factory Administration (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58243865A JPS60135165A (ja) | 1983-12-26 | 1983-12-26 | 分散型スケジュール方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58243865A JPS60135165A (ja) | 1983-12-26 | 1983-12-26 | 分散型スケジュール方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS60135165A true JPS60135165A (ja) | 1985-07-18 |
| JPH028860B2 JPH028860B2 (enExample) | 1990-02-27 |
Family
ID=17110121
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP58243865A Granted JPS60135165A (ja) | 1983-12-26 | 1983-12-26 | 分散型スケジュール方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60135165A (enExample) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS60233763A (ja) * | 1984-05-04 | 1985-11-20 | Asics Corp | 生産工程のライン・バランス管理システム |
| JPS6226510A (ja) * | 1985-07-26 | 1987-02-04 | Mitsubishi Electric Corp | 工程計画情報処理装置 |
| JPS63144939A (ja) * | 1986-12-09 | 1988-06-17 | Toyota Motor Corp | 生産管理方法 |
| JPH05314143A (ja) * | 1991-09-27 | 1993-11-26 | Fujitsu Ltd | バッチプラントにおける製品生産計画方式 |
-
1983
- 1983-12-26 JP JP58243865A patent/JPS60135165A/ja active Granted
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS60233763A (ja) * | 1984-05-04 | 1985-11-20 | Asics Corp | 生産工程のライン・バランス管理システム |
| JPS6226510A (ja) * | 1985-07-26 | 1987-02-04 | Mitsubishi Electric Corp | 工程計画情報処理装置 |
| JPS63144939A (ja) * | 1986-12-09 | 1988-06-17 | Toyota Motor Corp | 生産管理方法 |
| JPH05314143A (ja) * | 1991-09-27 | 1993-11-26 | Fujitsu Ltd | バッチプラントにおける製品生産計画方式 |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH028860B2 (enExample) | 1990-02-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPS5981049A (ja) | 生産処理システムにおける生産処理方法 | |
| KR19980042903A (ko) | 설비 그룹의 버퍼 용량을 고려하여 설비 그룹의 각 설비의 작업개시를 제어할 수 있는 생산 제어 장치 | |
| CN104794552B (zh) | 维修服务实时监视系统 | |
| EP0384497A2 (en) | Machine tool controlling system for use with a distributed system | |
| CN111489050A (zh) | 一种维修任务分配方法、系统、装置及存储介质 | |
| Panwalkar | Scheduling of a two-machine flowshop with travel time between machines | |
| JP2005502122A (ja) | ソフトウェア・キューイング・アプリケーションを監視するためのシステムおよび方法 | |
| CN109167681A (zh) | 状态监控方法及装置 | |
| CN105930203A (zh) | 一种控制消息分发的方法及装置 | |
| US8761190B2 (en) | Message loss prevention by using sender and receiver buffers in event-triggered distributed embedded real-time systems | |
| JPH0432951A (ja) | 問合せ応答型情報サービスシステム | |
| CN113965432B (zh) | 一种双通道can总线通信的控制系统 | |
| JPS6020845A (ja) | 分散処理システムを用いたジョブショップスケジューリング方法 | |
| WO2023158871A1 (en) | Method to identify and prioritize a bottleneck in a process | |
| CN104021499A (zh) | 半导体制造控制方法 | |
| JPH028860B2 (enExample) | ||
| JPH05314143A (ja) | バッチプラントにおける製品生産計画方式 | |
| CN114372687A (zh) | 一种故障处理的指挥调度方法、装置、设备及产品 | |
| JPH0816206A (ja) | 着工順序決定方法及び装置 | |
| CN108181885A (zh) | 一种自动化控制方法 | |
| JPH07129672A (ja) | 生産制御装置 | |
| TWI814362B (zh) | 產線料件的運輸排程系統與方法 | |
| JPH082648A (ja) | 物流オンライン制御方法とそのシステム、及び、かかるシステムに使用する物流量予測制御シミュレーション装置 | |
| CN115390529B (zh) | 一种基于单元级cps的模拟智能设备 | |
| JPS5945503A (ja) | 作業指示方式 |